AI Technical Summary
Existing railway control devices with redundant systems face challenges in efficiently managing system stoppages due to failures, leading to increased operational costs and inefficient equipment utilization, particularly in cloud-based environments.
A redundant system comprising a main control device and slave control devices, where slave processing is stopped when certain conditions are met, such as no trains in the control range, equipment being locked, or low train operation density, allowing flexible switching between main and slave systems.
Reduces operating costs and enhances equipment utilization efficiency by minimizing the need to stop the main system, especially during low-impact situations.
Smart Images

Figure 2024169881000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a redundant system having a primary system and a secondary system and a control method thereof, and is particularly suitable for a railway control device. [Background technology]
[0002] Railway control devices installed on the ground include electronic interlocking devices, automatic train control devices, traffic management devices, etc. In order to improve availability, these railway control devices often adopt a redundant system consisting of a primary system and a secondary system.
[0003] For example, Patent Document 1 discloses a train operation control device that is equipped with route control units for main and secondary systems, with each route control unit installed at two different stations sending and receiving its own survival information to the other. However, when its own system is stopped, it is unable to send its own survival information, nor can it receive survival information from the other system, so a technology is disclosed in which the next system is stopped upon receiving a stop command from the other system. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2011-235682 A Summary of the Invention [Problem to be solved by the invention]
[0005] In recent years, there has been a trend to promote asset-lightness in order to reduce operation costs, even for the above-mentioned railway control devices installed on the ground. As part of this trend, a proposal has been made to migrate the above-mentioned control device groups to a cloud environment. However, since cloud migration incurs new costs such as network usage costs and security measures, it is necessary not only to simply migrate current facilities to the cloud, but also to implement measures to improve the efficiency of equipment use, such as equipment consolidation. In addition, it is also necessary to consider the operating time of computing in order to reduce costs for redundant systems.
[0006] Furthermore, in Patent Document 1, when a primary or secondary system is stopped due to a failure, the system does not transmit survival information about itself and cannot receive survival information about the other system, so the technology stops the primary or secondary system after receiving a stop command from the other system. However, this is only a process for stopping the primary or secondary system in the event of an abnormality, and is not intended to be used for stopping the system under normal conditions.
[0007] Therefore, the present invention aims to provide a technology for stopping the secondary system in a railway control device that employs a redundant system when the impact of stopping the primary system is small, thereby reducing costs and improving the efficiency of equipment utilization. [Means for solving the problem]
[0008] In order to solve the above problems, one representative redundant system of the present invention is a redundant system consisting of a master control device and one or more slave control devices, and when status information of the controlled equipment controlled by the master or slave control device satisfies predetermined conditions, the slave processing by the slave control device is stopped. Effect of the Invention
[0009] According to the present invention, when the impact of stopping the main system is small, the secondary system is stopped, thereby making it possible to reduce the operating cost. Problems, configurations and effects other than those described above will become apparent from the following description of the preferred embodiment of the invention. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a diagram illustrating an example of a system configuration according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram illustrating an example of components constituting a control device serving as a master or slave in each embodiment of the present invention. [Diagram 3] FIG. 13 is a diagram illustrating an example of a flowchart of a secondary system startup process executed by a secondary system startup processing unit. [Figure 4] FIG. 11 is a diagram illustrating an example of a flowchart of a secondary system stop process executed by a secondary system stop processor. [Diagram 5] FIG. 11 is a diagram illustrating an example of a system configuration according to a second embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, with reference to the drawings, a description will be given of Example 1 and Example 2 as modes for carrying out the present invention. Note that the present invention is not limited to Example 1 and Example 2. In addition, in the description of the drawings, the same parts are denoted by the same reference numerals.
[0012] In the embodiment of the present invention, the target is an electronic interlocking device, which is one of the railway control devices installed on the ground, but the present invention is not limited to this and can also be applied to automatic train control devices or traffic management devices, etc. EXAMPLES
[0013] FIG. 1 is a diagram illustrating an example of a system configuration according to a first embodiment of the present invention. The redundant system 100 controls a controlled facility 130, and is composed of a primary control device 110 and at least one secondary control device 120. Hereinafter, the primary control device 110 will be referred to as the "control device (primary) 110" and the secondary control device 120 as the "control device (secondary) 120." Hereinafter, the control device (primary) 110, the control device (secondary) 120, and the controlled facility 130 are mutually connected via a network or the like, and transmit and receive necessary information between them.
[0014] In the present invention, both the control device (primary system) 110 and the control device (secondary system) 120 are provided with a secondary system startup processing unit 200 and a secondary system stop processing unit 300. This is on the assumption that the secondary system startup processing unit 200 and the secondary system stop processing unit 300 will be installed as software configurations, and are provided in both the primary system and the secondary system. This makes it possible to switch between the primary system and the secondary system without fixing the control device (primary system) 110 as only the primary system and the control device (secondary system) 120 as only the secondary system, and each of the control devices 110 and 120 can be either the primary system or the secondary system. The present invention is characterized in that the master control unit operates the slave start-up processing unit 200, and the slave control unit itself operates the slave stop processing unit 300.
[0015] 1, the control device (primary) 110 has a secondary system startup processing unit 200, shown in a solid line frame, that operates actively, and the control device (secondary) 120 has a secondary system stop processing unit 300, shown in a solid line frame, that operates actively. On the other hand, the secondary system stop processing unit of the control device (primary) 110 and the secondary system startup processing unit of the control device (secondary) 120, shown in a dotted line frame, are in an inactive state.
[0016] Here, when control device (slave) 120 is switched to the primary system and control device (primary) 110 is switched to the secondary system, the secondary system startup processing unit or secondary system stop processing unit that was in the dotted frame becomes active (i.e., becomes a solid frame), and the secondary system stop processing unit or secondary system startup processing unit that was in the solid frame becomes inactive (i.e., becomes a dotted frame).
[0017] It is also possible to fix the control device (primary) 110 to only the secondary startup processing unit 200 and the control device (secondary) 120 to only the secondary stop processing unit 300; however, since the secondary startup processing unit 200 and the secondary stop processing unit 300 are each software configurations, it is easy for each of the control device (primary) 110 and the control device (secondary) 120 to have both the secondary startup processing unit 200 and the secondary stop processing unit 300, and flexible response is possible. Of course, each of the secondary system start-up processing unit 200 and the secondary system stop processing unit 300 can be configured as hardware instead of software.
[0018] FIG. 2 is a diagram showing an example of components constituting the control device (110 or 120) serving as the master or slave according to each embodiment of the present invention. The control device (110 or 120), like a general control device, is composed of an arithmetic unit 170, a memory 140, a storage device 190, an input device 160, an output device 150, and a communication device 180.
[0019] The memory 140 stores, as software, a secondary system startup processing unit 200 and a secondary system shutdown processing unit 300, and stores, as information (data), ground equipment status information 400, control status information 500, a condition database (DB) 600, operation plan information 700, and train position information 800.
[0020] The ground equipment status information 400 is status information related to signals, track circuits, and points, which are the main ground equipment of a railway. For example, status information includes color signals for signals, whether track circuits are down or up, and whether points are locked or unlocked. This ground equipment status information is output from each ground equipment to an electronic interlocking device (not shown).
[0021] The control status information 500 is status information that indicates the control status such as locking / unlocking, time counting, etc., used when controlling the status of the ground facilities related to each other in an interlocking manner. This control status information is status information that is grasped from the output mode from the electronic interlocking device (not shown).
[0022] The condition database (DB) 600 is a database that stores conditions under which the slave control devices can be stopped with respect to the above-mentioned ground equipment status information 400 and the control status information 500. In addition, when two or more slave control devices are provided, the minimum number of slave devices to be started among the two or more slave control devices may be stored.
[0023] The operation plan information 700 is a train operation plan, specifically, information on a so-called train schedule that indicates a plan such as when and where trains will be located within a route.
[0024] Train position information 800 is position information of nearby trains that run outside the control range under the control of the control device. The train positions within the control range under the control of the control device can be ascertained from the state of the track circuit, which is a ground facility. However, the train positions within the control range may be stored in a redundant manner in combination with the ground facility state information 400.
[0025] Next, input / output modes and processing modes of the slave system start-up processing unit 200 and the slave system stop processing unit 300 provided in each of the control devices (110 or 120) that are to be the master or slave will be described.
[0026] The input data of the secondary system start-up processor 200 and the secondary system stop processor 300 are, as required data, ground equipment status information, control status information, and information stored in a condition database related to these information, and, as optional data, train operation plan information (or train operation forecast information) and train position information outside the control range.
[0027] On the other hand, as output data from the control device (110 or 120) which is the master or slave, slave start instruction data for starting up the slave is sent from the master to the slave, but no data is sent from the slave to the master (as will be described later, an instruction to stop the slave is given by the slave itself (self-system instruction)).
[0028] As described above in the "Problem to be Solved by the Invention" section, the present invention stops the secondary system when the impact of stopping the primary system is small. Based on the above-mentioned status information, the following cases apply to cases where the impact of stopping the primary system is small.
[0029] In other words, it is a state in which equipment control within the control range under management is not being carried out, specifically, a state in which the following 1) to 3) are true (AND). 1) There are no trains within the range. For example, there are no trains in the station or between the stations before. 2) The equipment is locked and not in time count mode.
[0030] 3) No trains are coming within the control range for a while. For example, if there is no approaching train within a certain time frame according to the train operation plan, or if the route is set without looking at the train operation plan, the secondary system will be activated. In addition to the above-mentioned conditions, there are also cases where the impact of a main system outage is small, such as when train operation density is low. This is a slightly more relaxed condition than the above-mentioned conditions, but it can be exemplified by cases where train operation is during off-peak hours or at night.
[0031] Next, a specific processing mode of the secondary system start-up processing and secondary system stop processing will be described. 3 is a diagram showing an example of a flowchart of the secondary system startup process executed by the secondary system startup processing unit 200. This flowchart is executed at a predetermined fixed cycle, and is executed by the secondary system startup processing unit 200. In the following, a description of the execution unit will be omitted.
[0032] In step S201, it is determined whether the secondary system is in operation. If the secondary system is already in operation (Yes), the secondary system startup processing flow ends. If the secondary system is not in operation (No), the process proceeds to step S202. In step S202, the contents of the secondary system start condition are judged. The secondary system start condition is described later, but is the opposite condition to the secondary system stop condition.
[0033] In step S203, it is determined whether the secondary system startup conditions are met. If the secondary system startup conditions are met (Yes), the process proceeds to step S204. If the secondary system startup conditions are not met (No), the secondary system startup process flow ends. In step S204, the startup of the secondary system is instructed, and then the secondary system startup processing flow ends.
[0034] 4 is a diagram showing an example of a flowchart of the secondary system stop processing executed by the secondary system stop processing unit 300. This flowchart is also executed at a predetermined fixed cycle, similar to the secondary system startup processing executed by the secondary system startup processing unit 200 described above, and is executed by the secondary system stop processing unit 300. In the following, a description of the executing unit will be omitted.
[0035] In step S301, the contents of the secondary system stop condition are judged. The secondary system stop condition, which will be described later, is a condition opposite to the secondary system start condition.
[0036] In step S302, it is determined whether or not the secondary system stop condition is satisfied. If the secondary system stop condition is satisfied (Yes), the process proceeds to step S303. If the secondary system stop condition is not satisfied (No), the secondary system stop processing flow is terminated.
[0037] In step S303, the secondary system is stopped, that is, the own system which is the secondary system is stopped, and then the secondary system stop processing flow is terminated.
[0038] Next, the slave system start condition and the slave system stop condition will be described. As described above, the slave start condition and the slave stop condition are mutually inverse, so in the following, the slave stop condition, which is the key point of the present invention, will be explained first.
[0039] <Slave stop conditions> The secondary system stop condition is a condition determined in step S301 of the secondary system stop processing flow shown in FIG. 4, and the secondary system start condition is a condition determined in step S202 of the secondary system start processing flow shown in FIG.
[0040] For both conditions, "A) Conditions regarding the current state" described below is a required condition, and at least one of "B) Conditions regarding future projections" and "C) Conditions regarding operation density" described below is an optional condition.
[0041] That is, the items that are "A) conditions related to the current state" are necessarily determined as secondary system stop conditions. On the other hand, at least one of the items that are "B) conditions related to future prediction" and "C) conditions related to operation density" is determined as an option, and is not necessarily determined together with "A) conditions related to the current state", but is determined as necessary.
[0042] In addition, when determining at least one of the options "B)" and "C)," even if the required "A)" is not satisfied and the secondary system is not stopped, if at least one of "B)" and "C)" is not satisfied, the secondary system, which is the own system, will be stopped.
[0043] The specific criteria for judgment are as follows. A) Current status conditions A. Input information -Wayside equipment status information: status information for signals, track circuits, and switches Control status information: Status information regarding lock status and time elements
[0044] B. Judgment conditions The condition for stopping is that the input information (i.e., the state indicated by the wayside equipment status information and the control status information) matches the set values in the condition database (DB). Here, the set values in the condition database (DB) are based on the default values for the wayside equipment status and the control status. These default values include "train not on the line," "route not set," "equipment not locked," "time unit count not in progress," etc., and if the AND condition of these default values is met, the stop condition is met.
[0045] However, there are cases where it is no problem to stop the secondary system even if it is not the default value, such as "route setting" in the case of reverse position holding, or "train on track" in the case of dwelling, etc. Therefore, the settings in the condition database (DB) are flexible.
[0046] B) Forward-looking statements A. Input information Train operation plan information or train operation forecast information, and train position information outside the control range
[0047] B. Judgment conditions In the train operation plan or train operation forecast, when the route decision time within the control range is greater than a pre-specified threshold, the stop condition is met. Specifically, the stop condition is met when there is a sufficient margin before the train enters the control range.
[0048] C) Conditions regarding service density A. Input information Train operation plan information or train operation forecast information
[0049] B. Judgment conditions In the train operation plan or train operation forecast, the stop condition is met when the route setting frequency within the control range is smaller than a pre-specified threshold value for a pre-specified time span from the current time. Specifically, the stop condition is met when the train operation density within the control range is sufficiently sparse.
[0050] <Secondary system startup conditions> On the other hand, the secondary system start condition is the reverse of the secondary system stop condition as described above, and will be described below in accordance with the secondary system stop condition.
[0051] A) Current status conditions A. Input information This is the same information as in the case of the secondary system stop condition.
[0052] B. Judgment conditions The condition for start-up is that the input information does not correspond to any of the default values for the ground equipment status and control status, which are the settings in the condition database (DB).
[0053] B) Forward-looking statements A. Input information This is the same information as in the case of the secondary system stop condition.
[0054] B. Judgment conditions The start condition is met when the route decision timing within the control range is smaller than a predefined threshold in the train operation plan or train operation forecast. Specifically, the start condition is met when there is not enough time before the train enters the control range.
[0055] C) Conditions regarding service density A. Input information This is the same information as in the case of the secondary system stop condition.
[0056] B. Judgment conditions In the train operation plan or train operation forecast, the start condition is met when the route setting frequency within the control range is greater than a pre-specified threshold value for a pre-specified time span from the current time. Specifically, the start condition is met when the train operation density within the control range is high. EXAMPLES
[0057] FIG. 5 is a diagram illustrating an example of a system configuration according to the second embodiment of the present invention. In the second embodiment, the configuration of the redundant system 100 according to the first embodiment is expanded to a plurality of control ranges, and there are a plurality of combinations of the primary system and the secondary system. As shown in Fig. 5, the system is configured with a primary control device 110 and a secondary control device 120 for a controlled facility in a control range 1, and a primary control device 110' and a secondary control device 120' for a controlled facility 130' in a control range 2. Both the primary and secondary control devices include a secondary system start-up processing unit 200 and a secondary system stop processing unit 300 therein. The configuration with a similar relationship is also applicable to the case of three or more control ranges.
[0058] A feature of the second embodiment is that it enables the activation of a control device in a control range 2 from a control range 1 of a different control range. For example, the configuration shown in Fig. 5 enables the activation of a control device in a control range 2 from the control range 1 (the reverse pattern is also possible). In other words, even if the primary control device 110' in the control range 2 goes down, the primary control device 110 in the control range 1 becomes a backup and performs the activation process of the secondary control device 120' in the control range 2. This backup method is also the same when the control range 1 causes the above-mentioned downtime.
[0059] Moreover, according to the above-mentioned first and second embodiments, at least the following technical aspects are included. <Technical aspect 1> A redundant system consisting of a master control device and one or more slave control devices, in which when status information of a controlled equipment controlled by the master or slave control device satisfies a predetermined condition, the slave processing by the slave control device is stopped.
[0060] <Technical aspect 2> In the redundant system described in Technical Aspect 1 above, the slave control device itself stops the slave processing.
[0061] <Technical aspect 3> In the redundant system described in Technical Aspect 1 or 2 above, if a predetermined condition is not satisfied when the slave processing is stopped, the master control device starts up the slave processing.
[0062] <Technical aspect 4> In a redundant system described in any one of technical aspects 1 to 3 above, when there are two or more slave control devices, a minimum number of control devices that need to be started as slaves is set, and stop and start processes are performed for the slave control devices according to the minimum number.
[0063] <Technical aspect 5> In the redundant system according to any one of the above technical aspects 1 to 4, the primary and secondary control devices have a condition database for storing predetermined conditions.
[0064] <Technical Aspect 6> In the redundant system according to any one of Technical Aspects 1 to 5 above, the controlled equipment is ground equipment provided in a railway interlocking device.
[0065] <Technical Aspect 7> In the redundant system described in Technical Aspect 6 above, the specified condition is at least one of a state in which equipment control is not being performed on the ground equipment located within a control range that manages the presence of trains on the line, a state in which no trains are approaching within the control range for a specified period of time, and a state in which the train operation density is less than a specified threshold value.
[0066] <Technical Aspect 8> In the redundant system described in Technical Aspect 7 above, a master and a slave control device are provided in each of the multiple control ranges, and the master control device activates slave processing in a control range different from its own control range.
[0067] <Technical Aspect 9> A control method for a redundant system consisting of a master control device and one or more slave control devices, which determines whether or not status information of a controlled object equipment controlled by the control device satisfies a predetermined condition, and if the predetermined condition is satisfied, stops slave processing by the slave control device.
[0068] <Technical Aspect 10> In the method for controlling a redundant system according to the ninth technical aspect, the control device of the slave system itself stops the processing of the slave system.
[0069] <Technical aspect 11> In the control method for a redundant system according to the ninth or tenth technical aspect, if a predetermined condition is not satisfied when the processing in the slave system is stopped, the control device of the master system starts up the processing in the slave system.
[0070] <Technical aspect 12> A control method for a redundant system described in any one of technical aspects 9 to 11 above, in which when there are two or more slave control devices, a minimum number of control devices that need to be started as slave devices is set, and stop and start processes are performed for the slave control devices according to the minimum number.
[0071] <Technical aspect 13> A control method for a redundant system according to any one of Technical Aspects 9 to 12 above, wherein the controlled equipment is ground equipment provided in an interlocking device of a railway.
[0072] <Technical aspect 14> In the control method for a redundant system described in Technical Aspect 13 above, the specified condition is at least one of a state in which equipment control is not being performed on ground equipment present within a control range that manages the presence of trains on the line, a state in which no trains are approaching within the control range for a specified period of time, and a state in which the train operation density is less than a specified threshold value.
[0073] <Technical aspect 15> A control method for a redundant system as described in Technical Aspect 14 above, in which a master and a slave control device are provided for each of a plurality of control ranges, and the master control device activates slave processing in a control range different from its own control range.
[0074] Although Example 1 and Example 2 have been described above as embodiments of the present invention, the present invention is not limited to the above-mentioned examples, and various modifications are possible without departing from the gist of the present invention. [Explanation of symbols]
[0075] 100...redundant system, 110...control device (main system), 120...control device (secondary system), 130... equipment to be controlled, 140... memory, 150... output device, 160... input device, 170...computing device, 180...communication device, 190...storage device, 200: secondary system start processing unit, 300: secondary system stop processing unit
Claims
1. A redundant system comprising a master control device and one or more slave control devices, When status information of a controlled facility controlled by the master or slave control device satisfies a predetermined condition, the slave processing by the slave control device is stopped. A redundant system comprising:
2. 2. The redundant system according to claim 1, The slave control device itself stops the slave processing. A redundant system comprising:
3. 3. The redundant system according to claim 2, If the predetermined condition is not satisfied while the slave processing is in a stopped state, the control device of the master system starts up the slave processing. A redundant system comprising:
4. 4. The redundant system according to claim 3, When the number of the slave control devices is two or more, a minimum number of the control devices that need to be started as slaves is set, and the stop processing and start processing of the slave control devices according to the minimum number is executed. A redundant system comprising:
5. 5. The redundant system according to claim 4, The primary and secondary control devices each have a condition database for storing the predetermined conditions. A redundant system comprising:
6. 6. The redundant system according to claim 1, The controlled equipment is ground equipment equipped with a railway interlocking device. A redundant system comprising:
7. 7. The redundant system according to claim 6, The predetermined condition is at least one of a state in which equipment control is not being performed on the ground equipment within a control range that manages the presence of trains on the track, a state in which no trains are approaching within the control range for a predetermined period of time, and a state in which the train operation density is less than a predetermined threshold. A redundant system comprising:
8. 8. The redundant system according to claim 7, a control device for the master system and a control device for the slave system are provided in each of the plurality of control ranges; The master control device activates the slave process in a control range different from its own control range. A redundant system comprising:
9. A method for controlling a redundant system including a master control device and one or more slave control devices, comprising: Determining whether or not status information of a control target facility controlled by the control device satisfies a predetermined condition; When the predetermined condition is satisfied, the slave processing by the slave control device is stopped. A method for controlling a redundant system comprising:
10. A method for controlling a redundant system according to claim 9, comprising: The slave control device itself stops the slave processing. A method for controlling a redundant system comprising:
11. A method for controlling a redundant system according to claim 10, comprising: If the predetermined condition is not satisfied while the slave processing is in a stopped state, the control device of the master system starts up the slave processing. A method for controlling a redundant system comprising:
12. A method for controlling a redundant system according to claim 11, comprising: When the number of the slave control devices is two or more, a minimum number of the control devices that need to be started as slaves is set, and the stop processing and start processing of the slave control devices according to the minimum number is executed. A method for controlling a redundant system comprising:
13. A method for controlling a redundant system according to any one of claims 9 to 12, comprising the steps of: The controlled equipment is ground equipment equipped with a railway interlocking device. A method for controlling a redundant system comprising:
14. A method for controlling a redundant system according to claim 13, comprising the steps of: The predetermined condition is at least one of a state in which equipment control is not being performed on the ground equipment within a control range that manages the presence of trains on the track, a state in which no trains are approaching within the control range for a predetermined period of time, and a state in which the train operation density is less than a predetermined threshold. A method for controlling a redundant system comprising:
15. A method for controlling a redundant system according to claim 14, comprising the steps of: a control device for the master system and a control device for the slave system are provided in each of the plurality of control ranges; The master control device activates the slave process in a control range different from its own control range. A method for controlling a redundant system comprising:
Citation Information
Patent Citations
Train operation control system
JP2011235682A