Work management system, work management method, program, and manufacturing system
The work management system optimizes supply operations by calculating efficient timings and reducing overlap between workers and robots, addressing movement restrictions caused by obstacles in production lines.
Patent Information
- Application Number
- JP2023081073
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-16
- Publication Date
- 2024-11-28
AI Technical Summary
Existing systems face inefficiencies due to restrictions on the movement and stopping of transfer robots caused by obstacles in production lines, which hinder optimal work performance.
A work management system that includes an acquisition unit to gather component data, a setting unit to designate workers and transfer robots as targets, and a generation unit to calculate and generate work instruction information, ensuring efficient supply timing and reducing overlap in operations.
The system reduces the likelihood of robots detecting workers as obstacles, thereby minimizing restrictions on movement and enhancing overall work efficiency by optimizing the supply operations of both workers and robots.
Smart Images

Figure 2024165159000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure generally relates to a work management system, a work management method, a program, and a manufacturing system, and more particularly to a work management system, a work management method, a program, and a manufacturing system for supplying components to a mounting line. [Background technology]
[0002] There is a known system that uses a transport robot to perform a supply operation for a production line (mounting line) that is made up of multiple production devices (e.g., mounting devices). The transport robot is stopped and its movement is regulated by sensors, etc., to prevent collisions with obstacles.
[0003] Patent Document 1 describes a production system that can reduce interference areas by gradually changing the movement restriction ranges of multiple transfer robots. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] International Publication No. 2022 / 118380 Summary of the Invention [Problem to be solved by the invention]
[0005] Incidentally, in order to increase the work efficiency of the transport robot, it is desirable to reduce the number of obstacles that cause the robot to stop or restrict its movement.
[0006] The present disclosure has been made in consideration of the above-mentioned problems, and aims to provide a work management system, a work management method, a program, and a manufacturing system that are capable of executing work efficiently. [Means for solving the problem]
[0007] A work management system according to an aspect of the present disclosure includes an acquisition unit, a setting unit, and a generation unit. The acquisition unit acquires component data related to components to be mounted on production targets in a mounting line, and a capacity of the components that can be accommodated in the mounting line. The setting unit sets at least one of a worker and a transport robot as targets for performing a task of supplying the components to the mounting line based on the component data and the capacity of the components. The generation unit generates work instruction information that instructs the target for performing the supply task to supply the components. The generation unit calculates a timing for supplying the components based on the component data and the capacity of the components, and creates the work instruction information for the target for performing the supply task, including a time for supplying the components, based on the supply timing.
[0008] A work management method according to an aspect of the present disclosure is executed by one or more processors and used in a work management system. The work management method acquires component data related to components to be mounted on a production target in a mounting line and a capacity of the components that can be accommodated in the mounting line. The work management method sets at least one of a worker and a transport robot as targets for performing a work of supplying the components to the mounting line based on the component data and the capacity of the components. The work management method calculates a supply timing of the components based on the component data and the capacity of the components. The work management method creates supply instruction information for a target for performing the supply work based on the supply timing, the supply instruction information instructing a target for performing the supply work to supply the components, the supply instruction information including a supply time of the components.
[0009] A program according to one aspect of the present disclosure is a program for causing one or more processors to execute the work management method.
[0010] A manufacturing system according to one aspect of the present disclosure includes the work management system and a transport robot that performs the supply work of the parts. Effect of the Invention
[0011] According to the present disclosure, work can be carried out efficiently. [Brief description of the drawings]
[0012] [Figure 1] FIG. 1 is a block diagram showing a configuration of a management device serving as a work management system according to an embodiment. [Diagram 2] FIG. 2 is a system diagram showing a configuration of a manufacturing system including the above-mentioned work management system. [Diagram 3] FIG. 3 is a diagram showing the work schedules of the worker u1 and the transport robot 20 for a given period of time. [Figure 4] FIG. 4 is a diagram showing an example of work instruction information generated by the work management system according to the embodiment. [Diagram 5] FIG. 5 is a diagram showing another example of the work instruction information generated by the work management system according to the embodiment of the present invention. [Figure 6] FIG. 6 is a flow chart showing the operation of the work management system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] The embodiments and modifications described below are merely examples of the present disclosure, and the present disclosure is not limited to the embodiments and modifications. Various modifications other than the following embodiments and modifications are possible according to the design, etc., as long as they do not deviate from the technical idea of the present disclosure.
[0014] (Embodiment) Hereinafter, a work management system 1 according to this embodiment will be described with reference to FIGS.
[0015] (1) Overview A management device 30 serving as a work management system 1 of this embodiment is used in a manufacturing system 2 including a mounting line 10 for mounting components on a board (see FIG. 2).
[0016] The manufacturing system 2 includes one or more manufacturing devices 11 used in a mounting line 10 (see FIG. 2), a transport robot 20, and a management device 30 (work management system 1). Here, the manufacturing system 2 includes one or more manufacturing devices 11 that perform predetermined operations on substrates, and one or more functional modules that provide predetermined functions to the manufacturing devices 11. The one or more functional modules are objects to be transported to the one or more manufacturing devices 11 by at least one of the transport robot 20 and a worker u1. The transport robot 20 and the worker u1 transport the objects to the manufacturing devices 11, which are the destinations, based on a schedule managed by the management device 30.
[0017] The "predetermined work" performed by one or more manufacturing devices 11 is work performed on a board. In the following embodiment, the predetermined work is described as an example of work performed on a board in a mounting line 10 where components are mounted on the board, but the predetermined work is not limited to work performed on a board in the mounting line 10, and may include work performed on a board in at least one of various processes such as a process of manufacturing the board itself, a process of mounting components on the board, and a process of inspecting the board. In other words, the manufacturing system 2 is not limited to being applied to the mounting line 10 of the board, but may be applied to at least one of each process of manufacturing the board. The predetermined work includes, for example, at least one of a printing work of printing solder on a board, a mounting work of placing components on a board (printed wiring board) on which wiring is printed, and a joining work of joining components to the board by melting the solder placed on the board. In the mounting line 10 shown in FIG. 2, one or more manufacturing devices 11 include a printing device 11A that performs printing work, a plurality of mounting devices 11B and 11C that perform mounting work, and a reflow soldering device 11D that performs bonding work.
[0018] The one or more functional modules each provide a predetermined function to the manufacturing apparatus 11. The "predetermined function" includes, for example, a function of providing components to the mounting apparatuses 11B and 11C. The predetermined function may also include at least one of a function of supplying solder and a mask to the printing apparatus 11A that performs solder printing work, and a function of collecting waste from the printing apparatus 11A. When a reel on which components are attached to a tape is supplied to the mounting apparatuses 11B and 11C, the predetermined function may also include a function of collecting the tape from the mounting apparatuses 11B and 11C after the components have been removed. When a tray on which components are placed is supplied to the mounting apparatuses 11B and 11C, the predetermined function may also include a function of collecting the tray from the mounting apparatuses 11B and 11C after the components have been removed. The predetermined function may also include at least one of a function of supplying a substrate to the manufacturing apparatus 11, a function of collecting a substrate from the manufacturing apparatus 11, a function of collecting cutting waste of reel components, a function of collecting maintenance target components from the manufacturing apparatus 11, and a function of returning maintenance target components to the manufacturing apparatus 11.
[0019] Here, the multiple functional modules are modules that provide a predetermined function to the manufacturing apparatus 11, and include, for example, a component supply module, a tray supply module, a waste recovery module, a board supply module, a board recovery module, a maintenance module, a feeder refill module, and the like. The component supply module is a module for supplying multiple components to be mounted on a board to the manufacturing apparatus 11. The multiple components supplied by the component supply module to the manufacturing apparatus 11 may be in a bulk state, may be attached to a tape wound on a reel, may be attached to a reelless type tape roll body, or may be in other forms (for example, a state in which multiple components are housed in a case, etc.). The tray supply module is a module for supplying multiple trays carrying multiple components, etc. to the manufacturing apparatus 11. The waste recovery module is a module for recovering waste discharged from the manufacturing apparatus 11. The board supply module is a module for supplying multiple boards to be worked on to the manufacturing apparatus 11. The board recovery module is a module for recovering multiple boards after work has been performed from the manufacturing apparatus 11. The maintenance module provides at least one of a function of providing materials used in manufacturing boards to the manufacturing equipment 11, a function of collecting parts to be maintained from the manufacturing equipment 11, and a function of returning the parts to be maintained to the manufacturing equipment 11. The feeder replenishment module is a module for replenishing feeders for the manufacturing equipment 11.
[0020] In this embodiment, a case where components are provided to mounting devices 11B and 11C as a predetermined function will be described.
[0021] As shown in FIG. 1, the management device 30 as the work management system 1 of this embodiment includes an acquisition unit 311, a setting unit 312, and a generation unit 313. The acquisition unit 311 acquires component data related to components to be mounted on production targets on the mounting line 10 (see FIG. 2), and the number of components that can be accommodated on the mounting line 10. The setting unit 312 sets at least one of the worker u1 (see FIG. 2) and the transport robot 20 (see FIG. 2) as a target for supplying components to the mounting line 10 based on the component data and the number of components accommodated. The generation unit 313 generates work instruction information that instructs the target for supplying components to supply components. The generation unit 313 calculates the timing of component supply based on the component data and the number of components accommodated. The generation unit 313 creates work instruction information for the target for supplying components, including the time of component supply, based on the supply timing.
[0022] According to this configuration, work instruction information is created for a target for which a supply operation is to be performed. For example, the work management system 1 creates work instruction information for each of the worker u1 and the transport robot 20, so that the supply times for the worker u1 and the transport robot 20 can be made different. As a result, the possibility that the worker u1 is present on the travel route of the transport robot 20 is reduced. This reduces the possibility that the transport robot 20 will detect the worker u1 as an obstacle, so that it is possible to reduce the number of times that the transport robot 20 is stopped or restricted in movement due to obstacles.
[0023] As shown in FIG. 2, the manufacturing system 2 further includes a first control device 31 and a second control device 32.
[0024] The first control device 31 monitors the operations of the multiple manufacturing devices 11 and the multiple inspection devices 12 that are provided in the mounting line 10.
[0025] The second controller 32 is configured to be able to communicate with the multiple transport robots 20 via one or more relays 34. The second controller 32 controls the transport work of each of the multiple transport robots 20.
[0026] The first control device 31, the second control device 32, and the management device 30 are configured to be able to communicate with each other. In this disclosure, "able to communicate" means that information can be exchanged directly or indirectly via the network NT1 or a repeater, etc., by an appropriate communication method such as wired communication or wireless communication.
[0027] (2) Composition The configuration of the manufacturing system 2 will be described below.
[0028] (2.1) Mounting line The mounting line 10 is provided in the mounting area A2.
[0029] The mounting area A2 is provided with a preparation area A3 for preparing items to be supplied to the manufacturing device 11. A plurality of reels on which components to be mounted on a board are attached are stored in the preparation area A3. At least one of the transport robot 20 and the worker u1 transports at least one reel from the preparation area A3 to the location of the destination mounting devices 11B and 11C. For example, at least one of the transport robot 20 and the worker u1 transports the component supply module 40 on which the reel is mounted from the preparation area A3 to the location of the destination mounting devices 11B and 11C.
[0030] The mounting line 10 is a manufacturing line for mounting components on a board. The mounting line 10 includes a plurality of (e.g., four) manufacturing devices 11 and a plurality of (e.g., two) inspection devices 12, each arranged along the conveying direction of the board. The plurality of manufacturing devices 11 include a printing device 11A that prints solder on the board, a plurality of mounting devices 11B and 11C that perform a mounting operation of placing components on the board on which the solder has been printed, and a reflow soldering device 11D that performs a joining operation of joining the components to the board. The two inspection devices 12 include an inspection device 12A that inspects the position, etc. of the solder printed on the board, and an inspection device 12B that inspects the position, etc. of the components placed on the board.
[0031] In mounting line 10, the boards are transported from left to right in Figure 2, and on mounting line 10, printing device 11A, inspection device 12A, mounting devices 11B and 11C, inspection device 12, and reflow soldering device 11D are lined up in this order along the arrangement direction of the boards.
[0032] The mounting devices 11B and 11C are provided with a mounting nozzle for mounting the supplied components on the board. The mounting devices 11B and 11C mount the components supplied from a component supply module 40, which supplies one or more reels around which a tape having components attached thereto is wound, at predetermined positions on the board using the mounting nozzle.
[0033] The reflow soldering device 11D melts the solder placed on the board to join the components and wiring mounted on the board.
[0034] The component supply module 40 has a reel supply function that supplies one or more reels to the mounting devices 11B, 11C. The component supply module 40 supplies reels to the mounting devices 11B, 11C by replacing the multiple reels attached to the mounting devices 11B, 11C one by one. The component supply module 40 may also replace the multiple reels attached to the mounting devices 11B, 11C all at once.
[0035] (2.2) Transport robot Next, one or more transfer robots 20 used in the manufacturing system 2 of this embodiment will be described.
[0036] As shown in FIG. 2, the transfer robot 20 is a so-called automatic guided vehicle (AGV) that travels unmanned to transfer a component supply module 40 that is a transfer target.
[0037] A plurality of wheels, including a pair of drive wheels and a pair of auxiliary wheels, are provided on the underside of the body of the transport robot 20, and the transport robot 20 is configured to be able to travel on the plurality of wheels.
[0038] The transport robot 20 is provided with a connection unit for connecting a transport object (component supply module 40). The transport robot 20 moves together with the transport object connected to the transport robot 20 by the connection unit. For example, the transport robot 20 travels with the transport robot 20 at the front, towing the transport object.
[0039] Here, a plurality of wheels are provided on the underside of the transported object, and the transported object is configured to be able to run on the wheels.
[0040] The transport robot 20 has a computer system having, for example, a processor and a memory. The processor executes a program stored in the memory, causing the computer system to realize the functions of the transport robot 20. The program executed by the processor is pre-recorded in the memory of the computer system here, but may be provided by being recorded on a recording medium such as a memory card, or may be provided via an electric communication line such as the Internet.
[0041] The transport robot 20 is configured to be able to communicate with the second control device 32. The transport robot 20 communicates with any of a plurality of repeaters 34 installed in a predetermined area including the mounting area A2 by wireless communication using radio waves as a medium. The repeater 34 is a device (access point) that relays communication between the transport robot 20 and the second control device 32. The repeater 34 communicates with the second control device 32. Therefore, the transport robot 20 and the second control device 32 communicate indirectly at least via the repeater 34. Note that, in the present embodiment, as an example, wireless communication conforming to standards such as Wi-Fi (registered trademark), Bluetooth (registered trademark), ZigBee (registered trademark), or low-power radio (specific low-power radio) that does not require a license is adopted for communication between the repeater 34 and the transport robot 20.
[0042] The transfer robot 20 has a detection unit. The detection unit detects the behavior of the vehicle body and the surrounding conditions of the vehicle body. In the present disclosure, "behavior" means an operation and a state. In other words, the behavior of the vehicle body includes the operating state of the vehicle body indicating whether the vehicle body is traveling or stopped, the travel distance and travel time of the vehicle body, the speed (and speed change) of the vehicle body, the acceleration acting on the vehicle body, and the attitude of the vehicle body.
[0043] The transport robot 20 estimates the current position of the transport robot 20 and aligns the stopping position based on information about surrounding objects detected by the detection unit and map data of the area in which the transport robot 20 moves.
[0044] The detection unit of the transport robot 20 may include a receiver that receives beacon signals transmitted by radio waves from multiple transmitters installed in a predetermined area, and may detect the current location based on the beacon signals transmitted from the multiple transmitters. Alternatively, the detection unit may detect the current location of the transport robot 20 using a global positioning system such as a Global Positioning System (GPS).
[0045] The transport robot 20 moves in a desired direction at a desired speed based on the work instruction information from the management device 30 and the detection result of the detection unit. For example, when transporting an object to be transported (component supply module 40), the transport robot 20 grips the object to be transported (component supply module 40) based on the work instruction information from the management device 30 and the detection result of the detection unit, and moves to the manufacturing device 11, which is the destination, at a desired speed.
[0046] Furthermore, the transfer robot 20 is configured to be driven by, for example, a secondary battery.
[0047] (2.3) First control device and second control device The first control device 31 has, for example, a computer system having a processor and a memory. The processor executes a program stored in the memory, causing the computer system to realize the functions of the first control device 31. The program executed by the processor is pre-recorded in the memory of the computer system here, but may be provided by being recorded on a recording medium such as a memory card, or may be provided via a telecommunications line such as the Internet.
[0048] The first control device 31 monitors the operations of the multiple manufacturing devices 11 and the multiple inspection devices 12 equipped in the mounting line 10. The first control device 31 is configured to be able to communicate with the multiple manufacturing devices 11 and the multiple inspection devices 12 via a network. In addition, the first control device 31 collects status information indicating the operating status from the multiple manufacturing devices 11 and the multiple inspection devices 12 (i.e., status information indicating the operating status of the mounting line 10) and outputs the collected status information to the management device 30.
[0049] The second control device 32 has, for example, a computer system having a processor and a memory. The processor executes a program stored in the memory, causing the computer system to realize the functions of the second control device 32. The program executed by the processor is pre-recorded in the memory of the computer system here, but may be provided by being recorded on a recording medium such as a memory card, or may be provided via a telecommunications line such as the Internet.
[0050] The second control device 32 is configured to be able to communicate with the multiple transport robots 20 via one or more relays 34. The second control device 32 controls the transport work of each of the multiple transport robots 20 by communicating with each of the multiple transport robots 20.
[0051] (2.4) Management device The management device 30 assigns part supply tasks to one or more workers u1 and one or more transport robots 20, respectively.
[0052] The management device 30 (the work management system 1) includes a first communication unit 301, a second communication unit 302, a storage unit 303, and a control unit 304, as shown in FIG.
[0053] The management device 30 has, for example, a computer system having a processor and a memory. The processor executes a program stored in the memory, causing the computer system to function as the control unit 304. The program executed by the processor is pre-recorded in the memory of the computer system here, but may be provided by being recorded on a recording medium such as a memory card, or may be provided via an electric communication line such as the Internet.
[0054] The first communication unit 301 has a communication interface for communicating with the first control device 31 and the second control device 32. That is, the first communication unit 301 is configured to be able to communicate with the first control device 31 and the second control device 32 via the network NT1.
[0055] The second communication unit 302 has a communication interface for communicating with the information terminal 50 (see FIG. 2) carried by the worker u1. For example, the second communication unit 302 communicates with the information terminal 50 by wireless communication.
[0056] The storage unit 303 is configured with a device selected from a read only memory (ROM), a random access memory (RAM), an electrically erasable programmable read only memory (EEPROM), and the like.
[0057] The storage unit 303 stores the required number of each component to be mounted on the boards to be manufactured in a predetermined period (e.g., one day). For example, as shown in Table 1, the storage unit 303 stores the number of multiple components required for manufacturing 50 boards "A" in a predetermined period for each component.
[0058] [Table 1]
[0059] According to Table 1, in order to manufacture 50 boards "A", 100 units of part "P01", 200 units of part "P02", and 250 units of part "P03" are required.
[0060] The storage unit 303 stores the mounting positions of reels containing components and the number of components mounted on one reel. For example, as shown in Table 2, the storage unit 303 stores the mounting positions of reels for each of components "P01", "P02", and "P03" and the number of components accommodated on one reel (accommodation number).
[0061] [Table 2]
[0062] According to Table 2, it can be seen that part "P01" is mounted in slot 1 of device "a1" (e.g., mounting device 11B), and the number of parts "P01" mounted on one reel is 50. It can be seen that part "P02" is mounted in slot 2 of device "a1", and the number of parts "P02" mounted on one reel is 150. It can be seen that part "P03" is mounted in slot 3 of device "a1", and the number of parts "P03" mounted on one reel is 1000.
[0063] Furthermore, the storage unit 303 stores, for each board, the time (mounting time) required to mount all components (for example, component "P01", component "P02", and component "P03") on the board.
[0064] The storage unit 303 stores a work schedule for each of one or more workers u1 and one or more transport robots 20 in a predetermined period. Here, the work schedules of each of the one or more workers u1 are the same, and the work schedules of each of the one or more transport robots 20 are the same. For example, as shown in FIG. 3, the storage unit 303 stores the work schedules of each of the workers u1 and the transport robot 20 in a predetermined period (time t0 to time t5). According to FIG. 3, the worker u1 can perform the supply work in each of the time slots T1, T3, and T5 from time t0 to time t3 and from time t4 to time t5 in the predetermined period (time t0 to time t5). In addition, the transport robot 20 can perform the supply work in each of the time slots T2 and T4 from time t0 to time t1 and from time t2 to time t5 in the predetermined period (time t0 to time t5). In addition, in this embodiment, the time slot T4 from time t3 to time t4 is set as a time slot during which the worker u1 cannot work. A time period T2 from time t1 to time t2 is set as a non-work time period for the transport robot 20. In other words, different non-work time periods are set for each of the worker u1 and the transport robot 20 as a time period during which part supply work is not possible.
[0065] The memory unit 303 stores, for each part, the time required for the worker u1 to splice the reel and the time required for the transport robot 20 to splice the reel as the splicing efficiency. That is, the memory unit 303 stores, for each part, the time required for the worker u1 to supply the part and the time required for the transport robot 20 to supply the part as the splicing efficiency. The splicing efficiency of the worker u1 is the average time required for each splicing by one or more workers u1. The splicing efficiency of the transport robot 20 is the average time required for each splicing by one or more transport robots 20. The time required for splicing and the splicing efficiency differ depending on the form of supply. Splicing in the case of a reel means, for example, attaching a new part tape to a part tape used in the mounting devices 11B and 11C, or attaching a new part tape to an autoloading feeder. In addition, in the case of a reelless type tape roll body or tray, splicing means, for example, replacing the tape roll body or tray used in the mounting devices 11B, 11C with a new tape roll body or tray.
[0066] As shown in FIG. 1, the control unit 304 includes an acquisition unit 311, a setting unit 312, a generation unit 313, and a notification unit 314.
[0067] The acquisition unit 311 acquires the splicing efficiency of the worker u1 and the splicing efficiency of the transport robot 20 from the storage unit 303 for each part.
[0068] Acquiring unit 311 acquires component data related to components to be mounted on production objects (e.g., boards) on mounting line 10, and the capacity of components that can be accommodated on mounting line 10. Here, the component data includes the number of boards on which components are mounted that are manufactured in a predetermined period, and the number of components (total number) required for the boards to be manufactured in the predetermined period. For example, acquiring unit 311 acquires component data from Table 1 stored in storage unit 303, and acquires the capacity from Table 2 stored in storage unit 303.
[0069] The setting unit 312 sets at least one of the workers u1 and the transport robots 20 as targets for performing the work of supplying components to the mounting line 10 based on the component data and the number of components stored. Here, the setting of the workers u1 means setting the number of workers u1 who will perform the supply work. Also, the setting of the transport robots 20 means setting the number of transport robots 20 who will perform the supply work. The setting unit 312 sets the number of workers u1 and the number of transport robots 20 as targets for performing the supply work, with both the workers u1 and the transport robots 20 as targets for performing the supply work. Specifically, based on the work schedule stored in the storage unit 303, the setting unit 312 sets both the workers u1 and the transport robots 20 as targets for performing the supply work when the number of reels to be supplied based on the component data and the number of components stored is greater than a predetermined value during a time period when both the workers u1 and the transport robots 20 are able to perform the supply work.
[0070] The setting unit 312 manages the settable number of transport robots 20 that can be set as targets for performing the supply work. For example, the setting unit 312 manages the number of workers u1 to be set as targets for performing the supply work and the number of transport robots 20 according to the time period for performing the supply work. When setting a target for performing the supply work, if there is an unset transport robot 20 based on the settable number and the number of transport robots 20 that have already been set as targets for performing the supply work, the setting unit 312 preferentially sets the unset transport robot 20 as a target for performing the supply work. That is, the setting unit 312 preferentially sets the transport robot 20 that has not been set as a target for performing the supply work, that is, the unset transport robot 20, as a target for performing the supply work. Similarly, when setting a target for performing the supply work, if there is an unset worker u1 based on the number of workers u1 managed and the number of workers u1 already set as targets for performing the supply work, the setting unit 312 preferentially sets the unset worker u1 as a target for performing the supply work. At this time, the setting unit 312 sets the number of targets for which the supply work is to be performed, and also sets the identifier of the worker u1 or the transport robot 20 that has been preferentially set.
[0071] In the case where a work unavailable time period is set for each of the worker u1 and the transport robot 20, the setting unit 312, when setting a target for a supply operation, preferentially sets the worker u1 or the transport robot 20 as a target for a supply operation during the work unavailable time period set for one of the worker u1 and the transport robot 20. For example, in the time period T4 from time t3 to time t4 set as the work unavailable time period for the worker u1, the setting unit 312 preferentially sets the transport robot 20. At this time, the setting unit 312 sets the number of targets for a supply operation during the time period T4, and also sets the identifier of the transport robot 20 that has been preferentially set. Furthermore, in the time period T2 from time t1 to time t2 set as the work unavailable time period for the transport robot 20, the setting unit 312 preferentially sets the worker u1. At this time, the setting unit 312 sets the identifier of the worker u1 that has been preferentially set as well as the number of targets for a supply operation during the time period T2.
[0072] The setting unit 312 sets both the worker u1 and the transport robot 20 as targets for performing the supply work. For example, the setting unit 312 sets both the worker u1 and the transport robot 20 as targets for performing the supply work at each of times t0 to t1, t2 to t3, and t4 to t5. At this time, the setting unit 312 sets an identifier of the worker u1 and an identifier of the transport robot 20 in addition to setting the number of targets for performing the supply work at each of times t0 to t1, t2 to t3, and t4 to t5.
[0073] Table 3 shows the result of the setting by the setting unit 312 of the targets for performing the supply work in each time period T1 to T4. The number of workers and the number of transport robots shown in Table 3 represent the number that can be set in the corresponding time period. The supply instruction targets represent the content set as targets for performing the supply work. The value in parentheses represents the number of targets for performing the supply work. For example, "worker (2)" represents that two workers u1 are set as targets for performing the supply work. "Transport robot (2)" represents that two transport robots 20 are set as targets for performing the supply work. When setting the worker u1 as the supply instruction target, the setting unit 312 sets the supply instruction targets to be equal to or less than the number indicated by the number of workers. When setting the transport robot 20 as the supply instruction target, the setting unit 312 sets the supply instruction targets to be equal to or less than the number indicated by the number of transport robots.
[0074] [Table 3]
[0075] The setting unit 312 sets at least one of the worker u1 and the transport robot 20 as a target of the supply work, that is, as a target of the supply instruction, based on the number of reels to be replaced (number of supplies) and the splicing efficiency of the worker u1 and the splicing efficiency of the transport robot 20 acquired by the acquisition unit 311. In the time period T3 shown in Table 3, the number of supplies is "5", and based on the splicing efficiency of the worker u1 and the splicing efficiency of the transport robot 20, it is more efficient to perform the work with the transport robot 20 than to perform the work with both the worker u1 and the transport robot 20. Therefore, the setting unit 312 preferentially sets the transport robot 20 as a target of the supply instruction in the time period T3. In addition, although not explicitly shown in Table 3, an identifier of the set target of the supply work is associated with each time period.
[0076] The setting unit 312 may set a supply instruction target (a target for performing a supply operation) based on the number of reels to be replaced (supply number). For example, when the supply number is equal to or less than a predetermined value, the setting unit 312 preferentially sets the transport robot 20 as the supply instruction target.
[0077] The setting unit 312 is configured to preferentially allocate the transport robot 20 based on the number of supplies, the splicing efficiency of the worker u1, and the splicing efficiency of the transport robot 20, or based on the number of supplies, but is not limited to this configuration. The generation unit 313 may preferentially allocate the worker u1.
[0078] The generating unit 313 generates work instruction information that instructs the supply of parts to a target for which supply work is to be performed. More specifically, the generating unit 313 calculates the timing of supply of parts from the part data and the number of parts contained. The generating unit 313 creates work instruction information for a target for which supply work is to be performed, including the time of supply of parts, based on the supply timing.
[0079] The generation unit 313 calculates the supply timing for each component using the following formula.
[0080] (Formula) Supply timing = Mounting time × Number of components accommodated / Number to be mounted on one board
[0081] For example, the mounting time is assumed to be 30 seconds. According to Table 1, the total number of parts "P01" required to manufacture 50 boards "A" is 100, so the number of parts "P01" to be mounted on one board "A" is 2. The number of parts "P01" accommodated is 50. In this case, if the timing when the part "P01" runs out of stock is set as the supply timing, 750 seconds is calculated from the above formula. That is, the generation unit 313 determines the supply timing of the part "P01" to be 12 minutes and 30 seconds (750 seconds) after the start of the work. According to Table 1, the total number of parts "P02" required to manufacture 50 boards "A" is 200, so the number of parts "P02" to be mounted on one board "A" is 4. The number of parts "P02" accommodated is 50. In this case, "the number of components accommodated / the number to be mounted on one board" is 37.5, and the component "P02" will run out of stock while the 38th board of "A" is being manufactured. Therefore, by rounding down to the nearest whole number, the generation unit 313 determines that the component will run out of stock on the 37th board, and calculates the supply timing by calculating "mounting time (30 seconds) x 37". In this case, the result is 1110 seconds, and the generation unit 313 determines that the supply timing of the component "P02" will be 18 minutes and 30 seconds (1110 seconds) after the start of the work.
[0082] The generation unit 313 calculates one or more supply timings for each component so that a predetermined number of boards can be manufactured in a predetermined period. For example, the generation unit 313 calculates one or more supply timings for each of the parts "P01", "P02", and "P03" so that 50 boards "A" can be manufactured in a predetermined period.
[0083] The generating unit 313 converts one or more supply timings for each part into a time based on time t0, which is the start time of a predetermined period. The generating unit 313 generates work instruction information for a target for which a supply work is to be performed, based on the one or more supply timings converted into a time for each part and the settings made by the setting unit 312.
[0084] The generation of work instruction information will be described in detail below.
[0085] When the supply instruction target includes both the worker u1 and the transport robot 20, the generation unit 313 generates work instruction information for each of the one or more workers u1 and each of the one or more transport robots 20 so that the supply work of the parts does not overlap in time. More specifically, the generation unit 313 generates work instruction information for each of the one or more workers u1 and each of the one or more transport robots 20 so that the supply work of the parts does not overlap in time, based on one or more supply timings for each part, the splicing efficiency of the worker u1 for each part, and the splicing efficiency of the transport robot 20. When the supply work of the parts overlaps in time, the generation unit 313 generates work instruction information for each of the one or more workers u1 and each of the transport robots 20 so that the supply work of the parts is performed in different areas (different mounting devices).
[0086] The generating unit 313 performs tagging so that operations that overlap in time are included in different tables based on one or more supply timings for each part and the splicing efficiency of the worker u1 for each part and the splicing efficiency of the transport robot 20. An example of the tagging result in the time period T1 from time t0 to time t1 is shown in Table 4. In Table 4, the supply operation at the supply time "9:55" and the supply operation at the supply time "9:56" overlap in time. That is, when different supply operation targets are assigned to the supply operation at the supply time "9:55" and the supply operation at the supply time "9:56", the supply operations overlap in time, taking into account the splicing efficiency of the worker u1 and the splicing efficiency of the transport robot 20. Therefore, the generating unit 313 associates different tags so that the supply operation at the supply time "9:55" and the supply operation at the supply time "9:56" are included in different tables. Here, the device "a1" is the mounting device 11B. The device "a2" is the mounting device 11C.
[0087] [Table 4]
[0088] The generating unit 313 divides the integrated table based on the tags included in the table (integrated table) shown in Table 4. That is, the generating unit 313 divides the integrated table so that the same tags become the same table. The generating unit 313 assigns either the worker u1 or the transport robot 20 to each divided table. For example, the generating unit 313 assigns the transport robot 20 to the divided table having the tag value of "1", and assigns the worker u1 to the divided table having the tag value of "2". The generating unit 313 associates one or more records included in the divided table to which the transport robot 20 is assigned with one or more transport robots 20 determined as the supply instruction target. The generating unit 313 associates one or more records included in the divided table to which the worker u1 is assigned with one or more workers u1 determined as the supply instruction target. Here, the records included in each divided table include the supply time. That is, the records included in each divided table correspond to the work instruction information. The generation unit 313 divides the integrated table based on the tags included in the integrated table, and generates tables after division, thereby generating work instruction information for each of the workers u1 and u2.
[0089] The following Table 5 is a divided table including work instruction information associated with the transport robot 20. Table 6 is a divided table including work instruction information associated with the worker u1. Here, "R001" and "R002" are identifiers for identifying the transport robot 20. "U001" and "U002" are identifiers for identifying the worker u1.
[0090] [Table 5]
[0091] [Table 6]
[0092] That is, the generation unit 313 generates work instruction information for each of the worker u1 and the transport robot 20 so that the supply work does not overlap during a time period (e.g., time periods T1, T3, and T4) set as a target for the supply work of both the worker u1 and the transport robot 20. For example, during the period from time t0 to time t1 shown in FIG. 3, the generation unit 313 generates work instruction information for each of one or more workers u1 and each of one or more transport robots 20 so that the supply work does not overlap.
[0093] When the supply work overlaps during a time period set as the target of both the worker u1 and the transport robot 20 performing the supply work, the generation unit 313 generates work instruction information for each of the worker u1 and the transport robot 20 so that the areas in which the worker u1 and the transport robot 20 perform the supply work on the mounting line 10 do not overlap. It is considered that the supply work overlaps during a part of the period from time t0 to time t1 (time period T1) shown in FIG. 3. In this case, the generation unit 313 generates work instruction information for each of the worker u1 and the transport robot 20 so that the devices to be supplied by each of the worker u1 and the transport robot 20 do not overlap on the mounting line 10. That is, the generation unit 313 generates work instruction information for each of the one or more workers u1 and the one or more transport robots 20 so that the devices to be supplied by each of the one or more workers u1 and the one or more transport robots 20 do not overlap on the mounting line 10. For example, when generating work instruction information for one worker u1 and one transport robot 20, the generation unit 313 generates work instruction information for each of the worker u1 and the transport robot 20 such that the devices to be supplied are not overlapped. That is, the generation unit 313 associates different tags with each of the mounting devices 11B and 11C. As a result, the generation unit 313 can generate work instruction information for the worker u1 so that the worker u1 performs the supply work at the mounting device 11B, and generate work instruction information for the transport robot 20 so that the transport robot 20 performs the supply work at the mounting device 11C.
[0094] A case where four mounting apparatuses 11B, 11C, 11E, and 11F are provided on the mounting line 10 will be described with reference to FIG. 4 as an example. It is assumed that one worker u1 and one transport robot 20 both need to perform supply work, and the supply work overlaps. In this case, the generation unit 313 generates work instruction information for both so that the mounting apparatuses to be supplied do not overlap. For example, the generation unit 313 generates work instruction information for the worker u1 so that the mounting apparatuses 11E, 11F, and 11C perform the supply work. The generation unit 313 generates work instruction information for the transport robot 20 so that the mounting apparatus 11B performs the supply work. In this way, the generation unit 313 can make the mounting apparatuses to be supplied different from each other for the worker u1 and the transport robot 20.
[0095] When the areas in the mounting line 10 where the worker u1 and the transport robot 20 perform the supply work overlap during the time period set as the target of the supply work, the generation unit 313 generates work instruction information for each of the worker u1 and the transport robot 20 so that the supply work of the worker u1 and the transport robot 20 in the area does not overlap. It is considered that the area of the supply work of the worker u1 (the device to be supplied) and the area of the supply work of the transport robot 20 overlap during the period from time t0 to time t1 (time period T1) shown in FIG. 3. In this case, the generation unit 313 generates work instruction information for each of the worker u1 and the transport robot 20 so that the supply work of the worker u1 and the transport robot 20 does not overlap in the same supply work area in the mounting line 10. That is, the generation unit 313 generates work instruction information for each of one or more workers u1 and one or more transport robots 20 so that the supply work of each of the one or more workers u1 and each of the one or more transport robots 20 does not overlap in the same supply work area. For example, when generating work instruction information for one worker u1 and one transport robot 20, the generation unit 313 generates work instruction information for each of the one worker u1 and one transport robot 20 so that the supply work does not overlap in the same supply work area. That is, the generation unit 313 associates different tags with different supply times in the same mounting device. As a result, when both the worker u1 and the transport robot 20 perform supply work in the same mounting device, the generation unit 313 can generate work instruction information for each of the worker u1 and the transport robot 20 so that the supply work is performed at different times.
[0096] A case where four mounting apparatuses 11B, 11C, 11E, and 11F are provided on the mounting line 10 will be described with reference to FIG. 5 as an example. Assume that one worker u1 and one transport robot 20 both perform a supply operation for the mounting apparatus 11E. In this case, the generation unit 313 generates work instruction information for both the worker u1 and the transport robot 20 so that the time period for the supply operation for the mounting apparatus 11E is different between the worker u1 and the transport robot 20. For example, the generation unit 313 generates work instruction information for the worker u1 so that the supply operation is performed first at the mounting apparatus 11E and then at the mounting apparatuses 11F and 11C. The generation unit 313 generates work instruction information for the transport robot 20 so that the supply operation is performed first at the mounting apparatus 11B and then at the mounting apparatus 11E. In this way, the generation unit 313 can differentiate the time period for the supply operation for the mounting apparatus 11E.
[0097] Also, when only one of the worker u1 and the transport robot 20 is determined as the work instruction target, there is no need to divide the integrated table. In other words, when only one of the worker u1 and the transport robot 20 is determined as the work instruction target, the generation unit 313 generates the integrated table to generate work instruction information for the work instruction target. At this time, the same tag is associated with each piece of work instruction information.
[0098] The notification unit 314 notifies the work instruction information to the work instruction target determined by the generation unit 313. That is, the notification unit 314 notifies the work instruction information to the worker u1 and the transport robot 20. More specifically, the notification unit 314 notifies at least one of the one or more workers u1 and the one or more transport robots 20 of the work instruction information.
[0099] The notification unit 314 transmits the work instruction information generated by the generation unit 313 for the worker u1 to the information terminal 50 carried by the worker u1. The notification unit 314 transmits the work instruction information generated by the generation unit 313 for the transfer robot 20 to the transfer robot 20 via the second control device 32.
[0100] When both the worker u1 and the transport robot 20 are determined as the work instruction targets, the notification unit 314 transmits all of one or more pieces of work instruction information included in the corresponding divided tables and corresponding to the notification destinations to the work targets included in the respective divided tables. When only one of the worker u1 and the transport robot 20 is determined as the work instruction target, the notification unit 314 transmits all of one or more pieces of work instruction information included in the integrated table and corresponding to the notification destinations to the work targets included in the integrated table.
[0101] (3) Operation Hereinafter, the operation of the management device 30 as the work management system 1 will be described with reference to FIG.
[0102] The acquisition unit 311 acquires the splicing efficiency of the worker u1 and the splicing efficiency of the transport robot 20 for each part from the storage unit 303 (step S1).
[0103] The acquiring unit 311 acquires component data related to components to be mounted on production objects (circuit boards in this case) on the mounting line 10, and the number of components that can be accommodated on the mounting line 10 (step S2).
[0104] The setting unit 312 performs a setting process (step S3). The setting unit 312 sets at least one of the workers u1 and the transport robots 20 as targets for supplying components to the mounting line 10 based on the component data and the number of components accommodated. More specifically, the setting unit 312 sets the number of workers u1 and the number of transport robots 20. Specifically, the setting unit 312 sets targets for supply instructions for each of the time periods T1 to T5 as shown in Table 3.
[0105] The generating unit 313 calculates the timing of supplying the parts from the part data and the number of contained parts (step S4).
[0106] The generating unit 313 creates work instruction information including the supply time of the parts based on the supply timing (step S5). The generating unit 313 assigns at least one of the worker u1 and the transport robot 20 as a supply instruction target based on the number of reels to be replaced (supply number) and the splicing efficiency of the worker u1 and the splicing efficiency of the transport robot 20. When both the worker u1 and the transport robot 20 are assigned as a supply instruction target, the generating unit 313 performs tagging so that the supply work overlaps in time in different tables. More specifically, the generating unit 313 performs tagging so that the supply work overlaps in time in different tables based on one or more supply timings for each part and the splicing efficiency of the worker u1 for each part and the splicing efficiency of the transport robot 20, and generates an integrated table. The generating unit 313 generates work instruction information for each of the worker u1 and the transport robot 20 by dividing the integrated table based on the tags included in the integrated table. When only one of the worker u1 and the transport robot 20 is determined as the work instruction target, the generation unit 313 generates the integrated table to generate work instruction information for the work instruction target.
[0107] The notification unit 314 performs notification processing (step S6). The notification unit 314 transmits the work instruction information generated by the generation unit 313 for the worker u1 to the information terminal 50 carried by the worker u1. The notification unit 314 transmits the work instruction information generated by the generation unit 313 for the transport robot 20 to the transport robot 20 via the second control device 32. When both the worker u1 and the transport robot 20 are determined as work instruction targets, the notification unit 314 transmits all of one or more pieces of work instruction information included in the corresponding divided tables and corresponding to the notification destinations, with the work targets included in each divided table as the notification destinations. When only one of the worker u1 and the transport robot 20 is determined as the work instruction target, the notification unit 314 transmits all of one or more pieces of work instruction information included in the integrated table and corresponding to the notification destinations, with the work targets included in the integrated table as the notification destinations.
[0108] (4) Advantages As described above, the work management system 1 of this embodiment includes an acquisition unit 311, a setting unit 312, and a generation unit 313. The acquisition unit 311 acquires component data related to components to be mounted on production targets (e.g., boards) on the mounting line 10, and the number of components that can be accommodated on the mounting line 10. The setting unit 312 sets at least one of the worker u1 and the transport robot 20 as targets for supplying components to the mounting line 10 based on the component data and the number of components accommodated. The generation unit 313 generates work instruction information that instructs the target for the supply work to supply components. The generation unit 313 calculates the timing of component supply based on the component data and the number of components accommodated, and creates work instruction information for the target for the supply work, including the time of component supply, based on the supply timing.
[0109] According to this configuration, work instruction information is created for a target for which a supply operation is to be performed. For example, the work management system 1 creates work instruction information for each of the worker u1 and the transport robot 20, so that the supply times for the worker u1 and the transport robot 20 can be made different. As a result, the possibility that the worker u1 is present on the travel route of the transport robot 20 is reduced. This reduces the possibility that the transport robot 20 will detect the worker u1 as an obstacle, so that it is possible to reduce the number of times that the transport robot 20 is stopped or restricted in movement due to obstacles.
[0110] (5) Variations The following are examples of modified examples. The modified examples described below can be applied in appropriate combination with the above-described embodiment.
[0111] (5.1) Variation 1 In the above embodiment, the transport robot 20 is configured as an AGV as an example, but is not limited to this configuration.
[0112] The transfer robot 20 may be an autonomous mobile robot (AMR).
[0113] Alternatively, the transport robot 20 may be a supply robot provided alongside the mounting line 10 .
[0114] (5.2) Variation 2 In the above embodiment, the management device 30 is configured to store the splicing efficiencies of the worker u1 and the transport robot 20 in the storage unit 303, but the present invention is not limited to this configuration.
[0115] The management device 30 may manage the work performance (work time) of each of the worker u1 and the transport robot 20 regarding splicing, and calculate the splicing efficiency of each of the worker u1 and the transport robot 20 based on the managed work performance.
[0116] (5.3) Variation 3 In each table obtained by dividing the integrated table, the supply sequence (operation sequence) may be included.
[0117] (5.4) Variation 4 The management device 30 is configured to generate work instruction information for the part supply work to at least one of the worker u1 and the transport robot 20, but is not limited to this configuration.
[0118] The management device 30 may calculate the timing of work for any of tray supply, waste recovery, substrate supply, substrate recovery, maintenance, and feeder replenishment, and generate work instruction information including the work time for at least one of the worker u1 and the transport robot 20.
[0119] (Other variations) The above embodiment is merely one of various embodiments of the present disclosure. The above embodiment can be modified in various ways depending on the design and the like as long as the object of the present disclosure can be achieved. In addition, the same function as the work management system 1 may be embodied in a work management method, a computer program, or a non-transitory recording medium on which a program is recorded. The work management method of the work management system 1 according to one aspect is executed by one or more processors and used in the work management system 1. The work management method acquires component data related to components to be mounted on a production target in the mounting line 10 and the number of components that can be accommodated in the mounting line 10. The work management method sets at least one of the worker u1 and the transport robot 20 as a target for performing a component supply operation to the mounting line 10 based on the component data and the number of components accommodated. The work management method calculates the timing of component supply based on the component data and the number of components accommodated. The work management method creates supply instruction information for a target for which the supply operation is to be performed, the supply instruction information including the supply time of the components and instructing the target for which the supply operation is to be performed based on the supply timing. The program according to one aspect is a program for causing a computer system to function as the above-mentioned work management system 1 or the work management method of the work management system 1.
[0120] The execution subject of the work management system 1 or the work management method of the work management system 1 in the present disclosure includes a computer system. The computer system has a processor and a memory as hardware. The processor executes a program recorded in the memory of the computer system to realize the function of the execution subject of the work management system 1 or the work management method of the work management system 1 in the present disclosure. The program may be pre-recorded in the memory of the computer system, or may be provided through an electric communication line. The program may also be recorded and provided in a non-transitory recording medium such as a memory card, an optical disk, or a hard disk drive that can be read by the computer system. The processor of the computer system is composed of one or more electronic circuits including a semiconductor integrated circuit (IC) or a large-scale integrated circuit (LSI). The integrated circuits such as IC or LSI referred to here are called by different names depending on the degree of integration, and include integrated circuits called system LSI, VLSI (Very Large Scale Integration), or ULSI (Ultra Large Scale Integration). Furthermore, a field-programmable gate array (FPGA) that is programmed after the manufacture of the LSI, or a logic device that can reconfigure the connection relationship inside the LSI or reconfigure the circuit partition inside the LSI, can also be adopted as a processor. The electronic circuits may be integrated in one chip or distributed across multiple chips. The chips may be integrated in one device or distributed across multiple devices.
[0121] Furthermore, it is not essential for the work management system 1 that multiple functions are concentrated in one housing, and the components of the work management system 1 may be distributed across multiple housings. Furthermore, at least some of the functions of the work management system 1 may be realized by the cloud (cloud computing) or the like.
[0122] (summary) As described above, the work management system (1) of the first aspect includes an acquisition unit (311), a setting unit (312), and a generation unit (313). The acquisition unit (311) acquires component data related to components to be mounted on a production target (e.g., a board) on the mounting line (10) and the number of components that can be accommodated on the mounting line (10). The setting unit (312) sets at least one of the worker (u1) and the transport robot (20) as a target for supplying components to the mounting line (10) based on the component data and the number of components. The generation unit (313) generates work instruction information that instructs the target for supplying components to supply components. The generation unit (313) calculates the timing of component supply based on the component data and the number of components, and creates work instruction information for the target for supplying components, including the time of component supply, based on the supply timing.
[0123] According to this embodiment, work instruction information is created for a target for which a supply operation is to be performed. For example, the work management system (1) creates work instruction information for each of the worker (u1) and the transport robot (20), and therefore the supply times for the worker (u1) and the transport robot (20) can be made different. As a result, the possibility that the worker (u1) is present on the travel route of the transport robot (20) is reduced. This reduces the possibility that the transport robot (20) will detect the worker (u1) as an obstacle, and therefore it is possible to reduce the number of stops and restrictions on movement due to obstacles.
[0124] In the work management system (1) of the second aspect, in the first aspect, the setting unit (312) sets the number of workers (u1) and the number of transport robots (20) with both the workers (u1) and the transport robots (20) as targets for supply work.
[0125] According to this embodiment, work instruction information can be created for each of the workers (u1) and the transport robots (20) according to the number of the workers (u1) and the number of the transport robots (20).
[0126] In the work management system (1) of the third aspect, in the second aspect, the setting unit (312) manages the settable number of transport robots (20) that can be set as targets for performing supply work. When setting a target for performing supply work, if there is an unset transport robot (20) based on the settable number and the number of transport robots (20) that have already been set as targets for performing supply work, the setting unit (312) preferentially sets the unset transport robot (20) as a target for performing supply work.
[0127] According to this embodiment, since an unselected transport robot (20) is preferentially selected as a target for performing a supply operation, it is possible to reduce bias in the transport robots (20) selected as targets for performing a supply operation.
[0128] In the work management system (1) of the fourth aspect, in any of the first to third aspects, different unavailable work time periods (e.g., time periods T2, T4) are set for each of the worker (u1) and the transport robot (20) as time periods during which supply work is not possible. When setting a target for supply work, the setting unit (312) preferentially sets the worker (u1) or the transport robot (20) as a target for supply work during the unavailable work time period set for the other.
[0129] According to this embodiment, during a time period when either the worker (u1) or the transport robot (20) (the unavailable target) is unavailable, the other is preferentially set as the target for supply work. Therefore, during the unavailable time period, the unavailable target can reliably suspend supply work.
[0130] In the work management system (1) of the fifth aspect, in any of the first to fourth aspects, the setting unit (312) sets both the worker (u1) and the transport robot (20) as targets for performing the supply work. The generation unit (313) generates work instruction information for each of the worker (u1) and the transport robot (20) so that the supply work does not overlap during time periods (e.g., time periods T1, T3, T5) in which both the worker (u1) and the transport robot (20) are set as targets for performing the supply work.
[0131] According to this embodiment, the supply operations do not overlap during the time period when both the worker (u1) and the transport robot (20) are set to perform the supply operations, so there is a low possibility that the worker (u1) will be present on the travel route of the transport robot (20). This reduces the possibility that the transport robot (20) will detect the worker (u1) as an obstacle, so that it is possible to reduce the number of stops and restrictions on movement due to obstacles.
[0132] In the sixth aspect of the work management system (1) in any of the first to fifth aspects, the setting unit (312) sets both the worker (u1) and the transport robot (20) as targets for performing the supply work. When the supply work overlaps during a time period (e.g., time periods T1, T3, T5) in which both the worker (u1) and the transport robot (20) are set as targets for performing the supply work, the generation unit (313) generates work instruction information for each of the worker (u1) and the transport robot (20) so that the areas (e.g., mounting devices 11B, 11C, 11E, 11F) in which the worker (u1) and the transport robot (20) perform the supply work on the mounting line (10) do not overlap.
[0133] According to this embodiment, the areas in which supply work is performed in the same time period do not overlap, so there is a low possibility that the worker (u1) will be present on the travel route of the transport robot (20). This reduces the possibility that the transport robot (20) will detect the worker (u1) as an obstacle, so that it is possible to reduce the number of stops and restrictions on movement due to obstacles.
[0134] In the seventh aspect of the work management system (1), in any of the first to sixth aspects, the setting unit (312) sets both the worker (u1) and the transport robot (20) as targets for performing the supply work. When the areas (e.g., mounting devices 11B, 11C, 11E, 11F) in the mounting line (10) where the worker (u1) and the transport robot (20) perform the supply work during the time period set as targets for performing the supply work overlap, the generation unit (313) generates work instruction information for each of the worker (u1) and the transport robot (20) so that the supply work of the worker (u1) and the transport robot (20) in the area does not overlap.
[0135] According to this embodiment, when the areas where the supply operations are performed overlap, the time periods during which the worker (u1) and the transport robot (20) perform their supply operations do not overlap, reducing the possibility that the worker (u1) will be present on the travel route of the transport robot (20). This reduces the possibility that the transport robot (20) will detect the worker (u1) as an obstacle, reducing the number of stops and restrictions on movement due to obstacles.
[0136] The work management method of the eighth aspect is executed by one or more processors and used in a work management system (1). The work management method acquires component data related to components to be mounted on a production target (e.g., a board) on a mounting line (10) and the number of components that can be accommodated on the mounting line (10). The work management method sets at least one of a worker (u1) and a transport robot (20) as a target for performing the work of supplying components to the mounting line (10) based on the component data and the number of components accommodated. The work management method calculates the timing of component supply based on the component data and the number of components accommodated. The work management method creates supply instruction information for the target for which the supply work is to be performed, based on the supply timing, which instructs the target for which the supply work is to be performed to supply components, and which includes a time for supplying the components.
[0137] According to this embodiment, work instruction information is created for a target for which a supply operation is to be performed. For example, the work management system (1) creates work instruction information for each of the worker (u1) and the transport robot (20), and therefore the supply times for the worker (u1) and the transport robot (20) can be made different. As a result, the possibility that the worker (u1) is present on the travel route of the transport robot (20) is reduced. This reduces the possibility that the transport robot (20) will detect the worker (u1) as an obstacle, and therefore it is possible to reduce the number of stops and restrictions on movement due to obstacles.
[0138] A program according to a ninth aspect is a program for causing one or more processors to execute the work management method according to the eighth aspect.
[0139] According to this embodiment, work instruction information is created for a target for which a supply operation is to be performed. For example, the work management system (1) creates work instruction information for each of the worker (u1) and the transport robot (20), and therefore the supply times for the worker (u1) and the transport robot (20) can be made different. As a result, the possibility that the worker (u1) is present on the travel route of the transport robot (20) is reduced. This reduces the possibility that the transport robot (20) will detect the worker (u1) as an obstacle, and therefore it is possible to reduce the number of stops and restrictions on movement due to obstacles.
[0140] A manufacturing system (2) of a tenth aspect includes the work management system (1) of any one of the first to seventh aspects, and a transfer robot (20) that performs a part supply operation.
[0141] According to this embodiment, work instruction information is created for a target for which a supply operation is to be performed. For example, the work management system (1) creates work instruction information for each of the worker (u1) and the transport robot (20), and therefore the supply times for the worker (u1) and the transport robot (20) can be made different. As a result, the possibility that the worker (u1) is present on the travel route of the transport robot (20) is reduced. This reduces the possibility that the transport robot (20) will detect the worker (u1) as an obstacle, and therefore it is possible to reduce the number of stops and restrictions on movement due to obstacles. [Explanation of symbols]
[0142] 1 Work Management System 2. Manufacturing System 10 Mounting Line 11B, 11C, 11E, 11F Mounting device 20 Transport Robot 30 Management device 311 Acquisition Department 312 Setting section 313 Generation part u1 Worker T1, T2, T3, T4, T5 time slots
Claims
1. an acquisition unit that acquires component data relating to components to be mounted on production targets on a mounting line and the number of components that can be accommodated on the mounting line; a setting unit that sets at least one of a worker and a transport robot as a target for supplying the components to the mounting line based on the component data and the number of the components accommodated; a generation unit that generates work instruction information that instructs a target to perform the supply work to supply the parts, The generation unit calculating a timing for supplying the component from the component data and the number of the component; creating the work instruction information for the target of the supply work, including the supply time of the parts, based on the supply timing; Work management system.
2. the setting unit sets the number of the workers and the number of the transport robots, with both the workers and the transport robots being targets for performing the supply work. The work management system according to claim 1 .
3. The setting unit a settable number of the transport robots that can be set as targets for the supply work is managed; When setting the target for the supply work, if there is an unset transport robot based on the settable number and the number of transport robots already set as targets for the supply work, the unset transport robot is preferentially set as the target for the supply work. The work management system according to claim 2 .
4. different non-work time periods are set for the worker and the transport robot as time periods during which the supply work cannot be performed, when setting a target for the supply work, the setting unit preferentially sets the other as a target for the supply work during the unavailable time period set for one of the worker and the transport robot. The work management system according to claim 1 .
5. the setting unit sets both the worker and the transport robot as targets for performing the supply work, the generation unit generates the work instruction information for each of the worker and the transport robot so that the supply work does not overlap during a time period set as a target for both the worker and the transport robot to perform the supply work. The work management system according to claim 1 .
6. the setting unit sets both the worker and the transport robot as targets for performing the supply work, the generation unit generates the work instruction information for each of the worker and the transport robot so that areas in which the worker and the transport robot perform the supply work on the mounting line do not overlap when the supply work overlaps during a time period set as an area in which both the worker and the transport robot perform the supply work. The work management system according to claim 1 .
7. the setting unit sets both the worker and the transport robot as targets for performing the supply work, when areas in the mounting line in which both the worker and the transport robot perform pre-supply work overlap during a time period set as a target for the supply work, the generation unit generates the work instruction information for each of the worker and the transport robot so that the supply work of the worker and the transport robot in the areas does not overlap. The work management system according to claim 1 .
8. 1. A work management method executed by one or more processors and used in a work management system, comprising: acquiring component data relating to components to be mounted on production targets on a mounting line and the number of components that can be accommodated on the mounting line; and setting at least one of a worker and a transport robot as a target for supplying the components to the mounting line based on the component data and the number of components accommodated; calculating a timing for supplying the component from the component data and the number of the component; creating supply instruction information for the target to be supplied with the supply work, the supply instruction information including a supply time of the part, for instructing the target to supply the part based on the supply timing; Work management methods.
9. The work management method according to claim 8 is executed by one or more processors, program.
10. The work management system according to claim 1; a transport robot that performs the component supply operation, Manufacturing system.
Citation Information
Patent Citations
Production system
WO2022118380A1
