Processing device, processing method, and program
The processing device stabilizes coke oven operations by setting bandwidths and operation ranges to manage manipulated variables, addressing sudden fluctuations and reducing operational costs and emissions in coke manufacturing.
Patent Information
- Application Number
- JP2023090977
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-06-01
- Publication Date
- 2024-12-12
AI Technical Summary
Existing control systems face issues with sudden fluctuations in operation amounts due to large prediction errors in process models, leading to hunting and increased costs and emissions during unsteady operations in coke manufacturing processes.
A processing device that sets a bandwidth for allowable error ranges and operation ranges to determine manipulated variables, preventing excessive convergence to target values and stabilizing operations by limiting fluctuations.
This approach suppresses sudden changes in operation amounts, reducing fuel costs, emissions, and equipment wear by maintaining controlled variables within allowable error ranges.
Smart Images

Figure 2024172918000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a processing device, a processing method, and a program. [Background technology]
[0002] A technique for determining a manipulated variable to be applied to a controlled object based on a predicted value and a target value of a controlled variable is described in Patent Document 1. Patent Document 1 discloses that when the predicted value of the controlled variable exceeds an allowable range and the controlled variable does not reach the target value even when the controlled variable of the current controlled object is operated up to its upper limit, a new controlled object is searched for and model predictive control is performed on the new controlled object to search for an optimal controlled variable. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2006-172273 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, in the technology described in Patent Document 1, when searching for the optimal manipulated variable for the searched manipulated variable, the manipulated variable for which the value of an evaluation function that has a higher evaluation as the predicted value of the controlled variable approaches the target value is searched for as the optimal manipulated variable. Therefore, for example, when a prediction error by a prediction model predicting a state change of a process is large, a manipulated variable that fluctuates rapidly to cancel out the large prediction error may be calculated as the optimal manipulated variable. If an operation is performed using such an optimal manipulated variable, there is a risk that the manipulated variable will hunt.
[0005] The present invention has been made in consideration of the above problems, and has an object to suppress a sudden change in a manipulated variable when controlling a controlled object. [Means for solving the problem]
[0006] The processing device of the present invention is a processing device that determines a manipulation amount to be given to a control object based on a predicted value and a target value of a control amount, and is equipped with a bandwidth setting unit that sets a bandwidth which is an allowable error range for the target value of the control amount, an operating range setting unit that sets an operating range which is a range of the manipulation amount within which the predicted value of the control amount falls within the bandwidth, and a manipulation amount determination unit that determines the manipulation amount to be given to the control object from within the operating range.
[0007] The processing method of the present invention is a processing method for determining a manipulated variable to be given to a control object based on a predicted value and a target value of a controlled variable, and includes a bandwidth setting step for setting a bandwidth which is an allowable error range for the target value of the controlled variable, an operating range setting step for setting an operating range which is a range of the manipulated variable within which the predicted value of the controlled variable falls within the bandwidth, and a manipulated variable determination step for determining the manipulated variable to be given to the control object from within the operating range.
[0008] The program of the present invention is characterized by causing a computer to function as each part of the processing device. Effect of the Invention
[0009] According to the present invention, a bandwidth, which is an allowable error range for a target value of a controlled variable, is set for the target value of the controlled variable, an operation range, which is a range of the operated variable for which a predicted value of the controlled variable falls within the set bandwidth, is set, and the operated variable to be applied to the controlled object is determined from within the set operation range. Therefore, when determining the operated variable to be applied to the controlled object, it is possible to allow the controlled variable to deviate from the target value as long as it is within the range of the bandwidth. Therefore, it is possible to prevent the operated variable from being determined so that the controlled variable approaches (or matches) the target value excessively. This makes it possible to prevent the operated variable from fluctuating suddenly. [Brief description of the drawings]
[0010] [Figure 1] FIG. 2 illustrates an example of a functional configuration of a processing device. [Diagram 2] FIG. 1 illustrates an example of a coke production process. [Figure 3A] FIG. 2 is a diagram illustrating an example of furnace temperature. [Figure 3B] FIG. 2 is a diagram showing an example of coke being pushed out of a carbonization chamber. [Figure 4] FIG. 2 is a diagram showing an example of the relationship between coke temperature, furnace temperature, input heat amount, and carbonization time and time. [Diagram 5] FIG. 2 is a diagram showing an example of a central target reactor temperature trajectory. [Figure 6] FIG. 13 is a diagram illustrating an example of a bandwidth. [Figure 7] 11A and 11B are diagrams illustrating an example of an operation range and an operation amount. [Figure 8] FIG. 4 is a diagram illustrating an example of a method for calculating the amount of heat input to a combustion chamber. [Figure 9] 11 is a flowchart illustrating an example of a processing method. [Figure 10] FIG. 11 is a diagram showing the first calculation results (calculation results when k=0) of the change over time in furnace temperature and input heat amount. [Figure 11] FIG. 11 is a diagram showing the second calculation results (calculation results when k=1) of the changes over time in the furnace battery temperature and input heat amount. [Figure 12] FIG. 11 is a diagram showing the third calculation results (calculation results when k=0.8) of the change over time in furnace temperature and input heat amount. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Note that the fact that the length, position, size, interval, and other aspects of a comparison are the same includes not only cases where the comparison is strictly the same, but also cases where the comparison is different within the scope of the invention (for example, cases where the comparison is different within the range of tolerances determined at the time of design).
[0012] 1 is a diagram showing an example of a functional configuration of a processing device 100. The processing device 100 has, as hardware, one or more hardware processors such as a CPU (Central Processing Unit) and one or more memories such as a RAM (Random Access Memory) and a ROM (Read Only Memory), and executes various calculations by executing one or more programs stored in the memory by the one or more hardware processors. Furthermore, the processing device 100 has, as hardware, an input device and an output device.
[0013] The processing device 100 performs processing for determining the manipulated variable for the controlled object based on the predicted value and the target value of the controlled variable. The controlled object is not limited, but in this embodiment, the controlled object is a coke manufacturing process including a coke oven (modified examples of the controlled object will be described later in the section <Modified Examples>).
[0014] First, an example of a coke production process will be outlined with reference to Fig. 2, Fig. 3A, and Fig. 3B. Fig. 2 is a diagram showing an example of a coke production process including a coke oven. Fig. 3A is a diagram explaining an example of a furnace temperature. Fig. 3B is a diagram showing an example of a state in which coke is pushed out of a coke chamber. Figs. 3A and 3B show a see-through view of the inside.
[0015] As shown in Figures 2 and 3A, in a coke oven 1, carbonization chambers (furnaces) 2 and combustion chambers 3 are arranged alternately with a furnace wall 4 between them. The carbonization chambers 2 carbonize the loaded coal to obtain coke. The combustion chambers 3 keep the carbonization chambers 2 at a high temperature by burning fuel gas.
[0016] In the coke production process using the coke oven 1, the so-called block loading method is adopted for the loading work. The loading work is a work of pushing coke out of the coke chamber 2 by a pusher ram 7 as shown in FIG. 3B, and then supplying coal to the coke chamber 2. In the block loading method, all the coke chambers 2 are divided into Da numbers (Da is an integer of 2 or more), and the loading work is carried out in units of the divided numbers. Each coke chamber 2 is assigned to one of the numbers so that multiple coke chambers 2 that are spaced Da apart in the arrangement order of the coke chambers 2 belong to the same number. For example, if Da is 5, the carbonization chambers 2 No. 1, 6, 11, 16, ... are assigned to the first line, the carbonization chambers 2 No. 2, 7, 12, 17, ... are assigned to the second line, the carbonization chambers 2 No. 3, 8, 13, 18, ... are assigned to the third line, the carbonization chambers 2 No. 4, 9, 14, 19, ... are assigned to the fourth line, and the carbonization chambers 2 No. 5, 10, 15, 20, ... are assigned to the fifth line. The carbonization chambers 2 are loaded with coal in the kiln in order starting from the lowest number. For example, the loading work of the coking chamber 2 assigned to the first line is carried out in the order of the coking chamber 2 of the coking chamber No. 1, the coking chamber 2 of the coking chamber No. 6, the coking chamber 2 of the coking chamber No. 11, the coking chamber 2 of the coking chamber No. 16, ... In addition, the loading order is, for example, the order of the first line, the third line, the fifth line, the second line, and the fourth line in order to prevent a sudden drop in temperature. The time from the timing when the loading work of the coking chamber is completed in one line to the timing when the loading work of the coking chamber is completed in the next line is called the running time. The running time is generally about 3 to 6 hours. This embodiment is not limited to the block loading method. For example, if the line (block) is treated as an individual coking chamber 2 in the following description, it can also be applied to the case where the loading work of the coking chamber is performed in units of one coking chamber 2.
[0017] In addition, in the coke oven manufacturing process, a furnace battery control is performed to adjust the input heat amount of all combustion chambers 3 at once and control the average carbonization state of each way. That is, the input heat amount to the coke oven 1 is controlled by operating one adjustment valve 5 installed for all combustion chambers 3. The adjustment valve 5 is a valve for adjusting the flow rate of the mixed gas of fuel gas and combustion air. The adjustment valve 5 is also operated via an actuator (not shown) under the control of the processing device 100. The representative value of the temperature of all combustion chambers 3 is called the furnace battery temperature. For example, as shown in FIG. 3A, a thermometer 6 for measuring the atmospheric temperature of the combustion chamber 3 is installed in a plurality of combustion chambers 3 among all combustion chambers 3, and the average temperature of the combustion chambers 3 in which the thermometer 6 is installed is set as the furnace battery temperature. In this embodiment, a case where the furnace temperature, which is the temperature in the combustion chamber 3 of the coke oven 1, is the furnace battery temperature is illustrated. Note that the method of this embodiment is not limited to the case where the input heat amount of all combustion chambers 3 is adjusted at once. For example, when carrying out the coal loading work for each carbonization chamber 2, a control valve and an actuator may be provided in each combustion chamber 3, and the carbonization state (amount of heat input) may be controlled for each carbonization chamber 2.
[0018] In the coke production process, there is a long time delay until the input heat amount is reflected in the furnace temperature. For this reason, it is preferable to perform model predictive control for optimizing the input heat amount while predicting future process state changes using a predictive model, as the combustion control in the combustion chamber 3. Therefore, in this embodiment, a case is illustrated in which the treatment device 100 determines the input heat amount as the manipulated variable by performing model predictive control.
[0019] Here, during steady operation of the coke oven 1, the coal loading work (coal loading work and pushing work) is repeated at an almost constant cycle. On the other hand, when the coal loading work is temporarily suspended due to equipment maintenance or the like, non-steady operation is performed. In the coke oven 1, combustion control is performed even during non-steady operation. Non-steady operation is not performed frequently. Therefore, it is not easy to obtain long-term actual data for learning the prediction model. Therefore, when performing model predictive control, the prediction error by the prediction model is likely to be large. If a prediction model with a large prediction error is used in this way, there is a risk that a rapidly fluctuating input heat amount is calculated to counteract the large prediction error. If the input heat amount calculated in this way is used as the operation amount for the combustion chamber 3, there is a risk that the input heat amount will hunt. If the input heat amount hunts, there is a risk that the fuel cost will increase due to a sudden fluctuation in the flow rate of the fuel gas and the amount of CO2 gas emissions will increase. In addition, the temperature of the furnace wall 4 changes rapidly due to the hunting of the input heat amount, which may accelerate the deterioration of the refractory material constituting the furnace wall 4. In addition, the amount of NOx (nitrides and oxides) gas emitted may increase due to the high-temperature combustion of the combustion air. In addition, the balance of the flow rates of the fuel gas and the combustion air may become unstable, which may increase the amount of black smoke emitted due to incomplete combustion.
[0020] In this embodiment, in order to solve these problems, a case where the treatment device 100 determines the input heat amount during non-steady operation as the manipulated variable is illustrated. Hereinafter, an example of non-steady operation in the coke oven 1 will be described. As described above, in steady operation, the kiln loading work is repeatedly performed at an approximately constant cycle corresponding to the run time. In contrast, in non-steady operation, the kiln loading work is temporarily suspended due to equipment maintenance, etc. During non-steady operation, for example, the furnace battery temperature is temporarily lowered to perform equipment maintenance, etc., and then the furnace battery temperature is raised. Non-steady operation is an operation during a period including a period during which the kiln loading work is temporarily suspended and a period during which at least one kiln loading work (loading and pushing) is performed following the period. In this embodiment, non-steady operation is an operation during a period including a period during which the kiln loading work is temporarily suspended and a period during which at least one run of the kiln loading work is performed following the period.
[0021] In addition, in this embodiment, the start and end of the non-steady operation are the end of the kiln loading work (coke extrusion (unloading) work). The end of the coke extrusion work is the timing after the timing when all the coke in the coke chamber 2 is pushed (discharged) from the coke chamber 2. The end of the coke extrusion work may be, for example, the timing when all the coke is discharged from the coke chamber 2, the timing when the door of the coke chamber 2 is closed thereafter, the timing when the temperature of the coke discharged from the coke chamber 2 is measured, or the timing when the coke pushed out from the coke chamber 2 starts to be transported to the downstream process. In addition, it may be the timing when the coke extrusion work is said to end in the operation manual of the coke plant. In the following description, the period during which the kiln loading work is temporarily suspended is also referred to as the suspension period. In addition, when an operation abnormality occurs, the start of the non-steady operation may be the timing when the operation abnormality is detected.
[0022] FIG. 4 is a diagram showing an example of the relationship between the coke temperature, the furnace temperature, the input heat amount, and the carbonization time and time. The coke temperature is the temperature of the coke discharged from the coke chamber 2, and is calculated, for example, from the value measured by the thermometer 8 shown in FIG. 3B. When the coke is pushed out of the coke chamber 2 by the pusher ram 7, the temperature of the coke sequentially discharged from the coke chamber 2 is measured by the thermometer 8, and the representative value of the temperature measured at each time and each position is taken as the temperature of the coke produced in the coke chamber 2. Examples of the representative value include the arithmetic mean value (the sum of the temperatures measured at each time and each position divided by the number of temperature measurements), the median, the mode, and the minimum value. The representative value of the temperatures of the coke produced in the coke chambers 2 belonging to one set is taken as the coke temperature.
[0023] The carbonization time is equal to the time required to carry out each of the five Da (=5) coal loading operations. As described above, in this embodiment, the case where the coke temperature and the carbonization time are expressed by the representative values for each run is exemplified. Therefore, the coke temperature and the carbonization time are obtained when the unloading coal loading work for one run is performed. In other words, the coke temperature and the carbonization time are obtained in a cycle of the run time. In the graphs of the coke temperature and the carbonization time shown in FIG. 4 (the top graph and the bottom graph), the distance on the time axis between two plots (●) adjacent to each other in the time axis direction is equal to the run time t t In Figure 4, at time t e As shown in time t t (t e ) is shown as an example. Note that the pass time t t is generally a constant time, but may vary.
[0024] When Da=5, the carbonization time is equal to the time required to perform each of the Da (=5) coal loading operations. Therefore, in the graph of coke temperature and carbonization time shown in Figure 4, the distance on the time axis between the two ends of the six plots (●) adjacent to each other on the time axis is the carbonization time. In Figure 4, e Drying time t k (t e ) is shown below.
[0025] In addition, since no coal loading operation is performed during the shutdown period, the coke temperature and carbonization time cannot be obtained (see Figure 4, where there is no plot (●) on the graph of coke temperature and carbonization time during the shutdown period).
[0026] On the other hand, the oven battery temperature and input heat amount are obtained regardless of the coal loading work (see FIG. 4, where plots (●) are added to the graph of the oven battery temperature and input heat amount even during the idle period). In this embodiment, a case is exemplified in which predicted and actual values of the oven battery temperature and input heat amount are obtained in the control period of the coke oven 1 (the output period of the control signal in the operation amount determination unit 150), predicted and actual values of the coke temperature are obtained in the pass time period, and scheduled and actual values of the carbonization time are obtained in the pass time period. Also, in this embodiment, a case is exemplified in which the control period of the coke oven 1 is 1 hour (hr). However, the control period of the coke oven 1 is not limited to 1 hour, and may be longer or shorter than 1 hour.
[0027] In FIG. 4, at time t s is an example of the start time of non-stationary operation, and time t e is an example of the end time of a non-steady operation. Specifically, in this embodiment, the end time of the coke extrusion work Db times (Db is an integer of 1 or more) before the start of the suspension of the coke loading work (charging and extrusion into the coke chamber 2) is set as the start time t s For example, when Db is 2, in FIG. 4, the end time of the coke pushing operation in the second run before the start of the suspension period (the time of the second plot of the coke temperature counting backward from the start time of the suspension period) is the start time t sIn the case where the downtime is known in advance, such as when equipment maintenance is performed, Db may be 1 or an integer of 2 or more. On the other hand, in the case where the downtime is not known in advance, such as when an operational abnormality occurs, Db is preferably 1. In FIG. 4, for convenience of notation, some plots overlap with the downtime in the graph of the coke temperature and carbonization time, but the plots are obtained by the coal loading work on a course basis just before and just after the downtime.
[0028] In this embodiment, the end time of the coke extrusion work in the Da+1th pass after the suspension of the coal loading work (charging and extrusion into the coke chamber 2) is the end time of the non-steady operation t e Here, the start of coke extrusion work in a street refers to the start of coke extrusion work in the coke chamber 2 in which the coke extrusion work is performed first among the coke chambers 2 belonging to that street, and the end of coke extrusion work in a street refers to the end of coke extrusion work in the coke chamber 2 in which the coke extrusion work is performed last among the coke chambers 2 belonging to that street. When Da is 5, in FIG. 4, the end time of the coke extrusion work in the sixth street after the end of the suspension period (the time of the sixth coke temperature plot counting forward from the end time of the suspension period) is the end time t e After the rest period ends, in the first through Da (fifth) passes, coke is produced from the coal present in the coke chamber 2 during the rest period.
[0029] On the other hand, in the Da+1th (sixth) case after the end of the halt period, coal is charged into the coke chamber 2 after the halt period ends. It is preferable that the carbonization state of the coke charged into the coke chamber 2 after the halt period ends approaches the carbonization state in the steady state as quickly as possible. Therefore, in this embodiment, the end time of the coke pushing operation in the Da+1th (sixth) case after the end of the halt of the kiln unloading coal loading operation (charging and pushing into the coke chamber 2) is set to the end time t eIn other words, the end time of the non-stationary operation is t e is the end time of the coke extrusion work in the street where the first loading work is performed after the end of the suspension period. However, the end time of the non-steady operation is not limited to the end time of the coke extrusion work in the Da+1-th street after the end of the suspension of the loading work (loading coal into the coke chamber 2 and extrusion). For example, the end time of the coke extrusion work in the Da+x-th street after the end of the suspension of the loading work (loading coal into the coke chamber 2 and extrusion) may be set as the end time of the non-steady operation, and the value of x may be selected from integers equal to or greater than 1. The values of x and Db may be appropriately adjusted so that coke of the desired quality is obtained as a result of actually executing the control of the input heat amount according to the deviation of the actual value of the oven temperature from the target oven temperature trajectory, as described later. As described above, the period of non-steady operation (non-steady operation) is at time t s ~t e This will be a period.
[0030] [Configuration of each part of the processing device 100] In this embodiment, the controlled object is a coke manufacturing process including the coke oven 1 as described above, the operation amount is the input heat amount, and the controlled amount is the oven battery temperature. The processing device 100 determines the input heat amount based on the predicted value and the target value of the oven battery temperature. As described above, in this embodiment, the processing device 100 determines the input heat amount based on the predicted value and the target value of the oven battery temperature. s ~t e Here, the case where the input heat amount during the period (period of time) is determined as the manipulated variable is illustrated. However, the processing apparatus 100 may determine the input heat amount during steady operation as the manipulated variable in addition to or instead of the non-steady operation.
[0031] In FIG. 1, the processing device 100 includes a data acquiring unit 110 , a target trajectory acquiring unit 120 , a bandwidth setting unit 130 , an operation range setting unit 140 , an operation amount determining unit 150 , and a control unit 160 .
[0032] <Data Acquisition Unit 110> The data acquisition unit 110 acquires various data used in the processing device 100. The data acquired by the data acquisition unit 110 includes past and present performance values of operations, future operation schedule values, operation target values, and various setting values used for calculations in the processing device 100. Examples of data acquisition modes include at least one of an operator's operation on an input device, reception from an external device, and reading from a portable storage medium. Each piece of data is input to the processing device 100 at any timing and acquired by the data acquisition unit 110. Therefore, each piece of data does not necessarily need to be input to the processing device 100 and acquired by the data acquisition unit 110 at the same timing.
[0033] <Target trajectory acquisition unit 120> The target trajectory acquisition unit 120 acquires a target trajectory, which is a time change of the target value of the controlled variable. The form in which the target trajectory acquisition unit 120 acquires the target trajectory is not limited. For example, when a target trajectory is included in an operation schedule during non-steady operation, the target trajectory acquisition unit 120 may acquire the target trajectory. For example, the target trajectory acquisition unit 120 may acquire data indicating the target trajectory by receiving data indicating the target trajectory transmitted from a host computer that manages the operation of the coke production process, or may acquire the target value of the controlled variable at each time input to the processing device 100 by an operator operating the processing device 100 as data indicating the target trajectory. In this case, the target trajectory acquisition unit 120 may have a function of acquiring data indicating the target trajectory among the functions of the data acquisition unit 110. However, in this embodiment, in order to acquire a highly accurate target trajectory as a target trajectory during non-steady operation, a case in which the target trajectory acquisition unit 120 calculates the target trajectory using a method similar to that of JP 2023-39669 A is illustrated. In this way, the target trajectory acquisition unit 120 of this embodiment can be realized by the technology described in Japanese Patent Application Laid-Open No. 2023-39669. Therefore, in the following, an example of each unit of the target trajectory acquisition unit 120 will be outlined, and detailed description thereof will be omitted.
[0034] As described above, in this embodiment, the processing apparatus 100 determines the input heat amount during non-steady operation as the manipulated variable. Therefore, in this embodiment, the target trajectory acquisition unit 120 acquires the target furnace temperature trajectory Tr_ref(t), which is the time change of the target furnace temperature during non-steady operation, as an example (note that t represents time). In this embodiment, the target trajectory acquisition unit 120 has a predicted value calculation unit 121 and a target trajectory determination unit 122. Alternatively, the predicted value calculation unit 121 has an manipulated variable prediction unit 121a and a state prediction unit 121b.
[0035] The state prediction unit 121b calculates at least a predicted value of the furnace battery temperature Tr(t+1) for each hour from time t to t+m based on the predicted value of the input heat amount Qin(t+1) output from the operation amount prediction unit 121a and a multiple regression equation (linear time series model) including variables expressed using the input heat amount as explanatory variables and variables expressed using the furnace battery temperature as objective variables. m is a positive integer of 2 or more, and is appropriately set depending on how far ahead of time t the prediction error of the furnace battery temperature is to be calculated. m is, for example, a time corresponding to the time lag until the input heat amount is reflected in the furnace battery temperature (the time lag until the operation amount is reflected in the control amount).
[0036] The operation amount prediction unit 121a performs a calculation to update the predicted value of the input heat amount Qin(t+1) during non-steady operation using the prediction error Tr_err of the furnace battery temperature at time t+m and output it to the state prediction unit 121b, repeatedly until the prediction error Tr_err of the furnace battery temperature at time t+m becomes equal to or smaller than a predetermined value. The prediction error Tr_err of the furnace battery temperature is expressed as the difference (Tr_err=Tr_ref(t+m)-Tr(t+m)) between the candidate of the target furnace temperature trajectory Tr_ref(t+m) output from the target trajectory determination unit 122 and the predicted value of the furnace battery temperature Tr(t+m) calculated by the state prediction unit 121b. The predicted value of the input heat amount Qin(t+1) after the update is expressed as, for example, the value obtained by adding the predicted value of the input heat amount Qin(t+1) before the update to the product of the prediction error Tr_err of the furnace battery temperature and a predetermined gain. As described in JP 2023-39669 A, the operation amount prediction unit 121a may calculate a predicted value of the input heat amount, for example, by using a control simulator that performs computer simulation of PID control.
[0037] When the prediction error Tr_err of the furnace temperature at time t+m is equal to or less than a predetermined value, the operation amount prediction unit 121a determines the predicted value of the input heat quantity Qin(t+1) at time t+1 updated using the prediction error Tr_err of the furnace temperature at time t+m as the predicted value of the input heat quantity Qin(t+1) at time t+1. The state prediction unit 121b calculates the predicted value of the furnace temperature Tr(t+1) at time t+1 using the predicted value of the input heat quantity Qin(t+1) at time t+1, and determines the calculated predicted value as the predicted value of the furnace temperature Tr(t+1) at time t+1.
[0038] The predicted value calculation unit 121 (the operation amount prediction unit 121a and the state prediction unit 121b) calculates the time t as the time t s +1 to time t e The predicted value of the input heat amount Qin(t+1) and the predicted value of the furnace temperature Tr(t+1) are calculated in the manner described above by shifting the time t s +1 to time t eThe predicted values of the input heat amount Qin(t+1) and the furnace temperature Tr(t+1) are calculated for each hour up to the end of the non-steady operation t e Furnace temperature Tr(t e ), the state prediction unit 121b calculates the predicted value of the furnace battery temperature Tr(t) and the end time t e Coke temperature Tc(t e ) is calculated.
[0039] The target trajectory determination unit 122 determines the candidate for the target furnace temperature trajectory Tr_ref(t) output to the predicted value calculation unit 121, and the predicted value of the input heat amount Qin(t), the predicted value of the furnace battery temperature Tr(t), and the predicted value of the coke temperature Tc(t) calculated (confirmed) by the predicted value calculation unit 121 for the candidate for the target furnace temperature trajectory Tr_ref(t). e ) and the target reactor temperature trajectory Tr_ref(t) is determined by solving an optimization problem such as a combinatorial optimization problem (more specifically, a metaheuristic method such as a genetic algorithm) based on the predicted value of
[0040] The evaluation function (fitness function) when solving the combinatorial optimization problem for determining the target furnace temperature trajectory Tr_ref(t) is, for example, an evaluation index for evaluating the difference between the candidate target furnace temperature trajectory Tr_ref(t) and the predicted value of the furnace battery temperature Tr(t), and the coke temperature Tc(t e ) and a target value, and an evaluation index for evaluating the total amount of input heat Qin(t). Note that, as long as the evaluation function includes an evaluation index for evaluating the difference between a candidate for the target reactor temperature trajectory Tr_ref(t) and the predicted value of the furnace battery temperature Tr(t), it may or may not include other evaluation indexes.
[0041] The prediction value calculation unit 121 uses the candidates for the target furnace temperature trajectory Tr_ref(t) to calculate the prediction value of the input heat amount Qin(t), the prediction value of the furnace battery temperature Tr(t), and the coke temperature Tc(t e ) is calculated (determined).
[0042] The target trajectory determination unit 122 determines whether or not a convergence condition is satisfied based on the calculation result of the value of the evaluation function for each candidate solution included in the group of candidate solutions of the target reactor temperature trajectory Tr_ref(t).
[0043] If the convergence condition is not satisfied, the target orbit determination unit 122 regenerates and updates the candidate solution group of the target reactor temperature trajectory Tr_ref(t), and outputs the updated candidate solution group to the predicted value calculation unit 121. Then, the target orbit determination unit 122 repeatedly executes the calculation of the value of the evaluation function, the determination of whether the convergence condition is satisfied, and the regeneration and output of the candidate solution group of the target reactor temperature trajectory Tr_ref(t) as described above, until the convergence condition is satisfied.
[0044] The target trajectory determination unit 122 determines the target reactor temperature trajectory Tr_ref(t) determined by the design variables when the value of the evaluation function becomes the optimal value (minimum or maximum value) among the values of the evaluation function for multiple candidates for the target reactor temperature trajectory Tr_ref calculated when the convergence conditions are satisfied, as the optimal solution of the target reactor temperature trajectory Tr_ref(t).
[0045] In the following description, the target reactor temperature trajectory Tr_ref(t) determined as the optimal solution by the target trajectory determination unit 122 is referred to as the central target reactor temperature trajectory Tr_ref_mid(t) as necessary. FIG. 5 is a diagram showing an example of the central target reactor temperature trajectory Tr_ref_mid(t). Here, the current time is t c Let the current time t c is the time when the input heat amount is determined by the operation amount determination unit 150 described later. As described above, in this embodiment, the control period of the coke oven 1 is 1 hour (hr) as an example. Therefore, in this embodiment, when the input heat amount is controlled every hour (i.e., at the current time t c In this example, the current time t c The input heat amount determined at the current time t c Time t one hour later c It is injected (operated) into the combustion chamber 3 by +1. Note that in Fig. 5, the black circle plots (●) indicate actual values.
[0046] <Bandwidth setting unit 130> The bandwidth setting unit 130 sets a bandwidth that is an allowable error range for the target value of the controlled variable. In this embodiment, the case where the bandwidth setting unit 130 sets a bandwidth that is an allowable error range for the central target furnace temperature trajectory Tr_ref_mid(t) is illustrated. If the bandwidth is too small, the manipulated variable is likely to hunt. On the other hand, if the bandwidth is too large, the controlled variable is likely to deviate from the target value. Therefore, the allowable error range is set, for example, so that the error for the target value of the controlled variable is within an allowable error in the controlled object (control process), and the hunting of the manipulated variable is within an allowable error in the controlled object (control process). For example, the fact that an object or state obtained as a result of control (for example, the temperature of coke in this embodiment) is within an allowable range in the controlled object is a necessary condition for the furnace temperature to be within an allowable error range for the central target furnace temperature trajectory Tr_ref_mid(t). Even if the object or state obtained as a result of this control (for example, the temperature of the coke in this embodiment) is within the range allowed for the controlled object, if the fuel cost and the impact on the external environment are not within the range allowed for the controlled object, it is difficult to say that the furnace temperature is appropriate. Therefore, for example, the bandwidth is set so that both the error of the controlled variable from the target value is within the error allowed for the controlled object (control process) and the hunting of the manipulated variable is within the error allowed for the controlled object (control process) are satisfied as much as possible.
[0047] FIG. 6 is a diagram showing an example of the bandwidth BW. In the following description, the value of the central target reactor temperature trajectory Tr_ref_mid(t) at each time t is referred to as the central target reactor temperature as necessary. In the following description, the time change of the upper limit of the bandwidth BW set for the central target reactor temperature trajectory Tr_ref_mid(t) is referred to as the upper limit target reactor temperature trajectory as necessary, and the value of the upper limit target reactor temperature trajectory at each time t is referred to as the upper limit target reactor temperature as necessary. In the following description, the time change of the lower limit of the bandwidth BW set for the central target reactor temperature trajectory is referred to as the lower limit target reactor temperature trajectory as necessary, and the value of the lower limit target reactor temperature trajectory at each time t is referred to as the lower limit target reactor temperature as necessary.
[0048] In this embodiment, the bandwidth BW for the central target reactor temperature trajectory Tr_ref_mid(t) is set by storing the upper limit target reactor temperature trajectory Tr_ref_max(t) and the lower limit target reactor temperature trajectory Tr_ref_min(t) in a storage device (storage medium). The storage device may be a non-volatile storage device or a volatile storage device.
[0049] In this embodiment, the case where the bandwidth BW does not change with time t is illustrated as an example, as shown in Fig. 6. However, the bandwidth BW may be changed as time t elapses.
[0050] In addition, as shown in FIG. 6, in this embodiment, the width of the allowable error range of the part larger than the central target reactor temperature trajectory Tr_ref_mid(t) and the width of the allowable error range of the part smaller than the central target reactor temperature trajectory Tr_ref_mid(t) are the same. That is, in this embodiment, the width of the allowable error range is 1 / 2 of the bandwidth BW. However, the width of the allowable error range of the part larger than the central target reactor temperature trajectory Tr_ref_mid(t) and the width of the allowable error range of the part smaller than the central target reactor temperature trajectory Tr_ref_mid(t) do not have to be the same. For example, the difference between the width of the allowable error range of the part larger than the central target reactor temperature trajectory Tr_ref_mid(t) and the width of the allowable error range of the part smaller than the central target reactor temperature trajectory Tr_ref_mid(t) may be different depending on the time change (amount of change per unit time) of the central target reactor temperature trajectory Tr_ref_mid(t). The width of the allowable error range of the portion larger than the central target reactor temperature trajectory Tr_ref_mid(t) is expressed, for example, by the absolute value of the difference between the central target reactor temperature trajectory Tr_ref_mid(t) and the upper limit target reactor temperature trajectory Tr_ref_max(t). The width of the allowable error range of the portion smaller than the central target reactor temperature trajectory Tr_ref_mid(t) is expressed, for example, by the absolute value of the difference between the central target reactor temperature trajectory Tr_ref_mid(t) and the lower limit target reactor temperature trajectory Tr_ref_min(t).
[0051] In addition, this embodiment illustrates an example in which the bandwidth setting unit 130 sets the bandwidth BW in advance offline. In this case, the bandwidth BW may be determined based on, for example, at least one of the time delay until the input heat amount is reflected in the furnace battery temperature and the accuracy of the prediction error of the prediction model that calculates the predicted value of the furnace battery temperature, which is the controlled variable. For example, the greater the time delay until the input heat amount is reflected in the furnace battery temperature, the larger the bandwidth BW may be. Note that the time delay until the input heat amount is reflected in the furnace battery temperature may be any time information that represents the degree of the time delay, and may be expressed, for example, by a time constant, a delay time, a settling time, a peak time, or any other time (for example, the time when the furnace battery temperature is Tr_ref_mid(t c+1) and the time it takes for the furnace temperature to reach Tr(t c )+(Tr_ref_mid(t c +1)-Tr(t c )) × 0.1, Tr(t c )+(Tr_ref_mid(t c +1)-Tr(t c )) × 0.9) In addition, the lower the accuracy of the prediction error of the prediction model that calculates the predicted value of the furnace battery temperature, the larger the bandwidth BW may be.
[0052] Further, in this embodiment, a case is illustrated in which data for identifying the bandwidth BW is acquired by the data acquiring unit 110. The data for identifying the bandwidth BW includes, for example, values at each time of an allowable error range of a portion larger than the central target reactor temperature trajectory Tr_ref_mid(t) and an allowable error range of a portion smaller than the central target reactor temperature trajectory Tr_ref_mid(t).
[0053] The bandwidth setting unit 130 may also change the bandwidth BW based on the data acquired by the data acquiring unit 110. For example, the bandwidth setting unit 130 may change the bandwidth BW based on the time change (amount of change per unit time) of the central target furnace temperature trajectory Tr_ref_mid(t). The bandwidth setting unit 130 may also change the bandwidth BW online based on at least one of the time change (amount of change per unit time) of the actual value of the input heat quantity Qin(t), the time change (amount of change per unit time) of the actual value of the furnace battery temperature Tr(t), and the actual value of the coke temperature Tc(t).
[0054] Furthermore, the bandwidth setting unit 130 may set the bandwidth BW online, rather than offline. For example, the bandwidth setting unit 130 may set the bandwidth BW for each control period. In this case, the bandwidth setting unit 130 may set the bandwidth BW online, for example, based on at least one of the time change (amount of change per unit time) of the actual value of the input heat quantity Qin(t), the time change (amount of change per unit time) of the actual value of the furnace temperature Tr(t), and the actual value of the coke temperature Tc(t).
[0055] As described above, the bandwidth setting unit 130 may set the bandwidth BW based on at least one of the time response of the furnace battery temperature Tr(t) to the input heat amount Qin(t), the prediction accuracy of the furnace battery temperature Tr(t), the central target furnace temperature trajectory Tr_ref_mid(t), and the operation record of the coke oven 1. In this case, the bandwidth BW is set so that the error of the furnace battery temperature Tr(t) from the target value is within the error allowed for ensuring the quality of the coke, and the time fluctuation of the input heat amount Qin(t) is within the range allowed from the viewpoint of the fuel cost and the impact on the external environment. The time response of the furnace battery temperature Tr(t) to the input heat amount Qin(t) includes at least one piece of information indicating the behavior (time change) of the furnace battery temperature Tr(t) when the input heat amount Qin(t) changes. In this embodiment, a case is illustrated in which the time delay until the input heat amount is reflected in the furnace battery temperature is included in the time response of the furnace battery temperature Tr(t) to the input heat amount Qin(t). However, this is not necessarily required. For example, the time response of the furnace battery temperature Tr(t) to the input heat quantity Qin(t) may include information other than time information (for example, the rate of change of the furnace battery temperature (slope of the time response) or the maximum overshoot) in addition to or instead of the time information such as the time constant and delay time described above.
[0056] <Operation range setting section 140> The operation range setting unit 140 sets a range of the operation amount so that the predicted value of the control amount falls within the bandwidth BW set by the bandwidth setting unit 130. In the following description, the range of the operation amount so that the predicted value of the control amount falls within the bandwidth BW set by the bandwidth setting unit 130 is referred to as the operation range as necessary. If a predicted value of the operation amount when the predicted value of the control amount becomes a value corresponding to the upper limit value and the lower limit value of the bandwidth is calculated, the upper limit value and the lower limit value of the operation range can be determined using the predicted value of the operation amount. Therefore, in this embodiment, a case will be illustrated where the operation range setting unit 140 calculates a predicted value of the operation amount when the predicted value of the control amount becomes a value corresponding to the upper limit value and the lower limit value of the bandwidth.
[0057] Here, the fact that the predicted value of the control quantity corresponds to the upper and lower limits of the bandwidth means that in addition to the predicted value of the control quantity matching the upper and lower limits of the bandwidth, it also includes satisfying specified conditions under which the predicted value of the control quantity can be regarded as the upper and lower limits of the bandwidth, such as the value of an evaluation index evaluating the difference between the predicted value of the control quantity and the upper and lower limits of the bandwidth satisfying specified conditions, or the absolute value of the difference between the predicted value of the control quantity and the upper and lower limits of the bandwidth being less than or equal to a specified value exceeding 0 (zero).
[0058] In this embodiment, the case where the predicted value of the controlled variable corresponds to the upper limit and lower limit of the bandwidth is exemplified when the value of the evaluation index evaluating the difference between the predicted value of the controlled variable and the upper limit and lower limit of the bandwidth satisfies a predetermined condition. Specifically, the operation range setting unit 140 performs model predictive control using a prediction model that calculates a predicted value of the controlled variable and a first evaluation function that evaluates at least the difference between the predicted value of the controlled variable and the upper limit of the bandwidth, thereby calculating the value of the controlled variable when the value of the first evaluation function becomes an optimal value as the predicted value of the controlled variable when the predicted value of the controlled variable becomes a value corresponding to the upper limit of the bandwidth. In addition, the operation range setting unit 140 performs model predictive control using a prediction model that calculates a predicted value of the controlled variable and a second evaluation function that evaluates at least the difference between the predicted value of the controlled variable and the lower limit of the bandwidth, thereby calculating the value of the controlled variable when the value of the second evaluation function becomes an optimal value as the predicted value of the controlled variable when the predicted value of the controlled variable becomes a value corresponding to the lower limit of the bandwidth. In addition, in an evaluation function including an evaluation index in which a smaller value indicates a higher evaluation, the optimal value is the minimum value, and in an evaluation function including an evaluation index in which a larger value indicates a higher evaluation, the optimal value is the maximum value.
[0059] A specific example of the functions of the operation range setting unit 140 of this embodiment will be described below. In this embodiment, the controlled variable is the furnace temperature, and the controlled variable is the furnace temperature at time t c +m central target reactor temperature Tr_ref_mid(t c +m)(time t c +m) is the target value of the controlled variable, and the manipulated variable is the target value of the controlled variable at time t c Input heat Qin(t c +1) will be illustrated. Therefore, in this embodiment, the operation range is from time t c Input heat Qin(t c +1) is within the acceptable range.
[0060] Therefore, in this embodiment, the operation range setting unit 140 sets the time t c +m furnace temperature Tr(t c +m) at time t c+m upper limit target furnace temperature Tr_ref_max(t c +m) at time t c Input heat amount Qin_max(t c +1) and time t c +m furnace temperature Tr(t c +m) at time t c +m lower limit target furnace temperature Tr_ref_min(t c +m) at time t c Input heat amount Qin_min(t c +1) is calculated as an example.
[0061] In the following explanation, time t c +m furnace temperature Tr(t c +m) at time t c +m upper limit target furnace temperature Tr_ref_max(t c +m) at time t c Input heat amount Qin_max(t c +1) and, if necessary, the upper limit of heat input Qin_max(t c +1). Also, at time t c +m furnace temperature Tr(t c +m) at time t c +m lower limit target furnace temperature Tr_ref_min(t c +m) at time t c The input heat quantity Qin_min(t+1) at +1 is set to the lower limit heat quantity Qin_min(t c +1).
[0062] In this embodiment, the operation range setting unit 140 performs model predictive control using a prediction model that predicts the furnace battery temperature Tr(t) using the input heat amount Qin(t), thereby setting the upper limit input heat amount Qin_max(t c +1) and the lower limit of input heat Qin_min(t c In this embodiment, the operation range setting unit 140 calculates the optimal solution for the upper limit heat input Qin_max(tc +1) and the lower limit of input heat Qin_min(t c +1) is calculated by solving an optimization problem such as a combinatorial optimization problem.
[0063] Therefore, the operation range setting unit 140 sets the upper limit of the input heat amount Qin_max(t c +1) using the candidate solution, the furnace temperature Tr(t c +m), and the predicted value and the upper limit target furnace temperature Tr_ref_max(t c The calculation of the value of the first evaluation function that evaluates at least the difference with the upper limit heat input Qin_max(t c +1) and repeat the process to find the upper limit of heat input Qin_max(t c +1) as the optimal solution. Similarly, the operation range setting unit 140 searches for the candidate solution of the lower limit heat input Qin_min(t c +1) using the candidate solution, the furnace temperature Tr(t c +m), and the calculated predicted value and the lower limit target furnace temperature Tr_ref_in(t c The calculation of the value of the second evaluation function that evaluates at least the difference with the lower limit input heat amount Qin_in(t c +1) and repeat the process to find the lower limit of the input heat Qin_min(t c +1) is searched for as the optimal solution. As mentioned above, in an evaluation function including an evaluation index in which a smaller value indicates a higher evaluation, the optimal value is the minimum value, and in an evaluation function including an evaluation index in which a larger value indicates a higher evaluation, the optimal value is the maximum value.
[0064] Fig. 7 is a diagram for explaining an example of the operation range and the operation amount. An example of the operation amount will be explained in the section <Operation amount determination unit 150>. In Fig. 7, the black circle plot (●) indicates an actual value, and the white circle plot (◯) indicates a predicted value.
[0065] The upper limit of input heat Qin_max(t c +1), the value of the first evaluation function becomes the optimal value, and as shown in Figure 7(a), at time t c +m furnace temperature Tr(t c +m) at time t c In this case, the operation range setting unit 140 determines whether the upper limit of the input heat amount Qin_max(t c +1) is the optimal solution. Similarly, the lower limit heat input Qin_min(t c +1), the value of the second evaluation function becomes the optimal value, and as shown in Figure 7(a), at time t c +m furnace temperature Tr(t c +m) at time t c In this case, the operation range setting unit 140 determines whether the lower limit input heat amount Qin_min(t c +1) is the optimal solution.
[0066] The operation range setting unit 140 determines the upper limit of the input heat amount Qin_max(t c +1) and the minimum input heat Qin_min(t c +1), the optimal solution is calculated as the upper limit of heat input Qin_max(t c +1) is set as the upper limit of the operation range OR, and the lower limit of the input heat quantity Qin_min(t c +1) is set as the lower limit of the operational range OR. In this embodiment, the operational range OR is set by storing the upper and lower limits of the operational range OR in a storage device (storage medium). The storage device may be a non-volatile storage device or a volatile storage device.
[0067] The following describes in detail an example of functions of the operational range setting unit 140. As shown in Fig. 1, in this embodiment, the operational range setting unit 140 has an upper limit operation amount determination unit 141a, an upper limit control amount prediction unit 142a, a lower limit operation amount determination unit 141b, and a lower limit control amount prediction unit 142b.
[0068] The upper limit operation amount determination unit 141a determines an operation amount corresponding to the upper limit of the bandwidth BW (bandwidth upper limit). The upper limit control amount prediction unit 142a calculates a predicted value of a control amount when an operation is performed with an operation amount corresponding to the upper limit of the bandwidth BW. For example, the upper limit operation amount determination unit 141a outputs a candidate operation amount corresponding to the upper limit of the bandwidth BW (bandwidth upper limit) to the upper limit control amount prediction unit 142a. The upper limit control amount prediction unit 142a calculates a predicted value of a control amount when an operation is performed with the candidate operation amount output from the upper limit operation amount determination unit 141a, and outputs the calculated value to the upper limit operation amount determination unit 141a. The upper limit operation amount determination unit 141a determines an operation amount corresponding to the upper limit of the bandwidth BW based on the predicted value of the control amount output from the upper limit control amount prediction unit 142a. In this embodiment, the upper limit operation amount determination unit 141a and the upper limit control amount prediction unit 142a calculate an upper limit heat input Qin_max(t c +1) is calculated as an example. c The first evaluation function J1 used when calculating the optimal solution of (1)+1) is, for example, equation (1) shown in the paragraph two after.
[0069] The lower limit operation amount determiner 141b determines an operation amount corresponding to the lower limit value of the bandwidth BW (bandwidth lower limit value). The lower limit control amount predictor 142b calculates a predicted value of a control amount when an operation is performed with an operation amount corresponding to the lower limit value of the bandwidth BW. For example, the lower limit operation amount determiner 141b outputs a candidate operation amount corresponding to the lower limit value of the bandwidth BW (bandwidth lower limit value) to the lower limit operation amount determiner 141b. The lower limit control amount predictor 142b calculates a predicted value of a control amount when an operation is performed with the candidate operation amount output from the lower limit operation amount determiner 141b, and outputs the predicted value to the lower limit operation amount determiner 141b. The lower limit operation amount determiner 141b determines an operation amount corresponding to the lower limit value of the bandwidth BW based on the predicted value of the control amount output from the lower limit control amount predictor 142b. In this embodiment, the lower limit operation amount determination unit 141b and the lower limit control amount prediction unit 142b calculate the lower limit input heat amount Qin_min(t c +1) is calculated as an example. c The second evaluation function J2 used when calculating the optimal solution of (1+1) is, for example, the following formula (2).
[0070]
number
[0071] The first term on the right side of equation (1) is the time t c +m upper limit target furnace temperature Tr_ref_max(t c +m) and time t c +m furnace temperature Tr(t c +m) and the difference between the predicted value of , and the smaller the value, the higher the evaluation. The second term on the right side of equation (1) is the upper limit of the heat input Qin_max(t c +1), where a smaller value indicates a higher evaluation.
[0072] w1 and w2 are set according to the degree of importance given to each evaluation index (evaluation item), and are weighting coefficients that represent the balance of evaluation between the evaluation indexes (note that weighting coefficients are also called cost coefficients, etc.). In this embodiment, weighting coefficients w1 and w2 are positive values. In this case, the weighting coefficient for the important evaluation index is set to a relatively large value. Also, in the example shown in formula (1), the smaller the value of each term on the right side, the higher the evaluation by each evaluation index. Therefore, the closer the value of the first evaluation function J1 is to 0, the more preferable it is.
[0073] It should be noted that the first evaluation function J1 is not limited to that shown in equation (1). For example, at time t c +m, but also time t c The difference between the upper limit target furnace temperature Tr_ref_max(t) and the predicted value of the furnace battery temperature Tr(t) may be further evaluated at one or more times before +m. In this case, for example, the first evaluation function J1 is c +m,t c +m-1, t c The evaluation index may include the average or integrated value of the absolute value of the difference between the upper limit target furnace temperature Tr_ref_max(t) and the furnace battery temperature Tr(t) at each time of +m-2.
[0074] Also, for example, the upper limit heat input amount Qin_max(t) may be evaluated not only at time t+1 but also at one or more times after time t+1. In this case, for example, the first evaluation function J1 may include, as an evaluation index, the average value or integrated value of the upper limit heat input amount Qin_max(t) at each of times t+1, t+2, and t+3. In addition, the first evaluation function J1 does not need to include an evaluation index for evaluating the upper limit of the input heat amount Qin_max(t).
[0075] The second evaluation function J2 shown in the formula (2) is explained by substituting the first evaluation function J1 for the second evaluation function J2 and the upper limit target furnace temperature Tr_ref_max(t c +m) to the lower limit target furnace temperature Tr_ref_min(tc +m), the upper limit target furnace temperature Tr_ref_max(t) is replaced with the lower limit target furnace temperature Tr_ref_min(t), the upper limit input heat amount Qin_max(t) is replaced with the lower limit input heat amount Qin_min(t), and the weighting coefficients w1 and w2 are replaced with w3 and w4. Therefore, a detailed description of the second evaluation function J2 is omitted here.
[0076] In addition, in this embodiment, the prediction model for predicting the furnace battery temperature Tr(t) using the input heat amount Qin(t) is illustrated as a multiple regression equation (linear time series model) shown in the following equations (3) to (5). Note that the following equations (3) to (5) are the same as the prediction model described in JP 2023-39669 A, and are the same as the prediction model used by the state prediction unit 121b to calculate the predicted value of the furnace battery temperature Tr(t+1).
[0077]
number
[0078] Here, Tr is the furnace battery temperature (℃). Qin is the input heat (GJ / hr). ΔTr(t+1), ΔTr(t), and ΔTr(t-1) are the changes (℃) in the furnace battery temperatures Tr(t+1), Tr(t), and Tr(t-1) at times t+1, t, and t-1, respectively, relative to the furnace battery temperatures Tr(t), Tr(t-1), and Tr(t-2) at times t, t-1, and t-2. In other words, the relationships ΔTr(t+1)=Tr(t+1)-Tr(t), ΔTr(t)=Tr(t)-Tr(t-1), and ΔTr(t-1)=Tr(t-1)-Tr(t-2) hold. ΔQin(t+1) is the change (GJ / hr) in the input heat Qin(t+1) at time t+1 relative to the input heat at time t. In other words, the relationship ΔQ(t+1)=Qin(t+1)-Qin(t) holds. Note that t+1, t-1, and t-2 are the times one hour after, one hour before, and two hours before time t, respectively.
[0079] The coefficients a1, a2, and b1 are the regression coefficients for ΔTr(t), ΔTr(t-1), and ΔQin(t+1), respectively. The regression coefficients a1, a2, and b1 are calculated separately to best fit the form of equation (3) to the past operating results of coke oven 1.
[0080] The prediction model for predicting the furnace battery temperature Tr(t) using the input heat amount Qin(t) is not limited to the formulas (3) to (5). For example, in the third term on the right-hand side of equation (3), the explanatory variable ΔQin(t+1) may be ΣΔQin(t+d) or (ΣΔQin(t+d))÷d. ΣΔQin(t+d) is accumulated for d, and the range of d to be accumulated is 1 to D, where D is an integer between 2 and m. Note that ΔQin(t+d) is the amount of change (GJ / hr) in the amount of heat input Qin(t+d) at time t+d relative to the amount of heat input at time t+d-1.
[0081] Also, for example, a term expressed as the product of ΔTr(th) and the regression coefficient for ΔTr(th) may be added to the right side of equation (3), where h is an integer of 2 or more, and ΔTr(th) is the change (°C) of the furnace battery temperature Tr(t-h) at time th relative to the furnace battery temperature Tr(th-1) at time th-1.
[0082] <<Processing of the upper limit manipulated variable determination unit 141a and the upper limit controlled variable prediction unit 142a>> The upper limit operation amount determination unit 141a and the upper limit control amount prediction unit 142a use the first evaluation function J1 shown in formula (1) and the prediction model shown in formulas (3) to (5) to determine the upper limit input heat amount Qin_max(t c +1) and calculate the optimal solution for the upper limit of heat input Qin_max(t c +1) will be described.
[0083] First, the upper limit operation amount determining unit 141a c +1 upper limit of heat input Qin_max(t cA candidate solution group (multiple candidate solutions) of upper limit heat input Qin_max(t)+1 is generated and output to the upper limit control amount prediction unit 142a. In this embodiment, a case is illustrated in which an optimal solution for the upper limit heat input Qin_max(t) is calculated using a metaheuristics method such as a genetic algorithm. Therefore, each candidate solution included in the candidate solution group for the upper limit heat input Qin_max(t) is generated according to a method used in a metaheuristics method such as a genetic algorithm. The metaheuristics method such as a genetic algorithm itself is realized by a known technology, so a detailed description thereof will be omitted.
[0084] The upper limit control amount prediction unit 142a predicts one of the candidate solutions (at time t c +1 upper limit of heat input Qin_max(t c +1)) and use equations (3) to (5) to find the time t c +m furnace temperature Tr(t c For example, the upper limit control amount prediction unit 142a calculates a predicted value of ΔQin(t c +1) and ΔTr(t c +1) and Tr(t c +1) is calculated in this order.
[0085] The upper limit control amount prediction unit 142a calculates the upper limit heat input Qin_max(t c +1) does not satisfy the constraints, the candidate solution is used at time t c +m furnace temperature Tr(t c +m) (calculation of the formulas (3) to (5)). c +1) is within the acceptable range, and the upper limit of the heat input Qin_max(t c +1) of the candidate solution (input heat amount shown in) c) is within an allowable range. The former constraint condition is for preventing an excessive amount of heat from being input to the coke oven 1. The latter constraint condition is for preventing the input heat amount from fluctuating suddenly.
[0086] In addition, when calculating equations (3) to (5), time t c The input heat Qin(t c ) and (Upper limit heat input Qin_max(t c ) at time t c The input heat Qin(t c ) may be used. c , t c -1, t c -2 furnace temperature Tr(t c ), Tr(t c -1), Tr(t c -2) Actual values may be used.
[0087] The upper limit control amount prediction unit 142a calculates the time t in the formulas (3) to (5) as the time t c +1 to time t c +m-1, the calculation of ΔQin(t+1) using equation (5), the calculation of ΔTr(t+1) using equation (3), and the calculation of Tr(t+1) using equation (4) are repeated. c +1 to time t c +m for each hour up to the furnace temperature Tr(t c +1)~Tr(t c +m) is calculated.
[0088] In this manner, the upper limit control amount prediction unit 142a predicts the time t c +1 to time t c +m for each hour up to the furnace temperature Tr(t c +1)~Tr(t c +m) is calculated based on the upper limit input heat amount Qin_max(t c+1) for each candidate solution in the candidate solution group, and c +m furnace temperature Tr(t c +m) to the upper limit manipulated variable determiner 141a.
[0089] The furnace temperature Tr(t c +m) is calculated based on the upper limit of the input heat Qin_max(t c +1) is equal to the number of candidate solutions that satisfy the constraints mentioned above.
[0090] The upper limit operation amount determination unit 141a determines the furnace temperature Tr(t c +m) and the upper limit of input heat Qin_max(t c +1) and the value of the first evaluation function J1 in the equation (1) is calculated based on the upper limit heat input Qin_max(t c +1) for each candidate solution in the candidate solution group.
[0091] The upper limit operation amount determination unit 141a determines the upper limit heat input Qin_max(t c Based on the calculation result of the value of the first evaluation function J1 for each candidate solution included in the group of candidate solutions (t +1), it is determined whether or not the convergence condition is satisfied. The convergence condition may be any condition that is used in metaheuristic methods such as genetic algorithms. The convergence condition may be, for example, the upper limit heat input Qin_max(t c The condition may be that the minimum value among the values of the first evaluation function J1 calculated for each candidate solution included in the group of candidate solutions (+1) is equal to or less than a predetermined value, or that the number of times the value of the first evaluation function J1 is calculated (the number of iterations) is a predetermined value.
[0092] When the convergence condition is not satisfied, the upper limit operation amount determination unit 141a determines the upper limit heat input Qin_max(t c+1) to the upper limit controlled variable prediction unit 142a. The upper limit manipulated variable determination unit 141a then continues to calculate the value of the first evaluation function J1, determine whether the convergence condition is satisfied, and calculate the upper limit input heat amount Qin_max(t c +1) regenerate and output the candidate solution group, and repeat the process.
[0093] The upper limit operation amount determination unit 141a determines the upper limit of the input heat amount Qin_max(t c +1) at time t c +1 upper limit of heat input Qin_max(t c +1) is determined to be the optimal solution.
[0094] In this embodiment, the combinatorial optimization problem is a minimization problem (a problem of calculating the minimum value of the first evaluation function J1). However, the combinatorial optimization problem is not limited to a minimization problem, and may be a maximization problem. In this case, for example, each term on the right side of the formula (1) may be multiplied by (-1) and used as the first evaluation function J1.
[0095] <<Processing of Lower Limit Manipulated Amount Determining Unit 141b and Lower Limit Controlled Amount Predicting Unit 142b>> The processing of the lower limit operation amount determiner 141b and the lower limit control amount predictor 142b is described in the above-mentioned section <<Processing of the upper limit operation amount determiner 141a and the upper limit control amount predictor 142a>>, with the upper limit operation amount determiner 141a being set to the lower limit operation amount determiner 141b, the upper limit control amount predictor 142b being set to the lower limit control amount predictor 142b, and the upper limit input heat amounts Qin_max(t), Qin_max(t c +1) is the lower limit of the input heat Qin_min(t), Qin_min(t c +1), the first evaluation function J1 is replaced with the second evaluation function J2, and formula (1) is replaced with formula (2). Therefore, detailed explanation of lower limit manipulated variable determiner 141b and lower limit controlled variable predictor 142b is omitted here.
[0096] <Manipulated amount determining section 150> The manipulated variable determination unit 150 determines the manipulated variable to be given to the control target from within the manipulated variable range OR (upper and lower limits) set by the manipulated variable range setting unit 140. The manipulated variable may be determined in any way as long as it is within the manipulated variable range OR, but the closer the controlled variable is to the target value, the higher the accuracy of the control can be. In this embodiment, the case where the manipulated variable is determined by using the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to the target value is illustrated. Here, the predicted value of the controlled variable being a value corresponding to the target value includes, in addition to the predicted value of the controlled variable matching the target value, the value of an evaluation index for evaluating the difference between the predicted value of the controlled variable and the target value satisfying a predetermined condition, the absolute value of the difference between the predicted value of the controlled variable and the target value being equal to or less than a predetermined value, and other predetermined conditions that can be considered to match the predicted value of the controlled variable.
[0097] In this embodiment, a case is illustrated in which the predicted value of the controlled variable corresponds to the target value when the value of an evaluation index for evaluating the difference between the predicted value of the controlled variable and the target value satisfies a predetermined condition. Specifically, the manipulated variable determination unit 150 performs model predictive control using a prediction model for calculating the predicted value of the controlled variable and a third evaluation function for evaluating at least the difference between the predicted value of the controlled variable and the target value, thereby calculating the value of the manipulated variable when the value of the third evaluation function becomes an optimal value as the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to the target value.
[0098] From the viewpoint of achieving high accuracy of control, it is preferable to determine the manipulated variable to be applied to the controlled object using the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to the target value. However, for example, when there is an operation requirement that should be prioritized over high accuracy of control, it is not necessary to determine the manipulated variable to be applied to the controlled object using the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to the target value. For example, there are various operation requirements, such as a case where emphasis is placed on stability of operation by reducing fluctuations in the manipulated variable, a case where emphasis is placed on reducing energy consumption by reducing the manipulated variable, and a case where the manipulated variable is increased in anticipation of future operations. The manipulated variable may be determined so as to satisfy any one of these various operation requirements.
[0099] Furthermore, the manipulated variable may be determined not by specializing in only one of these operation requirements but by considering multiple operation requirements. When determining the manipulated variable by considering multiple operation requirements, the manipulated variable may be determined based on multiple values within the operation range and a weighting factor indicating the relative importance of the multiple values with respect to the manipulated variable. For example, a positive weighting factor may be used as the weighting factor for multiple values within the operation range, which is larger as the value has a higher relative importance with respect to the manipulated variable. The manipulated variable may be a value obtained by multiplying multiple values within the operation range by the weighting factor for each value and accumulating the product of the multiple values. The sum of the weighting factors multiplied by the multiple values is, for example, 1.
[0100] The multiple values within the operation range include, for example, a predicted value of the operation amount when the predicted value of the control amount becomes a value corresponding to the upper limit value of the bandwidth BW (upper limit input heat amount Qin_max(t c +1) and the predicted value of the manipulated variable when the predicted value of the controlled variable becomes the value corresponding to the lower limit of the bandwidth BW (the lower limit of the input heat Qin_min(t c +1)) and the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to the target value. For example, the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to the upper limit and lower limit of the bandwidth BW (the optimal solution of the upper limit input heat amount Qin_max(t c +1), the optimal solution, the lower limit of the heat input Qin_min(t cIf the manipulated variable to be given to the controlled object is the arithmetic mean value of the upper and lower limits of the optimal solution of the control variable 1 + 1) or a value that coincides with (or is close to) the most recent actual value of the manipulated variable, the operation can be stabilized. On the other hand, if the manipulated variable to be given to the controlled object is the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to the target value, the control can be made more accurate. Therefore, for example, by using the arithmetic mean value of the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to the upper and lower limits of the bandwidth BW, the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to the target value, and a weighting coefficient for them, it is possible to determine a manipulated variable that prioritizes one over the other while considering both the high accuracy of control and the stabilization of operation by adjusting the weighting coefficient. Therefore, in this embodiment, a case will be illustrated in which the operation range setting unit 140 determines the manipulated variable using the arithmetic mean value of the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to the upper and lower limits of the bandwidth BW, the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to the target value, and a weighting coefficient for them. Note that, instead of the arithmetic mean value (arithmetic mean value) of the predicted values of the manipulated variables when the predicted values of the controlled variables correspond to the upper and lower limits of the bandwidth BW, for example, a geometric mean value or a harmonic mean value may be used. Note that, as described above, there are other operational requirements, and the values to be used as the multiple values within the operational range may be determined according to the operational requirements. For example, the predicted values of the manipulated variables when the predicted values of the controlled variables correspond to the upper and lower limits of the bandwidth BW may themselves be included in the multiple values within the operational range.
[0101] As described in the section of <Operation range setting unit 140>, in this embodiment, the controlled variable is the furnace temperature, and the controlled variable is the temperature at time t c +m central target reactor temperature Tr_ref_mid(t c +m) is the target value of the controlled variable, and the manipulated variable is the time c Input heat Qin(t c +1) is shown below.
[0102] Therefore, in this embodiment, the operation amount determination unit 150 determines the furnace battery temperature Tr(tc +m) is the predicted value of the central target reactor temperature Tr_ref_mid(t c +m) when the input heat amount Qin_mid(t c +1) is calculated as an example.
[0103] In the following explanation, the furnace temperature Tr(t c +m) is the predicted value of the central target reactor temperature Tr_ref_mid(t c +m) when the input heat amount Qin_mid(t c +1) and the central input heat Qin_mid(t c +1).
[0104] In this embodiment, the operation amount determination unit 150 determines the upper limit of the heat input Qin_max(t c +1) and the lower limit of input heat Qin_min(t c +1) is calculated using the same method as for calculating the optimal solution for the central input heat Qin_mid(t c In this example, the operation amount determining unit 150 calculates the optimal solution for the central input heat amount Qin_mid(t c +1) using the candidate solution for time t c +m furnace temperature Tr(t c +m) and calculate the predicted value and the central target reactor temperature Tr_ref_mid(t c The calculation of the value of the third evaluation function that evaluates at least the difference with the central input heat amount Qin_mid(t c +1) and repeat the process to find the optimal central input heat Qin_mid(t c +1) candidate solution is searched for as the optimal solution.
[0105] The central input heat quantity Qin_mid(t c +1) is used, the value of the third evaluation function becomes the optimal value, and as shown in Figure 7(a), c +m furnace temperature Tr(t c +m) at time t cIn this case, the manipulated variable determining unit 150 determines whether the central input heat quantity Qin_mid(t c +1) is the optimal solution. c +1) is the optimal solution for the upper limit of heat input Qin_max(t c +1) and the minimum input heat Qin_min(t c +1) is not necessarily the intermediate value (arithmetic mean) of the optimal solution.
[0106] In addition, the furnace temperature Tr(t c +m) is the predicted value of the central target reactor temperature Tr_ref_mid(t c +m), the more accurate the control can be. c +1) at time t c The amount of heat input Qin(t c +1), it is possible to improve the precision of the control.
[0107] On the other hand, the upper limit input heat amount Qin_max(t c +1) and the minimum input heat Qin_min(t c +1) the arithmetic mean of the optimal solution at time t c The amount of heat input Qin(t c +1), it is possible to stabilize the operation (suppress the fluctuation of the input heat quantity Qin(t)). In the following explanation, the upper limit of the input heat quantity Qin_max(t c +1) and the minimum input heat Qin_min(t c +1) is referred to as the arithmetic mean value of the optimal solutions for the upper and lower limit heat inputs as necessary.
[0108] Therefore, in this embodiment, the time t c The amount of heat input Qin(t c+1), the operation amount determining unit 150 determines the central input heat amount Qin_mid(t c +1), the arithmetic mean of the optimal solutions for the upper and lower limit heat input amounts, and the corresponding weighting coefficients are used to calculate the optimal solution for time t c The amount of heat input Qin(t c +1).
[0109] The following describes in detail an example of functions of the operation amount determination unit 150. In this embodiment, the operation amount determination unit 150 has a central operation amount determination unit 151, a central control amount prediction unit 152, and an operation amount calculation unit 153, as shown in FIG.
[0110] <<Central Operation Amount Determination Unit 151, Central Control Amount Prediction Unit 152>> The central manipulated variable determination unit 151 determines a manipulated variable corresponding to the target value of the controlled variable. The central control variable prediction unit 152 calculates a predicted value of the controlled variable when operated with a manipulated variable corresponding to the target value of the controlled variable. For example, the central manipulated variable determination unit 151 outputs candidates of manipulated variables corresponding to the target value of the controlled variable to the central control variable prediction unit 152. The central control variable prediction unit 152 calculates a predicted value of the controlled variable when operated with the manipulated variable candidates output from the central manipulated variable determination unit 151, and outputs the predicted value to the central manipulated variable determination unit 151. The central manipulated variable determination unit 151 determines a manipulated variable corresponding to the target value of the controlled variable based on the predicted value of the controlled variable output from the central control variable prediction unit 152. In this embodiment, the central manipulated variable determination unit 151 and the central control variable prediction unit 152 determine a central input heat amount Qin_mid(t c The processing of the central manipulated variable determination unit 151 and the central control variable prediction unit 152 is explained by assuming that the upper limit manipulated variable determination unit 141a is the central manipulated variable determination unit 151, the upper limit control variable prediction unit 142b is the central control variable prediction unit 152, and the upper limit heat input Qin_max(t), Qin_max(t c +1) is the central input heat Qin_mid(t), Qin_mid(t c+1), the first evaluation function J1 with a third evaluation function J3, and equation (1) with the following equation (6). Therefore, detailed explanation of the central manipulated variable determination unit 151 and the central controlled variable prediction unit 152 will be omitted here.
[0111]
number
[0112] The third evaluation function J3 shown in the formula (6) is explained by substituting the first evaluation function J1 for the third evaluation function J3 and the upper limit target furnace temperature Tr_ref_max(t c +m) as the center target furnace temperature Tr_ref_mid(t c +m), the upper limit target furnace temperature Tr_ref_max(t) is replaced with the central target furnace temperature Tr_ref_mid(t), the upper limit input heat amount Qin_max(t) is replaced with the central input heat amount Qin_mid(t), and the weighting coefficients w1 and w2 are replaced with w5 and w6. Therefore, a detailed description of the third evaluation function J3 is omitted here.
[0113] <<Operation amount calculation unit 153>> The operation amount calculation unit 153 calculates a value within the operation range OR (the upper limit and lower limit of the operation range OR) as the operation amount. c The amount of heat input Qin(t c 8 is a diagram for explaining an example of a method for calculating the actual value (+1). Note that in FIG. 8, as in FIG. 7, black circle plots (●) indicate actual values, and white circle plots (◯) indicate predicted values.
[0114] As described above, in this embodiment, the operation amount calculation unit 153 calculates the central input heat amount Qin_mid(t c +1), the arithmetic mean of the optimal solutions for the upper and lower limit heat input amounts, and the weighting coefficients for them are used to calculate the optimal solution for time t c Input heat Qin(t c +1) at time t cInput heat Qin(t c +1).
[0115]
number
[0116] Qin_ave(t c +1) is the arithmetic mean value of the optimal solution for the upper and lower heat input limits. In addition, in formulas (8), (10), and (12), the allowable increase amount ΔQin_max of the input heat amount is a limit value of the input heat amount that can be increased in one operation, and has a positive value. ΔQin_max is determined in advance according to equipment constraints of the coke oven 1 (for example, the maximum opening degree of the regulating valve 5 that can be changed in one operation), etc.
[0117] In addition, in equations (8), (10), and (12), Min(A,B) is a symbol that determines the smaller value of A and B. For example, in equation (8), Qin(t c )+ΔQin_max and Qin_max(t c +1) or the smaller value is the final upper limit of the heat input Q~in_max(t c +1). Note that Q~in_max(t c +1) is Qin_max(t c +1) with a ~ above the Q.
[0118] For example, as shown in FIG. 8(a), the formula (8) is expressed by the upper limit of the heat input Qin_max(t c +1) is the optimal solution for the input heat Q(t c ) is greater than or equal to the actual value of Qin_max(t c +1) ≧ Q(t c ) is used. The upper limit of input heat Qin_max(t c +1) is the optimal solution for the input heat Qin(t c) plus the allowable increase in heat input ΔQin_max, the latter (Qin(t c )+ΔQin_max) is the final upper limit of the input heat Q~in_max(t c +1), otherwise, the former (Qin_max(t c +1)) is the final upper limit of the heat input Q~in_max(t c +1) is adopted. By doing so, it is possible to prevent the upper limit of input heat amount Qin_max(t c +1), the upper limit of the heat input Qin_max(t c The input heat Qin(t c +1) can be prevented from being calculated.
[0119] For example, as shown in FIG. 8(a), the formula (10) is expressed as follows: c +1) is the optimal solution at time t c The amount of heat input in Q(t c ) is greater than or equal to the actual value of Qin_mid(t c +1) ≧ Q(t c The meaning of equation (10) is explained in the above explanation of equation (8) with reference to the upper limit of input heat amount Qin_max(t c +1) is the central input heat Qin_mid(t c +1), so detailed explanation will be omitted.
[0120] For example, as shown in FIG. 8(a), the formula (12) is expressed by the lower limit of the input heat quantity Qin_min(t c +1) is the optimal solution at time t c Input heat Qin(t c ) is greater than or equal to the actual value of (Qin_min(t c +1) ≧ Q(t c The meaning of equation (12) is explained in the above explanation of equation (8) with reference to the upper limit of input heat amount Qin_max(tc +1) is the lower limit of the input heat Qin_min(t c +1), so detailed explanation will be omitted.
[0121] In addition, in formulas (9), (11), and (13), the allowable decrease amount ΔQin_min of the input heat amount is the limit value of the input heat amount that can be decreased in one operation, and has a negative value. ΔQin_min is determined in advance according to the equipment constraints of the coke oven 1. Note that the absolute value of ΔQin_max and the absolute value of ΔQin_min may be the same value or different values.
[0122] In addition, in equations (9), (11), and (13), Max(A,B) is a symbol that determines the larger value of A and B. For example, in equation (9), Qin(t c )+ΔQin_min and Qin_max(t c +1) or the larger value is the final upper limit of the heat input Q~in_max(t c +1).
[0123] For example, as shown in FIG. 8B, the formula (9) is expressed by the upper limit of the heat input Qin_max(t c +1) is the optimal solution for the input heat Q(t c ) is less than the actual value of Qin_max(t c +1) <Q(t c ) is used. The upper limit of heat input Qin_max(t c +1) is the optimal solution for the input heat Qin(t c ) plus the allowable reduction in the amount of heat input ΔQin_min, the latter (Qin(t c )+ΔQin_min) is the final upper limit of the heat input Q~in_max(t c +1), otherwise, the former (Qin_max(t c +1)) is the final upper limit of the heat input Q~in_max(t c+1) is adopted. By doing so, it is possible to prevent the upper limit of input heat amount Qin_max(t c +1) is smaller than the upper limit of the heat input Qin_max(t c The input heat Qin(t c +1) can be prevented from being calculated.
[0124] For example, as shown in FIG. 8B, the formula (11) is expressed as follows: c +1) is the optimal solution at time t c The amount of heat input in Q(t c ) is less than the actual value of Qin_mid(t c +1) <Q(t c In addition, Q~in_mid(t c +1) is Qin_mid(t c +1) with a ~ above the Q. The meaning of formula (11) is explained in the explanation of formula (9) above. c +1) is the central input heat Qin_mid(t c +1), so detailed explanation will be omitted.
[0125] For example, as shown in FIG. 8B, the formula (13) is expressed by the lower limit of the input heat amount Qin_min(t c +1) is the optimal solution at time t c The amount of heat input in Q(t c ) is greater than or equal to the actual value of (Qin_min(t c +1) <Q(t c In addition, Q~in_min(t c +1) is Qin_min(t cIndicates the symbol with ~ attached to Q of (+1). The explanation of the meaning of equation (13) is the same as the explanation of equation (9) described above, where the upper limit input heat quantity Qin_max(t c +1) is replaced by the lower limit input heat quantity Qin_min(t c +1). Therefore, the detailed explanation is omitted.
[0126] In equation (15), k is an example of the weighting coefficient with respect to the arithmetic mean value Qin_ave(t c +1) of the optimal solutions of the upper and lower limit input heat quantities. 1 - k is an example of the weighting coefficient with respect to the final central input heat quantity Q~in_mid(t c +1). When emphasizing the high-precision control more than the stabilization of the operation, the value of k is made small (close to 0), and when emphasizing the stabilization of the operation more than the high-precision control, the value of k is made large (close to 1). From such a perspective, the weighting coefficient k may be determined in advance offline. Also, instead of equation (15), for example, 0 < k < 1, 0 < k ≤ 1, or 0 ≤ k < 1 may be used.
[0127] Also, the coefficient k may be determined online. For example, the coefficient k may be determined for each control cycle. In this case, for example, the value of the coefficient k may be determined based on the time change of the furnace group temperature Tr(t), which is an example of the control quantity. For example, at time t c at the central target furnace temperature trajectory Tr_ref_mid(t c ), and at time t c +1 at the central target furnace temperature trajectory Tr_ref_mid(t c +1), the larger the absolute value of the difference, the more the stabilization of the operation is emphasized, and the value of the coefficient k may be increased. In other words, the smaller the absolute value of the difference between the value of the central target furnace temperature trajectory Tr_ref_mid(t c +1) at time t c +1, the more the high-precision control is emphasized, and the value of the coefficient k may be decreased. Also, the actual value of the furnace group temperature Tr(t c ) at time t c and the furnace group temperature Tr(t c +1) at time t c+1) and the larger the absolute value of the difference between them, the more important it is to stabilize operations, and the larger the value of the coefficient k may be. c Furnace temperature Tr(t c ) and time t c +1 furnace temperature Tr(t c +1) and the smaller the absolute value of the difference between them, the more importance is attached to high accuracy of control, and the value of the coefficient k can be made smaller. In this case, c +1), for example, the central input heat amount Qin_mid(t c +1) is calculated by the central control amount prediction unit 152. c +1) predicted value is used.
[0128] In addition, the value of the coefficient k may be determined based on the time change of the input heat amount Qin(t), which is an example of the manipulated variable. For example, c The input heat Qin(t c ) and time t c +1 central input heat Qin_mid(t c +1) and the larger the absolute value of the difference between them, the more important it is to stabilize operations, and the larger the value of the coefficient k may be. In other words, c The input heat Qin(t c ) and time t c +1 central input heat Qin_mid(t c +1) and the smaller the absolute value of the difference between the optimal solution and , the more importance is placed on improving the control precision, and the value of the coefficient k can be made smaller.
[0129] In this embodiment, the operation amount determination unit 150 determines the time t c Input heat Qin(t c +1) at time t c The amount of heat input Qin(t c +1) is determined as an example.
[0130] <Control unit 160> The control unit 160 determines whether the operation amount determining unit 150 determines the time t c The amount of heat input Qin(t c +1) is input to the combustion chamber 3. The control signal is generated and output at the time t c Input heat Qin(t c +1) and time t c The central target reactor temperature Tr_ref_mid(t c ) or time t c Furnace temperature Tr(t c ) and the difference. An example of the output destination of the control signal is a control device for an actuator that operates the regulating valve 5. The control device instructs the actuator to operate the regulating valve 5 so that the opening degree is in accordance with the control signal. As a result, the input heat amount Qin(t c +1) at time t c The opening of the control valve 5 is adjusted so that the fuel is fed into the combustion chamber 3 by +1.
[0131] [flowchart] Next, an example of a processing method performed by the processing device 100 of this embodiment will be described with reference to the flowchart of Fig. 9. It is assumed here that data that needs to be acquired by the processing device 100 before the processing of the flowchart of Fig. 9 starts has been acquired by the data acquisition unit 110. For example, data related to the bandwidth BW, weighting coefficients w1 to w6, regression coefficients a1, a2, b1, coefficient k, allowable increase amount ΔQin_max of input heat amount, and allowable decrease amount ΔQin_min of input heat amount may be acquired by the processing device 100 before the processing of the flowchart of Fig. 9 starts.
[0132] First, in step S901, the target trajectory acquisition unit 120 acquires the central target reactor temperature trajectory Tr_ref(t). As described above, in this embodiment, the target trajectory acquisition unit 120 calculates the optimal solution of the central target reactor temperature trajectory Tr_ref(t) by the method described in JP 2023-39669 A.
[0133] Next, in step S902, the bandwidth setting unit 130 sets the bandwidth BW for the central target reactor temperature trajectory Tr_ref_mid(t). As described above, in this embodiment, the bandwidth setting unit 130 calculates and sets the upper limit target reactor temperature trajectory Tr_ref_max(t) and the lower limit target reactor temperature trajectory Tr_ref_min(t) to set the bandwidth BW for the central target reactor temperature trajectory Tr_ref_mid(t). The flowchart in FIG. 9 illustrates a case where, after the processes in steps S901 and S902 are completed, repeated processes are performed for each control period of the coke oven 1 (one hour in this embodiment).
[0134] In step S903, the operation range setting unit 140 (upper limit operation amount determination unit 141a, upper limit control amount prediction unit 142a, lower limit operation amount determination unit 141b, and lower limit control amount prediction unit 142b) performs model predictive control to obtain the upper limit input heat amount Qin_max(t c +1) and the lower limit of input heat Qin_min(t c +1) are calculated. The prediction model used in the model predictive control is, for example, the formulas (3) to (5). The evaluation functions used in solving the optimization problem in the model predictive control performed in step S903 are, for example, the first evaluation function J1 shown in formula (1) and the second evaluation function J2 shown in formula (2). The first evaluation function J1 is, c +1), the second evaluation function J2 is the lower limit heat input Qin_min(t c +1) is the evaluation function used to calculate the optimal solution.
[0135] Next, in step S904, the operation amount determination unit 150 (the central operation amount determination unit 151, the central control amount prediction unit 152) performs model predictive control to determine the central input heat amount Qin_mid(t cAs described above, the prediction model used in the model predictive control is, for example, the formulas (3) to (5). In addition, when solving the optimization problem in the model predictive control performed in step S904 (the central input heat amount Qin_mid(t c The evaluation function used in calculating the optimal solution of (1+1) is, for example, the third evaluation function J3 shown in equation (3).
[0136] Next, in step S905, the operation amount determination unit 150 (operation amount calculation unit 153) calculates the upper limit heat input Qin_max(t c +1) is set as the upper limit, and the lower limit input heat quantity Qin_min(t c +1) is the lowest value of the optimal solution, and the lowest value of the operation range OR is the time t c The amount of heat input Qin(t c In this embodiment, the operation amount determination unit 150 (operation amount calculation unit 153) determines the time t c Input heat Qin(t c +1) and calculate the input heat Qin(t c +1) at time t c The amount of heat input Qin(t c +1) is determined as an example.
[0137] Next, in step S906, the control unit 160 calculates the input heat amount Qin(t c +1) into the combustion chamber 3.
[0138] Next, in step S907, the control unit 160 judges whether or not to end the control of the coke oven 1. The control unit 160 may judge to end the control of the coke oven 1 when an instruction to end the control is given by an input operation of the operator to the processing device 100. In addition, the control unit 160 may judge to end the control of the coke oven 1 when, for example, at time t c +1 is time t eIf this is the case, it may be determined that the control of the coke oven 1 is to be ended.
[0139] If the result of the determination in step S907 is that the control of the coke oven 1 should not be ended (NO in step S907), the process of step S903 is performed again. Then, the processes of steps S903 to S907 are performed as the process for the next control cycle. On the other hand, if the result of the determination in step S907 is that the control of the coke oven 1 should be ended (YES in step S907), the process according to the flowchart in FIG. 9 ends.
[0140] [Calculation example] Next, a calculation example will be described. In this calculation example, the conditions other than the value of the coefficient k are the same, and the time t c Input heat Qin(t c +1) was determined (calculated) in sequence at time t c Input heat Qin(t c +1) was calculated using equations (7) to (15).
[0141] Fig. 10 shows the calculation results of the time changes in furnace battery temperature Tr(t) and input heat amount Qin(t) when coefficient k is 0 (zero). Fig. 11 shows the calculation results of the time changes in furnace battery temperature Tr(t) and input heat amount Qin(t) when coefficient k is 1.0. Fig. 12 shows the calculation results of the time changes in furnace battery temperature Tr(t) and input heat amount Qin(t) when coefficient k is 0.8.
[0142] When the coefficient k is 0 (zero), the input heat amount Qin(t c +1) is the final central input heat amount Q~in_mid(t c +1). In this case, the input heat Qin(t c +1) at time t c +m furnace temperature Tr(t c +m) at time t c +m central target reactor temperature Tr_ref_mid(tc +m) (the value of the third evaluation function J3 is the smallest) c +1)). As a result, as shown in Figure 10(a), the change in the furnace battery temperature Tr(t) follows the target furnace center temperature Tr_ref_mid(t) with high accuracy, but the change in the input heat quantity Qin(t) tends to be steep. In other words, the control performance of the furnace battery temperature is improved, but there is a risk of operation becoming unstable.
[0143] In addition, when the coefficient k is 1.0, the input heat amount Qin(t c +1) is the arithmetic mean value Qin_ave(t c +1). Therefore, the input heat Qin(t c +1) when calculating the furnace temperature Tr(t c +m) and the central target reactor temperature Tr_ref_mid(t c +m) is not taken into account, and the input heat Qin(t c +1) is the upper limit of heat input Qin_max(t c +1) and the minimum input heat Qin_min(t c +1). Therefore, as shown in Fig. 11(a), the time change of the furnace battery temperature Tr(t) fluctuates up and down relative to the central target furnace temperature trajectory Tr_ref_mid(t) compared to Fig. 10(a), but as shown in Fig. 11(b), the input heat amount Qin(t) changes more slowly over time compared to Fig. 10(b). In other words, the control performance of the furnace battery temperature is lower, but operation is stable.
[0144] In addition, when the coefficient k is 0.8 (coefficient k is neither 0 nor 1), the final central input heat amount Q~in_mid(t c +1) and the arithmetic mean value Qin_ave(t c +1) and the input heat Qin(t c+1) is calculated. Therefore, as shown in Figure 12(a), the change in the furnace battery temperature Tr(t) over time fluctuates up and down relative to the central target furnace temperature trajectory Tr_ref_mid(t) compared to Figure 10(a), but tracks the central target furnace temperature trajectory Tr_ref_mid(t) with higher accuracy compared to Figure 11(a). Also, as shown in Figure 12(b), the input heat amount Qin(t) fluctuates more sharply compared to Figure 11(b), but fluctuates more gently compared to Figure 10(b). In other words, it is possible to take into account both high accuracy control of the furnace battery temperature and stable operation.
[0145] [summary] As described above, in this embodiment, the treatment device 100 sets the bandwidth BW for the central target furnace temperature trajectory Tr_ref_mid(t), sets the operation range OR, which is the range of the input heat amount Qin for which the predicted value of the furnace battery temperature Tr(t) falls within the set bandwidth BW, and sets the input heat amount Qin(t c +1) is determined. Therefore, the input heat Qin(t c +1), it is possible to allow the furnace temperature Tr(t) to deviate from the central target furnace temperature trajectory Tr_ref_mid(t) within the range of the bandwidth BW. Therefore, the input heat amount Qin(t c +1) can be prevented from being determined. c +1) can be prevented from fluctuating rapidly.
[0146] In this embodiment, the treatment device 100 also controls the furnace battery temperature Tr(t c +m) is the predicted value of the central target reactor temperature Tr_ref_mid(t c +m) when the central input heat quantity Qin_mid(t c +1) to input heat Qin(t c +1) is determined. Therefore, the input heat Qin(t c+1) as an index to determine the central input heat Qin_mid(t c +1) can be used. For example, the furnace temperature Tr(t c +m) is the predicted value of the central target reactor temperature Tr_ref_mid(t c The input heat amount Qin(t c +1) can be determined.
[0147] In this embodiment, the treatment device 100 also controls the furnace battery temperature Tr(t c +1) and the furnace temperature Tr(t c +m) and the central target reactor temperature Tr_ref_mid(t c +m) and a model predictive control using the third evaluation function J3, which evaluates at least the difference between the furnace temperature Tr(t c +m) is the predicted value of the central target reactor temperature Tr_ref_mid(t c +m) when the central input heat quantity Qin_mid(t c Therefore, even if there is a long delay before the input heat amount is reflected in the furnace temperature, the input heat amount Qin(t c +1) can be determined with high accuracy.
[0148] In this embodiment, the processing device 100 determines the input heat amount Qin(t c +1) is determined. Therefore, the input heat amount Qin(t c +1) can be determined. In this case, the values of the multiple input heat amounts are the upper limit input heat amount Qin_max(t c +1) and the minimum input heat Qin_min(t c +1) and the optimal solution for the central input heat Qin_mid(t c+1) to be input to the combustion chamber 3. In this way, the input heat amount Qin(t c +1) can be determined.
[0149] In this embodiment, the processing device 100 c The input heat Qin(t c ) for time t c +1 central input heat Qin_mid(t c +1) (specifically, at time t c Furnace temperature Tr(t c ) and time t c +1 furnace temperature Tr(t c The input heat amount Qin(t c +1) is determined. For example, the input heat amount Qin(t c +1), it is possible to prevent the input heat amount from being determined such that the change over time is extremely large.
[0150] In this embodiment, the processing device 100 sets the bandwidth BW based on at least one of the time response of the furnace battery temperature Tr(t) to the input heat amount Qin(t), the prediction accuracy of the prediction model that calculates the predicted value of the furnace battery temperature Tr(t), the central target furnace temperature trajectory Tr_ref_mid(t), and the operating history of the coke oven 1. Therefore, the bandwidth BW can be set according to the actual conditions of the coke oven 1 and the processing device 100.
[0151] In this embodiment, the treatment device 100 also controls the furnace battery temperature Tr(t c +m) is the predicted upper limit of the target furnace temperature Tr_ref_max(t c +m) when the input heat quantity Qin_max(t c +1) is the upper limit of the input heat Qin_max(t c +1) is set as the upper limit of the operating range OR.c +m) is the lower limit of the target furnace temperature Tr_ref_min(t c The lower limit of the input heat quantity Qin_min(t + m) is the input heat quantity Qin_min(t c +1) is set as the lower limit of the operating range OR. Therefore, the upper and lower limits of the operating range OR are set by the furnace temperature Tr(t c +m) can be adjusted to correspond to the upper and lower limits of the furnace temperature Tr(t c +m) is the furnace temperature Tr(t c +m) upper and lower limits (upper limit of input heat Qin_max(t c +1) and the lower limit of input heat Qin_min(t c +1) is the input heat amount Qin(t c +1) can be suppressed.
[0152] In this embodiment, the treatment device 100 also controls the furnace battery temperature Tr(t c +1) and the furnace temperature Tr(t c +m) predicted value and upper limit target furnace temperature Tr_ref_max(t c +m) and performing model predictive control using the first evaluation function J1, which evaluates at least the difference between the furnace temperature Tr(t c +m) is the predicted upper limit of the target furnace temperature Tr_ref_max(t c +m) when the upper limit of heat input Qin_max(t c The processing device 100 also calculates the furnace battery temperature Tr(t c +1) and the furnace temperature Tr(t c +m) predicted value and lower limit heat input Qin_min(t c +1) and performing model predictive control using the second evaluation function J2, which evaluates at least the difference between the furnace temperature Tr(t c +m) is the lower limit of the input heat amount Qin_min(t c +1) cTherefore, even if there is a long time delay until the input heat amount is reflected in the furnace temperature, the input heat amount Qin(t c +1) can be determined with high accuracy.
[0153] <Modification> In this embodiment, as shown in the formulas (3) to (5), the upper limit of the input heat amount Qin_max(t c +1) and the minimum input heat Qin_min(t c +1) and the optimal solution for the central input heat Qin_mid(t c +1) and the input heat amount Qin(t c +1) is calculated (determined). However, it is not always necessary to calculate (determine) the input heat amount Qin(t c For example, it is not necessary to calculate (determine) the input heat amount Qin(t +1) to be input to the combustion chamber 3 from within the operation range OR based only on the time change of the input heat amount Qin(t). c In this case, for example, the input heat amount Qin(t +1) may be calculated (determined) from within the operation range OR based on the time change of the actual value of the input heat amount Qin(t). c +1) may be calculated (determined). c From the actual values of the input heat quantity Qin(t) at multiple times before +1, an approximation function showing the time change of the input heat quantity Qin(t) is calculated, and the approximation function is used to calculate the time t c Input heat Qin(t c In this way, if the time change of the input heat quantity Qin(t) represented by the actual value of the input heat quantity Qin(t) is used, as described in the present embodiment, the predicted value of the input heat quantity Qin(t) (for example, the time t c +1 central input heat Qin_mid(t c +1)) to calculate the time change of the input heat quantity Qin(t). Note that the approximation function may be a linear function or a nonlinear function.
[0154] In addition, in this embodiment, the case where both the upper limit target reactor temperature Tr_ref_max(t) and the lower limit target reactor temperature Tr_ref_min(t) are set is exemplified. However, this is not necessarily required. For example, the upper limit of the bandwidth BW may be made to coincide with the target reactor temperature trajectory Tr_ref(t) (central target reactor temperature trajectory Tr_ref_mid(t)) determined as the optimal solution by the target trajectory determination unit 122. In this case, the upper limit target reactor temperature Tr_ref_max(t c +m) does not need to be set. Therefore, the upper limit of the input heat amount Qin_max(t c +1) may not be set. The lower limit of the bandwidth BW may be set to coincide with the target reactor temperature trajectory Tr_ref(t) (central target reactor temperature trajectory Tr_ref_mid(t)) determined as the optimal solution by the target trajectory determination unit 122. In this case, the lower limit target reactor temperature Tr_ref_min(t c +m) does not need to be set. Therefore, the lower limit of the input heat amount Qin_min(t c +1) does not need to be set. c +m) and the lower limit target furnace temperature Tr_ref_min(t c +m) or the upper limit of the heat input Qin_max(t c +1) and the lower limit of input heat Qin_min(t c +1) or at least one of them should be set.
[0155] Further, in the present embodiment, the case where the controlled object is a coke manufacturing process including the coke oven 1 has been exemplified. However, the controlled object is not limited to the coke manufacturing process including the coke oven 1, and is not limited to the controlled object as long as the controlled object has a target value for a controlled variable.
[0156] For example, the controlled object may be a manufacturing process other than a coke manufacturing process, including an industrial furnace capable of performing continuous heating control on a heating object that is heated in succession. The heating object may be a solid, liquid, or gas. Specific examples of such industrial furnaces include a blast furnace, a converter, a hot stove, and a continuous annealing furnace. In such industrial furnaces, there may be a long time delay until the manipulated variable is reflected in the controlled variable. In this case, as described in this embodiment, it is preferable to perform model predictive control that optimizes the manipulated variable while predicting future state changes of the process using a predictive model, but when the prediction error of the predictive model is large, the manipulated variable is likely to hunt. Therefore, such an industrial furnace is an example of a controlled object to which the method of this embodiment is preferably applied.
[0157] In addition, for example, in an industrial furnace such as a coke oven in which heating control may be performed during non-steady operation, it is not easy to collect a large amount of actual data for learning a prediction model, and the prediction error of the prediction model is likely to become large. Therefore, it is preferable to apply the method of this embodiment to heating control during non-steady operation of such an industrial furnace. Note that non-steady operation refers to an operation different from an operation performed on a daily basis (steady operation). Non-steady operation may include at least one of, for example, an operation during inspection of an element constituting a control object, an operation during repair, an operation during an abnormal operation, and an operation different from a predetermined operation schedule (for example, an operation for temporary increase or decrease in production), and may be an operation in which a heating object is heated or an operation in which a heating object is not heated. In addition, non-steady operation may be, for example, an operation other than the operation performed most frequently.
[0158] (Other embodiments) The above-described embodiment of the present invention can be realized by a computer executing a program. A computer-readable recording medium having the program recorded thereon and a computer program product such as the program can also be applied as an embodiment of the present invention. Examples of the recording medium that can be used include a flexible disk, a hard disk, an optical disk, a magneto-optical disk, a CD-ROM, a magnetic tape, a non-volatile memory card, and a ROM. The embodiment of the present invention can be realized by a PLC (Programmable Logic Controller) or dedicated hardware such as an ASIC (Application Specific Integrated Circuit). Furthermore, the above-described embodiments of the present invention are merely examples of the implementation of the present invention, and the technical scope of the present invention should not be interpreted as being limited by these. In other words, the present invention can be implemented in various forms without departing from its technical concept or main features.
[0159] The disclosure of the above embodiment can be, for example, as follows. (Disclosure 1) A processing device that determines an operation amount to be applied to a controlled object based on a predicted value and a target value of a controlled amount, a bandwidth setting unit that sets a bandwidth that is an allowable error range for the target value of the controlled variable; an operation range setting unit that sets an operation range that is a range of the operation amount for which the predicted value of the controlled variable falls within the bandwidth; a manipulation amount determination unit that determines the manipulation amount to be applied to the control target within the manipulation range; A processing device comprising: (Disclosure 2) The processing device according to Disclosure 1, wherein the manipulated variable determination unit determines the manipulated variable by using a predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to a target value. (Disclosure 3) The processing device according to Disclosure 2, wherein the manipulated variable determination unit calculates a predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to a target value by performing model predictive control using a prediction model that calculates a predicted value of the controlled variable and an evaluation function that evaluates at least a difference between the predicted value of the controlled variable and a target value. (Disclosure 4) The processing device according to any one of Disclosures 1 to 3, wherein the manipulated variable determination unit determines the manipulated variable based on a plurality of values within the manipulated range and a weighting coefficient indicating a relative importance of the plurality of values with respect to the manipulated variable to be applied to the control object. (Disclosure 5) The processing device according to Disclosure 4, wherein the multiple values include a value based on a predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to an upper limit value and a lower limit value of the bandwidth, and a predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to a target value. (Disclosure 6) The processing device according to any one of Disclosures 1 to 5, wherein the manipulated variable determination unit determines the manipulated variable based on a time change of the manipulated variable represented by using an actual value of the manipulated variable. (Disclosure 7) The processing device according to any one of Disclosures 1 to 6, wherein the bandwidth setting unit sets the bandwidth based on at least one of a time response of the controlled variable to the manipulated variable, a prediction accuracy of the controlled variable, a target value of the controlled variable, and an operational performance of the controlled object. (Disclosure 8) The processing device according to any one of Disclosures 1 to 7, wherein the operational range setting unit performs at least one of setting the predicted value of the operation amount when the predicted value of the control amount becomes a bandwidth upper limit value, which is a value corresponding to the upper limit value of the bandwidth, as the upper limit value of the operational range, and setting the predicted value of the operation amount when the predicted value of the control amount becomes a bandwidth lower limit value, which is a value corresponding to the lower limit value of the bandwidth, as the lower limit value of the operational range. (Disclosure 9) The processing device according to Disclosure 8, wherein the operation range setting unit performs at least one of: calculating a predicted value of the operation amount when the predicted value of the control amount becomes the bandwidth upper limit value by performing model predictive control using a prediction model that calculates a predicted value of the control amount and an evaluation function that evaluates at least a difference between the predicted value of the control amount and an upper limit value of the bandwidth; and calculating a predicted value of the operation amount when the predicted value of the control amount becomes the bandwidth lower limit value by performing model predictive control using a prediction model that calculates the predicted value of the control amount and an evaluation function that evaluates at least a difference between the predicted value of the control amount and a lower limit value of the bandwidth. (Disclosure 10) The processing apparatus according to any one of Disclosures 1 to 9, wherein the controlled object includes an industrial furnace capable of performing continuous heating control on a heating object that is heated in succession. (Disclosure 11) The processing apparatus according to any one of Disclosures 1 to 10, wherein the controlled object includes an industrial furnace in which heating control may be performed during non-steady operation. (Disclosure 12) A processing method for determining an operation amount to be applied to a control object based on a predicted value and a target value of a control amount, comprising: a bandwidth setting step of setting a bandwidth which is an allowable error range for the target value of the controlled variable; an operation range setting step of setting an operation range which is a range of the operation amount such that the predicted value of the controlled variable falls within the bandwidth; a manipulated variable determination step of determining the manipulated variable to be applied to the control target from within the manipulated variable range; A processing method comprising: (Disclosure 13) A program for causing a computer to function as each part of the processing device according to any one of Disclosures 1 to 11. [Explanation of symbols]
[0160] 1. Coke oven 2. Carbonization chamber 3. Combustion chamber 4 Furnace wall 5. Regulating valve 6 thermometer 7 Extrusion Ram 8 Thermometer 9 Guide car 100 Processing equipment 110 Data Acquisition Section 120 Target trajectory acquisition section 121 Prediction value calculation unit 121a Operation volume prediction unit 121b State prediction unit 122 Target trajectory determination section 130 Bandwidth setting section 140 Operation range setting section 141a Upper limit operation amount determination section 141b Lower limit manipulated variable determination section 142a Upper limit control amount prediction unit 142b Lower limit control amount prediction unit 150 Operation amount determination section 151 Center operation amount determination section 152 Central control amount prediction unit 153 Operation amount calculation section 160 Control section t c Current time t s Start time of non-routine operation t e End time of non-routine operation BW Bandwidth OR Operation Range Qin(t) Input heat amount Qin_max(t c +1) Upper limit input heat amount Qin_mid(t c +1) Center input heat amount Qin_min(t c +1) Lower limit input heat amount Tr(t) Furnace temperature Tr_ref_max(t) Upper target furnace temperature trajectory Tr_ref_mid(t) Center target furnace temperature trajectory Tr_ref_min(t) Lower target furnace temperature trajectory ΔQin_max Allowable increase in heat input ΔQin_min Allowable decrease in heat input
Claims
1. A processing device that determines an operation amount to be applied to a controlled object based on a predicted value and a target value of a controlled amount, a bandwidth setting unit that sets a bandwidth that is an allowable error range for the target value of the controlled variable; an operation range setting unit that sets an operation range that is a range of the operation amount for which the predicted value of the controlled variable falls within the bandwidth; a manipulation amount determination unit that determines the manipulation amount to be applied to the control target from within the manipulation range; A processing device comprising:
2. The processing device according to claim 1 , wherein the manipulated variable determiner determines the manipulated variable by using a predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to a target value.
3. 3. The processing device according to claim 2, wherein the manipulated variable determiner calculates a predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to a target value by performing model predictive control using a prediction model that calculates a predicted value of the controlled variable and an evaluation function that evaluates at least a difference between the predicted value of the controlled variable and a target value.
4. The processing device according to any one of claims 1 to 3, wherein the operation amount determination unit determines the operation amount based on a plurality of values within the operation range and a weighting coefficient indicating a relative importance of the plurality of values with respect to the operation amount.
5. 5. The processing device according to claim 4, wherein the multiple values include values determined using a predicted value of the manipulated variable when the predicted value of the controlled variable becomes an upper limit value of the bandwidth, a value based on the predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to a lower limit value of the bandwidth, and a predicted value of the manipulated variable when the predicted value of the controlled variable becomes a value corresponding to a target value.
6. 4. The processing device according to claim 1, wherein the manipulated variable determination unit determines the manipulated variable based on a time change of the manipulated variable represented by an actual value of the manipulated variable.
7. The processing device according to any one of claims 1 to 3, wherein the bandwidth setting unit sets the bandwidth based on at least one of a time response of the controlled variable to the manipulated variable, a prediction accuracy of the controlled variable, a target value of the controlled variable, and an operational performance of the controlled object.
8. The processing device according to any one of claims 1 to 3, wherein the operational range setting unit performs at least one of the following: setting the predicted value of the operation amount when the predicted value of the control amount becomes a bandwidth upper limit value, which is a value corresponding to the upper limit value of the bandwidth, as the upper limit value of the operational range; and setting the predicted value of the operation amount when the predicted value of the control amount becomes a bandwidth lower limit value, which is a value corresponding to the lower limit value of the bandwidth, as the lower limit value of the operational range.
9. 9. The processing device according to claim 8, wherein the operational range setting unit performs at least one of: calculating a predicted value of the operational amount when the predicted value of the controlled amount becomes the bandwidth upper limit value by performing model predictive control using a prediction model that calculates a predicted value of the controlled amount and an evaluation function that evaluates at least a difference between the predicted value of the controlled amount and an upper limit value of the bandwidth; and calculating a predicted value of the operational amount when the predicted value of the controlled amount becomes the bandwidth lower limit value by performing model predictive control using a prediction model that calculates the predicted value of the controlled amount and an evaluation function that evaluates at least a difference between the predicted value of the controlled amount and a lower limit value of the bandwidth.
10. 4. The processing apparatus according to claim 1, wherein the controlled object includes an industrial furnace capable of performing continuous heating control on heating objects that are heated in succession.
11. 4. The processing apparatus according to claim 1, wherein the controlled object includes an industrial furnace in which heating control may be performed during non-steady operation.
12. A processing method for determining an operation amount to be applied to a control object based on a predicted value and a target value of a control amount, comprising: a bandwidth setting step of setting a bandwidth which is an allowable error range for the target value of the controlled variable; an operation range setting step of setting an operation range which is a range of the operation amount such that the predicted value of the controlled variable falls within the bandwidth; a manipulated variable determination step of determining the manipulated variable to be applied to the control target from within the manipulated variable range; A processing method comprising:
13. A program for causing a computer to function as each part of the processing device according to any one of claims 1 to 3.
Citation Information
Patent Citations
Model prediction control apparatus and method
JP2006172273A
Cited By
Techniques for determining channel state information using a neural network model
US12323210B2
Techniques for determining channel state information using a neural network model
US20230421223A1