Interchangeable marine energy storage system and control method thereof

The replaceable marine energy storage system addresses the challenges of battery capacity and charging time in electric propulsion ships by using a mobile charging vessel to replace batteries and provide continuous energy, enhancing navigation distance and efficiency.

JP2024542709AActive Publication Date: 2024-11-15LG ENERGY SOLUTION LTD

Patent Information

Application Number
JP2024532550
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-12-02
Filing Date
2022-11-08
Publication Date
2024-11-15
Estimated Expiration
2042-11-08

AI Technical Summary

Technical Problem

Existing electric propulsion systems for ships face challenges with increased battery capacity leading to higher weight, reduced operating distance, and longer charging times, which affect efficiency and overall operating time.

Method used

A replaceable marine energy storage system where a mobile charging vessel equipped with a mobile battery replaces the installed battery on an operating vessel, allowing for a smaller capacity battery to be used, and a network of charging stations and vessels provides continuous energy supply along the ship's route.

Benefits of technology

Enables long-distance navigation with reduced vessel weight and shorter overall operating times by using a smaller battery capacity and continuous energy supply, thereby reducing transportation costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024542709000001_ABST
    Figure 2024542709000001_ABST
Patent Text Reader

Abstract

This invention relates to a replaceable marine energy storage system and a control method thereof. The replaceable marine energy storage system of the present invention includes a mobile battery that is replaced with an installed battery on a mobile vessel and used as a power source for the mobile vessel, a mobile charging vessel that moves with the mobile battery on board, and a charging station that floats on the ocean together with the mobile charging vessel and uses generated electricity to charge the mobile battery on board the mobile charging vessel.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] This application claims priority to Korean Patent Application No. 10-2021-0171108 dated December 2, 2021, and all contents disclosed in the documents of the Korean patent application are incorporated herein by reference.

[0002] The present invention relates to a switchable marine energy storage system and a control method thereof, and more particularly to a switchable marine energy storage system and a control method thereof that can increase the cruising range of a vessel using electric batteries. [Background technology]

[0003] A typical ship is equipped with a power propulsion device to drive a propeller mounted at the rear of the ship. A steam turbine system and an electric propulsion system are typically used as the power propulsion device.

[0004] A steam turbine system is a rotary steam power engine, a type of external combustion engine that generates power by ejecting high-pressure steam generated in a boiler from a nozzle to create a high-velocity steam jet, which is then sprayed onto a rotating impeller.

[0005] These steam turbine systems are widely used in marine propulsion systems as well as thermal power plants because they have little vibration and are efficient, and can provide high speed and large capacity thrust. However, steam turbine systems have the disadvantages of being noisy and being too large in size, which increases the weight of the ship excessively.

[0006] To overcome these shortcomings, electric propulsion systems using electric motors that are quieter, less polluting, and have stronger thrust than steam turbine systems have been applied.

[0007] An electric propulsion system for a ship propels the ship by using an electric propulsion motor to drive a propeller shaft at the end of the propeller. Electric propulsion systems are used in a variety of ships, including LNG carriers, pleasure boats, and drilling ships.

[0008] When batteries are used to drive large ships, the battery capacity must be large in consideration of the load and long-distance operation of the large ship. However, increasing the battery capacity increases the weight of the battery, which shortens the ship's operating distance, and reduces the operating efficiency of the electric motor.

[0009] Furthermore, as the capacity of the battery increases, the time required to charge the battery also increases, which increases the overall operating time of the ship.

[0010] The background technology of the present invention is disclosed in Korean Patent Publication No. 2021-0092020 (published on July 23, 2021, title of invention: Power supply control device for electric propulsion vessel). Summary of the Invention [Problem to be solved by the invention]

[0011] An object of the present invention is to provide an exchangeable marine energy storage system and a control method thereof that enable long-distance operation even when equipped with batteries with a smaller charge capacity than conventional systems.

[0012] Another object of the present invention is to provide a replaceable marine energy storage system and a control method thereof for solving the problem that the overall operation time of a ship increases due to an increase in the time required to charge batteries installed in the ship.

[0013] The object of the present invention is not limited to the object mentioned above, and other objects and advantages of the present invention not mentioned can be understood from the following description and can be more clearly understood from the embodiments of the present invention. In addition, it is easy to understand that the object and advantages of the present invention can be realized by the means and combinations thereof described in the claims. [Means for solving the problem]

[0014] The replaceable marine energy storage system and control method thereof according to the present invention are characterized in that a mobile battery in a mobile charging vessel is replaced with an installed battery installed in a running vessel.

[0015] Specifically, since a mobile charging vessel equipped with a mobile battery is positioned on the travel route of the operating vessel, the battery loaded on the mobile charging vessel is replaced with the installed battery loaded on the operating vessel, thereby increasing the travel distance of the operating vessel. Also, since the installed battery loaded on the operating vessel can be replaced with a mobile battery, a smaller capacity installed battery can be used compared to the conventional method, and the total weight of the operating vessel is also reduced.

[0016] In addition, the exchangeable marine energy storage system and the control method thereof according to the present invention have a technical feature in that electricity for generating electricity stored in the charging station is transmitted to the mobile charging vessel to charge the mobile battery.

[0017] In addition, the exchangeable marine energy storage system and its control method according to the present invention have a technical feature in that the movement route of a moving ship is divided into a plurality of zones, and a mobile charging ship and a charging station are allocated to each zone, so that the energy supply to the moving ship is continuous.

[0018] A replaceable marine energy storage system according to one embodiment of the present invention includes a mobile battery that is replaced with an installed battery on a mobile vessel and used as a power source for the mobile vessel, a mobile charging vessel that moves with the mobile battery on board, and a charging station that floats on the ocean together with the mobile charging vessel and uses generated electricity to charge the mobile battery on board the mobile charging vessel.

[0019] The present invention further includes an operation control unit wirelessly connected to the operating vessel, the mobile charging vessel, and the charging station. The operation control unit receives the position and route of the operating vessel and controls the operations of the mobile charging vessel and the charging station.

[0020] In addition, the operating vessel receives electricity via an on-board battery or a portable battery to operate an electric motor provided on the operating vessel, thereby generating thrust for the operating vessel.

[0021] In addition, a plurality of mobile charging vessels are provided, and after docking at a charging station, electricity is supplied via the charging station to charge the mobile batteries.

[0022] In addition, the mobile charging ship can operate as an unmanned system that is automatically operated according to control signals from the operation control unit.

[0023] An interchangeable marine energy storage system according to one embodiment of the present invention includes an installed battery that is installed inside a moving vessel and used as a power source for the moving vessel, a charging station that is installed at a location away from the moving vessel and generates electricity using at least one of solar power, tides, and wind power, and floats on the sea, and a mobile charging vessel that docks to the charging station to be charged and is moved along the route of the moving vessel.

[0024] A mobile battery is installed inside the mobile charging vessel to replace the installed battery. The mobile battery may be charged while the mobile charging vessel is docked at the charging station, or may be charged using solar power generation provided on the mobile charging vessel.

[0025] In addition, a plurality of mobile charging vessels may be provided, and each of the mobile charging vessels may be docked at a plurality of charging stations and moved to a set position along the travel route of the operating vessel.

[0026] In addition, communication can be performed between the operating vessel and the charging station to exchange information, communication can be performed between the charging station and the mobile charging vessel to exchange information, and communication can be performed between the operating vessel and the mobile charging vessel to exchange information.

[0027] Additionally, communication between the operating vessel and the charging station may transmit movement information for the operating vessel, including the position of the operating vessel, the time to reach the destination, and the capacity of the installed battery.

[0028] In addition, a plurality of mobile charging vessels may be provided, the travel route of the operating vessel may be divided into a plurality of zones, and the mobile charging vessel may be moved to and anchored in each zone.

[0029] The charging station may also include a station body floating on the sea, and a power generation unit installed on the station body that generates electricity using at least one of solar power, wind power, and tidal power.

[0030] The charging station further includes a first docking connector protruding from a side surface of the station body, and the mobile charging vessel further includes a second docking connector connected to the first docking connector.

[0031] In addition, when the first docking connector and the second docking connector are connected, electricity stored in the charging station can be transmitted to the mobile charging vessel to charge the mobile battery.

[0032] A control method for a replaceable marine energy storage system according to one embodiment of the present invention can include a travel distance calculation step in which a operating vessel equipped with an attached battery calculates a distance that the operating vessel can travel using the attached battery, an exchange position setting step in which an operation control unit, which is transmitted the calculated travel distance of the operating vessel and the travel route of the operating vessel, sets an exchange position and exchange time for the attached battery attached to the operating vessel, and an exchange step in which the operation control unit moves the operating vessel to the exchange position and exchanges the attached battery with a mobile battery attached to the mobile charging vessel.

[0033] The present invention also includes a division step in which, after the travel distance calculation step, the operation control unit divides the sea into a plurality of areas along the route along which the operating vessel will be travelling.

[0034] The operation control unit also includes a measurement step of measuring the number of mobile charging vessels and charging stations in each partitioned area, and then calculating the total stored energy capacity of each area, and an adjustment step of moving at least one of the mobile charging vessels and the charging stations to an area where the total stored energy capacity is insufficient after the measurement step. Effect of the Invention

[0035] The replaceable marine energy storage system and its control method according to the present invention can reduce transportation costs by enabling a vessel to travel long distances even after installing batteries with a smaller charging capacity than before.

[0036] In addition, the present invention provides a method of replacing batteries installed on a ship without charging them, thereby continuously supplying electrical energy, thereby shortening the overall operation time of the ship and reducing shipping costs.

[0037] In addition, the present invention not only allows the mobile charging vessel itself to charge the mobile battery, but also allows electricity for generating electricity stored in the charging station to be transmitted to the mobile charging vessel to charge the mobile battery, thereby reducing the time and cost required to charge the mobile battery.

[0038] In addition, since the mobile charging vessel approaches the route of a moving vessel to replace batteries, the present invention can minimize the extent to which the moving vessel needs to change course to charge the installed batteries, thereby shortening the period of time required for the moving vessel to operate.

[0039] In addition, the present invention divides the travel route of a moving ship into multiple zones and allocates mobile charging ships and charging stations to each zone, thereby continuously supplying energy to the moving ship, thereby increasing the travelable distance of the moving ship.

[0040] The above-mentioned effects and specific effects of the present invention will be described in conjunction with the following description of the preferred embodiment of the invention. [Brief description of the drawings]

[0041] [Figure 1] FIG. 1 illustrates a swappable marine energy storage system according to one embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram showing a charging station and a mobile charging vessel according to an embodiment of the present invention. [Diagram 3] 1 is a diagram showing a state in which a movement route of a ship according to an embodiment of the present invention is divided into a plurality of zones. [Figure 4] FIG. 2 is a plan view showing a charging station and a mobile charging vessel according to an embodiment of the present invention. [Diagram 5] FIG. 1 is a block diagram illustrating a interchangeable marine energy storage system according to one embodiment of the present invention. [Figure 6] FIG. 2 is a flow diagram illustrating a method for controlling a switching marine energy storage system according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0042] The above-mentioned objects, features and advantages will be described in detail below with reference to the accompanying drawings, so that a person having ordinary skill in the art to which the present invention pertains can easily implement the technical idea of ​​the present invention. In describing the present invention, if a detailed description of a known technology according to the present invention is deemed to obscure the gist of the present invention, the detailed description will be omitted. Hereinafter, preferred embodiments according to the present invention will be described in detail with reference to the accompanying drawings. The same reference numerals in the drawings are used to indicate the same or similar components.

[0043] Although the terms "first", "second", etc. are used to indicate various components, it is understood that these components are not limited by these terms. These terms are used merely to distinguish one component from another, and it is understood that a first component may also be a second component unless otherwise specified.

[0044] Hereinafter, when an arbitrary structure is arranged on the "top (or bottom)" of a component or "above (or below)" a component, it means that the arbitrary structure is not only arranged in contact with the upper surface (or lower surface) of the component, but also that other structures may be interposed between the component and the arbitrary structure arranged on (or below) the component.

[0045] In addition, when a component is described as being "coupled," "coupled," or "connected" to another component, it should be understood that the components may be directly coupled or connected to each other, but that there may be other components "intervening" between each component, or each component may be "coupled," "coupled," or "connected" via other components.

[0046] Throughout the specification, unless otherwise specified to the contrary, each element may be singular or plural.

[0047] As used herein, singular expressions include plural expressions unless the context clearly indicates otherwise. In this application, the terms "comprise" or "include" should not be interpreted as including all of the components or steps described in the specification, but should be interpreted as including some components or steps that may not be included, or may further include additional components or steps.

[0048] In the entire specification, "A and / or B" means A, B, or A and B, unless otherwise specified, and "C to D" means C or more and D or less, unless otherwise specified.

[0049] The following describes an exchange type marine energy storage system 1 and a control method thereof according to an embodiment of the present invention.

[0050] FIG. 1 is a diagram showing a switchable marine energy storage system 1 according to one embodiment of the present invention, and FIG. 2 is a diagram showing a charging station 50 and a mobile charging vessel 40 according to one embodiment of the present invention.

[0051] As shown in Figures 1 and 2, an exchangeable marine energy storage system 1 according to one embodiment of the present invention provides a mobile charging vessel 40 that stores electrical energy and a charging station 50 that are installed along the travel route of a moving vessel 10 to supply electrical energy to the moving vessel 10.

[0052] In other words, since the mobile charging vessel 40 equipped with the mobile battery 30 is positioned on the travel route of the operating vessel 10, there is no need to change the travel route of the operating vessel 10, and the battery loaded on the mobile charging vessel 40 can be replaced with the installed battery 20 loaded on the operating vessel 10, thereby increasing the travelable distance of the operating vessel 10.

[0053] In addition, since the installed battery 20 on the moving vessel 10 can be replaced with a mobile battery 30 installed on the mobile charging vessel 40, a smaller capacity installed battery 20 can be used compared to the conventional case, and the total weight of the moving vessel 10 can be reduced, thereby saving the electrical energy required for the operation of the moving vessel 10.

[0054] A plurality of mobile charging vessels 40 are provided for each charging station 50, and each mobile charging vessel 40 is supplied with electric energy via the charging station 50 or generates its own electric energy using solar or wind power, etc.

[0055] The charging station 50 can be implemented in various variations, such as being anchored at sea or being moved to coordinates set by a control signal.

[0056] The operating vessel 10 is supplied with electricity via the onboard battery 20 or the mobile battery 30, which operates an electric motor provided on the operating vessel 10 to generate thrust for the operating vessel 10. The operating vessel 10 can be used for a variety of purposes, such as a cargo ship or passenger ship, and the onboard battery 20 is installed inside the operating vessel 10.

[0057] The routes of operating ships, such as barges and passenger ships, are determined to be the most efficient routes, and the charging station and the mobile charging ship may be located near such routes. Although the charging station and the mobile charging ship are located near the routes, they may be preferentially located in areas with constant, clear weather that are advantageous for solar power generation, in areas with constant wind speed and direction that are advantageous for wind power generation, or in areas with strong waves that are advantageous for wave power generation.

[0058] The electrical energy in the on-board battery 20 operates an electric motor provided on the moving vessel 10 to generate rotational power, which in turn rotates a propeller to move the moving vessel 10 .

[0059] The operating vessel 10 may be provided with a separate power generation facility for charging the mounted battery 20. The power generation facility can generate electrical energy using at least one of solar, wind, and tidal power. The power generation facility can also be modified in various ways, such as generating electrical energy using petroleum as a raw material.

[0060] The onboard battery 20 is a battery that is mounted inside the moving vessel 10 and stores electrical energy. The onboard battery 20 is used as a power source for the moving vessel 10.

[0061] The portable battery 30 replaces the on-board battery 20 installed on the moving vessel 10 and is used as a power source for the moving vessel 10.

[0062] The mounted battery 20 and the mobile battery 30 are batteries having the same size and the same electrical energy storage capacity. However, for ease of explanation, the battery mounted on the operating vessel 10 will be referred to as the mounted battery 20, and the battery mounted on the mobile charging vessel 40 will be referred to as the mobile battery 30.

[0063] FIG. 4 is a plan view showing a charging station 50 and a mobile charging vessel 40 according to an embodiment of the present invention.

[0064] As shown in Figures 2 and 4, the mobile charging vessel 40 is a vessel capable of moving on the sea by itself, and a mobile battery 30 is installed inside the mobile charging vessel 40 to be replaced with the mounted battery 20.

[0065] The mobile charging vessel 40 can move with the mobile battery 30 loaded. In addition, the mobile charging vessel 40 can be docked to a charging station 50 to charge the mobile battery 30. The mobile charging vessel 40 can be equipped with an energy harvesting device (such as a solar panel) and can charge the mobile battery 30 by itself. In addition, the mobile charging vessel 40 can be moved along the travel route of the operating vessel 10 and docked to the operating vessel 10 or maintained within a set distance to perform replacement work for the mounted battery 20 and the mobile battery 30.

[0066] A plurality of mobile charging ships 40 according to one embodiment of the present invention may be provided, and after docking with a charging station 50, electricity may be supplied via the charging station 50 to charge the mobile battery 30.

[0067] The mobile charging ship 40 is also provided with a power generation unit 52 that generates electricity using at least one of wind power, solar power, and tidal power. The mobile power generation unit 42 according to an embodiment of the present invention generates electricity using solar power.

[0068] The power source of the mobile charging vessel 40 is electricity generated by the power generation unit 52. The power generation unit 52 generates electricity using at least one of wind power, solar power, and tidal power, and can operate a motor provided in the mobile charging vessel 40 to move the mobile charging vessel 40. The mobile charging vessel 40 may further be provided with a separate battery for driving the motor. In addition, the mobile charging vessel 40 may be further equipped with an engine that is charged with separate emergency diesel fuel and operated using the diesel fuel.

[0069] The mobile battery 30 may be charged while the mobile charging vessel 40 is docked at the charging station 50, or may be charged using solar power generation provided on the mobile charging vessel 40.

[0070] The mobile charging ship 40 can be operated as an unmanned system that is automatically operated according to control signals from the operation control unit 60. When necessary, a person can directly board the mobile charging ship 40.

[0071] The mobile charging ship 40 according to one embodiment of the present invention includes a ship body 41, a mobile power generation unit 42, and a second docking connection unit 43.

[0072] The ship body 41 has a shape of a ship and can be modified in various ways, for example, it can be operated using electric energy or can be equipped with a separate internal combustion engine.

[0073] A mobile power generation unit 42 is installed on the ship body 41. The mobile power generation unit 42 generates electricity using at least one of wind power, solar power, and tidal power. The mobile power generation unit 42 according to one embodiment of the present invention includes a solar panel that generates electricity using solar power.

[0074] The second docking connector 43 may protrude outside the ship body 41 and be coupled to the first docking connector 54 provided on the charging station 50, so that the ship body 41 may be fixed to the outside of the charging station 50.

[0075] The mobile charging vessel 40 can be docked to a plurality of charging stations 50 and moved to respective set positions along the travel route of the operating vessel 10. In addition, since the mobile charging vessel 40 is equipped with communication equipment, communication can be performed between the mobile charging vessel 40 and the operating vessel 10, and various information including position information can be exchanged between them.

[0076] The electricity for generating electricity stored in the charging station 50 is transmitted to the mobile charging vessel 40 to charge the mobile battery 30. The charging station 50 floats on the ocean together with the mobile charging vessel 40, and the mobile battery 30 loaded on the mobile charging vessel 40 is charged using electricity generated at the charging station 50.

[0077] The charging station 50 floating on the sea can be modified in various ways within the technical concept of generating electricity, storing the electric energy, and charging the mobile battery 30 loaded on the mobile charging vessel 40. The charging station 50 is installed at a location away from the operating vessel 10, and generates electricity using at least one of sunlight, tides, and wind power.

[0078] The charging station 50 according to an embodiment of the present invention includes a station body 51, a power generating unit 52, an electricity storage unit 53, and a first docking coupling unit 54.

[0079] The station body 51 has a shape that floats on water, like the body of a ship. The station body 51 may have a shape similar to that of a normal ship, and may also have a square-shaped upper plate so that multiple mobile charging ships 40 can be docked at the same time. The station body 51 may be modified in various ways within the technical concept of having a shape that floats on the sea.

[0080] The power generation unit 52 is installed in the station body 51 and generates electricity using at least one of solar power, wind power, and tidal power. The power generation unit 52 according to an embodiment of the present invention generates electricity using solar power.

[0081] The electricity storage unit 53 is a device that stores the electricity generated by the power generation unit 52, and various devices including a battery can be used as the electricity storage unit 53.

[0082] The first docking connector 54 protrudes from a side of the station body 51 and is connected to the second docking connector 43 provided on the mobile charging vessel 40. When the first docking connector 54 and the second docking connector 43 are connected to each other, electricity stored in the charging station 50 can be transmitted to the mobile charging vessel 40 to charge the mobile battery 30.

[0083] The electric energy stored in the charging station 50 is transmitted to the mobile charging ship 40 by at least one of a wired and a wireless method. The electricity for generating electricity stored in the charging station 50 is transmitted to the mobile charging ship 40 to charge the mobile battery 30, thereby reducing the time and cost required for charging the mobile battery 30.

[0084] The operating vessel 10, the mobile charging vessel 40, and the charging station 50 are each equipped with a communication device. Thus, communication is performed between the operating vessel 10 and the charging station 50 to exchange information, and communication is performed between the charging station 50 and the mobile charging vessel 40 to exchange information. Furthermore, by communication between the operating vessel 10 and the charging station 50, movement information of the operating vessel 10, including the position of the operating vessel 10, the time to reach the destination, and the capacity of the installed battery 20, can be transmitted.

[0085] FIG. 5 is a block diagram illustrating a switchable marine energy storage system 1 according to one embodiment of the present invention.

[0086] 5, the operation control unit 60 is wirelessly connected to the operating vessel 10, the mobile charging vessel 40, and the charging station 50. The operation control unit 60 functions like a server and controls each component of the exchangeable marine energy storage system 1.

[0087] The operation control unit 60 may be installed in the charging station 50. In other embodiments of the present invention, the operation control unit 60 may be installed in the operating vessel 10 or in a separate control unit installed on land, and various modifications may be possible.

[0088] The operation control unit 60 according to an embodiment of the present invention receives the position and route of the operating ship 10 and controls the operations of the mobile charging ship 40 and the charging station 50.

[0089] FIG. 3 is a diagram showing a state in which a travel route of a ship 10 according to an embodiment of the present invention is divided into a plurality of zones.

[0090] 3, the operation control unit 60 according to an embodiment of the present invention divides the movement route of the moving vessel 10 into a plurality of zones, distributes the mobile charging vessels 40 and the charging stations 50 to each zone, and controls the continuous supply of energy to the moving vessel 10. This increases the travel distance of the moving vessel 10, which can continue to move without anchoring.

[0091] In addition, a plurality of mobile charging vessels 40 may be provided, the travel route of the operating vessel 10 may be divided into a plurality of zones, and the mobile charging vessels 40 may be moved to and anchored in each zone.

[0092] In one embodiment of the present invention, the operation control unit 60 divides the travel route of the operating vessel 10 into three zones. The zone from which the operating vessel 10 departs is set as the first zone (A1), the zone from which the operating vessel 10 arrives is set as the third zone (A3), and the zone between the first zone (A1) and the third zone (A3) is set as the second zone (A2).

[0093] The operation control unit 60 assigns the charging station 50 and the mobile charging ship 40 to the first area (A1), the second area (A2), and the third area (A3), respectively, and can also move the charging station 50 and the mobile charging ship 40 to other areas if necessary.

[0094] The size of each zone is set taking into consideration natural factors that generate electrical energy, such as solar radiation and wind power. The operation control unit 60 counts the numbers of the charging stations 50 and the mobile charging ships 40 in each zone, and calculates the amount of energy that can be generated in each zone based on this.

[0095] If the energy capacity in a particular area is low, the number of charging stations 50 or mobile charging vessels 40 can be increased to increase the energy capacity in that area.

[0096] In addition, when one of the multiple divided areas has a low energy capacity and the other areas have a high energy capacity, the operation control unit 60 can move the mobile charging vessel 40 or the charging station 50 in the other area to the area with the low energy capacity.

[0097] Hereinafter, a control method for the exchange type marine energy storage system 1 according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

[0098] FIG. 6 is a flow chart showing a control method for the exchange type marine energy storage system 1 according to one embodiment of the present invention.

[0099] As shown in FIG. 6, the control method of the replaceable marine energy storage system 1 according to one embodiment of the present invention includes a travel distance calculation step (S10) for calculating the distance that a mobile vessel 10 equipped with an installed battery 20 can travel using the installed battery 20.

[0100] Before the operating vessel 10 starts operation, information on the operating vessel 10, the travel route, the capacity of the installed battery 20, etc. are sent to the operation control unit 60. The operation control unit 60 calculates the distance that the operating vessel 10 can travel, taking into account weather information and the condition of the operating vessel 10 and the installed battery 20, etc.

[0101] The calculation of the travelable distance may include factors such as the sailing speed of the operating vessel 10, tides, wind speed, and temperature.

[0102] The above calculation steps can be performed by the moving vessel 10 or by the operation control unit 60. After the calculation steps are performed by the moving vessel 10, the coordinates where the mounted battery 20 needs to be replaced can be transmitted to the operation control unit 60. Alternatively, the operation control unit 60 can receive information from the moving vessel 10, perform calculations, and then transmit to the moving vessel 10 the coordinates where the mounted battery 20 needs to be replaced.

[0103] After the calculation step, the operation control unit 60 has a division step (S20) of dividing the sea into a plurality of zones along the route traveled by the operating ship 10. In the embodiment of the present invention, the sea is divided into a first zone (A1), a second zone (A2), and a third zone (A3), but this is not limited thereto, and various modifications are possible, such as the number of zones being increased or decreased from three.

[0104] After the division step (S20), the operation control unit 60 has a measurement step (S30) of measuring the number of mobile charging ships 40 and charging stations 50 in each divided area, and then calculating the total stored energy capacity of each area.

[0105] For example, if the first area (A1) has a greater number of mobile charging ships 40 and charging stations 50 than the second area (A2), the operation control unit 60 determines that the first area (A1) has a greater total stored energy capacity than the second area (A2).

[0106] After the measurement step (S30), the operation control unit 60 has an adjustment step (S40) of moving at least one of the mobile charging vessel 40 and the charging station 50 to an area where the total stored energy capacity is insufficient.

[0107] The operation control unit 60 readjusts the layout of each area and the number of mobile charging vessels 40 and charging stations 50 within the area, taking into account the travel route and travel distance of the operating vessel 10, the number of mobile charging vessels 40, and the number of charging stations 50.

[0108] The operation control unit 60, which receives the navigable distance calculated by the operating vessel 10 and the movement route of the operating vessel 10, has a replacement position setting step (S50) for setting the replacement position and replacement time of the installed battery 20 installed on the operating vessel 10.

[0109] The operation control unit 60 sets points for replacing the installed batteries 20 on the operating vessel 10, and then selects from among the mobile charging vessels 40 in each area a mobile charging vessel 40 that is close to the travel route of the operating vessel 10 and has completed charging its mobile battery 30.

[0110] The method further includes an exchange step (S60) in which the operation control unit 60 moves the operating vessel 10 to a replacement position and replaces the mounted battery 20 with the mobile battery 30 mounted on the mobile charging vessel 40.

[0111] The mobile charging vessel 40 moves to the battery exchange position and exchanges the battery with the operating vessel 10. The operating vessel 10 repeats the battery exchange method as described above while traveling, and travels to the destination.

[0112] After the battery exchange is completed, the mobile battery 30 loaded on the mobile charging vessel 40 is charged with electrical energy generated by the mobile power generation unit 42 of the mobile charging vessel 40. Then, the mobile charging vessel 40 moves to the charging station 50 and docks with the charging station 50, and the mobile battery 30 loaded on the mobile charging vessel 40 is charged via the charging station 50 as well.

[0113] The mobile charging vessel 40, whose mobile battery 30 has been fully charged, is moved to a location near the charging station 50 or a set location and waits there.

[0114] The operation control unit 60 checks the total energy amount of each set area from time to time, and when the total energy amount of a certain area falls below the set energy amount, moves at least one of the mobile charging vessel 40 and the charging station 50 to the area where the amount of energy is insufficient.

[0115] By using the replaceable marine energy storage system 1 according to one embodiment of the present invention, it is possible to operate a ship 10 long distances equipped with an installed battery 20 having a smaller charge capacity than in the past, thereby reducing transportation costs.

[0116] In addition, since the battery 20 installed on the operating ship 10 is replaced without being charged, electrical energy is continuously supplied, thereby shortening the overall operating time of the ship and reducing transportation costs.

[0117] Although the present invention has been described above with reference to the illustrative drawings, the present invention is not limited to the embodiments and drawings disclosed in this specification, and various modifications may be made by ordinary skilled artisans within the scope of the technical concept of the present invention. Even if the effects of the configuration of the present invention are not explicitly described and explained while describing the embodiments of the present invention, it is natural that the effects that can be predicted by the configuration should also be recognized. [Explanation of symbols]

[0118] 1. Switchable Marine Energy Storage System 10 Operating vessels 20 Battery installed 30 Portable Battery 40 Mobile charging vessel 41 Ship body 42 Mobile Power Generation Division 43 Second Docking Attachment 50 Charging Station 51 Station Body 52 Power Generation Division 53 Electrical storage unit 54 First Docking Portion 60 Operation Control Unit A1 1st area A2 2nd area A3 3rd area S10 Calculation Step S20 Partition Step S30 Measurement Step S40 Adjustment step S50 Exchange position setting step S60 Replacement Steps

Claims

1. a portable battery for replacing an on-board battery installed on a working vessel and for use as a power source for said working vessel; A mobile charging vessel that moves with the mobile battery loaded thereon; and a charging station that floats on the ocean together with the mobile charging vessel and charges the mobile battery loaded on the mobile charging vessel using generated electricity; Including, Switchable marine energy storage system.

2. an operation control unit wirelessly connected to the operating vessel, the mobile charging vessel, and the charging station, the operation control unit receiving a position and an operating route of the operating vessel and controlling operations of the mobile charging vessel and the charging station; 10. The interchangeable marine energy storage system of claim 1.

3. The operating vessel is supplied with electricity via the mounted battery or the mobile battery, and an electric motor provided on the operating vessel is operated to generate thrust for the operating vessel.

3. The interchangeable marine energy storage system of claim 2.

4. The mobile charging vessel is provided in plurality, After docking with the charging station, the mobile battery is charged by receiving electricity through the charging station.

3. The interchangeable marine energy storage system of claim 2.

5. The mobile charging ship is operated by an unmanned system that is automatically operated by a control signal from the operation control unit.

3. The interchangeable marine energy storage system of claim 2.

6. The charging station includes a station body floating on the sea; and a power generation unit that is installed in the station body and generates electricity by utilizing at least one of solar power, wind power, and tidal power; Including, 6. The interchangeable marine energy storage system of claim 2 .

7. The charging station includes a first docking connection portion protruding from a side surface of the station body, The mobile charging vessel includes a second docking connection portion connected to the first docking connection portion.

7. The interchangeable marine energy storage system of claim 6.

8. When the first docking unit and the second docking unit are connected to each other, electricity stored in the charging station is transmitted to the mobile charging vessel to charge the mobile battery.

8. The interchangeable marine energy storage system of claim 7.

9. a travel distance calculation step for calculating a distance that a vessel having an installed battery can travel using the installed battery; A replacement position setting step in which a navigation control unit, which receives the calculated navigable distance of the traveling vessel and the travel route of the traveling vessel, sets a replacement position and a replacement time of the installed battery installed in the traveling vessel; and an exchange step in which the operation control unit moves the operating vessel to an exchange position and exchanges the installed battery with a mobile battery installed in the mobile charging vessel; Including, A method for controlling a switched marine energy storage system.

10. a division step in which the navigation control unit divides the sea surface into a plurality of areas along a route along which the navigation vessel is to be moved, after the movement distance calculation step; A measurement step in which the operation control unit measures the number of the mobile charging ships and charging stations in each partitioned area and then calculates the total reserved energy capacity of each area; and an adjustment step in which, after the measurement step, the operation control unit moves at least one of the mobile charging vessel and the charging station to an area where the total stored energy capacity is insufficient; 10. The method of claim 9, wherein the control method is a control method for a swappable marine energy storage system.

Citation Information

Patent Citations

  • Methods of transporting electrical energy

    JP2005533470A

  • Ship for supplying energy and method of supplying energy using the same

    KR101918920B1

  • Distillation apparatus

    KR102577190B1

  • Electric vehicle having a GPS based gas station reservation function

    US20120158229A1

  • Battery-electric propulsion ship power feeding system, offshore power feeding facility, and battery-electric propulsion ship

    WO2020044601A1

Cited By

  • Electric fishing boat charging system and electric fishing boat charging program

    JP2026123380A