Combustion boiler control method, combustion boiler, and boiler calculation system
The method and system for dynamically controlling combustion boilers improve performance and flexibility by calculating real-time maximum loads, enhancing efficiency and reducing wear, while simplifying control systems.
Patent Information
- Application Number
- JP2024514426
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2021-09-09
- Publication Date
- 2024-10-02
- Estimated Expiration
- 2041-09-09
AI Technical Summary
Existing combustion boilers face challenges in achieving optimal combustion conditions, leading to inefficiencies and wear due to fixed maximum load limits, which can be exceeded, resulting in reduced performance and increased complexity in control systems.
A method and system for controlling combustion boilers that dynamically calculates the current maximum instantaneous load based on real-time monitored data, using an exhaust gas coefficient to adjust operations, allowing operation beyond fixed limits while ensuring safe and efficient performance.
This approach enhances boiler performance by increasing power/heat output by 2.5-5%, reduces wear, and simplifies control system complexity by allowing flexible operation within permissible limits.
Smart Images

Figure 2024535750000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to the control of a fired boiler, in particular to the control of a fluidized bed boiler, such as a circulating fluidized bed (CFB) boiler or a bubbling fluidized bed (BFB) boiler. [Background technology]
[0002] Combustion boilers, such as grate boilers and fluidized bed boilers, are commonly utilized to generate steam, which can be used for a variety of purposes, such as the production of electricity and heat.
[0003] In a fluidized bed boiler, fuel and solid particulate bed material are introduced into the furnace. The bed material and fuel are fluidized by introducing a fluidizing gas from the bottom of the furnace. The combustion of the fuel takes place in the furnace. In the combustion of the BFB, the fluidizing gas passes through the bed so as to form bubbles in the bed. The fluidized bed can be controlled in the BFB quite conveniently by controlling the fluidizing gas supply and the fuel supply. In addition to the fuel, certain additives may be added to the combustion, such as aluminum silicates (such as non-hydrated clays), alkali alkaline earth metal carbonates, and mixtures thereof (such as limestone or calcium carbonate), to enhance the sorption of possible heavy metals, sulfur, and also to enhance the sorption of alkali.
[0004] In a CFB combustion, a fluidizing gas is passed through the bed media. Most of the bed particles become entrained in the fluidizing gas and are carried along with the exhaust gas. The particles are separated from the exhaust gas in at least one particle separator and circulated back into the furnace. A fluidized bed heat exchanger is typically located downstream of the particle separator to recover heat from the particles before they are returned to the furnace.
[0005] In all boilers, regardless of combustion technology, combustion conditions, such as air and fuel mixing, may not be ideal.
[0006] Improbed AB's published international application WO 2016 / 202640A1 discloses a method for controlling the heat load of a fired boiler, in which the heat load of the fired boiler is reduced if the flue gas velocity monitored at at least one point of the boiler exceeds a predetermined maximum flue gas velocity limit. The flue gas velocity is calculated using a set of equations by dividing the flue gas volumetric flow rate by the cross-sectional area of the flue gas duct, located immediately downstream of the cyclone.
[0007] Fired boilers are conventionally designed for a given load, which is the boiler's respective boiler maximum continuous rating (BMCR), sometimes referred to as the design load level. Summary of the Invention [Problem to be solved by the invention]
[0008] The first object of the present invention is to improve boiler performance, profitability and flexibility and to improve boiler load control. The second object of the present invention is to reduce the complexity of the control system of a combustion boiler. [Means for solving the problem]
[0009] The first object can be achieved by a combustion boiler control method according to claim 1 and a combustion boiler according to claim 19. The second object can be achieved by a combustion boiler calculation system according to claim 24.
[0010] The dependent claims describe advantageous aspects of the combustion boiler control method, the combustion boiler and the combustion boiler calculation system.
[0011] Advantages of the Invention The combustion boiler control method includes the following steps. a) Current load Q of the combustion boiler h Monitoring the b) finding a value for the current calculated maximum boiler instantaneous load for which at least one exhaust gas coefficient calculated using currently monitored process data including a numerical model of the boiler satisfies the acceptance criteria, and designating this value as the current calculated maximum boiler instantaneous load Q h,max Selecting as c) Current calculated maximum boiler instantaneous load Q h、max and / or a process of displaying the current load Q h but, c1) When the load is smaller than the maximum instantaneous load of the boiler according to the current calculation. c1i) indicating to the boiler operator that the boiler load may increase; and / or c1ii) automatically increasing the boiler load; and / or c2) When the load is greater than the maximum instantaneous boiler load currently calculated, c2i) Boiler load Q h Indicating to the boiler operator that the current calculated maximum boiler instantaneous load is exceeded; and / or c2ii) Boiler load Q h automatically reducing the
[0012] In this manner, rather than fixing the maximum load of the boiler, the method of calculating the exhaust gas coefficient and suitably selecting the allowable condition of the exhaust gas coefficient allows the fired boiler to be safely operated at or close to the current calculated maximum boiler load of the fired boiler, which may be higher than the fixed maximum load of the boiler from time to time. The current calculated maximum boiler load may be higher than the design load level. Thus, the overall performance of the boiler may be improved and the power / heat generation may be increased. Furthermore, since the current calculated maximum boiler load may be lower than the design load level, the wear on the boiler due to exceeding the current calculated maximum boiler load may be better reduced. The current calculated maximum boiler load may be regarded as the maximum allowable boiler load and / or the preferred boiler load, in other words.
[0013] In the tests carried out, the Applicant has been able to obtain, on average, a power output from the fired boiler that exceeds the fixed boiler maximum load. The Applicant has been able to demonstrate in tests that for fired boilers, the improvement potential can be between 2.5 and 5%. This is the case for example for a 120 MW th For combustion boilers, 3 to 6MW th is equivalent to.
[0014] In this method, it is preferred that: i) The currently monitored process data of the boiler ia) the current exhaust gas outlet temperature in the exhaust gas flow path; ib) Heat duty for each heat transfer surface in the exhaust gas flow path and ii) The monitored process data from both ia) and ib) are used to calculate the exhaust gas coefficient and the current calculated maximum boiler instantaneous load Q h,max It is used when finding a numerical value for
[0015] Calculating the heat load of a heat exchanger is known to those skilled in the art, and the heat load can be obtained, for example, by using the following formula: Q fluid,i =q m,fluid,i ×(h fluid,out -h fluid,in ) Here, q m,fluid,i is the fluid flow rate at the i-th heat transfer surface, h fluid,in is the enthalpy of the fluid entering the ith heat transfer surface, h fluid,out is the enthalpy of the fluid leaving the ith heat transfer surface.
[0016] This discovery may be implemented such that if at least one exhaust gas coefficient calculated using currently monitored process data including a numerical model of the boiler fails to meet the tolerance criteria, a next value is automatically selected. The next value is preferably selected iteratively. This may enable the use of computational library functions, in particular iterative solvers (such as Python's FSOLVE function, which solves the roots of a function).
[0017] This finding can be done by performing the following computational steps. - I: a step of calculating an estimate of the boiler exhaust gas outlet temperature, which results in a calculated boiler model when the boiler heat load is matched with the numerical value; - II: calculating the exhaust gas mass flow rate; - III: calculating the heat load of each heat transfer surface in the exhaust gas flow path using the current heat load corrected by using a numerical boiler model; - IV: Using the calculated heat load for each heat transfer surface in the exhaust gas flow path, calculate the exhaust gas temperature at each heat transfer surface, starting with the heat transfer surface in the exhaust gas flow path closest to the exhaust gas outlet in the upstream direction of the exhaust gas flow, using the estimated value of the boiler exhaust gas outlet temperature; - V: A process for calculating the exhaust gas coefficient for each heat transfer surface in the exhaust gas flow path.
[0018] Using this technique, the condition of each heat transfer surface (hereinafter "heat transfer surface" means heat exchangers, heat exchanger tubes, heat exchanger tube bundles, heat exchanger packages and / or heat exchanger components such as economizers) in the exhaust gas flow path can be numerically estimated using the exhaust gas coefficients in a situation where the boiler heat load matches the numerical value. The term "heat transfer surface" preferably means heat exchanger components such as economizers. It can now be tested whether a particular numerical value, which is a candidate for the current calculated maximum boiler instantaneous load, produces an acceptable situation at the heat transfer surface.
[0019] According to one embodiment of the present invention, in step III), the numerical boiler model is fluid,i,candidate =Qfluid,i,current +Σα j,i (Q h,candidate ) j -Σpar j,i (Q h,current ) j This is a model of the form:
[0020] Parameter j,i ) can be fitted manually by a human or automatically by a computer using historical data. Automatic updates of parameters may occur, for example, once a month. AI and neural network-based algorithms can be used in the automatic updates.
[0021] This makes it possible, on the one hand, to predict the computationally permissible current maximum boiler instantaneous load without reaching a limit at the current boiler load, unlike the method disclosed in WO 2016 / 202640 A1, and, on the other hand, and even more importantly, to reach a limit without exceeding the computationally permissible current maximum boiler instantaneous load.
[0022] Preferably, the exhaust gas coefficients include or are less than or equal to the following: df i =k i (q m,fluegas / (ρ fluegas,i ×A cross,i )) n Where: k i is a non-zero parameter, preferably a positive (non-zero) number, that may be specifically selected for a combustion boiler; q m,fluegas is the mass flow rate of the exhaust gas, n is a model parameter, preferably a positive (non-zero) number, that may be specifically selected for a combustion boiler; ρ fluegas,i is the density of the exhaust gas on the i-th heat transfer surface, A cross,i is the cross-sectional area of the exhaust gas flow passage on the i-th heat transfer surface.
[0023] This is particularly advantageous because the selection of this functional form for the flue gas coefficient makes the flue gas coefficient very flexible and easily adaptable to the needs of various fired boilers, including based on current fuel conditions.
[0024] The model parameter n is particularly advantageous since it may be chosen to be at least one of the following: i) if a calculated exhaust gas velocity is used, it is in the range of 0.9 to 1.1, preferably equal to or about 1.0; ii) when using a calculated exhaust gas that causes corrosion, it is in the range of 2.9 to 3.5, preferably between 3.2 and 3.35; or iii) If pressure drop is used, it is in the range of 1.8 to 2.2, preferably equal to or about 2.0.
[0025] The value of n can be changed over time. This is advantageous because flue gas flow conditions at the heat transfer surface can change over time due to slagging, ash agglomeration, or fuel or bed conditions, etc. The flue gas coefficient can therefore be shifted over time to better reflect actual boiler conditions.
[0026] According to one embodiment of the present invention, when n=2 and the exhaust gas coefficient represents the pressure loss, the exhaust gas coefficient df i and the specified maximum value of the exhaust gas coefficient df max,i The comparison with can be performed for each heat transfer surface. The permissible condition, according to one embodiment, is substantially equal to df i =df max,i It is.
[0027] According to one embodiment of the present invention, when n=2 and the exhaust gas coefficient represents the pressure loss, the exhaust gas coefficient df i Sum of, dp tot =Σdf i and a given exhaust gas coefficient df max,ior the given flue gas coefficient simply represents the total pressure drop, and thus the comparison represents a comparison of the total pressure drop between the furnace and the chimney. The permissible condition, according to one embodiment, is substantially equal to dp tot =dp max,tot It is.
[0028] The exhaust gas factor, according to one embodiment of the present invention, represents the ash deposition factor and can be written in the following form: df i =k ph C(d)q m_fa v p n where k ph is the particle hardness coefficient, C(d) is the particle diameter function, q m_fa is the mass flow rate of fly ash, v p is the particle velocity and n is the power exponent (0, 3-4). The given flue gas coefficient represents the maximum ash deposition value in such a case. The ash deposition coefficient can also be adjusted based on the ash characteristics (softness, etc.).
[0029] The permissible condition, according to one embodiment of the present invention, is substantially df i =df max,i However, in a practical situation, the permissible conditions can be defined as follows: df max,i -δ <df i ≦df max,i where δ>0 and depends on the numerical precision and / or method. df max,i -δ <df i ≦df max,i means that at least one exhaust gas coefficient calculated using currently monitored process data, including a numerical model of the boiler, satisfies the permissible condition, and in such a case, the maximum permissible boiler load is found, and thus the value Q h,candidate However, the maximum instantaneous boiler load Q h,max is selected as.
[0030] The permissible condition, according to one embodiment of the present invention, is substantially Σ(df i)=Σ(df max,i ), but in a practical situation, the acceptable condition can be defined using the sum of Σ(df max,i )-δ<Σ(df i )≦Σ(df max,i ) where δ>0 and depends on the numerical precision and / or method. Σ(df max,i )-δ<Σ(df i )≦Σ(df max,i ), it means that at least one exhaust gas coefficient calculated using currently monitored process data including a numerical model of the boiler satisfies the permissible condition, and in such a case, the maximum permissible boiler load is found, and thus the value Q h,candidate However, the maximum instantaneous boiler load Q h,max According to one embodiment, the summation index i is over all of the heat transfer surface. According to another aspect of the invention, the summation index i is over only a portion of the heat transfer surface, preferably within the exhaust gas channel.
[0031] It is particularly useful when the value of n is determined using monitored operational data for each of the boilers from a boiler fleet that includes at least two separate boilers. Using a larger number of boilers (2, 3, 4, ...) will result in a larger data set and therefore more operational data being monitored. This can produce better results and may be particularly advantageous in situations where interpolation and / or extrapolation of experimental data is used in the determination.
[0032] The exhaust gas outlet temperature can be substantially estimated in the calculation of step I) by the following formula: T boiler,exit =α0+Σα i Q i h,candidate Alternatively, it is preferable that the coefficient α is estimated by a first-, second-, third- or higher-order approximation of the above formula. The coefficient α can be obtained by fitting after measuring the values of the exhaust gas outlet for several individual steam load values. This data can be collected over time and updated at any time, such as periodically. This data can alternatively or additionally be collected when performing one or more calibrations of the combustion boiler.
[0033] The fitting of the coefficients (α) can be done manually by a human or automatically by a computer using historical data. Automatic updating of the coefficients may be performed, for example, once a month. AI and neural network-based algorithms can be used for the automatic updating.
[0034] The exhaust gas outlet temperature can be substantially estimated in step I) by utilizing an artificial intelligence tool according to one embodiment of the invention. The exhaust gas outlet temperature can be substantially estimated in step I) by utilizing a neural network according to another embodiment of the invention.
[0035] The exhaust gas outlet temperature can be estimated in step I) according to one embodiment of the present invention by the following formula: T boiler,exit =α0+α1×Q h,candidate +α2×Q h,candidate 2 where α0, α1, and α2 can be predefined constants. Alternatively or additionally, the fitting of the coefficients (α) can be done manually by a human or automatically by a computer using historical data. Automatic updating of the coefficients may be performed, for example, once a month. AI and neural network-based algorithms can be used for the automatic update.
[0036] According to one embodiment of the present invention, the α 0 term can be solved based on the current state values. α0=T boiler,exit,current-α1×Q h,current -α2×Q h,current 2 Here, T boiler,exit,current represents the measured exhaust gas outlet temperature.
[0037] The exhaust gas mass flow rate is calculated in step II) according to one embodiment of the present invention using boiler mass and energy balance equations.
[0038] In step II), the calculation of the exhaust gas mass flow rate may include taking into account the mass flow rates of the components CO2, H2O, N2, SO2, O2. The concentrations of these components can be reliably measured using relatively simple equipment.
[0039] In step II), the component values may include fuel parameters, which may reflect changes in the fuel properties and / or the type of fuel used in the combustion boiler. For example, for fuels that tend to cause more corrosion, stricter tolerances may be used, whereas for fuels that tend to cause less corrosion, looser tolerances may be used.
[0040] Step b) may be performed remotely to the combustion boiler, preferably in a cloud-based computing service. This helps to simplify maintenance of the combustion boiler, since a remote computing device, such as one configured to run the cloud-based computing service, can be maintained separately from the combustion boiler. Updates to computing software can thereby be performed centrally, for example, in one or a few locations, instead of updating software at each combustion boiler.
[0041] Step b) may alternatively be performed locally at the combustion boiler, preferably at an edge server, which may speed up the computation since no data needs to be transferred to a remote computation location.
[0042] Either the currently monitored process data and / or the current load may be obtained by real-time measurement. Alternatively or in addition, the currently monitored process data and / or the current load may be processed by filtering, averaging, calculating trends, or any combination thereof. This helps to avoid noisy or outlier measurements that affect the calculation results, which facilitates increasing the stability of the currently calculated maximum boiler instantaneous load.
[0043] The permissive conditions may include a hysteresis condition that requires a predetermined minimum change before the current calculated maximum boiler load is changed, which is preferred because it may increase the stability of the current calculated maximum boiler load and help to avoid the current calculated maximum boiler load fluctuating up and down in a short period of time.
[0044] While the method can be used with any type of fired boiler, the applicant has found that it is particularly useful when the fired boiler is a circulating fluidized bed (CFB) or bubbling fluidized bed (BFB) boiler and step b) is performed on a fired boiler heat transfer surface. The method is particularly advantageous for CFB or BFB boilers.
[0045] Step b) is according to one embodiment carried out on the heat transfer surface of a combustion boiler between the furnace and the chimney.
[0046] The combustion boiler comprises: - a furnace and associated passages defining an exhaust gas flow path and including a number of heat transfer surfaces; - Monitoring the current load of the combustion boiler, measuring equipment, - separate measuring instruments to monitor current process data, as well as - a control system configured to perform the boiler control method.
[0047] A fired boiler, according to one embodiment, includes a furnace and associated passages that define an exhaust gas flow path and include a number of heat transfer surfaces within the exhaust gas flow path.
[0048] In such a fired boiler, improved boiler control can be achieved. The advantages are the same as those of the method.
[0049] The control system may include an edge server that may be configured to process real-time measurements of currently monitored process data and / or current loads, i.e., by filtering, averaging, and / or calculating trends. The edge server may facilitate reducing the amount of currently monitored process data. This may be particularly useful in view of the fact that in a particular installation, there may be 60-90 gigabytes of monitored process data each day.
[0050] The control system may be configured to perform method step b) to locally determine the current calculated maximum boiler instantaneous load, facilitating rapid decision making at the combustion boiler as less or no data may need to be transferred from the combustion boiler system.
[0051] The control system may alternatively or additionally be configured to transmit the data to a remote, preferably cloud-based, computing system that may be configured to execute step b) of the method and return the current calculated maximum boiler instantaneous load to the control system. This makes it easier to simplify the combustion boilers and to update the computing system more easily. Updates can be performed centrally in this situation, rather than at each and every combustion boiler.
[0052] The edge server may be configured to reduce the amount of measurement data passed to the remote computing system. In this way, a smaller bandwidth may be sufficient for data transfer. This may be particularly useful considering the fact that in a particular installation there may be 60-90 gigabytes of monitored process data every day.
[0053] The combustion boiler calculation system includes the following: - a group of fired boilers comprising a boiler control system, each boiler comprising an edge server system configured to process, i.e., by filtering, averaging and / or calculating trends, real-time measurements of currently monitored process data and / or current loads, and to transmit the processed real-time measurements to a remote computing system; - A remote computing system, preferably a cloud-based computing system, configured to receive the processed data from the real-time measurements, calculate the data for each of the boilers using a numerical boiler model, and return the calculations to the respective boilers.
[0054] In the combustion boiler calculation system, the boiler control system is further configured to adapt a function of the boiler control system based on the calculation result.
[0055] An advantage of this configuration is that it reduces the need for computing devices at the combustion boiler, while still providing efficient and fast computational results from a remote computing system.
[0056] The computing system may be configured to find a numerical or current calculated maximum boiler instantaneous load for which at least one flue gas coefficient calculated using currently monitored process data including a numerical model of the boiler satisfies the tolerance condition and select this numerical value as the current calculated maximum boiler instantaneous load, which essentially allows the method of the present invention to be used in a distributed environment.
[0057] The boiler calculation system may be configured to use the processed measurement data of the boiler to adapt or calibrate a numerical model of the boiler, such as an exhaust gas coefficient numerical model, making it easier to adapt or calibrate the numerical model of the boiler control remotely.
[0058] The boiler calculation system may be configured to use collected and processed measurement data from other boilers to adapt or calibrate the numerical model of the boiler, allowing the use of more collected data to adjust the numerical model of the boiler control.
[0059] The combustion boiler and the combustion boiler control method are described in more detail below with reference to the embodiments shown in the accompanying drawings of FIGS. [Brief description of the drawings]
[0060] [Figure 1] FIG. 1 is a diagram showing a CFB boiler. [Diagram 2] FIG. 1 is a diagram showing a BFB boiler. [Diagram 3] FIG. 2 is a diagram showing a flow of measurement data from a sensor. [Figure 4] 1 is a flow chart showing a first method for finding the current calculated maximum boiler instantaneous load Qh,max. [Diagram 5] 11 is a flow chart showing a second method for finding the current calculated maximum boiler instantaneous load Qh,max. [Figure 6] FIG. 13 illustrates how the current calculated maximum boiler instantaneous load Qh,max can be presented to the boiler operator. [Figure 7] 4 is a graph showing the boiler instantaneous load Qh, and the calculated current maximum calculated boiler instantaneous load Qh, max, and the effect of using the method according to the invention during a test period. [Figure 8]Looking more closely at the data of FIG. 7, the effect of using the method of the present invention becomes more apparent during the 10 day test period. FIG. 7 is a graph showing the boiler instantaneous load Qh, the calculated current maximum calculated boiler instantaneous load Qh,max. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0061] In all figures, the same reference numbers refer to the same technical features.
[0062] 1 shows a fired boiler 10, which is a CFB boiler, comprising a furnace 12 with tube walls 13 connected to the water steam circuit of the fired boiler 10. Water is supplied from a water tank (not shown) to an economizer, from which it is supplied to an evaporative heat transfer surface such as the tube walls 13 via a steam drum, then conducted via the steam drum to a superheater and then to a turbine. The exhaust gas channel may be provided with an economizer and / or a superheater.
[0063] Fluidizing gas (such as air and / or oxygen-containing gas) is supplied from a fluidizing gas supply 153 through a wind box (not shown) below the grate (the grate is not shown in FIG. 1), and the primary fluidizing air enters the furnace from below the grate through a nozzle (not shown) (for fluidizing the bed) and a secondary fluidizing gas supply 152 (which supplies oxygen-containing gas to control combustion). As a result, the bed medium is fluidized and oxygen required for combustion is also supplied to the furnace 12. Furthermore, fuel is supplied to the furnace 12 through a fuel supply 22. Combustion can be adjusted by controlling the fuel supply 22 (such as by decreasing or increasing the supply of fuel) and by controlling the supply of the fluidizing gas (such as by decreasing or increasing the amount of oxygen supplied to the furnace 12). The fuel can be supplied together with additives, in particular additives that act as alkali sorbents, such as CaCO3 and / or clay. Additionally or alternatively, a NOx reducing agent, such as ammonium or urea, may be provided in or above the combustion region of the furnace 12 .
[0064] A bed media is also provided in the furnace, which may include sand, limestone, and / or clay, the latter specifically including kaolin. As a result of the bed, and generally of the combustion, in the water steam circuit, water and steam are heated within the tube walls 13 and the water is converted to steam.
[0065] The ash falls to the bottom of the furnace 12 and is removed via an ash chute (omitted from FIG. 1 for clarity) and a part of the ash, the so-called fly ash, will be carried away with the exhaust gases.
[0066] Combustion products such as exhaust gas, unburned fuel, and bed media pass from the furnace 12 to a particle separator 17, which may be equipped with a vortex finder 103. The particle separator 17 separates the exhaust gas from the solids. There may be multiple (2, 3, ...) separators 17, preferably arranged parallel to one another, especially in larger combustion boilers 10.
[0067] The solids separated by the separator 17 pass through a loop seal 160, preferably located at the bottom of the separator 17. The solids then proceed to a fluidized bed heat exchanger (FBHE) 100, which is also a heat transfer surface, whereby the FBHE 100 collects heat from the solids and further heats the steam in the water steam circuit. The chamber in which the FBHE 100 is located may be fluidized, and the FBHE 100 itself comprises heat transfer tubes or other types of heat transfer surfaces. The FBHE 100 may be arranged as a reheater or a superheater. From the FBHE outlet 101, the steam is sent into the high pressure turbine (if the FBHE 100 is a superheater) or into the intermediate pressure turbine (if the FBHE 100 is a reheater). For clarity, the turbine is not shown in FIG. 1. The solids may be returned from the FBHE 100 through a return channel 102 into the furnace 12. Particularly in larger combustion boilers 10, there may be multiple (two, three, ...) loop seals 160 and FBHEs 100, preferably arranged parallel to one another, and return channels 102, so that for each separator 17 there is a respective loop seal 160, FBHE 100, and return channel 102. In practice, some of the FBHEs 100 may be arranged as superheaters and some others as reheaters.
[0068] From the separator 17 the exhaust gas is passed to a horizontal passage 15 which passes further to a rear flue 16 (which may preferably be a vertical passage) and from there through an exhaust gas conduit 18 to a chimney 19 .
[0069] The rear flue 16 is provided with several heat transfer surfaces 21 i (i=1, 2, 3, . . . , k, where k is the number of heat transfer surfaces). k-1 ,twenty one k The heat transfer surface 21 k indicates an air preheater. k-1, 212 denote superheaters, and heat transfer surfaces 211, 213 denote reheaters. The actual number of different heat transfer surfaces in each of these components can be selected differently for each combustion boiler, for example, depending on the actual needs. Also, other components with heat transfer surfaces 21 can be present as well.
[0070] The last heat transfer surface 21 k The exhaust gas from the exhaust outlet temperature T FG,exit This temperature is measured by the temperature sensor 20 k It is measured in.
[0071] According to one embodiment, each heat transfer surface 21 i The temperatures before and after (T FG,in,i , T FG,in,i+1 ) are the temperature sensors 20 i (i=1, 2, 3, . . . , k-1, k).
[0072] However, according to another embodiment, it is preferable that these temperatures do not necessarily need to be measured. FG,exit It would be sufficient to know the above heat transfer surfaces 21 i Temperature before and after (T FG,in,i , T FG,in,i+1 ) can be obtained numerically, as will be explained further below.
[0073] The combustion boiler 10 is equipped with a number of sensors and computer units. th ) A combustion boiler 10 may generate 100 million measurements per day, which requires 25 GB of storage space. Figures 1, 2 and 3 show some sensors and a computer unit. Examples of sensors include a combustion gas (usually combustion air) volumetric flow sensor 30 (to measure the primary and secondary fluidization gas supplies), a fuel supply sensor 650, and a temperature sensor 20. i(i=1, 2, . . . , k), there is a temperature sensor in the FBHE (both present only in the CFB boiler) and a pressure sensor 116 in the return channel 102 , as well as a sensor 40 in the furnace 12 .
[0074] Process data may be collected from the sensors by a distributed control system (DCS) 201. The data collection may be most conveniently located, for example, via a fieldbus 290. The DCS 201 may include a display / monitor 202 for displaying operational status information to an operator. An edge server 203 may process, such as filter and smooth, the measurement data obtained from the sensors. There may be a local storage device 204 for storing the data.
[0075] The DCS 201, display / monitor 202, edge server 203, and local storage 204 may be in a combustion boiler / network 280 (with local storage 204 preferably connected directly to the edge server). The combustion boiler network 280 is preferably independent of the field bus 290 used to communicate measurements from the sensors to the DCS 201 and / or edge server 203. There may be an open platform communication server 210 (see FIG. 3) between the DCS 201 and edge server 203 to further facilitate system interoperability.
[0076] The combustion boiler network 280 may be connected to the Internet 200, preferably via a gateway 290. Measurement results may in this situation be transferred from the combustion boiler network 280 to a cloud service, such as a process intelligence system 205 located in a computational cloud 206. The applicant currently operates a cloud service that runs the analytical platform. The cloud service may be operated in a virtualized server environment, such as Microsoft® Azure®, which is a virtualized, easily scalable environment for distributed computing and storage of data in the cloud. Other cloud computing services may also be suitable for running the analytical platform. Furthermore, instead of or in addition to the cloud computing service, a local or remote server may be used to run the analytical platform.
[0077] Figure 2 shows a fired boiler 10 that is a BFB boiler. A BFB boiler differs from a CFB boiler in that the fluidized bed is a bubbling bed rather than a circulating bed. Thus, the separator 17, loop seal 160, FBHE 100, and return channel 102 are not required.
[0078] Typically within furnace 12, preferably at the top of furnace 12, there is at least one superheater 14. The inlet 141 of superheater 14 is preferably from a steam drum or another superheater, and the outlet 142 is preferably to a high pressure turbine.
[0079] FIG. 4 shows a method for controlling a combustion boiler. a) The current load Q of the combustion boiler 10 h is monitored in step K1 (in the method shown in FIG. 4, the exhaust gas outlet temperature T FG,exit , and the heat transfer surface 21 in the exhaust gas flow path (vertical passage 16) i Heat load Q per fluid,i will also be monitored. b) Number Q h,candidate is selected (step K3), and then the heat transfer surface 21 iHeat load at, and Q h,candidate The exhaust gas temperature is then calculated for the number Q h,candidate Using currently monitored process data including a numerical model of the boiler that meets the tolerance conditions (tested in step K9), at least one exhaust gas coefficient df i Calculate (step K7) and get the value Q h,candidate The maximum instantaneous boiler load Q h,max as (step K11). c) Current calculated maximum boiler instantaneous load Q h、max is shown to the operator (such as by displaying on the monitor / screen 202) and / or the current load Q h but, c1) Calculated maximum instantaneous boiler load Q h,max If it is less than c1i) Boiler load Q h Indicate to the boiler operator that there may be an increase in c1ii) Boiler load Q h , which will automatically increase and / or c2) Calculated maximum instantaneous boiler load Q h,max If it is greater than c2i) Boiler load Q h indicates to the boiler operator that the maximum instantaneous load of the boiler is exceeded, and / or c2ii) Boiler load Q h is automatically reduced.
[0080] Step b) is a process for heating the heat transfer surface 21 between the furnace 12 and the chimney 19 of the combustion boiler 10. i Preferably, the method is performed on
[0081] In this method, the currently monitored process data of the boiler include: a) the current exhaust gas outlet temperature T FG,exit , and b) the heat transfer surface 21 in the exhaust gas flow path (rear flue 16) i Heat load Q per fluid,i may be included.
[0082] The method further comprises: determining whether the monitored process data from both a) and b) are related to the exhaust gas coefficient df i When calculating the maximum boiler instantaneous load Q h,max For, the number Q h,candidate It can be used when discovering
[0083] The findings are supported by at least one flue gas factor, df, calculated using currently monitored process data including a numerical model of the boiler. i If the tolerance condition cannot be met, the next number Q h,candidate is selected automatically. The automatic selection is preferably performed iteratively.
[0084] This finding can be done, as an example, by performing the following computational steps. - I: The heat load of the boiler is Q h,candidate The boiler exhaust gas outlet temperature T, which results in a calculated boiler model that coincides with boiler,exit calculating an estimate of - II: Exhaust gas mass flow rate q m,fluegas A process of calculating - III: Heat transfer surface 21 in the exhaust gas flow path (rear flue 16) i Heat load Q per fluid,i,candidate The numerical boiler model, Q fluid,i,candidate =Q fluid,i,current +Σα j,i (Q h,candidate ) j -Σpar j,i (Q h,current ) j The current heat load Q of the heat transfer surface, which is corrected by using fluid,i,current The process of calculating using - IV: Heat transfer surface 21 in the exhaust gas flow path (rear flue 16) i Calculated heat load Q per fluid,i,candidate The heat transfer surface 21 closest to the exhaust gas outlet in the upstream direction of the exhaust gas flow in the exhaust gas flow path (rear flue 16) is used. k From the estimated boiler exhaust gas outlet temperature T fluegas,out,m =TFG,exit Starting with the exhaust gas temperature at each heat transfer surface (T fluegas,in,i , T fluegas,out,i , i=1,...,k). - V: Heat transfer surface 21 in the exhaust gas flow path (rear flue 16) i Exhaust gas coefficient df i , i=1,...,k.
[0085] Parameter j,i ) can be fitted manually by a human or automatically by a computer using historical data. Automatic updating of parameters may be performed, for example, once a month. AI and neural network based algorithms can be used for the automatic updating.
[0086] In step II), the exhaust gas mass flow rate q m,fluegas,m A step of calculating
[0087] The exhaust gas temperature at each heat transfer surface can be calculated, for example, by the following formula.
[0088]
number
[0089] Preferably, the exhaust gas coefficients include or are less than or equal to the following: df i =k i (q m,fluegas / (ρ fluegas,I A cross,i )) n where k iis a predetermined non-zero parameter, preferably a positive (non-zero) number, that may be specifically selected for a combustion boiler; q m,fluegas is the mass flow rate of the exhaust gas, n is a positive number (which may be chosen as a natural number, a rational number, a real number, or even a complex number), ρ fluegas,i is the i-th heat transfer surface 21 i Exhaust gas temperature T FG,in,i is the exhaust gas density, obtained from A is the i-th heat transfer surface 21 i is the cross-sectional area of the exhaust gas channel at
[0090] Advantageously, n may be chosen to be at least one of the following: i) if a calculated exhaust gas velocity is used, it is in the range of 0.9 to 1.1, preferably equal to or about 1.0; ii) when using a calculated exhaust gas that causes corrosion, it is in the range of 2.9 to 3.5, preferably between 3.2 and 3.35; or iii) If pressure drop is used, it is in the range of 1.8 to 2.2, preferably equal to or about 2.0. The value of n may change over time. The value of n may be determined, in particular, from a group of combustion boilers, the group including at least two separate combustion boilers 10, and thus using monitored operational data for each combustion boiler 10.
[0091] In the calculation of step I), an arbitrary value Q selected for the boiler load h,candidate Under the above, the exhaust gas outlet temperature T FG,exit The calculated value of may be estimated by the following formula: T FG,exit =α0+Σα j (Q h,candidate ) j Alternatively, it is preferable to estimate the load by a first-order, second-order, or third-order or higher approximation of the above formula. The coefficients α0, α1, α2, . . . are the individual boiler loads Q steamFor the value of T, the exhaust gas outlet temperature FG,exit The values of are obtained beforehand by measuring and then fitting.
[0092] In step II), the component q m,fluegas,m It is preferred that the calculation of m = CO2, H2O, N2, SO2, O2 includes at least some, most preferably all, of the following. In other words, in step IV) of the calculation, q m,fluegas,m As the value of q m,fluegas,CO2 , q m,fluegas,H20 , q m,fluegas,N2 , q m,fluegas,SO2 , q m,fluegas,O2 These are preferably measured in the exhaust gas conduit 18 or in the longitudinal groove 19, for which purpose suitable sensors are installed in the exhaust gas passage. In step II), the component values can further include fuel parameters.
[0093] The exhaust gas mass flow is calculated based on the fuel analysis (proximate and final analysis of the fuel), the combustion air flow, and / or the recirculated gas flow from the boiler mass and energy balance calculations. The mass flow rate of the exhaust gas components, q m、fluegas、m The calculation may be based on the sum of
[0094] The mass flow rate of the exhaust gas may preferably be calculated by the following formula: q m,fluegas =Σq m,fluegas,i That is, for example, the sum of the following exhaust gas mass flow components CO2, H2O, N2, SO2, and O2.
[0095]
number
[0096] Step b) may be performed remotely to the combustion boiler, such as in the process intelligence system 205. Step b) may alternatively be performed locally at the combustion boiler, preferably at the edge server 203.
[0097] Any currently monitored process data and / or current load may be obtained by real-time measurement, processed by filtering, averaging, calculating trends, or any combination thereof.
[0098] The allowable conditions include the maximum boiler instantaneous load Q h,max A hysteresis condition may be included that requires a certain minimum change before V is changed.
[0099] The permissible conditions include at least one calculated exhaust gas factor df i The maximum value df max,i It is preferable to compare the maximum value df max,i is a preset value, preferably boiler specific. h,candidate is the maximum value df max,i If it exceeds this, it is discarded.
[0100] In the combustion boiler 10, the furnace 12 and associated passages (horizontal passage 15 and rear flue 16) define a passage through which the exhaust gas flows. The furnace 12 and passages 15, 16 have several heat transfer surfaces 21 within the passage through which the exhaust gas flows. i The combustion boiler 10 is equipped with a current load Q h and another measurement device for currently monitoring the current process data.
[0101] The control system (DCS 201 and edge server 203, or possibly with the involvement of edge server 203, remote process intelligence system 205) is configured to execute the boiler control method.
[0102] The edge server 203 may be configured to process, i.e., by filtering, averaging, and / or calculating trends, real-time measurements of currently monitored process data and / or current load.
[0103] The control system executes step b) of the method and calculates the current calculated maximum boiler instantaneous load Q h,max and locally determining and / or processing the data to perform step b) of the method, and determining the current calculated maximum boiler instantaneous load Q h,max to a remote, preferably cloud-based (such as the computational cloud 206) computing system (such as the process intelligence system 205), which is configured to return the information to the control system. The control system can then present the information to the boiler operator, such as by displaying the information using a display / monitor, as in step c) of the method.
[0104] The edge server 203 may be configured to reduce the amount of measurement data passed to the remote computing system.
[0105] The combustion boiler calculation system comprises a fleet of combustion boilers 10, each of which comprises a boiler control system (CS) comprising an edge server (203) system configured to process, i.e., filter, average, and / or calculate trends, real-time measurements of currently monitored process data and / or current loads, and transmit the processed real-time measurements to a remote computing system. The remote computing system is preferably a cloud-based computing system configured to receive the processed data from the real-time measurements, calculate data for each of the combustion boilers 10 using a numerical boiler model, and return the calculation results to each of the boilers 10. The boiler control system may be configured to adapt its functionality based on the calculation results.
[0106] The computing system includes at least one exhaust gas factor df that is calculated using currently monitored process data, including a numerical model of the boiler. i The maximum boiler instantaneous load Q currently calculated satisfies the allowable conditions. h,max The numerical value Q for h,candidate Discover the number Q h,candidate The maximum instantaneous boiler load Q h,max Preferably, the device is configured to select as
[0107] The boiler calculation system may be configured to adapt or calibrate a numerical model of the boiler using the processed measurement data of the combustion boiler 10. The boiler calculation system may alternatively or additionally be configured to adapt or calibrate a numerical model of the combustion boiler 10 using processed measurement data collected from other combustion boilers 10 as well.
[0108] Figure 5 shows a modification of the method shown in Figure 4. Steps L1, L3, L7, and L9 are the same as steps K1, K3, K9, and K11, respectively, but in step L5, all heat transfer surfaces 20 i Regarding the exhaust gas coefficient dfi can be calculated directly. That is, T FG,in,i , and each temperature sensor 21 i When the measurement is performed using the method shown in FIG. 5, step K7 can be omitted since back calculation is not necessary.
[0109] FIG. 6 shows the available inputs to the numerical boiler model in step N1. In step N3, Q h,max is numerically calculated using the boiler model and in step N5 the estimated maximum load Qh,max is presented to the boiler operator via a specific user interface (UI), preferably via a display / monitor 202.
[0110] Figure 7 shows the boiler instantaneous load Q h , and the calculated maximum boiler instantaneous load Q h、max , and the effect of using the method according to the invention during the test period. th The boiler output was 3 to 6MW on average during the test period. th Large loads were obtained. Figure 8 shows the 10 day test period in more detail.
[0111] In other words, in the boiler control method, a numerical model using the determined operating parameters of the fluidized bed combustion boiler is used to calculate the current calculated maximum boiler instantaneous load Q of the combustion boiler. h,max is estimated. The current boiler load Q h is calculated using measured data of the steam circuit.
[0112] Next, the boiler load Q h is the current calculated maximum boiler instantaneous load Q h,max If the boiler load Q is less than 0, then: i) indicate to the boiler operator that the boiler load may be increased; and / or ii) automatically increase the boiler load. Alternatively or additionally, h is the maximum instantaneous load of the boiler Q h,maxif greater than 0, i) indicate to the boiler operator that the boiler load is exceeding the boiler maximum instantaneous load, and / or ii) automatically reduce the boiler load.
[0113] It is obvious to those skilled in the art that with the advancement of technology, the basic idea of the present invention can be implemented in many ways. The present invention and its embodiments are therefore not limited to the examples and samples described above, but can be modified within the scope of the claims and their legal equivalents.
[0114] In addition to or instead of using the specific empirical formulas referred to above, it is possible to utilize artificial intelligence tools and / or neural networks in the numerical model calculations.
[0115] In the following claims and in the foregoing description of the invention, unless the context otherwise requires, either by express wording or necessary implication, the word "comprise" or variations such as "comprises" or "comprising" are used in the inclusive sense, i.e., used to specify the presence of stated features, but not to exclude the presence or addition of other features in various embodiments of the invention. [Explanation of symbols]
[0116] T FG,in,i heat exchanger 21 i Exhaust gas temperature at the inlet of (i=1, 2,...k) T FG,exit heat exchanger 21 k Exhaust gas temperature at the outlet Sensors 20 Temperature sensor (FBHE) 20 i Temperature sensor (i=1, 2,...k) 30 Gas volume flow sensor 40 Sensor inside the furnace 165 Pressure sensor (loop seal) 650 Fuel Supply Sensor 10 Combustion boiler 12 Furnace 13 Pipe wall 14 Superheater 15 horizontal passage 16 Rear flue 17 Particle separator 18 Exhaust gas duct 19 Vertical groove twenty one i Heat transfer surface (i=1, 2, ...k) 22 Fuel supply section 100 Fluidized bed heat exchanger (FBHE) 101 FBHE Exit 102 Return Channel 103 Vortex Finder 141 Superheater inlet 142 Superheater outlet 151 Primary fluidization gas supply section 152 Secondary fluidization gas supply section 153 Fluidizing Gas Supply Source 161 Reheater output 200 Internet 201 Distributed Control System 202 Display / Monitor 203 Edge Server 204 Local Storage 205 Process Intelligence Systems 206 Computational Cloud 210 Open Platform Communication Server 280 Combustion Boiler Network 290 Fieldbus
Claims
1. A combustion boiler control method, comprising: a) The current load of the combustion boiler (Q h ) monitoring the b) at least one exhaust gas coefficient (df i ) satisfies the allowable conditions, the current calculated maximum boiler instantaneous load (Q h,max ) to the numerical value (Q h,candidate ), and finding the value (Q h,candidate ) to the maximum boiler instantaneous load (Q h,max ) as c) The current calculated maximum boiler instantaneous load (Q h、max ) to the operator, and / or h )but, c1) The current calculated maximum boiler instantaneous load (Q h,max ), c1i) the boiler load (Q h and / or c1ii) The boiler load (Q h ) automatically increasing the and / or c2) The current calculated maximum boiler instantaneous load (Q h,max ), c2i) the boiler load (Q h indicating to the boiler operator that the current calculated maximum boiler instantaneous load exceeds the current calculated maximum boiler instantaneous load; and / or c2ii) The boiler load (Q h ) automatically reducing A method comprising:
2. i) the currently monitored process data of the boiler; ia) The current exhaust gas outlet temperature (T flue gas,exit,current )and, ib) the heat load (Q fluid,i )and and ii) monitored process data from both ia) and ib) are used in calculating the flue gas coefficient, and the current calculated maximum boiler instantaneous load (Q h,max ) to the numerical value (Q h,candidate ) is used when discovering The method of claim 1.
3. The current calculated maximum boiler instantaneous load (Q h,max ) to the numerical value (Q h,candidate The at least one exhaust gas coefficient (df) calculated using currently monitored process data including a numerical model of the boiler meets the tolerance conditions for i ) does not satisfy the tolerance condition, the discovery is h,candidate 3. The method of claim 1, wherein the method is performed so that the first and second selections are automatically selected.
4. The next numerical value (Q h,candidate 4. The method of claim 3, wherein:
5. The discovery - I: The heat load of the boiler is the value (Q h,candidate ) which results in a calculated boiler model boiler,exit ) calculating an estimate of - II: Exhaust gas mass flow rate (q m,fluegas ) -III: Heat load (Q for each heat transfer surface in the exhaust gas flow path) fluid,i,candidate ) into the numerical boiler model, (Q fluid,i,candidate =Q fluid,i,current +Σα j,i (Q steam,max ) j -Σα j,i (Q stream,current ) j ) corrected by using the current heat load (Q fluid,i,current ) calculating using - IV: The calculated heat load (Q fluid,i,candidate ) is used, and the heat transfer surface 21 in the exhaust gas flow path is closest to the exhaust gas outlet in the upstream direction of the exhaust gas flow. k From the above, the estimated value of the boiler exhaust gas outlet temperature (T fluegas,out,k =T FG,exit ) to start with the exhaust gas temperature (T fluegas,in,i , T fluegas,out,i , i=1, ..., k), - V: exhaust gas coefficient (df i , i=1, . . . , k) The method according to any one of claims 1 to 4, which is carried out by performing the following.
6. The exhaust gas coefficient includes or is the following formula: [Equation 1] Here, k i is a non-zero parameter, preferably a positive (non-zero) number, that may be selected in particular for combustion boilers; q m,fluegas is the mass flow rate of the exhaust gas, n is a model parameter, preferably a positive (non-zero) number, that may be selected specifically for a combustion boiler; ρ fluegas,i 6. The method of claim 5, wherein ∑ i = ∑ i ...
7. n is i) if a calculated exhaust gas velocity is used, in the range of 0.9 to 1.1, preferably equal to or about 1.0; ii) When using a calculated corrosion-causing exhaust gas, the range is between 2.9 and 3.5, preferably between 3.2 and 3.35; or iii) Pressure drop, if used, in the range of 1.8 to 2.2, preferably equal to or about 2.0 The method of claim 6 , wherein the selected value is at least one of:
8. The method of claim 7 , wherein the value of n is varied over time.
9. 9. The method of claim 7 or 8, wherein the value of n is determined from a group of boilers including at least two separate boilers using monitored operational data for each of the boilers.
10. In the calculation of step I), the exhaust gas outlet temperature is substantially calculated by the formula T boiler,exit =a 0 +Sa j (Q) h,candidate ) j Alternatively, preferably, the coefficients (α 0 , α 1 , α 2 , ...) are divided into several individual boiler loads (Q steam ) for the value of the exhaust gas outlet temperature (T FG,exit 10. The method according to claim 5, wherein the value of σ 1 , σ 2 , σ 3 , σ 4 , σ 5 , σ 6 , σ 7 , σ 8 , σ 9 , σ 10 , σ 2 , σ 3 , σ 4 , σ 5 , σ 6 , σ 7 , σ 8 , σ 9 , σ
11. In step II), the exhaust gas mass flow rate is calculated using the mass flow rate (q m,fluegas,m ) is used, and the components include CO 2 , H 2 O, N 2 , S.O. 2 , O 2 The method according to any one of claims 5 to 10, comprising:
12. 12. The method according to any one of claims 5 to 11, wherein in step II) the calculation of exhaust gas mass flow rate includes fuel parameters.
13. The method according to any one of claims 1 to 12, wherein step b) is performed remotely with respect to the combustion boiler.
14. The method according to any one of claims 1 to 12, wherein step b) is carried out locally in the combustion boiler.
15. The currently monitored process data and / or current load are both obtained by real-time measurement, processed by filtering, processed by averaging, calculating trends, or any combination thereof; The method according to any one of claims 1 to 14.
16. The allowable conditions include the maximum boiler instantaneous load (Q h,max 16. The method of any one of claims 1 to 15, including a hysteresis condition that requires a predetermined minimum change before changing the value of the parameter.
17. The permissive condition is determined based on the calculated at least one exhaust gas coefficient (df i ) to their respective design values, h,candidate 17. The method according to claim 1, wherein the amount of the molten metal is discarded if the amount of the molten metal exceeds the design value.
18. The method according to any one of claims 1 to 17, wherein the combustion boiler is a circulating fluidized bed (CFB) boiler or a bubbling fluidized bed (BFB) boiler, and step b) is carried out on a heat transfer surface of the combustion boiler, optionally including a furnace (12), preferably located between the furnace (12) and a chimney (19).
19. - several heat transfer surfaces (21) defining the flue gas flow passages and preferably located within said flue flow passages; i a furnace (12) and associated passages (15, 16) comprising - the current load of the combustion boiler (10) (Q h ) and a measuring device for monitoring the - sensors (20, 20) that monitor current process data i , 30, 40, 116, 165, 650) and another measuring device, a control system (CS 201, 203, 205) configured to implement the boiler control method according to any one of claims 1 to 18; A combustion boiler comprising:
20. 20. The combustion boiler (10) according to claim 19, wherein the control system (CS) comprises an edge server (203) configured to process real-time measurements of currently monitored process data and / or current load, i.e. by filtering, averaging and / or calculating trends.
21. The control system executes step b) of the method to calculate the current calculated maximum boiler instantaneous load (Q h、max 21. The combustion boiler of claim 19 or 20, configured to locally determine
22. The control system executes step b) of the method to calculate the current calculated maximum boiler instantaneous load (Q h、max 21. The combustion boiler of claim 19 or 20, configured to transmit data to a remote, preferably cloud-based computing system configured to return a value of the temperature, humidity, or temperature of the combustion boiler to the control system.
23. The combustion boiler of claim 22 , wherein the edge server is configured to reduce the amount of measurement data passed to the remote computing system.
24. a group of fired boilers (10), preferably according to any one of claims 18 to 22, each boiler comprising a boiler control system (DCS) comprising an edge server (203) system configured to process, i.e. by filtering, averaging and / or calculating trends, said real-time measurements of currently monitored process data and / or current loads and to transmit said processed real-time measurements to a remote computing system (205); a remote computing system (205), preferably a cloud-based (206) computing system, configured to receive processed data from the real-time measurements, calculate the data using a numerical boiler model for each of said combustion boilers (10), and return the calculation results to each of said combustion boilers (10); A combustion boiler calculation system comprising: The combustion boiler calculation system, wherein the boiler control system is configured to adapt a function of the boiler control system based on the calculation results.
25. The computing system calculates at least one exhaust gas coefficient (df i ) satisfies the allowable conditions, the current calculated maximum boiler instantaneous load (Q h,max ) to the numerical value (Q h,candidate ) and find the value (Q h,candidate ) to the maximum boiler instantaneous load (Q h,max ) as the 25. The boiler calculation system of claim 24.
26. 26. The boiler calculation system of claim 24 or 25, wherein the boiler calculation system is configured to use processed measurement data of the combustion boiler (10) to adapt or calibrate a numerical model of the combustion boiler (10).
27. 27. The boiler calculation system of claim 24, wherein the boiler calculation system is configured to adapt or calibrate a numerical model of the combustion boiler (10) using processed measurement data also collected from other combustion boilers (10).
Citation Information
Patent Citations
Combustion equipment
JP1999344218A
Boiler steam amount measuring method, boiler load analyzing method, boiler steam amount measuring apparatus, and boiler load analyzing apparatus
JP2013072602A
Operation diagnostic method of circulating fluidized bed boiler and operation diagnostic device
JP2013238331A
Apparatus and method for controlling at least one operational parameter of plant
JP2016053953A
Combustion control system, and combustion control method
JP2017138011A