Process management system, process management method and process management program
The process management system addresses the challenge of timing work correction instructions by using urgency-based determination and output mechanisms, ensuring efficient and timely delivery of corrections.
Patent Information
- Application Number
- JP2023083889
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-22
- Publication Date
- 2024-12-04
AI Technical Summary
Existing systems struggle to determine the appropriate timing for issuing work correction instructions, leading to potential interruptions in ongoing work and reduced efficiency.
A process management system that includes a correction instruction acquisition means, determining means for timing output based on urgency, and output means to deliver instructions at optimal times, considering factors like urgency and approval status.
Enables work correction instructions to be issued at appropriate times, minimizing interruptions and maintaining work efficiency by prioritizing urgent tasks.
Smart Images

Figure 2024167664000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a process control system. [Background technology]
[0002] At a construction site, for example, process management is performed to manage the progress of the process. Also, a supervisor at the construction site checks, for example, the finished state of the work performed by the workers. If there is any problem with the finished state of the work, the supervisor issues a corrective instruction, for example, an instruction to redo or correct the work. Also, process management and corrective instructions at a construction site may be performed via an information processing system.
[0003] The construction management server of Patent Document 1 acquires work correction instructions input by the construction manager based on the work confirmation results. Then, the construction management server of Patent Document 1 transmits the correction instructions to the mobile phone carried by the worker. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2009-265766 A Summary of the Invention [Problem to be solved by the invention]
[0005] In the technique described in Patent Document 1, it may be difficult to determine the timing for issuing an instruction to correct the work.
[0006] In order to solve the above-mentioned problems, the present disclosure aims to provide a process management system and the like that can output work correction instructions at an appropriate timing. [Means for solving the problem]
[0007] In order to solve the above problems, the process management system disclosed herein includes a corrective instruction acquisition means for acquiring corrective instructions for work that is the subject of process management, a decision means for deciding the timing to output the corrective instruction based on the urgency of the work to be performed based on the corrective instruction, and an output means for outputting the corrective instruction based on the decided timing.
[0008] The process management method disclosed herein obtains corrective instructions for work that is the subject of process management, determines the timing for outputting the corrective instructions based on the priority of the work to be performed based on the corrective instructions, and outputs the corrective instructions based on the determined timing.
[0009] The process management program disclosed herein causes a computer to execute a process of obtaining corrective instructions for work that is the subject of process management, a process of determining the timing to output the corrective instructions based on the priority of the work to be performed based on the corrective instructions, and a process of outputting the corrective instructions based on the determined timing. Effect of the Invention
[0010] According to the present disclosure, work correction instructions can be output at an appropriate time. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a diagram illustrating an example of a configuration of a management system according to an embodiment of the present disclosure. [Diagram 2] FIG. 1 is a diagram illustrating an example of a configuration of a process management system according to an embodiment of the present disclosure. [Diagram 3] FIG. 13 is a diagram illustrating an example of a display screen according to an embodiment of the present disclosure. [Figure 4] FIG. 13 is a diagram illustrating an example of a display screen according to an embodiment of the present disclosure. [Diagram 5] FIG. 13 is a diagram illustrating an example of a display screen according to an embodiment of the present disclosure. [Figure 6] FIG. 13 is a diagram illustrating an example of a display screen according to an embodiment of the present disclosure. [Figure 7] FIG. 13 is a diagram illustrating an example of a display screen according to an embodiment of the present disclosure. [Figure 8] FIG. 1 is a diagram illustrating an example of an operation flow of a process control system according to an embodiment of the present disclosure. [Figure 9] FIG. 1 is a diagram illustrating an example of an operation flow of a process control system according to an embodiment of the present disclosure. [Figure 10] FIG. 1 is a diagram illustrating an example of a hardware configuration of a process control system according to an embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] An embodiment of the present disclosure will be described in detail with reference to the drawings. FIG. 1 is a diagram showing an example of the configuration of a management system of the present embodiment. The management system includes, for example, a process management system 10, a supervisor terminal device 20, a manager terminal device 30, and a worker terminal device 40. The process management system 10 is connected to the supervisor terminal device 20, for example, via a network. The process management system 10 is connected to the manager terminal device 30, for example, via a network. The process management system 10 is also connected to the worker terminal device 40, for example, via a network. There may be a plurality of supervisor terminal devices 20, manager terminal devices 30, and worker terminal devices 40. The number of supervisor terminal devices 20, manager terminal devices 30, and worker terminal devices 40 may be set as appropriate.
[0013] The process control system 10 is, for example, a system used for process control at a construction site. The process control system 10 is, for example, a system that manages the progress of work at a construction site and transmits instructions related to the work. Instructions related to the work are, for example, given by a supervisor to at least one of a manager and a worker. Instructions related to the work include, for example, instructions related to normal work performed according to a plan and corrective instructions. Corrective instructions are given, for example, to instruct repair of defective parts or redoing work when there is a defect in the finished state of completed work. The supervisor terminal device 20 is, for example, a terminal device used by a supervisor to check the progress of work and give instructions related to the work. The manager terminal device 30 is, for example, a terminal device used by a manager to check and approve instructions from the supervisor. The worker terminal device 40 is, for example, a terminal device used by a worker to check instructions related to the work and to report the start and end of work.
[0014] A supervisor is, for example, a person who manages the process at a construction site. A supervisor, for example, plans a work plan, manages the progress of the work, and gives instructions regarding the work. A supervisor, for example, gives instructions regarding the work to a manager. Instructions regarding the work are information on at least one item among the content of the work, the work procedure, the area where the work is performed, the number of workers, and the work period. The area where the work is performed is also called a construction area. In addition, instructions regarding the work include instructions to correct the work. Instructions regarding the work are not limited to the above. When the completion of the work is reported, the supervisor, for example, checks the completion state of the work. For example, the supervisor checks the finished state at the site where the work was performed. Then, when the result of checking the finished state indicates that repairs or redoing the work is necessary, the supervisor gives corrective instructions. Checking the finished state is checking whether the state after the work is as planned. In addition, corrective instructions are, for example, instructions regarding additional work to make the finished state of the work as planned when the finished state of the work is not as planned.
[0015] The state as planned means, for example, a state in accordance with at least one of the design, the specification, the purchase order, and the instructions. For example, when the target process is a process of attaching wallpaper to an interior room, the state as planned means a state in which the wallpaper is attached in compliance with the position, size, and type specified in the specification. When the target process is a process of attaching wallpaper to an interior room, the state as planned may be a state in which the attached wallpaper is free of wrinkles and air bubbles. When the target process is a process of attaching wallpaper to an interior room, the state as planned is not limited to the above. When the target process is a process of attaching wallpaper to an interior room, for example, when the wallpaper is different from the specified wallpaper, the supervisor issues a corrective instruction to at least one of the manager and the worker to replace the wallpaper with the specified wallpaper. Also, for example, when the target process is the installation work of indoor piping, the state as planned means that the type and position of the piping are as designed. When the target process is the installation of indoor piping, and the installation position of the piping differs from the design, the supervisor issues a corrective instruction to at least one of the manager and the worker to correct the position of the piping to the position as designed. Corrective instructions are not limited to the above. Also, checking the completion status of the work at the site where the work is performed is also called checking the progress.
[0016] The manager is, for example, a person who manages multiple workers at a construction site. The manager manages the workers so that work is performed based on work instructions, for example. The manager, for example, checks and approves the work instructions. Approval of work instructions means consenting to having the workers perform work based on the work instructions. The manager approves normal work instructions and corrective instructions transmitted from the supervisor, for example, via the process control system 10. The manager is, for example, the leader of a group of workers. The manager is also called, for example, a foreman. The manager may be the person in charge at the construction site of a company that is contracted to perform work at the construction site by the company to which the supervisor belongs.
[0017] A worker is, for example, a person who actually performs work at a construction site. A worker is, for example, a person who belongs to the same company as the company to which the manager belongs. The same company may include companies that can be considered to be the same. In addition, the company to which the worker belongs may be different from the company to which the manager belongs. In addition, a worker may be a person who is contracted to perform work by the manager. The relationship between a worker and a manager is not limited to the above. For example, a worker performs work based on instructions regarding the work. For example, a worker performs work based on instructions from the manager. Work performed based on instructions from the manager includes, for example, instructions approved by the manager. For example, a worker obtains instructions approved by the manager from the process management system 10. The worker obtaining instructions includes obtaining instructions via the worker terminal device 40 that obtained instructions from the process management system 10. For example, a worker reports the start of work when starting work indicated by instructions regarding the work. In addition, a worker reports the completion of work when completing work indicated by instructions regarding the work. In addition, a manager and a worker may be the same person.
[0018] The construction site to be managed in the process is, for example, a construction site of an apartment building. The construction site may be a hotel, an office building, a school, a hospital, a public facility, a nursing home, a commercial facility, a multiplex movie theater, a road, a bridge, a tunnel, or a sports facility. The construction site is not limited to the above. In addition, for example, in a construction site of an apartment building, work is performed in a plurality of compartments of similar structure. When working in a plurality of compartments, for example, a worker finishes the work of a process he is in charge of in one compartment, and then performs the work of the same process in another compartment. Then, in the compartment where the work is completed, other workers perform the work of the subsequent process. At this time, if there is a defect in the finished state, the work of the subsequent process cannot be performed, which may affect the workers of the next process. In such a case, it is necessary to finish the work in response to the corrective instruction early. When it is necessary to finish the work early, for example, the supervisor communicates that the work based on the corrective instruction will be performed in priority over the work being performed. However, when a worker is working, if a corrective instruction is issued, the work being performed may be interrupted, which may reduce the efficiency of the work. Therefore, the process control system 10 outputs a corrective instruction at a timing based on the urgency of the work indicated by the corrective instruction.
[0019] The urgency is, for example, an index indicating the need to complete the work based on the corrective instruction quickly. For example, when the start of the next process is approaching, the urgency is higher than when there is sufficient time until the start of the next process. The urgency may be an index indicating the need to start the work based on the corrective instruction quickly. For example, when the work is easier to do by redoing it before the materials being used dry, such as attaching building materials with adhesive or pouring concrete, the urgency is higher than the work in which the ease of the work does not depend on the elapsed time.
[0020] The process control system 10 outputs a corrective instruction to the worker terminal device 40 used by the worker, for example, at a timing based on the urgency of the corrective instruction. For example, when the urgency of the work based on the corrective instruction is higher than a standard, the process control system 10 outputs a corrective instruction without waiting for the completion of the work being performed. By outputting a corrective instruction without waiting for the completion of the work being performed, the worker can be made to perform the work based on the corrective instruction early. For example, when the urgency of the work based on the corrective instruction is lower than a standard, the process control system 10 outputs a corrective instruction for the work after the work being performed is completed. By outputting a corrective instruction for the work after the work being performed is completed, the worker does not need to interrupt the work being performed, and therefore a decrease in work efficiency can be suppressed. In this way, by outputting a corrective instruction based on the urgency, the process control system 10 can output a corrective instruction at an appropriate timing.
[0021] Here, a specific example of the configuration of the process control system 10 will be described. Fig. 2 is a diagram showing an example of the configuration of the process control system 10. The process control system 10 basically includes a correction instruction acquisition unit 102, a decision unit 106, and an output unit 108. The process control system 10 further includes, for example, a work information acquisition unit 101, an approval acquisition unit 103, a work report acquisition unit 104, a confirmation result acquisition unit 105, a worker determination unit 107, an approval request output unit 109, a confirmation request output unit 110, and a memory unit 111.
[0022] The work information acquisition unit 101 acquires information on normal work carried out at a construction site, for example. The normal work is work carried out based on a work plan at a construction site, for example. The work information acquisition unit 101 acquires information on the work from, for example, the supervisor terminal device 20.
[0023] The information on normal work is, for example, information indicating how work is performed at a construction site. The information on normal work is, for example, information indicating at least one of the order of processes performed at a construction site, the content of work for each process, and the deadline for completing the work. The information on normal work may include information on one or more items of the work procedure, the area to be worked on, the type of work performed by workers, required qualifications, required safety equipment, and the number of workers. The information on normal work is not limited to the above.
[0024] The corrective instruction acquisition unit 102 acquires a corrective instruction for a task that is the subject of process management. The corrective instruction acquisition unit 102 acquires a corrective instruction for a task from, for example, the supervisor terminal device 20. A corrective instruction for a task is input, for example, to the supervisor terminal device 20 by an operation of a supervisor who is performing process management. The corrective instruction includes, for example, the content of the task, and information on the area in which the corrective task will be performed and the deadline for completion. The corrective instruction may include information indicating what kind of defect existed in the finished state of the task. The corrective instruction may include information on the worker who performed the task that was determined to have a defect. The information included in the corrective instruction is not limited to the above.
[0025] The approval acquisition unit 103 acquires, for example, the approval result of the corrective instruction by the manager who manages the worker who performs the work based on the corrective instruction. The approval result is, for example, the result of the manager selecting whether to approve or not approve the content of the work indicated by the corrective instruction. Approving the corrective instruction means that the manager approves the content of the work indicated by the corrective instruction. In other words, approving the corrective instruction means, for example, approving the worker managed by the manager to perform the work indicated by the corrective instruction. For example, at a construction site, work may be performed by a company with specialized technology for each process. When work is performed by a company with specialized technology for each process, the supervisor who manages the entire process at the construction site and the manager and worker for each process may belong to different entities. When the supervisor, the manager, and the worker belong to different entities, the supervisor may not be able to directly instruct the worker to perform the work. In such a case, the manager may need to approve the corrective instruction issued by the supervisor. Even if the manager needs to approve the corrective instruction, approval may not be required for a corrective instruction with a high level of urgency, such as one related to safety. The approval acquisition unit 103 acquires, for example, the approval result of the corrective instruction by the manager from the manager terminal device 30. The approval acquisition unit 103 may also acquire, for example, a selection of a worker who will perform the work based on the corrective instruction together with the approval result of the corrective instruction. The selection of which worker will perform the work based on the corrective instruction is input, for example, to the manager terminal device 30 by the manager.
[0026] The approval acquisition unit 103 acquires, for example, the manager's approval result for instructions regarding normal work. The approval result for normal work is, for example, the result of the manager's selection of whether to approve or not approve the content of the work indicated by the instructions regarding normal work. The approval acquisition unit 103 acquires, for example, from the manager terminal device 30, the manager's approval result for instructions regarding normal work. Instructions regarding normal work include, for example, the process name, the content of the work, and information on one or more items among the area where the work will be performed, the number of workers, the type of work of the workers, the required qualifications, and the completion deadline. The information included in instructions regarding normal work is not limited to the above.
[0027] The work report acquisition unit 104 acquires, for example, a work start report and a work end report. The work report acquisition unit 104 acquires, for example, a work start report and a work end report from the worker terminal device 40. The work start report is input, for example, by the worker's operation to the worker terminal device 40 when the worker starts the work. The work start report is input, for example, by the worker's operation to the worker terminal device 40 when the worker ends the work.
[0028] The work start report includes, for example, the start date and time of the work, the content of the work, the name of the worker, the identification number of the worker, and information on one or more items of the section in which the work is performed. The information included in the work start report is not limited to the above. Moreover, the work completion report includes, for example, the end date and time of the work, the content of the work, the name of the worker, the identification number of the worker, and information on one or more items of the section in which the work is performed. The information included in the work completion report is not limited to the above.
[0029] The confirmation result acquisition unit 105 acquires, for example, a confirmation result of whether or not the work based on the corrective instruction can be performed. The confirmation result acquisition unit 105 acquires, for example, from each worker terminal device 40, a confirmation result of whether or not the work based on the corrective instruction can be performed. The confirmation result of whether or not the work based on the corrective instruction can be information indicating, for example, a confirmation result of whether or not the worker can perform the work based on the corrective instruction when the corrective instruction is issued to the worker. For example, when a confirmation of whether or not the work can be performed is performed during work and the worker determines that the work cannot be interrupted, the worker responds to the confirmation of whether or not the work based on the corrective instruction can be performed indicating that the worker cannot perform the work. Also, when the worker can perform the work based on the corrective instruction, for example, the worker responds to the confirmation of whether or not the work can be performed.
[0030] The determination unit 106 determines the timing of outputting the corrective instruction based on the urgency of the work performed based on the corrective instruction. For example, the determination unit 106 determines based on the urgency of the work performed based on the corrective instruction whether to output the corrective instruction while another work other than the corrective instruction is being performed, or to wait until the work being performed is completed before outputting the corrective instruction.
[0031] The determination unit 106 determines the timing to output the corrective instruction, for example, when an approval result indicating that the corrective instruction is approved is obtained. The determination unit 106 determines the timing to output the corrective instruction, for example, when the corrective instruction is approved by an administrator. Also, the determination unit 106 reserves the decision on the timing to output the corrective instruction, for example, when the corrective instruction is not approved by an administrator.
[0032] For example, when the urgency of the corrective instruction acquired during the work is less than a predetermined standard, the decision unit 106 decides to output the corrective instruction after acquiring a work completion report. That is, when the urgency is less than a predetermined standard, the decision unit 106 decides to withhold output of the corrective instruction until acquiring a completion report of the work in progress. The work in progress is, for example, a work for which a start report has been acquired but an completion report has not been acquired.
[0033] For example, when the urgency of the corrective instruction acquired during the work is higher than a predetermined standard, the decision unit 106 decides to output the corrective instruction before acquiring the work completion report. That is, when the urgency is higher than a predetermined standard, the decision unit 106 decides not to hold back the output of the corrective instruction. Not holding back the output of the corrective instruction means, for example, immediately outputting the corrective instruction when the corrective instruction is in a state in which it can be output. The state in which it can be outputted means, for example, a state in which approval has been obtained from the administrator for the generation instruction. For example, assume a case in which a corrective instruction is issued to a worker who has received a work start report but has not received a work completion report. In this case, when the urgency of the corrective instruction acquired during the work is higher than a predetermined standard, the decision unit 106 decides to output the corrective instruction before acquiring the work completion report. When the urgency is equal to or higher than a predetermined standard and the corrective instruction has not been approved by the administrator and the determination of the timing is pending, the decision unit 106 may determine that the timing for outputting the corrective instruction is the timing when an approval result indicating that the corrective instruction is approved is obtained.
[0034] The urgency is, for example, an index indicating the need to complete a task early. For example, the value indicating the urgency is greater the sooner the task needs to be completed. For example, the value indicating the urgency may be, for example, an index indicating the need to start a task early. For example, the value indicating the urgency is greater the sooner the task needs to be started. For example, the urgency is set by a supervisor.
[0035] The predetermined criterion is, for example, a criterion for determining whether to give priority to a work based on a corrective instruction or a work in progress. The predetermined criterion is, for example, set based on the impact on the progress of the work. The predetermined criterion is, for example, set based on the small impact on the progress of the process that is the subject of process management. In other words, the predetermined criterion is, for example, a criterion for determining whether to give priority to a work based on a corrective instruction or a work in progress in order to efficiently proceed with the work. The predetermined criterion is, for example, set based on the ease of stopping a work in progress. For example, the easier it is to resume a work in progress even if it is stopped once, the lower the predetermined criterion is set. This is because, when the work can be resumed easily, the impact on the progress of the work is small even if the work based on a corrective instruction is given priority. In addition, the predetermined criterion is, for example, set based on the degree of delay in the work when the work in progress is stopped. For example, the higher the predetermined criterion is set, the greater the degree of delay in the work when the work in progress is stopped. This is because, when the degree of delay in work is large, stopping the ongoing work to carry out work based on the correction instructions will have a large impact on the progress of the work.
[0036] The determination unit 106 may determine the timing of outputting the corrective instruction based on the urgency according to the deadline for completing the work to be the target of the corrective instruction. The determination unit 106 determines the urgency based on, for example, the deadline for the work set by the supervisor. The determination unit 106 determines the urgency based on, for example, the remaining time until the deadline for the work. The determination unit 106 determines the urgency such that, for example, the shorter the remaining time until the deadline for the work, the higher the urgency. The urgency may be indicated in two stages. For example, the urgency is set in two stages, high and normal. In the case where the urgency is in two stages, high and normal, the determination unit 106 determines that, when the urgency is high, the corrective instruction is output before the work completion report is obtained. The determination unit 106 determines that, when the urgency is normal, the corrective instruction is output after the work completion report is obtained. The urgency may be indicated in a plurality of stages of three or more stages. How the urgency is set is not limited to the above.
[0037] The determination unit 106 may determine the timing to output the corrective instruction based on the urgency of the work indicated by the corrective instruction and the urgency of the work being performed. For example, when the urgency of the work indicated by the corrective instruction is higher than the urgency of the work being performed, the determination unit 106 determines to output the corrective instruction before obtaining the work completion report. Also, for example, when the urgency of the work indicated by the corrective instruction is lower than the urgency of the work being performed, the determination unit 106 determines to output the corrective instruction after obtaining the work completion report.
[0038] The determination unit 106 may determine the timing for outputting the corrective instruction based on the urgency of the work indicated by the corrective instruction and the urgency of multiple works scheduled as normal works. For example, when the urgency of the work indicated by the corrective instruction is less than the urgency of the first work among the works after the next process and is greater than the urgency of the second work, the determination unit 106 determines to output the corrective instruction when the completion report of the first work among the works after the next process is made.
[0039] The worker determination unit 107 determines a worker who will perform the work based on the corrective instruction based on at least one of the attributes of each of the multiple workers and the progress of the work. The attributes of the worker are, for example, at least one of the qualifications held by the worker, the period since the worker was employed as a worker, the number of sites where the work has been performed, the rank, and the skills possessed. The attributes of the workers are not limited to the above. The attributes of each worker and the progress of the work are stored, for example, as a table in which the workers are associated with the attributes and progress of the work of each worker. The worker determination unit 107, for example, refers to the table to determine a worker who will perform the work based on the corrective instruction from among workers who are capable of performing the work based on the corrective instruction. The worker determination unit 107, for example, determines a worker who will perform the work based on the corrective instruction from among workers who have the skills to perform the work based on the corrective instruction. The worker determination unit 107 may also determine, for example, a worker who finishes the work he or she is performing earliest as the worker who will perform the work based on the corrective instruction. The worker selection unit 107 predicts the end time of the work based on, for example, the start time of the work and the standard time required for the work. Then, the worker selection unit 107 selects, for example, the worker who has the earliest predicted end time of the work as the worker who will perform the work based on the correction instruction.
[0040] The worker determination unit 107 may determine a worker different from the worker who performed the work that is the subject of the corrective instruction as the worker who will perform the work based on the corrective instruction. The workers who performed the work are stored, for example, as a table in which a process, a section, and the workers who performed the work are associated with each other. The worker determination unit 107, for example, refers to the table and determines a worker different from the worker who performed the work that is the subject of the corrective instruction as the worker who will perform the work based on the corrective instruction. For example, the worker determination unit 107 determines a worker who has a higher skill level than the worker who performed the work that is the subject of the corrective instruction as the worker who will perform the work based on the corrective instruction. The worker determination unit 107 may determine a number of workers according to the completion deadline of the work that is the subject of the corrective instruction as the workers who will perform the work based on the corrective instruction. For example, if the completion deadline can be met if two people perform the work based on the corrective instruction, the worker determination unit 107 determines two workers based on the corrective instruction. The time required for the work based on the corrective instruction is set, for example, by a supervisor.
[0041] The worker determination unit 107 may determine the worker selected by the manager as the worker who will perform the work based on the corrective instruction. The worker determination unit 107 may also determine candidate workers when the manager selects a worker who will perform the work based on the corrective instruction. The worker determination unit 107 may determine a plurality of workers as candidate workers who will perform the work based on the corrective instruction. The determination of candidate workers who will perform the work based on the corrective instruction can be performed in the same manner as the determination of workers who will perform the work based on the corrective instruction described above, for example.
[0042] The output unit 108 outputs a correction instruction based on the timing determined by the determination unit 106. The output unit 108 outputs the correction instruction to, for example, the worker terminal device 40. The output unit 108 outputs the correction instruction to, for example, the worker terminal device 40 used by the worker determined by the worker determination unit 107. The output unit 108 may output a correction instruction to which information about the worker who will perform the work is added to each of the worker terminal devices 40 used by workers belonging to the same group. The output unit 108 may further output a correction instruction to the manager terminal device 30 used by the manager who manages the worker determined by the worker determination unit 107.
[0043] The output unit 108 may output the progress of the work. The output unit 108 may output the progress of the work to, for example, the supervisor terminal device 20. The progress of the work is, for example, information indicating the in-progress process and the work status for each section where the work is performed. The progress of the work may include information indicating whether or not the supervisor has checked the finished state of the work. The progress of the work may further include information on one or more items of the start time of the work, the end time of the work, the name of the company in charge, the name of the manager, the name of the worker, the work content, and necessary qualifications for the in-progress process for each section where the work is performed.
[0044] The approval request output unit 109 outputs, for example, an approval request for a correction instruction. The approval of a correction instruction is performed, for example, by an administrator. The approval of a correction instruction is approval for having a worker carry out work based on the correction instruction. The approval request output unit 109 outputs, for example, an approval request for the contents of the correction instruction to the administrator terminal device 30.
[0045] The approval request output unit 109 outputs an approval request for the contents of the work instructions. The approval of the contents of the work instructions is performed, for example, by an administrator. The work instructions are, for example, instructions showing how to perform normal work. Normal work is work performed based on a plan. The approval of the contents of the work instructions is, for example, approval to have a worker perform work based on the contents of the work instructions. The approval request output unit 109 outputs the approval request for the contents of the work instructions to, for example, the administrator terminal device 30. The approval request output unit 109 may also output an approval request for an instruction to correct the work, and candidates for workers to perform the work based on the correction instruction.
[0046] The confirmation request output unit 110 outputs, for example, a confirmation of whether or not the work based on the corrective instruction can be performed. For example, when a confirmation of whether or not the worker can perform the work based on the corrective instruction is made to a worker, the confirmation request output unit 110 outputs the confirmation of whether or not the work based on the corrective instruction can be performed to each of the worker terminal devices 40 used by multiple workers. The worker who is the subject of the confirmation of whether or not the worker can perform the work based on the corrective instruction is, for example, information for confirming whether or not the worker can perform the work based on the corrective instruction when a corrective instruction is issued to the worker.
[0047] When the worker determination unit 107 determines a candidate worker who will perform the work based on the corrective instruction, the confirmation request output unit 110 may output a confirmation of whether or not the worker can perform the work based on the corrective instruction to the worker terminal device 40 used by the determined candidate worker. The confirmation request output unit 110 may output a confirmation of whether or not the worker can perform the work based on the corrective instruction to the worker terminal device 40 used by a worker who is not performing the work. In addition, when the urgency of the corrective instruction is equal to or higher than a predetermined standard, the confirmation request output unit 110 may output a confirmation of whether or not the worker can perform the work based on the corrective instruction to the worker terminal device 40 used by the worker who is working. In addition, when the confirmation of whether or not the worker can perform the work based on the corrective instruction is performed for multiple workers, the confirmation request output unit 110 outputs, for example, information indicating that the worker is not the target of the corrective instruction to the worker terminal device 40 used by a worker other than the worker who was actually determined to be the target of the corrective instruction.
[0048] FIG. 3 is a diagram showing an example of a display screen showing the progress of work. The example of the display screen in FIG. 3 shows the progress of work for each room at a construction site of an apartment building. The example of the display screen in FIG. 3 is, for example, an example of a display screen displayed on the supervisor terminal device 20. The example of the display screen in FIG. 3 is, for example, output to the supervisor terminal device 20 by the output unit 108. The example of the display screen in FIG. 3 shows the progress of work for each room from the first floor to the fourth floor. In the example of the display screen in FIG. 3, the name of the construction site is displayed as "D Mansion". In the example of the display screen in FIG. 3, the room number, the process in progress, and the status of the process in progress are displayed for each room. In the example of the display screen in FIG. 3, "Before work" indicates that the work of the displayed process has not yet started. In the example of the display screen in FIG. 3, "Work in progress" indicates that the work of the displayed process is being carried out. In the example of the display screen in FIG. 3, "Confirmation not completed" indicates that the work of the displayed process has been completed and confirmation by the supervisor has not yet been completed. The supervisor checks the state of completion of the work for each room where the work has been completed, for example, by referring to a display screen such as the example of FIG.
[0049] FIG. 4 shows an example of a display screen for an approval request for a work correction instruction. The example of the display screen in FIG. 4 is, for example, an example of a display screen displayed on the manager terminal device 30. The example of the display screen in FIG. 4 is, for example, output to the manager terminal device 30 by the approval request output unit 109. In the example of the display screen in FIG. 4, "Worker", "Target section", "Process", and "Completion deadline" are displayed in the "Correction instruction" column. "Worker" is the name of the worker who performs the work. "Worker" is input by, for example, the manager. "Worker" may display the name of a candidate worker who performs the work selected by the process management system 10. "Target section" indicates the room number that is the target of the work correction instruction. "Process" indicates the process that is the target of the work correction instruction. "Completion deadline" indicates the deadline by which the work that is the target of the correction instruction must be completed. In addition, in the example of the display screen in FIG. 4, information on the work that was scheduled to be performed by worker A in the absence of a correction instruction is displayed in the "Work before change" column. "Target section" indicates the room number that is the target of the work before the change. "Process" indicates the target process in the work before the change. "Completion Deadline" indicates the completion deadline for the work before the change. In the example display screen of FIG. 4, an "Approval" button is displayed at the bottom. For example, when the manager presses the "Approval" button, the manager terminal device 30 outputs the approval result of the correction instruction to the approval acquisition unit 103 of the process management system 10.
[0050] FIG. 5 shows an example of a display screen showing an approval request for a work correction instruction and candidates for workers who will perform the work based on the corrective instruction. The example of the display screen in FIG. 5 is, for example, an example of a display screen displayed on the manager terminal device 30. The example of the display screen in FIG. 5 is, for example, output to the manager terminal device 30 by the approval request output unit 109. In the example of the display screen in FIG. 5, the "target section", "process", and "completion deadline" are shown in the "corrective instruction" column. The "target section" indicates the room number that is the target of the work correction instruction. The "process" indicates the process that is the target of the work correction instruction. The "completion deadline" indicates the deadline by which the work that is the target of the corrective instruction must be completed. In addition, in the example of the display screen in FIG. 5, the "candidate worker" column shows candidates for workers who will perform the work based on the corrective instruction. In the example of the display screen in FIG. 5, the names of three candidates, "worker A", "worker B", and "worker C", are shown as candidates for workers who will perform the work based on the corrective instruction. In addition, a radio button for selecting the worker to issue the corrective instruction is displayed to the left of each worker's name. In the example display screen of Figure 5, when the "Approve" button is pressed with a worker selected, the approval result of the corrective instruction and the name of the worker who will issue the corrective instruction are output to the approval acquisition unit 103 of the process control system 10.
[0051] FIG. 6 shows an example of a display screen showing a corrective instruction given to a worker. The example of the display screen in FIG. 6 is, for example, an example of a display screen displayed on the worker terminal device 40. The example of the display screen in FIG. 6 is, for example, output to the worker terminal device 40 by the output unit 108. In the example of the display screen in FIG. 6, a "target section", a "process" and a "completion deadline" are shown in the "corrective instruction" column. The "target section" indicates the room number that is the target of the work corrective instruction. The "process" indicates the process that is the target of the work corrective instruction. The "completion deadline" indicates the deadline by which the work that is the target of the corrective instruction must be completed. In addition, in the example of the display screen in FIG. 6, the "scheduled work (before change)" column shows the content of the work that would have been scheduled if there had been no corrective instruction. In the example of the display screen in FIG. 6, the "pre-change work" column shows information on the work that worker A was scheduled to perform if there had been no corrective instruction. The "target section" indicates the room number that is the target of the work before the change. The "process" indicates the process that is the target of the work before the change. "Completion deadline" indicates the completion deadline for the work before the change.
[0052] FIG. 7 shows an example of a display screen that allows a worker to confirm whether or not the worker can respond to the corrective instruction. The example of the display screen in FIG. 7 is, for example, an example of a display screen displayed on the worker terminal device 40. The example of the display screen in FIG. 7 is, for example, output to the worker terminal device 40 by the output unit 108. In the example of the display screen in FIG. 7, the "target section", "process", and "completion deadline" are shown in the "corrective instruction" column. "Target section" indicates the room number that is the target of the work corrective instruction. "Process" indicates the process that is the target of the work corrective instruction. "Completion deadline" indicates the deadline by which the work that is the target of the corrective instruction must be completed. In addition, in the example of the display screen in FIG. 7, the "scheduled work (before change)" column shows the content of the work that would have been scheduled if there had been no corrective instruction. In the example of the display screen in FIG. 7, the "pre-change work" column shows information on the work that worker A was scheduled to perform if there had been no corrective instruction. "Target section" indicates the room number that is the target of the work before the change. "Process" indicates the target process in the work before the change. The "Completion Deadline" indicates the deadline for completing the work before the change. In the example of the display screen in FIG. 7, a "Respond" button and a "Cannot Respond" button are displayed at the bottom. For example, when a worker presses the "Can Respond" button, the worker terminal device 40 outputs information indicating that the worker can respond to the corrective instruction to the confirmation result acquisition unit 105 of the process management system 10. Also, for example, when a worker presses the "Cannot Respond" button, the worker terminal device 40 outputs information indicating that the worker cannot respond to the corrective instruction to the confirmation result acquisition unit 105 of the process management system 10.
[0053] The memory unit 111 stores, for example, data used for process management at a construction site. The memory unit 111 stores, for example, instructions related to normal work. The memory unit 111 stores, for example, criteria for determining the urgency. The memory unit 111 stores, for example, the timing for outputting a corrective instruction determined by the determination unit 106. The memory unit 111 stores, for example, the start time and end time of work.
[0054] The supervisor terminal device 20 is, for example, a terminal device used by a supervisor for process management at a construction site. The supervisor terminal device 20 outputs information about normal work to, for example, the work information acquisition unit 101 of the process management system 10. The supervisor terminal device 20 outputs corrective instructions to, for example, the corrective instruction acquisition unit 102 of the process management system 10. The information about normal work and corrective instructions are input, for example, into the supervisor terminal device 20 by a supervisor.
[0055] For example, a personal computer, a tablet computer, or a smartphone is used as the supervisor terminal device 20. Examples of terminal devices used as the supervisor terminal device 20 are not limited to those mentioned above.
[0056] The manager terminal device 30 is a terminal device used by the manager to confirm and approve the contents of instructions obtained from the supervisor. The manager terminal device 30 obtains an approval request for the corrective instruction from the approval request output unit 109 of the process management system 10. The manager terminal device 30 then outputs the approval request for the corrective instruction to a display device (not shown). The manager terminal device 30 also outputs the approval result for the corrective instruction to the approval acquisition unit 103 of the process management system 10. The approval result for the corrective instruction is input, for example, to the manager terminal device 30 by the operation of the manager.
[0057] The manager terminal device 30 acquires an approval request for normal work from the approval request output unit 109 of the process management system 10. Then, the manager terminal device 30 outputs the approval request for normal work to a display device (not shown). In addition, the manager terminal device 30 outputs the approval result for normal work to the approval acquisition unit 103 of the process management system 10. The approval result for normal work is input into the manager terminal device 30, for example, by the operation of the manager.
[0058] For example, a smartphone is used as the administrator terminal device 30. A personal computer, a tablet computer, or a wearable terminal device may be used as the administrator terminal device 30. Examples of terminal devices used as the administrator terminal device 30 are not limited to those mentioned above.
[0059] The worker terminal device 40 is a terminal device used by workers to confirm the contents of instructions and report on work. The worker terminal device 40 acquires corrective instructions from the output unit 108 of the process management system 10. Then, the worker terminal device 40 outputs the corrective instructions to a display device (not shown). The worker terminal device 40 acquires information related to normal work from the output unit 108 of the process management system 10. Then, the worker terminal device 40 outputs information related to normal work to a display device (not shown).
[0060] The worker terminal device 40 outputs a work start report and a work end report, for example, to the work report acquisition unit 104 of the process management system 10. The work start report and the work end report are input, for example, to the worker terminal device 40 by the operation of the worker.
[0061] The worker terminal device 40 outputs, for example, a work start report and a work end report to which information on the section where the work is performed is added. The information on the section where the work is performed is, for example, input to the worker terminal device 40 by the worker. The worker terminal device 40 may output the work start report and the work end report with information on the section read from a barcode indicating the identifier of the section added thereto. When the construction site is an apartment building, the identifier of the section is, for example, an apartment number. The barcode indicating the identifier of the section is, for example, a two-dimensional barcode indicating the identifier of each section, which is displayed at the entrance of each section. The identifier of the section may be read from something other than a barcode. Also, when the manager and the worker are the same person, the manager terminal device 30 and the worker terminal device 40 may be an integrated terminal device.
[0062] For example, a smartphone is used as the worker terminal device 40. A personal computer, a tablet computer, or a wearable terminal device may be used as the worker terminal device 40. Examples of the terminal device used for the worker terminal device 40 are not limited to those mentioned above.
[0063] An example of the operation of outputting a work correction instruction by the process control system 10 will be described below. Fig. 8 is a diagram showing an example of the operation flow in the process of outputting a work correction instruction in the process control system 10.
[0064] The correction instruction acquisition unit 102 acquires a work correction instruction (step S11). The correction instruction acquisition unit 102 acquires the work correction instruction from the supervisor terminal device 20, for example.
[0065] When the work correction instruction is acquired, the output unit 108 outputs the work correction instruction to, for example, the manager terminal device 30 (step S12).
[0066] After the work correction instruction is output, the approval acquisition unit 103 acquires the approval result of the work correction instruction from the manager terminal device 30. When the approval result of the work correction instruction is acquired (Yes in step S13), if the work correction instruction is approved in the approval result (Yes in step S14), the decision unit 106 decides the timing to output the correction instruction based on the urgency of the work to be performed based on the correction instruction (step S15).
[0067] When the result of the determination of the timing to output the corrective instruction indicates that the corrective instruction is to be output after the completion report of the work is obtained (Yes in step S16), and the work is in a completed state (Yes in step S17), the output unit 108 outputs the corrective instruction (step S18). The output unit 108 outputs the corrective instruction to, for example, a worker terminal device used by a worker who performs the work based on the corrective instruction.
[0068] In step S16, if the result of the determination of the timing to output the corrective instruction indicates that the corrective instruction is to be output after a work completion report is obtained (Yes in step S16), and the work is being performed (No in step S17), the output unit 108 withholds output of the work corrective instruction until the work is completed.
[0069] Furthermore, in step S16, if the determination result of the timing to output the correction instruction is that the instruction should be output without waiting for the completion report of the work (No in step S16), the output unit 108 outputs the correction instruction (step S18).
[0070] Furthermore, in step S13, if the approval result of the work correction instruction has not been obtained (No in step S13), the process control system 10 waits until the confirmation result of the work correction instruction is obtained. If the approval result of the work correction instruction is not obtained for a predetermined time or more, the output unit 108 may output information indicating that the work correction instruction has not been approved to the supervisor terminal device 20. The predetermined time is set, for example, by the supervisor.
[0071] Furthermore, in step S13, when an approval result of the work correction instruction is acquired (Yes in step S13), if the approval result indicates that the work correction instruction has not been approved (No in step S14), the output unit 108 outputs information indicating that the work correction instruction has not been approved (step S19). The output unit 108 outputs information indicating that the work correction instruction has not been approved to, for example, the supervisor terminal device 20.
[0072] The following describes an operation of checking whether or not a worker can respond to a correction instruction when the instruction is output in the process control system 10. Fig. 9 is a diagram showing an example of an operation flow of a process of checking whether or not a worker can respond to a correction instruction in the process control system 10.
[0073] The confirmation request output unit 110 outputs a confirmation as to whether or not the work based on the correction instruction can be carried out to each worker terminal device 40 (step S21).
[0074] The confirmation result acquisition unit 105 acquires the confirmation result as to whether or not the work based on the corrective instruction can be handled from each worker terminal device 40 (step S22).
[0075] When the confirmation result of whether or not the work based on the corrective instruction can be completed is obtained, if there is a worker who has not yet completed the confirmation result (No in step S23), the process control system 10 returns to step S22 and waits until it obtains the confirmation result of whether or not the work based on the corrective instruction can be completed from the worker terminal device 40 that has not obtained the confirmation result.
[0076] In step S23, confirmation results are obtained from all worker terminal devices 40 (Yes in step S23), and if there is a worker available to handle the task (Yes in step S24), the worker determination unit 107 determines a worker who will perform the work based on the correction instructions (step S25).
[0077] When determining the workers who will perform the work based on the corrective instructions, if there are any workers who are not subject to the corrective instructions (Yes in step S26), the confirmation request output unit 110 outputs information indicating that the workers are not subject to the corrective instructions to the worker terminal devices 40 used by workers other than the determined worker (step S27).
[0078] In step S26, when there is no worker who is not subject to the corrective instruction (No in step S26), the process control system 10 ends the process of confirming whether or not the corrective instruction can be dealt with.
[0079] In step S24, if there is no available worker (No in step S24), the output unit 108 outputs information indicating that there is no available worker to the manager terminal device 30 (step S28).
[0080] The process control system 10 determines the timing for outputting a corrective instruction to the worker terminal device 40 used by the worker based on the urgency of the corrective instruction. Then, the process control system 10 outputs the corrective instruction to the worker terminal device 40 used by the worker based on the determined timing. For example, when the urgency of the corrective instruction is higher than a standard, the process control system 10 outputs the corrective instruction without waiting for the completion of the work being performed. By outputting the corrective instruction without waiting for the completion of the work being performed, the work that requires urgent correction can be performed early. Also, for example, when the urgency of the corrective instruction is lower than a standard, the process control system 10 outputs the corrective instruction after the work being performed is completed. By outputting the corrective instruction after the work being performed is completed, the corrective instruction can be issued without affecting the work being performed by the worker who receives the instruction. In this way, by determining the timing for outputting the corrective instruction based on the urgency of the corrective instruction, the process control system 10 can output the corrective instruction for the work at an appropriate timing.
[0081] Furthermore, for example, when a supervisor cannot give direct instructions to a worker, by obtaining approval for the corrective instructions from the manager, the process control system 10 can appropriately output the corrective instructions from the supervisor to the worker terminal device 40 used by the worker. Therefore, by using the process control system 10, it is possible to more appropriately output corrective instructions for work.
[0082] Although the above description has been given using a construction site as an example, the process control system 10 can be used as appropriate in other fields that are the subject of process control. For example, the process control system 10 may be used to give corrective instructions based on the finished state of work in cleaning, maintenance, repair, or manufacturing work.
[0083] Furthermore, each process in the process control system 10 may be distributed and executed in a plurality of information processing devices connected via a network. It may be set as appropriate which of the plurality of information processing devices each process in the process control system 10 is to be executed in. Furthermore, at least a part of the process executed in the process control system 10 may be executed in the supervisor terminal device 20 or the manager terminal device 30. For example, the process in at least one of the determination unit 106 and the worker determination unit 107 may be executed in the manager terminal device 30. Furthermore, the result of the process executed between the terminal devices may be output to the process control system 10. For example, the approval of the instruction to correct the work may be executed between the supervisor terminal device 20 and the manager terminal device 30. The result of the approval of the instruction to correct the work executed between the supervisor terminal device 20 and the manager terminal device 30 is output to the process control system 10 by the supervisor terminal device 20, for example. It may be set as appropriate which of the processes executed in the process control system 10 is to be executed in the terminal device.
[0084] Each process in the process control system 10 can be realized by executing a computer program on a computer. Fig. 10 shows an example of the configuration of a computer 200 that executes a computer program that performs each process in the process control system 10. The computer 200 includes a CPU (Central Processing Unit) 201, a memory 202, a storage device 203, an input / output I / F (Interface) 204, and a communication I / F 205.
[0085] The CPU 201 reads out and executes a computer program for performing each process from the storage device 203. The CPU 201 may be configured by a combination of a plurality of CPUs. The memory 202 is configured by a dynamic random access memory (DRAM) or the like, and temporarily stores the computer program executed by the CPU 201 and data being processed. The storage device 203 stores the computer program executed by the CPU 201. The storage device 203 is configured by, for example, a non-volatile semiconductor storage device. Other storage devices such as a hard disk drive may be used for the storage device 203. The input / output I / F 204 is an interface that receives input from the worker and outputs display data and the like. The communication I / F 205 is an interface that transmits and receives data between the supervisor terminal device 20, the manager terminal device 30, the worker terminal device 40, and other information processing devices. The supervisor terminal device 20, the manager terminal device 30, and the worker terminal device 40 may have the same configuration as the computer 200.
[0086] The computer programs used to execute each process can also be distributed by storing them in a computer-readable recording medium that non-temporarily records data. As the recording medium, for example, a magnetic disk such as a magnetic tape for recording data or a hard disk can be used. Also, an optical disk such as a CD-ROM (Compact Disc Read Only Memory) can be used as the recording medium. A non-volatile semiconductor storage device can also be used as the recording medium.
[0087] A part or all of the above-described embodiments can be described as, but is not limited to, the following supplementary notes. [Appendix 1] A correction instruction acquisition means for acquiring a correction instruction for a task that is a target of process management; a determination means for determining a timing for outputting the correction instruction based on an urgency of the work to be performed based on the correction instruction; an output means for outputting the correction instruction based on the determined timing; A process control system equipped with: [Appendix 2] Further comprising a work report acquisition means for acquiring a work start report and a work end report, the determining means determines to output the corrective instruction after obtaining the completion report when the urgency of the corrective instruction obtained during the work for which the start report has been obtained is less than a predetermined standard. 2. The process control system of claim 1. [Appendix 3] the determining means determines to output a correction instruction before obtaining the completion report when the urgency is higher than a predetermined standard. 3. The process control system according to claim 2. [Appendix 4] a worker determination unit that determines a worker who will perform the work based on the correction instruction based on at least one of the attributes of each of a plurality of workers and the progress of the work, the output means outputs the correction instruction to a terminal device used by at least one of the worker and a manager who manages the worker. 2. The process control system of claim 1. [Appendix 5] The worker determination means determines a worker other than the worker who performed the work that is the subject of the correction instruction as a worker who will perform the work based on the correction instruction. 5. The process control system according to claim 4. [Appendix 6] the worker determination means determines a worker having higher skill than the worker who performed the work that is the subject of the correction instruction as the worker who will perform the work based on the correction instruction; 5. The process control system according to claim 4. [Appendix 7] The worker determination means determines a number of workers according to a deadline for completing the work that is the subject of the correction instruction as workers who will perform the work based on the correction instruction. 5. The process control system according to claim 4. [Appendix 8] The system further includes an approval acquisition means for acquiring approval of the corrective instruction from a manager who manages a worker who performs work based on the corrective instruction, the determining means determines a timing for outputting the correction instruction when an approval result indicating approval of the correction instruction has been obtained; 2. The process control system of claim 1. [Appendix 9] the determination means determines the timing for outputting the correction instruction based on a degree of urgency corresponding to a deadline for completing the work that is the subject of the correction instruction. 2. The process control system of claim 1. [Appendix 10] Obtaining corrective instructions for work that is subject to process management, determining a timing for outputting the correction instruction based on a priority of the work to be performed based on the correction instruction; outputting the correction instruction based on the determined timing; Process control method. [Appendix 11] A process of obtaining corrective instructions for the work that is the subject of process management; A process of determining a timing for outputting the correction instruction based on a priority of the work to be performed based on the correction instruction; A process of outputting the correction instruction based on the determined timing. A process control program that causes a computer to execute the above. [Explanation of symbols]
[0088] 10 Process Control System 101 Work information acquisition unit 102 Correction instruction acquisition department 103 Approval Department 104 Work report acquisition department 105 Confirmation result acquisition unit 106 Decision Section 107 Worker Determination Department 108 Output section 109 Approval request output section 110 Confirmation request output section 111 Storage section 20 Supervisor terminal device 30 Administrator terminal device 40 Operator terminal device 200 Computers 201 CPU 202 Memory 203 Storage device 204 Input / Output Interface 205 Communication I / F
Claims
1. A correction instruction acquisition means for acquiring a correction instruction for a task that is a target of process management; a determination means for determining a timing for outputting the correction instruction based on an urgency of the work to be performed based on the correction instruction; an output means for outputting the correction instruction based on the determined timing; A process control system equipped with:
2. Further comprising a work report acquisition means for acquiring a work start report and a work end report, the determining means determines to output the corrective instruction after obtaining the completion report when the urgency of the corrective instruction obtained during the work for which the start report has been obtained is less than a predetermined standard. The process control system according to claim 1.
3. the determining means determines to output a correction instruction before obtaining the completion report when the urgency is higher than a predetermined standard. The process control system according to claim 2.
4. a worker determination unit that determines a worker who will perform the work based on the correction instruction based on at least one of the attributes of each of a plurality of workers and the progress of the work, the output means outputs the correction instruction to a terminal device used by at least one of the worker and a manager who manages the worker. The process control system according to claim 1.
5. the worker determination means determines a worker other than the worker who performed the work that is the subject of the correction instruction as a worker who will perform the work based on the correction instruction; The process control system according to claim 4.
6. the worker determination means determines a worker having higher skill than a worker who performed the work that is the subject of the correction instruction as a worker who will perform the work based on the correction instruction; The process control system according to claim 4.
7. the worker determination means determines a number of workers corresponding to a deadline for completing the work that is the subject of the correction instruction as workers who will perform the work based on the correction instruction; The process control system according to claim 4.
8. The system further includes an approval acquisition means for acquiring an approval result of the corrective instruction from a manager who manages a worker who performs work based on the corrective instruction, the determining means determines a timing for outputting the correction instruction when an approval result indicating approval of the correction instruction has been obtained; The process control system according to claim 1.
9. Obtaining corrective instructions for work that is subject to process management, determining a timing for outputting the correction instruction based on a priority of the work to be performed based on the correction instruction; outputting the correction instruction based on the determined timing; Process control method.
10. A process of obtaining corrective instructions for the work that is the subject of process management; A process of determining a timing for outputting the correction instruction based on a priority of the work to be performed based on the correction instruction; A process of outputting the correction instruction based on the determined timing. A process control program that causes a computer to execute the above.