Crane work management system and crane work management method

JP2024173425APending Publication Date: 2024-12-12SUMITOMO HEAVY IND MATERIAL HANDLING SYST

Patent Information

Application Number
JP2023091837
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-06-02
Publication Date
2024-12-12

AI Technical Summary

Benefits of technology

【0022】 本発明によれば、クレーンの作業内容を容易且つ正確に判定することができるクレーンの作業管理システム、及び作業管理方法を提供することができる。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024173425000001_ABST
    Figure 2024173425000001_ABST
Patent Text Reader

Abstract

To provide a crane work management system and a crane work management method that can easily and accurately determine a work content of a crane.SOLUTION: A work management system 100 includes a setting unit 12 that sets factors necessary for determining a work content of a crane 20 based on cargo-handling operation information as adjustable parameters. Such parameters can be registered in advance. This makes it possible to automatically determine the work content of the crane based on the cargo-handling operation information using the parameters. By registering the factors necessary for determining the work content as adjustable parameters in advance, automatic determination tailored to a site becomes possible. As described above, the work content of the crane 20 can be easily and accurately determined.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a crane work management system and a crane work management method. [Background technology]

[0002] A known conventional crane work management system is described in Patent Document 1. The crane described in Patent Document 1 is equipped with a camera, and the crane is managed based on information obtained from the camera. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication No. 2021-151920 Summary of the Invention [Problem to be solved by the invention]

[0004] When judging the transport performance based on the load data, it is necessary to consider accidental fluctuations in the load (such as measurement errors of the load meter, minute load fluctuations due to wind or machine vibration, etc.), the weight of the hoisting equipment, and momentary load fluctuations due to inching operations to determine whether the load has been lifted clearly, to recognize horizontal movement to grasp the fact of the transfer, and to identify temporary loss of load due to the transported item being temporarily deposited on the ground, etc., before recognizing the transport performance. A system that can accurately judge the work content of a crane while considering such factors was required.

[0005] The present invention has been made to solve such problems, and has an object to provide a crane work management system and management method that can easily and accurately determine the work content of a crane. [Means for solving the problem]

[0006] The crane work management system of the present invention is a crane work management system that manages work of a crane deployed at a work site, and is equipped with a loading and unloading operation information acquisition unit that acquires loading and unloading operation information including at least load data on the crane, and a setting unit that sets factors necessary for determining the work content of the crane based on the loading and unloading operation information as adjustable parameters, and the parameters can be registered in advance.

[0007] The crane work management system of the present invention includes a setting unit that sets factors necessary for determining the work content of the crane based on the cargo-handling operation information as adjustable parameters. In addition, such parameters can be registered in advance. This makes it possible to automatically determine the work content of the crane based on the cargo-handling operation information using the parameters. Furthermore, by registering factors necessary for determining the work content in advance as adjustable parameters, automatic determination tailored to the site becomes possible. As a result, the work content of the crane can be easily and accurately determined.

[0008] The parameters may include a load detection sampling pitch indicating a pitch for thinning out the load data to smooth the load data, and a smoothing interval indicating an interval for calculating a median value to smooth the load data. In this case, it is possible to determine the work content of the crane in a state where the load data is smoothed and the influence of vibrations of the load data is reduced.

[0009] The parameter may indicate a lower limit value for the load data for recognizing the presence of a load suspended by the crane. In this case, it is possible to avoid inevitable and accidental load errors and to suppress erroneous detection of a state in which the crane is not suspending a load as a transport operation.

[0010] The parameters include a lower limit of a task monitoring time indicating a lower limit of a task monitoring time for monitoring a time when the load data exceeds the load detection lower limit in order to recognize a start time of the transport operation by the crane. In this case, it is possible to suppress erroneous detection of a re-hoisting or inching operation as the start of transport.

[0011] The parameters may include a movement detection lower limit value that indicates a lower limit value of horizontal movement for recognizing transfer by a crane. In this case, it is possible to accurately confirm that transfer by a crane is being performed.

[0012] The parameters may include a lower limit of a task interval time indicating an observation time for checking the independence between successive transport tasks. In this case, the independence between successive transport tasks can be checked.

[0013] The crane operation management system may further include a transport operation performance information acquisition unit that acquires transport operation performance information indicating the performance of the transport operation by determining the loading operation information using the parameters set by the setting unit. In this case, the transport operation performance information acquisition unit can accurately grasp the performance of the transport operation by using the above-mentioned parameters.

[0014] The crane operation management system may further include an allocation unit that allocates transportation operation performance information to transportation operation plan tasks registered in advance. In this case, the plan and the actual operation can be easily compared.

[0015] The allocation unit may automatically allocate the transportation work performance information acquired by the transportation work performance information acquisition unit to the transportation work plan tasks in the order of the plan. In this case, the plan and the actual work can be automatically compared.

[0016] When a transportation work plan task is designated, the allocation unit may allocate the acquired transportation work performance information to the designated transportation work plan task. In this case, when the order of transportation work is changed from the plan, it is easy to respond.

[0017] When an unscheduled transportation task is declared, the allocation unit may allocate the acquired transportation task performance information as a transportation task other than the transportation plan. In this case, when an unscheduled transportation task occurs, it is possible to easily respond.

[0018] When a transportation work plan task is designated and a declaration of the start of transportation work and a declaration of the end of transportation work are input, the allocation unit may allocate the transportation work performed between the start of transportation work and the end of transportation work to the designated transportation work plan task. In this case, even if the load on the suspended load is light and transportation work is not automatically determined, it can be manually allocated to the transportation work plan task.

[0019] The crane work management system may further include a display unit that simultaneously displays the loading operation information, the parameters, and the transport work performance information acquired by the transport work performance information acquisition unit. In this case, the working status of the crane can be easily understood by referring to the contents displayed on the display unit.

[0020] The crane work management method of the present invention is a crane work management method for managing work of a crane deployed at a work site, and includes a loading / unloading operation information acquisition step for acquiring loading / unloading operation information including at least load data on the crane, and a setting step for setting factors necessary for determining the work content of the crane based on the loading / unloading operation information as adjustable parameters, and the parameters can be registered in advance.

[0021] According to the work management method of the present invention, it is possible to obtain the same functions and effects as the above-mentioned crane work management system. Effect of the Invention

[0022] According to the present invention, it is possible to provide a crane work management system and a work management method that can easily and accurately determine the work content of a crane. [Brief description of the drawings]

[0023] [Figure 1] 1 is a block diagram showing a block configuration of a crane work management system according to an embodiment of the present invention. FIG. [Diagram 2]FIG. 2 is a diagram illustrating an example of a configuration of a crane. [Diagram 3] 13 is a flowchart showing the process of the management device. [Figure 4] 13 is a flowchart showing the process of the management device. [Diagram 5] 13 is a flowchart showing the process of the management device. [Figure 6] 13 is a flowchart showing the process of the management device. [Figure 7] 13 is a flowchart showing the process of the management device. [Figure 8] 13 is a flowchart showing the process of the management device. [Figure 9] FIG. 4 is a diagram showing an example of a screen of a display unit. [Figure 10] FIG. 4 is a diagram showing an example of a screen of a display unit. [Figure 11] FIG. 4 is a diagram showing an example of a screen of a display unit. [Figure 12] FIG. 4 is a diagram showing an example of a screen of a display unit. [Figure 13] FIG. 4 is a diagram showing an example of a screen of a display unit. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0024] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of a crane work management system according to the present invention will be described with reference to the drawings.

[0025] Fig. 1 is a block diagram showing the block configuration of a crane work management system 100 according to an embodiment of the present invention. Fig. 2 is a schematic diagram showing a crane 20. The work management system 100 is a system for managing a plurality of cranes 20 arranged at a work site. As shown in Fig. 1, the work management system 100 includes a management device 10, the crane 20, and a display unit 15.

[0026] First, an example of the configuration of the crane 20 will be described with reference to FIG. 2. In this embodiment, a jib crane is exemplified as the crane 20. The crane 20 can travel along rails 36 installed on the ground. The crane 20 includes a jib 31 that suspends a load, a main body 32 that supports the jib 31, a support 34 that rotatably supports the main body 32, and a running part 33 that can support the support 34 and travel along the rails 36. A hoist 37 is provided at the tip of a wire extending from the jib 31, and the hoist 37 suspends a load 38. Therefore, the position of the load 38 coincides with the position of the hoist 37.

[0027] The jib 31 rotates together with the hoisting tool 37 at a rotation angle θ around the rotation center CL, and the radial position of the hoisting tool 37 can be changed depending on the magnitude of the retraction radius R1 relative to the main body 32. Therefore, the hoisting tool 37 can move within the range of a circle indicated by a dashed line in Fig. 2(b). In addition, the position of the hoisting tool 37 can be changed by the crane 20 traveling at a traveling speed V along the rail 36.

[0028] As shown in FIG. 1, the crane 20 includes a load detection unit 21, a position detection unit 22, and an information transmission / reception unit .

[0029] The load detection unit 21 and the position detection unit 22 have a function of acquiring loading operation information related to each loading operation of the crane 20. The detection units provided on the crane 20 are not limited to the load detection unit 21 and the position detection unit 22, and may include other detection units such as a camera. The load detection unit 21 detects load data of the load acting on the hoist 37. A load meter or the like may be adopted as the load detection unit 21.

[0030] The position detection unit 22 is a device capable of acquiring information capable of detecting the position of the load 38. For example, the position detection unit 22 is configured by a position detection device that detects the traveling position of the crane 20, the rotation position of the jib 31, and the retracted position of the jib 31. That is, if the traveling position of the crane 20, the rotation position of the jib 31, and the retracted position of the jib 31 are determined, the positions of the hoist 37 and the load 38 can be specified. Therefore, the traveling position of the crane 20, the rotation position of the jib 31, and the retracted position of the jib 31 are information that enables the position of the load 38 to be detected. The position detection unit 22 is not particularly limited as long as it can acquire information that enables the position of the load 38 to be detected. For example, a position measuring device such as a GPS provided on the hoist 37 may be used as the position detection unit 22, and a distance from the rail end measured by a laser distance meter or the like may also be used.

[0031] The information transmitting / receiving unit 23 transmits the acquired information to the management device 10. In addition, the information transmitting / receiving unit 23 receives information from the management device 10. The information transmitting / receiving unit 23 transmits and receives information by wireless communication.

[0032] The management device 10 is a device that collects and integrates the cargo handling operation information of each of the multiple cranes 20 acquired by the load detection unit 21 and the position detection unit 22. The management device 10 also outputs the integrated cargo handling operation information. The management device 10 transmits the integrated cargo handling operation information to the display unit 15 and displays it via the display unit 15. The integrated cargo handling operation information is information that indicates which crane 20 performed what cargo handling operation, in a linked state. The management device 10 automatically recognizes that the transported goods have been transported based on the transition of the actual load data of each crane 20, the behavior of the horizontal movement (all movement data including turning, hoisting, traveling, etc.), and the independence of the transport work due to the transport interval time, and accumulates, displays, and records the load value, transport time zone, and transport history as the transport work performance.

[0033] Next, a description will be given of a specific configuration of the management device 10. The management device 10 includes a cargo handling operation information acquisition unit 11, a setting unit 12, a transport operation performance information acquisition unit 13, a plan acquisition unit 14, an allocation unit 16, an information transmission / reception unit 17, and a storage unit 18.

[0034] The loading / unloading operation information acquisition unit 11 acquires loading / unloading operation information of the crane 20. The loading / unloading operation information includes at least load data, and in this embodiment, includes the load data detected by the load detection unit 21 and the position data of the hoisting tool 37 detected by the position detection unit 22.

[0035] The setting unit 12 sets factors necessary for determining the work content of the crane 20 based on the cargo handling operation information as adjustable parameters. The parameters can be registered in advance and are stored in the memory unit 18. When the transport work performance information acquisition unit 13 described below automatically determines the work content, the parameters are registered in advance and the setting unit 12 tunes these appropriately to suit the site, thereby improving the accuracy of the determination. Each parameter has a setting range (minimum to maximum value) and an initial value. The contents of the parameters will be explained in detail together with the flowchart described below.

[0036] The transport work performance information acquisition unit 13 acquires transport work performance information indicating the performance of the transport work by determining the loading and unloading operation information using the parameters set by the setting unit 12. The transport work performance information includes information on the transport start time, the transport end time, and the load during transport (e.g., maximum load) of the transport work actually performed by the crane 20. The transport work performance information acquisition unit 13 acquires the information by automatically determining the parts corresponding to the transport work of the suspended load 38 by the crane 20 from the acquired loading and unloading operation information.

[0037] The plan acquisition unit 14 acquires a plan for the transportation work by the crane 20. The plan acquisition unit 14 acquires transportation work plan tasks registered in advance. The registered transportation work plan tasks may be stored in the storage unit 18. The transportation work plan tasks include, for example, information on the contents of the suspended load 38 to be transported and from where to where the transportation will be performed. The plan acquisition unit 14 acquires, for example, at the beginning of a day or the day before, multiple transportation work plan tasks to be performed during the entire work day.

[0038] The allocation unit 16 allocates the transport work performance information to the transport work plan tasks registered in advance. The allocation unit 16 performs the allocation by a plurality of methods, and specific examples will be described later.

[0039] The information transmitting / receiving unit 17 transmits the acquired information to the display unit 15. The information transmitting / receiving unit 17 also receives information from each of the cranes 20. The information transmitting / receiving unit 17 transmits and receives information by wireless communication.

[0040] Next, the process performed by the management device 10 will be described with reference to Fig. 3. As shown in Fig. 3, the plan acquisition unit 14 of the management device 10 acquires transportation work plan tasks for a day on a work day for the target crane 20 (step S10).

[0041] Next, the cargo handling operation information acquisition unit 11 of the management device 10 acquires cargo handling operation information from the target crane 20 (step S20). The transport work performance information acquisition unit 13 of the management device 10 acquires transport work performance information based on the cargo handling operation information acquired in step S20 (step S30). In step S30, the setting unit 12 sets parameters in advance to perform various judgments.

[0042] The allocation unit 16 of the management device 10 allocates the transport work performance information acquired in step S30 to the transport work plan task acquired in step S10. The management device 10 refers to the transport work plan task acquired in step S10 and determines whether the work plan for one day has been completed (step S50). If it is determined in step S50 that the work plan has not been completed, the process is repeated again from step S20. The management device 10 may acquire the cargo handling operation information in real time and perform the allocation in real time. However, the management device 10 may also acquire the cargo handling operation information for one day collectively after the work for one day is completed and perform the allocation collectively.

[0043] Next, the specific contents of the process of acquiring the transport work performance information (step S30 in FIG. 3) will be described with reference to FIG. 4 to FIG. 8. The management device 10 can automatically perform a determination to acquire the transport work performance information. As shown in FIG. 4, the management device 10 acquires the transport work performance by following a procedure that is roughly divided into seven steps.

[0044] The management device 10 performs a load value fluctuation smoothing operation (step S110). Load data is affected by small fluctuations and therefore has small vibration components (for example, see graph G2 of actual load in FIG. 10). Therefore, in step S110, the management device 10 removes the small vibration components from the acquired load data to make it less susceptible to load fluctuations.

[0045] Next, the management device 10 recognizes the presence of a load 38 on the hoisting tool 37 of the crane 20 (step S120). Even if the hoisting tool 37 is not suspending a load 38, a load may be detected due to errors caused by various accidental fluctuations and the influence of the hoisting tool. Therefore, in step S120, the management device 10 recognizes the presence of a load that exceeds such errors.

[0046] Next, the management device 10 recognizes the start of the transport operation (step S130). In order to suppress erroneous detection of the start of the transport operation, in step S130, the management device 10 recognizes the start time of the transport operation by the state of the above-mentioned step S130 continuing for a certain period of time.

[0047] Next, the management device 10 judges whether or not the load 38 has been transferred (step S140). In step S140, the management device 10 recognizes the fact that the load 38 has been transferred in order to determine the "transportation" by the crane 20 in the state of step S130 described above.

[0048] The management device 10 recognizes the end of the transport operation (step S150). In step S150, the management device 10 confirms that the load has been removed from the state of step S140 described above, and grasps the end time of the transport operation.

[0049] The management device 10 judges the task interval time (step S160). Even in the same transport work task, there are cases where the suspended load 38 is once placed on the ground and transport is resumed again. In such a case, even if the load is once removed, it is necessary to regard it as the same transport work task. For example, referring to the graph G2 of the actual load corresponding to the bar chart shown in P3 of FIG. 11, there is a point where the load temporarily decreases, but since the interval is short, it is regarded as the same transport work. A certain amount of time is provided between independent tasks. Therefore, in step S150, the management device 10 observes the task interval time from the observation of the end of the transport work in the above-mentioned step S150 until the start of a new task (transport work) and judges the independence of the tasks.

[0050] The management device 10 grasps the transport performance (step S170). After confirming that the transport operations are independent in the judgment of step S160, the management device 10 extracts and records the actual load value, the transport start time, and the transport end time during the series of transport operations of steps S130 to S150.

[0051] Next, the parameters used to carry out the above-mentioned processing will be described.

[0052] The parameters set in step S110 include a load detection sampling pitch Sp and a smoothing section Ts. The load detection sampling pitch Sp is a parameter indicating a pitch for thinning out load data in order to smooth the load data. The smoothing section Ts is a parameter indicating a section in which a median is calculated in order to smooth the load data. The median is calculated in order to suppress error fluctuations in the load.

[0053] The parameters set in step S120 include a load detection lower limit Wa. The load detection lower limit Wa is a parameter indicating a lower limit for the load data for recognizing the presence of a load suspended by the crane in order to avoid inevitable and accidental load errors. The load detection lower limit Wa is decomposed into the following element parameters and is expressed as the sum of the element parameters, "Wa=Le+Wt+We". "Le: Load cell measurement error...error caused by hysteresis in the measurement system" "Wt: Weight of the lifting tool...the weight of the tool used to lift the load below the hook" "We: Accidental fluctuations in load... shaking when taking off from the ground caused by the aircraft's natural frequency, load vibration caused by wind, etc."

[0054] The parameters set in step S130 include a load detection lower limit exceeding monitoring time Tc. The load detection lower limit exceeding monitoring time Tc is a parameter for monitoring the time when the load data exceeds the load detection lower limit in order to avoid erroneous detection of re-suspending or inching operations and to accurately recognize the start time of the transport operation by the crane 20.

[0055] The parameters set in step S140 include a movement detection lower limit La. The movement detection lower limit La is a parameter indicating a lower limit of horizontal movement for recognizing transfer by the crane 20. The movement distance (ΣL) to be detected is expressed as "ΣL = Lt + Ls + Lk". Each element parameter is shown below. "Lt: Running distance = Running speed x Duration" "Ls: Turning distance = turning radius x turning angle variable" "Lk: Distance traveled uphill = Change in turning radius"

[0056] The parameters set in step S160 include a task interval time Te, which is a parameter indicating an observation time for confirming the independence of successive transportation work tasks.

[0057] Next, the specific contents of the process of acquiring the transport operation performance information will be described with reference to FIG. 5 to FIG. 8. The setting unit 12 sets various parameters in advance. The setting unit 12 sets at least one parameter of the load detection sampling pitch Sp, the load detection lower limit Wa, the lower limit Tc of the load detection lower limit over monitoring time, the movement detection lower limit La, and the lower limit Te of the task interval time before the start of the transport operation (step S200). If there is no significant change in the transport operation and no change is required from the already set parameters, the setting of at least one of the various parameters in step S200 or the entire step S200 may be omitted. As shown in FIG. 5, the transport operation performance information acquisition unit 13 starts detecting the load of the suspended load 38 based on the acquired load data (step S210). The setting unit 12 acquires and deploys the load detection sampling pitch Sp set in step S200 (step S220). The transport operation performance information acquisition unit 13 samples the load detection at the load detection sampling pitch Sp set in step S220 and starts acquiring the sampling value Ws (step S230). The setting unit 12 sets a smooth section Ts (step S240). The transport operation performance information acquisition unit 13 calculates the median Wm of the sampling values ​​Ws in the smooth section Ts set in step S240 (step S250). Steps S210 to S250 in FIG. 5 correspond to step S110 in FIG. 4.

[0058] Next, as shown in FIG. 6, the setting unit 12 acquires and expands the load detection lower limit Wa set in step S200 (step S260). For example, in FIG. 10, a graph G1 of the load detection lower limit Wa is set for the graph G2. The transport work performance information acquisition unit 13 judges whether or not the load detection median Wm exceeds the load detection lower limit Wa (step S270). If the result is "NO" in step S270, the process returns to step S230 in FIG. 5. If the result is "YES" in step S270, the setting unit 12 acquires and expands the lower limit Tc of the load detection lower limit over monitor time set in step S200 (step S280). The transport work performance information acquisition unit 13 judges whether or not the duration of the state in which the load detection median Wm exceeds the load detection lower limit Wa exceeds the lower limit Tc of the load detection lower limit over monitor time (step S290). If "NO" in step S290, return to step S230 in Fig. 5. If "YES" in step S290, the transport work performance information acquisition unit 13 confirms the start of the transport work and stores the transport start time Tf (step S300). In Fig. 10, the point where graph G3 rises is the point where the start of transport is confirmed. Steps S260 to S270 in Fig. 6 correspond to step S120 in Fig. 4. Steps S280 to S300 in Fig. 6 correspond to step S130 in Fig. 4.

[0059] Next, as shown in FIG. 7, the setting unit 12 acquires and expands the movement detection lower limit La set in step S200 (step S310). The transport work performance information acquisition unit 13 calculates the horizontal movement distance (step S320). The horizontal movement distance is calculated by "ΣL=Lt+Ls+Lk" as described above. The transport work performance information acquisition unit 13 judges whether the horizontal movement distance ΣL exceeds the movement detection lower limit La (step S330). If "NO" in step S330, the process returns to step S320. If "YES" in step S330, the transport work performance information acquisition unit 13 determines that the crane 20 is performing a transport operation. In FIG. 10, the point where the graph G3 is moving horizontally at a high position is the point where it is determined that the transport operation is being performed. The transport work performance information acquisition unit 13 judges whether the median value Wm of the load detection is equal to or lower than the load detection lower limit Wa to determine the end of transport (step S350). If "NO" in step S350, return to step S340. If "YES" in step S350, the transport operation performance information acquisition unit 13 makes a provisional decision to end the transport operation and grasps the transport end time Tt (step S360). Steps S310 to S340 in Fig. 7 correspond to step S140 in Fig. 4. Steps S350 to S360 in Fig. 7 correspond to step S150 in Fig. 4.

[0060] Next, as shown in FIG. 8, the setting unit 12 acquires and expands the lower limit Te of the task interval time set in step S200 (step S370). The transport work performance information acquisition unit 13 judges whether the task interval time (Tt2-Tt1) from the transport work end time to the subsequent transport work start time exceeds the lower limit Te of the task interval time (step S380). If "NO" in step S380, the process returns to step S300 in FIG. 6. If "YES" in step S380, the transport work performance information acquisition unit 13 confirms the end of the transport work and stores the transport end time (step S390). In FIG. 10, the point where the graph G3 falls is the point where the transport end is confirmed. The transport work performance information acquisition unit 13 grasps the transport performance (step S400). In step S400, the transport work performance information acquisition unit 13 grasps the transport start time, the transport end time, the maximum load between the transport start and end times, and the like. The transport operation performance information acquisition unit 13 accumulates, displays, and records the transport performance values ​​(step S410). Steps S370 to S390 in Fig. 8 correspond to step S160 in Fig. 4. Steps S400 to S410 in Fig. 8 correspond to step S170 in Fig. 4. This completes the processing in Figs. 5 to 8.

[0061] Next, the allocation of the transport operation result data to the transport operation plan tasks shown in step S40 of FIG. 3 will be specifically described with reference to FIG. 9 and FIG.

[0062] Fig. 9 is a diagram showing the display contents on the display unit 15 before work starts. Here, it is assumed that the display contents on the display unit 15 are shared by the operator of the crane 20 and the manager. Fig. 10 is a diagram showing the display contents on the display unit 15 after work starts. The screen of the display unit 15 has an operation area E1 where the worker performs operations, a graph area E2 showing graphs, a list area E3 showing the contents of the transportation work plan task, and a bar chart area E4 for linking the transportation work plan task with the transportation work performance data.

[0063] The operation area E1 is an area where the driver instructs the start and end of the transport work and the like as necessary, specifying a task. The graph area E2 is an area where a graph of the transport automatic determination result is displayed. The horizontal axis of the graph area E2 indicates time, which coincides with the time of the bar chart area E4 below. The vertical axis of the graph area E2 indicates load. The graph area E2 displays a graph G1 indicating the load detection lower limit, a graph G2 indicating the actual load acting on the hoist 37, a graph G3 indicating the transport work determination result, and a graph G4 indicating the travel position of the crane 20 (plus or minus distance from the fixed device position). In this way, the display unit 15 simultaneously displays the cargo handling operation information (actual load), the parameter (load detection lower limit), and the transport work performance information (transport work determination result) acquired by the transport work performance information acquisition unit 13.

[0064] In the list area E3, the transportation work plan for that day is clearly displayed in order of earliest scheduled work start time, with task work content (target product, block name, From, To, work content), and the scheduled start and end times and scheduled weight of the work. This is registered in advance in the evening of the previous day or before work begins on that day. As shown in Figure 9, the transportation work plan tasks to be performed on that day are planned in advance, even before work begins. In the example of Figure 9, four transportation work plan tasks with the work names "Draining," "Assembly," "Mounting," and "Small items" are planned. If a transportation work plan task is added on the day, it is added to the list area E3 as an "unplanned" task.

[0065] In allocating transportation work performance data to transportation work plan tasks, the allocation unit 16 executes four methods: "automatic allocation," "automatic allocation of task designation," "automatic allocation of unscheduled work," and "forced allocation of light load work determination."

[0066] [Automatic allocation] The allocation unit 16 automatically allocates the transportation work performance information acquired by the transportation work performance information acquisition unit 13 to the transportation work plan tasks in the planned order. When the actual transportation work is performed in that order, the allocation unit 16 automatically allocates the automatically determined transportation work performance information in the order from the top of the transportation work plan. For example, the allocation unit 16 allocates the transportation work W1 that is automatically determined first in FIG. 10 to the first transportation work plan task. As a result, a bar chart of "P1" is displayed for the time corresponding to the transportation work W1 in the first transportation work plan task.

[0067] [Automatic allocation of task] When a transportation work plan task is designated, the allocation unit 16 allocates the acquired transportation work performance information to the designated transportation work plan task. When the order of the transportation work plan changes due to the situation at the site on the day, the transportation work task to be performed is designated by operating the touch panel or the like. For example, as shown in FIG. 11, when it becomes necessary to perform the third work plan task from the top before the second transportation work plan task from the top, the worker touches the position of the third transportation work plan task from the top. As a result, the transportation work W2 that is automatically determined to be the second is allocated to the designated third transportation work plan task (see "P2"). In addition, the transportation work W3 that is automatically determined to be the third is allocated to the second transportation work plan task from the top, which has been placed later in the order due to interruption, according to the above-mentioned "automatic allocation" method (see "P3").

[0068] [Automatic allocation of unplanned work] When it is declared that the transportation work is unscheduled, the allocation unit 16 allocates the acquired transportation work performance information as a transportation work task other than the transportation plan. When the transportation work to be performed is not included in the transportation work plan tasks registered in advance, the worker declares that it is "unscheduled work" by operating the touch panel or the like. For example, as shown in FIG. 12, the worker presses the "unscheduled work" button in the operation area E1. In this case, the transportation work W5 automatically determined at that time is allocated to the "unscheduled work" set in the fifth column from the top (see "P5").

[0069] [Forced allocation of light load work] When a transport work task is specified and a declaration of the start of transport work and a declaration of the end of transport work are input, the allocation unit 16 allocates the transport work performed between the start of transport work and the end of transport work to the specified transport work plan task. When the transport work content is predicted to be a light load that is clearly less than the lower limit Wa of the load detection, the transport work plan task is specified by an instruction by the worker through the operation of a touch panel, etc., and then the start of transport work and the end of transport work are declared through the operation of a touch panel, etc., so that the start time of the transport work, the end time of the transport work, and the actual maximum load value during that period can be forcibly obtained, collected, displayed, and recorded. In the example shown in FIG. 13, the worker presses the "Transport Start" button in the operation area E1, and when the transport work is completed, the "Transport End" button is pressed. At this time, it is not automatically determined as a transport work, and the graph G3 is not displayed, but when the "Transport Start" and "Transport End" buttons are pressed, a bar chart is drawn in the column of the transport work plan task for "small items," which is the fourth from the top (see "P4"). In this case, it is necessary to be aware that the actual load value includes fluctuations due to load meter errors and aircraft vibrations, and care must be taken when handling the value. The fact that a transportation operation took place is recorded, and is effective for that purpose.

[0070] Next, the operation and effect of the work management system 100 for the crane 20 according to this embodiment will be described.

[0071] The crane work management system 100 of this embodiment includes a setting unit 12 that sets factors necessary for determining the work content of the crane 20 based on the cargo handling operation information as adjustable parameters. In addition, such parameters can be registered in advance. This makes it possible to automatically determine the work content of the crane based on the cargo handling operation information using the parameters. In addition, by registering factors necessary for determining the work content as adjustable parameters in advance, automatic determination tailored to the site becomes possible. As described above, the work content of the crane 20 can be easily and accurately determined.

[0072] The parameters may include a load detection sampling pitch indicating a pitch for thinning out the load data to smooth the load data, and a smoothing interval indicating an interval for calculating a median value to smooth the load data. In this case, it is possible to determine the work content of the crane 20 in a state where the load data is smoothed and the influence of vibrations, etc. of the load data is reduced.

[0073] The parameter may indicate a lower limit value for the load data for recognizing the presence of a load 38 suspended by the crane 20. In this case, inevitable and accidental errors in the load can be avoided, and a state in which the crane 20 is not suspending the load 38 can be prevented from being erroneously detected as a transport operation.

[0074] The parameters may include a lower limit of a task monitoring time that indicates a lower limit of the task monitoring time for monitoring the time when the load data exceeds the load detection lower limit, in order to recognize the start time of the transport operation by the crane 20. In this case, it is possible to suppress erroneous detection of re-hoisting or inching operations as the start of transport.

[0075] The parameters may include a movement detection lower limit value that indicates a lower limit value of horizontal movement for recognizing transfer by the crane 20. In this case, it can be accurately confirmed that transfer by the crane 20 is being performed.

[0076] The parameters may include a lower limit of a task interval time indicating an observation time for checking the independence between successive transport tasks. In this case, the independence between successive transport tasks can be checked.

[0077] The crane work management system 100 may further include a transport work performance information acquisition unit 13 that acquires transport work performance information indicating the performance of the transport work by determining the cargo handling operation information using the parameters set by the setting unit 12. In this case, the transport work performance information acquisition unit 13 can accurately grasp the performance of the transport work using the above-mentioned parameters.

[0078] The work management system 100 of the crane 20 may further include an allocation unit that allocates the transportation work performance information to the transportation work plan task registered in advance. In this case, the plan and the actual work can be easily compared.

[0079] The allocation unit 16 may automatically allocate the transportation work performance information acquired by the transportation work performance information acquisition unit 13 to the transportation work plan tasks in the order of the plan. In this case, the plan and the actual work can be automatically compared.

[0080] When a transportation work plan task is specified, the allocation unit 16 may allocate the acquired transportation work performance information to the specified transportation work plan task. In this case, when the order of transportation work is changed from the plan, it is easy to respond.

[0081] When an unscheduled transportation task is declared, the allocation unit 16 may allocate the acquired transportation task performance information as a transportation task other than the transportation plan. In this case, when an unscheduled transportation task occurs, it is possible to easily respond.

[0082] When a transportation work plan task is designated and a declaration of the start of transportation work and a declaration of the end of transportation work are input, the allocation unit 16 may allocate the transportation work performed between the start of transportation work and the end of transportation work to the designated transportation work plan task. In this case, even if the load on the suspended load is light and transportation work is not automatically determined, it can be manually allocated to the transportation work plan task.

[0083] The work management system 100 for the crane 20 may further include a display unit 15 that simultaneously displays the cargo handling operation information, parameters, and the transport work performance information acquired by the transport work performance information acquisition unit 13. In this case, the work status of the crane 20 can be easily grasped by referring to the contents displayed on the display unit 15.

[0084] In addition, the work management system 100 can build an overall framework in which transport work results are accumulated, displayed, and recorded without the intervention of the driver. It also makes it possible to collect light-load transport work results that are difficult to automatically determine through the driver's instructions (operations). It is possible to link and grasp the plans and results of transported goods handling, which contributes to improving productivity in the next production run and enables automatic development into the customer's daily report (recording the transport work items for the day and the actual work hours between the start and end times of each work item).

[0085] The work management method for crane 20 in this embodiment is a work management method for crane 20 that manages work of crane 20 arranged at a work site, and includes a loading / unloading operation information acquisition step of acquiring loading / unloading operation information including at least load data on the crane 20, and a setting step of setting factors necessary for determining the work content of the crane based on the loading / unloading operation information as adjustable parameters, and the parameters can be registered in advance.

[0086] According to the work management method of the present embodiment, it is possible to obtain the same functions and effects as those of the work management system 100 for the crane 20 described above.

[0087] The present invention is not limited to the above-described embodiments.

[0088] Although a jib crane has been given as an example of a crane, the type of crane is not particularly limited, and the present invention can be applied to other types of cranes, such as a gantry crane.

[0089] The transport work plans and performance data obtained by the above-mentioned system, as well as the values ​​of the various adopted parameters, can be accumulated and used as learning data for future AI. [Explanation of symbols]

[0090] 11...loading operation information acquisition unit, 12...setting unit, 13...transportation work performance information acquisition unit, 15...display unit, 16...allocation unit, 20...crane, 100...work management system.

Claims

1. A crane work management system that manages work of a crane arranged at a work site, A loading operation information acquisition unit that acquires loading operation information including at least load data of the crane; A setting unit that sets factors necessary for determining the work content of the crane based on the cargo handling operation information as adjustable parameters, The parameters can be registered in advance in this crane work management system.

2. The parameters are: a load detection sampling pitch indicating a pitch for thinning out the load data in order to smooth the load data; The crane work management system according to claim 1 , further comprising: a smoothing section indicating a section in which a median is calculated to smooth the load data.

3. The crane work management system according to claim 1 , wherein the parameters include a load detection lower limit value indicating a lower limit value for the load data for recognizing the presence of a load suspended by the crane.

4. 4. The crane work management system according to claim 3, wherein the parameters include a lower limit value of a task monitoring time indicating a lower limit value for a task monitoring time for monitoring a time at which the load data exceeds the lower limit value of the suspended load detection in order to recognize a start time of a transport operation by the crane.

5. The crane work management system according to claim 1 , wherein the parameters include a movement detection lower limit value indicating a lower limit value of horizontal movement for recognizing transfer by the crane.

6. 2. The crane work management system according to claim 1, wherein the parameters include a lower limit value of a task interval time indicating an observation time for confirming independence between successive transportation work tasks, the lower limit value being a lower limit value for a task interval time.

7. 2. The crane work management system according to claim 1, further comprising a transport work performance information acquisition unit that acquires transport work performance information indicating the performance of the transport work by determining the loading and unloading operation information using the parameters set by the setting unit.

8. The crane work management system according to claim 7, further comprising an allocation unit that allocates the transportation work performance information to a transportation work plan task registered in advance.

9. The crane work management system according to claim 8 , wherein the allocation unit automatically allocates the transportation work performance information acquired by the transportation work performance information acquisition unit to the transportation work plan tasks in a planned order.

10. The crane work management system according to claim 8 , wherein, when the transportation work planning task is designated, the allocation unit allocates the acquired transportation work performance information to the designated transportation work planning task.

11. The work management system according to claim 8, wherein when it is declared that the transportation work is unscheduled, the allocation unit allocates the acquired transportation work performance information as a transportation work task other than a transportation plan.

12. The work management system of claim 8, wherein when the transport work plan task is specified and a declaration of the start of the transport work and a declaration of the end of the transport work are input, the allocation unit allocates the transport work performed between the start of the transport work and the end of the transport work to the specified transport work plan task.

13. The crane work management system according to claim 7, further comprising a display unit that simultaneously displays the loading and unloading operation information, the parameters, and the transportation work performance information acquired by the transportation work performance information acquisition unit.

14. A crane work management method for managing work of a crane arranged at a work site, comprising: A loading operation information acquisition step of acquiring loading operation information including at least load data of the crane; A setting step of setting factors necessary for determining the work content of the crane based on the cargo handling operation information as adjustable parameters, The parameters can be registered in advance in this crane work management system.

Citation Information

Patent Citations

  • Construction monitoring system

    JP2012056753A

  • Work control device, method, and program

    JP2014237505A

  • Crane work management system and management unit

    JP2021151920A

  • Construction process management system and method using crane data

    KR102346759B1

Cited By

  • Automatic crane system and control method for automatic crane system

    WO2026196808A1