A program predicts and incentivizes the distribution of surplus power to energy storage devices, addressing the inefficiencies in existing systems by efficiently distributing solar-generated power to consumers and maintaining grid stability.

JP7565729B2Active Publication Date: 2024-10-11THE JAPAN RES INST
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2020154537
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-09-15
Publication Date
2024-10-11
Estimated Expiration
2040-09-15

AI Technical Summary

Technical Problem

Existing technologies do not efficiently distribute surplus power generated by solar power systems to individuals who wish to purchase it, such as electric vehicles or consumers.

Method used

A program that predicts surplus power generation and incentivizes its distribution to energy storage devices using incentive points, allowing consumers to apply for and receive surplus power based on predicted amounts and time periods.

Benefits of technology

Surplus power is efficiently distributed to multiple energy storage devices, maintaining grid power quality by adjusting supply and demand without requiring new infrastructure, and enabling flexible consumption by consumers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007565729000001
    Figure 0007565729000001
  • Figure 0007565729000002
    Figure 0007565729000002
  • Figure 0007565729000003
    Figure 0007565729000003
Patent Text Reader

Abstract

To provide a program, an information processing method, and an information processor capable of efficiently distributing surplus power of generated power by a generator to purchase applicants.SOLUTION: In an information processing system for creating a distribution plan of surplus power, a control section 21 (point acquisition section) of a terminal 20 for a user acquires an incentive point per unit power amount, acquires an absorption amount of the surplus power by an energy storage device according to the acquired incentive point, outputs the absorption amount of the acquired surplus power to a predetermined server 10, and acquires power reception information including power reception date and time and power reception amount determined by the server.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a program, an information processing method, and an information processing device. [Background technology]

[0002] Photovoltaic power generation systems installed on roofs of houses and the like are becoming widespread. In houses where photovoltaic power generation systems are installed, power generated by photovoltaic power generation is consumed by loads (electrical appliances) in the house, and the surplus power (surplus electricity) is purchased by electric power companies and the like. Patent Document 1 discloses a technique for calculating the amount of electricity traded among electric vehicles, consumers, photovoltaic power generation devices, and power grids in a group including electric vehicles, consumers, and photovoltaic power generation devices scattered in a specific area, so as to maximize the profit from electricity trades for the entire group. In the technique disclosed in Patent Document 1, the amount of electricity traded including the power generated by the photovoltaic power generation devices and the power supplied from the power grid is calculated so as to maximize the profit from electricity trades for the entire group. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-43634 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, the technology disclosed in Patent Document 1 does not allocate surplus power in a solar power generation device to potential purchasers such as electric vehicles or consumers who wish to purchase the surplus power.

[0005] The present disclosure has been made in consideration of the above circumstances, and its purpose is to provide a program or the like that can efficiently distribute surplus electricity generated by a generator to those who wish to purchase the surplus electricity (multiple energy storage devices). [Means for solving the problem]

[0006] The program disclosed herein is a program for applying for the amount of surplus electricity to be absorbed by an energy storage device based on the predicted amount of surplus electricity generated for each time period by generators connected to the power distribution network in each region, and causes a computer to execute a process of obtaining incentive points per unit amount of electricity, obtaining the amount of surplus electricity to be absorbed by the energy storage device according to the obtained incentive points, outputting the obtained amount of surplus electricity absorption to a specified server, and obtaining electricity reception information including the electricity reception date and time and amount of electricity received determined by the server. Effect of the Invention

[0007] In the present disclosure, surplus power generated by the generator can be efficiently distributed to multiple energy storage devices. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a schematic diagram showing a configuration example of a power supply network. [Diagram 2] 1 is a block diagram illustrating an example of the configuration of an information processing system. [Diagram 3] FIG. 2 is a schematic diagram showing an example of the configuration of a DB stored in a server. [Figure 4] FIG. 2 is a schematic diagram showing an example of the configuration of a DB stored in a server. [Diagram 5] 13 is a flowchart showing an example of a registration process procedure of purchase conditions. [Figure 6] FIG. 13 is a schematic diagram showing an example of a screen. [Figure 7] 10 is a flowchart showing an example of a procedure for distributing surplus power. [Figure 8] 10 is a flowchart showing an example of a procedure for distributing surplus power. [Figure 9] 13 is a flowchart illustrating an example of a matching process procedure. [Figure 10] FIG. 13 is a schematic diagram for explaining the allocation process. [Figure 11] FIG. 13 is a schematic diagram showing an example of a screen. [Figure 12] 13 is a flowchart illustrating an example of a procedure for a movement start notification process. [Figure 13] FIG. 11 is a schematic diagram showing an example of the configuration of a DB stored in a server of the second embodiment. [Figure 14] 10 is a flowchart showing an example of a procedure for distributing surplus power in the second embodiment. [Figure 15] 13 is a flowchart showing an example of a matching process procedure according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, a program, an information processing method, and an information processing device according to the present disclosure will be described in detail with reference to the drawings showing embodiments thereof.

[0010] (Embodiment 1) FIG. 1 is a schematic diagram showing a configuration example of a power supply network. Electric power generated at a power plant or the like is transmitted through a high-voltage transmission network, and reaches a distribution substation 101 via an extra-high-voltage substation, a primary substation, or the like (not shown). The distribution substation 101 transforms the transmitted electric power to 6600V, and distributes the transformed electric power to a load 104, a charger 105, or the like through a distribution network. The electric power distributed through the distribution network is transformed to 100V or 200V by a pole-mounted transformer 102 mounted on a utility pole, for example, and then supplied to a charging spot where an electric vehicle can be charged through a service line. The load 104 includes, for example, home appliances used in a home, electrical appliances used in an office or shopping center, and electrical equipment operated in a small factory. The charger 105 is, for example, a charger capable of charging a secondary battery 106 mounted on an electric vehicle, and includes a charger installed at a charging spot provided in a parking lot of an office, a shopping center, an automobile dealership, or the like. In the power supply network, the owner of the load 104 and the owner of the electric vehicle (secondary battery 106) are consumers who receive the supply of power.

[0011] In the power supply network shown in FIG. 1, the high-voltage transmission network is connected to a plurality of distribution substations 101 installed in each region, and a plurality of pole-mounted transformers 102 are provided in the power distribution network to which power is distributed from one distribution substation 101. Each pole-mounted transformer 102 supplies power to a load 104 and a charger 105 connected via a service line. In addition, in the power supply network of this embodiment, a generator 103 that is installed on the roof of a house and generates solar power is connected to the power distribution network, and the power generated by the generator 103 is configured to be distributed via the power distribution network. In this embodiment, the power generated by the generator 103 is consumed by home appliances in the house in which the generator 103 is installed, and the surplus power is distributed via the power distribution network. In this disclosure, the surplus power that is not consumed by the home appliances in the house in which the generator 103 is installed among the power generated by the generator 103 is referred to as "surplus power". The difference between the total power supply and the power consumption in the power grid managed by the distribution substation 101 may be considered as the surplus power. The power consumption is the power consumed by the load in the power grid managed by the distribution substation 101, and the load includes not only the houses in the power grid managed by the distribution substation 101 but also the loads in hospitals, schools, and factories. In this embodiment, the surplus power is supplied to the secondary battery 106 of the electric vehicle via the charger 105 in each distribution grid to which the generator 103 is connected, or in the case where the distribution grid is wide, for each divided distribution grid into which the distribution grid is divided, and consumed (absorbed). In the information processing system of this embodiment, consumers who wish to purchase surplus power are publicly invited, and consumers who wish to purchase surplus power apply to purchase the surplus power by specifying the power absorption amount (desired purchase amount, desired power reception amount) of the surplus power, etc. The range of the power distribution network or divided power distribution network in which the surplus power is consumed is, for example, a range that can be traveled by car in about 10 to 20 minutes, and this range is called a "power distribution network area" or "area." Thus, in this embodiment, in each area of ​​the power distribution network downstream of the distribution substation 101, surplus power in a generator 103 in the area is charged to an electric vehicle via a charger 105 in the area and consumed. In the power supply network shown in FIG. 1, a plurality of generators 103 and loads 104 may be provided in one power distribution network, and a plurality of generators 103 and loads 104 may be connected to one pole transformer 102.At least one charger 105 is provided in a power distribution network in one region. The generator 103 is not limited to a solar power generation configuration, so long as it is a natural energy generator that uses natural energy.

[0012] Fig. 2 is a block diagram showing a configuration example of an information processing system. The information processing system of this embodiment is a system that creates a distribution plan for distributing surplus power generated by a generator 103 to a plurality of electric vehicles (secondary batteries 106) in the same area via chargers 105 in a power supply network such as that shown in Fig. 1. The information processing system of this embodiment includes a server 10 that creates a distribution plan for the surplus power, and a consumer terminal 20 (terminal device) used by a consumer who is an owner of the electric vehicle. The server 10 and the plurality of consumer terminals 20 are connectable to a network N such as the Internet, and communicate via the network N.

[0013] The server 10 is an information processing device capable of various information processing and transmitting and receiving information, for example, a server computer or a personal computer. The server 10 may be provided in a plurality of units and configured to perform distributed processing, may be realized by a plurality of virtual machines provided in one server, or may be realized using a cloud server. The server 10 performs various information processing, such as a process of predicting surplus power in the generator 103, a process of predicting the amount of charge by the secondary battery 106 of the electric vehicle (the amount of surplus power absorbed by the energy storage device), and a process of creating an allocation plan for allocating surplus power to a plurality of electric vehicles based on these predicted amounts.

[0014] The server 10 includes a control unit 11, a storage unit 12, a communication unit 13, an input unit 14, a display unit 15, a reading unit 16, etc., and these units are connected to each other via a bus. The control unit 11 includes one or more processors such as a CPU (Central Processing Unit), an MPU (Micro-Processing Unit), or a GPU (Graphics Processing Unit). The control unit 11 executes various information processing and control processing to be performed by the server 10 by appropriately executing a control program 12P stored in the storage unit 12.

[0015] The storage unit 12 includes a RAM (Random Access Memory), a flash memory, a hard disk, an SSD (Solid State Drive), and the like. The storage unit 12 prestores a control program 12P executed by the control unit 11 and various data necessary for the execution of the control program 12P. The storage unit 12 also temporarily stores data generated when the control unit 11 executes the control program 12P. The storage unit 12 also stores a generator DB (database) 12a, a charger DB 12b, a consumer DB 12c, and a matching DB 12d, which will be described later. The generator DB 12a, the charger DB 12b, the consumer DB 12c, and the matching DB 12d may be stored in a storage device connected to the server 10, or may be stored in a storage device with which the server 10 can communicate. The generator DB 12a, the charger DB 12b, and the consumer DB 12c may also be stored in a blockchain, which is a distributed ledger technology or a distributed network configured by a plurality of nodes. In this case, tampering can be suppressed as long as the blockchain system is maintained.

[0016] The communication unit 13 is an interface for connecting to the network N by wired or wireless communication, and transmits and receives information to and from other devices via the network N. The input unit 14 includes, for example, a mouse and a keyboard, and receives operation input by a user who uses the server 10, and sends a control signal corresponding to the operation content to the control unit 11. The display unit 15 is a liquid crystal display or an organic EL display, etc., and displays various information according to instructions from the control unit 11. The input unit 14 and the display unit 15 may be a touch panel configured as an integrated unit.

[0017] The reading unit 16 reads information stored in a portable storage medium 1a including a CD (Compact Disc)-ROM, a DVD (Digital Versatile Disc)-ROM, a USB (Universal Serial Bus) memory, an SD (Secure Digital) card, etc. The control program 12P and various data stored in the storage unit 12 may be read by the control unit 11 from the portable storage medium 1a via the reading unit 16 and stored in the storage unit 12. The control program 12P and various data stored in the storage unit 12 may be downloaded by the control unit 11 from another device via the communication unit 13 and stored in the storage unit 12.

[0018] The consumer terminal 20 is an information processing device capable of various information processing and information transmission and reception, for example, a smartphone, a tablet terminal, a personal computer, or a car navigation device mounted on an electric vehicle. The consumer terminal 20 performs various information processing, such as a process of applying for purchase of surplus power from the server 10, and a process of receiving, via the network N, surplus power reception information based on a distribution plan for surplus power determined by the server 10. The consumer terminal 20 includes a control unit 21, a storage unit 22, a communication unit 23, an input unit 24, a display unit 25, etc., and these units are connected to each other via a bus. The control unit 21, the storage unit 22, the communication unit 23, the input unit 24, and the display unit 25 of the consumer terminal 20 have the same configuration as the control unit 11, the storage unit 12, the communication unit 13, the input unit 14, and the display unit 15 of the server 10, respectively, and therefore detailed description thereof will be omitted. The memory unit 22 of the consumer terminal 20 stores, in addition to the control program 22P executed by the control unit 21, a power purchasing application 22AP (power purchasing application program 22AP) for making a purchase application for surplus power (power receiving application) and receiving power receiving information based on a surplus power distribution plan created by the server 10.

[0019] 3 and 4 are schematic diagrams showing configuration examples of DBs 12a to 12d stored in the server 10. FIG. 3A shows the generator DB 12a, FIG. 3B shows the charger DB 12b, FIG. 4A shows the consumer DB 12c, and FIG. 4B shows the matching DB 12d. The generator DB 12a stores information about the generators 103 provided in the power distribution network of each region for each region. The generator DB 12a shown in FIG. 3A includes a power distribution network ID sequence, a generator ID sequence, a position information sequence, an equipment information sequence, a surplus power history sequence, and the like. The power distribution network ID sequence stores identification information (power distribution network ID) previously assigned to the power distribution network of each region. That is, the power distribution network ID may be identification information indicating each region. The generator ID column stores identification information (generator ID) previously assigned to the generator 103 installed in the distribution grid of the area indicated by the distribution grid ID in association with the power distribution grid ID, and the location information column, device information column, and surplus power history column store location information indicating the installation location of the generator 103, device information of the generator 103, and generation history of surplus power generated by the generator 103 in association with the generator ID, respectively. The location information may be, for example, coordinate values ​​of longitude and latitude, or an address, and may be any information that can identify the installation location of the generator 103. The device information includes, for example, information on the device of the generator 103, such as the manufacturer name, model number, date of manufacture, years of operation, and amount of power generated, and information on the owner of the generator 103, such as the name, address, and telephone number of the owner. The surplus power history includes surplus power information on the surplus power generated by the generator 103, which is associated with the date and time when the surplus power occurred, weather information, and power amount. The occurrence date and time may be indicated in a time period of a predetermined time, such as every hour or every two hours. The surplus power history may also include surplus prediction information that associates the occurrence date and time (time period) of the surplus power, weather forecast information, and the amount of generation with respect to future surplus power predicted by the server 10, as described below.

[0020] The power distribution network ID stored in the generator DB12a is issued and stored by the control unit 11 when a new power distribution network is established and the control unit 11 acquires information on the new power distribution network via the communication unit 13 or the input unit 14. The generator ID stored in the generator DB12a is issued and stored by the control unit 11 when a new generator is installed and the control unit 11 acquires information on the new generator 103 via the communication unit 13 or the input unit 14. The location information and device information stored in the generator DB12a are added or changed by the control unit 11 when the control unit 11 acquires an instruction to add or change via the communication unit 13 or the input unit 14. The surplus power history stored in the generator DB12a is stored by the control unit 11 when the control unit 11 acquires information on surplus power generated in the generator 103 via the communication unit 13 or the input unit 14. The contents stored in the generator DB12a are not limited to the example shown in FIG. 3A, and may store, for example, information on each power distribution network and information on each generator 103.

[0021] The charger DB 12b stores information about the chargers 105 installed in the power distribution network of each region for each region. The charger DB 12b shown in FIG. 3B includes a power distribution network ID column, a charger ID column, a location information column, a time period column, an incentive point column, a planned supply amount column, a transaction history column, and the like. The power distribution network ID column stores identification information (power distribution network ID) of the power distribution network of each region. The charger ID column stores identification information (charger ID) of the charger 105 installed in the power distribution network of the region indicated by the power distribution network ID in association with the power distribution network ID, and the location information column stores location information indicating the installation location of the charger 105 in association with the charger ID. The location information is, for example, longitude and latitude coordinate values, an address, a name of a landmark or a shopping center, and any information may be used as long as it can identify the installation location of the charger 105. The time slot column, the incentive point column, and the planned supply amount column store incentive points for each time slot set for the charger 105 and a predicted amount (planned supply amount) of surplus power that can be supplied via the charger 105, in association with the charger ID. The incentive points are points set (determined) according to the charger 105 (the location of the charger 105) and the time slot, and are points per unit of power amount such as 1 kWh. The incentive points are also used as points given to consumers when purchasing surplus power. For example, the incentive points are set to a higher value for the charger 105 and the time slot that should induce the purchase (reception) of surplus power. In the example shown in FIG. 3B, incentive points are set for time slots of every hour or every two hours, but the present invention is not limited to this configuration. The planned supply amount indicates the amount of surplus power predicted by the control unit 11, as described later. The transaction history column stores transaction information on surplus power purchased (received) via the charger 105, in association with the charger ID. The transaction information includes information about the consumer (eg, consumer ID), the date and time of receiving electricity, the amount of electricity received, incentive points set for the transaction, the date and time when the reservation for the transaction was completed, and the like.

[0022] The power distribution network ID and the charger ID stored in the charger DB 12b are issued and stored by the control unit 11 when a new power distribution network or a charger 105 is installed and the control unit 11 acquires information on the new power distribution network or the charger 105 via the communication unit 13 or the input unit 14. The location information stored in the charger DB 12b is added or changed by the control unit 11 when the control unit 11 acquires an instruction for addition or change via the communication unit 13 or the input unit 14. The time period, incentive points, and planned supply amount stored in the charger DB 12b are stored by the control unit 11 when the control unit 11 calculates the incentive points and planned supply amount corresponding to each charger 105. The transaction history stored in the charger DB 12b is stored by the control unit 11 every time the control unit 11 acquires information on a power receiving transaction (purchase transaction) of surplus power performed using the charger 105 via the communication unit 13 or the input unit 14. The stored contents of the charger DB 12b are not limited to the example shown in FIG. 3B, and may store information on the equipment of each charger 105, for example.

[0023] The consumer DB 12c stores information about purchasers (consumers) who wish to purchase surplus power. In this embodiment, consumers who purchase surplus power are owners of electric vehicles, so the consumer DB 12c stores information about the owners of the electric vehicles. The consumer DB 12c shown in FIG. 4A includes a consumer ID column, a location information column, a name column, a purchase condition column, a purchase history column, and the like. The consumer ID column stores identification information (consumer ID) previously assigned to each consumer. The location information column, the name column, and the purchase condition column store the location information of the electric vehicle, the consumer's name, and the purchase condition set by the consumer when purchasing surplus power, in association with the consumer ID, respectively. The location information is information indicating, for example, a parking location where the electric vehicle is usually parked, an area where the electric vehicle is usually driven, or a movable area, and is expressed using, for example, longitude and latitude coordinate values, an address, or the like. The purchase conditions are purchase request information for surplus power set in advance by the consumer, and include, for example, a lower or upper limit of allowable incentive points, a lower or upper limit of the amount of power desired to be purchased, the charger 105 from which the consumer wishes to receive power (the location of the charger 105), the time period during which power will be received (the desired time period for receiving power), etc. The purchase history column stores purchase information (power reception history) related to the surplus power purchased (received) by the consumer via the charger 105, in association with the consumer ID. The purchase information includes the date and time of power reception, weather information on the day of power reception, information on the charger 105 that received power (e.g., charger ID), the amount of power received, incentive points set for the transaction, the date and time when the reservation for the transaction was completed, etc.

[0024] The consumer ID stored in the consumer DB 12c is issued and stored by the control unit 11 when the control unit 11 acquires information on a new consumer via the communication unit 13 or the input unit 14. The location information, name, and purchase condition information stored in the consumer DB 12c are added or changed by the control unit 11 when the control unit 11 acquires an instruction to add or change via the communication unit 13 or the input unit 14. The purchase history stored in the consumer DB 12c is stored by the control unit 11 every time the control unit 11 acquires information on a purchase transaction (reception of surplus electricity) by a consumer via the communication unit 13 or the input unit 14. The stored contents of the consumer DB 12c are not limited to the example shown in FIG. 4A, and may store, for example, personal information of the consumer and information on an electric vehicle owned by the consumer.

[0025] The matching DB 12d stores information on purchase transactions (power receiving transactions) of surplus power received via each charger 105. Specifically, the matching DB 12d stores matching information between each charger 105 and a consumer who purchases surplus power via each charger 105. The matching DB 12d shown in FIG. 4B includes a power distribution network ID column, a charger ID column, a transaction ID column, a date and time column, an incentive point column, a consumer ID column, and a power amount column. The power distribution network ID column and the charger ID column store the power distribution network ID of the power distribution network in each region and the charger ID of each charger 105, respectively. The transaction ID column stores identification information (transaction ID) assigned to a purchase transaction of surplus power set (reserved) for the charger 105 in association with the charger ID. The date and time column, the incentive point column, the consumer ID column, and the power amount column store the date and time when the purchase transaction is performed, the incentive points set in the purchase transaction, the consumer ID of the consumer who performs the purchase transaction, and the amount of power to be traded in association with the transaction ID, respectively. The date and time of the purchase transaction indicates the date and time when the consumer charges the electric vehicle with surplus electricity from the charger 105, and may be expressed as a predetermined time period.

[0026] The power distribution network ID and the charger ID stored in the matching DB 12d are, for example, the power distribution network ID and the charger ID stored in the charger DB 12b. The transaction ID stored in the matching DB 12d is issued and stored by the control unit 11 when the control unit 11 sets (reserves) a new purchase transaction for each charger 105. The information on the date and time, incentive points, consumer ID, and power amount stored in the matching DB 12d is stored by the control unit 11 when the control unit 11 sets a new purchase transaction for each charger 105. The storage contents of the matching DB 12d are not limited to the example shown in FIG. 4B, and for example, information on each charger 105 and information on each consumer may be stored.

[0027] The following describes the process in the information processing system configured as described above, in which each consumer applies to purchase surplus power generated by each generator 103 and the details of the application (purchase conditions) are registered in the server 10. FIG. 5 is a flowchart showing an example of a purchase condition registration process, and FIG. 6 is a schematic diagram showing an example screen. In FIG. 5, the left side shows the process performed by the consumer terminal 20, and the right side shows the process performed by the server 10. The following process is realized by the control unit 21 in accordance with the control program 22P and the power purchasing application 22AP stored in the memory unit 22 of the consumer terminal 20, and is realized by the control unit 11 in accordance with the control program 12P stored in the memory unit 12 of the server 10. A part of the following process may be realized by a dedicated hardware circuit.

[0028] In the information processing system of this embodiment, consumers who wish to purchase surplus power generated by each power generator 103 are invited to apply for the purchase of surplus power. The consumer can apply for the purchase of surplus power from the power purchase application 22AP by executing the power purchase application 22AP on the consumer terminal 20. The control unit 21 of the consumer terminal 20 executes the power purchase application 22AP according to, for example, a user's operation via the input unit 24, and displays an application screen for applying to purchase surplus power on the display unit 25 (S61). FIG. 6 shows an example of the application screen, and the application screen has an input field for the charger that wishes to receive surplus power, an input field for the time period during which the surplus power is desired to be purchased, and an input field for the amount of power (amount of power received) that is desired to be purchased. The input field for the charger has a pull-down menu for selecting one of the chargers registered in advance in the charger DB 12b of the server 10. The input field for the time period has check boxes for selecting each time period, and the incentive points for each time period set for the selected charger 105 are displayed in association with each time period. The incentive points for each time period may be acquired from the server 10 and displayed. The input field for the amount of received power is configured to allow any numerical value to be input. The input field for the charger may be configured to allow the consumer to input an address of an area where the consumer can receive (charge) power instead of selecting a charger, and the input field for the amount of received power may be configured to allow any numerical value between the minimum and maximum amounts of power that can be purchased to be input. The application screen has an application button for instructing application with the input contents and a cancel button for instructing termination of processing. The application screen is not limited to the configuration shown in FIG. 6. For example, the application screen may be provided with an input field for incentive points that are allowed when the consumer purchases surplus power. The control unit 21 may access a website published by the server 10 via the network N, and acquire and display the application screen shown in FIG. 6 from the server 10.

[0029] The application screen shown in FIG. 6 displays incentive points set for each time period for the charger selected through the input field of the charger, so that the control unit 21 (point acquisition unit) of the consumer terminal 20 can acquire incentive points when purchasing surplus electricity through this charger. The application screen may display, for example, the amount of surplus electricity that can be purchased (sold) for each time period. In the application screen shown in FIG. 6, the consumer inputs desired content into each input field through the input unit 24, and operates the application button when instructing to apply with the input content. The control unit 21 accepts content (application content) for each input field in the application screen (S62), and displays the accepted application content in each input field. Thereby, the control unit 21 (absorption amount acquisition unit) acquires the amount of surplus electricity that the consumer wishes to purchase (absorption amount of surplus electricity) according to the incentive points. The control unit 21 then determines whether the application button on the application screen has been operated (S63), and ends the process when it is determined that the application button has not been operated (S63: NO). When it is determined that the application button has been operated (S63: YES), the control unit 21 (output unit) transmits (outputs) the application information received via the application screen to the server 10 (S64), and applies to purchase the surplus electricity to be sold. Specifically, the control unit 21 transmits to the server 10 purchase request information including the charger 105 from which power is desired to be received (desired power reception location), the time period (desired power reception time period), and the amount of power to be received (amount of surplus electricity absorbed). This allows the control unit 21 to receive applications for the purchase of surplus electricity from users according to incentive points, and can transmit the received application information to the server 10, thereby applying to the server 10 to purchase the surplus electricity based on the application information.

[0030] The control unit 11 of the server 10 acquires application information from the consumer terminal 20 (S65) and stores the acquired application information in the consumer DB 12c as purchase conditions (S66). Specifically, the control unit 11 stores purchase request information, including the location of the charger (desired power receiving location), the time period during which purchase is desired (desired power receiving time period), the incentive point value set for this time period, and the amount of power desired to be purchased (desired purchase amount) included in the application information, in the consumer DB 12c as purchase conditions. This allows the control unit 11 (acceptance unit) to accept applications from consumers for the amount of surplus power they wish to purchase (absorption amount of surplus power) according to the incentive points. Through the above-mentioned process, each consumer can apply to the server 10 for the amount of surplus power they wish to charge the secondary battery 106 of their own electric vehicle.

[0031] The process of allocating surplus power generated by each generator 103 to a plurality of consumers (secondary batteries 106 of electric vehicles) will be described below. Figs. 7 and 8 are flowcharts showing an example of a procedure for allocating surplus power, Fig. 9 is a flowchart showing an example of a procedure for a matching process, Fig. 10 is a schematic diagram for explaining the allocation process, and Fig. 11 is a schematic diagram showing an example of a screen. In Figs. 7 and 8, the left side shows the process performed by the server 10, and the right side shows the process performed by the consumer terminal 20. The matching process shown in Fig. 9 is the process of step S15 in the allocation process shown in Fig. 7. The following process is realized by the control unit 11 according to the control program 12P stored in the storage unit 12 of the server 10, and is realized by the control unit 21 according to the control program 22P and the power purchase application 22AP stored in the storage unit 22 of the consumer terminal 20. A part of the following process may be realized by a dedicated hardware circuit.

[0032] In the information processing system of this embodiment, a consumer who owns an electric vehicle and wants to purchase surplus power registers in advance with the server 10, and the server 10 stores information about the registered consumer in the consumer DB 12c. Specifically, the consumer applies for the purchase of surplus power by transmitting purchase request information including a desired amount of surplus power to be purchased, a desired place to receive power, a desired time period to receive power, and an allowable incentive point value to the server 10 using the consumer terminal 20, and the server 10 stores the received purchase request information as a purchase condition in the consumer DB 12c. The consumer terminal 20 and the server 10 execute the process shown in FIG. 5 described above, and the server 10 accepts an application for the purchase of surplus power from the consumer terminal 20. The server 10 also acquires the generation date and time, weather information, and generation amount of surplus power in each generator 103 from the generator 103 or a control terminal (not shown) that controls the operation of the generator 103, and stores the acquired information on the surplus power in the generator DB 12a as a surplus power history. The server 10 of this embodiment predicts the amount of surplus power (generation amount) to be generated by each generator 103 on the next day, for example, at a predetermined time once a day, based on the past surplus power history of each generator 103 and information on weather, etc. The server 10 also predicts the amount of surplus power that each consumer wishes to purchase on the next day, based on the purchasing conditions (purchase request information) and past purchase history of each consumer, etc., and performs processing to create an allocation plan for allocating the predicted amount of surplus power to each consumer.

[0033] The control unit 11 of the server 10 judges whether the timing (creation timing) for executing the process of creating an allocation plan for surplus power has arrived (S11), and if it is judged that the timing has not arrived (S11: NO), it waits until the timing arrives. In this embodiment, the allocation plan is created once a day, and whether the creation timing has arrived is judged depending on whether a predetermined time of the day has arrived. Alternatively, the allocation plan may be created once every two days or once every three days, and in this case, allocation plans for two or three days are created at once in one creation timing.

[0034] When it is determined that the creation timing has arrived (S11: YES), the control unit 11 performs the process of steps S12 to S16 for one region. Specifically, the control unit 11 (surplus predicted amount acquisition unit) calculates the predicted amount of surplus power to be generated on the next day (the day for which the distribution plan is to be created) in each power generator 103 in one region (S12). For example, the control unit 11 reads out surplus power information for the most recent week from the surplus power history of the power generator 103 to be predicted from the power generator DB 12a. Alternatively, the control unit 11 may obtain weather information for the next day from a website that publishes weather information via the network N, and read out surplus power information for the most recent few days when the weather was similar to the obtained weather. Then, the control unit 11 calculates the predicted amount of surplus power that may be generated on the next day for each time slot based on the read past surplus power information and the weather information for the next day. For example, the control unit 11 may calculate an average value of the surplus electricity generated for each time period based on surplus electricity information for several days when the weather was similar or the same as the weather of the next day, and use the calculated average value as the predicted amount of surplus electricity for the next day.

[0035] FIG. 10 is a graph showing the predicted amount of surplus power for each time period, where the horizontal axis indicates the time of day and the vertical axis indicates the amount of surplus power (predicted amount of surplus power) per hour, and the unit of the amount of surplus power is, for example, kWh. The control unit 11 calculates the predicted amount of surplus power for each hour, for example, as shown in FIG. 10. Furthermore, instead of the surplus power history, the generator DB 12a may store history information on the amount of power generated in the past by the generator 103 and history information on the amount of power consumed in the past (power consumption) in the house in which the generator 103 is installed. In this case, the control unit 11 may read out the history information on the amount of power generated and the history information on the amount of power consumed for, for example, the most recent week from the generator DB 12a, calculate the surplus power information for the most recent week based on the read history information on the amount of power generated and the history information on the amount of power consumed, and calculate the predicted amount of surplus power for the next day based on the calculated surplus power information. The control unit 11 calculates the predicted amount of surplus power for each time slot on the next day for all the power generators 103 in the area, and calculates the total predicted amount of surplus power for each time slot.

[0036] Next, the control unit 11 (the predicted absorption amount acquisition unit) calculates the predicted amount of charge (received power amount) of surplus power to be charged to the secondary battery 106 of the electric vehicle on the next day (the day for which the distribution plan is created) for each consumer in the processing target area (S13). For example, the control unit 11 reads out purchase information for the most recent week or several weeks from the purchase history of the consumer to be predicted from the consumer DB 12c. Then, the control unit 11 calculates the predicted amount of surplus power that the consumer may charge to the electric vehicle on the next day based on the read past purchase information. For example, the control unit 11 calculates the predicted amount of received power on the next day based on a purchase cycle (power receiving cycle) according to the past purchase information. The control unit 11 may also calculate the predicted amount of received power on the next day based on the past purchase information and weather information for the next day. The control unit 11 may predict the power receiving time period (the time period during which surplus power is purchased) along with the predicted amount of power received, and the power receiving time period may be a time period during which a consumer is likely to charge an electric vehicle based on past purchase information. The control unit 11 may also predict the amount of power received on the next day, taking into consideration the purchase conditions set by each consumer. The control unit 11 calculates the predicted amount of surplus power received on the next day for all consumers in the area, and calculates the total amount of predicted power received.

[0037] The control unit 11 may use a neural network constructed by machine learning to calculate a predicted amount of received power on the next day from the amount of received power or the amount of consumed power in the past, for example, in the past week or month. For example, a learning model consisting of a CNN (Convolution Neural Network) model, an RNN (Recurrent Neural Network) model, an LSTM (Long Short-Term Memory) model, or the like, which is trained to output information indicating the predicted amount of received power on the next day when the amount of received power or the amount of consumed power in the past is input may be used. In this case, the control unit 11 inputs the amount of received power or the amount of consumed power in the past into the learned learning model, and can specify the predicted amount of received power on the next day based on the output information from the learning model.

[0038] Next, the control unit 11 (decision unit) sets incentive points for each charger 105 in the processing target area in the buying and selling transaction (power receiving transaction) of surplus power to be performed via the charger 105 on the next day (the day for which the distribution plan is created) (S14). For example, the control unit 11 sets incentive points for each time slot on the next day based on the predicted amount of surplus power for each time slot in each generator 103 calculated in step S12 and the predicted amount of received surplus power for each consumer calculated in step S13. Specifically, the control unit 11 calculates, for each charger 105, the sum of the predicted amount of surplus power in the generators 103 near each charger 105 for each time slot. The generator 103 in the vicinity of the charger 105 may be, for example, a generator 103 connected to the same pole transformer 102 as the charger 105, a generator 103 connected to a power distribution network to which the charger 105 is connected via the pole transformer 102, or a generator 103 whose installation position is a predetermined distance or less from the installation position of the charger 105. The total predicted amount of surplus power in the generators 103 in the vicinity of such a charger 105 can be regarded as the amount of surplus power that can be supplied via this charger 105 (planned supply amount).

[0039] Furthermore, the control unit 11 calculates, for each charger 105, the sum of the predicted amounts of surplus power to be received (amount of power desired to be received) of consumers who receive surplus power via each charger 105. When the control unit 11 predicts the power receiving time slot for each consumer, it calculates the sum of the predicted amount of surplus power desired to be received for each time slot. Note that the consumer who receives surplus power via the charger 105 may be, for example, a consumer who has received surplus power via the same charger 105 in the past, or a consumer whose installation position of the charger 105 is a predetermined distance or less from the position of the electric vehicle (parked position, movable position, etc.). Then, the control unit 11 sets incentive points for each charger 105 for each time slot on the next day based on the planned amount of surplus power to be supplied via each charger 105, the number of consumers who wish to receive surplus power via each charger 105, the desired amount of power to be received, and the power receiving time slot. Incentive points are points per unit of power amount such as 1 kWh, and are used as points given to consumers when they purchase surplus power, for example. The incentive points have a high value when the amount of power the consumer wishes to receive is small compared to the planned amount of surplus power to be supplied via the charger 105, and a low value when the amount of power the consumer wishes to receive is large. The incentive points may be set taking into consideration the value of incentive points set in the past. The incentive points set in this way are presented to the consumer via the screen shown in FIG. 6.

[0040] The control unit 11 sets incentive points for each time slot on the next day for all the chargers 105 in the area, and stores the incentive points for each time slot and the planned amount of surplus power to be supplied via the chargers 105 in the charger DB 12b. If multiple chargers 105 are installed within a predetermined range, incentive points may be set collectively for these chargers 105. For example, if multiple chargers 105 are installed within a range that can be traveled by car in about 10 to 20 minutes, the control unit 11 calculates the total predicted amount of surplus power for each time slot in the generators 103 near each charger 105, and calculates the total predicted amount of surplus power desired to be received via each charger 105. The control unit 11 may then set incentive points for each time slot on the next day for the multiple chargers 105 based on the calculated total predicted amount of surplus power for each time slot and the total predicted amount of surplus power desired to be received. In this case, the same value of incentive points is stored in the charger DB 12b for the multiple chargers 105, and the planned supply amounts for the multiple chargers 105 are stored collectively in the charger DB 12b.

[0041] Next, the control unit 11 performs a matching process between each charger 105 and each consumer in the transaction of receiving surplus power via each charger 105 based on the incentive points for each time period set for each charger 105 in step S14, the planned supply amount for each charger 105, and the purchase conditions of each consumer (S15). That is, the control unit 11 creates an allocation plan for allocating the surplus power of the planned supply amount calculated for each charger 105 to each consumer. In the matching process shown in FIG. 9, the control unit 11 acquires information on the surplus power that can be supplied via one charger 105 (matching target charger 105) from the charger DB 12b (S31). Specifically, the control unit 11 acquires the incentive points for each time period set for the matching target charger 105 and the planned supply amount of surplus power for each time period via this charger 105.

[0042] The control unit 11 also identifies consumers (allocation targets) who wish to receive surplus power via the matching charger 105 based on the contents stored in the consumer DB 12c (S32). Specifically, the control unit 11 identifies consumers whose purchase conditions match the matching charger 105 as the allocation target based on the purchase conditions of each consumer stored in the consumer DB 12c. For example, when the charger 105 or location (desired power receiving location) from which each consumer wishes to receive power, the time period in which the consumer wishes to receive power, and the allowable incentive points match the matching charger 105, the control unit 11 identifies the consumer as the allocation target. Specifically, when the charger 105 from which each consumer wishes to receive power is the matching charger 105 or a charger 105 in the vicinity of the matching charger 105, and further when the incentive points for each time period set in the matching charger 105 are the time period in which the consumer wishes to receive power and the allowable incentive points, the control unit 11 identifies the consumer as the allocation target. Furthermore, the control unit 11 may specify, as the allocation target, a consumer who has received (purchased) surplus power via the matching target charger 105 based on the purchase history of each consumer stored in the consumer DB 12c. This allows a consumer who meets the purchase conditions, such as the place (charger 105) where the consumer wishes to receive surplus power, the desired time period for receiving power, and the allowable incentive points, to be specified as the allocation target for one charger 105. Note that the time period for managing the planned supply amount of surplus power and the consumer's desired time period for receiving power do not have to be the same time period. For example, the time period for managing the planned supply amount of surplus power may be in one-hour or two-hour units, and the consumer's desired time period for receiving power may be the morning or afternoon, etc.

[0043] Then, the control unit 11 allocates the surplus power to be supplied via the matching charger 105 to the allocation targets for each time period based on the incentive points and the planned supply amount for each time period acquired in step S31 and the purchase conditions (purchase request information) of the allocation targets identified in step S32 (S33). For example, the control unit 11 divides the planned supply amount into a predetermined power amount unit such as 1 kWh or 10 kWh for each time period, and allocates the amount of power that each allocation target wishes to purchase with the divided predetermined amount of power as the upper limit. Note that, when a rank or priority is set for each allocation target (consumer), the amount of power that each allocation target wishes to purchase may be allocated in descending order of the allocation target with the highest rank or priority. The control unit 11 may also divide the planned supply amount for each time period by the number of allocation targets, and allocate the amount of power equally to each allocation target. Also, for example, when the planned supply amount of surplus power is managed in one-hour units, the control unit 11 first allocates surplus power for the planned supply amount from 11:00 to 12:00 to the allocation target who has set 11:00 to 12:00 as the desired power receiving time period. Next, the control unit 11 allocates surplus power for the unallocated portion of the planned supply amount from 11:00 to 12:00 to the allocation target who has set 11:00 to 13:00 as the desired power receiving time period. At this time, if the planned supply amount from 11:00 to 12:00 is insufficient, the control unit 11 may allocate the shortage to this allocation target from the planned supply amount from 12:00 to 13:00, or may allocate all of the amount of power that this allocation target wishes to purchase from the planned supply amount from 12:00 to 13:00. When the control unit 11 allocates surplus power to the allocation target in correspondence with the charger 105 to be matched, it issues a transaction ID. Then, the control unit 11 stores in the matching DB 12d the transaction ID, the date and time including the allocated time period (scheduled date and time of power reception), the incentive points set for the allocated time period, the consumer ID of the allocation target, and the allocated amount of power, in association with the charger ID of the charger 105. In this way, matching information between each charger 105 that supplies surplus power and the consumer that receives the supply of surplus power via the charger 105 is stored.Furthermore, when the control unit 11 allocates surplus power to an allocation target, the control unit 11 updates the planned supply amount of the matching target charger 105 stored in the charger DB 12b to a value obtained by subtracting the amount of power allocated to the allocation target.

[0044] The control unit 11 judges whether or not the allocation of the amount of power that each of the allocation targets specified in step S32 wishes to purchase has been completed (S34), and if it is judged that the allocation has not been completed (S34: NO), it judges whether or not the allocation of all the planned supply amounts (surplus power) for each time period acquired in step S31 to the allocation targets has been completed (S35). If it is judged that the allocation of all the planned supply amounts to the allocation targets has not been completed (S35: NO), the control unit 11 returns to the process of step S33 and allocates the unallocated planned supply amount to the allocation targets who have not yet completed the allocation of the amount of power that they wish to purchase. The control unit 11 repeats the process of step S33 until the allocation of the amount of power that each of the allocation targets wishes to purchase has been completed or the allocation of all the planned supply amounts to the allocation targets has been completed. This allows the control unit 11 (allocation determination unit) to create an allocation plan in which surplus power generated by the generator 103 in the area is absorbed by the secondary battery 106 of the electric vehicle that can be charged via the charger 105 in the area.

[0045] When it is determined that the allocation of surplus power to all the allocation targets has been completed (S34: YES), or when it is determined that the allocation of all the planned supply amounts to the allocation targets has been completed (S35: YES), the control unit 11 determines whether or not the above-mentioned processing has been completed for all the chargers 105 registered in the charger DB 12b (S36). When it is determined that the processing has not been completed for all the chargers 105 (S36: NO), the control unit 11 returns to the processing of step S31, and performs the processing of steps S31 to S35 for the unprocessed chargers 105. This allows the surplus power to be supplied on the next day via each charger 105 to be allocated to consumers who meet the purchase conditions for the chargers 105 registered in the charger DB 12b. When it is determined that the processing has been completed for all the chargers 105 (S36: YES), the control unit 11 returns to the processing of FIG. 7.

[0046] After performing the matching process shown in FIG. 9, the control unit 11 judges whether or not the end condition of the matching process is satisfied (S16). For example, when a predetermined ratio (e.g., 80% or more) of the predicted amount (scheduled supply amount) of surplus power generated in the power generator 103 in the area on the next day (the day for which the distribution plan is created) calculated for the area to be processed in step S12 has been allocated to the allocation target, the control unit 11 judges that the end condition is satisfied. In addition, when a predetermined ratio (e.g., 90% or more) of the predicted amount of surplus power that consumers in the area will charge their electric vehicles (secondary batteries 106) on the next day calculated in step S13 has been allocated, the control unit 11 may judge that the end condition is satisfied. In addition, when the amount of surplus power not allocated to the allocation target becomes equal to or less than a predetermined amount with respect to the planned supply amount for the next day calculated in step S12, the control unit 11 may judge that the end condition is satisfied.

[0047] When it is determined that the end condition of the matching process is not satisfied (S16: NO), the control unit 11 performs the matching process again, but at this time, the process returns to step S14, and after changing the incentive points for each charger 105, the matching process is performed (S15). For example, the control unit 11 may change the incentive points by adding a predetermined value when the unallocated planned supply amount in each charger 105 is equal to or greater than a predetermined amount. Also, the control unit 11 may change the incentive points by adding a predetermined value when the ratio of the unallocated planned supply amount to the planned supply amount acquired in step S31 in each charger 105 is equal to or greater than a predetermined value. In this way, by increasing the incentive points for the chargers 105 that are likely to generate unallocated surplus power, it is possible to promote allocation to allocation targets in the next matching process and improve the matching probability.

[0048] When it is determined that the end condition of the matching process is satisfied (S16: YES), the control unit 11 determines whether or not there is an unprocessed region (S17). When it is determined that there is an unprocessed region (S17: YES), the control unit 11 returns to the process of step S12 and performs the processes of steps S12 to S16 for the unprocessed region. In this way, in each region, the surplus power to be supplied on the next day via each charger 105 in the region can be allocated to consumers who meet the purchase conditions. When it is determined that there is no unprocessed region (S17: NO), the control unit 11 transmits the allocation result (allocation plan for allocating surplus power to each consumer) to each consumer (allocation target) to which the surplus power has been allocated (S18). For example, the control unit 11 (output unit) generates a notification screen for notifying each consumer of the allocation information (power reception information) of the surplus power allocated to each consumer, as shown in FIG. 11A, and transmits (outputs) the notification screen to the consumer terminal 20 of the corresponding consumer. The screen shown in FIG. 11A displays power reception information in the power reception process, including the location of the charger 105 that charges the surplus power, the time period for charging (power reception date and time), the amount of power to be charged (power reception amount), incentive points, and the like. The screen shown in FIG. 11A also has a power reception schedule button for accepting the power reception transaction (purchase transaction) of the surplus power in the displayed content and reserving power reception (purchase), and a cancel button for refusing to accept the transaction for the power reception transaction of the surplus power and canceling the power reception. Specifically, the control unit 11 reads out the charger ID, date and time, incentive points, and power amount stored in the matching DB 12d in association with the consumer ID, and reads out information (location information) indicating the installation location of the charger 105 of the read charger ID from the charger DB 12b. The control unit 11 then displays the installation location, date and time, power amount (power reception amount), and incentive points of the read charger 105, and adds a power reception schedule button and a cancel button to generate the notification screen shown in FIG. 11A.

[0049] When the control unit 21 of the consumer terminal 20 receives the allocation result (power reception information) from the server 10, it displays the allocation result screen shown in FIG. 11A on the display unit 25 (S19). That is, the control unit 21 (power reception information acquisition unit) acquires power reception information according to the distribution plan for surplus power created by the server 10. On the screen shown in FIG. 11A, if the consumer wants to reserve the reception of surplus power according to the displayed contents, the consumer operates the power reception plan button via the input unit 24, and if the consumer wants to cancel the reception of surplus power, the consumer operates the cancel button. This allows the consumer to select whether or not to accept the power reception transaction according to the power reception contents notified by the server 10 on the screen shown in FIG. 11A. On the allocation result screen, if the power reception plan button is operated, the control unit 21 accepts the reservation for receiving surplus power, and if the cancel button is operated, the control unit 21 accepts the cancellation of power reception. The control unit 21 determines whether or not the power receiving reservation has been accepted (S20), and if it determines that the power receiving reservation has been accepted (S20: YES), it transmits an application for receiving surplus power with the displayed contents to the server 10 (S21), and ends the process. When the control unit 11 of the server 10 receives an application for receiving power from the consumer terminal 20, it confirms the allocation contents transmitted to the consumer terminal 20 in step S18 (S22). For example, the control unit 11 may confirm the power receiving transaction of the allocation contents by storing "approved" in the matching DB 12d in association with the power receiving transaction for which the power receiving application has been accepted.

[0050] On the other hand, when the control unit 21 of the consumer terminal 20 determines that the power receiving reservation has not been accepted (S20: NO), that is, when the power receiving cancellation has been accepted, the control unit 21 transmits a power receiving cancellation of the surplus power to the server 10 (S23) and ends the process. When the control unit 11 of the server 10 receives a power receiving cancellation from the consumer terminal 20, the control unit 11 discards the allocation details transmitted to the consumer terminal 20 in step S18 (S24). For example, the control unit 11 may discard the power receiving transaction of the allocation details by deleting information about the power receiving transaction for which the power receiving cancellation has been accepted from the matching DB 12d.

[0051] After the processing of step S22 or step S24, the control unit 11 judges whether there is a consumer to whom the allocation result has not been notified (S25). Specifically, the control unit 11 judges whether the allocation result has been notified to the consumer in each electricity receiving transaction stored in the matching DB 12d. If it is judged that there is an unnotified consumer (S25: YES), the control unit 11 returns to the processing of step S18 and transmits the allocation result to the unnotified consumer (allocation target) (S18). The control unit 11 also receives either an electricity receiving application or an electricity receiving cancellation from the consumer terminal 20, and confirms or discards the allocation content according to the received content. If it is judged that there is no unnotified consumer (S25: NO), that is, if the allocation content has been notified to all consumers, the control unit 11 ends the processing.

[0052] The allocation result screen may have a configuration shown in FIG. 11B. The screen shown in FIG. 11B displays two chargers 105 as chargers 105 for charging surplus power, and is configured to allow the customer to select one of the chargers 105. For example, when a plurality of available chargers 105 are allocated to one customer, a screen as shown in FIG. 11B is generated and transmitted to the customer terminal 20. The other configuration is the same as the screen shown in FIG. 11A. In the screen shown in FIG. 11B, the customer can apply to receive surplus power at the selected charger 105 by operating the power reception schedule button after selecting the charger 105 he / she wants to use. When the control unit 11 of the server 10 accepts an application to receive surplus power at the charger 105 selected by the customer from the customer terminal 20, the control unit 11 of the server 10 discards the allocation contents of the surplus power at the charger 105 not selected. Also, for example, when multiple time slots are assigned as the time slots (power receiving dates and times) for receiving surplus power, the screen shown in Fig. 11B may be configured to list multiple power receiving dates and times and to allow the user to select any one of the power receiving dates and times. Also, when the amount of surplus power received can be changed from the amount of power received set as the purchase condition, that is, when there is surplus power that can be additionally received (purchased), the screen shown in Fig. 11B may be configured to allow the amount of power received to be changed with the amount of power that can be added as an upper limit. With such a configuration, not only can power receiving transactions be performed with contents that match the purchase conditions registered in advance by the consumer, but also each consumer can flexibly change the transaction contents according to his / her desired contents depending on the result of allocation of surplus power to each consumer.

[0053] Through the above-mentioned process, the server 10 can create (determine) an allocation plan for allocating surplus power generated by the power generator 103 to consumers (electric vehicles) in each region. In this embodiment, an allocation plan is created for absorbing surplus power with the secondary battery 106 of a mobile electric vehicle. Since the electric vehicle can flexibly change the time and place (the place of the charger 105) for receiving surplus power depending on the driver (consumer), an allocation plan with a high degree of freedom is possible. Therefore, it becomes possible to efficiently allocate surplus power to each consumer. Note that the server 10 creates an allocation plan for allocating surplus power to electric vehicles on the next day, for example, once a day. However, depending on the difference between the amount of surplus power actually generated on the next day and the amount predicted on the previous day, there may be a case where surplus power that can be sold on the day occurs. In this case, it is possible to accept purchase applications for surplus power until just before the surplus power occurs, and allocate purchase transactions (power receiving transactions) to consumers who have made purchase applications.

[0054] A consumer who has been allocated surplus power by the above-mentioned process moves his / her electric vehicle to the location of the allocated charger 105 at the allocated date and time (power receiving time), and uses the charger 105 to charge the allocated amount of surplus power into the secondary battery 106 of the electric vehicle. Thus, the consumer obtains power receiving information related to the power receiving transaction of the surplus power allocated to the consumer from the server 10 via the consumer terminal 20, and can grasp the transaction details of the surplus power allocated to the consumer from the obtained power receiving information.

[0055] The following describes the process in the information processing system of this embodiment in which the consumer terminal 20 notifies the consumer that he or she should start moving to the installation location of the charger 105 in order to realize a power receiving transaction of surplus power allocated to the consumer in response to the consumer's power receiving application. FIG. 12 is a flowchart showing an example of a processing procedure for notifying the consumer of the start of movement. The following process is realized by the control unit 21 in accordance with the control program 22P and the power purchasing application 22AP stored in the memory unit 22 of the consumer terminal 20. A part of the following process may be realized by a dedicated hardware circuit.

[0056] The control unit 21 of the consumer terminal 20 performs the process shown in FIG. 12 after receiving the surplus power reception information (allocation result) from the server 10. When the allocation result is received from the server 10, the control unit 21 acquires information on the current location of the electric vehicle owned by the consumer (S41). The information on the current location of the electric vehicle is information on the parking lot where the electric vehicle is parked, or information on the location where the electric vehicle is running, and is expressed using, for example, coordinate values ​​of longitude and latitude, an address, or the like. For example, the consumer may register location information of the parking lot where the electric vehicle is usually parked, or the parking lot where the electric vehicle is parked outside, in the electricity purchasing application 22AP via the input unit 24, and in this case, the control unit 21 can acquire information on the current location of the electric vehicle according to the registration contents (location information of the parking lot). The control unit 21 may also acquire information on the current location detected by a GPS (Global Positioning System) mounted on the electric vehicle. Furthermore, when a consumer is traveling in an electric vehicle while carrying the consumer terminal 20, information on the current location detected by a GPS included in the consumer terminal 20 may be acquired.

[0057] The control unit 21 calculates the time required for the electric vehicle to travel from the current location to the charger 105 based on the current location of the electric vehicle and the power receiving location (the installation location of the charger 105) in the power receiving information received from the server 10 (S42). The control unit 21 may calculate the predetermined time based on the distance from the current location to the charger 105 and the average driving speed of the electric vehicle operated by the consumer. The control unit 21 may also obtain the time required for the route from the current location to the charger 105 from a website that provides route search results for vehicles via the network N.

[0058] Then, the control unit 21 judges whether or not the electric vehicle should start moving toward the charger 105 based on the time required to travel from the current location to the charger 105 and the current time (S43). For example, the control unit 21 calculates the time from the current time to the power reception time (power reception date and time) in the power reception information received from the server 10, and judges that the date and time to start moving has arrived when the calculated time is equal to or less than the time required to travel from the current location to the charger 105. Note that at this time, the control unit 21 may judge that the electric vehicle should start moving a predetermined time before the date and time when the electric vehicle should start moving arrives, with a predetermined margin of time.

[0059] When the control unit 21 determines that the electric vehicle should not start moving (S43: NO), it determines whether the electric vehicle is moving (running) or not (S44). Here, the control unit 21 determines whether the electric vehicle is moving or not based on information on the current location successively detected by a GPS mounted on the electric vehicle or a GPS possessed by the consumer terminal 20 of the consumer riding in the electric vehicle. Note that the consumer may register in the electricity purchasing application 22AP that the electric vehicle is currently parked, and in this case, the control unit 21 may determine that the electric vehicle is not moving according to the registered content (being parked). When it determines that the electric vehicle is not moving (S44: NO), the control unit 21 returns to the process of step S43 and repeats the processes of steps S43 and S44 until it determines that the electric vehicle should start moving or determines that the electric vehicle has moved.

[0060] When the control unit 21 determines that the electric vehicle has moved (S44: YES), the control unit 21 returns to the process of step S41, acquires information on the current location of the electric vehicle (S41), and recalculates the time required from the current location to the charger 105 (S42). As a result, when the electric vehicle is moving, the control unit 21 determines whether or not the electric vehicle should start moving, according to the time required from the current location of the electric vehicle to the charger 105, which is updated sequentially. When the control unit 21 determines that the electric vehicle should start moving (S43: YES), the control unit 21 notifies the consumer by, for example, displaying a message indicating that the electric vehicle should start moving on the display unit 25 (S45). As a result, the consumer terminal 20 can guide the consumer to start moving the electric vehicle so that the electric vehicle can arrive at the installation location of the charger 105 by the power receiving time assigned to the consumer. Note that the method of notifying the consumer that the electric vehicle has started moving may be, for example, by lighting or blinking the lamp, sounding the buzzer, etc., if the consumer terminal 20 has a lamp or a buzzer, etc.

[0061] Through the above-mentioned process, the consumer terminal 20 instructs the consumer to start moving the electric vehicle so as to arrive at the power receiving time allocated to the consumer. By starting to move the electric vehicle at the timing notified by the consumer terminal 20, the consumer can charge the secondary battery 106 of the electric vehicle with surplus power of the allocated receiving amount of power via the allocated charger 105 at the power receiving time allocated to the consumer.

[0062] In this embodiment, as described above, the surplus power generated by the generator 103 is absorbed by the electric vehicle at the timing of generation, so that it is consumed efficiently. With this configuration, even if the surplus power generated by the generator 103 further increases, the secondary battery 106 of the electric vehicle can be used as a power buffer to adjust the supply and demand of the surplus power, and the quality of the grid power can be maintained without affecting the grid power. In addition, in this embodiment, the surplus power is absorbed via the charger 105 located near the place where the surplus power is generated (the place where the generator 103 is installed). In this way, since the surplus power generated in each region is consumed within the region, it is not necessary to install new substation equipment or the like in the distribution network, and the supply and demand of the surplus power can be adjusted. In addition, in this embodiment, for example, the amount of surplus power generated on the next day and the amount of surplus power received by the consumer (electric vehicle) are predicted based on the most recent record and weather information, so that values ​​close to the actual power amount can be predicted. Therefore, a more appropriate distribution plan for the surplus power can be created based on the more accurately predicted amount of surplus power generated and the amount of surplus power received by the consumer.

[0063] In this embodiment, when a consumer receives (purchases) surplus power via the charger 105, information on the power receiving transaction of the surplus power is transmitted to the server 10 from a control terminal (not shown) that controls the operation of the charger 105. For example, information on the power receiving transaction including information on the charger 105 (e.g., charger ID), information on the consumer (e.g., consumer ID), the date and time of power receiving and weather information at that time, the amount of received power, etc. is transmitted to the server 10. Thus, the control unit 11 of the server 10 stores the transaction information including each piece of received information in the charger DB 12b as a transaction history corresponding to the charger ID, and stores the purchase information (power receiving history) including each piece of received information in the consumer DB 12c as a purchase history corresponding to the consumer ID. As a result, information on the power receiving transaction (purchase transaction) of surplus power performed by each consumer via each charger 105 is accumulated in the charger DB 12b and the consumer DB 12c. In this way, by accumulating information on the transactions of receiving surplus electricity via each charger 105 and information on the transactions of purchasing surplus electricity by each consumer, it becomes possible to issue various documents or certificates using this information. For example, it is possible to issue a purchase history or purchase certificate of renewable energy (natural energy) or CO2-free electricity. In addition, based on the total value of incentive points in the purchase transactions by each consumer, it is possible to grasp the amount of surplus electricity purchased, and it becomes possible to provide a privilege according to the incentive points acquired in a year, for example.

[0064] Furthermore, in this embodiment, for example, when a consumer instructs the power purchasing application 22AP to be launched via the input unit 24, the consumer terminal 20 may be configured to obtain the consumer's surplus power purchase history from the server 10 and display the surplus power purchase history on an initial screen. Furthermore, when the consumer terminal 20 is instructed to launch the power purchasing application 22AP, it may be configured to obtain incentive points set for each charger 105 from the server 10 and display the incentive points for each charger 105 on an initial screen. By displaying the consumer's purchase history or the incentive points for each charger 105 in this manner, it is possible to notify the consumer of information that is likely to be of interest to the consumer on the initial screen.

[0065] In this embodiment, the consumer sets the charger 105 or the location of the charger 105 that the consumer wants to use, the time period in which the consumer wants to receive power, the amount of power received, the incentive points that the consumer can accept, and the like as purchase conditions, and can receive from the server 10 a proposal for a power reception transaction (purchase transaction) with power reception content that matches the purchase conditions. Therefore, in order to purchase surplus power with the power reception content allocated to the consumer, the consumer can run the electric vehicle to consume the charge in the secondary battery 106 before the scheduled power reception time arrives. In this case, by running the electric vehicle according to the allocated power reception content, it becomes possible to efficiently purchase (receive) surplus power at the scheduled power reception time.

[0066] In addition, in this embodiment, since the consumer can apply for or cancel the power receiving transaction with the proposed power receiving content, for example, when the remaining amount of the secondary battery 106 of the electric vehicle is large and the proposed power receiving transaction is unnecessary, the consumer can cancel the power receiving transaction. In addition, when the allocation result screen as shown in FIG. 11B is notified, the consumer can apply for the power receiving transaction after appropriately changing the demand content. In this case, for example, if there is a charger 105 or a power receiving time period with a higher incentive point, the consumer can change the driving schedule for the next day and apply for the power receiving transaction with the charger 105 or the power receiving time period with a higher incentive point. Therefore, for example, the consumer can consume the charged amount of the secondary battery 106 by driving the electric vehicle before the time period with a higher incentive point, and can receive surplus power thereafter. In this way, the sale of surplus power with a high incentive point can be promoted, and the consumer can efficiently purchase surplus power with a high incentive point. In addition, it is also possible to register, as a purchase condition, that the electricity receiving transaction will be confirmed with the electricity receiving content allocated by the server 10 without obtaining the consumer's consent. In this case, the server 10 may confirm the electricity receiving transaction by the consumer at the time when the electricity receiving content of the surplus electricity is allocated.

[0067] In this embodiment, the consumer registers, as the purchase conditions, for example, chargers 105 on the planned driving route and the planned time period of driving according to the consumer's driving schedule (driving plan) for the next day, and can receive a proposal for an electricity receiving transaction with electricity receiving contents that match the purchase conditions from the server 10. Thus, by receiving surplus electricity with the proposed electricity receiving contents, the consumer can receive surplus electricity from an appropriate charger 105 at an appropriate time according to the driving schedule for the next day.

[0068] In the present embodiment, a matching process between surplus electricity and consumers in the buying and selling of surplus electricity may be performed on a blockchain. In such a configuration, a smart contract is executed on the blockchain when performing the matching process, so that the buying and selling of surplus electricity can be performed in an autonomous and decentralized manner.

[0069] In this embodiment, the electric vehicle that absorbs the surplus power may be configured to be capable of automatic running. In this case, the server 10 may instruct each electric vehicle to execute the power receiving transaction with the power receiving content assigned to each electric vehicle without obtaining the consent of the consumer. The electric vehicle may automatically run to the specified location at the specified date and time according to the power receiving content instructed by the server 10, and receive the surplus power via the specified charger 105. Note that the server 10 may be configured to transmit the power receiving content (power receiving information) assigned to the electric vehicle to a car navigation device (consumer terminal 20) mounted on the electric vehicle, and the car navigation device may instruct the electric vehicle to execute the power receiving transaction. In an electric vehicle that can automatically run, in order to receive power with the power receiving content instructed by the server 10, the charge amount of the secondary battery 106 is consumed by automatically running before the scheduled power receiving time, thereby enabling efficient reception of surplus power. If the charger 105 can charge the secondary battery 106 in a non-contact manner, the electric vehicle can be charged by the charger 105 by stopping at a specified position. In addition, when an electric vehicle capable of self-driving is used for car sharing shared by multiple users, it can be configured to receive surplus electricity during free time of sharing. For example, by registering the free time of sharing as a desired time period for receiving electricity according to the sharing schedule for the next day as a purchase condition, if a power receiving transaction that meets the purchase condition is possible, it is possible to efficiently charge during the free time of sharing.

[0070] In this embodiment, a charger 105 capable of charging the secondary battery 106 of the electric vehicle may be embedded in a road so that the electric vehicle can be charged while traveling. In this case, the consumer can receive surplus power according to the power receiving content assigned to the consumer by traveling the electric vehicle on the road where the charger 105 is embedded in accordance with the power receiving content assigned to the consumer.

[0071] Furthermore, in this embodiment, the secondary battery 106 of the electric vehicle that absorbs the surplus power does not have to be a battery for driving the electric vehicle. For example, a configuration in which a secondary battery 106 that is not a battery for driving mounted on a moving body such as an automobile is charged may be used. In this case, the automobile with the surplus power charged in the secondary battery 106 moves, making it possible to supply power at any location. Therefore, power can be supplied in places where a failure has occurred in the power supply network.

[0072] (Embodiment 2) An information processing system that creates an allocation plan for allocating surplus power generated by a generator 103 not only to a secondary battery 106 of an electric vehicle but also to a load 104 installed in a house or the like will be described. Therefore, in this embodiment, the consumer who purchases the surplus power is the owner of the electric vehicle and the owner of the load 104. In this embodiment, the load 104 to which the surplus power is allocated includes, for example, a refrigerator, a freezer, an air conditioner, an electric water heater, a cold storage warehouse, a freezer warehouse, a heat storage device, etc. used in a house, and these devices are used as a power buffer (energy storage device) that holds the surplus power. For example, a refrigerator has a period in which the compressor is operated to perform a cooling process and a period in which the cooling process is not performed. Therefore, when surplus power occurs, the compressor is operated using the surplus power to cool the inside of the refrigerator, and when the temperature falls below a predetermined temperature, the compressor is stopped, thereby making it possible to efficiently use the surplus power for cooling. A device that can convert power into heat and hold it in this way is expected to be used as a power buffer.

[0073] The information processing system of this embodiment can be realized by the same device as the information processing system of the first embodiment, so the description of the configuration will be omitted. The consumer DB 12c stored in the memory unit 12 of the server 10 of this embodiment has a slightly different configuration from the consumer DB 12c of the first embodiment. The memory unit 12 of the server 10 of this embodiment stores a power distribution network DB 12e and a load matching DB 12f in addition to the DBs 12a to 12d shown in FIG. 2. FIG. 13 is a schematic diagram showing an example of the configuration of the DBs stored in the server 10 of the second embodiment. FIG. 13A shows the consumer DB 12c, FIG. 13B shows the power distribution network DB 12e, and FIG. 13C shows the load matching DB 12f.

[0074] The consumer DB 12c includes an equipment type column in addition to the configuration of the consumer DB 12c of the first embodiment shown in FIG. 4A. In this embodiment, consumers who purchase surplus power include not only the owners of electric vehicles but also the owners of the loads 104, so the consumer DB 12c stores information about the owners of the electric vehicles and information about the owners of the loads 104. The equipment type column stores the types of equipment owned by the consumers in association with the consumer ID. The types of equipment can be, for example, electric vehicles, refrigerators, electric water heaters, freezers, air conditioners, refrigerated warehouses, frozen warehouses, and thermal storage devices. In the consumer DB 12c, the location information corresponding to each equipment of the loads 104 is information indicating the installation location of each equipment. Furthermore, the purchase conditions corresponding to each equipment of the loads 104 may include the amount of power that can be consumed by each equipment as the amount of power to be purchased. This allows the amount of power that can be consumed by the equipment (the amount of surplus power absorbed) to be registered as a purchase condition. The device type is added or changed by the control unit 11 when the control unit 11 acquires an instruction to add or change via the communication unit 13 or the input unit 14. The contents stored in the consumer DB 12c of the present embodiment are not limited to the example shown in FIG. 13A.

[0075] The power distribution network DB12e stores information about the power distribution network in each region. The power distribution network DB12e shown in FIG. 13B is similar to the configuration of the charger DB12b shown in FIG. 3B, and includes a power distribution network ID column, a location information column, a time period column, an incentive point column, a planned supply amount column, a transaction history column, and the like. The power distribution network ID column stores identification information (power distribution network ID) of the power distribution network in each region, and the location information column stores location information indicating the installation location of the power distribution network in association with the power distribution network ID. The location information of the power distribution network is information indicating the area that includes the power distribution network. The time period column, the incentive point column, and the planned supply amount column store incentive points for each time period set for surplus power generated in the power distribution network and a predicted amount (planned supply amount) of surplus power that can be supplied in association with the power distribution network ID. The transaction history column stores transaction information about surplus power received (purchased) by the load 104 in the power distribution network in association with the power distribution network ID. The distribution network ID stored in the distribution network DB 12e is issued and stored by the control unit 11 when a new distribution network is installed and the control unit 11 acquires information on the new distribution network via the communication unit 13 or the input unit 14. The location information is added or changed by the control unit 11 when the control unit 11 acquires an instruction to add or change via the communication unit 13 or the input unit 14. The time period, incentive points, and planned supply amount are stored by the control unit 11 when the control unit 11 calculates incentive points and planned supply amount for surplus power in the distribution network. The transaction history is stored by the control unit 11 every time the control unit 11 acquires information on a power receiving transaction (purchase transaction) of surplus power conducted in the distribution network via the communication unit 13 or the input unit 14. The stored contents of the distribution network DB 12e are not limited to the example shown in FIG. 13B.

[0076] The load matching DB 12f stores information on electricity receiving transactions (purchase transactions) of surplus electricity received by the load 104 in the electricity distribution network. The load matching DB 12f shown in FIG. 13C has a similar configuration to the matching DB 12d shown in FIG. 4B, and includes an electricity distribution network ID column, a transaction ID column, a date and time column, an incentive point column, a consumer ID column, and an energy amount column. The electricity distribution network ID column stores the electricity distribution network ID of the electricity distribution network in each region, and the transaction ID column stores, in association with the electricity distribution network ID, a transaction ID of an electricity receiving transaction (purchase transaction) of surplus electricity set (reserved) for surplus electricity generated in the electricity distribution network. The date and time column, the incentive point column, the consumer ID column, and the energy amount column store, in association with the transaction ID, the date and time when the purchase transaction is performed, the incentive points set in the purchase transaction, the consumer ID of the consumer who performs the purchase transaction, and the energy amount to be traded, respectively. The power distribution network ID stored in the load matching DB 12f is stored in advance, and the transaction ID is issued and stored by the control unit 11 when the control unit 11 sets a new purchase transaction. When the control unit 11 sets a new purchase transaction, each piece of information related to the set purchase transaction, such as the date and time, the incentive points, the consumer ID, and the amount of power, is stored by the control unit 11. The contents stored in the matching DB 12d are not limited to the example shown in FIG. 13C.

[0077] Fig. 14 is a flowchart showing an example of a procedure for allocating surplus power in the second embodiment, and Fig. 15 is a flowchart showing an example of a procedure for matching in the second embodiment. The process shown in Fig. 14 is obtained by adding step S51 between steps S14 and S15 in the process shown in Fig. 7, and the process shown in Fig. 15 is obtained by adding step S52 between steps S33 and S34 in the process shown in Fig. 9. Explanations of the same steps as in Figs. 7 to 9 will be omitted. Note that Fig. 14 omits illustration of the process shown in Fig. 8 (steps S18 to S25).

[0078] In the information processing system of this embodiment, the control unit 11 of the server 10 performs the same processes as steps S11 to S14 in Fig. 7. As a result, when the time to create a distribution plan for surplus power arrives, the server 10 calculates, for the processing target area, a predicted amount of surplus power generated by the generators 103 in the area on the next day (the day for which the distribution plan is created) and a predicted amount of surplus power received by the consumers in the area on the next day. Note that the amount of surplus power received by the consumers includes not only the amount of power charged to the secondary battery 106 of the electric vehicle, but also the amount of power consumed by the load 104. The server 10 then sets incentive points for each time slot on the next day for each charger 105 in the processing target area.

[0079] Next, the control unit 11 of the server 10 sets incentive points for the buying and selling of surplus power to be carried out via the power distribution network on the next day, for the power distribution network in the processing target area, by the same process as step S14 (S51). Specifically, the control unit 11 sets incentive points for each time slot based on the predicted amount of surplus power generated in the power distribution network (i.e., in the area) for each time slot calculated in step S12 and the predicted amount of surplus power received in the power distribution network calculated in step S13. For example, the control unit 11 calculates the total predicted amount of surplus power generated by each generator 103 in the power distribution network (the planned supply amount of surplus power that can be supplied in the power distribution network) and the total predicted amount of surplus power received by consumers in the power distribution network, and sets incentive points for the next day based on these. The control unit 11 sets incentive points for each time slot on the next day for the distribution network in the area, and stores the incentive points for each time slot and the calculated planned supply amount of surplus power in the distribution network in the distribution network DB 12e. The incentive points set in this way are presented to the consumer via a screen shown in FIG.

[0080] Next, the control unit 11 performs a matching process between the surplus power and each consumer in the transaction of receiving surplus power via each charger 105 and the transaction of receiving surplus power by each load 104, based on the incentive points for each time period set for each charger 105 in step S14, the incentive points for each time period set for the power distribution network in step S51, the planned supply amount via the power distribution network or each charger 105, and the purchase conditions of each consumer (S15). In the matching process shown in Fig. 15, the control unit 11 performs the same process as steps S31 to S33 in Fig. 9. As a result, for the charger 105 to be matched, the surplus power that can be supplied via this charger 105 is allocated to the allocation target (electric vehicle) for each time period. When the control unit 11 allocates surplus power to an allocation target, it updates the planned supply amount in the matching charger 105 stored in the charger DB 12b to a value obtained by subtracting the amount of power allocated to the allocation target, and also updates the planned supply amount in the matching distribution network stored in the distribution network DB 12e to a value obtained by subtracting the amount of power allocated to the allocation target.

[0081] Next, the control unit 11 allocates the surplus power to be supplied to the load 104 (allocation target) for each time period based on the incentive points and the planned supply amount for each time period in the distribution network (area) to be processed stored in the distribution network DB 12e and the purchase conditions of the consumer (load 104) stored in the consumer DB 12c (S52). If the control unit 11 knows the location of the generator 103 that generates the surplus power, the control unit 11 may allocate the surplus power to the load 104 near the generator 103. When the control unit 11 allocates the surplus power to the load 104, the control unit 11 issues a transaction ID and stores the transaction ID, the date and time including the allocated time period (scheduled date and time of receiving power), the incentive points set for the allocated time period, the consumer ID of the allocation target, and the allocated power amount in the load matching DB 12f in association with the distribution network ID. As a result, matching information regarding the load 104 to which the surplus power generated in the distribution network is allocated is stored.

[0082] Thereafter, the control unit 11 performs the process from step S34 onward, and repeats the processes of steps S33 and S52 until the allocation of the amount of power desired to be purchased by all the allocation targets is completed or the allocation of the entire planned supply amount to the allocation targets is completed, thereby performing the process of allocating surplus power generated in the power distribution network to consumers. In this way, it is possible to create a distribution plan in which surplus power generated by the generators 103 in the area is absorbed by the electric vehicles or loads 104 in the area.

[0083] In the server 10 of this embodiment, in step S18 in FIG. 8, the control unit 11 also transmits the allocation result to the allocation target to which the surplus power has been allocated (S18). When the allocation target is the load 104, the control unit 11 instructs the load 104 to receive power according to the power receiving content allocated to the load 104. The load 104 receives the surplus power of the specified amount at the specified date and time in accordance with the instruction from the server 10, thereby realizing the power receiving transaction of the allocated surplus power. The load 104 is configured to perform the power receiving transaction in accordance with the instruction from the server 10, and may confirm the power receiving transaction without accepting the consent of the owner of the load 104 for the power receiving transaction. In this case, it is not necessary to perform the processing of steps S19 to S21 in FIG. 8. However, the load 104 may be configured to confirm the power receiving transaction after accepting the consent of the owner of the load 104 for the power receiving transaction. In this case, the consumer terminal 20 performs the processing of steps S19 to S21 in FIG. 8.

[0084] By the above-mentioned process, the server 10 can create an allocation plan for allocating surplus power generated by the generator 103 in each region to consumers (electric vehicles and loads 104) in the region. Also in this embodiment, if the consumer to whom the surplus power is allocated is the owner of an electric vehicle, the consumer moves the electric vehicle to the installation location of the allocated charger 105 on the allocated date and time, and charges the allocated amount of surplus power into the secondary battery 106 of the electric vehicle. Also, if the consumer to whom the surplus power is allocated is the owner of the load 104, the load 104 consumes the allocated amount of surplus power on the allocated date and time. As a result, surplus power generated in the power distribution network is absorbed by the electric vehicle or the load 104 at the timing of generation, and is efficiently consumed. Therefore, by using the secondary battery 106 of the electric vehicle, the load 104 such as a refrigerator and an air conditioner as a power buffer, the supply and demand of surplus power can be adjusted, and the quality of the grid power can be maintained without affecting the grid power.

[0085] Also in this embodiment, when a consumer (electric vehicle and load 104) receives (purchases) surplus power, information on the transaction of receiving surplus power is transmitted to the server 10 from a control terminal (not shown) that controls the operation of the charger 105 or the load 104. Thus, the control unit 11 of the server 10 stores transaction information including the received information as transaction history in the charger DB 12b or the power distribution network DB 12e, and stores purchase information including the received information as the consumer's purchase history in the consumer DB 12c. Thus, also in this embodiment, information on the transaction of receiving surplus power in the power distribution network and information on the purchase transaction of surplus power by each consumer can be accumulated, and various documents can be generated using such information.

[0086] In this embodiment, the same effects as those in the first embodiment can be obtained. In addition, in this embodiment, surplus power generated in the power distribution network can be absorbed not only by electric vehicles but also by the load 104 in the power distribution network, so that supply and demand of surplus power can be adjusted more flexibly. The modified examples described in the first embodiment can also be applied to the information processing system of this embodiment as appropriate.

[0087] The embodiments disclosed herein are illustrative in all respects and should not be considered as limiting. The scope of the present invention is defined by the claims, not by the above meaning, and is intended to include all modifications within the scope and meaning equivalent to the claims. [Explanation of symbols]

[0088] 10 Server 11 Control section 12 Storage section 13. Communications Department 14 Input section 15 Display 20 Consumer terminal 21 Control section 23 Communications Department 103 Generator 104 Load 105 Charger 106 Secondary battery

Claims

1. A program for applying for an absorption amount of surplus electricity by an energy storage device based on a predicted amount of surplus electricity generated by a generator connected to a power distribution grid in each region for each time period, obtaining incentive points per unit amount of power for each of the regions, the incentive points being determined based on a predicted amount of surplus power for each of the regions and a predicted amount of absorption of the surplus power by a plurality of energy storage devices in each of the regions for each of the regions; Displaying the acquired incentive points for each time period in each region on a display unit; Acquire the amount of surplus electricity absorbed by the energy storage device in association with the displayed incentive points for each time period of each of the regions; outputting the obtained absorption amount of surplus power to a predetermined server; The server acquires power reception information including the determined power reception date and time and the received power amount. A program that causes a computer to carry out processing.

2. The energy storage device includes a secondary battery mounted on an electric vehicle; The power receiving information includes a power receiving location that receives the surplus power. The program according to claim 1.

3. Outputting purchase request information including the amount of surplus electricity absorbed by the energy storage device to the server in association with the displayed incentive points.

3. The program according to claim 1, which causes the computer to execute a process.

4. The power reception information is determined based on a predicted amount of surplus power and an absorption amount of the surplus power by a plurality of energy storage devices. A program according to any one of claims 1 to 3.

5. outputting purchase request information including an absorption amount of the surplus power, a desired place and a desired time period for receiving the power, to the server in association with the energy storage device; Acquire power receiving information for the energy storage device determined based on the predicted amount of surplus power for each time period and the purchase request information.

5. The program according to claim 1, which causes the computer to execute a process.

6. Obtaining whether or not to approve the electricity receiving transaction indicated by the obtained electricity receiving information; The acquired transaction approval / disapproval is output to the server.

6. The program according to claim 1, which causes the computer to execute a process.

7. The energy storage device includes a secondary battery mounted on an electric vehicle; Outputting purchase information including the amount of surplus power absorbed, the desired place of receiving power, and the desired time period of receiving power, which are specified based on a driving plan of the electric vehicle, to the server.

7. The program according to claim 1, which causes the computer to execute a process.

8. Calculating a date and time when the electric vehicle should start moving based on the position of the electric vehicle, the power receiving location indicated by the acquired power receiving information, and the power receiving date and time indicated by the power receiving information; Output a notification regarding the start of movement before the date and time when the movement should start arrives The program according to claim 2 , which causes the computer to execute a process.

9. Instructing the electric vehicle to travel so as to arrive at the power receiving location indicated by the acquired power receiving information at the power receiving date and time indicated by the power receiving information. The program according to claim 2 , which causes the computer to execute a process.

10. An information processing method for applying for an absorption amount of surplus electricity by an energy storage device based on a predicted amount of surplus electricity generated by a generator connected to a power distribution network in each region for each time period, the method comprising: obtaining incentive points per unit amount of power for each of the regions, the incentive points being determined based on a predicted amount of surplus power for each of the regions and a predicted amount of absorption of the surplus power by a plurality of energy storage devices in each of the regions for each of the regions; Displaying the acquired incentive points for each time period in each region on a display unit; Acquire the amount of surplus electricity absorbed by the energy storage device in association with the displayed incentive points for each time period of each of the regions; outputting the obtained absorption amount of surplus power to a predetermined server; The server acquires power reception information including the determined power reception date and time and the received power amount. An information processing method in which processing is performed by a computer.

11. An information processing device for applying for an absorption amount of surplus electricity by an energy storage device based on a predicted amount of surplus electricity generated for each time period by a generator connected to a power distribution network in each region, a point acquisition unit that acquires incentive points per unit amount of power for each of the time periods, the incentive points being determined based on a predicted amount of surplus power for each of the time periods and a predicted amount of absorption of the surplus power by a plurality of energy storage devices in each of the regions; A display unit that displays the incentive points for each time period in each region that has been acquired; an absorption amount acquisition unit that acquires an absorption amount of the surplus power by the energy storage device in association with the displayed incentive points for each time period of each of the regions; an output unit that outputs the obtained absorption amount of surplus power to a predetermined server; a power reception information acquisition unit that acquires power reception information including the power reception date and time and the power reception amount determined by the server; An information processing device comprising:

Citation Information

Patent Citations

  • Charge control method for electric vehicle, charge monitoring control center, on-vehicle navigation device, and power system stabilization system

    JP2012048286A

  • Management method, service management device, service management system and program

    JP2018190249A

  • Electric power transaction amount optimizing device

    JP2020043634A

  • Control device and program

    JP2020114155A

  • Power management system and power management method

    WO2012066651A1