Bath device
The bath device maintains water temperature through reheating, addressing the issue of temperature drop during the bath, ensuring user warmth and satisfaction at the scheduled exit time.
Patent Information
- Application Number
- JP2023082040
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-18
- Publication Date
- 2024-11-28
AI Technical Summary
Conventional bath devices with timer functions may prompt users to leave the bath despite the water temperature dropping below the desired warmth level due to environmental influences, leading to dissatisfaction.
A bath device with a water level sensor, temperature sensor, and circulation pump that maintains water temperature by reheating when it drops below a threshold, ensuring the user feels sufficiently warmed at the scheduled exit time.
The device effectively maintains water temperature throughout the bath, ensuring the user feels adequately warmed when prompted to exit, preventing discomfort and enhancing user satisfaction.
Smart Images

Figure 2024165666000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a bath device that performs a specified bath function. [Background technology]
[0002] Conventionally, bath devices are provided with a function for displaying bathing time. The bather's entry into the bathtub is detected by the output of a water level sensor, etc. Upon this detection, timing of the bathing time begins. The bathing time is displayed on a remote controller installed in the bathroom. The bather can keep track of his or her own bathing time by looking at the displayed time. Such a function is described, for example, in Patent Document 1 below.
[0003] Furthermore, the bath device may be provided with a timer function that not only displays the bathing time, but also prompts the bather to leave the bath according to certain conditions. For example, the bath device may be provided with a timer function that estimates the bathing time suitable for getting a good night's sleep and notifies the bather when this time has elapsed. A bath device with such a function is described, for example, in Patent Document 2 below. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2012-107767 A [Patent Document 2] JP 2021-120604 A Summary of the Invention [Problem to be solved by the invention]
[0005] Another timer function that may be provided in a bath device is one for preventing the bather from getting too hot. This timer function estimates the expected bathing time at which the bather may get too hot, and when this time has elapsed after the bath, it notifies the bather to exit the bath.
[0006] However, the temperature of the water in the bathtub may drop due to the influence of the ambient temperature, etc., when the warming function is not being performed. Such a drop in water temperature may occur even within the time set by the timer function. In this case, the bather may end up being prompted by the timer function to leave the bath, even though he or she feels that the body is not sufficiently warm.
[0007] In view of such problems, the present invention aims to provide a bath apparatus that enables a bather to more reliably obtain a sense of satisfaction from being warmed when prompted to leave the bath by a timer function. [Means for solving the problem]
[0008] A bath device according to a main aspect of the present invention comprises a water level sensor arranged in a circulation path for circulating hot and cold water in the bathtub between a water heater and a bathtub, the water level sensor being arranged in the circulation path for detecting the water level in the bathtub, a temperature sensor arranged in the circulation path for detecting the water temperature in the bathtub, a room temperature sensor for detecting the room temperature in the bathroom in which the bathtub is installed, a bathing detection unit for detecting bathing in the bathtub based on the detection result of the water level sensor, a bathing timer unit for starting counting the bathing time based on the detection of bathing, a time setting unit for setting a planned bathing time based on the water temperature and the room temperature at the time of bathing detection in order to limit the bather's body temperature from rising above a predetermined level, an alarm processing unit for issuing an alarm when the bathing time has reached the planned bathing time, and a re-heating execution unit for executing a process to re-heat the hot and cold water in the bathtub while the bathing timer is running based on the fact that the water temperature detected by the temperature sensor is lower than the water temperature at the start of bathing.
[0009] According to the bath device of this embodiment, if the temperature of the water in the bathtub drops while the bath timer is running, the water is reheated to raise the temperature. Therefore, when the scheduled bathing time has elapsed, the bather's body is sufficiently warmed. Therefore, when the timer function prompts the bather to leave the bath, the bather can more reliably feel satisfied with the warmth.
[0010] In the bath apparatus of this aspect, the reheating execution unit may be configured to execute reheating processing based on the decrease in water temperature from a timing a predetermined time before the scheduled bathing time.
[0011] With this configuration, repeated reheating can be avoided from the start of the bath timer, while the bather's body can be effectively kept warm when the scheduled bathing time has elapsed.
[0012] The bath apparatus of this embodiment is equipped with a circulation pump for circulating hot water through the circulation path, and the re-heating execution unit can be configured to have the temperature sensor detect the hot water temperature while the bath timer is running while the circulation pump is operating.
[0013] With this configuration, the temperature of the water in the bathtub and in the circulation path becomes approximately equal, so the temperature sensor can detect the temperature of the water in the bathtub more accurately. This allows the water temperature to be reheated more appropriately based on the drop in water temperature, and the bather's body can be kept appropriately warm when the scheduled bathing time has passed.
[0014] In the bath apparatus of this embodiment, the re-heating execution unit can be configured to stop the re-heating based on the water temperature reaching a predetermined set temperature while the re-heating is being performed.
[0015] This configuration prevents the bather's body from becoming too warm due to the reheating process while the bath timer is running. Therefore, the bather can appropriately feel satisfied with the warmth when the timer function prompts them to leave the bath.
[0016] In this case, the re-heating execution unit can be configured to repeatedly execute the re-heating process based on the decrease in water temperature after the re-heating is stopped until the bathing time reaches the scheduled bathing time.
[0017] With this configuration, the water temperature can be kept close to the set temperature while the bath timer is running, so the bather can feel satisfied with the warmth when the timer function prompts them to leave the bath.
[0018] The re-heating execution unit may be configured to stop the re-heating while the re-heating is being performed based on the fact that the bathing time has reached the scheduled bathing time.
[0019] This configuration makes it possible to prevent reheating from continuing after the bather is notified that the bath time has reached the scheduled bath time, and therefore allows for efficient reheating in conjunction with the input timer. Effect of the Invention
[0020] As described above, according to the present invention, a bath apparatus can be provided that allows a bather to more reliably obtain a sense of satisfaction from being warmed when prompted to leave the bath by the timer function.
[0021] The effects and significance of the present invention will become clearer from the following description of the embodiment. However, the embodiment described below is merely an example of how the present invention can be put into practice, and the present invention is not limited to the embodiment described below. [Brief description of the drawings]
[0022] [Figure 1] FIG. 1 is a diagram showing a configuration of a water heating device according to an embodiment. [Diagram 2] FIG. 2 is a diagram showing circuit blocks of each device constituting the hot water supply device according to the embodiment. [Diagram 3] FIG. 3 is a diagram showing a schematic configuration of a combustion system and piping of a water heater according to an embodiment. [Figure 4] FIG. 4 is a diagram showing an example of the configuration of a scheduled bathing time setting table according to the embodiment. [Diagram 5] FIG. 5 is a diagram for explaining a human body thermal model according to the embodiment. [Figure 6] FIG. 6 is a diagram for explaining a human body thermal model according to the embodiment. [Figure 7] FIG. 7 is a flowchart showing a process executed by the control unit of the bathroom remote control to execute the timer function according to the embodiment. [Figure 8] FIG. 8 is a flowchart showing a process executed by the control unit of the water heater to execute the timer function according to the embodiment. [Figure 9] FIG. 9 is a diagram showing a state in which the bathroom remote control according to the embodiment is notifying the user that the scheduled bath time has arrived. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0023] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0024] In the following embodiment, the water heating apparatus 10 corresponds to a "bath apparatus" as described in the claims. In the following embodiment, the water heating apparatus 10 performs a hot water supply function for a kitchen faucet, a bathroom faucet, etc., in addition to a bath-related function.
[0025] However, the above description is intended merely to match the configuration of the claims with the configuration of the embodiments, and the above correspondence does not in any way limit the invention described in the claims to the configuration of the embodiments.
[0026] FIG. 1 is a diagram showing the configuration of a water heating apparatus 10. As shown in FIG.
[0027] The hot water supply device 10, as a bath device, executes bath functions such as an automatic bath function, a reheating function, a hot water addition function, and a cold water addition function.
[0028] Water heating device 10 includes water heater 11 and remote controllers 12 and 13. Water heater 11 is a gas water heater that uses gas as fuel to supply hot water. Hot water generated by water heater 11 is supplied to a kitchen faucet, a bathtub, a faucet, etc. through pipes connected to hot water outlet 11a. When water heater 11 has a floor heating function, a bathroom heating function, and a heating function using a panel heater, hot water is supplied from water heater 11 to devices that realize these functions.
[0029] Remote controllers 12 and 13 are connected to water heater 11 and are used to make various settings for each function of water heating apparatus 10. Remote controller 12 has a display unit 121 and an input unit 122, and remote controller 13 has a display input unit 131 consisting of a touch panel and an operation button 132. The operator can make any settings for filling the water tank, adjusting the hot water temperature, etc. by operating input unit 122 according to the screen displayed on display unit 121. The operator can also make settings for filling the water tank, etc. by operating display input unit 131.
[0030] The remote controller 12 is installed in a bathroom, and the remote controller 13 is installed in a kitchen etc. The remote controllers 12 and 13 are provided with audio windows 12a and 13a for inputting and outputting audio.
[0031] Hereinafter, the remote controller 12 installed in the bathroom will be referred to as the "bathroom remote control 12," and the remote controller 13 installed in the kitchen or the like will be referred to as the "kitchen remote control 13."
[0032] An operation button 122a is included in the input section 122 of the bathroom remote control 12. The operation buttons 122a and 132 are buttons for switching the water heater 11 between an operation on state and an operation off state.
[0033] Furthermore, input unit 122 and display input unit 131 include a button for changing the hot water supply temperature. The operator can change the set hot water supply temperature by operating this button. In addition, input unit 122 and display input unit 131 include buttons for controlling the operation of water heater 11, such as buttons for executing the automatic bath function, reheating function, hot water addition function, water addition function, etc.
[0034] FIG. 2 is a diagram showing circuit blocks of each device constituting hot water supply apparatus 10. As shown in FIG.
[0035] Water heater 11 includes a control unit 111, a storage unit 112, a communication unit 113, and a detection unit 114. Control unit 111 includes a microcomputer, and controls each unit in water heater 11 according to a program stored in storage unit 112. Storage unit 112 includes a memory, and stores a predetermined control program.
[0036] Communication unit 113 communicates with bathroom remote control 12 and kitchen remote control 13 according to control from control unit 111. Communication unit 113 is connected to communication unit 125 of bathroom remote control 12 and communication unit 135 of kitchen remote control 13 via two-core communication lines L1 and L2. In addition, two-core communication lines L1 and L2 are connected to each other inside communication unit 113. Therefore, communication unit 125 of bathroom remote control 12 and communication unit 135 of kitchen remote control 13 are connected to each other by two-core communication lines L1 and L2. Therefore, a signal transmitted from any of communication units 113, 125, 135 is simultaneously transmitted to the other communication unit.
[0037] Detection unit 114 includes various sensors arranged in water heater 11. For example, detection unit 114 includes a temperature sensor for detecting the temperature of hot and cold water, a flow rate sensor for detecting the supply of hot and cold water, and the like.
[0038] Bathroom remote control 12 includes, in addition to display unit 121 and input unit 122 described above, control unit 123, memory unit 124, communication unit 125, speaker 126, and room temperature sensor 127. Display unit 121 is, for example, configured with a liquid crystal panel. Input unit 122 includes various operation buttons such as a temperature setting button. Display unit 121 may be a touch panel.
[0039] The control unit 123 includes a microcomputer and performs predetermined control in accordance with a program stored in the storage unit 124. The storage unit 124 includes a memory and stores the predetermined control program.
[0040] Communication unit 125 communicates with water heater 11 and kitchen remote control 13 under the control of control unit 123. Speaker 126 outputs sound based on the sound signal generated by control unit 123. Control unit 123 reads out sound information stored in storage unit 124 as needed to generate the sound signal. The sound output from speaker 126 is output from sound window 12a in FIG. 1.
[0041] Room temperature sensor 127 detects the temperature (room temperature) in bathroom 3 and outputs the detected room temperature to control unit 123. As described below, the detected room temperature is used to set a scheduled bathing time in the timer function. In addition, the detected room temperature is sent from control unit 123 to water heater 11 at any time.
[0042] In addition to the above-mentioned display input unit 131 and operation button 132, kitchen remote control 13 also includes control unit 133, storage unit 134, communication unit 135, and speaker 136. Control unit 133 includes a microcomputer, and performs predetermined control according to a program stored in storage unit 134. Storage unit 134 includes a memory, and stores a predetermined control program.
[0043] Communication unit 135 communicates with water heater 11 and bathroom remote control 12 under the control of control unit 133. Speaker 136 outputs sound based on the sound signal generated by control unit 133. Control unit 133 reads out sound information stored in memory unit 134 as needed to generate the sound signal. The sound output from speaker 136 is output from sound window 13a in FIG. 1.
[0044] In this embodiment, water heating apparatus 10 is equipped with a timer function to prevent the bather from getting too hot. To realize this timer function, control unit 111 of water heater 11 is given the functions of bathing detection unit 111a, bathing timer unit 111b, notification processing unit 111c, and reheating execution unit 111d by a program stored in memory unit 112. Also, to realize this timer function, control unit 123 of bathroom remote control 12 is given the function of time setting unit 123a by a program stored in memory unit 124.
[0045] The bathing detection unit 111a detects bathing in the bathtub based on the detection result of the water level sensor S1 (see FIG. 3) described below. When a person enters a bathtub filled with hot water, the water level in the bathtub rises. The water level sensor S1 can detect the water level fluctuation caused by the person entering the bathtub. The bathing detection unit 111a detects a person bathing in the bathtub 2 based on the detection result of the water level sensor S1.
[0046] When a person leaves a bathtub filled with hot water, the water level in the bathtub drops. Therefore, the control unit 111 can detect the person's exit from the bathtub by detecting the water level fluctuation based on the person's exit from the bathtub using the water level sensor S1.
[0047] Bathing timer section 111b starts counting the bathing time when bathing detection section 111a detects bathing. Notification processing section 111c issues a predetermined notification when the bathing time counted by bathing timer section 111b reaches the planned bathing time set by time setting section 123a. Reheating execution section 111d executes a process of reheating the water in the bathtub while the bathing timer is running, based on the fact that the water temperature in the bathtub detected by temperature sensor S5 (see FIG. 3), which will be described later, is lower than the water temperature at the start of bathing.
[0048] When bathing is detected by the bathing detection unit 111a, the time setting unit 123a sets a scheduled bathing time based on the water temperature detected by the temperature sensor S5 and the room temperature detected by the room temperature sensor 127 to limit the bather's body temperature from rising above a predetermined temperature.
[0049] A method for setting the scheduled bathing time in time setting unit 123a will be described later with reference to Figures 4 to 7. Also, processing performed when the bathing timer is executed in bathing detection unit 111a, bathing timer unit 111b, notification processing unit 111c, and reheating execution unit 111d will be described later with reference to Figure 8.
[0050] FIG. 3 is a diagram showing a schematic configuration of the combustion system and piping of water heater 11. As shown in FIG.
[0051] As shown in Fig. 3, water heater 11 includes, as components of its combustion system, a hot water supply section 210, a re-heating section 220, and a bypass section 230. Water heater 11 is installed outside bathroom 3 in which bathtub 2 is provided.
[0052] The hot water supply section 210 includes a water supply pipe 211, a hot water supply heat exchanger 212, a hot water supply pipe 213, a hot water supply combustor 214, and an air supply fan 215. The water supply pipe 211 is connected to a water pipe and the hot water supply heat exchanger 212, and the hot water supply pipe 213 is connected to the hot water supply heat exchanger 212, the bathroom faucet 4, and the external faucet 5. The hot water supply combustor 214 is supplied with gas (fuel gas) in an amount corresponding to the opening degree of a proportional valve 216 through a hot water supply gas pipe 217. When a gas solenoid valve (not shown) is opened, gas is supplied to the hot water supply gas pipe 217. The hot water supply combustor 214 uses gas as fuel and combusts with an intensity corresponding to the amount of gas supplied. The air supply fan 215 supplies air for combustion to the hot water supply combustor 214.
[0053] The reheating section 220 includes a return pipe 221, a bath heat exchanger 222, an outgoing pipe 223, a bath combustor 224, and a circulation pump 225. The return pipe 221 is connected to the circulation adapter 2a of the bathtub 2 and the bath heat exchanger 222, and the outgoing pipe 223 is connected to the bath heat exchanger 222 and the circulation adapter 2a. The return pipe 221, the bath heat exchanger 222, and the outgoing pipe 223 constitute a circulation path P1 for circulating hot and cold water in the bathtub 2 between the water heater 11 and the bathtub 2.
[0054] The bath combustor 224 is supplied with an amount of gas (fuel gas) according to the opening of the proportional valve 226 through the bath gas pipe 227. When a gas solenoid valve (not shown) is opened, gas is supplied to the bath gas pipe 227. The bath combustor 224 burns gas as fuel with an intensity according to the amount of gas supplied. The air supply fan 215 is shared between the hot water supply section 210 and the reheating section 220, and air for combustion is supplied from the air supply fan 215 to the bath combustor 224. A circulation pump 225 and a water level sensor S1 are arranged in the return pipe 221. The water level sensor S1 detects the water level in the bathtub 2 based on the water pressure in the return pipe 221.
[0055] The bypass unit 230 includes a bypass pipe 231 and a hot water supply solenoid valve 232. The bypass pipe 231 is connected to the hot water supply pipe 213 and the return pipe 221. The hot water supply solenoid valve 232 opens and closes the bypass pipe 231.
[0056] In addition to water level sensor S1, water heater 11 is equipped with a flow rate sensor S2 for detecting the flow rate of water supply pipe 211, a temperature sensor S3 for detecting the temperature of water introduced into water supply pipe 211, and a temperature sensor S4 for detecting the temperature of the hot water after it has been heated by hot water heat exchanger 212. Water heater 11 also has a temperature sensor S5 for detecting the temperature of the hot water stored in bathtub 2 by detecting the temperature of the hot water in return pipe 221. These sensors S1 to S5 are included in detection unit 114 in FIG. 2.
[0057] The control unit 111 controls the hot water combustor 214, the air supply fan 215 and the proportional valve 216 of the hot water supply unit 210, the bath combustor 224, the circulation pump 225 and the proportional valve 226 of the re-heating unit 220, the hot water solenoid valve 232 of the bypass unit 230, and the like.
[0058] When bathroom faucet 4 or external faucet 5 is opened, the hot water supply function is executed. Water from the water pipe is introduced into hot water heat exchanger 212 through water supply pipe 211, and hot water combustor 214 combusts, heating hot water heat exchanger 212. The water introduced into hot water heat exchanger 212 is heated to become hot water, and the hot water is supplied to bathroom faucet 4 or external faucet 5 through hot water pipe 213. When bathroom faucet 4 or external faucet 5 is closed, water supply from the water pipe to water supply pipe 211 stops, and combustion in hot water combustor 214 stops.
[0059] Furthermore, control unit 111 controls hot water supply unit 210 to execute a hot water filling function (automatic bath function). In this case, hot water solenoid valve 232 is opened, and water from a water pipe is introduced into hot water heat exchanger 212 through water supply pipe 211, and is heated by hot water heat exchanger 212. Then, hot water from hot water heat exchanger 212 is introduced into return pipe 221 through hot water supply pipe 213 and bypass pipe 231.
[0060] A portion of the hot water introduced into the return pipe 221 flows through the return pipe 221 toward the circulation adapter 2a and is poured from the circulation adapter 2a into the bathtub 2. The rest of the hot water introduced into the return pipe 221 flows through the return pipe 221 toward the bath heat exchanger 222, and further flows through the bath heat exchanger 222 and the outgoing pipe 223 before being poured into the bathtub 2 from the circulation adapter 2a.
[0061] When hot water is supplied and stored in bathtub 2, return pipe 221, bath heat exchanger 222, and supply pipe 223 are filled with hot water. This allows water level sensor S1 to detect the water level in bathtub 2. When water level sensor S1 detects that the water level in bathtub 2 has reached a preset water level, hot water supply solenoid valve 232 is closed, water supply from the water pipe to water supply pipe 211 is stopped, and combustion in hot water supply combustor 214 is stopped.
[0062] When the return pipe 221, the bath heat exchanger 222, and the supply pipe 223 are filled with hot water, the temperature of the hot water in the return pipe 221 becomes approximately equal to the temperature of the hot water in the bathtub 2. The temperature sensor S5 can detect the temperature of the hot water in the return pipe 221 as the temperature of the hot water in the bathtub 2. The temperature detected by the temperature sensor S5 is used as the temperature of the hot water (hot water temperature) in the bathtub 2. The temperature sensor S5 outputs the detected hot water temperature to the control unit 111.
[0063] In addition, the control unit 111 controls the reheating unit 220 to execute the reheating function. In this case, the circulation pump 225 operates and the bath combustor 224 starts combustion. The hot water in the bathtub 2 circulates between the bathtub 2 and the circulation path P1 consisting of the return pipe 221, the bath heat exchanger 222, and the forward pipe 223, and is heated by the bath heat exchanger 222 during the circulation. This causes the temperature of the hot water in the bathtub 2 to rise.
[0064] Furthermore, the hot water addition function and the cold water addition function are executed by supplying hot water and cold water to bathtub 2 from hot water supply unit 210 under the control of control unit 111. In the cold water addition function, hot water supply combustor 214 does not combust.
[0065] The automatic bath function includes a filling function and a heat retention function that maintains the temperature of the water in bathtub 2 at a specified bath set temperature after filling. In the heat retention function, control unit 111 references the water temperature from temperature sensor S5 at a specified timing, and performs reheating by reheating unit 220 based on the referenced water temperature so that the water temperature in bathtub 2 becomes the bath set temperature. The heat retention function causes the water temperature in bathtub 2 to follow the bath set temperature. The bath set temperature is set by operating the buttons on bathroom remote control 12.
[0066] Next, a method for setting a scheduled bath time will be described.
[0067] In this embodiment, the scheduled bathing time is set by a timer function for preventing the bather from getting hot. However, the scheduled bathing time may be set by a timer function other than the timer function for preventing hot flashes. For example, the scheduled bathing time may be set by a timer function for warming the bather's body so that the bather can sleep comfortably after bathing.
[0068] The scheduled bathing time is set by the time setting unit 123a in Fig. 2. The scheduled bathing time is the time from the start of bathing in the bathtub 2 until the rise in the bather's core body temperature reaches a predetermined temperature rise value set to prevent overheating. If the core body temperature rises excessively as a result of bathing, it is likely to lead to poor physical condition symptoms such as heat stroke, i.e., overheating. The above-mentioned temperature rise value is selected taking this into consideration.
[0069] In this embodiment, a scheduled bathing time setting table is prepared in advance, in which the scheduled bathing time from the start of bathing until the bather's deep body temperature reaches this temperature rise value is linked to a combination of room temperature and water temperature. Such a scheduled bathing time setting table is stored in memory unit 124 of bathroom remote control 12. The scheduled bathing time setting table can be generated using human body heat model HM, which will be described later. That is, the deep body temperature is calculated based on a calculation formula obtained by human body heat model HM, and the scheduled bathing time to be registered in the scheduled bathing time setting table is calculated based on the calculated deep body temperature.
[0070] However, the method of generating the scheduled bathing time table is not limited to this. For example, the scheduled bathing time table may be generated by measuring the temperature rise of a person's core body temperature when actually immersed in hot water and performing statistical processing on the measurement results.
[0071] FIG. 4 is a diagram showing an example of the configuration of a scheduled bathing time setting table.
[0072] In the scheduled bathing time setting table, the time at which the rise in core body temperature reaches a predetermined temperature rise value (temperature rise value for monitoring hot flashes) at the water temperature in the bathtub 2 and the room temperature in the bathroom 3 is registered as the scheduled bathing time in association with the combination of the water temperature and room temperature in the bathtub 2. In FIG. 4, the scheduled bathing times are shown as tn (n=1 to 221). For example, a combination of a water temperature of 32° and a room temperature of 5° is associated with scheduled bathing time t1.
[0073] When the above-mentioned human body heat model HM is used, the scheduled bathing time setting table is created, for example, by the following steps.
[0074] The deep body temperature is estimated (calculated using a formula) for each predetermined time from the start of bathing, and data (graph) is created that shows the relationship between the deep body temperature and the time since the start of bathing. While changing the water temperature in the bathtub 2 and the room temperature in the bathroom 3, such data is created for each combination of water temperature and room temperature. From each created data (graph), the time at which the deep body temperature rise value reaches a predetermined temperature rise value is calculated as the planned bathing time linked to the combination of water temperature and room temperature for each data. In this way, a planned bathing time setting table is created that links the planned bathing time to each combination of water temperature and room temperature. In the planned bathing time setting table, the higher the water temperature in the bathtub 2, and the higher the room temperature in the bathroom 3, the shorter the planned bathing time.
[0075] The human body thermal model HM used to estimate the bather's core body temperature is a physical model that calculates body temperature based on the heat balance in each part (layer) when the human body is divided into multiple parts (layers).
[0076] 5 and 6 are diagrams for explaining the human body thermal model HM.
[0077] 5, in the human body thermal model HM of this embodiment, the human body is divided into a skin layer SK, a core layer CR that is closer to the center of the human body than the skin layer SK, and an intermediate layer MD between the skin layer SK and the core layer CR. Furthermore, the skin layer SK is divided into a first skin layer SK1 that contacts the air in the bathroom 3 and a second skin layer SK2 that contacts the hot and cold water in the bathtub 2, and the intermediate layer MD is divided into a first intermediate layer MD1 that contacts the first skin layer SK1 and a second intermediate layer MD2 that contacts the second skin layer SK2.
[0078] As shown in Fig. 6, in the first skin layer SK1, heat transfer occurs between the air in the bathroom 3 and the first skin layer SK1 through heat transfer by radiation and convection, and heat loss through evaporation. Heat transfer occurs between the first skin layer SK1 and the first intermediate layer MD1 through heat transfer between tissues. Heat transfer occurs between the first skin layer SK1 and the core layer CR through heat transfer by blood flow.
[0079] In the second skin layer SK2, heat transfer occurs by convection between the hot and cold water in the bathtub 2 and the second skin layer SK2. Heat transfer between the second skin layer SK2 and the second intermediate layer MD2 occurs as heat transfer between tissues. Heat transfer by blood flow occurs between the second skin layer SK2 and the core layer CR.
[0080] In the first intermediate layer MD1, heat transfer between the first skin layer SK1 and the first intermediate layer MD1 occurs as heat transfer between tissues. Also, heat transfer between the first intermediate layer MD1 and the core layer CR occurs as heat transfer between tissues and heat transfer due to blood flow.
[0081] In the second intermediate layer MD2, heat transfer between the second skin layer SK2 and the second intermediate layer MD2 occurs as heat transfer between tissues. Also, heat transfer between the second intermediate layer MD2 and the core layer CR occurs as heat transfer between tissues and heat transfer due to blood flow.
[0082] In the core layer CR, the heat transfer between the first intermediate layer MD1 and the core layer CR is heat transfer between tissues and heat transfer by blood flow. The heat transfer between the second intermediate layer MD2 and the core layer CR is heat transfer between tissues and heat transfer by blood flow. The heat transfer between the first skin layer SK1 and the core layer CR is heat transfer by blood flow. The heat transfer between the second skin layer SK2 and the core layer CR is heat transfer by blood flow. The heat transfer is also caused by heat production due to metabolism, heat loss due to respiration, and external work.
[0083] The heat balance equations (heat balance relational equations) in the first intermediate layer MD1, the second intermediate layer MD2, the core layer CR, the first skin layer SK1 and the second skin layer SK2 obtained by the human body thermal model HM are expressed by the following Equations 1, 2, 3, 4 and 5, respectively.
[0084]
number
[0085]
number
[0086]
number
[0087]
number
[0088]
number
[0089] The symbols in these formulas have the following meanings:
[0090] c md: Specific heat of intermediate layer MD (first intermediate layer MD1, second intermediate layer MD2) [J / kg°C] c cr : Specific heat of core layer CR [J / kg°C] c sk : Specific heat of skin layer SK (first skin layer SK1, second skin layer SK2) [J / kg°C] c bl : Specific heat of blood flow [[J / kg·℃] m md_a : Mass of the first intermediate layer MD1 [kg] m md_b : Mass of the second intermediate layer MD2 [kg] m sk_a : Mass of the first skin layer SK1 [kg] m sk_b : Mass of the second skin layer SK2 [kg] m cr : Mass of the core layer CR [kg] T md_a :Temperature of the first intermediate layer MD1 [℃] T md_b :Temperature of the second intermediate layer MD2 [℃] T sk_a :Temperature of the first skin layer SK1 [℃] T sk_b : Temperature of the second skin layer SK2 [℃] T cr : Temperature of core layer CR [℃] α: Body surface area in contact with water [%] K cm : Thermal conductance between the core layer CR and the intermediate layer MD [W / (m 2 ·°C)] K ms : Thermal conductance between the intermediate layer MD and the skin layer SK [W / (m 2 ·°C)] M: metabolic productivity [W / m 2 ] W: External work load [W / m 2 ] E res : Heat loss to the outside due to breathing [W / m 2 ] E sk : Heat loss by evaporation on the skin surface [W / m 2 ] Ra : Radiative heat transfer to air [W / m 2 ] C a : Convection heat transfer to air [W / m 2 ] C hw : Heat transfer by convection to hot water [W / m 2 ] V bl :Blood flow [m 2 / (m 2 ·S)] A: Body surface area [m 2 ]
[0091] c md , c cr , c sk , c bl , m md_a , m md_b , m sk_a , m sk_b , m cr , α, K cm , K ms , M, W, and A are predetermined.
[0092] That is, since there is no significant difference in the specific heat of the intermediate layer MD, the core layer CR, and the skin layer SK, for example, c md , c cr , c sk is assumed to be the same value, and the specific heat of the human body is used. For example, m md_a , m md_b , m sk_a , m sk_b , m cr is determined based on the standard weight of Japanese people and the mass ratio of each layer by determining the mass ratio of the first intermediate layer MD1, the second intermediate layer MD2, the core layer CR, the first skin layer SK1 and the second skin layer SK2. α is set to, for example, 70%, assuming that the lower part of the human body from the armpits is in contact with hot water.
[0093] Also, K cm and K. msFor example, the thermal resistance of each layer is calculated using height, weight, and the density, thermal conductivity, and mass ratio of each of the core layer CR, intermediate layer MD, and skin layer SK, and the reciprocal of these thermal resistances can be obtained from these thermal resistances.
[0094] Furthermore, for M, for example, the standard basal metabolic rate of Japanese people is used. W is set to 0 because the bather hardly moves during bathing. For A, for example, the standard body surface area of Japanese people is used.
[0095] E res and E sk can be calculated using the formula given in the literature on human body temperature physiological models, "Gagge, AP, Stolwijk, JAJ and Nishi, Y.: An Effective Temperature Scale Based on a Simple Model of Human Physiological Regulatory Response, ASHRAE Trans., 77, 247-262, 1971." That is, E res is the temperature in bathroom 3, T a It can be calculated using the saturated water vapor pressure at the surface, the relative humidity in the air, and metabolic productivity M. sk is the heat of diffusion of water vapor E diff and the heat of evaporation from sweating E rsw It is calculated by adding up the following: E diff is the heat transfer coefficient of air, and T is the temperature of the skin layer SK sk Saturated water vapor pressure in the bathroom, temperature T a It can be calculated using the saturated water vapor pressure at the temperature of 100°C, the relative humidity of the air, etc. rsw is the temperature of the skin layer SK sk , the temperature of the core layer CR T cr It can be found using the following:
[0096] R a is T sk_a and the temperature in bathroom 3, T a It is calculated by multiplying the difference between the two by the radiation heat transfer coefficient. a is T sk_a and Ta It is calculated by multiplying the difference between the heat transfer coefficient and the convection heat transfer coefficient. hw is T sk_b and the water temperature in bathtub 2 T b It is calculated by multiplying the difference between these values by the convection heat transfer coefficient.
[0097] V bl The value is calculated using the following formula 6.
[0098]
number
[0099] The symbols in this formula have the following meanings:
[0100] T sk : Temperature of the skin layer SK [℃] T sk_sp : Set point of skin layer SK [℃] T cr_sp : Core layer CR set point [℃]
[0101] T sk is T based on α sk_a and T sk_b is the weighted average of the temperature of the skin layer SK. sk_sp is determined based on the average temperature of the skin layer SK.
[0102] The bather's deep body temperature is calculated using the above-mentioned formula (heat balance formula) as follows:
[0103] First, the temperature T md_a , the temperature T of the second intermediate layer MD2 md_b , the temperature T of the first skin layer SK1 sk_a , the temperature T of the second skin layer SK2 sk_b , the temperature of the core layer CR T cr The initial values of are set. The initial values are the temperatures of each layer before bathing.
[0104] Here, before bathing, md_a and T md_b(Initial value) is set to the same value, and T before bathing sk_a and T sk_b (Initial value) is set to the same value. For example, the average deep body temperature of Japanese people is T cr The initial value of the average skin temperature of Japanese people is T sk_a , T sk_b Based on these average core body temperature and average skin temperature, T md_a , T md_b The initial value of is determined.
[0105] Next, the temperature gradient dT of the first intermediate layer MD1, the second intermediate layer MD2, the core layer CR, the first skin layer SK1, and the second skin layer SK2 after a time ΔT has elapsed since bathing md_a / dt, dT md_b / dt, dT cr / dt, dT sk_a / dt, dT sk_b / dt is calculated based on the above formulas (1) to (5). Here, the temperature T of each layer a time ΔT before the current timing is calculated. md_a , T md_b , T sk_a , T sk_b , T cr The temperature gradients of each layer are calculated by applying the above initial values to the corresponding formulas (1) to (5). At the first time ΔT has elapsed after bathing, the temperature gradients of each layer are calculated by applying the above initial values to the corresponding formulas.
[0106] In this case, the heat transfer by radiation to the air R included in equation (4) a and convection heat transfer to air C a The temperature T used to calculate a The room temperature in the bathroom 3 at the start of bathing is applied to the temperature of the water. hw The water temperature T used to calculate b The water temperature in bathtub 2 at the start of bathing is applied to the temperature.
[0107] Therefore, the temperature dT of the core layer CR calculated by equation (3) cr / dt rIn other words, the water temperature and room temperature at the start of bathing are also used to calculate the temperature gradient of the core body temperature.
[0108] Next, the calculated temperature gradient of each layer is integrated over time ΔT to calculate the temperature rise value of each layer. Then, the calculated temperature rise value of each layer is multiplied by the temperature T of each layer from the time ΔT before the current timing. md_a , T md_b , T sk_a , T sk_b , T cr The temperature of each layer is calculated by adding the initial value to the temperature rise value of each layer at the first time when the time ΔT has elapsed since the start of bathing. md_a , T md_b , T sk_a , T sk_b , T cr is calculated.
[0109] In this way, the temperature of each layer when the room temperature and water temperature are at the respective predetermined temperatures is calculated every time ΔT elapses from the start of bathing. The bather's deep body temperature is the temperature of the core layer CR. Therefore, the temperature of the core layer CR calculated every time ΔT elapses from the start of bathing corresponds to the data (graph) showing the relationship between the time elapsed from the start of bathing and the deep body temperature described above.
[0110] 4, multiple pieces of such data are created using the above-mentioned calculation method while varying the water temperature in the bathtub 2 and the room temperature in the bathroom 3. Then, from each piece of created data (graph), the time at which the rise in core body temperature reaches a predetermined temperature rise is extracted as the planned bathing time linked to the combination of water temperature and room temperature for each piece of data.
[0111] Here, the predetermined temperature rise value is a temperature rise value at which the possibility of hot flashes may occur, as described above. If the timer function is a timer function for warming the body of the bather so that the bather can fall asleep comfortably after bathing, the predetermined temperature rise value to be compared with the deep body temperature is set from the viewpoint of such a sound sleep effect. For example, the predetermined temperature rise value set from the viewpoint of a sound sleep effect may be set to about half of the predetermined temperature rise value set from the viewpoint of preventing hot flashes.
[0112] 7 is a flow chart showing the process executed by control unit 123 of bathroom remote control 12 to execute the timer function. The process in FIG. 7 is mainly performed by the function of time setting unit 123a.
[0113] The control unit 123 determines whether or not someone has taken a bath in the bathtub 2 (S101). This determination is made based on the bathing detection result by the control unit 111 (bathing detection unit 111a) on the water heater 11 side. That is, the control unit 111 (bathing detection unit 111a) of the water heater 11 constantly refers to the detection result of the water level sensor S1 to monitor whether or not someone has taken a bath in the bathtub 2. When the control unit 123 detects that someone has taken a bath in the bathtub 2, it notifies the bathroom remote control 12 and the kitchen remote control 13 of this fact. Based on receiving this notification, the control unit 123 of the bathroom remote control 12 determines YES in step S101.
[0114] When a person enters bathtub 2 (S101: YES), control unit 123 acquires the room temperature from room temperature sensor 127 (S102), and further acquires the temperature of the water in bathtub 2 (water temperature) (S103). The current bath setting temperature is used as the water temperature in step S103. Alternatively, control unit 123 may acquire from water heater 11 the current water temperature detected by temperature sensor S5 in Fig. 3 at the start of bathing.
[0115] The control unit 123 obtains the planned bathing time from the obtained room temperature and water temperature (S104). Specifically, the control unit 123 obtains the planned bathing time linked to the combination of the room temperature and water temperature from the planned bathing time setting table of Fig. 4. The control unit 123 notifies the water heater 11 of the obtained planned bathing time (S105). This causes the control unit 123 to end the processing of Fig. 7.
[0116] FIG. 8 is a flowchart showing the process executed by control unit 111 of water heater 11 to execute the timer function.
[0117] In the processing of FIG. 8, step S201 is performed by the function of bathing detection unit 111a, step S202 is performed by the function of bathing timer unit 111b, steps S203 to S209 and S212 are performed by the function of re-heating execution unit 111d, and steps S210 and S211 are performed by the function of notification processing unit 111c.
[0118] The control unit 111 monitors whether or not a person has entered the bathtub 2 based on the detection result of the water level sensor S1 (S201). When a person has entered the bathtub 2 (S201: YES), the control unit 111 starts counting the bathing time (S202) and determines whether or not the bathing time has reached a point a predetermined time ΔT before the scheduled bathing time (S203).
[0119] The scheduled bath time in step S203 is notified to water heater 11 from bathroom remote control 12 by the process shown in Fig. 7. The predetermined time ΔT is set to about several minutes (for example, 3 minutes). However, the predetermined time ΔT is not limited to this, and may be set so that the determination in step S203 becomes YES at a timing approximately immediately after the start of bathing.
[0120] If the determination in step S203 is YES, the control unit 111 operates the circulation pump 225 in Fig. 3 to circulate the hot and cold water in the bathtub 2 through the circulation path P1 (S204). This allows the temperature sensor S5 to accurately detect the temperature of the hot and cold water in the bathtub 2. The control unit 111 then determines whether the current water temperature detected by the temperature sensor S5 has dropped by a predetermined threshold temperature compared to the temperature of the hot and cold water in the bathtub 2 at the time of bathing (S205).
[0121] Here, the bath temperature setting at the time of bathing is used as it is as the bath water temperature at the time of bathing. Alternatively, the water temperature detected at the time of bathing by temperature sensor S5 in Fig. 3 may be used as the water temperature at the time of bathing. The threshold temperature may be set, for example, in a range up to 1°C. Note that in step S205, it may be determined whether the current water temperature has dropped below the water temperature at the time of bathing without using the threshold temperature.
[0122] If the determination in step S206 is NO, the control unit 111 advances the process to step S210. If the determination in step S206 is YES, the control unit 111 starts reheating the hot water in the bathtub 2 (S206). This reheating continues as long as the bathing time has not reached the scheduled bathing time (S207: YES) and the temperature of the hot water in the bathtub 2 (water temperature) is below the bath setting temperature (S208: NO).
[0123] When the bathing time reaches the scheduled bathing time (S207: NO), or when the temperature of the hot water in the bathtub 2 (hot water temperature) reaches or exceeds the bath setting temperature (S208: YES), the control unit 111 ends the reheating (S209). Then, the control unit 111 determines whether the bathing time has reached the scheduled bathing time (S210).
[0124] If the bathing time has not reached the scheduled bathing time (S210: NO), the control unit 111 advances the process to step S205 and repeats the above process. If the bathing time has reached the scheduled bathing time (S210: YES), the control unit 111 performs a notification process to prompt the bather to leave the bath (S211). Then, the control unit 111 stops the circulation pump 225 (S212). This causes the control unit 111 to end the process of FIG. 8.
[0125] In this notification process in step S211, control unit 111 transmits a command to bathroom remote control 12 to notify the user to leave the bath. This causes bathroom remote control 12 to issue a notification to encourage the bather to leave the bath. For example, control unit 123 of bathroom remote control 12 causes speaker 126 to output a voice message as shown in FIG. 9. This encourages the bather to leave the bath and leaves bathtub 2. This prevents the bather from getting too hot and overheating.
[0126] <Effects of the embodiment> According to this embodiment, the following effects can be achieved.
[0127] As shown in Fig. 8, if the temperature of the water in the bathtub 2 drops (S205) while the bathing timer is running (S202), the water is reheated (S206) to raise the temperature of the water in the bathtub 2. As a result, when the scheduled bathing time has elapsed (S210: YES), the bather's body is sufficiently warmed. Therefore, when the timer function prompts the bather to leave the bath, the bather can be sure of feeling satisfied with the warmth.
[0128] 8, the control unit 111 (reheating execution unit 111d) executes reheating processing based on a drop in water temperature (S204-S209) from a timing a predetermined time ΔT before the scheduled bathing time (S203: YES). This makes it possible to effectively warm the bather's body when the scheduled bathing time has passed while avoiding repeated reheating from the start of the bathing timer.
[0129] As shown in Fig. 3, water heater 10 (bath apparatus) includes circulation pump 225 for circulating hot water through circulation path P1, and as shown in Fig. 8, control unit 111 (reheating execution unit 111d) operates circulation pump 225 (S204) and causes temperature sensor S5 to detect the hot water temperature while the bathing timer is running (S205). This makes the hot water temperatures in bathtub 2 and circulation path P1 approximately equal, allowing temperature sensor S5 to more accurately detect the hot water temperature in bathtub 2. This allows reheating to be performed more appropriately based on a drop in hot water temperature, and the bather's body can be kept appropriately warm when the scheduled bathing time has passed.
[0130] As shown in Fig. 8, the control unit 111 (reheating execution unit 111d) stops reheating (S209) when the hot water temperature reaches a preset temperature during reheating (S208: YES). This prevents the bather's body from becoming too warm due to the reheating process while the bathing timer is running. Therefore, the bather can appropriately feel satisfied with the warmth when the timer function prompts him or her to leave the bath.
[0131] As shown in Fig. 8, after stopping reheating (S209), the control unit 111 (reheating execution unit) repeatedly executes the reheating process (S205, S206) based on the drop in water temperature until the bathing time reaches the scheduled bathing time (S210: NO). This makes it possible to keep the water temperature close to the set temperature while the bathing timer is running. Therefore, the bather can feel satisfied with the warmth when the timer function prompts them to leave the bath.
[0132] As shown in Fig. 8, the control unit 111 (reheating execution unit) stops reheating (S209) when the bathing time reaches the scheduled bathing time (S207: NO) during reheating. This makes it possible to prevent reheating from continuing after the bather is notified that the bathing time has reached the scheduled bathing time. This makes it possible to efficiently perform reheating in conjunction with the input timer.
[0133] <Example of change> In the above embodiment, the planned bathing time corresponding to the room temperature and water temperature at the time of bathing was obtained from the planned bathing time setting table in FIG. 4. However, the method of obtaining the planned bathing time is not limited to this, and for example, the planned bathing time may be calculated by the above-mentioned calculation method. In this case, the temperature data (graph) of the core layer CR is calculated from the room temperature and water temperature at the time of bathing by the above-mentioned calculation method. Then, from the calculated temperature data (graph), the time at which the temperature rise value of the core layer CR temperature (core body temperature) from the start of bathing reaches a predetermined temperature rise value is calculated. The time calculated in this way is obtained as the planned bathing time.
[0134] In the above embodiment, the expected bathing time is the time from the start of bathing until the core body temperature reaches a predetermined temperature increase value. However, the method of setting the expected bathing time is not limited to this, and for example, the expected bathing time may be the time from the start of bathing until the core body temperature reaches a predetermined temperature.
[0135] Furthermore, in the above embodiment, the notification urging the user to leave the bath is made by speaker 126 of bathroom remote control 12, but this notification may also be made not only by bathroom remote control 12 but also by kitchen remote control 13, by voice from speaker 136 or by screen display from display input unit 131. Also, if water heating apparatus 10 (bath apparatus) is capable of communicating with a mobile terminal device of a family member using water heating apparatus 10, a notification that a notification urging the user to leave the bath has been made may be sent to this mobile terminal device.
[0136] In addition, in the above embodiment, the functions of a bathing detection unit 111a, a bathing timer unit 111b, an alarm processing unit 111c and a re-heating execution unit 111d are set in the control unit 111 of the water heater 11, and the function of a time setting unit 123a is set in the control unit 123 of the bathroom remote control 12, but the setting form of these functions is not limited to this.
[0137] For example, the function of time setting unit 123a may be further set in control unit 111 of water heater 11, and the function of time setting unit 123a may be omitted from control unit 123 of bathroom remote control 12. In this case, control unit 111 of water heater 11 executes the processes of S101 to S104 in Fig. 7 using the function of the time setting unit to obtain the planned bathing time. In step S102, control unit 111 obtains the room temperature from bathroom remote control 12. In addition, the planned bathing time setting table of Fig. 4 is held in memory unit 112 of water heater 11.
[0138] Alternatively, all or some of these functions may be set in bathroom remote control 12, and all or some of these functions may be set in kitchen remote control 13. In addition, if water heating apparatus 10 (bath apparatus) includes a control unit other than water heater 11, bathroom remote control 12, and kitchen remote control 13, all or some of these functions may be set in this control unit.
[0139] 8 is merely an example, and some parts may be changed. For example, step S203 may be omitted from the process in FIG. 8, and the processes from step S204 onward may be executed in response to the start of counting the bathing time.
[0140] In addition, the bathing detection unit 111a, the bathing timer unit 111b, the notification processing unit 111c, the re-heating execution unit 111d, and the time setting unit 123a do not necessarily have to be realized as functions based on a program, and may be realized by hardware based on a logic circuit.
[0141] Furthermore, room temperature sensor 127 does not necessarily have to be located on bathroom remote control 12, and may be located, for example, in a location separate from bathroom remote control 12 in bathroom 3.
[0142] Furthermore, the configuration of water heater 11 is not limited to the configuration shown in Figures 2 and 3, and may be other configurations. Furthermore, water heater 10 (bath equipment) is not limited to one that uses gas fuel, and may be a water heater that uses oil as fuel. Water heater 10 may be of a storage type that uses a storage tank, and may be configured to further include a power generation unit such as a fuel cell.
[0143] In addition, the embodiments of the present invention can be modified in various ways as appropriate within the scope of the claims. [Explanation of symbols]
[0144] 2 Bathtub 3 Bathroom 10. Hot water supply equipment (bath equipment) 111a Bathing detection unit 111b Bath Timer 111c Notification processing unit 111d Reheating Executive Department 123a Time setting section 127 Room Temperature Sensor S1 Water Level Sensor S5 Temperature Sensor
Claims
1. a water level sensor disposed in a circulation path for circulating hot and cold water in the bathtub between the water heater and the bathtub, for detecting the water level in the bathtub; A temperature sensor disposed in the circulation path for detecting a temperature of the water in the bathtub; a room temperature sensor for detecting a room temperature in a bathroom in which the bathtub is installed; a bathing detection unit that detects bathing in the bathtub based on a detection result of the water level sensor; A bathing timer unit that starts counting the bathing time based on the detection of the bathing; a time setting unit that sets a scheduled bathing time based on the hot water temperature and the room temperature at the time of bathing detection in order to limit the bather's body temperature from rising to a predetermined value or higher; a notification processing unit that issues a notification when the bathing time reaches the scheduled bathing time; and a reheating execution unit that executes a process of reheating the hot water in the bathtub based on the fact that the hot water temperature detected by the temperature sensor is lower than the hot water temperature at the start of bathing while the bathing timer is running. A bath device characterized by the above.
2. The bath device according to claim 1, The reheating execution unit executes a reheating process based on the decrease in the hot water temperature from a timing a predetermined time before the scheduled bathing time. A bath device characterized by the above.
3. The bath device according to claim 1, A circulation pump is provided for circulating hot and cold water through the circulation path, The reheating execution unit causes the temperature sensor to detect the hot water temperature during execution of the bathing timer while the circulation pump is operating. A bath device characterized by the above.
4. The bath device according to claim 1, The re-heating execution unit stops the re-heating based on the fact that the hot water temperature has reached a preset temperature during the execution of the re-heating. A bath device characterized by the above.
5. The bath apparatus according to claim 4, The reheating execution unit repeatedly executes the reheating process based on the decrease in the hot water temperature until the bathing time reaches the scheduled bathing time after the reheating is stopped. A bath device characterized by the above.
6. In the bath device according to any one of claims 1 to 5, The re-heating execution unit stops the re-heating based on the fact that the bathing time has reached the scheduled bathing time during the execution of the re-heating. A bath device characterized by the above.
Citation Information
Patent Citations
Apparatus for supplying hot water to bath
JP2012107767A
Bath system
JP2021120604A
Cited By
Bathing navigation program, bathing navigation method, bathing navigation device, and bathing navigation system
JP7886470B1
