Quality estimation device and method

The quality estimation device accurately estimates equipment quality by associating quality control data with equipment combinations, addressing the challenge of identifying individual equipment contributions to product quality issues, thereby improving production efficiency.

JP7565500B2Active Publication Date: 2024-10-11PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2021566785
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2019-12-27
Filing Date
2020-06-29
Publication Date
2024-10-11
Estimated Expiration
2040-06-29

AI Technical Summary

Technical Problem

Existing technologies struggle to accurately estimate the quality of products produced using multiple manufacturing equipment, as they primarily focus on the influence of equipment on final yields through decision tree analysis, making it difficult to identify individual equipment contributing to quality deterioration.

Method used

A quality estimation device and method that generates equipment yield information by associating quality control data with the combination of equipment used for each product, using arithmetic processing to calculate the quality of each piece of equipment directly, enabling accurate estimation of equipment yield and identifying bottleneck equipment.

Benefits of technology

Enables precise estimation of equipment quality, allowing for targeted maintenance and improvement strategies to enhance production efficiency and quality control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000016_0000
    Figure 00000016_0000
  • Figure 00000017_0000
    Figure 00000017_0000
  • Figure 00000017_0001
    Figure 00000017_0001
Patent Text Reader

Abstract

Provided is a quality estimation device that generates information about the quality of a plurality of unit articles acquired by using a plurality of facilities for at least one process. This quality estimation device is provided with: a storage unit; and a control unit. The storage unit stores quality management data in which the facilities through which the respective unit articles pass while being acquired in a process are associated with the quality of the acquired unit articles. The control unit controls an arithmetic operation based on the quality management data stored in the storage unit. The control unit extracts, from the quality management data, a plurality of pieces of passage information indicating combinations of facilities through which the respective unit articles have passed and the quality of the respective unit articles. The control unit generates facility quality information indicating the quality of one of the facilities by the arithmetic operation on the basis of the extracted pieces of passage information.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a quality estimation apparatus and method. [Background technology]

[0002] Patent Document 1 discloses an abnormal equipment estimation device for estimating the manufacturing equipment causing the deterioration of product quality in a manufacturing system that manufactures products using one of a plurality of manufacturing equipment for each of a plurality of processing steps. The abnormal equipment estimation device creates analysis data in which quality inspection results and manufacturing equipment identification information are associated with each product identification information. The abnormal equipment estimation device classifies the analysis data using a decision tree analysis method, and calculates the degree of influence of classification by lower nodes of the created decision tree on classification by higher nodes. In this way, the manufacturing equipment causing the deterioration of product quality is estimated by calculating the degree of influence of manufacturing equipment assigned to each node on the deterioration of quality. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2006-319220 A Summary of the Invention [Problem to be solved by the invention]

[0004] The present disclosure provides a quality estimation device and method capable of accurately estimating the quality per facility when a plurality of unit articles are obtained using a plurality of facilities. [Means for solving the problem]

[0005] A quality estimation device according to one aspect of the present disclosure generates information on the quality of a plurality of unit items obtained using a plurality of pieces of equipment for at least one process. The quality estimation device includes a memory unit and a control unit. The memory unit stores quality control data that associates the equipment passed through in each process when obtaining each unit item with the quality of the obtained unit item. The control unit controls arithmetic processing based on the quality control data stored in the memory unit. The control unit extracts, from the quality control data, a plurality of pieces of route information indicating a combination of the equipment passed through for each unit item and the quality of the unit item, and the control unit generates, by arithmetic processing, equipment quality information indicating the quality per piece of equipment among the plurality of pieces of equipment based on the extracted plurality of pieces of route information.

[0006] These general and specific aspects may be realized by a system, a method, and a computer program, as well as combinations thereof. Effect of the Invention

[0007] According to the quality estimation device and method disclosed herein, the quality per facility can be accurately estimated when multiple unit items are obtained using multiple facilities. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a diagram for explaining an overview of a quality estimation device according to a first embodiment of the present disclosure. [Diagram 2] A block diagram illustrating a configuration of a quality estimation device [Diagram 3] A functional block diagram showing a functional configuration of a quality estimation device. [Figure 4] FIG. 1 is a diagram illustrating an example of a data structure of quality control data in a quality estimation device. [Diagram 5] 1 is a flowchart illustrating an operation of a quality estimation device according to the first embodiment. [Figure 6] FIG. 13 is a diagram showing an example of a display of a low-yield lot detection unit in a quality estimation device; [Figure 7] FIG. 13 is a diagram showing a display example of a bottleneck equipment determination unit in the quality estimation device. [Figure 8] FIG. 13 is a diagram showing an example of a display of a time series analysis unit in the quality estimation device. [Figure 9] A diagram explaining the formulation of the equipment yield estimation method [Figure 10] 1 is a flowchart illustrating a process of analyzing equipment yield in the quality estimation device according to the first embodiment; [Figure 11] 1 is a flowchart illustrating a process of time series analysis in the quality estimation device according to the first embodiment; [Figure 12] A diagram explaining the numerical simulation of the equipment yield estimation method [Figure 13] 11 is a flowchart illustrating a process of analyzing equipment yield in the quality estimation device according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, the embodiments will be described in detail with reference to the drawings as appropriate. However, more detailed explanation than necessary may be omitted. For example, detailed explanation of already well-known matters or duplicate explanation of substantially the same configuration may be omitted. This is to avoid the following explanation becoming unnecessarily redundant and to facilitate understanding by those skilled in the art.

[0010] The applicant provides the accompanying drawings and the following description so that those skilled in the art can fully understand the present disclosure, and they are not intended to limit the subject matter described in the claims.

[0011] (Embodiment 1) Hereinafter, a first embodiment of the present disclosure will be described with reference to the drawings.

[0012] 1. Configuration 1-1. Overview 1 is a diagram for explaining an overview of a quality estimation device 2 according to this embodiment. The quality estimation device 2 of this embodiment is applied to data analysis for a user 1, such as a manager, to manage quality in a factory facility that produces products such as electronic components in lots of tens of thousands of units. The factory facility includes, for example, a plurality of pieces of equipment Ea-1 to Ec-n for producing a plurality of lots simultaneously in parallel. A product in a lot unit is an example of a unit article in this embodiment.

[0013] FIG. 1 illustrates an example in which there is a series of processes Sa to Sc for producing each lot of products, followed by a final inspection process Sz. In this example, multiple equipment Ea-1 to Ec-n are divided into three processes Sa, Sb, and Sc. The equipment Ea-1 to Ea-n, Eb-1 to Eb-n, and Ec-1 to Ec-n for each of the processes Sa, Sb, and Sc are provided in one or multiple factories so as to perform similar processing for each of the processes Sa, Sb, and Sc. The number of processes and the number of equipment are not particularly limited, and the number of equipment for each process may be different. Hereinafter, the equipment Ea-1 to Ec-n may be collectively referred to as "equipment E".

[0014] For multiple lots, various combinations of equipment E are used for each of the processes Sa, Sb, and Sc. For example, in the example of FIG. 1, a specific lot L is processed in process Sa by equipment Ea-2, in process Sb by equipment Eb-1, and in process Sc by equipment Ec-n. Then, in the final inspection process Sz, the final yield, which is the proportion of the products of the specific lot L excluding defective products, is measured using various inspection items. Lot management data D1, which includes various information for managing each lot such as the final yield, is successively collected and accumulated. The lot management data D1 is an example of quality control data in this embodiment.

[0015] In the above-mentioned factory equipment, when a decrease in the final yield is found in the inspection process Sz, there is a demand for identifying the equipment that caused the quality decrease in the processes Sa to Sc on the way to the inspection process Sz so that the manager can take measures. However, according to the conventional technology, for example, the influence of the equipment on the final defect rate is estimated as the influence from the lower node to the upper node by using a decision tree analysis method (see Patent Document 1), and it is difficult to directly estimate the yield of each equipment E.

[0016] In response to this, the present embodiment provides a quality estimation device 2 that can directly estimate the yield per facility E, i.e., the facility yield, based on the lot management data D1. This allows the quality of each facility E to be accurately estimated, and the user 1 can take effective measures, such as prioritizing the facilities Ea-1 to Ec-n and performing maintenance, according to the facility yield for each facility E obtained from the quality estimation device 2.

[0017] 1-2. Configuration of quality estimation device The configuration of the quality estimation device 2 in this embodiment will be described with reference to Figures 2 to 4. Figure 2 is a block diagram illustrating the configuration of the quality estimation device 2.

[0018] The quality estimation device 2 is configured with an information processing device such as a PC. The quality estimation device 2 illustrated in Fig. 2 includes a control unit 20, a storage unit 21, an operation unit 22, a display unit 23, a device interface 24, and a network interface 25. Hereinafter, the interface will be abbreviated as "I / F".

[0019] The control unit 20 includes, for example, a CPU or MPU that cooperates with software to realize predetermined functions, and controls the overall operation of the quality estimation device 2. The control unit 20 reads out data and programs stored in the storage unit 21, performs various arithmetic processing, and realizes various functions.

[0020] Fig. 3 is a functional block diagram showing a functional configuration of the quality estimation device 2. The quality estimation device 2 includes, as functional configurations of the control unit 20, an equipment yield estimation unit 30 that generates equipment yield estimation information D2 based on lot management data D1, a low-yield lot detection unit 31, a bottleneck equipment determination unit 32, and a time-series analysis unit 33. Fig. 4 illustrates an example of the data structure of the lot management data D1.

[0021] As shown in FIG. 4, for example, the lot management data D1 associates a "lot number" for identifying a lot, "date" and "equipment" for each process Sa, Sb, Sc, and various inspection items for the final yield, and manages them as lot path information D10. In this example, the inspection items for the final yield include "voltage failure," "visual failure," and "leakage current." The items for the final yield are not limited to the above, and may include other inspection items. Furthermore, in addition to the measured values ​​for each inspection item, a total value for the final yield that comprehensively takes into account each inspection item may also be managed in the lot management data D1.

[0022] The lot route information D10 indicates the route of a lot identified by a lot number through a combination of equipment by indicating the "equipment" through which the lot passed through each of the processes Sa, Sb, and Sc on a "date." For example, the route of a lot with lot number "6" passes through equipment Ea-9 in process Sa on "November 8," equipment Eb-1 in process Sb on "November 9," and equipment Ec-11 in process Sc on "December 3."

[0023] 3 performs a calculation process to be described later using a plurality of lot path information D10 in the lot management data D1, thereby calculating equipment yield estimation information D2. The equipment yield estimation information D2 is an example of equipment quality information in this embodiment.

[0024] The low-yield lot detection unit 31 detects low-yield lots, which are lots having significantly low final yields, based on the lot management data D1. The bottleneck equipment determination unit 32 determines bottleneck equipment, which is equipment considered to be the cause of quality degradation, from, for example, equipment E through which the low-yield lot passed. The time-series analysis unit 33 generates information indicating, for example, changes in equipment yield over time for bottleneck equipment. The functions of the bottleneck equipment determination unit 32 and the time-series analysis unit 33 are realized using estimated information D2 of equipment yields that meet each condition (details will be described later).

[0025] Returning to Fig. 2, the control unit 20 executes a program including a set of instructions for implementing the functions of the quality estimation device 2 or the quality estimation method as described above. The above program may be provided via a communication network such as the Internet, or may be stored in a portable recording medium. The control unit 20 may also be a hardware circuit such as a dedicated electronic circuit or a reconfigurable electronic circuit designed to implement each of the above functions. The control unit 20 may be configured with various semiconductor integrated circuits such as a CPU, an MPU, a GPU, a GPGPU, a TPU, a microcomputer, a DSP, an FPGA, and an ASIC.

[0026] The storage unit 21 is a storage medium that stores programs and data necessary to realize the functions of the quality estimation device 2. As shown in Fig. 2, the storage unit 21 includes a storage unit 21a and a temporary storage unit 21b.

[0027] The storage unit 21a stores parameters, data, control programs, etc. for implementing predetermined functions. The storage unit 21a is configured with, for example, an HDD or SSD. For example, the storage unit 21a stores the above-mentioned programs, quality control data D1, etc.

[0028] The temporary storage unit 21b is configured with a RAM such as a DRAM or an SRAM, and temporarily stores (i.e., holds) data. For example, the temporary storage unit 21b holds estimated information D2 of the equipment yield. The temporary storage unit 21b may function as a work area for the control unit 20, and may be configured with a storage area in the internal memory of the control unit 20.

[0029] The operation unit 22 is a general term for operation members operated by the user. The operation unit 22 may constitute a touch panel together with the display unit 23. The operation unit 22 is not limited to a touch panel, and may be, for example, a keyboard, a touch pad, a button, a switch, or the like. The operation unit 22 is an example of an acquisition unit that acquires various information input by a user's operation.

[0030] The display unit 23 is an example of an output unit configured, for example, by a liquid crystal display or an organic EL display. The display unit 23 may display various information such as various icons for operating the operation unit 22 and information input from the operation unit 22.

[0031] The device I / F 24 is a circuit for connecting an external device to the quality estimation device 2. The device I / F 24 is an example of a communication unit that performs communication according to a predetermined communication standard. The predetermined standards include USB, HDMI (registered trademark), IEEE1395, WiFi, Bluetooth (registered trademark), and the like. The device I / F 24 may constitute an acquisition unit that receives various information from or an output unit that transmits various information to an external device in the quality estimation device 2.

[0032] The network I / F 25 is a circuit for connecting the quality estimation device 2 to a communication network via a wireless or wired communication line. The network I / F 25 is an example of a communication unit that performs communication in compliance with a predetermined communication standard. The predetermined communication standard includes communication standards such as IEEE802.3, IEEE802.11a / 11b / 11g / 11ac, etc. The network I / F 25 may constitute an acquisition unit that receives various information or an output unit that transmits various information via the communication network in the quality estimation device 2.

[0033] The above-described configuration of the quality estimation device 2 is an example, and the configuration of the quality estimation device 2 is not limited to this. The quality estimation device 2 may be configured with various computers including a server device. The quality estimation method of this embodiment may be executed in distributed computing. Furthermore, the acquisition unit in the quality estimation device 2 may be realized by cooperation with various software in the control unit 20 and the like. The acquisition unit in the quality estimation device 2 may acquire various pieces of information by reading out the various pieces of information stored in various storage media (e.g., the storage unit 21a) into the working area of ​​the control unit 20 (e.g., the temporary storage unit 21b).

[0034] 2. Operation The operation of the quality estimation device 2 configured as above will be described below.

[0035] The quality estimation device 2 of this embodiment executes calculation processing for estimating the equipment yield as an equipment yield estimation unit 30 based on, for example, lot management data D1 stored in advance in a storage unit 21. In the equipment yield estimation method of this embodiment, direct estimation of the equipment yield by each of the equipment Ea-1 to Ec-n is realized by a formulation focusing on the situation where various lots pass through various equipment Ea-1 to Ec-n for each process Sa to Sc. The equipment yield estimation method of this embodiment will be described in detail later.

[0036] The overall operation of the quality estimation device 2 of this embodiment, which utilizes the equipment yield estimation information D2 obtained from the above process, will be described with reference to Figures 5 to 8. Figure 5 is a flowchart illustrating the operation of the quality estimation device 2 in this embodiment. The process shown in this flowchart is executed by, for example, the control unit 20 of the quality estimation device 2.

[0037] First, the control unit 20 of the quality estimation device 2 functions as, for example, a low-yield lot detection unit 31, acquires the lot management data D1 from the storage unit 21 (S1), and detects low-yield lots (S2). An example display of step S2 is shown in Fig. 6. In this display example, the display unit 23 of the quality estimation device 2 is controlled by, for example, the control unit 20 functioning as the low-yield lot detection unit 31 to display a final yield table D3. The final yield table D3 indicates, for example, the measured values ​​of various inspection items as the final yield for each lot for each lot number.

[0038] In step S2, the low-yield lot detection unit 31 compares the final yield of each lot in the lot management data D1 with a predetermined threshold value, for example, and detects lots whose final yield is equal to or less than the threshold value as low-yield lots. The threshold value indicates a standard for a significantly low final yield. The comparison target for the threshold value can be set as appropriate to any measured value in various inspection items for the final yield, or to the overall value between items. In the example of FIG. 6, the lot with lot number "6" is detected by the low-yield lot detection unit 31 and is highlighted.

[0039] In this embodiment, the control unit 20 functions as a bottleneck equipment determination unit 32 based on the detection result of the low yield lot detection unit 31, for example, and analyzes the equipment yield in the route of a specific lot such as a low yield lot (S3). The processing of step S3 is performed by the bottleneck equipment determination unit 32 acquiring equipment yield estimation information D2 for all equipment E through which the specific lot passed. The processing of the equipment yield analysis in step S3 will be described later. An example display of step S3 is shown in FIG.

[0040] In the example of Fig. 7, the display unit 23 is controlled by the control unit 20 as, for example, the bottleneck equipment determination unit 32 to display the equipment yield table D4. The equipment yield table D4 includes, for example, the equipment E of each process Sa, Sb, Sc through which a specific lot passed, the date of processing at each equipment E, and an estimated value for each inspection item as the equipment yield of each equipment E. When, for example, a low-yield lot is identified, the user 1 can check the equipment yield of each equipment E in the path of the low-yield lot by using the equipment yield table D4. Also, for example, in the example of Fig. 7, the bottleneck equipment determination unit 32 determines that equipment Ea-9 having the lowest equipment yield in the equipment yield table D4 is the bottleneck equipment.

[0041] 5, the control unit 20 of this embodiment functions as a time series analysis unit 33 based on the judgment result of the bottleneck equipment judgment unit 32, for example, and performs a time series analysis of the equipment yield (S4). The processing of step S4 is performed by the time series analysis unit 33 acquiring estimated information D2 of the equipment yield for a specific equipment such as a bottleneck equipment. An example of the display of step S4 is shown in FIG.

[0042] In the example of FIG. 8, the display unit 23 is controlled by the control unit 20 as the time series analysis unit 33, for example, to display an equipment yield graph G1. The equipment yield graph G1 shows the time series change of the equipment yield in a specific equipment, and includes, for example, a curve for each inspection item. In the example of FIG. 8, it can be confirmed from the equipment yield graph G1 that a sudden drop in yield occurred during the processing period of a low-yield lot. In this way, the time series analysis processing in step S4 makes it possible to visualize the time when an abnormal lot was produced for each equipment E. The processing of step S4 will be described later. The processing shown in the flowchart of FIG. 5 ends, for example, after execution of step S4.

[0043] As described above, the quality estimation device 2 of this embodiment can provide a user interface that utilizes the equipment yield estimation information D2 to identify bottleneck equipment for low-yield lots and to check changes in equipment yield over time.

[0044] In the above steps S2 and S3, the detection by the low-yield lot detection unit 31 and the judgment by the bottleneck equipment judgment unit 32 may be omitted as appropriate. Instead, the quality estimation device 2 may accept a user operation in which the user 1 designates a specific lot or equipment on the operation unit 22 while the tables D3 and D4 are being displayed on the display unit 23.

[0045] 2-1.How to estimate equipment yield The details of the method for estimating the equipment yield in this embodiment will be described with reference to Fig. 9. Fig. 9 is a diagram for explaining the formulation of the method for estimating the equipment yield.

[0046] In Figure 9, the final yield y i (i=1,2,…,M) and the equipment yield x for N pieces of equipment E j (j=1, 2, ..., N). The number of lots M and the number of facilities N can be set appropriately, for example, provided that M>N. As an example, Fig. 9 illustrates a case where the number of facilities N is 9, and three processes Sa, Sb, and Sc each include three facilities Ea-1 to Ea-3, Eb-1 to Eb-3, and Ec-1 to Ec-3.

[0047] In this estimation method, the final yield of each lot, y i is the potential equipment yield x of each equipment E each time the lot passes through the equipment E in the unique route. j The effect of each lot is cumulative. Then, the final yield of each lot, y i The equipment yield x of the combination according to the lot route information D10 j can be written in the form of a product of multiplying each other.

[0048] For example, in Figure 9, the final yield of the first lot, y 1 is the first equipment yield x belonging to process Sa 1 and the fifth equipment yield x belonging to process Sb 5 and the seventh equipment yield x belonging to process Sc 7The order of the lots corresponds to, for example, lot numbers within a predetermined range in the lot management data D1. The order of the equipment E is set, for example, starting from the equipment Ea-1 of the process Sa, over all the steps Sa to Sc.

[0049] Moreover, the above-mentioned product form is converted to a sum form by taking logarithms, as shown in FIG. 9. From this, the final yield y based on the lot route information D10 is i and equipment yield x j The relationship between them can be formulated as a linear simultaneous equation using logarithms. Each equation in the simultaneous equation is formulated, for example, from lot route information D10 for one route. In this embodiment, a matrix formulation is adopted as shown in FIG. 9, and a final yield vector Y, an equipment yield vector X, and a route matrix A are used as shown in equation (1).

[0050] The final yield vector Y is an M-dimensional vector, and each component (i=1 to M) is the final yield y i The logarithm of log(y i The equipment yield vector X is an N-dimensional vector, and each of the j-th equipment yield x j The logarithm of log(x j The logarithm used for each of the vectors X and Y is not particularly limited, and may be, for example, a common logarithm, a natural logarithm, or a binary logarithm.

[0051] The route matrix A is a matrix of M rows and N columns that is set based on the lot route information D10. As shown in FIG. 9, the route matrix A is a matrix of route flags a i,j is constructed as the matrix element in the i-th row and j-th column. i,j indicates whether the i-th lot has passed through the j-th facility. In this embodiment, since each lot passes through one facility E for each process Sa, Sb, and Sc, the pass flag a i,j has one "1" within the range of column numbers for each of steps Sa, Sb, and Sc.

[0052] Equation (1) can be made into a simultaneous linear equation with excessive conditions by making the number of lots M larger than the number of facilities N. Therefore, in this embodiment, equation (1) is formulated using M pieces of lot route information D10, which are sufficiently large in the lot management data D1, and the facility yield vector X, which is a numerical solution of equation (1), is obtained by the least squares method as shown in the following equation (10).

[0053]

number

[0054] The equipment yield x j corresponds to the average potential yield across lots passing through the corresponding equipment E in the lot management data D1 within the range used in the formulation. The condition X<0 in the above formula (10) is j is between 0 and 1. To find a solution in the least squares method, for example, the BFGS-B method, a quasi-Newton method, can be used.

[0055] 2-2. Processing of equipment yield analysis The process of step S3 in FIG. 5 using the above-described method for estimating the equipment yield will be described with reference to FIG.

[0056] Fig. 10 is a flowchart illustrating the process of analyzing the equipment yield in the quality estimation device 2 of this embodiment (S3 in Fig. 5). The process shown in the flowchart in Fig. 10 starts in a state where one lot, such as a low-yield lot, has been identified.

[0057] First, the control unit 20 functions as, for example, a bottleneck equipment determination unit 32, and selects one piece of equipment in the route of a specific lot as a processing target based on lot route information D10 related to the lot (S11). In this embodiment, the selection in step S11 is performed sequentially for each of the processes Sa, Sb, and Sc. For example, the bottleneck equipment determination unit 32 acquires the process and date corresponding to the processing target equipment from the lot route information D10, and sets them in the equipment yield estimation unit 30 as the reference time for processing.

[0058] Next, the control unit 20 extracts, from the lot management data D1, a plurality of pieces of lot path information D10 in which the date of the set process falls within a predetermined period around the reference time, for example, with a date set in the equipment yield estimation unit 30 as a reference time (S12). The number of lots M as the number of pieces of lot path information D10 to be extracted may be set in advance, or may not be set in particular. For example, in the lot route information D10 for lot number "6" shown in FIG. 4, the date "November 8th" of equipment Ea-9 for process Sa is set as the reference time, and lot route information D10 having the date of process Sa within the range of "November 5th to November 11th" of one week including that date is collected in step S12.

[0059] Next, the control unit 20, for example as the equipment yield estimation unit 30, sets a path matrix A based on the extracted M pieces of lot path information D10 (S13). For example, the control unit 20 provides the number of rows equal to the number of collected lot path information D10 and the number of columns equal to the number of all equipment E in all processes Sa to Sc, and assigns the route flags a of the column numbers of the equipment included in each lot path information D10 in each row. i,j Set to "1" and other via flags a i,j Set to "0".

[0060] Next, the control unit 20 selects one of the inspection items in the extracted lot path information D10, and sets a final yield vector Y to represent the final yield of the selected inspection item (S14). For example, the control unit 20 calculates the logarithm of the measurement value of the inspection item selected in each lot path information D10, and sets the calculated logarithm to each component of the final yield vector Y.

[0061] Next, the control unit 20 performs calculation processing according to equation (10) based on the set path matrix A and final yield vector Y to obtain a numerical solution of equation (1) to calculate the equipment yield vector X (S15). At this time, the control unit 20 calculates the equipment yield of the equipment selected in step S11 by, for example, calculating the exponent of the corresponding component in the calculated equipment yield vector X (S16), and records it in the storage unit 21.

[0062] The control unit 20 performs the processes of steps S14 to S16 for each inspection item (NO in S17), and calculates the equipment yield for each inspection item for the selected equipment. At this time, the common path matrix A set in step S13 is used.

[0063] When the control unit 20 calculates the equipment yields of all items related to one equipment (YES in S17), it performs the processes from step S11 onwards for other equipment on the route of the same lot based on the lot route information D10 for the specific lot (NO in S18).

[0064] When the control unit 20 calculates the equipment yields of all equipment E in the path of a specific lot (YES in S18), it generates an equipment yield table D4 based on the calculated equipment yields (S19) and displays it on the display unit 23, for example, as shown in Fig. 7. The equipment yield table D4 is an example of equipment quality information in this embodiment. In step S19, for example, when the control unit 20 determines a bottleneck equipment as the bottleneck equipment determination unit 32 based on the calculated equipment yield, it highlights information about the corresponding equipment in the equipment yield table D4.

[0065] In this embodiment, the control unit 20 verifies the estimation accuracy using the generated equipment yield table D4 (S19). For example, the control unit 20 multiplies the calculated equipment yields of all equipment E for each inspection item, and determines that the closer the calculated product is to the final yield of a specific lot, the higher the estimation accuracy. The estimation accuracy may be displayed as a numerical value as shown in FIG. 7, or may be displayed as a message indicating whether the estimation accuracy is high or not.

[0066] For example, when the control unit 20 verifies the estimation accuracy (S20), it ends the process of analyzing the equipment yield in the lot path (S3 in FIG. 5).

[0067] According to the above process, the equipment yield of each equipment in the route of a specific lot is calculated by sequentially extracting the lot route information D10 of the lot that passed through the equipment of the same process as the equipment in question at the same time based on the date of passing through the equipment in question, and formulating formula (1) (S16). The equipment yield vector X corresponding to all the equipment E is obtained from the calculation process (S15) of formula (1), but only the corresponding components are used. This makes it possible to optimize the data that is the basis for estimating the equipment yield, and improve the accuracy of the equipment yield estimation.

[0068] 2-3. Processing of time series analysis The process of step S4 in FIG. 5 will be described with reference to FIG.

[0069] Fig. 11 is a flowchart illustrating the process of time-series analysis of equipment yield in the quality estimation device 2 of this embodiment (S4 in Fig. 5). The process shown in the flowchart in Fig. 11 is started in a state where a piece of equipment, such as a bottleneck piece of equipment, has been identified.

[0070] First, the control unit 20 functions as a time series analysis unit 33, and acquires information indicating a specific facility as a target of the time series analysis based on, for example, the processing results of steps S2 and S3 in Fig. 5, and determines the period to be the range of the time series analysis of the facility, i.e., the analysis period (S30). For example, when a bottleneck facility for a low yield lot is to be the analysis target, the control unit 20 determines a period such as several months including the date of the facility in the lot path information D10 for the low yield lot as the analysis period.

[0071] In the process of step S3, lot route information D10 used to calculate the equipment yield for each piece of equipment in the route of a specific lot is collected (S11 to S18 in FIG. 10). In the process of time series analysis (S4), the lot route information D10 is collected for each date on which a specific piece of equipment was used, and the equipment yield is calculated (S31 to S38).

[0072] For example, the control unit 20 sets the dates as the reference time in sequence within the determined analysis period (S31), and extracts a plurality (M items) of lot route information D10 for equipment that belongs to the same process as the equipment to be analyzed, similar to step S12 in Fig. 11 (S32). Next, the control unit 20 formulates equation (1) based on the extracted lot route information D10, similar to steps S13 to S17, and executes calculation processing (S33 to S37). The control unit 20 also repeats the processing from step S31 onwards for each date in the analysis period in sequence (NO in S38).

[0073] When the equipment yield for all dates during the analysis period is calculated (YES in S38), the control unit 20 generates an equipment yield graph G1 based on the calculation results (S39) and displays it on the display unit 23, for example, as shown in Fig. 8. The equipment yield graph G1 is an example of equipment quality information in this embodiment. For example, after the equipment yield graph G1 is displayed, the processing according to this flowchart ends.

[0074] According to the above-described time series analysis process of equipment yield, by sequentially changing the lot route information D10 for estimating the equipment yield for each date during the analysis period (S31 to S38), it is possible to visualize the equipment yield that changes from moment to moment.

[0075] 3. Summary As described above, the quality estimation device 2 in this embodiment generates information on the quality of a plurality of lots, which are an example of a plurality of unit items, obtained by using, for example, a plurality of pieces of equipment E for a plurality of processes Sa to Sc. The quality estimation device 2 includes a storage unit 21 and a control unit 20. The storage unit 21 stores lot management data D1, which is an example of quality control data that associates the equipment passed through in each of the processes Sa to Sc when obtaining the product of each lot with the quality of the product of the obtained lot. The control unit 20 controls the calculation process based on the lot management data D1 stored in the storage unit 21. The control unit 20 extracts a plurality of pieces of lot path information D10, which is an example of route information indicating a combination of equipment passed through for each lot and the quality of the lot, from the lot management data D1 (S12, S32). The control unit 20 generates equipment quality information indicating the equipment yield as an example of the quality per equipment of the plurality of pieces of equipment by calculation process based on the extracted plurality of pieces of route information (S19, S39).

[0076] According to the above-described quality estimation device 2, equipment quality information is generated by calculation based on a plurality of lot path information D10 indicating the path through the equipment for each lot. This makes it possible to accurately estimate the quality per equipment when a plurality of unit articles are obtained using a plurality of equipment.

[0077] In this embodiment, a product in a unit of lot is obtained through each of the equipments Ea-1 to Ea-n, Eb-1 to Eb-n, and Ec-1 to Ec-n in a plurality of processes Sa to Sc. The control unit 20 acquires the time when the lot passed through a specific equipment (S11, S31), extracts a plurality of lot route information D10 in which the unit item passed through equipment for the same process as the specific equipment within a predetermined period based on the acquired time (S12, S32), and generates equipment quality information on the specific equipment. This makes it possible to improve the estimation accuracy of the quality per equipment based on the appropriate lot route information D10.

[0078] In this embodiment, the control unit 20 generates equipment quality information by performing a calculation process of Equation (10) that obtains a numerical solution indicating the quality of each piece of equipment in the simultaneous equations (Equation (1)) formulated for each lot route information D10. This makes it possible to generate highly accurate equipment quality information.

[0079] In this embodiment, the equipment quality information is, for example, an equipment yield table D4 that indicates the quality of each piece of equipment in a combination of a specific unit item among a plurality of unit items, that is, the route of a lot. This makes it possible to confirm the quality of each piece of equipment in the route of a lot.

[0080] In this embodiment, the equipment quality information is an equipment yield graph showing the quality of a specific equipment along a time series in a predetermined period such as an analysis period, etc. This makes it possible to confirm the quality per equipment along a time series.

[0081] In this embodiment, the control unit 20 generates equipment quality information by extracting a plurality of M pieces of lot path information D10, which is greater than the number N of pieces of equipment. As a result, for example, by making the formula (1) an excessive condition, it is possible to generate highly accurate equipment quality information.

[0082] In this embodiment, the unit items are products produced in lots at a plurality of facilities. The equipment quality information indicates the yield per facility. By using such equipment quality information, the yield in the factory equipment can be estimated with high accuracy.

[0083] The quality estimation method of this embodiment is a method for generating information on the quality of a plurality of unit items obtained using a plurality of pieces of equipment for at least one process. This method includes a step in which a control unit 20 of a computer extracts a plurality of pieces of route information indicating a combination of the pieces of equipment passed through for each unit item and the quality of the unit item from quality control data that associates the pieces of equipment passed through in the processes in which each unit item is obtained with the quality of the unit item obtained. This method also includes a step of generating, by arithmetic processing, equipment quality information indicating the quality per piece of equipment among the plurality of pieces of equipment, based on the extracted plurality of pieces of route information.

[0084] In the present embodiment, a program is provided for causing a control unit of a computer to execute the above-described quality estimation method. According to the quality estimation method of the present embodiment, when a number of unit items are obtained using a plurality of pieces of equipment, the quality per piece of equipment can be accurately estimated.

[0085] (Embodiment 2) Hereinafter, the second embodiment will be described with reference to Figures 12 and 13. In the second embodiment, theoretical problems that became clear through the intensive research of the present inventors in the above-mentioned equipment yield estimation method and practical means for avoiding the problems will be described.

[0086] Hereinafter, the description of the configuration and operation similar to those of the quality estimation device 2 according to the first embodiment will be omitted as appropriate, and the quality estimation device 2 and the quality estimation method according to this embodiment will be described.

[0087] 1. Knowledge about falling rank Generally, the rank of a matrix has a maximum value "N" in a matrix with M rows and N columns, where M>N. Also, if there are multiple lots that pass through the same route, multiple rows with the same numerical value will appear in the route matrix A, and the rank will be lowered. However, even if "M" is a sufficiently large number, for example, in the route matrix A of the first embodiment, since there is a constraint that each process passes through one piece of equipment, the rank of the route matrix A will be lower than the maximum value "N" by (total number of processes - 1). Due to such a rank deficiency, there is a problem that, for example, the calculation process of equation (10) will fall into an indeterminate solution.

[0088] The inventors of the present application have conducted extensive research into the above-mentioned problems and have found that, under practically normal circumstances, for example, in a factory where there is a sufficient amount of equipment operating normally, the above-mentioned problems can be avoided as described below, making it possible to make accurate estimations.

[0089] In other words, a normal piece of equipment is considered to have an equipment yield of "1" within the range of the appropriate tolerance by operating without any particular malfunction. The value of the component of the equipment yield vector X corresponding to such equipment is logarithmically "0", and the route flag a of the column corresponding to the equipment in the route matrix A is "0". i,j can be regarded as "0" even if it is "1". In other words, for the process to which the equipment belongs, the constraint that one piece of equipment in the process must be passed through is essentially lifted, which is equivalent to the rank of the path matrix A being restored to that extent. Therefore, it was found that if there is at least one piece of equipment with an equipment yield of "1" in each process, the rank of the path matrix A is restored as a result, and it is possible to realize accurate estimation of the equipment yield.

[0090] 1-1. Numerical simulation FIG. 12 is a diagram illustrating a numerical simulation of a method for estimating equipment yield. As a numerical simulation to confirm the above findings, the inventors of the present application performed numerical calculations in the case where there is an abnormal process with an extremely small number of normal equipment. In this simulation, four processes Sa, Sb, Sc, and Sd including an abnormal process Sb were set. In addition, the number of lots M was 500, and the total number of pieces of equipment was 140. The number of pieces of equipment in process Sa was 50, the number of pieces of equipment in process Sb was 30, the number of pieces of equipment in process Sc was 20, and the number of pieces of equipment in process Sd was 40.

[0091] Figure 12(A) shows the simulation results when processes Sa, Sc, and Sd include equipment with an equipment yield of "1", and abnormal process Sb does not have a single piece of equipment with an equipment yield of "1". Figure 12(B) shows the simulation results when abnormal process Sb has only one piece of equipment with an equipment yield of "1". In Figures 12(A) and (B), the horizontal axis shows the equipment number, and the vertical axis shows the equipment yield.

[0092] 12(A) and (B) show graph G2 of the true values ​​set in the simulation environment and graph G3 of the estimation results when this estimation method is applied. In each simulation, the processes Sa, Sc, and Sd other than the abnormal process Sb were assumed to be normal, and the true value of each equipment yield was set to a value close to "1." In addition, the true value of the equipment yield in the abnormal process Sb was set to about "0.5" on average between the facilities.

[0093] According to the graph G3 of the estimation result in Fig. 12(A), the equipment yield of the estimation result is higher than the true value graph G2 in the abnormal process Sb, while it is lower than the true value in the other processes Sa, Sc, and Sd. Thus, according to the simulation result in Fig. 12(A), it was confirmed that when there is an abnormal process Sb that does not have even one piece of equipment with an equipment yield of "1", an offset-like error occurs in the graph G3 of the estimation result, which is located between the abnormal process Sb and the normal processes Sa, Sc, and Sd.

[0094] In contrast, the graph G3 of the estimation results in Fig. 12(B) reproduces the true value graph G2, in which the equipment yield of the abnormal process Sb is low while the equipment yields of the other processes Sa, Sc, and Sd are high. In this way, the simulation results in Fig. 12(B) confirmed that the error in the equipment yield estimation results by this estimation method is significantly reduced compared to the case of Fig. 12(A) when there is only one piece of equipment with an equipment yield of "1" in the abnormal process Sb similar to that in Fig. 12(A).

[0095] 2. Operation In the second embodiment, a quality estimation device 2 is provided that verifies whether estimation is performed with high accuracy as shown in Fig. 12(B) The operation of the quality estimation device 2 of this embodiment will be described with reference to Fig. 13.

[0096] 13 is a flowchart illustrating the equipment yield analysis process in the quality estimation device 2 of the embodiment 2. In the equipment yield analysis process (FIG. 10) similar to that of the embodiment 1, the quality estimation device 2 of the embodiment verifies the estimation accuracy regarding the influence of the above-mentioned rank deficiency (S20A) instead of the process of step S20, for example.

[0097] For example, in step S20A, the control unit 20 of the quality estimation device 2 judges whether or not there is a component of value "0" for each process in the equipment yield vector X based on the numerical solution obtained in step S15. A component of value "0" in the equipment yield vector X indicates that the equipment yield of the corresponding equipment is "1". For example, the control unit 20 verifies the estimation accuracy in multiple stages according to the number of processes set in advance, so that the more processes it is judged to have a component of value "0", the higher the estimation accuracy is judged to be.

[0098] According to the above process, for example, in a factory facility, it is possible to confirm that a highly accurate estimation is being performed as shown in Fig. 12(B), and to confirm the situation even if the accuracy has decreased as shown in Fig. 12(A). Also, according to the process of step S20A, for example, every time the equipment yield of one inspection item of one facility is calculated (S16), the estimation accuracy for each equipment yield can be verified.

[0099] In the above description, the verification of the estimation accuracy regarding the rank deficiency is performed in the analysis processing of the equipment yield in the lot path, but it may be performed in the processing of time series analysis, for example. For example, the same processing as that in step S20A may be performed on the equipment yield calculated in step S36 of FIG.

[0100] In addition, in this embodiment, the products in the lot unit may include products that do not undergo one or more processes. In other words, the products may include lots that do not pass through the equipment of the corresponding processes. The route of such a lot can be managed as lot route information D10 that skips the above-mentioned processes in the lot management data D1. When such lot route information D10 is used in the route matrix A, the constraints on the skipped processes are removed, and the rank of the route matrix A increases accordingly.

[0101] Therefore, in the above step S20A, the control unit 20 may further determine whether or not there is a skipped process in the lot route information D10 used in the path matrix A. The skipped process can be treated in the same manner as a process having equipment with an equipment yield of "1". Therefore, the control unit 20 determines the estimation accuracy to be higher when there are fewer processes determined to have no components with a value of "0" among the processes through which all of the lot route information D10 used in the path matrix A pass (S20A). This makes it possible to accurately verify the deterioration of the estimation accuracy caused by the rank deficiency of the path matrix A.

[0102] 3. Summary As described above, in the second embodiment, the control unit 20 determines the estimation accuracy of the equipment quality information so that the accuracy is higher as the number of processes through which each lot in the lot route information D10 used in the route matrix A passes and in which the equipment quality does not include a predetermined value such as "0" in the equipment yield vector X of the numerical solution is smaller (S20A). This makes it possible to accurately verify the estimation accuracy of the equipment quality information.

[0103] (Other embodiments) As described above, the first and second embodiments have been described as examples of the technology disclosed in the present application. However, the technology in the present disclosure is not limited to these, and can be applied to embodiments in which modifications, substitutions, additions, omissions, etc. are appropriately performed. In addition, it is also possible to combine the components described in each of the above embodiments to create a new embodiment. Therefore, other embodiments will be exemplified below.

[0104] In the above first and second embodiments, electronic components are exemplified as an example of a lot-based product. In this embodiment, the lot-based product is not particularly limited, and may be, for example, various components such as semiconductor components or mechanical components, or finished products such as electronic devices. The present disclosure can also be applied to a process in which one lot is one component, and the final yield is OK or NG, that is, "1" or "0". The idea of ​​the present disclosure can also be applied to a case in which some lots skip a specific process.

[0105] In each of the above embodiments, the quality estimation device 2 is applied to factory equipment. In this embodiment, the quality estimation device 2 is applicable to various fields such as logistics and data communication. Furthermore, the unit item is not limited to a product in a lot unit, but may be various tangible objects handled in various units, or may be data having a unit such as a packet.

[0106] For example, a process in logistics can be a series of processes from receiving goods to a base from which goods are delivered, traveling a long distance, and then delivering the goods to the base at which the goods are delivered. The facilities used in this process include a delivery vehicle, a base, and a means of long-distance transportation. The means of long-distance transportation can be, for example, a bullet train, an airplane, or a truck. The quality such as the yield rate in this case can be set to, for example, the customer satisfaction rate in logistics (=1.0 - complaint rate).

[0107] In addition, in data communications, for example, there is one process, and it is possible to estimate the quality when passing through multiple pieces of equipment within that one process. The equipment is, for example, a base station and a router. In this case, the quality such as the yield can be set to, for example, the packet passing rate. In this way, even when passing through the same process multiple times, a numerical solution can be found in the same way as above by appropriately setting the path matrix A, and the quality per piece of equipment can be estimated.

[0108] In addition, in each of the above embodiments, the calculation process (S13 to S16, S33 to S36) for calculating the equipment yield is performed in the process of analyzing various equipment yields, but such calculation process may be performed in advance. For example, the estimated information D2 of the equipment yield solved in advance using various lot path information D10 may be appropriately organized into a database and stored in the storage unit 21 or an external storage device. During the analysis process, the control unit 20 can obtain the equipment yield corresponding to the lot path information D10 corresponding to each condition from the database and generate equipment quality information.

[0109] As described above, the embodiments have been described as examples of the technology in the present disclosure, and the accompanying drawings and detailed description have been provided for this purpose.

[0110] Therefore, among the components described in the attached drawings and the detailed description, not only are there components essential for solving the problem, but there may also be components that are not essential for solving the problem in order to illustrate the above technology. Therefore, the fact that such non-essential components are described in the attached drawings or the detailed description should not be interpreted as immediately indicating that such non-essential components are essential.

[0111] Furthermore, since the above-described embodiments are intended to illustrate the technology in the present disclosure, various modifications, substitutions, additions, omissions, and the like can be made within the scope of the claims or their equivalents. [Industrial Applicability]

[0112] The present disclosure is applicable to various fields such as factory equipment, logistics, and data communications.

Claims

1. A quality estimation device that generates information regarding quality obtained by using a plurality of pieces of equipment for at least one process, comprising: a storage unit for storing quality control data that associates the equipment through which each unit item is obtained in a process with the quality of the obtained unit item; a control unit that controls a calculation process based on the quality control data stored in the storage unit, The control unit is extracting from the quality control data a plurality of pieces of route information indicating a combination of facilities through which each unit item passes and the quality of the unit item; generating equipment quality information indicating the quality of each of the plurality of pieces of equipment by performing a calculation process for obtaining a numerical solution indicating the quality of each of the plurality of pieces of equipment in a simultaneous equation formulated for each of the plurality of pieces of equipment based on the plurality of pieces of extracted route information; The accuracy of the estimation of the equipment quality information is determined so that the accuracy is increased as the number of processes through which each unit item of the plurality of pieces of route information passes and in which the quality of the equipment does not include a predetermined value in the numerical solution is reduced. Quality estimation device.

2. The unit item is obtained through each facility in a plurality of steps, The control unit is Obtaining the time when the unit item passed through a specific facility; Extracting a plurality of pieces of route information in which the unit item passes through equipment for the same process as the specific equipment within a predetermined period based on the acquired time, and generating equipment quality information regarding the specific equipment. The quality estimation device according to claim 1 .

3. The equipment quality information indicates the quality of each piece of equipment in a combination through which a specific unit item in the plurality of unit items passes. The quality estimation device according to claim 1 .

4. The equipment quality information indicates the quality of a specific equipment along a time series in a predetermined period. The quality estimation device according to claim 1 .

5. The control unit extracts a plurality of pieces of route information, the number of which is greater than the number of the pieces of equipment, and generates the equipment quality information. The quality estimation device according to any one of claims 1 to 4.

6. the unit items are products produced in each lot in the plurality of facilities, The equipment quality information indicates a yield per one piece of equipment. The quality estimation device according to any one of claims 1 to 5.

7. 1. A quality estimation method for generating information regarding quality obtained by using a plurality of pieces of equipment for at least one process, comprising the steps of: The control unit of the computer extracting a plurality of pieces of route information indicating a combination of facilities through which each unit item passes and the quality of the unit item from quality control data that associates the facilities through which each unit item passes in a process for obtaining the unit item with the quality of the obtained unit item; generating equipment quality information indicating the quality of each of the plurality of facilities by a calculation process of obtaining a numerical solution indicating the quality of each of the plurality of facilities in a simultaneous equation formulated for each of the plurality of route information based on the extracted plurality of route information; determining the estimation accuracy of the equipment quality information so that the accuracy is increased as the number of processes through which each unit item of the plurality of route information passes and in which the quality of the equipment does not include a predetermined value in the numerical solution is reduced; A quality estimation method including:

8. A program for causing a control unit of a computer to execute the quality estimation method according to claim 7.

9. The control unit determines the estimation accuracy based on the equipment quality information for a part or all of the plurality of equipment. The quality estimation device according to claim 1 .

10. The control unit determines the estimation accuracy by comparing a quality indicated by the equipment quality information for a group of equipment among the plurality of equipment with a predetermined reference value based on the equipment quality information for the group of equipment. The quality estimation device according to claim 1 .

Citation Information

Patent Citations

  • Semiconductor device, and device and method for manufacture thereof

    JP2000012640A

  • System for specifying equipment having cause of fault, and method for specifying equipment having the cause of fault

    JP2005284650A

  • Information analysis system, information analysis method and program

    JP2006318263A

  • Unit, method, and program for fault equipment estimation, and recording medium

    JP2006319220A

  • Device, method and program for displaying quality variation, and recording medium recorded the program

    JP2008165832A