Embankment construction management support system
The embankment construction management support system automates data recording and soil quality determination using GPS and beacon tracking, enhancing efficiency and traceability in embankment construction by reducing errors and ensuring accurate soil quality assessment.
Patent Information
- Application Number
- JP2021035396
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-03-05
- Publication Date
- 2024-10-16
- Estimated Expiration
- 2041-03-05
AI Technical Summary
Existing embankment construction methods lack efficiency and traceability due to manual data input, which leads to slowed work, errors, and unreliable soil quality management, particularly in the dispersion and compaction of materials.
An embankment construction management support system that automates data recording through GPS, beacon ID tracking, and compaction monitoring, using ICT construction machines to determine soil quality and compaction information, and creates voxel blocks for precise soil quality determination.
Improves management efficiency and traceability by reducing human error and ensuring accurate soil quality assessment, enabling real-time monitoring and historical tracking of embankment construction processes.
Smart Images

Figure 0007568379000001 
Figure 0007568379000002 
Figure 0007568379000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an embankment construction management support system, and more particularly to a technology that is effective when applied to an embankment management support system that manages and supports embankment construction for laying foundations for buildings such as housing sites and roads. [Background technology]
[0002] Generally, in the construction of embankments to create the foundations of buildings such as housing sites and roads, soil from a borrow pit is loaded onto the carrier of a dump truck or the like and transported to the embankment, which is the construction site, where it is unloaded. The unloaded soil is then spread to a predetermined thickness in each predetermined area using a leveling machine such as a backhoe, and is then compacted using a compaction machine such as a vibrating roller.
[0003] In this embankment construction, since it is necessary to guarantee the quality of the embankment after construction, it is necessary to grasp the embankment information for each embankment layer and manage the construction results. In order to grasp and manage such information, the construction manager collected various information and created forms manually, but the creation work was time-consuming and troublesome.
[0004] For example, Patent Document 1 discloses an embankment construction management support system that records soil information on the embankment material excavated in the excavation area, information on the transport vehicle transporting the embankment, information on the transport vehicle that carried out the embankment in the embankment area, and location information of the embankment, in order to facilitate the creation and management of documents of the results of embankment construction.The system also divides the embankment area into cubes that can be set to any dimensions to generate multiple mesh blocks, and assigns and manages soil information on the embankment material and location information of the embankment to each cube of the multiple mesh blocks.
[0005] Furthermore, for example, Patent Document 2 discloses a material management system that, in order to manage materials more accurately when pouring cement-based materials and the like, estimates the volume of the material being transported from its weight and sets management blocks accordingly, and records the placement position information and material characteristic information for each management block in association with each other, in order to manage materials more accurately when pouring cement-based materials and the like. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2006-291454 A [Patent Document 2] JP 2009-102894 A Summary of the Invention [Problem to be solved by the invention]
[0007] However, as described above, in embankment construction, the complexity of the work is not sufficiently considered. For example, in Patent Document 1, the backhoe operator inputs the soil information of the embankment material in the excavation work area and the information of the transport vehicle that transports the embankment, and the dump truck driver inputs the information of the transport vehicle that has done the embankment in the embankment work area and the position information of the embankment, which causes a problem that the work is stagnated due to the information acquisition and input work, and the efficiency of the embankment construction work decreases. In addition, there is a problem that errors are likely to occur during input due to this. In addition, Patent Document 2 does not disclose the loading position of the cement-based material, since the loading position of the cement-based material is fixed.
[0008] In addition, the above-mentioned Patent Documents 1 and 2 describe obtaining position information when unloading soil loaded on a dump truck at an embankment site, but do not take into consideration the dispersion of soil to the surrounding area during unloading, leveling, and compaction.
[0009] In addition, when soil information is assigned to each of a plurality of mesh blocks, there may be cases where blank mesh blocks are generated in which no soil information is recorded in the data because embankment is not directly unloaded even though embankment has actually been done. In such blank mesh blocks, the necessary thickness is ensured by pouring in embankment material from neighboring mesh blocks in actual construction, but the soil quality is not taken into consideration. In other words, the soil quality in each mesh block changes as the soil spreads and mixes with the soil in other mesh blocks. In addition, if a mesh block where embankment work has actually been completed is blank, there is no soil information in the blank mesh block, and the data ignores the presence of the soil that flowed into that mesh block.
[0010] As a result of these factors, the reliability of the soil information assigned to the mesh blocks of the embankment becomes low, and there is a problem that the ability to trace the history of the quality and condition of the embankment after construction (so-called traceability) is reduced.
[0011] The present invention has been made in light of the above-mentioned technical background, and has an object to improve the efficiency of management by automating the recording work related to embankment construction work.
[0012] The present invention has been made in light of the above-mentioned technical background, and aims to improve the traceability of embankment materials brought into a filling site. [Means for solving the problem]
[0013] In order to solve the above problems, the embankment construction management support system of the present invention as described in claim 1 is a system for managing and supporting embankment construction using embankment site information created based on information acquired at the borrow pit and the embankment site and transmitted to a server, in which embankment materials excavated by a loader at a borrow pit are loaded onto a transport vehicle and transported to a banking site, and the embankment materials are unloaded at a banking location at the banking site and compacted by a compactor to form a bank, the system comprising: a loader having a transmission terminal for transmitting unique information of the loader; the vehicle information processing system has a function of calculating a position of the transport vehicle and transmitting vehicle position information having the position information and date and time information when the position information is calculated to the server, and a function of acquiring unique information of the loader transmitted from the transmitting terminal and transmitting loading position information to the server having the position information of the transport vehicle on which the fill material has been loaded by the loader, date and time information when the position information was calculated, unique information of the transport vehicle on which the fill material has been loaded by the loader, and unique information of the loader. a function of detecting unloading of the transport vehicle and transmitting to the server unloading position information including position information of the transport vehicle that unloaded the load, date and time information when the position information was calculated, unique information of the transport vehicle, and unique information of a loader that loaded the embankment material onto the transport vehicle; the compactor includes a compaction information processing system that transmits information of the compactor to the server, and the compaction information processing system calculates the position of the compactor and transmits the position information, date and time information when the position information was calculated, the number of compactions calculated based on the position information, and the number of times the compaction has been performed. and a function of transmitting to the server compaction information having an acceleration response value created based on the measurement value of an accelerometer provided on the compactor, the server having a memory unit for storing information and an information processing unit for processing the information, the memory unit having pre-stored therein soil master information indicating unique information of the loader and information on the soil type to be excavated by the loader in a specified period of time, the information processing unit having a function of generating a plurality of voxel blocks arranged in a mesh pattern by dividing the embankment into a plurality of cubes that can be set to predetermined dimensions,a function of creating unloading soil quality information, which includes unloading position information of the transport vehicle, information on the date and time when the position information was calculated, and information on the soil quality of the unloaded embankment material, based on the unloading position information and the soil quality master information, and storing the information in the storage unit; and a function of determining the soil quality of each of the plurality of voxel blocks based on the unloading soil quality information and the compaction information, to create the embankment site information, and storing the information in the storage unit. In determining the soil quality of each of the plurality of voxel blocks, a center of gravity position in a plan view of the plurality of voxel blocks is obtained, and a voxel block containing the position where the embankment material of the transport vehicle was unloaded and a center of gravity position of the voxel block are determined. the method is characterized in that, for each of the voxel blocks surrounding the unloaded position, a distance from the unloading position to a center of gravity position of each voxel block is calculated, a mixing ratio of the embankment material of each soil type in each voxel block is calculated based on the distance, the soil type with the highest mixing ratio in each voxel block is determined to be the soil type of the embankment material of each voxel block, a blank voxel block whose soil type has not been determined is detected among the plurality of voxel blocks based on the soil type determination information and the compaction information, and the soil type of the embankment material of the blank voxel block is determined based on the soil type of the embankment material of the voxel blocks surrounding the blank voxel block.
[0014] The embankment construction management support system of the present invention as described in claim 2 is characterized in that, in the invention as described in claim 1 above, in calculating the mixing ratio of embankment material of each soil type in each voxel block, a weighting value indicating how much of the unloaded embankment material is mixed into each voxel block based on the distance is calculated from the inverse of the ratio of the distance from the unloading position to the center of gravity position of each voxel block, and the mixing ratio of the embankment material of each soil type in each voxel block is calculated by calculating the ratio of the weighting value of each soil type using the weighting value.
[0015] The embankment construction management support system of the present invention described in claim 3 is Claim 2In the invention described in the above, the weighting value is calculated for the voxel block containing the unloaded position and for the surrounding voxel blocks in the same layer as the voxel block and in contact with the outer faces or edges of the voxel block.
[0016] The embankment construction management support system of the present invention described in claim 4 is characterized in that, in the invention described in any one of claims 1 to 3 above, in determining the soil type of the blank voxel block, reference is made to the soil types of a predetermined number of unloading positions close to the center of gravity of the blank voxel block, and the soil type that is most prevalent among the soil types of the unloading positions is determined to be the soil type of the blank voxel block.
[0017] The embankment construction management support system of the present invention described in claim 5 is characterized in that, in the invention described in any one of claims 1 to 3 above, in determining the soil quality of the blank voxel block, a reference point number, which is the number of unloading locations to be referenced for determining the soil quality, is specified in advance, a reference circle centered on the center of gravity of the blank voxel block is enlarged until it reaches said reference point number, and the soil type with the highest number of points within the reference circle when said reference point number is reached is determined to be the soil quality of the blank voxel block.
[0018] The embankment construction management support system of the present invention described in claim 6 is characterized in that, in the invention described in any one of claims 1 to 3 above, in determining the soil type of the blank voxel block, the size of a reference circle centered on the center of gravity of the blank voxel block is specified in advance, and the soil type with the highest number of points within the reference circle is determined to be the soil type of the blank voxel block.
[0019] The embankment construction management support system of the present invention described in claim 7 is characterized in that, in the invention described in any one of claims 1 to 6 above, soil information obtained by the soil quality judgment is added to each of the voxel blocks.
[0020] The embankment construction management support system of the present invention described in claim 8 is characterized in that, in the invention described in any one of claims 1 to 7 above, in determining the soil quality of the voxel block, if the mixing ratio of different soil types is the same, the soil quality is determined to be that of embankment material unloaded at a relatively later date and time. Effect of the Invention
[0021] According to the present invention, by automating the recording work related to embankment construction work, it is possible to improve the efficiency of management.
[0022] According to the present invention, it is possible to improve the traceability of embankment materials brought into a filling site. [Brief description of the drawings]
[0023] [Figure 1] 1 is a schematic overall configuration diagram showing the overall configuration of an embankment construction area and the overall configuration of an embankment management support system according to one embodiment of the present invention; [Diagram 2] FIG. 2 is a schematic configuration diagram of the embankment construction management support system of FIG. 1. [Diagram 3] FIG. 11 is a diagram illustrating an example of a setting file. [Figure 4] 1A is a diagram showing an example of soil master information, and FIG. 1B is a diagram showing an example of how to set the soil master information. [Diagram 5] FIG. 13 is a diagram showing an example of unloading soil quality information. [Figure 6] FIG. 11 is a diagram showing an example of embankment site information. [Figure 7] 7(a) is a plan view of the main part of the embankment used in the rolling compaction management, and (b) is a plan view of the main part showing the arrangement of voxel blocks within the plane of the embankment for the rolling compaction management in FIG. 7(a). [Figure 8] 1A is a schematic plan view of a portion of a voxel block in an embankment, and FIG. 1B is a diagram showing an example of the weighting values of each voxel block. [Figure 9]This is a plan view of a main part of a voxel block in an embankment, which is shown in schematic form to explain an example of the concept of determining the soil quality of the voxel block. [Figure 10] 11 is an explanatory diagram for explaining an example of a soil type determination method when the mixing ratios of different soil types are equal in soil type determination of a voxel block. FIG. [Figure 11] FIG. 13 is an explanatory diagram for explaining an example of soil type determination for a blank voxel block. [Figure 12] FIG. 13 is a diagram showing a three-dimensional image of the embankment site displayed on a display screen based on embankment site information. [Figure 13] 13(a) to 13(d) are diagrams showing three-dimensional images of a portion of the voxel block in FIG. 12. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0024] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. In the drawings for explaining the embodiment, the same components are generally designated by the same reference numerals, and the repeated description will be omitted.
[0025] FIG. 1 is a schematic overall configuration diagram showing the overall configuration of an embankment construction area and the overall configuration of an embankment management support system according to this embodiment.
[0026] The embankment construction management support system SS of this embodiment is a system that, for example, in embankment construction in which soil (embankment material) S from a borrow pit Pd is loaded onto a dump truck (transport vehicle) Dt and transported to an embankment Pm, and the soil S is unloaded at a filling location of the embankment Pm to carry out the embankment, enables the embankment construction during and after construction to be displayed on a display unit such as a monitor M or a printer P of an external device based on embankment construction information created based on information transmitted from the borrow pit Pd and the embankment Pm to a cloud server Sv, and manages and supports the embankment construction. The monitor M includes the screen of a personal computer in the office (not shown in FIG. 2) of the borrow pit Pd or the embankment Pm, as well as the screen of an external device such as a tablet (not shown) carried by a worker or a construction machine operator.
[0027] The borrow pit Pd is a place where the soil S to be piled up in the embankment Pm is stored. In the borrow pit Pd, the soil is stored in a state where, for example, in which position (storage area), what type of soil, how thick the layer, how much of the soil, whether impurities such as cement-based inclusions and slag are contained in the soil, etc. are known in advance through investigation. The stored soil information such as the storage area, layer thickness, boundary position where the soil type changes, amount, and presence or absence of impurities for each soil type are stored in advance in the secondary storage device of the cloud server Sv or the personal computer of the borrow pit Pd office (not shown in FIG. 1). The soil S in such a borrow pit Pd is excavated in the required amount for each soil type by, for example, multiple backhoes (loaders) Bh, and loaded into a dump truck Dt.
[0028] For example, an ICT (Information and Communication Technology) construction machine is used as the backhoe Bh. That is, an ICT information processing system (not shown) mounted on the backhoe Bh automatically measures the position (latitude and longitude) of the backhoe Bh in real time using, for example, a Global Navigation Satellite System (GNSS) that performs positioning using radio waves from multiple positioning satellites Sp, or a Total Station (TS) that performs positioning using equipment installed on the ground, and supports the operator of the backhoe Bh by displaying the difference between the design data for embankment construction and the on-site data (position information, construction information, and on-site situation information of the backhoe Bh, etc.) on an on-board monitor (not shown) installed in the operator's seat of the backhoe Bh.
[0029] In this embodiment, the soil quality of the soil S to be excavated in a given period is predetermined for each backhoe Bh. The on-board monitor of the backhoe Bh utilizing ICT is linked to an embankment construction management screen, and is configured to display backhoe construction instruction information such as how much soil (soil quality) from which storage area is to be excavated in which period. In the backhoe Bh utilizing more advanced ICT, automatic control is performed, for example, such as stopping the arm when attempting to excavate soil outside the designated range by mistake. This allows the operator of the backhoe Bh to check the excavation area (sand storage area) and excavation amount of the backhoe Bh in real time on the on-board monitor, thereby reducing or preventing human error such as excavating the wrong soil or excavating an excessive or insufficient amount.
[0030] In this embodiment, each backhoe Bh is equipped with a beacon (not shown) that uses, for example, BLE (Bluetooth Low Energy). Each beacon on each backhoe Bh has its own beacon ID (Identification) and transmits individual beacon ID information once every few seconds within a radius of several tens of meters. The beacon ID information of each beacon is unique information for each backhoe Bh.
[0031] The backhoe construction instruction information includes the construction period, excavation area (storage area for a specific soil and sand), and excavation volume of soil and sand for each beacon ID information of the beacon equipped on the backhoe Bh. This backhoe construction instruction information is stored in advance in a secondary storage device of the cloud server Sv or a personal computer in the office of the borrow pit Pd (not shown in FIG. 1).
[0032] The dump truck Dt is a transport vehicle for transporting the soil S loaded on the carrier by the backhoe Bh to the embankment Pm and unloading it at a designated embankment location. Note that, although there are cases where multiple dump trucks Dt transport the soil S from one borrow pit Pd to the embankment Pm, or cases where multiple dump trucks Dt transport the soil S from multiple borrow pits Pd to the embankment Pm, only one dump truck Dt is shown here for ease of viewing the drawing.
[0033] The dump truck Dt is equipped with a vehicle information processing system (not shown) that transmits vehicle information to a cloud server Sv. The vehicle information processing system includes a GPS (Global Positioning System) function unit, a beacon ID receiving unit, an unloading detection unit, a storage unit that stores information, and a transmitting unit that transmits the acquired information to the cloud server Sv. When the vehicle information processing system is installed, the name of the vehicle information processing system is registered (stored in the storage unit of the vehicle information processing system), and the name is unique information of the dump truck Dt.
[0034] The GPS function unit of the vehicle information processing system is a device that calculates the position (latitude and longitude) of the dump truck Dt by utilizing radio waves transmitted from multiple positioning satellites Sp. The vehicle information processing system transmits vehicle position information of the dump truck Dt obtained by the GPS function unit (position information of the dump truck Dt, date and time information when the position was calculated, and unique information of the dump truck Dt, etc.) to the cloud server Sv at a rate of once per minute via a transmission unit compatible with LTE (Long Term Evolution). Information on the driving route and movement amount of the dump truck Dt created based on this vehicle position information is stored in the cloud server Sv as embankment site information.
[0035] The beacon ID receiving unit of the vehicle information processing system is a device that receives beacon ID information transmitted from a beacon equipped on the backhoe Bh. When the vehicle information processing system receives the beacon ID information, the vehicle information processing system stores the beacon ID information in a storage unit of the vehicle information processing system, and transmits loading position information of the dump truck Dt (beacon ID information of the backhoe Bh, position information of the dump truck Dt loaded with the soil S, date and time information when the position was calculated, unique information of the dump truck Dt loaded with the soil S, etc.) to the cloud server Sv via the transmitting unit.
[0036] The unloading detection unit of the vehicle information processing system is a device that detects the unloading of the dump truck Dt in response to detection signals sent from, for example, a contact sensor that detects that the driver of the dump truck Dt has touched the dump up lever and an acceleration sensor that detects the stop of the dump truck Dt. When unloading is detected, the vehicle information processing system transmits unloading position information of the dump truck Dt (position information of the dump truck Dt that unloaded the load, date and time information when the position was calculated, unique information of the dump truck Dt that unloaded the load, and beacon ID information of the backhoe Bh of the borrow pit Pd that loaded the soil S on the unloaded dump truck Dt, etc.) to the cloud server Sv via the above-mentioned transmission unit.
[0037] On the other hand, the embankment site Pm is a place where embankment construction is carried out to build the foundations of buildings such as housing sites and roads. A plurality of backhoes (not shown) and vibratory rollers (compactors) Rv are installed at the embankment site Pm. Note that only one vibratory roller Rv is shown here for ease of viewing the drawing.
[0038] The soil S that is transported to the embankment site Pm by the dump truck Dt and unloaded is spread evenly to a specified thickness in each specified area by a backhoe, then compacted by a vibrating roller Rv, and then the slope is shaped by the backhoe to give it the desired shape. For example, ICT construction machines are used as the backhoes and vibrating rollers Rv deployed at this embankment site Pm.
[0039] The ICT information processing system (compaction information processing system: not shown) mounted on the vibratory roller Rv automatically measures the position (latitude and longitude) of the vibratory roller Rv in real time, for example, by the above-mentioned GNSS, TS, etc., and counts the number of compactions by collating a plurality of compaction blocks RB (see FIG. 7 shown later) arranged in a mesh pattern for embankment construction described later with on-site data (position information of the vibratory roller Rv, construction information, site situation information, etc.). That is, the ICT information processing system of the vibratory roller Rv counts the number of compactions by counting how many times the vibratory roller Rv has passed the same compaction block RB from the running track of the vibratory roller Rv. The result is displayed on an in-vehicle monitor (not shown) installed in the driver's seat of the vibratory roller Rv to support the operator of the vibratory roller Rv. This allows the operator of the vibratory roller Rv to check the running track of the vibratory roller Rv, the number of compactions, etc. on the in-vehicle monitor in real time. In addition, the compaction distribution map is displayed in color on the in-vehicle monitor of the vibratory roller Rv. This allows the vibratory roller operator to carry out work while checking the color-coded compaction distribution map on the onboard monitor in real time. The onboard monitor of the vibratory roller RV also displays which areas have been compacted by how many revolutions, making it possible to see which areas have not been compacted enough. Since problems can occur if the number of compactions is too many, the system also provides support for adhering to the number of compaction cycles. This makes it possible to quickly manage the entire layer of the embankment, prevents insufficient compaction cycles due to human error, and ensures uniform quality. Furthermore, as the compaction information is stored, it can be used as an embankment management chart.
[0040] The ICT information processing system mounted on the vibrating roller Rv is adapted to calculate an acceleration response value (Compaction Control Value, hereinafter referred to as CCV value) by arithmetic processing of a vibration acceleration waveform obtained by an acceleration sensor mounted on the roller part of the vibrating roller Rv. The ICT information processing system of the vibrating roller Rv is adapted to transmit the compaction information of the vibrating roller Rv (position information of the vibrating roller, date and time information when the position was calculated, compaction count information, CCV value information, etc.) to the cloud server Sv via, for example, an LTE-compatible transmission unit.
[0041] The vehicle information (loading position information, vehicle position information, and unloading position information) of the dump truck Dt is sent to the server Sv1 of the cloud server Sv, and is further sent to the server Sv3 via the access server Sv2 and stored therein. Based on the unloading position information and the soil master information previously stored in the cloud server Sv, unloading soil information (dump-up information) (described later) describing the soil quality of the unloaded soil is created and stored. The rolling information of the vibrating roller Rv is sent to the server Sv3 of the cloud server Sv and stored therein, and the unloading soil information and the rolling information of the vibrating roller Rv are combined to create and store embankment site information (traceability information).
[0042] Next, Fig. 2 is a schematic configuration diagram of the embankment construction management support system of Fig. 1. Note that Fig. 2 shows a simplified server configuration of the cloud server Sv.
[0043] The cloud server Sv includes a communication interface 10, a central processing unit (CPU) 11, a read only memory (ROM) 12, a random access memory (RAM) 13, and a secondary storage device 14.
[0044] The communication interface 10 is a functional unit that transmits and receives information between external devices (a personal computer in the office Fd of the borrow pit Pd, a vehicle information processing system of the dump truck Dt, a personal computer in the office Fm of the embankment Pm, and a rolling information processing system of the vibratory roller Rv of the embankment Pm, etc.).
[0045] The CPU (information processing unit) 11 is a device that controls the overall operation, and is electrically connected to and accessible from the communication interface 10, ROM 12, RAM 13, and secondary storage device 14 via a system bus (not shown). The ROM 12 is a memory in which various control programs and various parameters are stored in advance, and the RAM 13 is a memory used as a work area when the CPU 11 executes various processing programs.
[0046] In addition, the CPU 11 sends and receives various information to and from external devices connected to the network via the communication interface 10 (the vehicle information processing system of the dump truck, the ICT information processing system of the vibrating roller, the personal computer in the borrow pit office, the personal computer in the embankment site office, etc.), and stores the sent information (loading position information, vehicle position information, unloading position information, soil quality master information, backhoe construction instruction information, stored soil information, etc.) and the created information (unloading soil quality information and embankment site information) in the secondary memory device 14.
[0047] The personal computers (not shown) in the offices Fd, Fm of the borrow pit Pd and the embankment pit Pm are electrically connected to the communication interface 10 of the cloud server Sv via an Internet line or the like. The management workers in the offices Fd, Fm of the borrow pit Pd and the embankment pit Pm can access the embankment construction management site through their personal computers and log in to the site by inputting a specified ID and password, thereby viewing information on the site displayed on the monitor M (see FIG. 1), adding information, modifying information, and printing information such as forms through the printers P (see FIG. 1) in the offices Fd, Fm.
[0048] The secondary storage device (storage unit) 14 is a storage device for storing various information, and is composed of, for example, a hard disk. In addition to various program files such as an embankment construction management program file PF1 and an embankment site information application program file PF2, the secondary storage device 14 stores a plurality of information files such as a setting file DF1, a soil master information file DF2, a stored soil information file DF3, a backhoe construction instruction information file DF4, a vehicle position information file DF5, a loading position information file DF6, an unloading position information file DF7, an unloading soil information file DF8, a rolling information file DF9, an embankment site information file DF10, and other information files.
[0049] The embankment construction management program file PF1 is a file that stores a program that supports the entire embankment construction process. The embankment site information application program file PF2 is a file that stores an application program that judges the soil quality of each embankment location in the embankment site and creates embankment site information.
[0050] The setting file DF1 stores information required for logging in to the embankment construction management site. Figure 3 shows an example of a setting file. The setting file DF1 stores a tenant ID, a site ID, a user name, a password, etc. The tenant ID is an ID that identifies the company, and is displayed as "tenant_id" on the management screen. The site ID is an ID that identifies the work site, and is displayed as "site_id" on the management screen. The user name is the login user name, and is displayed as "user_name" on the management screen. The password is the password used when logging in to the embankment construction management site, and is displayed as "password" on the management screen.
[0051] The soil master information file DF2 in Fig. 2 stores beacon ID information of the backhoe Bh at the borrow pit Pd and information on the soil type that the backhoe Bh excavates in a predetermined period of time. This soil master information is stored in advance in the secondary storage device 14 of the cloud server Sv from, for example, a personal computer in the office of the borrow pit Pd.
[0052] FIG. 4(a) is a diagram showing an example of soil master information, and FIG. 4(b) is a diagram showing an example of how to set soil master information. The "terminal_tag" item in FIG. 4(a) is the beacon ID information of the backhoe. This beacon ID information is indicated by characters such as BL02-0002, BL02-0003, etc. in FIG. 4(b). The "start period and end period of application" item in FIG. 4(a) is the period during which a specific backhoe Bh excavates soil of a specific soil type, and is indicated by date (YYYYMMDD). That is, for example, as shown in "start_date, end_date" in FIG. 4(b), it is indicated by "20191001, 20191231", etc. The "soil type name" in the item of Fig. 4(a) is the name of the soil type, and is shown as, for example, "2nd borrow pit, sand, clayey soil, 1st borrow pit, sand" as shown in "soil_type" in Fig. 4(b). In addition to the above, other soil types include, for example, gravelly soil, ordinary soil, boulders, improved soil, crushed stone, and gravel.
[0053] The stored sediment information file DF3 in Fig. 2 stores the stored sediment information. The stored sediment information includes information such as the location (sand storage area), the type of soil, the layer thickness, and the amount of sediment S that is stored. This stored sediment information is stored in advance, for example, in a secondary storage device of a personal computer in the office of the borrow pit Pd, or in the secondary storage device 14 of the cloud server Sv from the personal computer or the like.
[0054] The backhoe construction instruction information file DF4 stores backhoe construction instruction information. The backhoe construction instruction information includes beacon ID information of each backhoe Bh in the borrow pit Pd, and for each beacon ID information, the construction period, excavation position (sand storage area), and excavation volume of the soil. This backhoe construction instruction information is stored in advance, for example, in a secondary storage device of a personal computer in the office of the borrow pit Pd or in the secondary storage device 14 of the cloud server Sv from the personal computer.
[0055] The vehicle position information file DF5 stores vehicle position information (position information of the dump truck Dt, information on the date and time when the position was calculated, and information specific to the dump truck Dt) sent from the vehicle information processing system of the dump truck Dt to the cloud server Sv. Based on this vehicle position information, the operating route and movement amount of the dump truck Dt during movement are calculated and stored in the secondary storage device 14 as embankment site information.
[0056] The loading position information file DF6 stores the loading position information (beacon ID information of the backhoe Bh, position information of the dump truck Dt loaded with soil S, date and time information when the position was calculated, and unique information of the dump truck Dt loaded with soil S) sent from the vehicle information processing system of the dump truck Dt to the cloud server Sv when the backhoe Bh loads soil S onto the dump truck Dt at the borrow pit Pd.
[0057] The unloading position information file DF7 stores the unloading position information sent from the vehicle information processing system of the dump truck Dt to the cloud server Sv when the dump truck Dt unloads at the embankment site Pm (position information of the dump truck Dt that unloaded, the date and time information when the position was calculated, unique information of the dump truck Dt that unloaded, and the beacon ID information of the backhoe Bh that loaded the soil S at the borrow pit Pd onto the dump truck Dt that unloaded).
[0058] The unloading soil information file DF8 stores unloading soil information describing the soil quality of the soil S unloaded at the embankment site Pm (position information of the dump truck Dt that unloaded, the date and time information when the position was calculated, unique information of the dump truck Dt that unloaded, beacon ID information of the backhoe Bh that loaded the soil S onto the unloading dump truck Dt at the borrow pit Pd, and soil quality information of the unloaded soil S).
[0059] As the unloading soil information, for example, information on the height of the unloading position of the dump truck Dt and information on the unloading range may be added. In addition, since the rear end of the bed of the dump truck Dt in a plan view (the position where the soil S is actually unloaded) is away from the GPS function unit that calculates the position of the dump truck Dt, a correction may be made by adding the distance between the rear end of the bed of the dump truck Dt and the GPS function unit to the position calculated by the GPS function unit.
[0060] This unloading soil information is created by the CPU 11 based on the unloading position information and the soil master information exemplified in FIG. 4. That is, the CPU 11 automatically determines the soil quality of the unloaded soil and sand by finding the relevant beacon ID information from the soil master information exemplified in FIG. 4 based on the beacon ID information of the backhoe Bh of the unloading position information and the date and time information, and stores the determined soil quality in the secondary storage device 14. In this manner, in the present embodiment, the information is linked so that the soil quality of the unloaded soil and sand S can be automatically determined by the beacon ID information of the backhoe Bh at the borrow pit Pd. Therefore, at the borrow pit Pd, it is not necessary for the worker to check the soil quality of the soil and sand S loaded on the dump truck Dt or to input the soil quality. Therefore, it is possible to prevent the work at the borrow pit Pd from stagnation, and the efficiency of the embankment construction work can be improved. In addition, it is possible to eliminate human error when inputting information, and therefore the traceability of the embankment pit can be improved.
[0061] FIG. 5 is a diagram showing an example of unloading soil quality information. The latitude and longitude items indicate the position information of the dump truck Dt that unloaded at the embankment Pd. The time item indicates the date and time information when the position of the unloading dump truck Dt was calculated. The borrow pit ID item indicates the beacon ID information (terminal_tag) of the backhoe Bh that loaded the soil on the dump truck Dt at the borrow pit Pd. These positions, dates and times, and borrow pit ID are automatically acquired from the unloading position information described above. Furthermore, the soil quality name item indicates the name of the soil quality of the soil unloaded by the dump truck Dt at the embankment Pm. As described above, this soil quality name is automatically acquired based on the unloading position information and the soil quality master information illustrated in FIG. 4.
[0062] 2 stores the compaction information (position information of the vibrating roller Rv, date and time information when the position was calculated, number of compactions information, CCV value information, etc.) sent from the compaction information processing system of the vibrating roller Rv at the embankment site Pm to the cloud server Sv. The position information of the vibrating roller Rv is indicated by, for example, latitude and longitude.
[0063] The embankment information file DF10 stores embankment information indicating the soil quality of each embankment location of the embankment site Pm. This embankment site information is created by the CPU 11 based on the above-mentioned unloaded soil quality information and the above-mentioned rolling compaction information. That is, the CPU 11 generates a plurality of voxel blocks (not shown in FIG. 2) arranged in a mesh shape by dividing the entire embankment site Pm into a plurality of cubes that can be set to a predetermined dimension, and determines the soil quality of each of the plurality of voxel blocks based on the above-mentioned unloaded soil quality information and the above-mentioned rolling compaction information to create embankment site information (three-dimensional construction information of the embankment site) and store it in the secondary storage device 14. The plurality of voxel blocks of the embankment site Pd correspond to the mesh blocks described in the above-mentioned Patent Document 1. An example of a method for determining the soil quality of each of the voxel blocks will be described later.
[0064] Figure 6 shows an example of embankment site information. The X and Y items indicate the central coordinates of the voxel block, H indicates the elevation of the voxel block, and the planned elevation is the planned elevation. The units for the central X coordinate, central Y coordinate, elevation, and planned elevation are "m." The construction date and time items are the date and time information of the unloading, and are shown in year / month / day (YYYYMMDD format) and hour / minute / second (HHMMSS format), respectively. These are automatically obtained from the unloading soil information.
[0065] The layer thickness of the item indicates the thickness of the voxel block, the layer number of the item indicates the layer number of the voxel block, and the size of the item indicates the dimensions of the voxel block. The specified number of times is the specified value for the number of compactions. The moisture content of the soil S is used to calculate the required number of compactions. A test construction is carried out in advance to confirm the allowable range of the moisture content of the soil S that exhibits the specified performance, and it is confirmed that the moisture content of the soil S is within the allowable range when the soil S is excavated by the backhoe Bh. The amount of moisture that evaporates from the soil S when the dump truck Dt transports it is ignored because it is very small. The number of compactions of the item is the number of compactions performed by the vibrating roller Rv. The temperature of the item is the surface temperature of the piled soil, and is expressed in "℃". The 5m mesh vertical position of the item indicates the vertical position of the 5m voxel block, and the 5m mesh horizontal position of the item indicates the horizontal position of the 5m voxel block. These are automatically obtained from the compaction information.
[0066] The soil type information of an item is the soil type name automatically obtained from the unloaded soil type information (i.e., the soil type master information shown in Fig. 4) described above. The soil mixing ratio of an item is the mixing ratio of soil and sand of different soil types contained in one voxel block. The mixing ratio is indicated as the input ratio, and the unit is "%". When multiple soil types are mixed, the soil types defined in the soil type master information in Fig. 4 are separated by a full-width comma ",", such as "sand, clayey soil, first borrow pit". This soil mixing ratio is automatically determined and obtained by combining the unloaded soil type information and compaction information described above.
[0067] Next, an example of a method for determining the soil type of each of a plurality of voxel blocks created by dividing the entire area of the above-mentioned embankment site Pm into a mesh will be described with reference to FIG. 2 and FIGS. 7 to 12. FIG.
[0068] First, in this embodiment, the CPU 11 (see FIG. 2) divides the entire area of the embankment site Pm into a plurality of cubes whose dimensions can be set in advance in the data, thereby generating a plurality of voxel blocks arranged in a mesh pattern. The shapes of the voxel blocks are all uniform (at this stage, changes in height due to compaction are ignored). The size of each voxel block is, for example, based on the load of soil and sand equivalent to about one 10-ton dump truck, and is 5 m x 5 m x 0.3 m (width x depth x height). The data of the voxel blocks is stored in the secondary storage device 14 as point cloud data. The dimensions (width x depth x height) and number of the voxel blocks can be set and changed, for example, by accessing and logging in to the embankment construction management site via a personal computer in the office Fm of the embankment site Pm.
[0069] Here, FIG. 7(a) is a plan view of the main part of the embankment used in the rolling compaction management. In the rolling compaction management, the rolling information (number of times of rolling, CCV value, etc.) is managed for each of a plurality of rolling blocks RB arranged in a mesh pattern over the entire area of the embankment Pm. Each rolling block RB in the rolling compaction management is composed of a plurality of cubes that can be set to a predetermined dimension, and the planar dimensions of each are, for example, 50 cm x 50 cm. This is because the width of a general vibrating roller Rv is about 1.0 to 1.5 m, and therefore accurate management is not possible with the width of the above voxel block. The mesh origin Ps is determined from the minimum value of the X-axis and Y-axis that are perpendicular to each other.
[0070] FIG. 7(b) is a plan view of the main part of the embankment field for compaction management in FIG. 7(a), in which voxel blocks are arranged in the plane. The symbol VB indicates a voxel block. As described above, the planar dimensions of the voxel block VB are, for example, 5m x 5m, so when generating the voxel block VB, a 5m area from the mesh origin Ps is defined as one voxel block VB. In this case, the soil type is set for each voxel block VB. Therefore, the soil type of multiple compaction blocks RB in the same voxel block VB is the same. However, as described above, the compaction information is set for each compaction block RB, so that the number of compactions, CCV values, etc. may differ even for compaction blocks RB in the same voxel block VB. The compaction block RB and the number of compactions, etc. are recorded as background data and do not affect the judgment of the soil type of the voxel block VB.
[0071] Next, the soil type of each voxel block VB is determined. When determining the soil type of a voxel block VB, the soil type of the soil unloaded into the voxel block VB can be determined as the soil type of the voxel block VB as it is. However, soil S from different borrow pits Pd or soil S loaded by different backhoes Bh may be unloaded into one or adjacent voxel blocks VB. In reality, the unloaded soil is often not limited to the unloading position but spreads to the surrounding area, resulting in the soil being mixed with each other. Therefore, in this embodiment, the soil type of each voxel block VB is determined as follows, assuming that the unloaded soil spreads from the unloading position to the surrounding area, mainly based on the unloading soil information described above.
[0072] Fig. 8(a) is a schematic plan view of a portion of a voxel block in an embankment. First, the center of gravity Pc in the plane of each voxel block VB (VBa to VBi) is found. The center of gravity Pc is the center point in the plane of each voxel block. Next, the distances from the unloading position Pu to the center of gravity Pc of each of the eight voxel blocks VBa to VBd, VBf to VBh, which are adjacent to the outer peripheral face or side of the voxel block VBe and are in the same layer as the voxel block VBe, are calculated.
[0073] Next, a weighting value is calculated based on the distance between the unloading position Pu and the center of gravity position Pc of each voxel block VBa to VBi. The weighting value indicates how much of the unloaded soil was mixed into each voxel block VBa to VBi, and is calculated by calculating the distance ratio (1 / (distance / total distance)) and then taking the reciprocal of the ratio.
[0074] Fig. 8(b) is a diagram showing an example of the weighting value of each voxel block. It is assumed that the unloaded soil and sand spreads to each of the voxel blocks VBa to VBi in proportion to the inverse of the distance from the unloading position Pu. Therefore, the weighting value of the voxel block VBe at the unloading position Pu is the highest (e.g., 52.90), and the weighting value of the voxel block VBg farthest from the unloading position Pu is the smallest (e.g., 5.81). Note that the weighting value is rounded to two decimal places.
[0075] Next, the ratio of the weighting value for each soil type is calculated using the weighting values calculated as above (in the example of Figure 8(a) , the sum of the weighting values for each soil type relative to the total weighting value for the central voxel block VB and its surrounding eight voxel blocks VB (total of nine)) to calculate the soil / sand mixing ratio for each soil type in each voxel block VBa to VBi, and the soil type with the highest mixing ratio is determined to be the soil type of that voxel block VBa to VBi. Each soil type and its mixing ratio are stored as background data for each voxel block VBa to VBi.
[0076] FIG. 9 is a schematic plan view of a part of a voxel block of an embankment to explain an example of the concept of soil type determination of a voxel block. In FIG. 9, the symbols Sa to Sd in parentheses of each unloading position Pu indicate the soil type. Here, different hatching is applied to each soil type Sa to Sd to make the drawing easier to see. In FIG. 9, for ease of explanation, 10 unloading positions Pu are shown for one voxel block VBa, VBb, VBd, and VBe, but in reality, there are about 2 to 4 positions. In FIG. 9, for ease of explanation, the weighting described above is not taken into consideration, and the soil types Sa to Sd are determined only by the number of unloading positions Pu.
[0077] As shown in the upper part of Fig. 9, in the voxel block VBa, the soil type Sa is 70% and the soil type Sb is 30%, so that the voxel block VBa is determined to have the soil type Sa as shown in the lower part of Fig. 9. Also, as shown in the upper part of Fig. 9, in the voxel block VBb, the soil type Sc is 100%, so that the voxel block VBb is determined to have the soil type Sc as shown in the lower part of Fig. 9. Also, as shown in the upper part of Fig. 9, in the voxel block VBd, the soil type Sa is 10%, the soil type Sb is 80%, and the soil type Sc is 10%, so that the voxel block VBd is determined to have the soil type Sb as shown in the lower part of Fig. 9. Also, as shown in the upper part of Fig. 9, in the voxel block VBe, the soil type Sa is 10%, the soil type Sb is 20%, the soil type Sc is 10%, and the soil type Sd is 60%, so that the voxel block VBe is determined to have the soil type Sd as shown in the lower part of Fig. 9.
[0078] Fig. 10 is an explanatory diagram for explaining an example of a soil type determination method when the mixing ratios of different soil types are equal in the soil type determination of a voxel block. When the mixing ratios of different soil types Sa and Sb are equal in one voxel block VB, the soil type Sb is determined to be the soil type Sb of the soil that was unloaded later. For example, as shown in the upper part of Fig. 10, if the soil type Sa was unloaded at 10:10, and as shown in the middle part of Fig. 10, the soil type Sb was unloaded at 14:30, the voxel block VB is determined to be the soil type Sb, as shown in the lower part of Fig. 10.
[0079] In this embodiment, the soil type of each voxel block VB is determined on the assumption that the soil S unloaded from the dump truck Dt at the embankment site Pm spreads from the unloading position Pu to the surrounding area, thereby improving the reliability of the soil type determination and improving the reliability of the embankment site information. Therefore, the traceability of the embankment site Pm can be improved.
[0080] In the above soil type determination, there may be cases where blank voxel blocks VB for which soil type determination has not been performed in the data (i.e., soil type information has not been stored) are generated due to the topography of the embankment site Pm, etc. In this embodiment, when the above unloading soil type information and the above rolling compaction information are combined to create embankment site information, the rolling compaction information obtained by actually performing rolling compaction work is used to find blank voxel blocks VB for which soil type determination has not been performed in the data, and the soil type of the blank voxel blocks VB is determined.
[0081] FIG. 11 is an explanatory diagram for explaining an example of soil type determination of a blank voxel block. In FIG. 11, a dump truck Dt enters the voxel block VB on the left side of the upper part and unloads the load, but the voxel block VBm on the right side of the upper part of FIG. 11 is not directly unloaded, so a blank voxel block VBm is generated. When determining the soil type of the blank voxel block VBm, as shown in the lower part of FIG. 11, the soil types of 10 unloading positions Pu within a reference circle RS (a circle shown by a broken line in the lower part of FIG. 11) from the center of gravity position Pc of the blank voxel block VBm are referenced, and the soil type that is most prevalent among the 10 points is determined to be the soil type of the blank voxel block VBm. Here, six points of the unloading position Pu are soil type Sd, and four points of the unloading position Pu are soil type Sc, so the soil type of the blank voxel block VBm is determined to be soil type Sd. In reality, the soil in an empty voxel block VBm where no direct unloading takes place flows in from nearby locations, and the soil quality of the soil unloaded at closer locations is greater, so by determining the soil quality of the empty voxel block VBm as the soil quality of the empty voxel block VBm that is most prevalent among the unloading positions Pu closest to the empty voxel block VBm, the soil quality of the empty voxel block VBm can be set to a more realistic soil quality, allowing for more accurate management of the embankment. In addition, by specifying a reference circle RS centered on the center of gravity Pc of the blank voxel block VB when selecting the reference soil quality, the selection range can be narrowed down, improving the calculation processing speed.
[0082] As another method, the number of unloading positions Pu to be referenced (reference points) does not have to be limited to 10, but the reference points can be specified by making the reference circle RS centered on the center of gravity Pc of the blank voxel block VBm larger or smaller until that reference point number is reached, and the soil type with the most points within the reference circle RS when the reference point number is reached can be determined to be the soil type of the blank voxel block VBm.
[0083] As another method, the size of the reference circle RS may be specified from the beginning, and the soil type with the highest score within the reference circle RS may be determined to be the soil type of the blank voxel block VBm. In this case, it may be considered that the soil type of the blank voxel block VBm is only affected up to the voxel block VB immediately adjacent to the blank voxel block VBm, so it is preferable that the diameter of the reference circle RS does not include the unloading position Pu of the voxel block VB adjacent to the blank voxel block VBm. In this example, it is preferable that the diameter of the reference circle RS does not exceed, for example, 7.5 m.
[0084] In this manner, in this embodiment, embankment site information (see FIG. 6) is created that stores detailed information on soil quality in multiple voxel blocks VB throughout the entire embankment site Pm. The state of the embankment site created using this embankment site information can be viewed in three dimensions on a display screen such as the monitor M (see FIG. 1).
[0085] FIG. 12 is a diagram of a three-dimensional image of the embankment site displayed on a display screen based on the embankment site information, and FIGS. 13(a) to (d) are diagrams of three-dimensional images showing a portion of the voxel block of FIG.
[0086] As shown in Fig. 12, the state of the embankment Pm is displayed three-dimensionally on the display screen. On the display screen, the shapes of the voxel blocks VB are all uniform. However, when displayed on the display screen, the height (shape) of the voxel blocks VB may be corrected to reflect changes due to compaction.
[0087] Furthermore, on the display screen, each voxel block VB is displayed in a different color according to the soil type, for example. This allows the soil condition of the embankment site Pm to be displayed in a more easily understandable manner. The color of the voxel block VB may represent the soil mixture ratio by the transmittance. In Fig. 12 and Fig. 13, the color of the voxel block VB is shown by hatching instead.
[0088] In this way, in this embodiment, a simplified image of the embankment site Pm is displayed on a display screen such as the monitor M. This makes it easier to determine the soil information of the embankment site Pm. This makes it possible to reduce or prevent mistakes in embankment work during construction, and to improve the efficiency of work to trace the construction quality and construction status history after construction of the embankment.
[0089] Also, the name and mixture ratio of the representative soil type for each voxel block VB can be displayed on the display screen by a pop-up method or the like. Also, as shown in FIG. 13(a), it is possible to take out and display only a group of some voxel blocks VB, or as shown in FIG. 13(b) and (c), it is possible to remove some voxel blocks VB from a group of voxel blocks VB and display the internal voxel blocks VB, or to display each voxel block VB in cross section in the width direction, depth direction and height direction. Also, as shown in FIG. 13(c), it is possible to show only the voxel blocks VB of a specific soil type (for example, soil type Sc) by showing the inside of the group of voxel blocks VB through a see-through view. Furthermore, it is possible to display the embankment condition at a specific date and time for each voxel block VB by using characters or the like.
[0090] Here, in the construction of embankments, soil and sand are brought in from multiple borrow pits Pd, and the borrow pits may change depending on the schedule, and the amount of information is large and complicated, so manual information input often does not record information such as which location of which borrow pit Pd the soil was shipped from, and how much soil and sand was used in which area. For this reason, even if the ground swells due to impurities (cement-based inclusions, slag, etc.) contained in the embankment, or the ground subsides due to insufficient rolling or a decrease in the compaction degree of the clay, it is often impossible to identify the cause of such defects. Furthermore, even if the cause of the defect can be identified, investigations and preventive measures cannot be taken unless it is known where the soil and sand are used.
[0091] In contrast to this, in the present embodiment, a huge amount of information is stored in linked form for each of the multiple voxel blocks VB that make up the embankment site Pm in the data, such as how much soil and sand was unloaded from which location in which borrow pit, the number of times it was compacted, and the CCV value at which it was compacted, and specific information can be retrieved from this huge amount of information in a short time by relatively simple operations.
[0092] For this reason, it is possible to look back on the information about soil and sand at a given location in the embankment Pm with relatively simple operations, making it easy to identify the cause of any problems that may occur, such as swelling or subsidence of the ground. In addition, it is also possible to know where the soil and sand that caused the problem was used, making it possible to investigate and take preventive measures in other locations where that soil and sand is used before any problems occur.
[0093] The invention made by the inventor has been specifically described above based on the embodiment, but the embodiment disclosed in this specification is illustrative in all respects and is not limited to the disclosed technology. In other words, the technical scope of the present invention should not be interpreted restrictively based on the description in the above embodiment, but should be interpreted strictly according to the description in the claims, and includes technologies equivalent to the described technologies in the claims and all modifications that do not deviate from the gist of the claims.
[0094] For example, the backhoe Bh and vibratory roller Rv do not necessarily have to be ICT construction machines, and may be operated entirely by a human operator as in the past. However, even in this case, the backhoe Bh must be equipped with a beacon and periodically transmit beacon ID information.
[0095] Furthermore, it is not necessary that all of the information files DF1 to DF10 are stored in advance in the server Sv. For example, the soil master information file DF2 may be stored in the beacon of the backhoe Bh, and the dump truck Dt may receive it together with the beacon ID information and transmit it to the cloud server Sv. [Industrial Applicability]
[0096] The above explanation shows the application of the embankment construction management support system of the present invention to embankment construction for laying foundations for buildings such as housing sites and roads, but it can also be applied to embankment construction for creating parks, golf courses, etc. [Explanation of symbols]
[0097] 10 Communication Interface 11 CPU 12 ROM 13 RAM 14 Secondary storage SS Embankment construction management support system Sp Positioning satellite Pd Borrow Pit Pm Embankment site Fd,Fm office M Monitor P Printer Bh Backhoe Dt Dump Truck Rv Vibration Roller S. Soil Sa~Sd soil quality Sv cloud server Sv1 Server Sv2 Access Server Sv3 Server PF1 Embankment construction management program file PF2 Embankment information application program file DF1 configuration files DF2 Soil Master Information File DF3 Storage sediment information file DF4 Backhoe Construction Instructions DF5 Vehicle Location File DF6 Loading Position Information File DF7 Unloading Location Information File DF8 Unloaded Soil Information File DF9 Compaction Information File DF10 Embankment information file RB Rolling Block VB, VBa~VBi Voxel Block Ps Mesh origin PC center of gravity position Pu Unloading position Rs Reference Yen
Claims
1. In an embankment construction project in which embankment materials excavated by a loading machine at a borrow pit are loaded onto a transport vehicle and transported to an embankment site, and the embankment materials are unloaded at a filling location at the embankment site and compacted by a compactor to form an embankment, the embankment construction management support system manages and supports the construction of the embankment using embankment site information created based on information acquired at the borrow pit and the embankment site and transmitted to a server, The loading machine includes a transmission terminal that transmits unique information of the loading machine, The transport vehicle includes a vehicle information processing system that transmits information about the transport vehicle to the server, The vehicle information processing system includes: a function of calculating a position of the transport vehicle and transmitting vehicle position information including the calculated position information and date and time information when the calculated position information is calculated to the server; a function of acquiring unique information of the loader transmitted from the transmitting terminal, and transmitting to the server loading position information including position information of the transport vehicle on which the embankment material has been loaded by the loader, date and time information on when the position information was calculated, unique information of the transport vehicle on which the embankment material has been loaded by the loader, and unique information of the loader; a function of detecting the unloading of the transport vehicle and transmitting unloading position information to the server, the unloading position information including the position information of the transport vehicle that unloaded the load, the date and time information when the position information was calculated, the unique information of the transport vehicle, and the unique information of the loading machine that loaded the embankment material onto the transport vehicle; Equipped with The rolling machine includes a rolling information processing system that transmits information about the rolling machine to the server, The rolling information processing system includes: a function of calculating the position of the roller compactor and transmitting to the server roller compaction information including the position information, date and time information when the position information was calculated, the number of roller compactions calculated based on the position information, and an acceleration response value created based on the measurement value of an accelerometer provided on the roller compactor; Equipped with The server includes a storage unit that stores information and an information processing unit that processes the information, The storage unit has soil master information stored in advance, the soil master information indicating unique information of the loading machine and information on the soil to be excavated by the loading machine in a predetermined period of time, The information processing unit includes: A function for generating a plurality of voxel blocks arranged in a mesh shape by dividing the embankment into a plurality of cubes that can be set to a predetermined dimension; A function of creating unloading soil information including unloading position information of the transport vehicle, date and time information when the position information was calculated, and soil quality information of the unloaded embankment material based on the unloading position information and the soil quality master information, and storing the information in the storage unit; a function of determining the soil quality of each of the plurality of voxel blocks based on the unloading soil quality information and the rolling compaction information, creating the embankment site information, and storing the information in the storage unit; having a soil type determination unit that determines the soil type of each of the plurality of voxel blocks based on the soil type determination information and the compaction information; and a step of determining the soil type of the embankment material of each of the plurality of voxel blocks based on the soil type determination information and the compaction information. The method of the present invention provides an embankment construction management support system that determines the soil type of each of the plurality of voxel blocks based on the soil type determination information and the compaction information. The method of the present invention provides an embankment construction management support system that determines the soil type of each of the plurality of voxel blocks based on the soil type of the embankment material of each of the plurality of voxel blocks based on the soil type of the embankment material of each of the plurality of voxel blocks.
2. The embankment construction management support system described in claim 1, characterized in that in calculating the mixing ratio of embankment material of each soil type in each voxel block, a weighting value indicating how much of the unloaded embankment material is mixed into each voxel block based on the distance is calculated from the inverse of the ratio of the distance from the unloading position to the center of gravity of each voxel block, and the mixing ratio of embankment material of each soil type in each voxel block is calculated by calculating the ratio of the weighting value of each soil type using the weighting value.
3. The embankment construction management support system according to claim 2, characterized in that the weighting value is calculated for the voxel block containing the unloading position and for the surrounding voxel blocks in the same layer as the voxel block and in contact with the outer faces or edges of the voxel block.
4. The embankment construction management support system described in any one of claims 1 to 3, characterized in that in determining the soil type of the blank voxel block, the soil type of a predetermined number of unloading positions close to the center of gravity of the blank voxel block is referenced, and the soil type that is most prevalent among the soil types of the unloading positions is determined to be the soil type of the blank voxel block.
5. The embankment construction management support system of any one of claims 1 to 3, characterized in that in determining the soil type of the blank voxel block, a reference point number, which is the number of unloading locations to be referenced for determining the soil type, is specified in advance, a reference circle centered on the center of gravity of the blank voxel block is enlarged until it reaches the reference point number, and the soil type with the highest number of points within the reference circle when the reference point number is reached is determined to be the soil type of the blank voxel block.
6. The embankment construction management support system described in any one of claims 1 to 3, characterized in that in determining the soil type of the blank voxel block, the size of a reference circle centered on the center of gravity of the blank voxel block is specified in advance, and the soil type with the highest number of points within the reference circle is determined to be the soil type of the blank voxel block.
7. 7. The embankment construction management support system according to claim 1, wherein soil information obtained by the soil quality judgment is added to each of the voxel blocks.
8. An embankment construction management support system as described in any one of claims 1 to 7, characterized in that in determining the soil quality of the voxel block, if the mixing ratio of different soil types is the same, the soil quality is determined to be that of embankment material unloaded at a relatively later date and time.
Citation Information
Patent Citations
Compaction quality control method
JP2005030073A
Embankment management support system
JP2006291454A
Material management system, material management method, and material management program
JP2009102894A
Construction support system in earthwork
JP2009243039A