Dynamic cable pull for floating wind turbines

The remote cable entry system for FWTs addresses the complexity of inter-array cable installation by using a vessel with a winch and dynamic positioning to automate the process, ensuring safer and more efficient cable connection and hang-off operations.

JP2024542785AActive Publication Date: 2024-11-15KONGSBERG MARITIME AS
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2024533011
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-12-03
Filing Date
2022-12-05
Publication Date
2024-11-15
Estimated Expiration
2042-12-05

AI Technical Summary

Technical Problem

The installation of inter-array dynamic cables on floating wind turbines (FWTs) is complex and challenging due to the movement of both the installation vessel and the FWTs, which are exposed to external forces like waves and currents, leading to significant dynamic stresses and potential damage, requiring manual intervention and increased safety risks.

Method used

A remote cable entry system using a vessel equipped with a winch and dynamic positioning system to compensate for relative motion between the vessel and the FWT, allowing for automated cable connection and hang-off operations without personnel on the FWT, utilizing sensors and communication systems for precise control.

Benefits of technology

The system enables faster, safer, and more cost-effective installation of dynamic cables by reducing the need for on-site personnel and equipment, enhancing safety and operational flexibility, and minimizing cable damage through synchronized DP and winch control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024542785000001_ABST
    Figure 2024542785000001_ABST
Patent Text Reader

Abstract

1. A system for remote cable pulling of a dynamic cable 3 from a vessel 5 to a floating wind turbine 2, comprising: a floating wind turbine 2 having a pulling wire 10 attachable to the dynamic cable 3 connected to the floating wind turbine 2; and a vessel 5 for performing a dynamic cable pulling operation to connect the dynamic cable 3 to the floating wind turbine 2, the pulling wire being attachable to the dynamic cable 3 and the vessel 5 adapted to pull the pulling wire and the dynamic cable 3 attached to the floating wind turbine, the system being adapted to compensate for relative motion between the vessel 5 and the floating wind turbine 2 during the pulling operation.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a system for remote cable pulling of a dynamic cable from a vessel to a floating wind turbine (FWT), a floating wind turbine (FWT) and a vessel for performing a pulling operation of the dynamic cable on the FWT, and a method for pulling a dynamic cable onto a floating wind turbine (FWT). [Background technology]

[0002] FWTs organized in a floating wind turbine park as shown in FIG. 1, or individual FWTs, are typically connected to subsea power cables for transporting the electrical energy produced by the wind turbines to its destination, which may be, for example, onshore, offshore, or for export. The subsea export cables may be connected to an offshore converter or substation (OSS) and further to the grid. The wind turbines in a floating wind turbine park may be connected together by inter-array power cables. To export the produced electrical energy, the inter-array cables may be collectively connected to an offshore converter station or offshore substation. The offshore substation generally serves to step up the voltage from the distribution voltage of the site to a higher voltage. For projects located far from the grid connection point, the electrical energy may be converted from AC to DC.

[0003] The capacity in the inter-array power cables is typically 36 kV or 66 kV. High capacity or export cables can have up to 220 kV. The wind turbine inter-array dynamic power cables are typically connected to the subsea power cable in a transition joint. For larger wind turbine parks, the turbines may be connected to several "strings" where the power goes to the converter / substation before going in the export cable. The inter-array cable may include a specific cross section in the dynamic part of the cable with a transition joint versus a reduced cross section in the static part of the cable. The static part may be pre-installed and connected to the dynamic part that connects with the dynamic cable installation. Alternatively, it is possible to have only one dynamically sized cross section in the entire length of the inter-array cable between turbine a and turbine b, but this is a cost issue in terms of manufacturing and installation.

[0004] FWTs require dynamic and high capacity subsea cable systems to collect and export the generated power. FWTs are generally moored to the seabed to keep them in a more or less stable position. In contrast to bottom-mounted wind turbines such as monopile wind turbines that stand on the seabed in a fixed position, FWTs are floating and therefore exposed to external forces such as wind, currents and waves that cause movement. Not only may the installation vessel move during the installation process relative to the cable, but the FWT may also move relative to the vessel. Therefore, the installation procedure for FWTs is generally much more challenging in terms of technical and safety problems to be solved compared to fixed-mounted WTs that stand on the seabed. The movements and deflections of the FWTs as well as the waves and currents subject the inter-array dynamic power cables to significant dynamic stresses. These inter-array dynamic cables must therefore accommodate all the movements and loads from the ocean for floating wind turbines, as well as the weight of the dynamic cable itself. The inter-array dynamic cables are sensitive to voltage and bending, and the possibility of damage is high during installation of the inter-array dynamic cables on the FWT. The process for installing and connecting the inter-array dynamic cables to the floating wind turbine can be complex and time consuming. The installation process is generally more complex and sensitive compared to the installation process on a bottom-fixed wind turbine, since the FWT is exposed to and reacts to external forces such as waves, wind, and currents. Today's solutions for dynamic cable installation require access by personnel on board the cable installation vessel, and also by personnel on board the floating wind turbine for winch control. To install the inter-array dynamic cables on the floating wind turbine, a pulling winch for pulling the inter-array dynamic cables can be pre-installed on the floating wind turbine (FWT) along with other necessary infrastructure and equipment. The pulling winch can be either a permanent system that remains on the floating wind turbine or a temporary system that is dismantled after use. A support vessel with a motion compensation gangway can be used to provide the pulling crew access to the FWT.If the pulling winch system is temporarily installed on the FWT, a vessel with a 3D crane can be used to hoist / lower the pulling winch system. The motion compensated gangway and 3D crane can allow operation in higher weather conditions (higher waves, stronger winds, etc.) and also provide a safer installation of the inter-array dynamic cables to the floating wind turbine. Summary of the Invention [Problem to be solved by the invention]

[0005] For floating wind turbines to move from demonstration and pilot projects to large-scale development, there is an industry need to develop new and improved methods for installing and connecting inter-array dynamic cables to floating wind turbines. [Means for solving the problem]

[0006] The present invention provides a system for remote cable pulling of a dynamic cable from a vessel to a floating wind turbine, the system comprising: - a floating wind turbine having a pull-in n attachable to a dynamic cable connected to the floating wind turbine; - a vessel for performing a dynamic cable pulling operation to connect the dynamic cable to the floating wind turbine, wherein a pull wire is attachable to the dynamic cable, the vessel being adapted to pull the pull wire and the dynamic cable attached to the floating wind turbine; The system is adapted to compensate for relative movements between the vessel and the floating wind turbine during the retraction operation.

[0007] The system may be adapted to compensate for motion of the pull-in wire relative to the floating wind turbine, which may be caused by varying distance between the vessel and the floating wind turbine caused by vertical and / or horizontal movements of either the vessel and / or the floating wind turbine. The motion may be axial motion.

[0008] The system may further comprise a first sensor for measuring a distance between the floating wind turbine and the vessel. The first sensor may be a distance sensor, preferably an optical sensor. The relative motion between the vessel and the floating wind turbine may be indirectly estimated by using data from at least two sensors, where at least one sensor is disposed on the vessel and at least one second sensor is disposed on the floating wind platform. The at least two sensors may be absolute position sensors.

[0009] The vessel may include a dynamic positioning system adapted to control the vessel based on at least one first input parameter. The dynamic positioning system controls the position and orientation of the vessel by using the vessel's own propellers / thrusters. The winch control system may be adapted to control a winch on the vessel based on at least one second input parameter. The winch control system may be provided on the vessel.

[0010] The at least one first input parameter is - the location of the floating wind turbines; - vessel position, - motion of the floating wind turbine, including at least one of heave, sway, surge, roll, pitch, and yaw; - vessel motions including at least one of heave, sway, surge, roll, pitch, and yaw; - the position of the pull wires and dynamic cables, and - tension in the dynamic cable, - tension in the pull-in wire, - the position of the pull-in wire relative to the FWT, - the movement of the pull wire relative to the FWT; - Dynamic cable position relative to the FWT, - Dynamic cable movement relative to the FWT, - Output from the winch control system, The signal may have at least one of the following:

[0011] The at least one second input parameter is - the location of the floating wind turbines; - vessel position, - motions of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; - vessel motions including at least one of heave, sway, surge, roll, pitch, and yaw; - the position of the pull wires and dynamic cables, and - tension in the dynamic cable, - tension in the pull-in wire, - the position of the pull-in wire relative to the FWT, - movement of the pull wire relative to the FWT; - Dynamic cable position relative to the FWT, - Dynamic cable movement relative to the FWT, - Output from a DP system, The signal may have at least one of the following:

[0012] Compensating for the relative motion between the vessel and the floating wind turbine during the retraction operation may be performed by a winch or by a winch and dynamic positioning system.

[0013] The system may further comprise at least one inertial navigation system (INS). The system may further comprise at least one of a satellite navigation system or an inertial measurement unit. The inertial measurement unit may be at least one of a motion reference unit (MRU) and a motion gyro compass (MGC). At least one second sensor may be provided for monitoring a hang-off area on the floating wind turbine relative to the dynamic cable. The second sensor may desirably be an optical sensor. The system may further comprise a first communication system adapted to transmit at least one sensor signal from the floating wind platform to the vessel and a second communication system on the vessel for receiving the at least one sensor signal. The first communication system and the second communication system may be marine broad band radio (MBR).

[0014] A system for remote cable retraction of a dynamic cable from a vessel to a floating wind turbine is provided. The system comprises a floating wind turbine having a retraction wire attachable to a dynamic cable connected to the floating wind turbine. The system further comprises a vessel having a winch for performing a dynamic cable retraction operation to connect the dynamic cable to the floating wind turbine. The retraction wire is attachable to the dynamic cable. The vessel is adapted to pull the retraction wire and the dynamic cable attached to the floating wind turbine by a winch controlled by a winch control system. The system for remote cable retraction is adapted to compensate for relative motion between the vessel and the floating wind turbine during the retraction operation via the winch and the winch control system, the winch control system being adapted to compensate and control motion of the retraction wire caused by relative motion between the vessel and the floating wind turbine during the retraction operation.

[0015] The winch control system controls the winch based on at least one of the relative position between the vessel and the floating wind turbine, the speed of the floating wind turbine with respect to the vessel, and the orientation between the floating wind turbine and the vessel. An instrumentation system provided on the floating wind turbine determines the relative position, speed, and orientation between the vessel and the floating wind turbine and provides output data to the winch control system on the vessel.

[0016] The system may further include a dynamic positioning system adapted to compensate for the tension of the winch, the tension of the winch being provided by an external force, and the dynamic positioning system may further be adapted to compensate for environmental influences, such as wind, waves, and currents.

[0017] The present invention provides a floating wind turbine having a retraction wire attachable to a dynamic cable connected to the floating wind turbine, the retraction wire being attachable to a vessel for performing a retraction operation of the dynamic cable into the floating wind turbine, the vessel being adapted to compensate for relative motion between the floating wind turbine and the vessel during the retraction operation. The cable may be compensated to allow for relative motion between the vessel and the floating wind turbine. The vessel may be adapted to compensate for movement of the pull-in wire relative to the floating wind turbine, which may be caused by a varying distance between the vessel and the floating wind turbine caused by vertical and / or horizontal movements of either the vessel and / or the floating wind turbine. The movement may be an axial movement.

[0018] The floating wind turbine may further be provided with a sensor for measuring a distance between the floating wind turbine and the vessel. The sensor may be a distance sensor. The floating wind turbine may further comprise at least one Inertial Navigation System (INS).

[0019] The floating wind turbine may further comprise at least one of a satellite navigation system and an inertial measurement unit, preferably a motion reference unit (MRU) or a motion gyro-compass (MGC). The floating wind turbine may further comprise at least one sensor for monitoring a hang-off area relative to the dynamic cable. The sensor for monitoring the hang-off area may be an optical sensor. The at least one sensor may be adapted to provide a signal when the dynamic cable is in a final hang-off position. The floating wind turbine may further comprise a hang-off device adapted for hang-off of the dynamic cable retracted and connected to the floating wind turbine. The hang-off device may be adapted for hang-off of the dynamic cable retracted and connected to the floating wind turbine without manual intervention. The hang-off device may be adapted for automatic hang-off. The hang-off device may be a mechanical hang-off device. The hang-off device may be a hang-off clamp arrangement. The hang-off device may include a weak link system to release the cable in the event of mooring line failure and large floating wind turbine drift-off. The floating wind turbine may further include a communication system, preferably a Marine Broadband Radio (MBR), adapted to transmit at least one signal from the floating wind turbine to the vessel.

[0020] The invention provides a vessel for performing a dynamic cable retraction operation to connect a dynamic cable to a floating wind turbine provided with a retraction wire, the retraction wire being attachable to the dynamic cable, the vessel having a winch adapted to pull the retraction wire to retract the dynamic cable into the floating wind turbine, the vessel being adapted to compensate for relative movements between the floating wind turbine and the vessel during the retraction operation. The cable may be compensated to allow for relative movements between the vessel and the floating wind turbine.

[0021] The vessel may be adapted to compensate for movement of the pull wire relative to the floating wind turbine, which may be caused by varying distance between the vessel and the floating wind turbine caused by vertical and / or horizontal movement of either the vessel and / or the floating wind turbine.

[0022] The movement may be axial movement.The vessel may further include a sensor for measuring a distance between the floating wind turbine and the vessel.

[0023] The vessel may be further provided with a dynamic positioning system adapted to control the vessel based on the at least one first input parameter. The winch control system may be adapted to control the winch based on the at least one second input parameter.

[0024] The at least one first input parameter is - the location of the floating wind turbines; - vessel position, - motions of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; - vessel motions including at least one of heave, sway, surge, roll, pitch, and yaw; - the position of the pull wires and dynamic cables, and - tension in the dynamic cable, - tension in the pull-in wire, - the position of the pull-in wire relative to the FWT, - movement of the pull wire relative to the FWT; - Dynamic cable position relative to the FWT, - Dynamic cable movement relative to the FWT, - Output from the winch control system, The present invention may further include at least one of the following:

[0025] The at least one second input parameter is - the location of the floating wind turbines; - vessel position, - motions of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; - vessel motions including at least one of heave, sway, surge, roll, pitch, and yaw; - the position of the pull wires and dynamic cables, and - tension in the dynamic cable, - tension in the pull-in wire, - the position of the pull-in wire relative to the FWT, - movement of the pull wire relative to the FWT; - Dynamic cable position relative to the FWT, - Dynamic cable movement relative to the FWT, - Output from a DP system, The present invention may further include at least one of the following:

[0026] Compensating for the relative motion between the vessel and the floating wind turbine during the retraction operation may be performed by a winch or by a winch and dynamic positioning system.

[0027] The vessel may be provided with a communication system, preferably a Marine Broadband Radio (MBR), for receiving at least one sensor signal from the floating wind turbine.

[0028] The present invention also provides a method for performing a cable pulling of a dynamic cable to a floating wind turbine according to the above system. The method comprises the steps of attaching the dynamic cable to a pulling wire on the floating wind turbine, pulling the pulling wire by the vessel until the dynamic cable is installed in a hang-off device on the floating wind turbine, and compensating for relative motion between the floating wind turbine and the vessel during the pulling operation. The cable may be compensated to allow for relative motion between the vessel and the floating wind turbine. The pulling by the vessel may be performed by a winch on the vessel.

[0029] The system may be adapted to compensate for movement of the pull wire relative to the floating wind turbine, which may be caused by varying distance between the vessel and the floating wind turbine caused by vertical and / or horizontal movement of either the vessel and / or the floating wind turbine.

[0030] The movement may be axial movement. The method may further comprise measuring a distance between the floating wind turbine and the vessel. The distance may be measured between an exit for the pull-in wire on the floating wind turbine and an entrance for the pull-in wire on the vessel.

[0031] The method may further comprise controlling the vessel by the dynamic positioning system based on the at least one first input parameter. The method may further comprise controlling the winch by the winch control system based on the at least one second input parameter. The at least one first input parameter may comprise: - the location of the floating wind turbines; - vessel position, - motions of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; - vessel motions including at least one of heave, sway, surge, roll, pitch, and yaw; - the position of the pull wires and dynamic cables, and - tension in the dynamic cable, - tension in the pull-in wire, - the position of the pull-in wire relative to the FWT, - movement of the pull wire relative to the FWT; - Dynamic cable position relative to the FWT, - Dynamic cable movement relative to the FWT, - Output from the winch control system, The present invention has at least one of the following:

[0032] The at least one second input parameter is - the location of the floating wind turbines; - vessel position, - motions of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; - vessel motions including at least one of heave, sway, surge, roll, pitch, and yaw; - the position of the pull wires and dynamic cables, and - tension in the dynamic cable, - tension in the pull-in wire, - the position of the pull-in wire relative to the FWT, - movement of the pull wire relative to the FWT; - Dynamic cable position relative to the FWT, - Dynamic cable movement relative to the FWT, - Output from a DP system, The present invention has at least one of the following:

[0033] Compensating for the relative motion between the vessel and the floating wind turbine during the retraction operation is performed by a winch or by a winch and a dynamic positioning system.

[0034] The idea with this concept is to create a dynamic cable retraction system on a floating and therefore moving installation, such as a FWT, that can be installed and operated from the vessel that installs or performs the retraction of the inter-array dynamic cables. The vessel in the inventive concept is floating and kept substantially in a fixed position by dynamic positioning. However, the vessel may also perform the retraction operation by use of an active winch without a DP system as explained above. By eliminating the need for a retraction winch installed on each of the FWTs, as well as reducing the need for personnel and equipment movement to and from the FWTs during the construction phase, an industrial challenge is addressed. For wind parks of a certain size, especially large wind parks, the inventive system with its outlined methodology: 1. Reduces the total cost of inter-array dynamic cabling installation. 2. Avoiding the movement of personnel and heavy equipment to and from the FWT during cable pull-in and hang-off, thereby enhancing safety. 3. Improve flexibility in marine schedules by reducing the need for coordination of support vessels and personnel. 4. Easy retrofit on board the FWT and vessel to reduce travel time to perform future cable disconnections / connections.

[0035] The remote dynamic cable pull system according to the present invention addresses the industry challenges to the installation and splicing process of dynamic cables. The new solution provides a more standardized process that is faster to install compared to today's solutions, reduces the need for equipment and personnel on the floating body, and reduces the need for an ROV in the process.

[0036] The new solution provides enhanced safety in the process offering the possibility for a synchronized DP system and winch control system. The DP control system can also be provided with a system for improved process overview during retraction operations. The DP control system can be integrated with the winch control system for semi-automatic fault handling. Integration between the winch control system and the DP control system on the vessel can enable these systems to monitor each other. This provides improved operator awareness and the ability to automatically trigger compensatory actions in case of failure of the vessel's DP or winch, which improves process safety and prevents damage to the power cables. For improved safety, the DP system and the winch control system can be co-located on the bridge of the vessel.

[0037] A DP system with special enhanced mission execution capabilities controls the position and orientation on the vessel. The DP system may have an interface for a dynamic positioning operator. This DP system also provides payout / reel commands, set points from the dynamic positioning (DP) / dynamic positioning operator (DPO) system, and system status of the DP / DPO system to the winch control system. The winch control system may provide data for wire length, wire tension, and system status of the winch control system to the DP / DPO system. The winch control system may also be provided with a local human machine interface (HMI). The winch control system may receive speed and set points from the winch. The winch control system controls the winch based on commands and data received from the DP / DPO system, the local HMI, and the winch.

[0038] Benefits associated with the new remote dynamic cable pulling solution include: The dynamic cable retraction and hanging-off process can be carried out faster and in higher wave conditions compared to known solutions, without compromising safety. The pre-positioned equipment required on the FWT is significantly reduced and no pull winch on the FWT is required. Dynamic cable pulling and dynamic cable temporary hang-off can be performed remotely from the cable installation / pulling vessel without personnel on the FWT, so the need for a second vessel to assist the process is significantly reduced. Reduced need for ROVs with pre-deployed messenger wires that can be picked up at the surface.

[0039] A baseline study implementing the DP remote dynamic cable pulling solution of the present invention shows significant cost reduction. Improved operability and productivity without compromising process safety Integrated DP and winch control for automated consistent vessel and winch operations with reduced human interaction

[0040] Exemplary embodiments will now be described with reference to the following drawings, in which: [Brief description of the drawings]

[0041] [Figure 1] Shown are three floating wind turbines 2 in an offshore wind turbine park, where the floating wind turbines are interconnected using inter-array power cables 3. The floating wind turbines are moored to the seabed by mooring lines and anchors 4. [Diagram 2] A demonstration of a remote dynamic cable pull concept for installing inter-array dynamic power cables on floating wind turbines is presented. [Diagram 3] 1 illustrates exemplary equipment on a floating wind turbine to enable installation of inter-array dynamic cables on the floating wind turbine using a remote dynamic cable pull-in concept. [Figure 4] An example of a towing winch system on an installation vessel is shown. [Diagram 5] An example with enhanced functionality of the DP control system of an installation vessel including dynamic working areas for safe operation is shown. [Figure 6] 1 shows a combined DP and winch control system that may also be operated manually by personnel on board the installation vessel. [Figure 7] 1 illustrates an exemplary remote hang-off connection for a dynamic cable installed on a floating wind turbine. [Figure 8] 1 shows the concept integration between the instrument on the floating wind turbine, the pulling winch, and the dynamic positioning system on the installation vessel. [Figure 9] Illustrates steps (1)-(4) in the “direct crosshaul” of the first inter-array dynamic cable end in the first floating wind turbine. [Figure 10]1 shows steps (5)-(7) in the “direct crosshaul” of the first inter-array dynamic cable end in the first floating wind turbine. [Figure 11] 1 shows steps (8)-(10) in the “direct crosshaul” of the first inter-array dynamic cable end in the first floating wind turbine. [Figure 12] 1 illustrates an example of inter-array dynamic cabling installation between a first floating wind turbine and a second floating wind turbine. [Figure 13] A marine approach to inter-array dynamic cable pull-in and hang-off for a second floating wind turbine is demonstrated. [Figure 14] 13 illustrates an example of steps for an inter-array dynamic cable crosshaul process at a second floating wind turbine, where an installation vessel is first positioned close to a second floating wind turbine to perform the inter-array cable crosshaul with a pre-installed messenger wire connected to the floating wind turbine. [Figure 15] 13 shows example steps for the retraction and hang-off process of a second inter-array dynamic cable end at a second floating wind turbine, where the inter-array dynamic cable is retracted through a guide tube on the floating wind turbine and a cable hang-off on the floating wind turbine. [Figure 16] 13 shows an illustration of the final step of the retraction and hang-off process for the second inter-array dynamic cable end for the second floating wind turbine where the messenger wire is disconnected from the retraction system and released from the installation vessel. [Figure 17] 1 illustrates example steps for a retrieval and retraction operation in which an inter-array dynamic cable is retrieved from a subsea wet store. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0042] Exemplary embodiments are described with reference to the drawings, which should not be construed as limiting the invention. The same reference numbers are used in all drawings and throughout the description for the same or similar features.

[0043] Figure 1 shows three floating wind turbines 2 in an offshore wind turbine park. The floating wind turbines are interconnected using inter-array power cables 3. The floating wind turbines are moored to the seabed by mooring lines and anchors 4.

[0044] FIG. 2 shows an illustration of the remote dynamic cable pull concept for installing inter-array dynamic power cables on floating wind turbines.

[0045] FIG. 2 shows a system for remote cable retraction of a dynamic cable 3 from a vessel 5 to a FWT 2. The floating wind turbine 2 may be provided with a retraction wire 10 attachable to the dynamic cable 3 connected to the floating wind turbine 2. The FWT may also be provided with a hang-off device for the dynamic cable 3 attachable to the floating wind turbine 2. The hang-off device will be explained in detail later. The system may also include a vessel 5 for performing a dynamic cable retraction operation to connect the dynamic cable 3 to the floating wind turbine 2, the retraction wire attachable to the dynamic cable 3. The vessel 5 may be provided with a winch 6 adapted to pull the retraction wire and the dynamic cable 3 attached to the floating wind turbine. The system may be adapted to compensate for a relative motion between the vessel 5 and the floating wind turbine 2 during the retraction operation. The relative motion may for example be waves or currents induced and / or generated when the vessel decides to move.

[0046] The system may be adapted to compensate for movements on the pull-in wire due to the relative distance between the FWT 2 and the vessel 5 and due to longitudinal and / or lateral movements of the FWT 2 and the vessel 5. This allows the movements of the pull-in wire to be synchronized with the movements of the floating wind turbine 2.

[0047] A first sensor for measuring the distance between the floating wind turbine and the vessel may be provided on the FWT and / or on the vessel. The first sensor may generally be a distance sensor. The distance sensor may be an optical sensor. The optical sensor may be a laser or an IR sensor. Other distance sensors such as radar or ultrasonic may also be used depending on the system and system requirements.

[0048] The relative motion between the vessel 5 and the floating wind turbine 2 may alternatively be estimated indirectly by using data from at least two sensors, where at least one sensor is located on the vessel 5 and at least one sensor is located on the floating wind platform 2. The at least two sensors may be absolute position sensors.

[0049] The vessel 5 may be provided with a dynamic positioning system 51. Dynamic positioning (DP) involves automatically or semi-automatically controlling the position and orientation of the vessel by using its own propellers and thrusters with respect to one or more position references. The dynamic positioning (DP) system may keep the vessel's position fixed within given parameters or may steer the vessel in a manner that is indispensable to the vessel. The dynamic positioning (DP) system may steer the vessel based on a number of input parameters. These input parameters may be, for example: - Sensors for location, direction and speed; - Sensors for external factors such as wind, waves, and currents; and - It can result from inputs from a user to perform a mission such as maintaining a position or moving in a particular pattern. The control algorithms of the Dynamic Positioning (DP) system take in the sensor and user input parameters and perform the maneuvering of the vessel by controlling the on-board propellers and thrusters even with changes in external forces.

[0050] The DP system may be adapted to control the vessel 5 based on at least one first input parameter, the parameter comprising: - the location of the floating wind turbines; - vessel position, - motions of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; - vessel motions including at least one of heave, sway, surge, roll, pitch, and yaw; - the position of the pull wires and dynamic cables, and - tension in the dynamic cable, - tension in the pull-in wire, - the position of the pull-in wire relative to the FWT, - movement of the pull wire relative to the FWT; - Dynamic cable position relative to the FWT, - Dynamic cable movement relative to the FWT, - Output from the winch control system, The signal may have at least one of the following:

[0051] The winch control 61 system is adapted to control a winch 6 on the vessel based on at least one second input parameter, which parameter may include: - the location of the floating wind turbines; - vessel position, - motions of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; - vessel motions including at least one of heave, sway, surge, roll, pitch, and yaw; - the position of the pull wires and dynamic cables, and - tension in the dynamic cable, - tension in the pull-in wire, - the position of the pull-in wire relative to the FWT, - movement of the pull wire relative to the FWT; - Dynamic cable position relative to the FWT, - Dynamic cable movement relative to the FWT, - Output from a DP system, The signal may have at least one of the following:

[0052] The system may be provided with at least one Inertial Navigation System (INS) 13, which may be a satellite navigation system or an Inertial Measurement Unit, which may be at least one of a Motion Reference Unit (MRU) and a Motion Gyro-Compass (MGC).

[0053] The vessel may or may not be provided with a dynamic positioning system.

[0054] In case the vessel is not provided with a DP system, an exemplary concept system includes a winch on the vessel and an instrument on the floating wind turbine. By communicating with the instrument on the floating wind turbine, the winch compensates for the motions of the floating wind turbine and the vessel. This allows controlling the motion of the retraction wire relative to a guide tube for the dynamic cable on the floating wind turbine. The winch is an active winch that can compensate for the motions on both the vessel and the floating wind turbine (FWT). The active winch is controlled by a winch control system. The position of the vessel can be controlled manually, for example in a "joystick" mode. An instrumentation system determines the relative position, speed, and orientation between the vessel and the floating wind turbine and provides output data to a winch control system on the vessel. The winch control system is adapted to accurately compensate and control the motion of the cable caused by the relative motion between the vessel and the floating wind turbine during the retraction operation by using sensor data from the vessel and the floating wind turbine. Decisions may be provided in real time and data may be provided to the winch control system with a continuous output. Decisions may be provided in near real time or periodically and data may be provided to the winch control system with a near continuous or intermittent output depending on the process requirements. One part of the system (the vessel processing device) is located on the vessel and another part (the remote motion system) is located on the floating wind turbine. The two parts of the system may communicate via a Marine Broadband Radio (MBR) data link.

[0055] When the vessel is provided with a DP system, an exemplary concept includes a winch on the vessel and a DP control system and instruments on the floating wind turbine. The winch is controlled by the winch control system. The DP control system and the winch control system are adapted to optimally compensate for the relative motion between the vessel and the FWT during retraction of the cable. An instrumentation system determines the relative position, speed and orientation between the vessel and the floating wind turbine and provides output data to the DP system and the winch control system on the vessel. The determinations are provided in real time and the data may provide a continuous output to the DP system and the winch control system. The determinations are provided in real time and the data may provide a continuous output to the winch control system. The determinations are provided in near real time or periodically and the data may provide a near continuous or intermittent output to the winch control system depending on the requirements of the process. The vessel DP system compensates for the winch tension (external forces) in addition to environmental influences. A vessel processor on the vessel may receive real-time positions from the floating wind turbine, calculate relative position, speed, and heading, and output these data to the DP and winch control systems. A remote motion system is provided on the floating wind turbine. The remote motion system may include an inertial measurement unit, a processor, and a battery. The remote motion system and the vessel processor may communicate via a Marine Broadband Radio (MBR) data link. Further details of these systems are described below.

[0056] If the vessel is provided with a dynamic positioning (DP) system, measuring the 2×6 degrees-of-freedom (DOF) motion and compensating for the 2×6 degrees-of-freedom (DOF) motion is achieved by synchronizing the DP control system with the winch control system. The DP control system and the winch control system are synchronized to maintain a safety margin during the process of the vessel and the floating wind turbine being connected together. The DP control system and the winch control system are adapted to optimally compensate the relative motion between the vessel and the FWT during retracting the cable. The synchronization of the DP control system and the winch control system may involve at least one of the position of the floating wind turbine (e.g. measured using a sensor on the floating wind turbine), the position of the vessel provided by the dynamic positioning system, the position of the retracting cable provided by the winch / winch control system, and the operation status of the DP system and the winch / winch control system. The DP control system and the winch control system work together and know each other's operation based on the input parameters described and listed above. Each of the DP control system and the winch control system also knows the status of the other system. The status can be in the form of a fault / error condition or whether the system is operating normally or not. This can be used to improve the security of the system in case of a fault / error. If one of the DP control system or the winch control system fails during operation, i.e. it can no longer hold the correct position of the vessel and the pulling wire, the remaining motion control system (DP or winch control system) will move the vessel and wire to a position with an increased safety margin. The pulling wire (with attached dynamic cable) can for example be guided to a safe position, the motion reversed or the motion interrupted.

[0057] Some examples of winch or DP system failures: Example a): The winch is locked and cannot compensate -> the vessel then moves closer to the FWT and lowers the dynamic power cable, keeping it away from the critical point close to the FWT. Example b): DP fails and vessel does not hold position -> winch reels out reel wire to lower dynamic cable to seabed for emergency disconnection.

[0058] As explained above, FIG. 2 shows an exemplary remote dynamic cable pulling concept 1 for a floating wind turbine (FWT) 2. The cable to be pulled is an inter-array dynamic cable 3 connected to the floating wind turbine 2. The floating wind turbine may be part of an offshore wind turbine plant. As explained before, the inter-array dynamic cable is sensitive to voltages and bending and the chance of damage is high during installation. The floating wind turbine 2 is provided with a guide tube 20 for the inter-array dynamic cable 3 in the example of FIG. 2. As explained in detail below, a floater instrumentation kit 7 is provided for monitoring the messenger wire 10.

[0059] The installation vessel 5 may be provided with a dynamic positioning system (DP) and a pulling winch 6. The winch 6 is provided with a winch control system. The winch control system is arranged on the vessel 5. The winch control system is connected to the DP control system for providing winch parameters to the DP control system and for controlling the winch 6 by the DP control system. The DP system may be integrated into the winch control system. The integration of the systems may provide an improved process overview to the operator of the integrated DP and winch control system.

[0060] The retraction winch 6 retracts a messenger wire / retraction wire 10 which is connected to the inter-array dynamic cable 3 via a guide tube 20. The messenger wire / retraction wire 10 travels over rollers or pulleys on the floating wind turbine deck which support and guide the messenger wire / retraction wire 10. Rollers and pulleys may also be provided on the installation vessel 5 to support and guide the messenger / retraction wire 10 as it comes on board the vessel and further on the vessel deck before reaching the retraction winch 6. The installation vessel 5 and floating wind turbine 2 are provided with wireless communications to transmit signals from instruments on the floating wind turbine 2 to the installation vessel 5.

[0061] An example of the equipment typically provided on the floating wind turbine 2 is shown in FIG. 3. A first pulley / guide 11 is positioned to center the messenger / pull wire 10 within a guide tube 20 on the floating wind turbine. The pulley / guide 11 is positioned above the guide tube hang-off 16. A second pulley / guide 12 is positioned to support and deflect the messenger wire 10 from the floating wind turbine 2 before it leaves the floating wind platform and proceeds over the installation vessel 5. A top to remote cable hang-off guide tube hang-off arrangement 16 is provided at the top of the guide tube 20. This is where the messenger wire and inter-array dynamic cable 3 exit the guide tube 20. One or more sensors may be provided to monitor the hang-off area for the dynamic cable 3. The sensor may be, for example, a distance sensor in the form of a laser or IR sensor or a radar. The sensor may be an optical sensor, e.g. a camera or a video camera. The first camera 14 may be arranged to monitor the dynamic cable hang-off area. The second camera 17 may be arranged to monitor the messenger wire 10 in the further pulley / guide 12. The second camera 17 may also monitor the exit of the messenger wire from the further pulley / guide 12. The first and second cameras may be, e.g., video cameras. The FWT may be provided with at least one sensor adapted to provide a signal when the dynamic cable is in the final hang-off position.

[0062] The floating wind turbine may be provided with an inertial navigation system (INS) 13. The inertial navigation system 13 may include at least one of a satellite navigation system (e.g. Global Navigation Satellite System (GNSS) or GPS) and an inertial measurement unit (MRU or MGC) to measure the position and motion of the floating wind turbine 2. The satellite navigation system may be, for example, GNSS, GPS, GLOANASS, BeiDou, Galileo, QZSS, IRNASS, or NavIC. The inertial navigation system (INS) may be mounted near the second pulley / guide 12 where the messenger wire leaves the floating wind turbine. This allows the motion of the floating wind turbine, i.e. heave, sway, surge, roll, pitch, and yaw, to be monitored. The floating wind turbine 2 may further be provided with a communication system (transceiver) 15 for transmitting signals from floating instruments mounted on the floating wind turbine, e.g. signals from an inertial navigation system (INS), sensors and cameras, to the installation vessel. The communication system may for example be a Marine Broadband Radio (MBR), but other wireless communication systems may also be used. The instruments on the floating body may be pre-installed. The installations on the floating body may be removable. Also, the messenger wire / pull wire 10 may be pre-installed on the floating wind turbine 2. The floating wind turbine may be provided with a distance sensor for measuring the relative distance between the floating wind turbine 2 and the vessel 5. The distance sensor may for example be a laser, an IR sensor, an ultrasonic sensor or a radar.

[0063] The pulling winch system on the installation vessel 5 can be adapted with different pulley arrangements in different positions to route and support the pulling wires (see for example FIG. 4). This allows the concept to be implemented in different vessel lay spreads, e.g. Horizontal Lay Spread (HLS) with dynamic cables installed over the stern or over the side, Vertical Lay Spread (VLS) with dynamic cables installed through the moonpool or over the side.

[0064] The messenger wires on the floating wind turbine can be pre-installed in various configurations to release and connect to the dynamic cable and the pull-in winch. Hang-off devices can also be incorporated into the messenger wire arrangement to allow temporary hanging off of the dynamic cable and release of the pull-in winch wire in case of jettisoning.

[0065] The remote cable hang-off mounted on the floating wind turbine 2 can be a mechanical arrangement, a mechanism built into the hang-off clamp design, a mechanism built into the hang-off flange, or a combined clamp and hang-off flange mechanism. The combined hang-off flange mechanism can be a remotely operated connector design similar to a diverless bend-reinforced connector. The hang-off of the dynamic cable 3 that is pulled into and connected to the floating wind turbine 2 can be performed without manual intervention. An automatic hang-off allows the hang-off operation to be performed without personnel on the floating body. An example can be the use of a system with three latch dogs that rotate and grip in a groove or support in the cable termination head. The three latch dogs are mounted on the top of the guide tube. The latch dogs can include a weak link that releases the cable from the floating wind turbine if the large floating wind turbine drifts, for example due to a mooring line failure.

[0066] The pull-in winch 6 on the installation vessel 5 is shown in more detail in FIG. 4. The pull-in winch (PIW) is provided with a PIW control system 61. The control system 61 may also have a backup in the form of personnel 62 (local HMI of the PIW) on board the installation vessel 5 who may manually control the pull-in winch. The control system is connected to a communication system 18 for communicating with the transceiver 15 on the floating wind turbine. The communication system may be a Marine Broadband Radio (MBR). The equipment on the installation vessel may also include a pulley / guide arrangement 63 to support and deflect the messenger / pull-in wire 10. The pulley / guide arrangement may enable the vessel to optimize position and orientation. A dynamic positioning system (DP) 51 (FIG. 6) on the installation vessel 5 may also be given special enhanced mission equipment functionality to control the installation vessel 5 during dynamic cable pulling operations, also based on input from a sensor system on the floating wind turbine 2. The dynamic positioning system 51 on the installation vessel 5 may have a communication module to enable communication with and to control the retraction winch control system 61. As a security system in case of system failure, the DP system and the retraction winch control system may be provided with manual controls 52, 64 for control by personnel on board the installation vessel 5.

[0067] FIG. 5 is an illustration of how the DP control system on the installation vessel 5 may include the determination of a safe working area for positioning the installation vessel in the current operation step. When the installation vessel is directly connected to the dynamic cable, the working area is defined by the limits that avoid damage to the dynamic cable, for example by bending or dragging. After the dynamic cable is connected to the messenger / pull wire, the limits of the installation vessel position and orientation are defined by the operating angle and length of the pull winch. The defined limits may be used by the DP control system to prevent the operator from moving or orienting the installation vessel outside the safe working area. Alarms and warnings may also be issued to the operator if the installation vessel approaches these limits.

[0068] The floating wind turbine 2 (FWT) instruments, the vessel's pull-in winch (PIW) system 6, and the installation vessel's 5 dynamic positioning (DP) system 51 work together to accomplish the task of the pull-in operation procedure of the inter-array dynamic cable on board the floating wind turbine 2. Figure 8 shows this concept of integration between the floating wind turbine 2's instrumentation kit 7, the pull-in winch 6, and the dynamic positioning system 51. The floating wind turbine 2's instruments measure the floating wind turbine 2's position and motion (heave, sway, surge, roll, pitch, yaw). These position and motion parameters are transmitted to the installation vessel 5. The pull-in winch 6 control system 61 and the dynamic positioning system 51 receive the position and motion parameters from the instruments 7 on board the floating wind turbine. The dynamic positioning system 51 controls the installation vessel 5 based on several parameters including the position of the installation vessel and position and motion parameters from the fixture 7 on the floating wind turbine, and compensates for the relative motion between the floating wind turbine 2 and the installation vessel to enable controlled cable retraction and hang-off operations. The dynamic positioning system 51 also provides input parameters to a winch control system 61 which controls the retraction winch 6, as shown in Figure 8.

[0069] The integration of the winch control system 61 with the vessel DP system 51 allows to perform coordinated vessel positioning and winch payout / reeling operations and also improves overall safety in case of vessel DP incidents or winch failure. To perform dynamic cable retraction operations without on-board personnel, the floating wind turbine 2 further has a pre-installed messenger wire 10 routed through the guide tube 20 and pulley arrangements 11, 12 as described above. To perform dynamic cable hang-off operations without on-board personnel, the floating wind turbine 2 is provided with an automatic hang-off clamp arrangement 31. The automatic hang-off clamp arrangement may be placed on the top surface of the floating body, typically on the top surface of the guide tube 16 end, an example of which is shown in FIG. 7.

[0070] FIG. 7 shows an example of an automatic hang-off device on the FWT. The guide tube 20 is provided with a top hang-off flange arrangement / interface 16 for remote cable hang-off. The inter-array dynamic cable 3 may be provided with a hang-off clamp having a spring-loaded latch arrangement 31. As the inter-array dynamic cable 3 is pulled up through the guide tube 20 and exits the top of the guide tube 16, the spring-loaded latch arrangement 31 expands and secures the inter-array dynamic cable 3 in position on top of the hang-off plate, preventing the inter-array dynamic cable from sliding back down into the guide tube 20. Further functions of the guide tube in guiding the cable in the retraction operation are described.

[0071] Figure 8 shows the concept integration between the instrumentation kit 7 on the floating wind turbine 2, the pulling winch 6 and the dynamic positioning (DP) system 51 on the installation vessel. The instrumentation on the floating wind turbine distributes information about the floating wind turbine position and the floating wind turbine motion to the winch control system 61 and the dynamic positioning system. The pulling winch may send information about the messenger wire / pulling wire length and the messenger wire / pulling wire tension to the DP system 51. The pulling winch control system 61 may receive the messenger wire / pulling wire length set point from the dynamic positioning (DP) system 51. The winch control system receives separate signals for the vessel motion, the floating wind turbine motion and the relative motion from the remote motion system on the floating wind turbine.

[0072] A method is disclosed for performing a cable pulling of a dynamic cable to a floating wind turbine for the system described above. The dynamic cable is attached to a pull wire on the floating wind turbine. Pulling of the pull wire by the vessel is performed until the dynamic cable is positioned at a hang-off device on the floating wind turbine. Pulling of the pull wire can be performed by moving the vessel, by towing the pull wire and / or by hauling. Hauling can be performed by use of a winch or by use of a pulley (e.g. as in a heave compensation system). The pulley performs the dynamic compensation. The winch can be dynamically controlled. Relative motion between the floating wind turbine and the vessel is compensated for during the retraction operation.

[0073] The system is adapted to compensate for the relative distance between the floating wind turbine 2 and the vessel 5 and for the motion on the pulling wire due to longitudinal motion of the floating wind turbine 2 and the vessel 5. To control the pulling operation, the distance between the floating wind turbine and the vessel may be measured. The distance may be measured between an exit for the pulling wire on the floating wind turbine and an entry for the pulling wire on the vessel. The exit / entry point may be the starting / entry point or vice versa depending on the surrounding conditions. The vessel may be controlled by a dynamic positioning system based on at least one first input parameter. The winch may be controlled by a winch control system based on at least one second input parameter. The at least one first input parameter comprises at least one of: position of the floating wind turbine; position of the vessel; motion of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; position of the pull wire and dynamic cable; motion of the vessel including at least one of heave, sway, surge, roll, pitch, and yaw; and tension in the dynamic cable; tension in the pull wire; position of the pull wire relative to the FWT; motion of the pull wire relative to the FWT; position of the dynamic cable relative to the FWT; motion of the dynamic cable relative to the FWT; and output from a winch control system. The at least one second input parameter comprises at least one of: the position of the floating wind turbine; the position of the vessel; the motion of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; the motion of the vessel including at least one of heave, sway, surge, roll, pitch, and yaw; the position of the pull wire and the dynamic cable; and the tension in the dynamic cable; the tension in the pull wire; the position of the pull wire relative to the FWT; the motion of the pull wire relative to the FWT; the position of the dynamic cable relative to the FWT; the motion of the dynamic cable relative to the FWT; and an output from the DP system.

[0074] Cable retraction operation As mentioned above, the cables are sensitive to voltages and bending and the retraction procedure must be performed carefully. Cable retraction performed on top of a floating wind turbine limits tension monitoring to heave / deflection on the floating wind turbine. Retraction from a vessel is known from a fixed-bottom turbine and tension monitoring is limited to heave / deflection of the vessel (if operated on a DP). Retraction from a vessel to a floating wind turbine may involve monitoring and compensating for the relative distance / motion of both the vessel and the floating wind turbine. As explained before, in contrast to fixed-bottom wind turbines, floating wind turbines (FWTs) are floating and therefore exposed to external forces like wind, currents and motion-generated waves. During the installation process for the cables, not only is the installation vessel moving, but the FWT is also moving relative to the vessel. The cables are vulnerable to small radius bends and tensions that place stringent demands on the operation and the equipment involved in the operation. Therefore, the installation procedure for FWTs is generally much more challenging in terms of technical and safety issues to be resolved compared to fixed-mounted wind turbines standing on the seabed. The described reeling solution includes an automation system for coordinating the motion of the floater, the reeling winch and (if the vessel is a DP vessel) the DP setpoints during normal operation and during contingency scenarios.

[0075] Direct cross-hauling of dynamic cable ends between first arrays in a first floating wind turbine Figure 9 shows different steps (1) to (4) indicated in brackets in Figure 9, preparing to perform a direct crosshaul of the first inter-array dynamic cable ends in the first floating wind turbine 2 by the installation vessel 5. The floating wind turbine has mooring lines 4 for connecting to the seabed.

[0076] At the start of the operation, the installation vessel may be positioned near the floating wind turbine. Operational tasks in steps (1) to (4) of FIG. 9: 1. An installation vessel 5 may pick up a messenger wire 10 that has been pre-installed on a floating wind turbine on the sea surface, or the messenger wire 10 may be picked up below the sea surface by an ROV. 2. The subsea routed messenger wire end is picked up by the installation vessel or ROV and connected on board the installation vessel 5 to the top of the inter-array dynamic cable 3 mounted on the installation vessel 5. 3. The messenger wire end routed to the top surface on the floating wind turbine is connected to the vessel’s pulling winch 6. 4. The vessel position and orientation is optimized within the procedural limits to crosshaul the inter-array dynamic cables 3 to the floating wind turbines 2.

[0077] The installation vessel is now ready to perform the cross-haul of the first inter-array dynamic cable to the first floating wind platform. Operational steps (5)-(7) of FIG. 10: 5. The first ends of the inter-array dynamic cables are deployed from the installation vessel to the cross-haul depth. The cables are bend sensitive and a cross-haul depth is determined that provides an acceptable cable bend that will not damage the cable. 6. Continue paying out cable from installation vessel 5 and begin retracting first end of cable with retraction winch 6. The mission may have a lay schedule for each dynamic cable. The lay schedule is a detailed description of the installation vessel position and motion, dynamic cable payout / reel, winch payout / reel based on mission analysis. The lay schedule may be followed by the installation vessel operator and / or programmed into the dynamic positioning system. Subsea operations are typically monitored by an ROV. 7. Continue retracting the cable with the retraction winch and monitor the top end with the camera 14 as the cable enters the bottom of the guide tube 20. The position of the installation vessel is adjusted and cable payout is performed to ensure correct entry of the cable into the guide tube 20.

[0078] The pulling and hanging off of the inter-array dynamic cable on the floating wind turbine can then be performed. Figure 11a shows the different steps (8)-(10) indicated in brackets for pulling and hanging off the first inter-array dynamic cable end on the first floating wind turbine 2 by the installation vessel 5. Figure 11b also shows the cable 3 with the hang-off clamp as it is attached to the pull-in wire 10 and enters the guide tube 20 in step (8), and shows the cable 3 resting on top of the hang-off flange / interface 16 after the hang-off clamp 31 has been pulled up through the guide tube (in steps (9)-(10)). Operation steps (8)~(10): 8. The installation vessel continues to pull the top end of the cable into the guide tube while closely monitoring the cable as it enters the bottom of the guide tube. The bottom of the guide tube may be provided with a bellmouth, or alternative bend stiffening connector (not shown). For dynamic cables, one bend stiffening arrangement may be appropriate for the FWT. 9. Continue retracting the cable while being monitored by the topside camera until the hang-off clamp is pulled up through the guide tube and over the topside hang-off flange / interface, then stop retracting. 10. Lower the hang-off clamp with the extracted latch onto the hang-off flange / interface.

[0079] As shown in Figure 12, after the retraction and hang-off of the first inter-array dynamic cable is completed, the installation vessel cuts the retraction winch wires on the first floating wind turbine and continues to install the inter-array cable towards the second FWT. The retraction action may be reversed until the hang-off clamp is pulled past the guide tube hang-off flange / interface. After this point, the installation vessel continues to install the inter-array cable.

[0080] The approach to pulling and hanging off the inter-array dynamic cable at the second floating wind turbine is shown in FIG. 13. The installation vessel 5 is positioned close to the floating wind turbine 2 to perform the pulling and hanging off of the inter-array dynamic cable at the second floating wind turbine. Upon approaching the second floating wind turbine 2, the installation vessel 5 rotates so that the bow of the installation vessel faces outwardly of the floating wind turbine and the stern ends towards the floating wind turbine. The installation vessel then reverses stern-forward towards the floating wind turbine. The method of FIG. 13 is shown for a horizontal laying system with a chute on the stern of the vessel. This implies that the vessel must rotate and reverse stern-forward towards the floating body as explained above. The method shown in FIG. 13 is an alternative and other methods may be possible depending on the floating installation and the vessel.

[0081] FIG. 14 shows the crosshauling of the inter-array dynamic cable 3 end at the second floating wind turbine 2. In FIG. 14, the installation vessel is positioned close to the floating wind turbines to perform the inter-array dynamic cable crosshauling operation task. The installation vessel has deployed the inter-array cable 3 from the first floating wind turbine to the second floating wind turbine. The subsea routed end and topside routed end of the pre-installed messenger wire are picked up and connected at the first floating wind turbine 2 similar to the steps in FIG. 9. 1. The installation vessel 5 lowers the dynamic cable on its "A&R wire" (abandonment and retrieval wire) to transfer depth, where a take-up winch is pulled in to remove slack in the messenger wire. 2. The installation vessel 5 continues to pay out the A&R (abandonment and retrieval) wire and begins retracting the second end of the inter-array dynamic cable 3 with the retraction winch 6 according to the laying table for the operation. The subsea operation is typically monitored by an ROV. 3. When the catenary load of the inter-array dynamic cable has been transferred to the pull winch 6, the A&R (abandon and retrieve) wire is ready to be cut. 4. The installation vessel continues pulling in the cable after the A&R (Abandon and Retrieve) wire is cut. An ROV is typically used to cut the A&R wire.

[0082] 15 shows the retraction and hanging off of the inter-array dynamic cable 3 end at the second floating wind turbine 2. In step 1, the inter-array dynamic cable is retracted onto the floating wind turbine 2 through the guide tube 20. In step 2, the inter-array dynamic cable is hung off onto the floating wind turbine.

[0083] In Figure 16, the messenger wires / pull-in wires are disconnected from the installation vessel 5. On the floating wind turbine, the pull-in and hang-off operation of the second inter-array dynamic cable end is similar to the pull-in and hang-off operation of the first inter-array dynamic cable end. The process can be reversed until the hang-off clamps are pulled past the guide tube hang-off flanges / interface.

[0084] Recovery and withdrawal from wet storage 17A-17C show the retrieval and retraction of the inter-array dynamic cable from wet storage, which is located on the seabed.

[0085] Stage 1: 1. Position the installation vessel 5 over the top ends of the wet-stored inter-array dynamic cables. 2. Deploy recovery wires and connect to inter-array dynamic cables.

[0086] Stage 2: 3. Begin retrieval of the inter-array dynamic cables and monitor the configuration and touch down point (TDP) of the inter-array dynamic cables, typically by an ROV. 4. Move the installation vessel into position near the floating wind turbine for the pull-in operation.

[0087] Stage 3: 5. Pick up the pre-installed messenger wire onto the floating wind turbine. 6. Connect the subsea routed messenger wire ends to the inter-array dynamic cables. 7. Connect the messenger wire end routed on the top surface to the pull-in winch. Continue crosshauling, retracting, and hanging off in the same manner as described for the crosshaul of the second inter-array dynamic cable end in the retracting and hanging off operation described above.

[0088] The steps shown in Figures 9 to 17 are only illustrative and the remote retraction concept can also be performed in other steps according to the laying plan of the dynamic cable installation. Alternative methods can be envisaged depending on the vessel and laying spread, the configuration of the dynamic cable and the interfaces on the floating installation. The remote retraction concept can be adapted to various variants and scenarios.

[0089] Although the example is shown and described for a floating wind turbine, the dynamic cable retraction concept may also be used for other floating installations that are provided with dynamic cables, and the example and the invention are not limited to floating wind turbines. The concept may be used on other floating installations that allow pre-installation and integration of the equipment and tools described above for the FWT on the floating installation.

[0090] In the illustrative example, the inter-array dynamic cables are connected between the floating wind turbines, however, this is illustrative only and the dynamic cables may generally be installed by use of the remote retraction concept described above. The remote retraction winch concept may also be used to install the dynamic cables on the floating installations and / or between the floating installations, especially when there are many floating installations connected together by dynamic cables. The retraction winch concept to perform the retraction operation may also be used on floating installations where it is difficult or dangerous to get personnel and equipment on / off the floating installation. On some floating installations, the space for larger required equipment, e.g. winches to perform the retraction operation, is limited or unavailable. The space on the floating installation may also be limited or too small for personnel required during the retraction operation.

[0091] The process of cable installation may be accomplished in the manner described above by controlling the relative position of the FWT and the vessel through on-board dynamic positioning combined with winch control and position signals from the FWT. Thus, cable installation may be controlled by monitoring the distance between the vessel and the FWT. Movement of the retraction wire and cable may alternatively be monitored relative to a reference point on the FWT and compensated for by the retraction system.

[0092] Although preferred embodiments of the invention have been described, it will be apparent to those skilled in the art that other embodiments incorporating the present concepts may be used. These and other examples of the invention set forth above are intended as examples only, and the actual scope of the invention should be determined from the claims which follow. [Explanation of symbols]

[0093] 1 Cable Installation System 2. Floating Wind Turbines 3 Dynamic Cable 4. Anchor 5 Ships 6. Winch 7 Floating Body Instrumentation Kit 8 Steps 9 Steps 10 Messenger Wire / Pulling Wire 11 First Pulley / Guide 12 Second Pulley / Guide 13 Inertial Navigation System 14 First Camera 15 Communication Systems (Transceivers) 16 Guide tube hang-off, guide tube hang-off device / interface 17 Second Camera 18 Communication Systems 20 Guide Tube 31 Automatic Hang-Off Clamp Placement 32 Unknown (Code in Figures 11 and 15) 51 Dynamic Positioning System 52 Manual Control 61 Winch Control 62 personnel 63 Pulley / Guide Arrangement 64 Manual Control

Claims

1. A system for remote cable pulling of a dynamic cable (3) from a vessel (5) to a floating wind turbine (2), comprising: A floating wind turbine (2) having a pull wire (10) attachable to a dynamic cable (3) connected to the floating wind turbine (2); a vessel (5) for performing a dynamic cable pulling operation for connecting the dynamic cable (3) to the floating wind turbine (2), the pulling wire being attachable to the dynamic cable (3), the vessel (5) being adapted to pull the pulling wire and the attached dynamic cable (3) to the floating wind turbine; having The system is adapted to compensate for relative movements between the vessel (5) and the floating wind turbine (2) during the retracting operation.

2. 2. The system according to claim 1, wherein the system is adapted to compensate for movements of the pull-in wire relative to the floating wind turbine (2) that may result from a varying distance between the vessel (5) and the floating wind turbine (2) caused by vertical and / or horizontal movements of either the vessel (5) and / or the floating wind turbine (2).

3. The system of claim 1 or claim 2, further comprising a sensor for measuring the distance between the floating wind turbine and the vessel.

4. 2. The system of claim 1, wherein the relative movement between the vessel (5) and the floating wind turbine (2) is indirectly estimated by using data from at least two sensors, whereby at least one first sensor is disposed on the vessel (5) and at least one second sensor is disposed on the floating wind platform (2).

5. The system according to one of the preceding claims, wherein the vessel (5) comprises a dynamic positioning system (51) adapted to control the vessel (5) based on at least one first input parameter.

6. 6. The system according to one of the preceding claims, wherein a winch control (61) system is adapted to control a winch (6) on the vessel based on at least one second input parameter.

7. The at least one first input parameter is: a location of the floating wind turbine; the position of said vessel; motion of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; motions of the vessel including at least one of heave, sway, surge, roll, pitch, and yaw; the location of the pull wire and the dynamic cable; tension in the dynamic cable; tension in the pull wire; the position of the pull-in wire relative to the FWT; movement of the pull-in wire relative to the FWT; the position of the dynamic cable relative to the FWT; movement of the dynamic cable relative to the FWT; Output from the winch control system, The system of claim 5 , further comprising at least one of:

8. The at least one second input parameter is: a location of the floating wind turbine; the position of said vessel; motion of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; motions of the vessel including at least one of heave, sway, surge, roll, pitch, and yaw; the location of the pull wire and the dynamic cable; tension in the dynamic cable; tension in the pull wire; the position of the pull-in wire relative to the FWT; movement of the pull-in wire relative to the FWT; the position of the dynamic cable relative to the FWT; movement of the dynamic cable relative to the FWT; Output from the DP system, The system of claim 6 , further comprising at least one of:

9. Compensating for the relative movement between the vessel (5) and the floating wind turbine (2) during the retracting operation The winch (6), or The winch (6) and the dynamic positioning system (51) The system according to claim 1 , wherein the system is executed by:

10. The system according to one of the claims 1 to 9, further comprising at least one Inertial Navigation System (INS) (13).

11. The system according to claim 1 , further comprising at least one of a satellite navigation system or an inertial measurement unit.

12. The system of claim 11 , wherein the inertial measurement unit is at least one of a motion reference unit (MRU) and a motion gyro compass (MGC).

13. The system according to one of the claims 1 to 12, further comprising at least one second sensor for monitoring a hang-off area on the floating wind turbine for the dynamic cable (3).

14. a first communication system (15) adapted to transmit at least one sensor signal from the floating wind platform to the vessel (5); a second communication system (18) on the vessel for receiving the at least one sensor signal; The system according to claim 1 , further comprising:

15. The system according to claim 13, wherein the first communication system (15) and the second communication system (18) are preferably Marine Broadband Radio (MBR).

16. A floating wind turbine (2), comprising: a pull wire (10) attachable to a dynamic cable (3) connected to the floating wind turbine (2); The retraction wire is attachable to a vessel (5) for performing a retraction operation of the dynamic cable (3) into the floating wind turbine, the vessel (5) being adapted to compensate for relative movements between the floating wind turbine (2) and the vessel (5) during the retraction operation.

17. 17. The floating wind turbine (2) according to claim 16, wherein the vessel (5) is adapted to compensate for movements of the pull-in wire relative to the floating wind turbine (2) that may result from a varying distance between the vessel (5) and the floating wind turbine (2) caused by vertical and / or horizontal movements of either the vessel (5) and / or the floating wind turbine (2).

18. 18. The floating wind turbine (2) according to claim 16 or 17, further comprising a sensor for measuring the distance between the floating wind turbine and the vessel.

19. The floating wind turbine (2) according to one of claims 16 to 18, further comprising at least one inertial navigation system (INS) (13).

20. The floating wind turbine (2) according to one of claims 16 to 19, further comprising at least one of a satellite navigation system and an inertial measurement unit (13), preferably a Motion Reference Unit (MRU) or a Motion Gyro Compass (MGC).

21. The floating wind turbine (2) according to one of claims 16 to 20, further comprising at least one sensor for monitoring a hang-off area for the dynamic cable (3).

22. The floating wind turbine (2) according to claim 21, wherein the at least one sensor is adapted to provide a signal when the dynamic cable is in a final hang-off position.

23. 23. The floating wind turbine (2) according to one of claims 16 to 22, further comprising a hang-off device adapted for hanging off the dynamic cable (3) which is reeled in and connected to the floating wind turbine.

24. The floating wind turbine (2) according to one of claims 16 to 23, further comprising a communication system (15), preferably a Marine Broadband Radio (MBR), adapted to transmit at least one signal from the floating wind turbine to the vessel (5).

25. 1. A vessel (5) for performing a dynamic cable retraction operation to connect a dynamic cable (3) to a floating wind turbine (2) equipped with a retraction wire, the retraction wire being attachable to the dynamic cable (3), the vessel (5) having a winch (6) adapted to pull the retraction wire to retract the dynamic cable (3) into the floating wind turbine, the vessel (5) being adapted to compensate for relative movements between the floating wind turbine (2) and the vessel (5) during the retraction operation.

26. 26. The vessel (5) according to claim 25, wherein the vessel is adapted to compensate for movements of the pull-in wire relative to the floating wind turbine (2) that may result from a varying distance between the vessel (5) and the floating wind turbine (2) caused by vertical and / or horizontal movements of either the vessel (5) and / or the floating wind turbine (2).

27. 27. The vessel (5) according to claim 25 or 26, further comprising a sensor for measuring the distance between the floating wind turbine and the vessel.

28. 28. The vessel (5) according to one of claims 25 to 27, further comprising a dynamic positioning system (51) adapted to control the vessel (5) based on at least one first input parameter.

29. 29. The vessel (5) according to one of claims 25 to 28, wherein a winch control (61) system is adapted to control said winch on the basis of at least one second input parameter.

30. The at least one first input parameter is: a location of the floating wind turbine; the position of said vessel; motion of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; motions of the vessel including at least one of heave, sway, surge, roll, pitch, and yaw; the location of the pull wire and the dynamic cable; tension in the dynamic cable; tension in the pull wire; the position of the pull-in wire relative to the FWT; movement of the pull-in wire relative to the FWT; the position of the dynamic cable relative to the FWT; movement of the dynamic cable relative to the FWT; an output from the winch control system; 30. The marine vessel of claim 28, further comprising at least one of:

31. The at least one second input parameter is: a location of the floating wind turbine; the position of said vessel; motion of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; motions of the vessel including at least one of heave, sway, surge, roll, pitch, and yaw; the location of the pull wire and the dynamic cable; tension in the dynamic cable; tension in the pull wire; the position of the pull-in wire relative to the FWT; movement of the pull-in wire relative to the FWT; the position of the dynamic cable relative to the FWT; movement of the dynamic cable relative to the FWT; Output from the DP system, 30. The marine vessel of claim 29, further comprising at least one of:

32. Compensating for the relative movement between the vessel (5) and the floating wind turbine (2) during the retracting operation The winch (6), or The winch (6) and the dynamic positioning system (51) 32. A vessel according to one of claims 25 to 31, which is carried out by

33. The vessel (5) according to one of claims 25 to 32, further comprising a communication system (18), preferably a Marine Broadband Radio (MBR) (18), for receiving at least one sensor signal from the floating wind turbine (2).

34. 13. A method for performing cable pulling of a dynamic cable into a floating wind turbine according to the system of claim 1, comprising: attaching the dynamic cable to a pull wire on the floating wind turbine; pulling the pull wire by the vessel until the dynamic cable is positioned at a hang-off device on the floating wind turbine; and compensating for relative movement between the floating wind turbine and the vessel during the retracting operation.

35. 35. The method according to claim 34, wherein the system is adapted to compensate for movements of the pull-in wire relative to the floating wind turbine (2) that may result from a varying distance between the vessel (5) and the floating wind turbine (2) caused by vertical and / or horizontal movements of either the vessel (5) and / or the floating wind turbine (2).

36. 36. The method of claim 34 or claim 35, further comprising measuring the distance between the floating wind turbine and the vessel.

37. 37. The method according to one of claims 34 to 36, further comprising the step of measuring the distance between an outlet for the pull-in wire on the floating wind turbine and an inlet for the pull-in wire on the vessel.

38. 38. The method according to one of claims 34 to 37, further comprising controlling the vessel by a dynamic positioning system based on at least one first input parameter.

39. 38. The method according to one of claims 35 to 37, further comprising the step of controlling the winch by a winch control system based on at least one second input parameter.

40. The at least one first input parameter is: a location of the floating wind turbine; the position of said vessel; motion of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; motions of the vessel including at least one of heave, sway, surge, roll, pitch, and yaw; the location of the pull wire and the dynamic cable; tension in the dynamic cable; tension in the pull wire; the position of the pull-in wire relative to the FWT; movement of the pull-in wire relative to the FWT; the position of the dynamic cable relative to the FWT; movement of the dynamic cable relative to the FWT; an output from the winch control system; 40. The method of claim 38, further comprising at least one of:

41. The at least one second input parameter is: a location of the floating wind turbine; the position of said vessel; motion of the floating wind turbine including at least one of heave, sway, surge, roll, pitch, and yaw; motions of the vessel including at least one of heave, sway, surge, roll, pitch, and yaw; the location of the pull wire and the dynamic cable; tension in the dynamic cable; tension in the pull wire; the position of the pull-in wire relative to the FWT; movement of the pull-in wire relative to the FWT; the position of the dynamic cable relative to the FWT; movement of the dynamic cable relative to the FWT; Output from the DP system, 40. The method of claim 39, comprising at least one of:

42. Compensating for the relative movement between the vessel (5) and the floating wind turbine (2) during the retracting operation The winch (6), or The winch (6) and the dynamic positioning system (51) The method according to one of claims 34 to 41, which is carried out by

Citation Information

Patent Citations

  • Replenishment-at-sea installation for a supply ship

    EP0050420A1

  • Cable hang-off arrangement

    EP2696123A1

  • Method and apparatus for adaptive motion compensation

    EP3303204A1

  • System and method for testing a marine control system - Patents.com

    JP4546260B2

  • System and method for static or dynamic positioning or motion control of an offshore structure

    JP6141406B2