Water heater

The water heater system addresses ozonated water generation failures by using a control circuit and switching valve to ensure hot water supply to the bathtub while preventing continuous ozonated water output, improving user convenience and product quality.

JP2024166640APending Publication Date: 2024-11-29NORITZ CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023082856
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-19
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

Existing water heaters with integrated ozonated water generation for pipe cleaning face issues with user convenience and product quality when ozonated water generation fails, leading to the inability to supply hot water to the bathtub due to continuous output of functional water.

Method used

A water heater system with a control circuit that includes a switching valve and on-off valve to bypass the ozonated water generation device during failures, ensuring hot water supply to the bathtub while preventing continuous output of ozonated water.

Benefits of technology

The system effectively responds to ozonated water generation failures by maintaining hot water supply to the bathtub and preventing continuous output of ozonated water, enhancing user convenience and product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024166640000001_ABST
    Figure 2024166640000001_ABST
Patent Text Reader

Abstract

To appropriately respond to a failure in which generation of functional water cannot be stopped in a water heater having a piping cleaning operation function by using the functional water with sterilization effects.SOLUTION: When operated, a functional water generation unit 35 disposed in a hot water filling path from a hot water supply circuit to a bathtub generates functional water from hot water supplied from the hot water supply circuit by opening a bath hot water filling valve 13. A three-way valve 32 selects a first path P1 that does not pass through the functional water generation unit 35 in the hot water filling path and a second path P2 that passes through the functional water generation device. When detecting ON failure of the functional water generation unit 35, a controller 12 closes the bath hot water filling valve 13 and controls the three-way valve 32 so as to select the first path P1. Until the ON failure is resolved, the controller prohibits selection of the second path P2 by the three-way valve 32 and allows opening of the bath hot water filling valve 13 while the three-way valve 32 selects the first path P1.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a hot water supply apparatus having a pipe cleaning function using functional water, such as ozone water, having a sterilizing effect. [Background technology]

[0002] A bathroom cleaning device using ozone water is described in, for example, Japanese Patent Laid-Open Publication No. 11-9481 (Patent Document 1).

[0003] In the bathtub cleaning device described in Patent Document 1, a switching valve is provided to select a route for tap water supplied to a spray nozzle or shower installed in the bathroom, either one that passes through the ozone water generator or one that does not pass through the ozone water generator.

[0004] Furthermore, Patent Document 1 describes that when a human body detection sensor detects that a user has left the bathroom, a switching valve is controlled so that a route for tap water passing through the ozone water generation device is selected. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Japanese Patent Application Publication No. 11-9481 Summary of the Invention [Problem to be solved by the invention]

[0006] One type of water heater is a model that includes a bathtub as a hot water supply destination, and in this model, the water heater can fill the bathtub with hot water. Furthermore, when drainage from the bathtub is detected, the water heater can supply hot water to the same route as when filling the bathtub, allowing a cleaning operation of the pipes, etc. to be performed.

[0007] When an ozone water generator similar to that described in Patent Document 1 is applied to such a water heater, it becomes possible to perform pipe cleaning with a sterilizing effect. On the other hand, as described above, if the water supply path from the water heater to the bathtub is the same when filling the bathtub with water and when cleaning the pipes, there is a concern that in the event of an abnormality in the ozone water generator, particularly an abnormality that makes it impossible to stop generating ozone water, water cannot be supplied from the water heater to the bathtub due to the water filling operation, etc., which reduces convenience for users and reduces marketability.

[0008] The present invention has been made to solve such problems, and the object of the present invention is to appropriately respond to a failure in a hot water supply device having a pipe cleaning operation function using functional water with a disinfecting effect, which makes it impossible to stop producing the functional water. [Means for solving the problem]

[0009] In one aspect of the present invention, there is provided a water heating device including a bathtub as a hot water supply destination. The water heating device includes a hot water supply circuit that supplies hot water, a hot water pouring path for supplying the hot water from the hot water supply circuit to the bathtub, an on-off valve arranged between the hot water supply circuit and the hot water pouring path, a functional water production device and a switching valve arranged in the hot water pouring path, and a control circuit. The functional water production device is configured to produce functional water from hot water when in operation. The switching valve selects a first path in which the hot water does not pass through the functional water production device and a second path in which the hot water passes through the functional water production device. The control circuit controls the switching valve to open the on-off valve and select the second path during a period of pipe cleaning operation using functional water, and instructs the functional water production device to operate. Furthermore, when the control circuit detects an on-failure in which the functional water production device is operating during a period in which the control circuit is not instructed to operate, the control circuit closes the on-off valve and controls the switching valve to select the first path. After detecting the on-failure, the control circuit prohibits the switching valve from selecting the second path until the on-failure is resolved, while allowing the on-off valve to open while the switching valve selects the first path. Effect of the Invention

[0010] According to the present invention, in a water heating device having a pipe cleaning operation function using functional water with a disinfecting effect, by realizing control that allows operation to supply hot water to the bathtub while avoiding the continuous output of functional water into the bathtub, it is possible to appropriately respond to a failure that makes it impossible to stop the production of functional water. [Brief description of the drawings]

[0011] [Figure 1] 1 is a schematic diagram illustrating a configuration example of a water heating device according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a block diagram illustrating a configuration related to a pipe cleaning operation in hot water supply apparatus 100 of FIG. [Diagram 3] 5 is a flowchart illustrating a pipe cleaning operation performed by the hot water supply apparatus according to the present embodiment. [Figure 4] 10 is a flowchart illustrating a control process for dealing with an on-failure of the functional water generating unit by the hot water supply device according to the present embodiment. [Diagram 5] 5 is a flowchart illustrating a control process for a three-way valve operation check test performed by the water heating apparatus according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. In the following, the same or corresponding parts in the drawings are given the same reference characters, and their description will not be repeated in principle.

[0013] FIG. 1 is a schematic diagram illustrating an example of the configuration of a water heating device according to the present embodiment.

[0014] 1, a water heater 100 according to this embodiment includes a bathtub 20 installed in a bathroom 200 as a hot water supply destination, in addition to a hot water tap and the like (not shown).

[0015] The water heating device 100 comprises a housing 1, a burner 2, a fan 3, a heat exchanger 4, a water inlet pipe 5, a hot water supply pipe 6, a bypass valve 7, a bypass pipe 7a, a circulation path 8, temperature sensors 9, 18, 19, a circulation pump 10, a water level sensor 11, a controller 12, a bath water supply valve 13, electrical wiring 14, flow sensors 15, 16, remote controls 40, 50, a three-way valve 32, a functional water generation unit 35, and a constant flow valve 36.

[0016] The housing 1 is provided so that the inside and outside of the housing 1 are in communication with each other, and has an exhaust port 1a for exhausting combustion gas. The housing 1 is configured to accommodate a burner 2, a fan 3, a heat exchanger 4, a water inlet pipe 5, a hot water supply pipe 6, a bypass valve 7, a bypass pipe 7a, temperature sensors 9, 18, 19, flow sensors 15, 16, a circulation pump 10, a water level sensor 11, a controller 12, a bath hot water supply valve 13, a three-way valve 32, a functional water production unit 35, and a constant flow valve 36. The housing 1 also accommodates a part of a circulation path 8 for reheating operation.

[0017] The burner 2 is configured to perform combustion operation by receiving a supply of fuel gas from a fuel supply system (not shown). The burner 2 supplies the combustion gas to the heat exchanger 4. The burner 2 has a hot water supply burner 2a and a supplementary heating burner 2b.

[0018] Fan 3 supplies air for combustion to burner 2. Fan 3 has fan 3a that supplies air for combustion to burner 2a, and fan 3b that supplies air for combustion to burner 2b. Each of fans 3a and 3b has a blade and a motor for rotating the blade. The blade is rotated by applying a current to the motor to supply air for combustion. Fans 3a and 3b are disposed below burners 2a and 2b in the height direction of water heater 100, respectively. Note that, regarding fan 3, FIG. 1 illustrates a configuration in which burners 2a and 2b are each provided with one fan 3a and one fan 3b, respectively, but it is also possible to configure a configuration in which one fan is shared by multiple burners 2a and 2b.

[0019] Heat exchanger 4 has heat exchanger 4a for hot water supply and heat exchanger 4b for reheating. Heat exchangers 4a and 4b are respectively arranged above burners 2a and 2b in the height direction of water heating apparatus 100. Heat exchangers 4a and 4b are arranged near exhaust port 1a.

[0020] The heat exchanger 4a recovers heat from the combustion gas supplied by the burner 2a. The heat exchanger 4b recovers heat from the combustion gas supplied by the burner 2b. Each of the heat exchangers 4a and 4b may include a primary heat exchanger that heats the incoming water by heat exchange with the sensible heat (combustion heat) of the combustion gas of the burner 2, and a secondary heat exchanger that heats the flowing water by heat exchange with the latent heat of the combustion exhaust gas from the burner 2.

[0021] The water inlet pipe 5 is connected to a water supply pipe at the water inlet port 5a. When the hot water tap is turned on and / or the bath hot water valve 13 is opened, low-temperature water is introduced from the water inlet port 5a to the water heater 100 by the supply pressure of the tap water. A temperature sensor 18 provided on the water inlet pipe 5 detects the temperature Tw of the inlet water introduced from the water inlet port 5a.

[0022] The water inlet pipe 5 is branched into a boiler body pipe 5b and a bypass pipe 7a via a bypass valve 7. The boiler body pipe 5b is connected to one end of the heat exchanger 4a. The flow rate ratio of the bypass pipe 7a and the boiler body pipe 5b to the total flow rate of the water inlet pipe 5 is controlled by the opening degree of the bypass valve 7.

[0023] The other end of the heat exchanger 4a is connected to one end of the hot water supply pipe 6. Low-temperature water supplied from the water inlet pipe 5 to the boiler body pipe 5b is heated to a predetermined temperature by the heat exchanger 4a and output to the hot water supply pipe 6. A flow rate sensor 15 is disposed in the boiler body pipe 5b. The flow rate sensor 15 can detect the flow rate of the heat exchanger 4a (boiler body flow rate).

[0024] On the other hand, bypass piping 7a bypasses heat exchanger 4a and is connected to hot water supply piping 6. Therefore, low-temperature water supplied from water inlet piping 5 to bypass piping 7a is output to hot water supply piping 6 without being heated by heat exchanger 4a. In this way, hot water supply device 100 can mix high-temperature water output from heat exchanger 4a and low-temperature water that has passed through bypass piping 7a, and output hot water at an appropriate temperature according to the set temperature from hot water supply piping 6.

[0025] The other end of the hot water supply pipe 6 is connected to a hot water outlet 6a connected to a hot water tap (not shown) or the like. Therefore, when the hot water tap is opened, hot water at an appropriate temperature controlled to a set temperature is supplied from the hot water supply device 100 to the hot water tap via the hot water outlet 6a.

[0026] The hot water supply pipe 6 is further connected to a hot water supply pipe 13a leading to the bathtub 20. A bath hot water supply valve 13 is connected between the hot water supply pipe 6 and the hot water supply pipe 13a. The bath hot water supply valve 13 can be configured, for example, by a solenoid valve that can be controlled to open and close. By opening the bath hot water supply valve 13, a path can be formed for outputting hot water from the hot water supply pipe 6 to the bathtub 20. In this way, the hot water supply device 100 can include the bathtub 20 as a hot water supply destination in addition to a hot water tap, etc.

[0027] In this specification, the supply of hot water from the water heater 100 to the bathtub 20 is referred to as "pouring hot water" to distinguish it from the supply of hot water to the outlet 6a (hot water tap, etc.). A flow rate sensor 16 is provided in the hot water supply pipe 13a. The flow rate sensor 16 can detect the flow rate of hot water supplied from the water heater 100 to the bathtub 20. In this embodiment, the action of supplying hot water or water to the bathtub 20 via the hot water supply pipe 13a by opening the bath hot water supply valve 13, regardless of the outlet hot water temperature at the hot water supply pipe 6, is referred to as "pouring hot water". In addition, the path formed by opening the bath hot water supply valve 13, through which hot water or water is output from the hot water supply pipe 6 to the bathtub 20, is referred to as the "pouring hot water path".

[0028] That is, one embodiment of the "hot water supply circuit" can be configured by the burner 2a, fan 3a, heat exchanger 4a, water inlet pipe 5, boiler body pipe 5b, hot water supply pipe 6, bypass valve 7, and bypass pipe 7a of the hot water supply device 100. Also, the bath hot water supply valve 13 corresponds to an "on-off valve" arranged between the hot water supply circuit and the hot water supply path.

[0029] The circulation path 8 is for circulating hot water 21 in the bathtub 20 (hereinafter also referred to as bathtub water 21) within the water heater 100, and has a return pipe 8a, a forward pipe 8b, and a circulation pump 10. One end of the return pipe 8a is connected to a circulation adapter 25 in the bathtub 20, and the other end is connected to the input side of the heat exchanger 4b. One end of the forward pipe 8b is connected to the output side of the heat exchanger 4b, and the other end is connected to the circulation adapter 25.

[0030] By operating the circulation pump 10, a path (reheating circulation path) is formed in which bath water 21 drawn in from the circulation adapter 25 passes through the return pipe 8a, the heat exchanger 4b, and the forward pipe 8b, and is discharged from the circulation adapter 25. When the combustion operation of the burner 2b is turned on while the reheating circulation path is formed, the bath water 21 introduced from the return pipe 8a is heated by the heat exchanger 4b, and the heated bath water 21 is supplied to the bathtub 20 by the forward pipe 8b, thereby performing a reheating operation that raises the temperature of the bath water 21.

[0031] A temperature sensor 9 and a water level sensor 11 are connected to the return pipe 8a. The temperature sensor 9 can detect the temperature of the bathtub water 21 (bathtub water temperature Tbt). The water level sensor 11 is, for example, a pressure sensor, and detects the level of the bathtub water 21 in the bathtub 20 (hereinafter simply referred to as the "bathtub water level") based on the water pressure of the bathtub water 21. The temperature sensor 9 and the water level sensor 11 are disposed in an area of ​​the return pipe 8a into which the bathtub water 21 enters, even when the circulation pump 10 is stopped.

[0032] Return pipe 8a is further connected to hot water supply pipe 13a at connection point 8c. For example, connection point 8c can be provided on circulation pump 10. As a result, when hot water is poured from hot water supply device 100, a hot water pouring path can be formed that includes a path from hot water supply pipe 13a to bathtub 20 via connection point 8c (circulation pump 10) and return pipe 8a, and a path from hot water supply pipe 13a to bathtub 20 via connection point 8c (circulation pump 10), return pipe 8a, heat exchanger 4b, and forward pipe 8b. This allows the bath to be filled by pouring hot water from hot water supply device 100.

[0033] In this way, hot and cold water from water heater 100 (hot water supply circuit) is supplied to bathtub 20 via a hot water supply path including circulation path 8. Bathtub 20 is provided with a drain plug 26. Drain plug 26 can be configured as either a "manual drain plug" that is opened and closed by manual operation by the user, or an "automatic drain plug" that can also be opened and closed automatically in response to an operation command from controller 12.

[0034] 1, the drainage from drain plug 26 joins with the drainage from drain outlet 210 provided on the floor of bathroom 200 in a drain trap and is discharged from drain pipe 220. A mist shower 250 may also be provided in bathroom 200.

[0035] In the hot water supply device 100 according to this embodiment, a three-way valve 32, a functional water production unit 35, and a constant flow valve 36, which are devices for pipe cleaning operation using functional water, are disposed in the hot water supply path, more specifically, between the bath hot water supply valve 13 and the connection point 8c. As will be described in detail later, the hot water from the hot water supply circuit is supplied to the connection point 8c by the three-way valve 32 selecting a path that passes through the functional water production unit 35 or a path that does not pass through the functional water production unit 35.

[0036] The controller 12 can include, for example, a microcomputer. The controller 12 is electrically connected to the burners 2a, 2b, the fans 3a, 3b, the temperature sensors 9, 18, 19, the circulation pump 10, the water level sensor 11, the bath hot water valve 13, the electrical wiring 14, the three-way valve 32, and the functional water production unit 35. The electrical wiring 14 is configured to supply power to the controller 12 by being connected to a power source (not shown). The controller 12 corresponds to one embodiment of a "control circuit".

[0037] The controller 12 receives detection values ​​from the flow rate sensors 15 and 16 and the temperature sensors 9, 18, and 19. The flow rate sensors 15 and 16 may be configured, for example, by impeller-type flow meters. The temperature sensors 9, 18, and 19 may be configured, for example, by thermistors.

[0038] The controller 12 can obtain the inlet water temperature Tw from the detection value of the temperature sensor 18, the outlet water temperature Th from the detection value of the temperature sensor 19, and the bathtub water temperature from the detection value of the temperature sensor 9. The controller 12 can also calculate the amount (volume) of hot water poured into the bathtub 20 by integrating the flow rate (pouring water flow rate) detected by the flow rate sensor 16.

[0039] Furthermore, the controller 12 is communicatively connected to a remote control 40 and a remote control 50. Note that the communication between these devices may be in accordance with any known standard, and may be wired or wireless.

[0040] Remote control 40 is installed on the wall of bathroom 200 and is used to operate water heater 100. Remote control 40 includes a display unit 41 for displaying information, an operation unit 42 for accepting input setting operations from a user or installer, and a speaker 43 capable of audio output. Display unit 41 is typically configured with a liquid crystal panel, and is configured to be able to display the bathtub water level setting, hot water supply temperature setting, bath temperature setting, etc. Operation unit 42 is typically configured with push buttons or touch buttons, and is configured to be able to accept setting operations related to at least the bathtub water level and temperature.

[0041] Remote control 50 is installed outside bathroom 200 and is used to operate water heating apparatus 100. Remote control 50 is typically installed on a wall in the kitchen. Remote control 50 includes a display unit 51 for displaying information, an operation unit 52 for accepting input setting operations from a user or the like, and a speaker 53 capable of outputting audio.

[0042] Display unit 51 is typically configured with a liquid crystal panel, and is configured to be able to display the hot water supply setting temperature, the bath setting temperature, etc. Operation unit 52 is typically configured with push buttons or touch buttons, and is configured to be able to accept setting operations related to the operation of water heating device 100.

[0043] Based on input setting operations by a user or the like from remote controls 40, 50, controller 12 controls the operation of water heating apparatus 100 so that water heating apparatus 100 operates according to the input instructions.

[0044] As an example of this control, controller 12 executes a bath filling operation when automatic bath operation is instructed by operating remote controls 40, 50. The bath filling operation ends when the bath water level in bathtub 20 reaches the set water level due to hot water poured from water heater 100 and the bath water temperature detected by temperature sensor 9 reaches the bath set temperature.

[0045] In water heating device 100, it is possible to set an automatic mode that maintains the temperature and water level of bathtub water 21 after the bath filling operation is completed. When this automatic mode is selected, if the bathtub water temperature detected by temperature sensor 9 falls below a reference temperature set corresponding to the bath set temperature (for example, set 2 to 3°C lower than the bath set temperature), a reheating operation is automatically started for heat retention control. Furthermore, if the bathtub water level detected by water level sensor 11 falls below the set water level, a top-up operation is automatically started to supply additional hot water from water heating device 100 to bathtub 20.

[0046] In the hot water supply apparatus according to this embodiment, after draining bathtub 20, a pipe cleaning operation is performed by pouring hot water from hot water supply apparatus 100 to clean the inside of the pipes, including circulation path 8. By operating remote controls 40, 50, the user can select whether to turn on or off the automatic pipe cleaning operation linked to draining bathtub 20.

[0047] Furthermore, the pipe cleaning operation according to this embodiment has a "functional water cleaning mode" in which functional water having a sterilizing effect is supplied to the circulation path 8. For example, the functional water may be hot water mixed with ozone (hereinafter referred to as "ozone water") obtained by electrolyzing hot water supplied from the hot water supply circuit. Below, an example of pipe cleaning operation using ozone water as functional water will be described, but it is also possible to use hot water mixed with hypochlorous acid or the like obtained by electrolysis as the "functional water".

[0048] The contents of the pipe cleaning operation can also be set by the user operating the remote controls 40, 50. For example, the user can select between (1) a mode in which the functional water cleaning mode is turned off and the pipes are cleaned only with hot water from the hot water supply circuit (hereinafter, hot water cleaning), and (2) a mode in which the functional water cleaning mode is turned on and the pipes are cleaned with functional water. In the functional water cleaning mode, hot water cleaning may be further combined before or after cleaning with functional water, or both before and after.

[0049] FIG. 2 is a block diagram illustrating a configuration related to the pipe cleaning operation in water heating apparatus 100 of FIG.

[0050] As shown in FIG. 2, the three-way valve 32 is disposed between the bath hot water supply valve 13 (hot water supply circuit) and the connection point 8c (circulation pump 10).

[0051] The three-way valve 32 operates in response to commands from the controller 12 to select the route by which hot water from the hot water supply circuit reaches the connection point 8c when the bath hot water supply valve 13 is opened from either a first route P1 that does not pass through the functional water production unit 35, or a second route P2 that passes through the functional water production unit 35. Similarly, the bath hot water supply valve 13 is controlled to open and close in response to commands from the controller 12.

[0052] The operation and stopping (non-operation) of the functional water production unit 35 is controlled according to commands from the controller 12 via the power supply board 38 and the sub-board 39. The sub-board 39 controls the power supply board 38 to supply a current for electrolysis during a period when an operation command for the functional water production unit 35 is generated from the controller 12.

[0053] As a result, when the functional water production unit 35 is in operation, electricity is applied to the hot water passing through the second path P2 by power from the power supply board 38. This causes the hot water to be electrolyzed, and the functional water production unit 35 can produce ozone water having a sterilizing effect.

[0054] On the other hand, the sub-board 39 controls the power supply board 38 to stop the supply of current for electrolysis during a period when no operation command for the functional water production unit 35 is generated from the controller 12. Therefore, when the functional water production unit 35 is not operating (when no current is passing through), ozone water (functional water) is not produced, and the functional water production unit 35 outputs hot water supplied from the hot water supply circuit as is.

[0055] A current sensor 37 for detecting the above-mentioned current flow is disposed in the functional water production unit 35. The detection value Ioz of the current flow by the current sensor 37 is input to the controller 12 via a power supply board 38 and a sub-board 39. The current sensor 37 may be disposed on the power supply board 38 and detect the current flow by measuring the current supplied to the functional water production unit 35.

[0056] In the functional water production unit 35, the efficiency of ozone production decreases when the temperature of the hot water is high. Therefore, when the functional water production unit 35 is energized, it is preferable that the controller 12 stops the combustion of the burner 2a so that unheated water is supplied to the functional water production unit 35 from the hot water supply circuit.

[0057] The constant flow valve 36 is disposed on the second path P2 as a flow rate adjustment means for the functional water production unit 35. When the constant flow valve 36 is disposed as the adjustment means, the flow rate Q2 passing through the functional water production unit 35 is controlled to a constant flow rate that depends on the specifications of the constant flow valve 36. For example, the flow rate Q2 is adjusted to ensure the ozone concentration in the ozone water in accordance with the specifications (electrolysis capacity, etc.) of the functional water production unit 35. Note that the flow rate Q2 can also be variably adjusted by disposing a servo valve or the like instead of the constant flow valve 36.

[0058] In contrast, the flow rate Q1 of the first path P1, which does not pass through the functional water production unit 35, is determined depending on the water inlet pressure at the water inlet pipe 5 and the pressure loss in the path from the water inlet pipe 5 to the bathtub 20 when the bath hot water valve 13 is opened. Normally, the flow rate Q2 is smaller than the flow rate Q1. Note that each of the above-mentioned flow rates Q1 and Q2 can be detected by the flow sensor 16 in FIG. 1 (detected flow rate Q). Furthermore, the controller 12 can know in advance the flow rate Q2 when the second path P2 is formed, based on the specification value of the constant flow valve 36 or the control command of the servo valve.

[0059] The controller 12 generates, as functions related to the pipe cleaning operation, commands to open / close the bath hot water valve 13, commands for the three-way valve 32 (selection of the first path P1 or the second path P2), and operation commands (on / off commands) for the functional water production unit 35. The controller 12 has a built-in timer 12t, and is capable of measuring the elapsed time from any timing. The controller 12 also receives inputs of the detection value (flow rate detection value Q) of the flow rate sensor 16, the detection value (inlet water temperature Tw) of the temperature sensor 18, the detection value (outlet hot water temperature Th) of the temperature sensor 19, the detection value Ioz (current flow) of the current sensor 37, etc.

[0060] Fig. 3 is a flow chart for explaining the pipe cleaning operation by the hot water supply device according to the present embodiment. The process shown in Fig. 3 is repeatedly executed by controller 12 when the user turns on the automatic pipe cleaning operation linked to the drainage of bathtub 20.

[0061] 3, when draining of bathtub 20 is detected with automatic pipe cleaning operation selected in step (hereinafter simply referred to as "S") 110 (YES determination in S110), controller 12 starts pipe cleaning operation in S120. For example, in the determination in S110, draining can be detected when water level sensor 11 detects that the bath water level has dropped to a level at which circulation adapter 25 is exposed after the bath filling operation is completed.

[0062] Alternatively, if the drain plug 26 is an automatic drain plug, it is also possible to detect drainage when a predetermined time has elapsed after a command to open the drain plug 26. In this way, any method can be used to detect drainage of the bathtub 20 without any particular limitations.

[0063] In S120, the controller 12 determines the contents of the pipe cleaning operation according to the user settings at the start of the pipe cleaning operation. Here, as an example, a pattern is set in which pipe cleaning with hot water (pre-cleaning) is performed, followed by pipe cleaning with functional water (functional water cleaning), and then pipe cleaning with hot water (post-cleaning) is performed again.

[0064] In S130, the controller 12 judges whether or not it is time to start functional water cleaning according to the content (pattern) set in S120. In the above example, after the start of the pipe cleaning operation, the post-cleaning with hot and cold water is executed first, so that the judgment in S130 is NO.

[0065] When hot and cold water flushing is started (NO in S130), the controller 12 advances the process to S170 and controls the three-way valve 32. For example, during pre-flushing, the three-way valve 32 is controlled to select the first path P1 with the bath hot water valve 13 closed in S170. Furthermore, the controller 12 opens the bath hot water valve 13 in S175 and keeps the functional water production unit 35 inactive (power not supplied) in S177. As a result, hot and cold water supplied from the hot water supply circuit is passed to the bathtub 20 without being powered by the functional water production unit 35, thereby performing pipe cleaning.

[0066] In S180, the controller 12 determines whether or not the conditions for ending the hot and cold water flush in S170 to S177 are met. For example, the determination in S180 can be made by comparing the time of the hot and cold water flush measured by the timer 12t or the amount (volume) of hot and cold water based on the integrated value of the flow rate detected by the flow rate sensor 16 with a predetermined determination value.

[0067] When the condition for ending the hot and cold water flush is met (YES in S180), the controller 12 closes the bath hot water supply valve 13 in S185, thereby ending the hot and cold water flush.

[0068] Furthermore, the controller 12 determines in S190 whether the end condition for the pipe cleaning set in S120 has been met. In this example, when all of the above-mentioned pre-cleaning, functional water cleaning, and post-cleaning are completed, a YES determination is made in S190. Therefore, at the end of the pre-cleaning, a NO determination is made in S190, and the process returns to S130. Then, a YES determination is made in S130 in order to perform functional water cleaning after the pre-cleaning.

[0069] When functional water cleaning is started (YES in S130), the controller 12 controls the three-way valve 32 to select the second path P2 with the bath hot water valve 13 closed in S140. Furthermore, the bath hot water valve 13 is opened in S145, causing the hot water supplied from the hot water supply circuit to pass through the functional water production unit 35. The controller 12 generates an operation command for the functional water production unit 35 in S150. As a result, the functional water production unit 35 applies electricity to the hot water from the hot water supply circuit, and functional water (ozonated water) is output to the hot water supply path including the circulation path 8. This allows the pipes to be cleaned with functional water having a disinfecting effect.

[0070] The controller 12 determines in S160 whether or not the end condition of the functional water cleaning in S140 to S150 is satisfied. The determination in S160 can be made based on the time measurement by the timer 12t, as in S180.

[0071] When the condition for ending the functional water flush is met (YES in S160), the controller 12 deactivates the functional water production unit 35 and stops the power supply, and closes the bath hot water valve 13 in S185. This ends the functional water flush.

[0072] Furthermore, the controller 12 executes S190 again to determine whether the end condition of the pipe cleaning set in S120 is satisfied. In this example, at the end of the functional water cleaning, the result of S190 is NO, and the process returns to S130. Then, the result of S130 is NO in order to perform post-cleaning after the functional water cleaning.

[0073] When the hot water flush is started (NO in S130), the controller 12 advances the process to S170. For example, in the post-flushing, in order to remove functional water (ozone water) remaining in the piping, in S170, the three-way valve 32 is controlled to select the second path P2 with the bath hot water valve 13 in the closed state.

[0074] Furthermore, the controller 12 opens the bath hot water valve 13 and keeps the functional water production unit 35 inactive (power not applied) in S175 and S177. This allows hot water supplied from the hot water supply circuit to flow to the bathtub 20 without being powered by the functional water production unit 35, thereby performing pipe cleaning. In particular, by performing hot water cleaning by selecting the second path P2, corrosion of the pipes due to residual functional water (ozone water) can be suppressed. In this way, hot water cleaning can be performed by either the first path P1 or the second path P2 by the three-way valve 32.

[0075] The controller 12 determines whether the end condition of the hot water flush (post-flush) in S170 to S177 is met in the above-mentioned S180. When the end condition of the hot water flush (post-flush) is met (YES in S180), the controller 12 closes the bath hot water supply valve 13 in S185.

[0076] Furthermore, the controller 12 executes S190 again to determine whether the end condition of the pipe cleaning pattern set in S120 is satisfied. In this example, at the end of the post-cleaning, S190 is determined to be YES, and the process proceeds to S200, where the pipe cleaning operation is ended. At the end of the pipe cleaning operation, the bath hot water supply valve 13 is closed.

[0077] One type of failure of the functional water production unit 35 is a failure in which power cannot be stopped during a non-operating period when no operation command is being generated due to a short circuit in the power supply board 38 or the like (hereinafter also referred to as an "on failure"), i.e., a failure in which production of functional water cannot be stopped. If the occurrence of such an on failure causes functional water (ozone water) to be continuously output to the bathtub 20, there is a concern that the concentration of substances (e.g., ozone) having a sterilizing effect in the air in the bathroom 200 will excessively increase. Therefore, the hot water supply device of this embodiment is capable of appropriately responding to such an on failure and realizes the above-mentioned pipe cleaning operation including functional water cleaning.

[0078] 4 is a flow chart for explaining a control process for dealing with an on-failure of the functional water producing unit in the hot water supply device according to the present embodiment. The process shown in FIG.

[0079] 4, the controller 12 executes a process of detecting an on-failure of the functional water production unit 35 at S300 throughout the power-on period of the hot water supply apparatus 100. S300 includes S310, S315, and S320.

[0080] In S310, the controller 12 determines whether or not it is a non-operating (non-energized) period of the functional water production unit 35. In S310, a NO determination is made while the controller 12 is generating an operation command for the functional water production unit 35, whereas a YES determination is made otherwise, i.e., when the operation command is not being generated.

[0081] During the period when the functional water production unit 35 is not operating (YES in S310), the controller 12 determines in S315 whether or not electricity is flowing to the functional water production unit 35 based on the detection value Ioz of the current flowing through the current sensor 37 (FIG. 2). For example, if the detection value Ioz remains greater than a predetermined determination value ε for a certain period of time, YES is determined in S315.

[0082] When the functional water production unit 35 is not in operation and power is being applied to the functional water production unit 35 (YES in S315), the controller 12 proceeds to S320 and detects an on-failure of the functional water production unit 35. At this time, a predetermined error code is set by the controller 12. The error code is released when a service technician or the like performs a predetermined special input when repairs to the functional water production unit 35 are completed. Therefore, the error code is maintained until the special input is performed.

[0083] In contrast, while the functional water production unit is in operation (NO in S310) or when no current is being passed through the functional water production unit 35 (NO in S315), an ON failure is not detected by S380.

[0084] When the controller 12 detects an on-failure of the functional water generation unit 35, it notifies the user of the occurrence of an on-failure of the functional water generation unit 35 by S330. For example, the display unit 41, 51 and / or speaker 43, 53 of the remote control 40, 50 can be used as an "alarm unit" to notify the user of a message visually or audibly. At this time, a message is output encouraging the user to request repairs at a service station or the like to resolve the malfunction of the functional water generation unit 35.

[0085] In S340, the controller 12 closes the bath hot water valve 13. If the bath hot water valve 13 is open at that time, the closed state is maintained. On the other hand, if an on-failure of the functional water production unit 35 is detected while the bath hot water valve 13 is open, the bath hot water valve 13 is closed in S340. As a result, when an on-failure of the functional water production unit 35 is detected, the bath hot water valve 13 is reliably closed once.

[0086] Furthermore, the controller 12 controls the three-way valve 32 to select the first path P1 in S350. Then, in S360, it is determined whether the on-fault of the functional water production unit 35 has been resolved. The determination in S360 can be made based on whether the error code set in S320 has been cleared, as described above.

[0087] The controller 12 controls the three-way valve 32 (S350) to fix the selection of the first path P1 until the on-failure of the functional water production unit 35 is resolved (NO in S360), thereby prohibiting the three-way valve 32 from selecting the second path P2.

[0088] When the on-fault of the functional water generation unit 35 is resolved (YES in S360), the fixed selection of the first path P1 (S350) is released in S370, and the three-way valve 32 becomes able to select both the first path P1 and the second path P2. In contrast, once it has been confirmed by S340 that the bath hot water valve 13 has been temporarily closed, it is permitted thereafter to open the bath hot water valve 13 for bath filling operation, etc., regardless of whether the on-fault of the functional water generation unit 35 has been resolved.

[0089] As a result, in the hot water supply device of this embodiment, when an on-failure occurs that makes it impossible to stop the production of functional water by the functional water generation unit 35, the bath hot water supply valve 13 is temporarily closed, and the three-way valve 32 is controlled to select the first path P1 in the hot water supply path that bypasses the functional water generation unit 35, thereby preventing functional water (ozone water) from being continuously output to the bathtub 20.

[0090] Furthermore, while the three-way valve 32 is prohibited from selecting the second path P2 until the ON fault of the functional water production unit 35 is resolved, the bath hot water valve 13 is allowed to open, so that an operation such as filling the bath with water can be performed to supply hot water from the hot water supply circuit to the bathtub 20. As a result, the ON fault of the functional water production unit 35 can be appropriately dealt with.

[0091] Furthermore, in the hot water supply device according to the present embodiment, when starting functional water cleaning, it is preferable to perform an operation check to determine whether the path switching function of three-way valve 32 is normal.

[0092] FIG. 5 is a flowchart illustrating a control process for an operational test of a three-way valve by the water heating apparatus according to the present embodiment.

[0093] 5, at the start of functional water cleaning (YES determination in S130), the controller 12 performs an operation test in S410 on the three-way valve 32. Specifically, the operation test is performed to determine whether the three-way valve 32 can normally switch from the second path P2 to the first path P1.

[0094] 2, when the second path P2 is selected, the flow rate detected by the flow sensor 16 becomes a known value (Q2) due to a flow rate adjustment means such as the constant flow valve 36. Therefore, the controller 12 can confirm whether the second path P2 is selected as instructed by the controller 12, based on the flow rate detection value of the flow sensor 16 while instructing the three-way valve 32 to select the second path P2.

[0095] Thereafter, the controller 12 instructs the three-way valve 32 to switch to the first path P1, and based on whether the flow rate detection value of the flow sensor 16 changes from Q2, it can be confirmed whether the switching to the first path P1 has been successfully performed as instructed by the controller 12.

[0096] In this manner, in S410, the operation test of the three-way valve 32 can be performed using the flow rate detected by the flow rate sensor 16.

[0097] In S420, the controller 12 branches the process depending on the result of the operation test in S410. When the operation of the three-way valve 32 is normal, the determination in S420 is YES, and the process proceeds to S140 in Fig. 3, where cleaning with functional water is performed.

[0098] In contrast, when the operation of the three-way valve 32 is abnormal, a NO judgment is made in S420, and functional water cleaning is prohibited in S430. Furthermore, it is preferable to temporarily stop the pipe cleaning operation by proceeding to S200 in Fig. 3. At this time, the remote controller 40, 50, etc. can be used as a "notification unit" to notify the user of the failure of the three-way valve 32, as in S330 in Fig. 4.

[0099] By performing an operation test of the three-way valve in advance, it is possible to further prevent the functional water (ozone water) from being continuously output to the bathtub 20 when an on-failure occurs in the functional water generation unit 35.

[0100] In this embodiment, the pipe cleaning operation using functional water (ozone water) has been described, but a similar configuration can also be applied to the mist shower 250 shown in Fig. 1. Specifically, by changing the connection destination of the configuration in Fig. 2 from connection point 8c (circulation pump 10) with the circulation path 8 to the mist shower 250, a sterilization operation function can be realized in the bathroom 200 by spraying functional water (ozone water) having a sterilizing effect. In this case, by applying the control processes in Figs. 4 and 5, it is possible to prevent functional water (ozone water) from being continuously output into the bathroom 200 when the functional water production unit 35 has an on-failure, and to enable the mist shower function using hot water from the hot water supply circuit.

[0101] In addition, in the present embodiment, the water heating apparatus 100 using the combustion of fuel gas as a heat source has been exemplified, but the heat source of the water heating apparatus 100 is not particularly limited. For example, even if the water heating apparatus uses the combustion heat of a fuel other than gas as a heat source, or uses exhaust heat from a power generation unit or the like, or a heat pump mechanism as a heat source, and supplies and pours hot water from a hot water storage tank, it is possible to similarly perform the cleaning piping operation including the functional water cleaning operation described in this embodiment, so long as it has a configuration including a hot water pouring path and a reheating circulation path.

[0102] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is defined by the claims, not the above description, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0103] 1 housing, 1a exhaust port, 2, 2a, 2b burner, 3, 3a, 3b fan, 4, 4a, 4b heat exchanger, 5 water inlet pipe, 5a water inlet, 5b boiler body pipe, 6 hot water supply pipe, 6a hot water outlet, 7 bypass valve, 7a bypass pipe, 8 circulation path, 8a return pipe, 8b forward pipe, 8c connection point, 9, 18, 19 temperature sensor, 10 circulation pump, 11 water level sensor, 12 controller, 12t timer, 13 bath water supply valve, 13a hot water supply pipe, 14 electrical wiring, 15, 16 flow rate sensor, 20 bathtub, 21 bathtub water, 25 circulation adapter, 26 drain plug, 32 three-way valve, 35 functional water generation unit, 36 constant flow valve, 37 current sensor, 38 power supply board, 39 sub-board, 40, 50 Remote control, 41, 51 display unit, 42, 52 operation unit, 43, 53 speaker, 100 water heater, 200 bathroom, 210 drain, 220 drain pipe, 250 mist shower, Ioz detected value (current flow), P1 first path, P2 second path.

Claims

1. A hot water supply device including a bathtub as a hot water supply destination, A hot water supply circuit for supplying hot water; A hot water supply path for supplying hot water from the hot water supply circuit to the bathtub; An on-off valve disposed between the hot water supply circuit and the hot water pouring path; a functional water generating device disposed in the molten water pouring passage and generating functional water from the molten water when activated; a switching valve disposed in the pouring path for selecting a first path in which the hot water does not pass through the functional water generating device and a second path in which the hot water passes through the functional water generating device; a control circuit that controls the switching valve to open the on-off valve and select the second path during a period of a pipe cleaning operation using the functional water, and that instructs the functional water production device to operate; When the control circuit detects an ON failure in which the functional water production apparatus is operating during a period in which the operation of the functional water production apparatus is not instructed, the control circuit closes the on-off valve and controls the switching valve to select the first path, and further A hot water supply device which, after detecting the on-failure, prohibits the switching valve from selecting the second path until the on-failure is resolved, while allowing the opening of the on-off valve while the switching valve selects the first path.

2. A flow rate sensor is further provided in the pouring path, the molten metal pouring path is configured such that a flow rate caused by opening of the on-off valve differs between the first path and the second path, The hot water supply device of claim 1, wherein the control circuit performs an operation test of the switching valve based on the detected flow rate of the flow sensor when the switching valve switches between the first path and the second path before starting pipe cleaning operation using the functional water.

3. the functional water generating device is configured to generate functional water by electrolyzing the hot water during the operation, The hot water supply device includes: A current sensor is further provided to detect the current flowing through the hot and cold water by the functional water generating device. The hot water supply device of claim 1 or 2, wherein the control circuit detects the on-failure of the functional water generating device when the current detected by the current sensor exceeds a predetermined judgment current during a period when the functional water generating device is not instructed to operate.

4. The hot water supply device according to claim 3 , further comprising an alarm unit for notifying a user of the on-failure of the functional water producing device when the control circuit detects the on-failure.

Citation Information

Patent Citations

  • Bathroom cleaning device

    JP1999009481A