Dam management system, runoff prediction device, and dam operation support method
The dam management system and runoff prediction device improve flood response by predicting inflow and ranking data by similarity, supporting timely and accurate dam operation to reduce downstream flood damage.
Patent Information
- Application Number
- JP2020196077
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-11-26
- Publication Date
- 2024-10-07
- Estimated Expiration
- 2040-11-26
AI Technical Summary
Dam managers face challenges in making timely and accurate judgments during flood events, leading to potential increased damage in downstream areas due to delays in assessing situations.
A dam management system and runoff prediction device that utilize a runoff forecaster to predict inflow based on rainfall patterns, incorporating a database with forecast data and metadata, and implement a similarity calculation to rank prediction data by similarity to observed data, supporting more accurate situational judgment and gate control planning.
Enhances dam managers' judgment capabilities by providing quantified and visually comparative data analysis, enabling quicker and more accurate decision-making to minimize flood damage.
Smart Images

Figure 0007562384000003 
Figure 0007562384000004 
Figure 0007562384000005
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to a dam management system, a runoff prediction device, and a dam operation support method. [Background technology]
[0002] Many dams have been constructed for the purposes of flood control, water supply, agricultural water (irrigation), hydroelectric power generation, etc. Many dams are equipped with dam management control processing systems (also called dam controls) that adjust the discharge volume according to the inflow volume. Non-Patent Document 1 published by the Ministry of Land, Infrastructure, Transport and Tourism describes in detail the standard design specifications for dam controls, and future dam controls will be designed in accordance with these specifications. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2017-15453 A [Patent Document 2] JP 2006-30013 A [Patent Document 3] JP 2006-184206 A [Non-patent literature]
[0004] [Non-Patent Document 1] Ministry of Land, Infrastructure, Transport and Tourism "Standard Design Specifications and Commentary for Dam Management Control and Processing Equipment (August 2016)" Summary of the Invention [Problem to be solved by the invention]
[0005] Dam control operators are seeking a variety of services that go beyond the scope of standard specifications. For example, improved functionality to support dam managers in assessing the situation. In particular, as the incidence of large-scale floods has been increasing year by year in recent years, the frequency of flood responses in dam management is also on the rise. Delays in dam managers' assessment of the situation during floods can lead to greater damage downstream.
[0006] Therefore, an object is to provide a dam management system, a runoff prediction device, and a dam operation support method that support the decisions of dam managers and contribute to reducing flood damage. [Means for solving the problem]
[0007] The dam management system is Predict the inflow into the dam Runoff prediction device and a forecast data table containing multiple forecast data based on different rainfall patterns and a metadata table in which metadata including at least one of the following items, which are associated with each of the forecast data: flood occurrence date and time, flood occurrence period, rainfall cause, flood scale, basin average maximum rainfall, basin average total rainfall, maximum inflow amount, maximum discharge amount, maximum water level, classification, and article, is registered. The runoff prediction device includes an observation data input unit, a prediction data acquisition unit, a similarity calculation unit, and a list creation unit. The observation data input unit accepts input of rainfall observation data. The prediction data acquisition unit acquires a plurality of prediction data from the database. The similarity calculation unit calculates the similarity between each of the acquired plurality of prediction data and the observation data. The list creation unit creates a list in which the prediction data is rearranged based on the similarity. Then, the metadata associated with the predicted data in the list is retrieved from the metadata table and placed in the list. do. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a functional block diagram showing an example of a dam management system according to an embodiment. [Diagram 2] FIG. 2 is a functional block diagram showing an example of a runoff prediction device 60. [Diagram 3] FIG. 13 is a diagram showing an example of the contents registered in a prediction data table 70a. [Figure 4] FIG. 13 is a diagram showing an example of contents registered in a metadata table 70b. [Diagram 5] FIG. 13 is a diagram showing an example of a window showing a list of prediction data. [Figure 6] 4 is a flowchart showing an example of a processing procedure of the runoff prediction device 60. [Figure 7] FIG. 13 is a diagram showing an example of a similar rainfall search dialogue window. [Figure 8] 11 is a diagram for explaining a method of calculating a similarity between observed data and predicted data. [Figure 9] 10A and 10B are diagrams for explaining another method of calculating the similarity between observed data and predicted data. [Figure 10] FIG. 13 is a diagram showing an example of a window in which prediction data is sorted in order of similarity. [Figure 11] FIG. 13 is a diagram showing an example of a window displaying details of predicted data. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] [composition] Fig. 1 is a functional block diagram showing an example of a dam management system according to an embodiment. This dam management system includes an information input / providing device 10 capable of communicating with each relevant party 1, and a training device 30, which are connected to an information system LAN (Local Area Network). The dam management system also includes a discharge operation device 50 and a runoff prediction device 60, which are connected to the information system LAN and the control system LAN. The information input / providing device 10, the training device 30, the discharge operation device 50, and the runoff prediction device 60 are realized as, for example, a factory computer (Factory Automation PC: FA-PC).
[0010] The input / output device 80 and the remote manual operation device 90 are connected to the control system LAN. The input / output device 80 and the remote manual operation device 90 are connected to the machine-side transmission device 2. This allows various facilities of the dam to be controlled remotely. The input / output device 80 and the remote manual operation device 90 are realized, for example, as a PLC (Programmable Logic Controller).
[0011] 1, an information input / providing device 10 is used to input and provide various information to the dam management system. A training device 30 controls the display of various information on a liquid crystal panel display (display device) or the like.
[0012] The discharge operation device 50 and the runoff prediction device 60 are made redundant with each other, and one can function as a backup system for the other. The discharge operation device 50 controls the opening and closing of the discharge gate of the dam.
[0013] The runoff prediction device 60 accesses the prediction database 70 and realizes the "similar rainfall search function" according to the embodiment based on various information stored in the prediction database 70.
[0014] For example, a runoff prediction function is implemented as part of the functions in the application of the runoff prediction device 60. Then, a "similar rainfall search function" can be implemented as part of the functions in this runoff prediction function. Note that "runoff prediction" is a term described in Non-Patent Document 1, and can also be understood to mean predicting the amount of inflow into a dam.
[0015] The forecast database 70 is constructed, for example, as a relational database, and includes various tables related to dam operation and a database management system (DBMS) that extracts queried data from the target table.
[0016] 2 is a functional block diagram showing an example of a runoff prediction device 60. The runoff prediction device 60, which is a computer, includes a display device 61 that visually displays information related to rainfall prediction, an input / output unit 62 as a user interface, and a LAN interface (I / F) 63 connected to an information system LAN and a control system LAN. The runoff prediction device 60 also includes a memory 64 and a processor 65. The processor 65 executes instructions included in a program 64a stored in the memory 64, thereby realizing each function according to the embodiment.
[0017] In the embodiment, the runoff prediction device 60 stores a prediction database 70 in a recording medium such as a hard disk drive (HDD) or a solid state drive (SSD). The prediction database 70 stores a prediction data table 70a and a metadata table 70b.
[0018] 3 is a diagram showing an example of the contents registered in the forecast data table 70a. The forecast data table 70a includes a plurality of forecast data based on different rainfall patterns. Each record (row) of the forecast data table 70a is distinguished by a number (No.), and each forecast data is registered with a precipitation pattern for each time, for example, every 10 minutes, which is classified into fields (columns). As the forecast data, past observation data may be registered, or data created by an operator offline may be registered.
[0019] Fig. 4 is a diagram showing an example of the contents registered in the metadata table 70b. The metadata table 70b is a table in which metadata associated with each piece of predicted data is registered. As shown in Fig. 4, the fields of the metadata table 70b include items such as flood occurrence date and time, flood occurrence period, ..., classification, article, etc. In one record, the values of each field of predicted data distinguished by number (No.) are registered.
[0020] When the operator operates the runoff prediction device 60 to send a query requesting acquisition of predicted data to the prediction database 70, multiple pieces of predicted data and corresponding metadata are returned. The runoff prediction device 60 interprets each piece of returned data, lists the predicted data, and creates a window in Figure 5 showing the list of data, which is displayed on the display device 61.
[0021] Fig. 5 is a diagram showing an example of a window showing a list of forecast data. The column labels in the list screen of Fig. 5 are clickable buttons, and by clicking a button, the forecast data can be sorted according to the content assigned to each button. For example, this window has a [Search for Similar Rainfall] button. When this [Search for Similar Rainfall] button is clicked, a process of calculating the similarity between the observed data and the forecast data in the forecast database 70 is started.
[0022] Returning to Figure 2, we will continue with the explanation. The processor 65 shown in FIG. 2 includes, as processing functions according to the embodiment, an observation data input unit 65a, a predicted data acquisition unit 65b, a similarity calculation unit 65c, a list creation unit 65d, and a display control unit 65e.
[0023] The observation data input unit 65a accepts input of rainfall observation data. The observation data may be input manually by an operator using the input / output unit 62. Alternatively, actual rainfall data may be acquired from the filing data of the discharge operation device 50 and the runoff prediction device 60. Alternatively, real-time observation data published by the relevant locations 1 (FIG. 1) may be acquired via the information input / provision device 10 and stored in the memory 64 of the runoff prediction device 60.
[0024] The predicted data acquisition unit 65b acquires a plurality of predicted data from the predicted database 70. The predicted data of all records in the predicted database 70 may be acquired, or the predicted data of a specified range (period, number, etc.) may be acquired.
[0025] The similarity calculation unit 65c calculates the similarity between each of the acquired multiple pieces of predicted data and the input observation data. The list creation unit 65d rearranges (sorts) the acquired predicted data based on the similarity calculated by the similarity calculation unit 65c, and creates a list in which the data is arranged in a tabular format. At this time, the list creation unit 65d acquires metadata associated with the predicted data in the list from the metadata table 70b and arranges the metadata in the list, thereby presenting more detailed information. Note that all predicted data acquired by the predicted data acquisition unit 65b may be listed, or only predicted data with a similarity equal to or greater than a preset value may be arranged in the list.
[0026] The display control unit 65e displays the list created by the list creation unit 65d on the display device 61. The display control unit 65e displays a window on the screen of a browser installed in the runoff prediction device 60 or a dedicated application screen, for example, and displays the list in the window. The display control unit 65e also displays various dialog windows on the display device 61 for receiving operations from the operator.
[0027] Next, the operation of the above configuration will be described. [Effect] FIG. 6 is a flowchart showing an example of a processing procedure of the outflow prediction device 60.
[0028] 5, the runoff prediction device 60 accepts input of observed data to be compared with the predicted data (step S1). Next, the runoff prediction device 60 displays a similar precipitation search dialogue window on the display device 61 and accepts the specification of the range of the target period of the predicted data (step S2).
[0029] 7 is a diagram showing an example of a similar rainfall search dialogue window. When a desired period is entered in the "Reference Rainfall Time" field or the field showing "Past [□] Hours" in this window and the "Start" button is clicked, the target period is entered into the runoff prediction device 60.
[0030] Returning to Fig. 6, the runoff prediction device 60 acquires a plurality of pieces of prediction data from the prediction database 70 (step S3). Then, for each piece of prediction data, the similarity between the prediction data and the observation data is calculated (step S4).
[0031] 8 is a diagram for explaining the calculation of the similarity between observed data and predicted data. The similarity calculation unit 65c calculates the similarity between the predicted data and observed data in the period (comparison rainfall period) specified in the similar rainfall search dialogue window.
[0032] As shown in Fig. 8, the similarity calculation unit 65c compares the waveform of the observed data with the waveform of each predicted data over the same comparative rainfall period and evaluates the similarity. For example, if the predicted data No. 2 is most similar to the observed data, the predicted data No. 3 is second most similar, and the predicted data No. 1 is third most similar, then the predicted data are ranked in that order, and the results are stored in the memory 64 (Fig. 2).
[0033] In the calculation of similarity, the actual rainfall data, i.e., the observed data (time T = 0 to T J ) forecast data hourly rainfall in R J_HOUR_T The cumulative rainfall is R J_TOTAL_T In addition, the prediction data i (times T=0 to T) registered in the prediction database 70 is Ci ) hourly rainfall is R Ci_HOUR_T , the cumulative rainfall is R Ci_TOTAL_T The cumulative rainfall correction coefficient is C.
[0034] The similarity sim between the predicted data and the observed data waveform k can be calculated by equation (1).
[0035]
number
[0036] The data with the lowest similarity sim is ranked in ascending order. When extracting similar rainfall, it is not always the case that there is rainfall in the actual rainfall data that matches the registered forecast data exactly. Therefore, the registered forecast data pattern is stretched so that the sum of the hourly rainfall of the registered forecast data within the rainfall comparison time period is equal to the sum of the hourly rainfall of the actual rainfall data. The cumulative rainfall correction coefficient C is calculated using formula (2).
[0037]
number
[0038] Fig. 9 is a diagram for explaining another calculation of the similarity between observed data and predicted data. It is also possible to extract a plurality of data over the same period from the observed data shown in Fig. 9(a) and one predicted data shown in Fig. 9(b), and calculate and compare the similarity of each period data. In this case, the waveforms of the extracted predicted data are rearranged in order (ascending or descending) according to the similarity (Fig. 9(c)) and displayed on the display device 61.
[0039] Returning to Fig. 6, the explanation will be continued. After the calculation of the similarity is completed, the runoff prediction device 60 sorts (rearranges) the prediction data in ascending or descending order of similarity (step S5), and creates a window in which the data is arranged (step S6). The data of this window is stored in the memory 64, and is read out in response to a predetermined operator operation and displayed on the screen of the display device 61 (step S7).
[0040] Fig. 10 is a diagram showing an example of a window in which the forecast data has been sorted in order of similarity. When [Similar Rainfall Ranking] is clicked in the window of Fig. 5, the forecast data is rearranged according to the similarity order stored in memory 64, resulting in the state shown in Fig. 10. The forecast data most similar to the given observation data is the forecast data with a similar rainfall ranking of 1, and Fig. 10 shows that this corresponds to (No. 5). The operator can click on any of the forecast data to find out its details.
[0041] Fig. 11 is a diagram showing an example of a window that displays the details of the forecast data. The window in Fig. 11 is called, for example, a [Forecast Result Display / Delete Screen], and on this screen, the similarity of the forecast data can be referred to. The upper left corner of the window in Fig. 11 shows the forecast result (No. 2) and that the similarity is 50%. Also, on this screen, the observation data (actual rainfall data) to be compared can be plotted on the same graph as the forecast data.
[0042] As the title bar of the window says [Prediction: Storage Function Method], for example, runoff prediction processing using the storage function method can be used. Of course, it is not limited to the storage function method, and other methods can also be applied.
[0043] [effect] As described above, in the embodiment, a similar rainfall search function is implemented in the dam management system, and when displaying a list of forecast data stored in the database, the similarity between the observation data for a specified period and each forecast data is calculated. Then, the similarity is calculated for the forecast data that can be referenced in the database, and the list of forecast results is sorted by "similar rainfall ranking" and displayed on the screen.
[0044] That is, the runoff prediction device 60 of the embodiment compares various patterns of rainfall data (predicted data) registered in advance in the prediction database 70 with actually observed data, calculates the similarity (quantification of the comparison result), and ranks the predicted data according to the calculated similarity. This quantifies the priority of the data that the operator should refer to, realizing more quantitative data comparison.
[0045] As shown in Fig. 11, the graph of the data to be compared can be overlaid on the graph of the data to be compared, allowing visual comparison. This allows for simultaneous intuitive comparison in addition to quantified quantitative data evaluation, providing detailed support for the operator's situational judgment based on their know-how. In other words, it becomes easier to grasp the rainfall data and forecast data trends for each piece of data. It also makes it possible to organize forecast data based on various factors.
[0046] Therefore, according to the embodiment, even in a situation categorized as an emergency, such as a flood, it is possible to support more accurate situation assessment and more effective gate control planning. In other words, in dam management during floods, the operator who is the dam manager can select prediction data based on quicker and more accurate situation assessment. As a result, it is possible to realize dam management that minimizes flood damage downstream.
[0047] As a result, according to the embodiments, it is possible to provide a dam management system, a runoff prediction device, and a dam operation support method that support the decisions of dam managers and contribute to reducing flood damage.
[0048] It should be noted that the present invention is not limited to the above embodiment. For example, in FIG. 2, the embodiment in which the prediction database 70 is implemented in the outflow prediction device 60 has been described. However, the present invention is not limited to this, and it is of course possible to build the prediction database 70 in a network. For example, the prediction database 70 may be provided in a data center or a cloud computing system. Alternatively, a server may be connected to the information LAN in FIG. 1, and the prediction database 70 may be stored in this server. In short, the form of the prediction database 70 is not limited as long as it can be accessed from the outflow prediction device 60.
[0049] In addition, in the embodiment, the outflow prediction device 60 is provided with the display device 61. However, a terminal such as a tablet that can wirelessly access the outflow prediction device 60 may also be used as the display device.
[0050] Although an embodiment of the present invention has been described, this embodiment is presented as an example and is not intended to limit the scope of the invention. This novel embodiment can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. This embodiment and its modifications are included in the scope and gist of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]
[0051] 1...related parties, 2...machine-side transmission device, 10...information input / provision device, 30...training device, 50...discharge operation device, 60...spill prediction device, 70...prediction database, 80...input / output device, 90...remote manual operation device, 61...display device, 62...input / output section, 63...LAN interface, 64...memory, 64a...program, 65...processor, 65a...observation data input section, 65b...prediction data acquisition section, 65c...similarity calculation section, 65d...list creation section, 65e...display control section, 70a...prediction data table, 70b...metadata table.
Claims
1. A runoff prediction device for predicting the amount of inflow into a dam; The database includes a forecast data table including a plurality of forecast data based on different rainfall patterns, and a metadata table including metadata associated with each of the forecast data, the metadata including at least any of the following items: flood occurrence date and time, flood occurrence time, rainfall cause, flood scale, basin average maximum rainfall, basin average total rainfall, maximum inflow amount, maximum discharge amount, maximum water level, classification, and article; The runoff prediction device includes: an observation data input unit that accepts input of rainfall observation data; a prediction data acquisition unit for acquiring a plurality of prediction data from the database; a similarity calculation unit that calculates a similarity between each of the acquired plurality of predicted data and the observed data; a list creation unit that creates a list in which the predicted data is rearranged based on the similarity, and that acquires the metadata associated with the predicted data in the list from the metadata table and arranges the metadata in the list; A dam management system equipped with:
2. Further comprising a display device, The runoff prediction device includes: further comprising a display control unit that displays the list on the display device. The dam management system according to claim 1.
3. the display control unit displays a dialogue window for designating a period on the display device; the similarity calculation unit calculates a similarity between the observed data and the predicted data for a period specified in the dialogue window; The dam management system according to claim 2.
4. The dam management system according to claim 1 , wherein the list creation unit arranges in the list prediction data whose similarity is equal to or greater than a predetermined value.
5. A runoff prediction device for predicting the amount of water flowing into a dam, comprising: an observation data input unit that accepts input of rainfall observation data; a forecast data acquisition unit that acquires a plurality of forecast data from a database that stores a forecast data table including a plurality of forecast data based on different rainfall patterns, and a metadata table that registers metadata including at least one of the following items associated with each of the forecast data: flood occurrence date and time, flood occurrence time, rainfall cause, flood scale, basin average maximum rainfall, basin average total rainfall, maximum inflow amount, maximum discharge amount, maximum water level, classification, and article; a similarity calculation unit that calculates a similarity between each of the acquired plurality of predicted data and the observed data; a list creation unit that creates a list in which the prediction data is rearranged based on the similarity; a list creation unit that creates a list in which the predicted data is rearranged based on the similarity, and that acquires the metadata associated with the predicted data in the list from the metadata table and arranges the metadata in the list; A runoff prediction device comprising:
6. A dam operation support method for assisting the operation of a dam, comprising: an observation data input unit receiving input of rainfall observation data; a forecast data acquisition unit acquiring a plurality of forecast data from a database storing a forecast data table including a plurality of forecast data based on different rainfall patterns, and a metadata table registering metadata including at least one of the following items associated with each of the forecast data: flood occurrence date and time, flood occurrence time, rainfall cause, flood scale, basin average maximum rainfall, basin average total rainfall, maximum inflow amount, maximum discharge amount, maximum water level, classification, and article; a step of calculating a similarity between each of the acquired plurality of predicted data and the observed data by a similarity calculation unit; a list creation unit creating a list in which the prediction data is rearranged based on the similarity; a step of a list creation unit acquiring the metadata associated with the prediction data in the list from the metadata table and arranging the metadata in the list; A dam operation support method comprising the steps of:
Citation Information
Patent Citations
Method and device for estimating inflow to dam
JP1996219828A
Thunder estimation support-equipment
JP2001174571A
Nationwide combined radar rainfall information providing system
JP2006030013A
System and program for predicting distributed outflow
JP2006184206A
Method for evaluating output value of neural network, and recording medium
JP2006236367A
