Support assembly dolly, support installation device, and support installation method

The support assembly cart with a mounting table and pitch gauge simplifies and stabilizes the installation of support components in rehabilitated pipes, addressing labor-intensive and unstable issues with conventional methods.

JP2024168322AActive Publication Date: 2024-12-05NIPPON NO-DIG TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023084883
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-23
Publication Date
2024-12-05
Estimated Expiration
2043-05-23

AI Technical Summary

Technical Problem

The installation of support components in rehabilitated pipes is labor-intensive and unstable due to the weight and size of polygonal frames, requiring multiple workers to maintain stability and precise positioning, which is difficult with conventional trolleys.

Method used

A support assembly cart with a mounting table, casters, and a pitch gauge that facilitates easy transportation, assembly, and precise positioning of support components, using a trolley with a mounting base and frames to stabilize and measure intervals without obstructing the lower part of the frame, and a hook for secure upright placement.

Benefits of technology

Enables efficient and stable installation of support components by reducing labor requirements and ensuring precise positioning, allowing single-worker operation and minimizing frame wobbling during assembly and transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024168322000001_ABST
    Figure 2024168322000001_ABST
Patent Text Reader

Abstract

To provide a support assembly dolly, a support installation device, and a support installation method that make it easy and highly efficient to transport, assemble, and install components of a support.SOLUTION: The present invention comprises a mounting table P on which at least a lower frame of a support used when supporting from the inside of a rehabilitation pipe to be installed on an existing pipe is placed, and casters 23 provided below the mounting table P. The mounting table P has a pair of first mounting frames 21, 21 that support the lower frame of the support at at least two points spaced apart in the extension direction of the lower frame arranged to extend in a direction perpendicular to the axial direction of the rehabilitation pipe, and second mounting frames 22, 22 that connect the pair of first mounting frames 21, 21. The present invention relates to a support assembly dolly 20 that enables installation work of the support between the pair of first mounting frames 21, 21.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a support assembly cart, a support installation device, and a support installation method. [Background technology]

[0002] A widely used method for rehabilitating existing pipes such as aged sewer pipes is to fabricate a rehabilitating pipe made of synthetic resin such as rigid polyvinyl chloride inside the existing pipe, and then inject and harden a backfilling material into the gap between the existing pipe and the rehabilitating pipe. When injecting the backfilling material, the load and injection pressure of the backfilling material can cause the rehabilitating pipe to buckle and deform, and the buoyancy of the rehabilitating pipe can cause it to shift from its specified position relative to the existing pipe. For this reason, supports are installed inside the rehabilitating pipe at approximately equal intervals in the axial direction of the pipe before the backfilling material is injected (see, for example, Patent Document 1).

[0003] When installing the support, the corner members and side members that form the polygonal frame of the support are each carried into the rehabilitating pipe, assembled, and the frame is then erected and fixed to the rehabilitating pipe. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent Publication No. 2013-256854 Summary of the Invention [Problem to be solved by the invention]

[0005] Because each part of the polygonal frame alone is quite heavy, the supports are transported into the rehabilitated pipe using a cart, and the parts are then assembled and installed. This required a great deal of labor, including transporting and assembling the supports, and measuring the installation positions. In addition, when erecting the polygonal frame, the size and weight of the polygonal frame make it prone to wobbling, resulting in a very unstable installation. When installing the supports, three or more workers were required per unit to hold the polygonal frame upright and secure it to the rehabilitated pipe. Even with three or more workers, it was still a great deal of labor, as holding the very large and heavy supports required considerable attention. Furthermore, when polygonal frame parts or the polygonal frame itself are transported using a conventional cart, the load and dimensions are large, so that even removing the polygonal frame from the cart requires a great deal of effort and care. Therefore, the present invention provides a support assembly cart, a support installation device, and a support installation method that make it easy and very efficient to transport, assemble, and install support components. [Means for solving the problem]

[0006] (1) The support assembly cart of the present invention comprises a mounting base for mounting at least the lower frame of a support used when supporting from the inside a rehabilitation pipe to be installed on an existing pipe, and casters provided below the mounting base, and the mounting base has a pair of first mounting frames supporting the lower frame of the support at at least two points spaced apart in the extension direction of the lower frame arranged to extend in a direction perpendicular to the axial direction of the rehabilitation pipe, and a second mounting frame connecting the pair of first mounting frames, making it possible to install the support between the pair of first mounting frames. With this configuration, there is a space between the pair of first mounting frames that make up the mounting base, so that with the deformation prevention frame placed on the mounting base, it is possible to perform tasks such as fixing the deformation prevention frame to the rib material. (2) The pair of first mounting frames of the support assembly cart of the present invention may be constructed by arranging rod-shaped members parallel to each other, and the portions of the pair of first mounting frames that support the lower frame may be used as mounting sections, and the pair of first mounting frames may be connected by two or more second mounting frames in areas other than the mounting sections. According to this configuration, the lower side of the deformation prevention frame is not blocked by the second mounting frame, and work can be performed with the deformation prevention frame remaining on the support assembly cart. (3) The mounting portion of the support assembly cart of the present invention may be provided on one half of the pair of first mounting frames obtained by equally dividing the pair of first mounting frames in the longitudinal direction. With this configuration, in the mounting portion of the deformation prevention frame, the lower part of the deformation prevention frame can be prevented from being covered by the second mounting frame, and a larger working space can be secured below the mounting table. (4) The support assembly cart of the present invention may have a hook portion formed on the support stand for attaching a string-like member for fixing the support. With this configuration, the deformation prevention frame assembled on the support assembly cart can be held firmly in an upright position. (5) The support installation device of the present invention has a pitch gauge in addition to any one of the support assembly dollies described above. This configuration eliminates the need to measure the distance between deformation prevention frames that are installed at intervals. (6) The method of installing supports of the present invention includes a transporting step of transporting the constituent parts of the support into the rehabilitated pipe, a belly-raising member installing step of installing belly-raising members on the inner wall surface of the rehabilitated pipe, a frame assembling step of assembling a deformation prevention frame that constitutes the support on a support assembly cart described in any one of claims 1 to 4, a moving step of moving the support assembly cart above the belly-raising member while carrying a part of the deformation prevention frame or the assembled deformation prevention frame, a deformation prevention frame mounting step of fixing the deformation prevention frame to the belly-raising member, and a cart removal step of pulling the support assembly cart out of the deformation prevention frame. With this configuration, the supports can be efficiently assembled while still on the cart. (7) The support installation method of the present invention may further include a pitch gauge placement step of engaging a pitch gauge, which determines the distance between an existing deformation prevention frame and the next deformation prevention frame to be installed, with the existing deformation prevention frame. According to this configuration, the installation of the supports can be quickly proceeded with without the need to measure the dimensions between the deformation prevention frames. Effect of the Invention

[0007] The support assembly cart, support installation device, and support installation method of the present invention have the effect of making it easy and very efficient to transport, assemble, and install the components of the support. [Brief description of the drawings]

[0008] [Figure 1] 1 is a schematic front view showing a support in a rehabilitation pipe to which the present invention is applied. [Diagram 2] 1A is a plan view showing a frame member constituting a support in a rehabilitating pipe to which the present invention is applied, and FIG. [Diagram 3] 1A is a plan view showing a support assembly cart according to an embodiment of the present invention, and FIG. [Figure 4] 1A is a plan view showing a pitch gauge of a support installation device according to an embodiment of the present invention, and FIG. [Diagram 5] 2 is a schematic diagram showing a step of a support installation method according to one embodiment of the present invention. FIG. [Figure 6] 2 is a schematic diagram showing a step of a support installation method according to one embodiment of the present invention. FIG. [Figure 7] 2 is a schematic diagram showing a step of a support installation method according to one embodiment of the present invention. FIG. [Figure 8] 2 is a schematic diagram showing a step of a support installation method according to one embodiment of the present invention. FIG. [Figure 9] 2 is a schematic diagram showing a step of a support installation method according to one embodiment of the present invention. FIG. [Figure 10]2 is a schematic diagram showing a step of a support installation method according to one embodiment of the present invention. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, the embodiment of the support assembly cart, support installation device, and support installation method of the present invention will be described with reference to the drawings. Note that the dimensions of each part in the drawings used in the following description are not necessarily the same as the actual ones, and can be changed as appropriate.

[0010] First, the support to which the present invention is applied will be described. As shown in Figure 1, the support 1 mainly comprises a polygonal ring-shaped (octagonal in this embodiment) deformation prevention frame 2, a plurality of walnut members 3 fixed to the inner wall surface of the rehabilitation pipe X, and a support member 5 braced between the deformation prevention frame 2 and the walnut members 3. The deformation prevention frame 2 is a member in which a hollow, thin, plate-like (box-shaped) frame member 6 and a corner member 7 are assembled to surround the axis L of the rehabilitating pipe X.

[0011] When the deformation prevention frame 2 is viewed in the direction of the axis L, the frame members 6 extend horizontally (width) and vertically (height). As illustrated in Figure 4(a), multiple frame members 6 may be connected using fasteners such as bolts and nuts and used as a single frame member 6.

[0012] 1, frame members 6, 6 installed in the horizontal and vertical directions are connected to each other using corner members 7. The connection is performed using fasteners such as bolts and nuts.

[0013] The deformation prevention frame 2 illustrated in this embodiment, as shown in Figures 2(a) and (b), uses a hollow, roughly plate-like frame member 6, and is formed in a cylindrical shape that is relatively easy to stand on its own because the depth dimension is 10 to 20 times its thickness dimension.

[0014] The frame member 6 is formed with an insertion hole h for inserting a jack bolt (support member 5) used for pressing the wale-raising material 3 in the thickness direction. Further, handles T are provided on the side walls extending in the longitudinal direction of the frame member 6 near both ends in the longitudinal direction.

[0015] The wale raising material 3 shown in FIG. 1 is generally a rod-shaped rectangular steel material, and is a member that is fixed to the bottom surface, top surface, left and right surfaces, and corner portions of the inner wall of the rehabilitating pipe X along the axial direction of the rehabilitating pipe X. The support member 5 is equipped with a jack bolt 14 etc. and a dish member 14a fixed to the tip thereof into which the wale-raising material 3 is fitted, and is a member that braces the deformation prevention frame 2 against the wale-raising material 3.

[0016] Although not essential, the deformation prevention frame 2 may be provided with a reinforcing member (not shown) that is fixed to the inside of the deformation prevention frame 2 across the horizontal frame members 6, 6. Note that some deformation prevention frames 2 do not have a reinforcing member, or may have a reinforcing member across the vertical frame members 6, 6 or both between the horizontal frames 6, 6 and between the vertical frames 6, 6.

[0017] As shown in Figures 3(a) and (b), one embodiment of a support assembly cart 20 (hereinafter referred to as "cart 20") has a pair of first mounting frames 21, 21 arranged parallel to each other and facing each other, a second mounting frame 22 that crosses the pair of first mounting frames 21, 21 (orthogonal in this embodiment) to connect the pair of first mounting frames 21, 21, and casters 23.

[0018] The first mounting frame 21 is a long, highly rigid rod-shaped member having at least a flat surface on the upper surface, such as a flat square steel pipe. Here, the term rod-shaped is used to include a square steel pipe or a plate-shaped member, so long as it extends long (the same applies hereinafter in this specification). The pair of first mounting frames 21, 21 may be connected by two or more second mounting frames 22, and in this embodiment, they are connected to two second mounting frames 22.

[0019] The second mounting frames 22 are formed of long, highly rigid rod-shaped members having a flat surface at least on the lower surface, such as flat square steel pipes. One of the second mounting frames 22 is fixed to one end or near one end in the longitudinal direction of the first mounting frame 21, and the other is fixed to approximately the center in the longitudinal direction of the first mounting frame 21. The second mounting frame 22 is fixed in a state of being placed on the upper surface of the first mounting frame 21. The first mounting frame 21 and the second mounting frame 22 constitute a mounting table P on which the deformation prevention frame 2 is placed.

[0020] In the first mounting frames 21, 21, the portion other than between the second mounting frames 22, 22 constitutes a mounting portion Y on which the deformation prevention frame 2 is placed. With this configuration, the mounting unit Y supports the deformation prevention frame 2 at two locations spaced apart in the longitudinal direction only by the first mounting frames 21, 21, and is in a clear state not covered by other parts of the cart 20 including the second deformation prevention frames 22, 22. In other words, the lower part of the mounting unit Y is in a state where the parts that require work to be done from below the deformation prevention frame 2 are exposed, so that the work is not hindered.

[0021] Casters 23 are attached to the bottom surface of the first mounting frame 21 at both ends in the longitudinal direction and at the center separating the ends at substantially equal intervals. The casters 23 are attached so that the height from the installation surface (ie, the inner bottom surface of the rehabilitating pipe X) to the lower surface of the first mounting frame 21 is greater than the height dimension of the wale-raising material 3 from the rehabilitating pipe X. At both longitudinal ends of the first mounting frame 21, there are formed hanging portions 24 for passing and fixing a string-like member such as a rope or wire that stably holds the deformation prevention frame 2 placed on the mounting table P. The hanging portions 24 may be of any type as long as they can fix a rope or wire, but in this embodiment, the hanging portions 24 are provided in the form of through holes formed in the thickness direction of the first mounting frame 21.

[0022] As shown in FIG. 4, pitch gauge 25 is a rod-shaped steel material having extending portion 25a that is rod-shaped and extends linearly, and locking portions 25b that are formed on both ends of extending portion 25a. The locking portions 25b are generally U-shaped members that protrude in the same direction from both ends of the extension portion.

[0023] Next, a method for installing supports 1 in a rehabilitating pipe X using the support installation device 20 will be described.

[0024] <Support component delivery process and belly-raising material installation process> As shown in FIG. 5, first, the wale raising material 3 to be installed on the bottom of the inner wall of the rehabilitating pipe X is carried into the rehabilitating pipe X and installed therein. Next, the frame members 6, corner members 7, support members 5, fixing devices, pitch gauge 25, string-like members for lashing, etc. that constitute the deformation prevention frame 2 are placed on the platform P of the cart 20 and transported into the rehabilitation pipe X.

[0025] <Frame member assembly process and movement process> After the cart 20 has been moved to a predetermined position, the frame members 6 and the corner members 7 are assembled starting from the lower members, as shown in Figures 6 and 7. The wale raising members 3 to be attached to the inner wall side and upper surface of the rehabilitating pipe X are appropriately installed on the inner wall surface.

[0026] 3(a) of the cart 20 of the present invention is configured such that the mounting section Y is substantially composed of only a pair of first mounting frames 21, 21, and the space between these first mounting frames 21, 21 is open so as not to be covered by other parts. In other words, the first mounting frames 21.21 support the vicinity of both ends of the tamper-proof frame 2 from below, and the lower side of the tamper-proof frame 2 is exposed between them. This provides the advantage that assembly work such as tightening of fixing members can be performed by inserting a jig or an operator's hand below the lower frame member 6 while the lower frame member 6 is placed on the cart 20.

[0027] Specifically, when the dolly 20 is used to connect a plurality of lower frame members 6, the bolts connecting these can be inserted from the underside (i.e., outer surface) of the lower frame member 6 while the dolly 20 is placed on the dolly 20, and nuts can be easily tightened from the upper side (i.e., inner surface) of the frame member 6. Also, when inserting a jack bolt from the upper surface of the lower frame member 6 of the deformation prevention frame 2 to connect it to the wale-raising material 3, the dolly 20 makes it easy to position and hold the dish member 14a provided at the tip of the jack bolt 14 relative to the wale-raising material 3 while the deformation prevention frame 2 is placed on the dolly 20.

[0028] Furthermore, since the second mounting frame 22 is fixed to the upper surface of the first mounting frames 21, 21, a step is generated between the mounting portion Y and the second mounting frame 22, the step being equal to the thickness of the second mounting frame 22. Therefore, when the lower frame member 6 is placed on the mounting table P, it is easy to position the lower frame 6 on the mounting table P. This also has the effect of preventing the deformation prevention frame 2 from falling over on the mounting table P.

[0029] 8, when the deformation prevention frame 2 is assembled, a fixing metal fitting on one end of a string-like member 30 such as a wire is attached to the hanging portion 24 formed on one of the first mounting frames 21, and the fixing metal fitting on the other end of the string-like member 30 is fixed to the hanging portion 24 of the other first mounting frame 21 so that it straddles the upper frame and is hung diagonally. To further enhance stability, a further string-like member 30 may be attached to the hanging portions 24 of the pair of first mounting frames 21, 21 so as to cross the previously hung string-like member 30.

[0030] <Deformation prevention frame installation process> With the deformation prevention frame 2 fixed to the cart 20 in this way, the cart 20 is moved onto the wale-raising material 3 fixed to the bottom surface of the inner wall of the rehabilitation pipe X, and the deformation prevention frame 2 is fixed to the wale-raising material 3 using the support members 5. The lower frame member 6 is temporarily fixed and is kept slightly floating above the wale-raising material 3.

[0031] Even in this case, the dolly 20 has a sufficient space between the pair of first mounting frames 21, 21, and has a height that allows the mounting platform P to move across the wale-raising material 3, so that it is possible to prevent contact between the wale-raising material 3 and the dolly 20 when transporting and setting up the dolly 20. Therefore, the deformation prevention frame 2 can be attached to the wale-raising material 3 while it is still placed on the dolly 20, and this has the effect of allowing the work to be performed more safely and efficiently with the deformation prevention frame 2 stably placed on the dolly 20.

[0032] <Trolley removal process> The deformation prevention frame 2 is fixed to the walnut members 3 on the inner wall side and upper surface using the support members 5, and once the support installation is complete, the trolley 20 is pulled out of the deformation prevention frame 2 and the lower frame member 6 is firmly fixed to the walnut members 3 below it. This completes the installation of one deformation prevention frame 2.

[0033] In this way, according to the support installation method of the present invention, the components of the support 1 are carried in to a predetermined position such as near the entrance of the rehabilitating pipe X, the deformation prevention frame 2 is assembled on the cart 20, and then the cart 20 is quickly moved into the rehabilitating pipe X and the installation is repeated from the back. By adopting such a method, the support 1 can be installed extremely efficiently. The subsequent installation of the deformation prevention frames 2 can be carried out as described above, but when installing them at intervals in the depth direction of the rehabilitation pipe X, this can be done extremely efficiently by using a pitch gauge 25.

[0034] For convenience of illustration, Figure 9 is a diagram viewed in the direction in which supports are installed in order toward the back, while Figure 10 is a schematic diagram viewed in the opposite direction to Figure 9, in which supports are installed toward the front, and shows the state after the pitch gauge 25 has been removed after measuring the spacing with the pitch gauge 25.

[0035] That is, as shown in FIG. 9, after installing one deformation prevention frame 2, when installing the next deformation prevention frame 2, the dimensions between the deformation prevention frames 2, 2 can be accurately set by using a pitch gauge 25 to measure four mutually spaced locations on the deformation prevention frame 2 (in this embodiment, the handles T on the upper and lower frames) and four locations on the handles T that correspond to the four locations on the deformation prevention frame 2 to be installed next.

[0036] Specifically, the locking portion 25b on one end of the pitch gauge 25 is hooked onto each of the handles T, T of the lower frame member 6, and the other end of this pitch gauge 25 is attached to the opposing handles T, T of the lower frame member 6 of the next deformation prevention frame 2 shown in Figure 10. It is advisable to remove the pitch gauge 25 once the distance between the frame members 6, 6 has been set.

[0037] In FIG. 10, after the lower frame member 6 on the front side and the frame members 6, 6 on both sides are fixed, when the upper frame member 6 is fixed, the pitch gauge 25 is again used to set the dimension between the upper frame members 6, 6 in the same manner as described above.

[0038] In this way, by measuring the dimensions at four corresponding points of the deformation prevention frame 2 using the pitch gauge 25, the dimensions between the deformation prevention frames 2, 2 can be set very accurately even if the shape of the rehabilitation pipe X is slightly curved, etc.

[0039] In other words, by assembling the supports using the trolley 20 and pitch gauge 25 of the present invention, it is possible to eliminate the need to measure the distance between the deformation prevention frames 2, 2 by simply hanging the pitch gauge 25, and to efficiently install the deformation prevention frames 2 in the designated positions one after another.

[0040] In the above embodiment, the mounting table P in which the first mounting frame 21 and the second mounting frame 22 are connected in a lattice shape is exemplified, but the present invention is not limited to the above embodiment. That is, the present invention may be configured in any way as long as the lower frame member 6 is supported at least at two spaced locations, so that assembly work can be performed above and below the lower frame member 6 while it is placed on the cart 20, the cart 20 can straddle the wale-raising material 3, and work can be performed above the wale-raising material 3.

[0041] Specifically, three or more first mounting frames 21 may be used as long as they do not interfere with assembly in consideration of the configuration of the deformation prevention frame 2. Also, the first mounting frames 21 may be connected by three or more second mounting frames 22. In addition, the deformation prevention frame 2 may be assembled on the cart 20 after the cart 20 is moved to a predetermined position on the wale-raising material 3. Moreover, the deformation prevention frame 2 to which the present invention is applied may be made of square steel material. [Explanation of symbols]

[0042] 1. Support 2 Deformation prevention frame 3 Waist raising material 20 Carts 21 First loading frame 22 Second loading frame 23 Caster 24 Latch part P Placement table Y placement part

Claims

1. The present invention is provided with a support for supporting a rehabilitating pipe from the inside of an existing pipe, the support having at least a lower frame member placed thereon, and casters provided below the support. The mounting base includes a pair of first mounting frames that support the lower frame member of the support at at least two locations spaced apart in the extension direction of the lower frame member of the support, the pair being arranged to extend in a direction perpendicular to the axial direction of the rehabilitation pipe; a second mounting frame connecting the pair of first mounting frames, A support assembly cart that enables the support installation work to be performed between the pair of first mounting frames.

2. The pair of first mounting frames are configured by arranging rod-shaped members in parallel to each other, a portion of the pair of first mounting frames that supports the lower frame member is a mounting portion, 2. The support assembly cart according to claim 1, wherein the pair of first mounting frames are connected by two or more second mounting frames in an area other than the mounting portion.

3. 2. The support assembly cart according to claim 1, wherein the placement portion is provided on one half of the pair of first placement frames obtained by equally dividing the pair of first placement frames in the longitudinal direction.

4. 2. The support assembly cart according to claim 1, wherein the support base is formed with a hook portion for attaching a string-like member for fixing the support.

5. A support installation device comprising the support assembly cart according to any one of claims 1 to 4 and a pitch gauge.

6. The method for installing supports of the present invention includes the steps of: a carrying-in process for carrying components of the support into the rehabilitation pipe; a wale-raising material installation process for installing the wale-raising material on the inner wall surface of the rehabilitation pipe; A frame member assembling process for assembling a deformation prevention frame constituting a support on the support assembling cart according to any one of claims 1 to 4; A moving process in which the support assembly cart is moved above the belly-raising material while carrying a part of the deformation prevention frame or the assembled deformation prevention frame; a deformation prevention frame mounting step of fixing the deformation prevention frame to the wale-raising material; A support installation method comprising a support assembly cart removal process for removing the support assembly cart from the deformation prevention frame.

7. 7. The support installation method according to claim 6, further comprising a pitch gauge arrangement step of engaging a pitch gauge, which defines the distance between an existing deformation prevention frame and a deformation prevention frame to be installed next, with the existing deformation prevention frame.

Citation Information

Patent Citations

  • Bearer transporting apparatus and pipe line constructing method

    JP2002309899A

  • Timbering device

    JP2007046751A

  • Timbering device and pipeline construction method using the same

    JP2008045728A

  • Conduit line regeneration method and timbering device

    JP2017145844A

  • Timbering installation method and timbering installation device

    JP2023028167A