Control device, panel conveyance system, control method, and program
The control device addresses panel transfer issues by using a floating mechanism and two-step motion to adjust distances and suction processes, ensuring smooth conveyance despite variations in panel height and weight.
Patent Information
- Application Number
- JP2023081588
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-17
- Publication Date
- 2024-11-28
AI Technical Summary
Existing control devices face difficulties in smoothly transferring panels due to variations in suction pad heights and the resulting impact from large panels, especially when moving between stages and transport devices.
A control device that includes a control unit and memory, allowing for the adjustment of the distance between a stage and an arm using a floating mechanism, with a two-step motion to minimize impact by varying the distance between the suction surface and the stage, and controlling suction processes to smoothly transfer panels.
The solution effectively suppresses the impact on the arm during panel transfer, enabling smooth conveyance of panels by adjusting the distance and suction processes to accommodate variations in panel thickness and height.
Smart Images

Figure 2024165410000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a control device for controlling the transport of a panel. [Background technology]
[0002] Conventionally, there has been provided a component mounting apparatus that presses electronic components (hereinafter, simply referred to as "components") onto a liquid crystal panel (see, for example, Patent Document 1). This component mounting apparatus mounts components onto the edge of a liquid crystal panel via an anisotropic conductive film (ACF), which is an anisotropic conductive member. That is, ACF is attached to the edge of the liquid crystal panel as an adhesive member. The component mounting device mounts components on the portion of the liquid crystal panel where the ACF is attached, and then presses the components onto the liquid crystal panel. The liquid crystal panel is also called a panel or a substrate.
[0003] The component mounting device of Patent Document 1 also includes a plurality of substrate transfer units each transporting a liquid crystal panel, and a control device that controls the plurality of substrate transfer units. The substrate transfer unit has an arm and a suction pad attached to the arm, and holds and moves the liquid crystal panel placed on the stage by vacuum suction from above with the suction pad according to the control of the control device. The substrate transfer unit then places the liquid crystal panel on another stage by stopping the vacuum suction of the liquid crystal panel by the suction pad. In this way, the liquid crystal panel is transferred between the substrate transfer unit and the stage according to the control of the control device. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2015-149456 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, the control device of Patent Document 1 has a problem in that it may be difficult to smoothly transfer the panel.
[0006] Therefore, the present disclosure provides a control device and the like that can smoothly transfer panels. [Means for solving the problem]
[0007] A control device according to one aspect of the present disclosure is a control device that controls at least one of a panel transport device and a stage, the control device comprising a control unit and a memory connected to the control unit, the panel transport device comprising an arm and a holding unit that holds the panel by adsorbing the panel with an adsorption surface, the holding unit being attached to the arm such that an adsorption surface of the holding unit is elastically movable in a predetermined direction relative to the arm, and the control unit using the memory to adjust the arm and the stage so that an adjustment distance between the arm and the stage, which is arranged alongside the arm along the predetermined direction, is shortened to a first distance. a first process of moving at least one of the arm and the stage in the predetermined direction to sandwich the panel between the suction surface of the holding unit and the stage and to push the suction surface of the holding unit in a direction opposite to the stage as viewed from the arm; a second process of causing the panel conveying device to perform or stop suction of the panel by the suction surface of the holding unit; a third process of moving at least one of the arm and the stage so that the adjustment distance is increased to a second distance that is longer than the first distance; and a third process of maintaining the adjustment distance at the second distance while the panel is in contact with the suction surface of the holding unit and the stage for a predetermined stop period. A fourth process and a fifth process of moving at least one of the arm and the stage so that the adjustment distance is longer than the second distance are performed.
[0008] These comprehensive or specific aspects may be realized by a system, a method, an integrated circuit, a computer program, or a computer-readable recording medium such as a CD-ROM, or may be realized by any combination of the system, the method, the integrated circuit, the computer program, and the recording medium. The recording medium may be a non-transitory recording medium. Effect of the Invention
[0009] The control device of the present disclosure can smoothly transfer the panel.
[0010] Further advantages and benefits of certain aspects of the present disclosure will become apparent from the specification and drawings, in which such advantages and / or benefits are provided by some of the embodiments and features described in the specification and drawings, respectively, but not necessarily all of which are provided to obtain one or more identical features. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a diagram showing a schematic configuration of a component mounting line in the first embodiment. [Diagram 2] FIG. 2 is a plan view of the component mounting line in the first embodiment. [Diagram 3] FIG. 3 is a block diagram showing an example of a configuration of the panel conveying system according to the first embodiment. As shown in FIG. [Figure 4] FIG. 4 is a perspective view showing an example of the panel transport device according to the first embodiment. [Diagram 5] FIG. 5 is a diagram for explaining the adjustment distance controlled by the control device in the first embodiment. [Figure 6] FIG. 6 is a diagram showing an example of an operation when a panel is transferred from a stage to a panel transport device in the first embodiment, in comparison with a comparative example. [Figure 7]FIG. 7 is a diagram showing an example of the timing of an operation when a panel is transferred from a stage to a panel transport device in the first embodiment, in comparison with a comparative example. [Figure 8] FIG. 8 is a flowchart illustrating an example of a processing operation of the control device in the first embodiment. [Figure 9] FIG. 9 is a diagram showing an example of an operation when a panel is transferred from a stage to a panel transport device in the modification of the first embodiment. [Figure 10] FIG. 10 is a flowchart showing an example of a processing operation of the control device in the modification of the first embodiment. [Figure 11] FIG. 11 is a diagram showing an example of an operation when a panel is transferred from the panel transport device to a stage in the second embodiment. [Figure 12] FIG. 12 is a diagram showing an example of the timing of an operation when a panel is transferred from the panel transport device to the stage in the second embodiment. [Figure 13] FIG. 13 is a flowchart illustrating an example of a processing operation of the control device in the second embodiment. [Figure 14] FIG. 14 is a diagram showing an example of an operation when a panel is transferred from the panel transport device to the stage in the modification of the second embodiment. [Figure 15] FIG. 15 is a flowchart showing an example of a processing operation of the control device in the modification of the second embodiment. [Figure 16] FIG. 16 is a flowchart illustrating an example of a schematic processing operation of the control device in the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] (Findings on which this disclosure is based) The present inventors have found that the control device of Patent Document 1 described in the "Background Art" section above has the following problems.
[0013] In recent years, panels handled by component mounting devices have become larger. As the panels become larger, it is necessary to enlarge the arms and suction pads for transporting the panels. Alternatively, it is necessary to increase the number of suction pads and widely distribute many of them. As a result, the heights of the multiple suction pads may vary greatly. Such variation in the heights of the multiple suction pads has a negative effect on the suction of panels arranged along the horizontal direction. Therefore, it is considered to adopt a floating mechanism for attaching the suction pads to the arm. In the floating mechanism, the suction pads are attached to the arm via elastic members such as springs. Therefore, when the stage on which the panel is placed rises, each suction pad abuts and is pressed against the panel on the stage at a timing according to the height of the suction pad. The suction pads pressed against the panel rise relative to the arm while biasing the above-mentioned elastic members. In other words, each suction pad is pressed upward. As a result, even if there is a large variation in the heights of the multiple suction pads, all the suction pads can firmly suction and hold the panel.
[0014] Therefore, the component mounting device of Patent Document 1 also employs a floating mechanism to transfer a large panel from the stage to the substrate transfer unit. However, the control device of the component mounting device of Patent Document 1 lowers the stage to the standby position in one go after the panel is adsorbed by the multiple suction pads of the substrate transfer unit, which causes a large impact on the arm of the substrate transfer unit. Specifically, when the stage is lowered in one go, the arm receives an impact in one go that is the sum of the force of the elastic member and the weight of the large panel. In addition, if the amount of pressing of the multiple suction pads is increased in order to suppress the above-mentioned adverse effects due to the variation in height of the multiple suction pads, the impact on the arm will be further increased. As a result, the control device of Patent Document 1 has a problem that it is difficult to smoothly transfer the panel.
[0015] In order to solve such problems, a control device according to a first aspect of the present disclosure is a control device that controls at least one of a panel transport device and a stage, and includes a control unit and a memory connected to the control unit, the panel transport device includes an arm and a holding unit that holds the panel by adsorbing the panel with an adsorption surface, the holding unit is attached to the arm such that an adsorption surface of the holding unit is movable in a predetermined direction relative to the arm by elasticity, and the control unit uses the memory to move at least one of the arm and the stage in the predetermined direction such that an adjustment distance between the arm and the stage, which is arranged alongside the arm along the predetermined direction, is shortened to a first distance. The panel conveying device executes a first process of sandwiching the panel between the suction surface of the holding part and the stage and pushing the suction surface of the holding part in a direction opposite to the stage side as viewed from the arm, a second process of causing the panel conveying device to execute or stop suction of the panel by the suction surface of the holding part, a third process of moving at least one of the arm and the stage so that the adjustment distance is increased to a second distance longer than the first distance, a fourth process of maintaining the adjustment distance at the second distance while the panel is in contact with the suction surface of the holding part and the stage for a predetermined stop period, and a fifth process of moving at least one of the arm and the stage so that the adjustment distance is longer than the second distance. The predetermined direction is, for example, a vertical direction.
[0016] As a result, the holder is attached to the arm by a floating mechanism. In the first process, the suction surface of the holder is pressed in by the floating mechanism, and after the panel suction is performed or stopped in the second process, the third and fourth processes are performed without directly performing the fifth process. Therefore, the arm and stage can be easily moved. At least one of the arm and the stage does not move a long distance at once, moves so that the adjustment distance becomes longer than the first distance, and then temporarily stops at a position where the adjustment distance becomes the second distance, and then moves further so that the adjustment distance becomes longer than the second distance. That is, the movement of at least one of the arm and the stage is performed by a two-stage motion including a third process motion and a fifth process motion. The third process motion is the first-stage motion, and the fifth process motion is the second-stage motion. In addition, between these two motions, the panel is maintained in a state of contact with the suction surface of the holding unit and the stage for a stop period. As a result, when at least one of the arm and the stage moves so that the adjustment distance becomes longer than the second distance from the first distance, the impact received by the arm can be suppressed. Therefore, the panel can be smoothly transferred between the stage and the panel conveying device.
[0017] In a control device according to a second aspect, in the first process, the control unit may move at least one of the arm and the stage so that the panel transitions from a state in which the panel is placed on the stage and not in contact with the suction surface of the holder to a state in which the panel is in contact with and pressed against the suction surface of the holder, and in the second process, cause the panel transport device to suction the panel with the suction surface of the holder. Note that the second aspect is dependent on the first aspect.
[0018] This allows the panel to be transferred from the stage to the panel transport device. As a result, when the panel is transferred from the stage to the panel transport device, more specifically, when the holding section adsorbs the panel and the adjustment distance becomes longer, it is possible to suppress the impact that the arm receives due to the weight of the panel. Therefore, the panel can be transferred smoothly from the stage to the panel transport device.
[0019] In a control device according to a third aspect, in the first process, the control unit may move at least one of the arm and the stage so that the panel transitions from a state in which the panel is not placed on the stage and is adsorbed to the adsorption surface of the holder to a state in which the panel is placed on the stage and pressed against the adsorption surface of the holder, and in the second process, cause the panel transport device to stop adsorption of the panel by the adsorption surface of the holder. Note that the third aspect is dependent on the first aspect.
[0020] This allows the panel to be transferred from the panel transport device to the stage. As a result, it is possible to reduce the impact that the arm receives when the panel is transferred from the panel transport device to the stage. This allows the panel to be transferred smoothly from the panel transport device to the stage.
[0021] In addition, in the control device according to a fourth aspect, the control unit may move the stage toward the arm side in the first process, move the stage in a direction opposite to the arm side in the third process and the fifth process, and stop the stage in the fourth process, thereby maintaining the adjustment distance at the second distance. Note that the fourth aspect may be subordinate to any one of the first to third aspects.
[0022] This makes it possible to reduce the impact that the arm receives when the panel is handed over due to the movement of the stage, and allows the panel to be handed over smoothly.
[0023] In addition, in the control device according to a fifth aspect, the control unit may move the arm toward the stage in the first process, move the arm away from the stage in the third process and the fifth process, and stop the arm in the fourth process, thereby maintaining the adjustment distance at the second distance. Note that the fifth aspect may be subordinate to any one of the first to third aspects.
[0024] This makes it possible to reduce the impact that the arm receives when the panel is handed over by the movement of the arm, thereby enabling the panel to be handed over smoothly.
[0025] In the control device according to a sixth aspect, the second distance may be determined by (1) a thickness of the panel, and (2) a distance between the suction surface of the holding part and the arm when no force is applied from the panel. Note that the sixth aspect may be dependent on any one of the first to fifth aspects.
[0026] This makes it possible to set the second distance to a distance at which the biasing force of the floating mechanism is released, thereby effectively suppressing the impact received by the arm.
[0027] In the control device according to a seventh aspect, the control unit may further acquire thickness information indicating a thickness of the panel, and determine the second distance based on the thickness information. Note that the seventh aspect may be subordinate to any one of the first to sixth aspects.
[0028] As a result, the second distance is determined based on the thickness of the panel, so that the impact received by the arm can be appropriately suppressed according to the thickness of the panel.
[0029] In the control device according to an eighth aspect, the control unit may determine the second distance such that the second distance is longer as the thickness of the panel indicated by the thickness information is larger. Note that the eighth aspect is dependent on the seventh aspect.
[0030] This makes it possible to effectively suppress the impact on the arm in accordance with the thickness of the panel.
[0031] A panel transport system according to a ninth aspect of the present disclosure includes the control device according to any one of the first to eighth aspects, the panel transport device, and the stage.
[0032] This makes it possible to achieve the same effect as any one of the first to eighth aspects.
[0033] In a panel conveying system according to a tenth aspect, the holding unit may include a support shaft attached to the arm so as to be movable in the predetermined direction, and a suction pad made of an elastic member connected to the support shaft and configured to suction the panel with the suction surface. Note that the tenth aspect is dependent on the ninth aspect.
[0034] This allows the holding portion to be appropriately attached to the arm by the floating mechanism, and as a result, when multiple holding portions adsorb a panel, even if there is variation in the positions of the adsorption surfaces of those holding portions in a predetermined direction, the multiple holding portions can appropriately adsorb the panel.
[0035] Hereinafter, the embodiment will be specifically described with reference to the drawings.
[0036] The embodiments described below are all comprehensive or specific examples. The numerical values, shapes, materials, components, arrangement and connection of components, steps, and order of steps shown in the following embodiments are merely examples and are not intended to limit the present disclosure. In addition, among the components in the following embodiments, components that are not described in an independent claim showing the highest concept are described as optional components. In addition, each figure is a schematic diagram and is not necessarily a strict illustration. In addition, the same components are given the same reference numerals in each figure.
[0037] (Embodiment 1) [Schematic configuration of component mounting line] FIG. 1 is a diagram showing a schematic configuration of a component mounting line in this embodiment.
[0038] The component mounting line 1 in this embodiment is a system that produces products such as display panels (i.e., mounted panels) by mounting components 5 on panels 3 such as liquid crystal panels, organic EL (Electro-Luminescence) panels, etc. The components 5 are, for example, electronic components such as drive circuits, and the panels 3 are also called substrates.
[0039] 1, such a component mounting line 1 has a panel carry-in section 10, an adhesion section 20, a temporary pressure-bonding section 30, a final pressure-bonding section 40, and a panel carry-out section 50. The panel carry-in section 10, the adhesion section 20, the temporary pressure-bonding section 30, the final pressure-bonding section 40, and the panel carry-out section 50 are connected in this order.
[0040] The panel carry-in section 10 receives the panel 3 carried in by a worker or from another device on the upstream side. The panel 3 is then carried out to the downstream bonding section 20. An example of the shape of the panel 3 is a rectangle.
[0041] The bonding section 20 receives the panel 3 carried out from the panel carry-in section 10, and bonds an adhesive material such as ACF to each of the multiple electrode sections 4 on the periphery of the panel 3. Then, the panel 3 with the adhesive material attached is carried out to the temporary pressure bonding section 30. Each of the multiple electrode sections 4 is composed of, for example, multiple electrodes.
[0042] The temporary bonding unit 30 receives the panel 3 carried out from the attachment unit 20, and mounts and temporarily bonds the component 5 on the portion of the panel 3 to which the adhesive member has been attached. Then, the panel 3 to which the component 5 has been temporarily bonded is carried out to the full bonding unit 40.
[0043] The final compression bonding section 40 receives the panel 3 carried out from the temporary compression bonding section 30, and performs final compression bonding (also called thermocompression bonding) on the components 5 temporarily bonded to the panel 3. Then, the panel 3 that has been subjected to the final compression bonding is carried out to a panel discharge section 50.
[0044] The panel discharge section 50 receives the panel 3 discharged from the final pressure bonding section 40. The panel 3 received by the panel discharge section 50 is discharged downstream.
[0045] In this manner, the component mounting line 1 performs component mounting work of mounting components 5 to each of the multiple electrode portions 4 provided on the periphery of the loaded panel 3, and then transports the panel 3 with the components 5 mounted thereon from the panel unloading section 50 as a mounting panel or mounting board.
[0046] [Detailed configuration of component mounting line] FIG. 2 is a plan view of the component mounting line 1 in this embodiment. Specifically, FIG. 2 shows the configuration of the component mounting line 1 viewed from above. In this embodiment, the conveying direction of the panel 3, i.e., the left-right direction, is referred to as the X-axis direction, the vertical direction, i.e., the up-down direction, is referred to as the Z-axis direction, and the direction perpendicular to the X-axis direction and the Z-axis direction, i.e., the depth direction, is referred to as the Y-axis direction. The negative side and the positive side in the X-axis direction correspond to the upstream side and the downstream side, respectively, in the conveying direction of the panel 3, the negative side and the positive side in the Z-axis direction correspond to the lower side and the upper side, respectively, in the vertical direction, and the negative side and the positive side in the Y-axis direction correspond to the near side and the far side, or the front side and the rear side, respectively, in the depth direction.
[0047] The panel carry-in unit 10 includes a base 1a on which the panel 3 to be carried in is placed. The base 1a of the panel carry-in unit 10 is provided with a stage 11 on which the panel 3 is placed. The stage 11 moves up and down in the Z-axis direction relative to the base 1a. In addition, a plurality of suction holes 11a are provided on the top surface of the stage 11. The stage 11 holds the panel 3, which has been carried in by a worker or from another device upstream and placed on the stage 11, by vacuum suction through the suction holes 11a using a suction device such as a pump (not shown).
[0048] The adhering unit 20 has a function of performing an adhering operation of adhering an ACF, which is an adhesive member, to the electrode unit 4 of the panel 3. The adhering unit 20 includes a panel moving mechanism 21 and an adhering mechanism 22.
[0049] The panel moving mechanism 21 is a mechanism that moves the panel 3. The panel moving mechanism 21 includes, for example, an X-axis table movable in the X-axis direction, a Y-axis table movable in the Y-axis direction, a Z-axis table movable in the Z-axis direction, and a stage 23. In the panel moving mechanism 21, the X-axis table, the Y-axis table, the Z-axis table, and the stage 23 are stacked on top of each other on the base 1b in this order from the bottom.
[0050] The Y-axis table is provided to extend in the Y-axis direction and moves freely in the X-axis direction on the X-axis table. The Z-axis table moves freely in the Y-axis direction on the Y-axis table, and raises and lowers the stage 23 provided on the upper portion in the Z-axis direction and rotates it around the Z axis.
[0051] Furthermore, a plurality of suction holes 23a are provided on the upper surface of the stage 23, and the stage 23 holds the panel 3 placed on its upper surface by vacuum suction. In this manner, the panel moving mechanism 21 suctions and holds the panel 3, moves it within a horizontal plane (specifically, in the X-axis and Y-axis directions), raises and lowers it in the vertical direction (i.e., the Z-axis direction), and rotates it around the Z axis.
[0052] The bonding mechanism 22 is provided with, for example, two bonding heads aligned in the X-axis direction above the base 1b. Each bonding head is provided with a supply unit that supplies ACF and a bonding tool for bonding the ACF to the panel 3. Each of the two bonding heads bonds the ACF to positions on the panel 3 that correspond to the multiple electrode portions 4. Also, a bonding support stand is provided at a position corresponding to each of the two bonding heads below.
[0053] The temporary compression bonding unit 30 performs a temporary compression bonding operation in which a component 5 is mounted on the area of the panel 3 where the ACF is attached (i.e., the compression target portion) and temporarily compressed. The temporary compression bonding unit 30 includes a panel moving mechanism 31, a component mounting mechanism 32, a component supply unit 33, and a component transport unit 35.
[0054] The panel moving mechanism 31 has a structure similar to that of the panel moving mechanism 21 of the bonding unit 20. Specifically, the panel moving mechanism 31 has a stage 37 that holds the panel 3. A plurality of suction holes 37a is provided on the upper surface of the stage 37. The panel moving mechanism 31 holds the panel 3 placed on the stage 37 by vacuum suction through the plurality of suction holes 37a. The panel moving mechanism 31 also has a function of moving the stage 37 that suction-holds the panel 3 within a horizontal plane, raising and lowering it in the vertical direction, and rotating it around the Z axis. By moving and rotating the stage 37, the panel moving mechanism 31 positions the area of the panel 3, where the ACF is affixed, that is held by suction, above the backup unit 36, which is the backup stage of the component mounting mechanism 32.
[0055] The component supply unit 33 is provided on the far side of the component mounting mechanism 32 (i.e., the positive side in the Y-axis direction) and protrudes from the rear of the base 1b. For example, the component supply unit 33 includes a supply reel 33a around which a tape member such as TCP is wound, a punching unit 33b, a movable stage 33c, and rails 33d. Such a component supply unit 33 sequentially supplies components 5 from the tape member by the movements of these components.
[0056] The component transfer unit 35 moves the component 5 supplied from the component supply unit 33 to the side of the crimping tool 34 included in the component mounting mechanism 32 .
[0057] The component mounting mechanism 32 is provided on the base 1b, and includes a pressure bonding tool 34 and a backup unit 36.
[0058] Backup unit 36 is a member formed into an elongated shape, and supports panel 3 from below. In other words, backup unit 36 supports from below a portion to be crimped, which is a predetermined portion of panel 3 held by stage 37. This portion to be crimped is the portion of panel 3 to which ACF is attached.
[0059] The crimping tool 34 holds the component 5 and crimps the component 5 onto the upper surface of the panel 3 supported by the backup unit 36. That is, the crimping tool 34 crimps the component 5 onto the portion of the panel 3 that is to be crimped. Specifically, the crimping tool 34 moves up and down in the Z-axis direction, and adsorbs (i.e., picks up) the component 5 moved by the component transfer unit 35 from above. The crimping tool 34 then places the adsorbed component 5 on the ACF and presses the panel 3 against the backup unit 36, thereby pre-pressing the component 5 to the panel 3. The pre-pressing unit 30 may be provided with a mechanism for rotating the orientation of the panel 3 held by the panel movement mechanism 31 by 90 degrees.
[0060] The final bonding unit 40 performs a final bonding operation (also referred to as a thermocompression operation) of final bonding (i.e., thermocompression bonding) of the component 5, which has been temporarily bonded to the panel 3 by the temporary bonding unit 30, to the panel 3. In this manner, the electrode unit 4 formed on the panel 3 and the component 5 are electrically connected via the ACF. The final bonding unit 40 includes a panel moving mechanism 41 and a bonding mechanism 42.
[0061] The panel moving mechanism 41 has a structure similar to that of the panel moving mechanism 21 of the bonding unit 20. Specifically, the panel moving mechanism 41 has a stage 49. A plurality of suction holes 49a are provided on the upper surface of the stage 49. The panel moving mechanism 41 holds the panel 3 placed on the stage 49 by vacuum suction through the plurality of suction holes 49a. The panel moving mechanism 41 also has a function of moving the stage 49 that suction-holds the panel 3 in a horizontal plane, raising and lowering it in the vertical direction, and rotating it around the Z axis. By moving and rotating the stage 49, the panel moving mechanism 41 positions the area where the component 5 of the panel 3, which is suction-held and temporarily pressure-bonded, above the pressure-bonding support unit of the pressure-bonding mechanism 42.
[0062] The bonding mechanism 42 presses the component 5 of the panel 3 toward the bonding support part with a heated head. This causes the component 5 to be fully bonded, and the electrode part 4 formed on the panel 3 and the component 5 are electrically connected via the ACF.
[0063] The panel discharge section 50 has a function of vacuum-adsorbing and holding the panel 3 transported from the final pressure bonding section 40 on the stage 51. The panel 3 held in the panel discharge section 50 is either transported to another device downstream or removed from the stage 51 by an operator. The stage 51 moves up and down in the Z-axis direction relative to the base 1c. In addition, a plurality of suction holes 51a are provided on the upper surface of the stage 51, and the panel 3 transferred from the final pressure bonding section 40 is vacuum-adsorbed and held on the upper surface of the stage 51.
[0064] The conveying section 60 is a device that conveys the panel 3. Specifically, the conveying section 60 has a function of delivering (transporting) the panel 3 that has been carried into the panel carry-in section 10 to the adhering section 20, the temporary pressure-bonding section 30, the final pressure-bonding section 40, and the panel carry-out section 50 in that order. The conveying section 60 is disposed in a front area (i.e., on the negative side in the Y-axis direction) of the adhering section 20, the temporary pressure-bonding section 30, and the final pressure-bonding section 40. It is being done.
[0065] The transport section 60 includes a panel transport mechanism 62A, a panel transport mechanism 62B, a panel transport mechanism 62C, and a panel transport mechanism 62D, which are arranged in this order from the upstream side on a moving base 61 extending in the X-axis direction across the bases 1a, 1b, and 1c. Each of the panel transport mechanisms 62A to 62D includes a base 63 and one or more arm units 64. In this embodiment, a case is illustrated in which each of the panel transport mechanisms 62A to 62D includes two arm units 64. The base 63 is provided on the moving base 61 and is freely movable in the X-axis direction. On the base 63, two arm units 64 are provided side by side in the X-axis direction. The arm units 64 vacuum-suck the panel 3 from above.
[0066] Each of the panel conveying mechanisms 62A to 62D moves to a panel delivery position where the panel 3 held by the stage 11, 23, 37, 49, 51 is vacuum-sucked from above, and receives or delivers the panel 3 from the rising and lowering stage 11, 23, 37, 49, 51. For example, the panel conveying mechanism 62A receives the panel 3 placed on the stage 11 of the panel carry-in section 10 and delivers it to the stage 23 of the bonding section 20. Also, for example, the panel conveying mechanism 62B receives the panel 3 from the stage 23 of the bonding section 20 and delivers it to the stage 37 of the temporary pressure-bonding section 30. Also, for example, the panel conveying mechanism 62C receives the panel 3 from the stage 37 of the temporary pressure-bonding section 30 and delivers it to the stage 49 of the main pressure-bonding section 40. Also, for example, the panel conveying mechanism 62D receives the panel 3 from the stage 49 of the main pressure-bonding section 40 and delivers it to the stage 51 of the panel conveying section 50.
[0067] [Panel transport system] The panel conveying system in this embodiment is made up of a plurality of components included in the component mounting line 1.
[0068] FIG. 3 is a block diagram showing an example of the configuration of a panel conveying system 100 according to the present embodiment.
[0069] The panel conveying system 100 includes a control device 110, a panel conveying device 120, and a stage 130.
[0070] Panel transport apparatus 120 is any one of panel transport mechanisms 62A to 62D shown in Fig. 2. Panel transport apparatus 120 may be composed of two or more of panel transport mechanisms 62A to 62D. Panel transport apparatus 120 may be transport section 60 shown in Fig. 2.
[0071] Stage 130 is any one of stages 11, 23, 37, 49, and 51 shown in Figure 2. Stage 130 may also be made up of two or more of stages 11, 23, 37, 49, and 51.
[0072] The control device 110 includes a control unit 111 and a memory 112. The control device 110 may be a device incorporated in the component mounting line 1, or may be a device connected to the component mounting line 1 via, for example, a communication network. The memory 112 is a recording medium connected to the control unit 111, and is specifically, for example, a random access memory (RAM), a read only memory (ROM), or a semiconductor memory. The memory 112 may be volatile or non-volatile. The memory 112 may store a computer program or control data. The control unit 111 is, for example, a circuit such as a processor or a central processing unit (CPU), and receives computer program data from the memory 112. The panel transport device 120 and the stage 122 are read and executed by the data program. 130. Furthermore, when controlling panel conveying device 120 and stage 130, control unit 111 may determine various parameters for controlling panel conveying device 120 and stage 130 by referring to control data stored in memory 112. In other words, control unit 111 executes various processes using memory 112.
[0073] 4 is a perspective view showing an example of a panel transport apparatus 120 in the present embodiment. Note that the panel transport apparatus 120 shown in FIG. 4 is any one of the panel transport mechanisms 62A to 62D shown in FIG.
[0074] As shown in FIG. 4, the panel conveying device 120 has a base 63 provided on a movable base 61 so as to be movable in the X-axis direction, and two arm units 64 provided on the base 63. Each arm unit 64 has an arm base 65 fixed to the base 63, and two arms 66 provided extending horizontally rearward from the arm base 65. Each arm 66 is provided with a plurality of suction pads 67 with their suction surfaces facing downward. Each arm unit 64 vacuum-sucks one panel 3 via the plurality of suction pads 67 (four in this embodiment) provided on the two arms 66. Thus, the panel conveying device 120 in this embodiment has the arm 66, and a holding unit having suction pads 67 that hold the panel 3 by sucking the panel 3 on the suction surface. The holding unit will be described in detail later.
[0075] In this embodiment, four suction pads 67 are used to adsorb one panel 3, but a number of suction pads 67 according to the size of the panel 3 may be used to adsorb the panel 3. For example, 4 to 16 suction pads 67 may be used to adsorb one panel 3.
[0076] FIG. 5 is a diagram for explaining the adjustment distance controlled by the control device 110 in this embodiment.
[0077] The control unit 111 of the control device 110 controls the adjustment distance of the panel conveying device 120 as shown in (a) and (b) of FIG. 5. Here, in this embodiment, the suction pad 67 is attached to the arm 66 via a support shaft 68. The support shaft 68 is attached to the arm 66 by an elastic member such as a spring so as to be movable in the Z-axis direction relative to the arm 66 along the Y-axis direction. The suction pad 67 is attached to the lower end side of the support shaft 68. The suction pad 67 is made of an elastic member such as rubber. Note that a mechanism including the support shaft 68 and the suction pad 67 attached to the support shaft 68 is configured as a holding unit 69 that holds the panel 3. That is, in this embodiment, the holding unit 69 is attached to the arm 66 so that the suction surface 67a of the holding unit 69 can move in the Z-axis direction relative to the arm 66 by elasticity. Note that the elasticity is at least one of the elasticity of the elastic member such as a spring of the support shaft 68 and the elasticity of the suction pad 67. Specifically, the holding unit 69 includes a support shaft 68 that is attached to the arm 66 so as to be movable in the Z-axis direction, and a suction pad 67 made of an elastic member that is connected to the support shaft 68 and configured to adsorb the panel 3 on its suction surface 67a. Thereby, in this embodiment, the holding unit 69 can be appropriately attached to the arm 66 by a floating mechanism. As a result, when a plurality of holding units 69 adsorb the panel 3, even if there is variation in the positions of the suction surfaces 67a of the holding units 69 in the Z-axis direction, the plurality of holding units 69 can appropriately adsorb the panel 3.
[0078] The adjustment distance in this embodiment is the distance in the Z-axis direction between the arm 66 and the upper surface of the stage 130. The control unit 111 in this embodiment raises and lowers the stage 130 to set the adjustment distance to a first distance L1, or to a second distance L2.
[0079] For example, as shown in FIG. 5A, the control unit 111 sets the adjustment distance to the second distance L2 by moving the stage 130 in the Z-axis direction. When the adjustment distance is the second distance L2, the plurality of suction pads 67 and the stage 130 contact the panel 3 with the panel 3 sandwiched therebetween. The second distance L2 is the sum of the distance La between the arm 66 and the suction surface 67a of the suction pad 67 and the thickness Lp of the panel 3. Here, the distance La is the distance between the suction surface 67a of the suction pad 67 and the arm 66 when the suction pad 67 is not receiving a force in the Z-axis direction from the panel 3. The distance La is determined by the configuration of the panel conveying device 120, regardless of the thickness Lp of the panel 3. That is, the second distance L2 is determined by (1) the thickness Lp of the panel 3 and (2) the distance La between the suction surface 67a of the holder 69 and the arm 66 when no force is received from the panel 3. The distance La may be a distance that is several percent to 10% shorter than that distance.
[0080] Also, the control unit 111 sets the adjustment distance to the first distance L1 by moving the stage 130 in the Z-axis direction as shown in FIG. 5B. For example, the control unit 111 sets the adjustment distance to the first distance L1 by raising the stage 130 in the state shown in FIG. 5A. When the adjustment distance is the first distance L1, the stage 130 and the panel 3 push the suction pad 67 upward as shown in FIG. 5B. At this time, the suction pad 67 pushes the support shaft 68 connected to the suction pad 67 upward while being distorted by the force received from the panel 3 and the elasticity of the suction pad 67, that is, while being contracted in the height direction. At this time, the support shaft 68 is biased upward. Such a first distance L1 is the sum of the distance Lb between the arm 66 and the suction surface 67a of the suction pad 67 and the thickness Lp of the panel 3. Note that the distance Lb is shorter than the distance La.
[0081] The first distance L1 and the second distance L2 may be stored as control data in the memory 112 of the control device 110. The control unit 111 may read out the first distance L1 and the second distance L2 from the memory 112, and thereby raise and lower the stage 130 so that the adjustment distance becomes the first distance L1 or the second distance L2. The distance La and the distance Lb may be stored as control data in the memory 112 of the control device 110. In this case, the control unit 111 acquires thickness information indicated in the production data, for example, and reads out the distance La from the memory 112. The thickness information indicates the thickness Lp of the panel 3. The control unit 111 may determine the second distance L2 by adding the thickness Lp and the distance La. That is, the control unit 111 acquires thickness information indicating the thickness Lp of the panel 3, and determines the second distance L2 based on the thickness information. Therefore, the control unit 111 determines the second distance L2 such that the second distance L2 is longer as the thickness Lp of the panel 3 indicated by the thickness information is larger.
[0082] FIG. 6 is a diagram showing an example of the operation when a panel 3 is transferred from stage 130 to panel conveying device 120 in this embodiment in comparison with a comparative example. Note that (a1), (a2), and (a3) of FIG. 6 show the operation between stage 1300 and panel conveying device 1200 in the comparative example. Also, in the comparative example, panel 3 that is sucked and held on stage 1300 is transferred to panel conveying device 1200. Also, panel conveying device 1200 includes arm 660, support shaft 680, and suction pad 670, which correspond to arm 66, support shaft 68, and suction pad 67 in this embodiment. Meanwhile, (b1), (b2), (b3), and (a4) of FIG. 6 show the operation between stage 130 and panel conveying device 120 in this embodiment.
[0083] In the comparative example, first, as shown in (a1) of FIG. 6, the stage 1300 sucks and holds the panel 3, and the multiple suction pads 670 of the panel conveying device 1200 are located above and away from the panel 3. Then, as shown in (a2) of FIG. 6, the stage 1300 sucks and holds the panel 3. The suction pads 670 rise while suction-holding the panel 3, and press the panel 3 against the plurality of suction pads 670. As a result, the plurality of suction pads 670 are pushed upward together with the plurality of support shafts 680 while distorting. At this time, the elastic members such as springs of the support shafts 680 are urged. The plurality of suction pads 670 then suction-hold the panel 3.
[0084] Next, the stage 1300 descends in one go, as shown in (a3) of FIG. 6. As a result, the suction pads 670 that are adsorbing the panel 3 and the support shafts 680 connected thereto also descend in one go. As a result, the arm 660 receives a large impact. Specifically, when the stage 1300 descends in one go, the arm 660 receives an impact in one go that is the sum of the force of the elastic members of the support shafts 680 and the weight of the panel 3. Also, the larger the panel 3, the larger the impact the arm 660 receives.
[0085] Therefore, in the present embodiment, when the panel 3 is transferred from the stage 130 to the panel conveying device 120, the control unit 111 lowers the stage 130 by a two-stage motion. For example, the control unit 111 causes the stage 130 to suction-hold the panel 3 as shown in (b1) of FIG. 6, and then raises the stage 130 as shown in (b2) of FIG. 6. At this time, the control unit 111 raises the stage 130 until the above-mentioned adjustment distance becomes the first distance L1. As a result, the panel 3 suction-held on the stage 130 is pressed against the plurality of suction pads 67. As a result, the plurality of suction pads 67 are pushed upward together with the plurality of support shafts 68 while being distorted. At this time, as in the comparative example, the elastic members such as springs of the support shafts 68 are urged. Then, the plurality of suction pads 67 suction-hold the panel 3.
[0086] Next, as shown in (b3) and (b4) of Fig. 6, the control unit 111 lowers the stage 130 in a two-stage motion, without lowering the stage 130 all at once. That is, in the first stage, the control unit 111 lowers the stage 130 until the adjustment distance becomes the second distance L2, as shown in (b3) of Fig. 6, and stops the stage 130 for a predetermined stop period when the adjustment distance becomes the second distance L2. Then, in the second stage, the control unit 111 further lowers the stage 130, as shown in (b4) of Fig. 6.
[0087] FIG. 7 is a diagram showing an example of the timing of operations when a panel 3 is transferred from the stage 130 to the panel conveying device 120 in this embodiment, in comparison with a comparative example. The graph in FIG. 7(a) is a comparative example, and shows the timing of each of the operations of the stage 1300 and the panel conveying device 1200. Specifically, the graph in FIG. 7(a) shows the time changes of the movement state of the stage 1300 in the Z-axis direction, the adsorption state of the panel 3 by the stage 1300, and the adsorption state of the panel 3 by the panel conveying device 1200. On the other hand, the graph in FIG. 7(b) shows the timing of each of the operations of the stage 130 and the panel conveying device 120 in this embodiment. Specifically, the graph in FIG. 7(b) shows the time changes of the movement state of the stage 130 in the Z-axis direction, the adsorption state of the panel 3 by the stage 130, and the adsorption state of the panel 3 by the panel conveying device 120.
[0088] For example, in the comparative example, as shown in (a) of FIG. 7, the stage 1300 that has risen falls in one go. Specifically, as shown in (a1) of FIG. 6, the stage 1300 stops and adsorbs the panel 3 by vacuum suction. That is, the adsorption state of the stage 1300 is set to adsorption ON. On the other hand, the panel conveying device 1200 does not perform vacuum suction. That is, the adsorption state of the panel conveying device 1200 is set to adsorption OFF. Then, the stage 1300 starts to rise from time t0 while adsorbing the panel 3, and stops at time t1. At this time, the panel 3 pushes up the suction pad 670 of the panel conveying device 1200, as shown in (a2) of FIG. 6. Thereafter, at time t2, the adsorption state of the stage 1300 is switched from adsorption ON to adsorption OFF, and the adsorption state of the panel conveying device 1200 is switched from adsorption OFF to adsorption ON. After that, from time t3 to time t4, the stage 1300 drops sharply as shown in (a3) of FIG.
[0089] On the other hand, in this embodiment, as shown in (b) of FIG. 7, the raised stage 130 does not descend all at once, but descends in a two-step motion. Specifically, as shown in (b1) of FIG. 6, the control unit 111 stops the stage 130 and causes the stage 130 to perform vacuum suction to adsorb the panel 3. That is, the adsorption state of the stage 130 is set to adsorption ON. On the other hand, the control unit 111 does not cause the panel conveying device 120 to perform vacuum suction. That is, the adsorption state of the panel conveying device 120 is set to adsorption OFF. Then, the control unit 111 starts to raise the stage 130 from time t0 while adsorbing the panel 3 to the stage 130, and stops it at time t1. At this time, the panel 3 pushes up the suction pad 67 of the panel conveying device 120, as shown in (b2) of FIG. 6. After that, at time t2, the control unit 111 switches the suction state of the stage 130 from suction ON to suction OFF, and switches the suction state of the panel transport device 120 from suction OFF to suction ON. After that, the control unit 111 causes the stage 130 to execute the first stage motion. That is, the control unit 111 causes the stage 130 to descend from time t3 to time t11. That is, the stage 130 descends as shown in (b2) and (b3) of FIG. 6. At this time, the biasing of the floating mechanism of the holding unit 69 is released. Then, when a predetermined stop period has elapsed from time t11, that is, at time t12, the control unit 111 causes the stage 130 to start the second stage motion. That is, the control unit 111 causes the stage 130 to descend from time t12 to time t13. As a result, the stage 130 descends as shown in (b3) and (b4) of FIG. 6.
[0090] In this way, the control unit 111 in this embodiment temporarily stops the descent of the stage 130 when the biasing force of the floating mechanism of the holding unit 69 is released, thereby suppressing the impact that the arm 66 receives due to the weight of the panel 3. This allows the panel 3 to be smoothly transferred from the stage 130 to the panel transport device 120.
[0091] The stop period from time t11 to time t12 is, for example, 100 msec, and may be changed depending on the shape and weight of the panel 3. The control unit 111 may determine the stop period depending on the size of the panel 3. Specifically, the control unit 111 may determine a longer period as the stop period as the size of the panel 3 increases. Alternatively, the control unit 111 may accept a period within a range of, for example, 10 msec to 2 sec as the stop period in response to an input operation by the user. The period from time t1 to time t3 is also called a pressing period or a pushing period. The end point of such a period (i.e., time t3) may be determined depending on the suction states of all the suction pads 67 used to suction the panel 3. That is, the control unit 111 may detect the suction states of all the suction pads 67 by a sensor or the like, and determine the timing at which it is detected that all the suction pads 67 are suctioning the panel 3 as the end point of the pushing period.
[0092] FIG. 8 is a flowchart showing an example of the processing operation of the control device 110 in this embodiment.
[0093] As shown in FIG. 8, the control unit 111 first executes a first process. That is, the control unit 111 raises the stage 130 that adsorbs and holds the panel 3, and shortens the adjustment distance between the stage 130 and the arm 66 to a first distance L1. As a result, the control unit 111 presses the panel 3 adsorbed on the stage 130 against the suction pad 67 (step S11). Next, the control unit 111 executes a second process. In the second process, the control unit 111 causes the panel conveying device 120 to adsorb the panel 3 by the suction pad 67 (step S12). That is, in the first process, the control unit 111 moves the stage 130 so that the panel 3 transitions from a state in which the panel 3 is placed on the stage 130 and not in contact with the adsorption surface 67a of the suction pad 67 to a state in which the panel 3 abuts against and is pressed against the adsorption surface 67a of the suction pad 67, as shown in (b1) and (b2) of FIG. 6. Then, in the second process, the control unit 111 causes the panel transport device 120 to adsorb the panel 3 by the suction surface 67a of the suction pad 67. At this time, the control unit 111 also causes the stage 130 to stop adsorbing the panel 3.
[0094] Next, the control unit 111 executes a third process. In the third process, the control unit 111 lowers the stage 130 as shown in (b3) of FIG. 6, to lengthen the adjustment distance to the second distance L2 (step S13). Then, the control unit 111 executes a fourth process. In the fourth process, the control unit 111 maintains the adjustment distance at the second distance L2 for a predetermined stop period (step S14). Thereafter, the control unit 111 executes a fifth process. In the fifth process, the control unit 111 further lowers the stage 130 as shown in (b4) of FIG. 6, to lengthen the adjustment distance beyond the second distance L2 (step S15).
[0095] Thus, in the present embodiment, in the first process, the suction surface 67a of the holder 69 is pressed in by the floating mechanism, and after the panel 3 is suctioned in the second process, the third process and the fourth process are performed without directly performing the fifth process. Therefore, the stage 130 does not descend a long distance at once, but descends so that the adjustment distance becomes longer than the first distance L1, and then temporarily stops at a position where the adjustment distance becomes the second distance L2, and then further descends so that the adjustment distance becomes longer than the second distance L2. That is, the descent of the stage 130 is performed by a two-stage motion including the motion of the third process and the motion of the fifth process. The motion of the third process is the first stage motion, and the motion of the fifth process is the second stage motion. In addition, between these two motions, the panel 3 is maintained in a state of contact with the suction surface 67a of the holder 69 and the stage 130 for a stop period. As a result, when the stage 130 moves so that the adjustment distance becomes longer than the second distance L2 from the first distance L1, it is possible to suppress the impact received by the arm 66. In other words, when the panel 3 is transferred from the stage 130 to the panel conveying device 120, more specifically, when the holding portion 69 adsorbs the panel 3 and the adjustment distance becomes longer, it is possible to suppress the impact received by the arm 66 due to the weight of the panel 3. Therefore, the panel 3 can be transferred smoothly from the stage 130 to the panel conveying device 120.
[0096] Moreover, in this embodiment, the control unit 111 moves the stage 130 when the panel 3 is transferred from the stage 130 to the panel conveying device 120. That is, in the first process, the control unit 111 moves the stage 130 toward the arm 66. In the third and fifth processes, the control unit 111 moves the stage 130 in the opposite direction to the arm 66. In the fourth process, the control unit 111 stops the stage 130 to maintain the adjustment distance at the second distance L2. This causes the stage 130 to move in this embodiment. That is, the stage 130 moves up and down. Therefore, the movement of the stage 130 can suppress the impact on the arm 66 when the panel 3 is transferred from the stage 130 to the panel conveying device 120, and the transfer of the panel 3 can be performed smoothly.
[0097] In this embodiment, the second distance L2 is determined by (1) the thickness of the panel 3, and (2) the distance between the suction surface 67a of the holding portion 69 and the arm 66 when no force is received from the panel 3. This makes it possible to set the second distance L2 to a distance at which the biasing force of the floating mechanism is released, and effectively suppresses the impact received by the arm 66.
[0098] In this embodiment, the control unit 111 acquires thickness information and performs a process based on the thickness information. Thus, the second distance L2 is determined based on the thickness Lp of the panel 3, so that the impact received by the arm 66 can be appropriately suppressed in accordance with the thickness Lp of the panel 3.
[0099] Furthermore, in this embodiment, the control unit 111 determines the second distance L2 to be a longer distance as the thickness Lp of the panel 3 indicated by the thickness information increases. This makes it possible to effectively suppress the impact received by the arm 66 in accordance with the thickness Lp of the panel 3.
[0100] (Modification of the first embodiment) In the first embodiment, when the panel 3 is transferred from the stage 130 to the panel transport device 120, the stage 130 moves. On the other hand, in this modification, the arm 66 moves.
[0101] FIG. 9 is a diagram showing an example of the operation when the panel 3 is transferred from the stage 130 to the panel transport device 120 in this modified example.
[0102] When the panel 3 is transferred from the stage 130 to the panel conveying device 120, the control unit 111 in this modification lifts the arm 66 of the panel conveying device 120 by a two-stage motion. For example, the control unit 111 causes the stage 130 to suction and hold the panel 3 as shown in (a) of FIG. 9. Then, the control unit 111 lowers the arm 66 instead of the stage 130 as shown in (b) of FIG. 9. At this time, the control unit 111 lowers the arm 66 until the above-mentioned adjustment distance becomes the first distance L1. As a result, the panel 3 suction-held on the stage 130 is pressed against the multiple suction pads 67. As a result, the multiple suction pads 67 are pushed upward together with the multiple support shafts 68 as viewed from the arm 66 while being distorted. At this time, the elastic members such as springs of the support shafts 68 are urged. Then, the multiple suction pads 67 suction the panel 3.
[0103] Next, as shown in (c) and (d) of Fig. 9, the control unit 111 raises the arm 66 in a two-stage motion, without raising the arm 66 all at once. That is, in the first stage, the control unit 111 raises the arm 66 until the adjustment distance becomes the second distance L2, as shown in (c) of Fig. 9, and stops the arm 66 for a predetermined stop period in a state where the adjustment distance becomes the second distance L2. Then, in the second stage, the control unit 111 further raises the arm 66, as shown in (d) of Fig. 9.
[0104] FIG. 10 is a flowchart showing an example of the processing operation of the control device 110 in this modified example.
[0105] As shown in FIG. 10, the control unit 111 first executes a first process. That is, the control unit 111 lowers the arm 66 to shorten the adjustment distance between the stage 130 and the arm 66 to a first distance L1, thereby pressing the panel 3 on the stage 130 against the suction pad 67 (step S11a). Next, the control unit 111 executes a second process. In the second process, the control unit 111 causes the panel conveying device 120 to suck the panel 3 by the suction pad 67 (step S12a). That is, in the first process, the control unit 111 moves the arm 66 so that the panel 3 transitions from a state in which the panel 3 is placed on the stage 130 and not in contact with the suction surface 67a of the suction pad 67 to a state in which the panel 3 is in contact with and pressed against the suction surface 67a of the suction pad 67, as shown in FIG. 9(a) and (b). Then, in the second process, the control unit 111 causes the panel transport device 120 to adsorb the panel 3 by the suction surface 67a of the suction pad 67. At this time, the control unit 111 also causes the stage 130 to stop adsorbing the panel 3.
[0106] Next, the control unit 111 executes a third process. In the third process, the control unit 111 executes the process shown in FIG. 9(c), the arm 66 is raised to lengthen the adjustment distance to the second distance L2 (step S13a). Then, the control unit 111 executes a fourth process. In the fourth process, the control unit 111 maintains the adjustment distance at the second distance L2 for a predetermined stop period (step S14a). Thereafter, the control unit 111 executes a fifth process. In the fifth process, the control unit 111 further raises the arm 66 to lengthen the adjustment distance beyond the second distance L2 (step S15a), as shown in FIG. 9(d).
[0107] In this manner, the control unit 111 in this modification moves the arm 66 of the panel conveying device 120 when the panel 3 is transferred from the stage 130 to the panel conveying device 120. That is, the control unit 111 moves the arm 66 toward the stage 130 in the first process. In the third and fifth processes, the control unit 111 moves the arm 66 in the opposite direction to the stage 130. In the fourth process, the control unit 111 stops the arm 66 to maintain the adjustment distance at the second distance L2. As a result, the arm 66 moves in this modification. That is, the arm 66 moves up and down. Therefore, the movement of the arm 66 can suppress the impact that the arm 66 receives when the panel 3 is transferred from the stage 130 to the panel conveying device 120, and the panel 3 can be transferred smoothly. That is, even when the arm 66 moves up and down, the same effect as in the first embodiment can be obtained.
[0108] (Embodiment 2) In the first embodiment and its modified examples, the panel 3 is transferred from the stage 130 to the panel conveying device 120. On the other hand, in the present embodiment, the panel 3 is transferred from the panel conveying device 120 to the stage 130. Then, in the present embodiment, as in the first embodiment, the stage 130 moves in a two-stage motion. Note that, among the components in the present embodiment, the same components as in the first embodiment are given the same reference numerals as in the first embodiment, and detailed description will be omitted. Also, the panel conveying system 100 in the present embodiment has the configuration shown in FIG. 3, as in the first embodiment.
[0109] FIG. 11 is a diagram showing an example of the operation when the panel 3 is transferred from the panel transport device 120 to the stage 130 in this embodiment.
[0110] In the present embodiment, when the panel 3 is transferred from the panel conveying device 120 to the stage 130, the control unit 111 lowers the stage 130 by a two-step motion. For example, as shown in FIG. 11(a), the control unit 111 causes the panel 3 to be sucked and held by the suction pads 67 of the panel conveying device 120, and raises the stage 130 as shown in FIG. 11(b). At this time, the control unit 111 raises the stage 130 until the above-mentioned adjustment distance becomes the first distance L1. As a result, the panel 3 sucked and held by the suction pads 67 is pressed against the upper surface of the stage 130. As a result, the suction pads 67 are pushed upward together with the support shafts 68 while being distorted. At this time, the elastic members such as springs of the support shafts 68 are urged. Then, the stage 130 sucks the panel 3, and the suction pads 67 stop sucking the panel 3.
[0111] Next, the control unit 111 lowers the stage 130 in a two-stage motion, without lowering the stage 130 all at once, as shown in (c) and (d) of Fig. 11. That is, in the first stage, the control unit 111 lowers the stage 130 until the adjustment distance becomes the second distance L2, as shown in (c) of Fig. 11, and stops the stage 130 for a predetermined stop period when the adjustment distance becomes the second distance L2. Then, in the second stage, the control unit 111 further lowers the stage 130, as shown in (d) of Fig. 11.
[0112] Fig. 12 is a diagram showing an example of the timing of operations when panel 3 is transferred from panel conveying device 120 to stage 130 in this embodiment. The graph in Fig. 12 shows the timing of operations of stage 130 and panel conveying device 120 in this embodiment. Specifically, the graph in Fig. 12 shows the time changes of the movement state of stage 130 in the Z axis direction, the suction state of panel 3 by stage 130, and the suction state of panel 3 by panel conveying device 120.
[0113] In this embodiment, as shown in FIG. 12, the stage 130 does not descend all at once, but descends in a two-step motion. Specifically, as shown in FIG. 11(a), the control unit 111 stops the stage 130 and causes the suction pads 67 of the panel conveying device 120 to perform vacuum suction to adsorb the panel 3. That is, the suction state of the suction pads 67 is set to suction ON. On the other hand, the control unit 111 does not cause the stage 130 to perform vacuum suction. That is, the suction state of the stage 130 is set to suction OFF. Then, the control unit 111 starts the rise of the stage 130 from time t0 and stops the rise at time t1. At this time, the stage 130 pushes up the suction pads 67 of the panel conveying device 120 together with the panel 3, as shown in FIG. 11(b). After that, at time t2, the control unit 111 switches the suction state of the stage 1300 from suction OFF to suction ON, and switches the suction state of the panel conveying device 120 from suction ON to suction OFF. After that, the control unit 111 causes the stage 130 to execute the first stage motion. That is, the control unit 111 causes the stage 130 to descend from time t3 to time t21. That is, the stage 130 descends as shown in (b) and (c) of FIG. 11. Then, when a predetermined stop period has elapsed from time t21, that is, at time t22, the control unit 111 causes the stage 130 to start the second stage motion. That is, the control unit 111 causes the stage 130 to descend from time t22 to time t23. As a result, the stage 130 descends as shown in (c) and (d) of FIG. 11.
[0114] In this manner, in this embodiment, the control unit 111 temporarily stops the descent of the stage 130 when the biasing force of the floating mechanism of the holding unit 69 is released, thereby suppressing the impact on the arm 66. This allows the panel 3 to be smoothly transferred from the panel transport device 120 to the stage 130.
[0115] FIG. 13 is a flowchart showing an example of the processing operation of the control device 110 in this embodiment.
[0116] As shown in FIG. 13, the control unit 111 first executes a first process. That is, the control unit 111 raises the stage 130 to shorten the adjustment distance between the stage 130 and the arm 66 of the panel conveying device 120 that adsorbs and holds the panel 3 to a first distance L1. As a result, the control unit 111 presses the stage 130 against the panel 3 that is adsorbed to the multiple suction pads 67 (step S21). Next, the control unit 111 executes a second process. In the second process, the control unit 111 causes the panel conveying device 120 to stop adsorbing the panel 3 by the suction pads 67 (step S22). That is, in the first process, the control unit 111 moves the stage 130 so that the panel 3 transitions from a state in which the panel 3 is not placed on the stage 130 and is adsorbed to the adsorption surface 67a of the suction pad 67 to a state in which the panel 3 is placed on the stage 130 and is pressed against the adsorption surface 67a of the suction pad 67, as shown in FIG. 12(a) and (b). Then, in the second process, the control unit 111 causes the panel conveying device 120 to stop suction of the panel 3 by the suction surface 67a of the suction pad 67. At this time, the control unit 111 also causes the stage 130 to suction the panel 3.
[0117] Next, the control unit 111 executes a third process. In the third process, the control unit 111 lowers the stage 130 to increase the adjustment distance to the second distance L2, as shown in FIG. (Step S23). Then, the control unit 111 executes a fourth process. In the fourth process, the control unit 111 maintains the adjustment distance at the second distance L2 for a predetermined stop period (Step S24). Thereafter, the control unit 111 executes a fifth process. In the fifth process, the control unit 111 further lowers the stage 130 as shown in FIG. 12(d) to make the adjustment distance longer than the second distance L2 (Step S25).
[0118] Thus, in this embodiment, when panel 3 is transferred from panel transport device 120 to stage 130, stage 130 is lowered in a two-stage motion, similar to embodiment 1. Therefore, this embodiment can also provide the same advantageous effects as embodiment 1.
[0119] That is, in the present embodiment, in the first process, the suction surface 67a of the holder 69 is pushed in by the floating mechanism, and after the suction of the panel 3 is stopped by the second process, the third process and the fourth process are performed without directly performing the fifth process. Therefore, the stage 130 does not descend a long distance at once, but descends so that the adjustment distance becomes longer than the first distance L1, and then temporarily stops at a position where the adjustment distance becomes the second distance L2, and then further descends so that the adjustment distance becomes longer than the second distance L2. That is, the descent of the stage 130 is performed by a two-stage motion including the motion of the third process and the motion of the fifth process. The motion of the third process is the first stage motion, and the motion of the fifth process is the second stage motion. In addition, between these two motions, the panel 3 is maintained in a state of contact with the suction surface 67a of the holder 69 and the stage 130 for a stop period. As a result, it is possible to suppress the impact received by the arm 66 when the stage 130 moves so that the adjustment distance becomes longer than the second distance L2 from the first distance L1. In other words, it is possible to suppress the impact received by the arm 66 when the panel 3 is transferred from the panel conveying device 120 to the stage 130, more specifically, when the holder 69 stops adsorbing the panel 3 and the adjustment distance becomes longer. Therefore, it is possible to smoothly transfer the panel 3 from the panel conveying device 120 to the stage 130.
[0120] Moreover, in the present embodiment, the control unit 111 moves the stage 130 when the panel 3 is transferred from the panel conveying device 120 to the stage 130. That is, in the first process, the control unit 111 moves the stage 130 toward the arm 66. In the third and fifth processes, the control unit 111 moves the stage 130 in the opposite direction to the arm 66. In the fourth process, the control unit 111 stops the stage 130 to maintain the adjustment distance at the second distance L2. This causes the stage 130 to move in this embodiment. That is, the stage 130 moves up and down. Therefore, the movement of the stage 130 can suppress the impact on the arm 66 when the panel 3 is transferred from the panel conveying device 120 to the stage 130, and the transfer of the panel 3 can be performed smoothly.
[0121] (Modification of the second embodiment) In the second embodiment, when the panel 3 is transferred from the panel transport device 120 to the stage 130, the stage 130 moves. On the other hand, in this modification, the arm 66 moves.
[0122] FIG. 14 is a diagram showing an example of the operation when the panel 3 is transferred from the panel transport device 120 to the stage 130 in this modified example.
[0123] When the panel 3 is transferred from the panel transport device 120 to the stage 130, the control unit 111 in this modification raises the arm 66 of the panel transport device 120 in a two-stage motion. For example, as shown in FIG. 14(a), the control unit 111 causes the multiple suction pads 67 of the panel transport device 120 to suction and hold the panel 3. Then, the control unit 111 14(b), the arm 66 is lowered instead of the stage 130. At this time, the control unit 111 lowers the arm 66 until the above-mentioned adjustment distance becomes the first distance L1. As a result, the panel 3 that is sucked and held by the multiple suction pads 67 is pressed against the stage 130. This causes the multiple suction pads 67 to be pushed upward together with the multiple support shafts 68 as viewed from the arm 66 while being distorted. Then, the multiple suction pads 67 stop sucking the panel 3, and the stage 130 sucks the panel 3.
[0124] Next, as shown in (c) and (d) of Fig. 14, the control unit 111 raises the arm 66 in a two-stage motion, without raising the arm 66 all at once. That is, in the first stage, the control unit 111 raises the arm 66 until the adjustment distance becomes the second distance L2, as shown in (c) of Fig. 14, and stops the arm 66 for a predetermined stop period in a state where the adjustment distance becomes the second distance L2. Then, in the second stage, the control unit 111 further raises the arm 66, as shown in (d) of Fig. 14.
[0125] FIG. 15 is a flowchart showing an example of the processing operation of the control device 110 in this modified example.
[0126] The control unit 111 first executes a first process as shown in Fig. 15. That is, the control unit 111 lowers the arm 66 to shorten the adjustment distance between the stage 130 and the arm 66 to a first distance L1, thereby pressing the panel 3, which is adsorbed by the suction pads 67 of the panel conveying device 120, against the upper surface of the stage 130 (step S21a). Next, the control unit 111 causes the panel conveying device 120 to stop adsorption of the panel 3 by the suction pad 67 (step S22a). That is, in the first process, the control unit 111 moves the arm 66 so that the panel 3 transitions from a state in which the panel 3 is not placed on the stage 130 and is adsorbed on the suction surface 67a of the suction pad 67 to a state in which the panel 3 is placed on the stage 130 and is pressed against the suction surface 67a of the suction pad 67, as shown in (a) and (b) of Fig. 14. Then, in the second process, the control unit 111 causes the panel conveying device 120 to stop suction of the panel 3 by the suction surface 67a of the suction pad 67. At this time, the control unit 111 also causes the stage 130 to suction the panel 3.
[0127] Next, the control unit 111 executes a third process. In the third process, the control unit 111 raises the arm 66 as shown in FIG. 14(c) to lengthen the adjustment distance to the second distance L2 (step S23a). Then, the control unit 111 executes a fourth process. In the fourth process, the control unit 111 maintains the adjustment distance at the second distance L2 for a predetermined stop period (step S24a). Thereafter, the control unit 111 executes a fifth process. In the fifth process, the control unit 111 further raises the arm 66 as shown in FIG. 14(d) to lengthen the adjustment distance beyond the second distance L2 (step S25a).
[0128] In this manner, the control unit 111 in this modification moves the arm 66 of the panel conveying device 120 when the panel 3 is transferred from the panel conveying device 120 to the stage 130. That is, the control unit 111 moves the arm 66 toward the stage 130 in the first process. In the third and fifth processes, the control unit 111 moves the arm 66 in the direction opposite to the stage 130. In addition, in the fourth process, the control unit 111 stops the arm 66 to maintain the adjustment distance at the second distance L2. As a result, the arm 66 moves in this modification. That is, the arm 66 moves up and down. Therefore, the movement of the arm 66 can suppress the impact that the arm 66 receives when the panel 3 is transferred from the panel conveying device 120 to the stage 130, and the transfer of the panel 3 can be performed smoothly. That is, even when the arm 66 moves up and down, the same effect as that of the second embodiment can be obtained.
[0129] As described above, the control unit 111 of the control device 110 in this disclosure moves the stage 130 or the arm 66 in a two-stage motion, as in the first embodiment and its modified example, and the second embodiment and its modified example.
[0130] FIG. 16 is a flowchart showing an example of a schematic processing operation of the control device 110 in the present disclosure.
[0131] The control unit 111 of the control device 110 first executes a first process (step S1). In this first process, the control unit 111 moves the arm 66 or the stage 130 in a predetermined direction so that the adjustment distance between the stage 130 arranged alongside the arm 66 along the predetermined direction and the arm 66 is shortened to a first distance. In the present disclosure, the predetermined direction is the Z-axis direction. In the first and second embodiments, the stage 130 moves, and in the modified examples of these embodiments, the arm 66 moves. As a result, the control unit 111 sandwiches the panel 3 between the suction surface 67a of the holder 69 and the stage 130, and presses the suction surface 67a of the holder 69 in the opposite direction to the stage 130 side when viewed from the arm 66.
[0132] Next, the control unit 111 executes a second process of causing the panel conveying device 120 to perform or stop adsorption of the panel 3 by the adsorption surface 67a of the holder 69 (step S2). Note that in the first embodiment and its modified example, the control unit 111 causes the panel conveying device 120 to perform adsorption of the panel 3, and in the second embodiment and its modified example, the control unit 111 stops adsorption of the panel 3.
[0133] Thereafter, the control unit 111 executes a third process of moving the arm 66 or the stage 130 so that the above-mentioned adjustment distance becomes a second distance longer than the first distance (step S3). Note that in the first and second embodiments, the stage 130 moves, and in the modified examples of these embodiments, the arm 66 moves.
[0134] Next, the control unit 111 executes a fourth process for maintaining the above-mentioned adjustment distance at the second distance while the panel 3 is in contact with the adsorption surface 67a of the holder 69 and the stage 130 for a predetermined stop period (step S4). Then, the control unit 111 executes a fifth process of moving the arm 66 or the stage 130 so that the above-mentioned adjustment distance becomes longer than the second distance (step S5). Note that in the first and second embodiments, the stage 130 moves, and in the modified examples of these embodiments, the arm 66 moves.
[0135] As a result, after the second process performs or stops the adsorption of the panel 3, the third process and the fourth process are performed without directly performing the fifth process. Therefore, the arm 66 or the stage 130 does not move a long distance in one go, but moves so that the adjustment distance becomes longer than the first distance L1, and then temporarily stops at a position where the adjustment distance becomes the second distance L2, and then moves further so that the adjustment distance becomes longer than the second distance L2. That is, the movement of the arm 66 or the stage 130 is performed by a two-stage motion. In addition, between these two motions, the panel 3 is maintained in a state of contact with the adsorption surface 67a of the holder 69 and the stage 130 for a stop period. As a result, when the arm 66 or the stage 130 moves so that the adjustment distance becomes longer than the second distance L2 from the first distance L1, the impact that the arm 66 receives can be suppressed. Therefore, the panel 3 can be smoothly transferred between the stage 130 and the panel conveying device 120.
[0136] The control device 110 and the control method according to one or more aspects have been described above based on the above-mentioned embodiments and their modifications, but the present disclosure is not limited to these embodiments and their modifications. As long as it does not deviate from the spirit of the present disclosure, various modifications conceived by a person skilled in the art may be made to the above-mentioned embodiments and their modifications, or the above-mentioned embodiments and their modifications may be made without departing from the spirit of the present disclosure. Configurations constructed by combining components in the above variations may also be included within the scope of the present disclosure.
[0137] For example, in each of the above-described embodiments and their modified examples, when the panel 3 is handed over, only one of the stage 130 and the arm 66 is raised and lowered. However, each of the stage 130 and the arm 66 may be raised and lowered. That is, the control unit 111 may raise and lower both the stage 130 and the arm 66 in each of the first process, the third process, and the fifth process. Alternatively, the control unit 111 may raise and lower the stage 130 in one or more of the first process, the third process, and the fifth process, and raise and lower the arm 66 in the remaining other processes.
[0138] Furthermore, in each of the above-described embodiments and the modified examples, control device 110 controls stage 130 and panel conveying device 120, but of stage 130 and panel conveying device 120, control device 110 may control only panel conveying device 120. In other words, control device 110 may control at least one of stage 130 and panel conveying device 120.
[0139] In addition, in each of the above-described embodiments and the modified examples, the stage 130 or the arm 66 is moved in the Z-axis direction, but if the stage 130 and the arm 66 are not aligned in the Z-axis direction, the stage 130 or the arm 66 may be moved along the direction in which they are aligned. In other words, the above-described predetermined direction may be a direction different from the Z-axis direction.
[0140] In addition, in each of the above-mentioned embodiments and their modified examples, all or part of the components such as the control unit 111 may be configured with dedicated hardware, or may be realized by executing a software program suitable for the components. The control unit 111 may be realized by a program execution unit such as a CPU (Central Processing Unit) or a processor reading and executing a software program recorded on a recording medium such as a HDD (Hard Disk Drive) or a semiconductor memory. For example, the program execution unit causes at least one of the stage 130 and the panel conveying device 120 to execute each step shown in FIG. 8, FIG. 10, FIG. 13, FIG. 15, and FIG. 16.
[0141] Furthermore, the control unit 111 may be configured with one or more electronic circuits. Each of the one or more electronic circuits may be a general-purpose circuit or a dedicated circuit. The one or more electronic circuits may include, for example, a semiconductor device, an IC (Integrated Circuit), or an LSI (Large Scale Integration), etc. An IC or an LSI may be integrated into one chip. It may be integrated on a single chip or on multiple chips. Here, it is called IC or LSI, but depending on the degree of integration, it may be called system LSI, VLSI (Very Large Scale Integration), or ULSI (Ultra Large Scale Integration). Also, FPGAs (Field Programmable Gate Arrays), which are programmed after the LSI is manufactured, can be used for the same purpose. [Industrial Applicability]
[0142] The present disclosure can be used, for example, in a panel conveying system provided in a component mounting line that produces liquid crystal displays. [Explanation of symbols]
[0143] 1. Component mounting line 3 Panel 4 Electrode section 5 parts 10 Panel loading area Stages 11, 23, 37, 49, 51 20 Adhesive part 21, 31, 41 Panel movement mechanism 30 Temporary crimping section 32 Parts mounting mechanism 33 Parts Supply Department 33a Supply reel 33b Punching section 33c Movable stage 33d Rail 34 Crimping tool 35 Parts Transfer Section 36 Backup Department 40 Crimping section 50 Panel removal section 60 Conveyor 61 Mobile Base 62A, 62B, 62C, 62D Panel transport mechanism 63 Base 64 Arm Unit 65 Arm Base 66, 660 Arm 67, 670 Suction pad 67a Adsorption surface 68, 680 support shaft 69 Holding part 100 Panel conveying system 110 Control device 111 Control section 112 Memory 120, 1200 Panel conveyor 130, 1300 Stage
Claims
1. A control device that controls at least one of the panel transport device and the stage, A control unit; A memory connected to the control unit, the panel transport device includes an arm and a holding unit that holds the panel by suction with a suction surface; the holding portion is attached to the arm such that an adsorption surface of the holding portion is elastically movable relative to the arm in a predetermined direction; The control unit uses the memory to a first process of moving at least one of the arm and the stage in the predetermined direction so that an adjustment distance between the arm and the stage, which is arranged alongside the arm along the predetermined direction, is shortened to a first distance, thereby sandwiching the panel between the suction surface of the holder and the stage and pressing the suction surface of the holder in a direction away from the stage when viewed from the arm; a second process of causing the panel conveying device to perform or stop suction of the panel by the suction surface of the holding unit; a third process of moving at least one of the arm and the stage so that the adjustment distance is increased to a second distance that is longer than the first distance; a fourth process of maintaining the adjustment distance at the second distance while the panel is in contact with the suction surface of the holder and the stage for a predetermined stop period; and a fifth process of moving at least one of the arm and the stage so that the adjustment distance is longer than the second distance. Control device.
2. The control unit is In the first process, at least one of the arm and the stage is moved so that the panel transitions from a state in which the panel is placed on the stage and is not in contact with the suction surface of the holder to a state in which the panel is in contact with and pressed against the suction surface of the holder; the second process causes the panel conveying device to adsorb the panel using an adsorption surface of the holding unit; The control device according to claim 1 .
3. The control unit is In the first process, at least one of the arm and the stage is moved so that the panel transitions from a state in which the panel is not placed on the stage and is attracted to the suction surface of the holder to a state in which the panel is placed on the stage and pressed against the suction surface of the holder; the second process causes the panel transport device to stop suction of the panel by the suction surface of the holding unit; The control device according to claim 1 .
4. The control unit is In the first process, the stage is moved toward the arm side, In the third process and the fifth process, the stage is moved in a direction opposite to the arm side, In the fourth process, the stage is stopped to maintain the adjustment distance at the second distance. The control device according to claim 1 .
5. The control unit is In the first process, the arm is moved toward the stage; In the third process and the fifth process, the arm is moved in a direction opposite to the stage side, In the fourth process, the adjustment distance is maintained at the second distance by stopping the arm. The control device according to claim 1 .
6. the second distance is determined by (1) a thickness of the panel, and (2) a distance between the suction surface of the holding portion and the arm when no force is applied from the panel. The control device according to claim 1 .
7. The control unit further Acquire thickness information indicating a thickness of the panel; determining the second distance based on the thickness information; The control device according to claim 1 .
8. The control unit is determining the second distance such that the second distance is longer as the thickness of the panel indicated by the thickness information is larger; The control device according to claim 7.
9. A control device according to any one of claims 1 to 8; The panel conveying device; The stage; A panel transport system comprising:
10. The holding portion is a support shaft attached to the arm so as to be movable in the predetermined direction; a suction pad made of an elastic member, the suction pad being connected to the support shaft and configured to suction the panel on the suction surface; The panel transport system according to claim 9.
11. A control method for controlling at least one of a panel transport device and a stage by a computer, comprising the steps of: the panel transport device includes an arm and a holding unit that holds the panel by suction with a suction surface; the holding portion is attached to the arm such that an adsorption surface of the holding portion is elastically movable relative to the arm in a predetermined direction; In the control method, a first process of moving at least one of the arm and the stage in the predetermined direction so that an adjustment distance between the arm and the stage, which is arranged alongside the arm along the predetermined direction, is shortened to a first distance, thereby sandwiching the panel between the suction surface of the holder and the stage and pressing the suction surface of the holder in a direction away from the stage when viewed from the arm; a second process of causing the panel conveying device to perform or stop suction of the panel by the suction surface of the holding unit; a third process of moving at least one of the arm and the stage so that the adjustment distance is increased to a second distance that is longer than the first distance; The panel is held on the suction surface of the holder and on the stage for a predetermined stop period. a fourth process of maintaining the adjustment distance at the second distance in a contact state; and a fifth process of moving at least one of the arm and the stage so that the adjustment distance is longer than the second distance. Control methods.
12. A program for controlling at least one of a panel transport device and a stage by a computer, the panel transport device includes an arm and a holding unit that holds the panel by suction with a suction surface; the holding portion is attached to the arm such that an adsorption surface of the holding portion is elastically movable relative to the arm in a predetermined direction; The program is a first process of moving at least one of the arm and the stage in the predetermined direction so that an adjustment distance between the arm and the stage, which is arranged alongside the arm along the predetermined direction, is shortened to a first distance, thereby sandwiching the panel between the suction surface of the holder and the stage and pressing the suction surface of the holder in a direction away from the stage when viewed from the arm; a second process of causing the panel conveying device to perform or stop suction of the panel by the suction surface of the holding unit; a third process of moving at least one of the arm and the stage so that the adjustment distance is increased to a second distance that is longer than the first distance; a fourth process of maintaining the adjustment distance at the second distance while the panel is in contact with the suction surface of the holder and the stage for a predetermined stop period; and a fifth process of moving at least one of the arm and the stage so that the adjustment distance is longer than the second distance. program.
Citation Information
Patent Citations
Method of replacing protective sheets in component mounting apparatus
JP2015149456A
Cited By
Mixture formation apparatus, method of manufacturing a mixture formation apparatus and working device or internal combustion engine
US12416278B2
