Parts Supply System

The parts supply system balances workload across multiple work lines by using an acquisition and designation unit to distribute parts based on priority, distance, and volume, ensuring efficient and timely supply.

JP7571588B2Active Publication Date: 2024-10-23TOYOTA BOSHOKU KK
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021015787
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-02-03
Publication Date
2024-10-23
Estimated Expiration
2041-02-03

AI Technical Summary

Technical Problem

Existing parts supply systems do not effectively manage workload distribution among multiple work lines in a factory, leading to uneven demand and inefficiencies.

Method used

A parts supply system that includes an acquisition unit for used parts information, a designation unit for assigning parts to work lines, and a reception unit for receiving and distributing parts across multiple work lines, using a management device to balance workload by adjusting part distribution based on priority, distance, and volume considerations.

Benefits of technology

The system achieves leveled workload distribution by transmitting part information to all work lines, setting work limits, and adjusting priorities to ensure efficient and timely part supply, reducing waiting times and preventing stockouts.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

To realize a parts supply system in which a work load for parts supply is leveled.SOLUTION: A parts supply system 10 is a system for supplying parts from a parts storage area S to a plurality of work lines L in a production factory Q having a plurality of work lines L. The parts supply system 10 acquires used parts information, which is information on used parts used in the plurality of work lines L, and based on the used parts information, designates supply parts to be supplied from the parts storage area S to each of the work lines L. The parts supply system 10 has a mobile terminal 50 having a receiving unit for receiving information about the supply parts to be supplied. The receiving unit is assigned to each work line L, and a plurality of the receiving units are provided for the work lines. The parts supply system 10 transmits information to the receiving unit as parts supply information for providing the receiving unit with both the supply parts corresponding to the work line L to which the receiving unit is assigned and the supply parts corresponding to the work line different from the work line L to which the receiving unit is assigned.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a parts supply system. [Background technology]

[0002] Patent Document 1 discloses a parts supply system for supplying parts to a work line installed in a factory. This parts supply system employs a "kanban system." In the kanban system, a kanban on which various information such as the name of the parts contained and the number of parts contained is inserted is fitted into a storage box delivered to the factory. The storage box is placed in a parts storage area in the factory and is supplied to the work line at a predetermined timing. In the work line, when the first part is taken out of the storage box, the kanban is removed and sent to a collection post. Then, the kanban sent to the collection post and collected is collected again as a purchase order for parts supply to each parts factory. In the parts factory, parts are manufactured based on the information on the collected kanban. In this way, by manufacturing and supplying parts used in the work line in the parts factory, excess parts inventory can be reduced. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 7-61536 Summary of the Invention [Problem to be solved by the invention]

[0004] In the parts supply system described in Patent Document 1, an automatic conveying device is used to supply parts from a parts storage area to one work line. When multiple work lines are provided in a factory, multiple conveying devices are assigned to each work line, but the workload of each conveying device may vary depending on the number of parts supplied to each work line, etc. The parts supply system described in Patent Document 1 does not take this into consideration, and there is room for improvement.

[0005] An object of the present invention is to realize a parts supply system that averages out the workload involved in parts supply. [Means for solving the problem]

[0006] A parts supply system for solving the above-mentioned problems is a parts supply system for supplying parts to a plurality of work lines from a parts storage location located at a different position from the plurality of work lines in a factory having the plurality of work lines, and includes an acquisition unit that acquires used parts information, which is information on parts used on the plurality of work lines, a designation unit that designates supplied parts to be supplied from the parts storage location to each of the work lines based on the used parts information acquired by the acquisition unit, and a receiving unit that receives information regarding the supplied parts designated by the designation unit, wherein a plurality of receiving units are provided and assigned to each of the work lines, and the designation unit transmits to the receiving units information regarding the supplied parts that includes both the supplied parts corresponding to the work line to which the receiving unit is assigned and the supplied parts corresponding to a work line different from the work line to which the receiving unit is assigned, as information regarding the supplied parts.

[0007] In the above configuration, the receiving unit receives information on the parts to be supplied, including not only the work line to which the receiving unit is assigned, but also other work lines to which the receiving unit is not assigned. Therefore, based on the information transmitted to the receiving unit, it is possible to supply parts to not only the assigned work line, but also to the unassigned work lines. For example, when there are many parts to be supplied to one work line and few parts to be supplied to the other work line, information including the parts to be supplied corresponding to the one work line is transmitted to the receiving unit assigned to the other work line. In this way, if the information on the parts to be supplied corresponding to the one work line is transmitted not only to the receiving unit assigned to the one work line but also to the other receiving units in a distributed manner, it is possible to level the workload when supplying parts based on the information transmitted to each receiving unit. Therefore, according to the above configuration, it is possible to realize a parts supply system in which the workload for supplying parts is leveled. [Brief description of the drawings]

[0008] [Figure 1] 1 is a schematic diagram showing an example of a state in which parts are delivered from each parts factory to a production factory in which a parts supply system according to an embodiment is provided; [Diagram 2] FIG. 1 is a schematic diagram showing a state in which parts are supplied from a parts storage area to each work line in a production factory. [Diagram 3] FIG. 2 is a functional block diagram of a parts supply system. [Figure 4] 4 is a flowchart showing a series of steps involved in a part supply process executed by the part supply system. [Diagram 5] FIG. 13 is a schematic diagram showing an image when containers are virtually assigned to each mobile terminal. [Figure 6] FIG. 13 is a schematic diagram showing an image when containers are virtually assigned to each mobile terminal. [Figure 7] FIG. 13 is a schematic diagram showing an image when a container to be allocated to each mobile terminal is reselected. [Figure 8] FIG. 13 is a schematic diagram showing an image when the containers to be assigned to the mobile terminals are reset a second time. [Figure 9] 13 is a graph showing the relationship between each supplier and the work value. [Figure 10] FIG. 13 is a schematic diagram showing an image when a storage box to be carried over is selected from the storage boxes assigned to the first mobile terminal. [Figure 11] 13 is a graph showing the workload per cycle in the parts supply operation of a supplier. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] An embodiment of a component supply system will be described with reference to FIGS. As shown in FIG. 1, parts are delivered from a plurality of parts factories R (a first parts factory R1, a second parts factory R2, a third parts factory R3, ...) to a production factory Q in which a parts supply system 10 is installed. Parts manufactured in each parts factory R are transported to a parts storage area S of the production factory Q in a state of being stored in a storage box 80. In the parts storage area S, the parts are placed in a state of being stored in the storage box 80. A kanban K on which information on the stored parts is written is fitted in the storage box 80. For example, the name of the stored part, the identification code of the storage box 80, the number of parts stored, the delivery position in the parts storage area S, the name of the parts factory R that manufactured the parts, etc., and a code such as a QR code (registered trademark) storing such information are printed on the kanban K. The volume of each storage box 80 corresponds to the size and number of parts stored, and is different from one another.

[0010] The parts delivered to the parts storage area S of the production factory Q are stored in a storage box 80 and supplied to the work line L at a predetermined interval. The production factory Q is provided with three work lines L, namely, a first work line L1, a second work line L2, and a third work line L3. In each work line L, at least one of various operations such as product assembly, machining, molding, and inspection is performed.

[0011] 1 and 2, in a production factory Q, a parts storage area S is disposed at a position different from each work line L. Hereinafter, the left hand side when looking at each work line L from the parts storage area S will be simply referred to as the left side, and the right hand side will be simply referred to as the right side.

[0012] As shown in FIG. 2, each work line L is provided with a parts shelf T on which the storage box 80 is placed. The first work line L1 is provided with a first left parts shelf TL1 and a first right parts shelf TR1 as the parts shelves T. The first work line L1 is provided with a work bench (not shown) composed of a belt conveyor or the like between the first left parts shelf TL1 and the first right parts shelf TR1. The second work line L2 is located on the right hand side of the first work line L1. The second work line L2 is provided with a second left parts shelf TL2 and a second right parts shelf TR2 as the parts shelves T. The second work line L2 is provided with a work bench (not shown) composed of a belt conveyor or the like between the second left parts shelf TL2 and the second right parts shelf TR2. The third work line L3 is located on the right hand side of the second work line L2. In other words, the second work line L2 is located between the first work line L1 and the third work line L3. The third work line L3 is provided with a third left component shelf TL3 and a third right component shelf TR3 as component shelves T. On the third work line L3, a work table (not shown) formed of a belt conveyor or the like is disposed between the third left component shelf TL3 and the third right component shelf TR3. On each component shelf T, a placement position corresponding to each storage box 80 is preset. Therefore, each storage box 80 is placed on the component shelf T at a predetermined position.

[0013] The storage box 80 placed in the parts storage site S is placed on a dolly D by a supplier P and transported to each work line L based on a parts supply process executed by the parts supply system 10 at a predetermined cycle. The supplier P places the storage box 80 transported to each work line L at a predetermined placement position on the parts shelf T. In this way, the parts stored in the storage box 80 are supplied from the parts storage site S to the work line L. In the production factory Q, the number of suppliers P for supplying parts is three, which is the same as the number of work lines L. In the following, the supplier P mainly responsible for supplying parts to the first work line L1 is referred to as the first supplier P1, the supplier P mainly responsible for supplying parts to the second work line L2 is referred to as the second supplier P2, and the supplier P mainly responsible for supplying parts to the third work line L3 is referred to as the third supplier P3.

[0014] In each work line L, a worker (not shown) is positioned at a predetermined position on the work bench. The worker takes out parts from the storage box 80 according to the type of work to be performed and uses them. In this embodiment, different parts are supplied to the first work line L1, the second work line L2, and the third work line L3. However, the same parts may be supplied to each work line L. When the worker takes out the first part from the storage box 80, he or she removes the kanban K from the storage box 80.

[0015] As shown in Fig. 1, the removed kanban K is collected and consolidated in a collection post 20 located downstream of each work line L. The collection post 20 is provided with a code reader (not shown) that reads the code written on each collected kanban K. The method of collecting the kanban K from the work line L to the collection post 20 may be manual or automatic.

[0016] The kanbans K collected in the collection post 20 are collected at a predetermined timing to each parts factory R as purchase orders for parts supply. Each parts factory R manufactures parts based on the collected kanbans K. The manufactured parts are stored in a storage box 80 and are delivered again from the parts factory R to the production factory Q.

[0017] The production factory Q is provided with a management device 30 configured to be able to communicate with the collection post 20, a server 40 configured to be able to communicate with the management device 30, a mobile terminal 50, and a display device 60. As a communication method, a wireless or wired WAN (Wide Area Network) and LAN (Local Area Network), etc. can be adopted. The collection post 20, management device 30, server 40, mobile terminal 50, and display device 60 constitute the parts supply system 10.

[0018] The management device 30 is, for example, a stationary personal computer, and includes a CPU, a ROM, a RAM, etc. The management device 30 executes the part supply process repeatedly at predetermined intervals by the CPU expanding a program stored in the ROM into the RAM and executing various arithmetic processes.

[0019] The server 40 has a database DB that stores various parameter information related to parts. The database DB stores information such as the name of the part, the identification code of the storage box 80 in which the part is stored, the placement position of the storage box 80, a distance coefficient Kd set for each storage box 80, a volumetric coefficient Kv set for each storage box 80, and a priority order set for each storage box 80. The distance coefficient Kd is preset to a larger value for a storage box 80 whose placement position on the parts shelf T is farther from the parts storage area S. The volumetric coefficient Kv is preset to a larger value for a storage box 80 with a larger volume.

[0020] In addition, the supply parts supplied to the work line L include parts that are frequently used on the work line L and parts that are not frequently used on the work line L. For example, parts that are frequently used are likely to run out of stock immediately if the part supply is delayed, so they can be said to be supply parts with high priority in the part supply work. On the other hand, parts that are not frequently used are unlikely to run out of stock immediately even if the part supply is delayed, so they can be said to be supply parts with low priority in the part supply work. In this embodiment, the priority of the supply parts is set based on such frequency of use. That is, the priority is set in four stages, high, medium, low, and rare, starting from the storage box 80 that stores the supply parts with high frequency of use, and such information is stored in the database DB. In this way, the database DB of the server 40 also functions as a priority storage unit that stores the priority set for each storage box 80.

[0021] The mobile terminal 50 may be, for example, a tablet PC or a wearable terminal such as a smart watch. A plurality of mobile terminals 50 are provided and assigned to each work line L, including a first mobile terminal 50A assigned to the first work line L1, a second mobile terminal 50B assigned to the second work line L2, and a third mobile terminal 50C assigned to the third work line L3. The first mobile terminal 50A is owned by the first supplier P1, and the second mobile terminal 50B is owned by the second supplier P2. The third mobile terminal 50C is owned by the third supplier P3.

[0022] The display device 60 may be, for example, a liquid crystal display or an LED display. Next, a functional unit for performing the part supply process in the part supply system 10 will be described.

[0023] As shown in FIG. 3, the collection post 20 has an acquisition unit 21 and a first communication unit 22 as functional units. The acquisition unit 21 reads the code of the kanban K when the kanban K is collected in the collection post 20. In this way, used part information, which is information on the parts used in the multiple work lines L, is acquired.

[0024] The first communication unit 22 communicates with the management device 30 to send and receive information. The management device 30 has, as functional units, a designation unit 31, a carryover information storage unit 37, a priority advancement unit 38, and a progress information collection unit 39.

[0025] The designation unit 31 designates parts to be supplied from the parts storage area S to each of the work lines L based on the part-used information acquired by the acquisition unit 21. The designation unit 31 has, as functional units, a second communication unit 32, a part-used information reading unit 33, a parameter reading unit 34, an upper limit storage unit 35, and a selection unit 36.

[0026] The second communication unit 32 communicates with the collection post 20, the server 40, the mobile terminal 50, and the display device 60 to transmit and receive information. The used part information reading unit 33 reads the used part information from the acquisition unit 21 of the collection post 20 via the second communication unit 32.

[0027] The parameter reading unit 34 accesses the database DB of the server 40 via the second communication unit 32 based on the information read by the used part information reading unit 33. The parameter reading unit 34 reads parameter information related to the used part from various parameter information stored in the database DB. The parameter information to be read includes the identification symbol of the container 80 corresponding to the used part, the placement position, the distance coefficient Kd, the volume coefficient Kv, and the priority order.

[0028] The upper limit storage unit 35 stores a preset upper limit for a single part supply operation. The upper limit is preset in consideration of the execution cycle (takt time) of the part supply process, the transport distance of the parts to be supplied, the loading capacity of the cart D, and a method of calculating the work value, which will be described later.

[0029] The selection unit 36 ​​selects the storage box 80 so that the sum of the work values ​​set for each storage box 80 does not exceed the work upper limit value stored in the upper limit value storage unit 35. The selection unit 36 ​​uses both the distance coefficient Kd and the volume coefficient Kv as the work value. In this embodiment, the selection unit 36 ​​uses, as an example, a value obtained by multiplying the distance coefficient Kd and the volume coefficient Kv as the work value. When using the distance coefficient Kd and the volume coefficient Kv, the selection unit 36 ​​may use values ​​calculated by other methods, such as a value obtained by adding these coefficients Kd and Kv or a value obtained by dividing one coefficient by the other coefficient. The selection unit 36 ​​selects the storage box 80 based on the work value calculated in this way, as well as the priority order stored in the database DB of the server 40, the used part information read by the used part information reading unit 33, the information on the carried-over storage box 80 stored in the carried-over information storage unit 37, and the priority order information stored in the priority order moving-up unit 38. By selecting a storage box 80 by the selection unit 36 ​​in this manner, the designation unit 31 designates a supply part to be supplied from the parts storage site S to each of the work lines L. Information on the storage box 80 selected by the selection unit 36 ​​is transmitted from the second communication unit 32 to a receiving unit 52 (described later) of each mobile terminal 50 as information on the supply part.

[0030] The carry-over information storage unit 37 stores information on storage boxes 80 that were not designated and carried over in the previous parts supply process. That is, the carry-over information storage unit 37 stores, based on the used parts information read by the used parts information reading unit 33 in the previous parts supply process and the information on the supply parts selected by the selection unit 36, information on storage boxes 80 that store the used parts that were not selected as supply parts as information on the carry-over storage boxes 80.

[0031] The priority moving up unit 38 moves up the priority of the storage box 80 stored in the carry-over information storage unit 37 by one and stores it as moving up information. That is, for example, if the first storage box 80A was not designated in the previous part supply process and was carried over, the first storage box 80A is stored in the carry-over information storage unit 37 as information on the carried-over storage box 80. Also, if the priority of the first storage box 80A stored in the server 40 is "low", the priority moving up unit 38 sets the priority of the first storage box 80A to "medium" and stores it as moving up information. In this case, in the next part supply process, the selection unit 36 ​​uses the priority (medium) stored in the priority moving up unit 38 as the priority of the first storage box 80A, rather than the priority (low) stored in the server 40.

[0032] Furthermore, if the first storage box 80A, which is the carryover storage box 80, is not specified again in the same part supply process, the first storage box 80A is stored again as information on the carryover storage box 80 in the carryover information storage unit 37. Furthermore, the priority moving up unit 38 sets the priority of the first storage box 80A to "high" and stores it as moving up information. Note that thereafter, until the first storage box 80A, which is the carryover storage box 80, is specified in the part supply process, the priority moving up unit 38 maintains the priority of the carryover storage box 80 as "high" and stores it as moving up information.

[0033] The progress information collection unit 39 collects and stores progress information on the parts supply work from each mobile terminal 50. The server 40 has, as a functional unit, a third communication unit 41 that can access the database DB. The third communication unit 41 communicates with the management device 30 to send and receive information.

[0034] Each mobile terminal 50 has a fourth communication unit 51, a first display unit 54, and an operation unit 55 as functional units. The fourth communication unit 51 has a receiving unit 52 and a transmitting unit 53 as functional units. The receiving unit 52 receives information on the container 80 selected by the selecting unit 36 ​​as information on the supply part designated by the designating unit 31. The transmitting unit 53 transmits information operated by the supplier P on the mobile terminal 50 to the management device 30. Since the first mobile terminal 50A is assigned to the first work line, the receiving unit 52 provided on the first mobile terminal 50A is assigned to the first work line L1. Similarly, the receiving unit 52 provided on the second mobile terminal 50B is assigned to the second work line L2, and the receiving unit 52 provided on the third mobile terminal 50C is assigned to the third work line L3.

[0035] The first display unit 54 displays the information about the container 80 received by the receiving unit 52. In this way, information about the supplied part is transmitted to the supplier P. The operation unit 55 outputs information operated by the supplier P on the mobile terminal 50 to the first display unit 54. The operation unit 55 also transmits information operated by the supplier P on the mobile terminal 50 to the transmission unit 53. For example, in a part supply operation, when the supplier P loads a designated storage box 80 onto the dolly D, the supplier P inputs the information into the mobile terminal 50. The input information is reflected on the first display unit 54 of the mobile terminal 50, so that the supplier P can check the display to confirm that the supply part has not been loaded onto the dolly D. The input information is also transmitted from the transmission unit 53 to the management device 30, and is stored in the progress information collection unit 39 in the management device 30. In this way, the operation unit 55 transmits progress information to the management device 30 via the transmission unit 53, so that information on the storage box 80 loaded onto the dolly D and information on the storage box 80 moved from the dolly D to the part shelf T can be collected in real time by the management device 30 during the part supply operation. Therefore, the management device 30 can grasp the progress of each supplier P's part supply work.

[0036] The display device 60 has a fifth communication unit 61 and a second display unit 62 as functional units. The fifth communication unit 61 receives information by communicating with the management device 30. The second display unit 62 receives the progress information stored in the progress information collection unit 39 of the management device 30 via the fifth communication unit 61. The second display unit 62 displays the acquired progress information on the display device 60. As a result, the progress degree of the parts supply work at each supplier P is displayed on the display device 60 in the production factory Q.

[0037] Next, a series of flows of the part supply process executed by the part supply system 10 will be described with reference to the flowchart of Fig. 4. The part supply process transmits information about the storage box 80 as information about the supplied parts to the receiving unit 52 of each mobile terminal 50, and is repeatedly executed at a predetermined cycle. Note that in this embodiment, the case where the transmission cycle of information about the supplied parts to the receiving unit 52 of the first mobile terminal 50A, the second mobile terminal 50B, and the third mobile terminal 50C is the same, that is, the case where the takt time is the same, will be described as an example.

[0038] When the parts supply system 10 starts a parts supply process, first, the parts used information reading unit 33 of the management device 30 acquires the parts used information acquired by the acquisition unit 21 of the collection post 20 (step S40). As a result, the management device 30 acquires information on the parts used that have been used since the previous parts supply process was performed until the start of the current parts supply process.

[0039] Thereafter, in the management device 30, the selection unit 36 ​​acquires the used part information and acquires the carryover information related to the carryover storage box 80 from the carryover information storage unit 37 (step S41). As a result, information on the storage box 80 that was not designated and was carried over in the previous part supply process is also acquired.

[0040] The selection unit 36 ​​then acquires the parameter information read by the parameter reading unit 34, i.e., the identification symbol, placement position, distance coefficient Kd, volume coefficient Kv, and information regarding the priority of the container 80 corresponding to the used part. The selection unit 36 ​​also acquires priority promotion information stored in the priority promotion unit 38 (step S42).

[0041] After that, the selection unit 36 ​​selects a container 80 to be virtually assigned to each mobile terminal 50 from among all of the containers 80 corresponding to the parts to be used and the carried-over containers 80 (step S43).

[0042] That is, as shown in Fig. 5, the selection unit 36 ​​first assigns the storage boxes 80 corresponding to the first work line L1 to the first mobile terminal 50A in the order of decreasing priority, assigns the storage boxes 80 corresponding to the second work line L2 to the second mobile terminal 50B in the order of decreasing priority, and assigns the storage boxes 80 corresponding to the third work line L3 to the third mobile terminal 50C in the order of decreasing priority. The storage boxes 80 corresponding to the first work line L1 correspond to the storage boxes 80 whose placement positions are set on either the first left component shelf TL1 or the first right component shelf TR1. Similarly, the storage boxes 80 corresponding to the second work line L2 correspond to the storage boxes 80 whose placement positions are set on either the second left component shelf TL2 or the second right component shelf TR2, and the storage boxes 80 corresponding to the third work line L3 correspond to the storage boxes 80 whose placement positions are set on either the third left component shelf TL3 or the third right component shelf TR3.

[0043] In FIG. 5, identifiers "○△△□" are used to distinguish storage boxes 80. A number "1 to 3" is written in each "○" to indicate which work line L it corresponds to. "△△" is written with "LH" (left parts shelf) or "RH" (right parts shelf) to distinguish the parts shelf T on which it is placed. An alphabet is written in each "□" as an identifier. In other words, storage box 80 (2RHa) refers to a storage box 80 stored on the second right parts shelf TR2 of the second work line L2.

[0044] Once all of the storage boxes 80 extracted from the used part information and carryover information have been allocated in this manner, the process proceeds to step S44 in Fig. 4. In the process of step S44, the selection unit 36 ​​calculates the sum of the work values ​​in the storage boxes 80 allocated to each mobile terminal 50.

[0045] 5, in this embodiment, as a first example, a case will be described in which the sum of the work values ​​of the storage boxes 80 assigned to the first mobile terminal 50A is 17, the sum of the work values ​​of the storage boxes 80 assigned to the second mobile terminal 50B is 17, and the sum of the work values ​​of the storage boxes 80 assigned to the third mobile terminal 50C is 19. It is assumed that 20 is set in the upper limit storage unit 35 as an example of the work upper limit value.

[0046] After calculating the sum of the work values ​​in the containers 80 assigned to each mobile terminal 50, the selection unit 36 ​​proceeds to the process of step S45 in FIG. 4 and determines whether or not each sum is equal to or less than the work upper limit value.

[0047] In this first example, since each total is equal to or less than 20, the determination in the process of step S45 is affirmative (step S45: YES), and the process proceeds to step S46. In the process of step S46, the designation unit 31 of the management device 30 transmits information about the storage box 80 assigned by the selection unit 36 ​​to the receiving unit 52 of each mobile terminal 50 as information about the supply parts. Therefore, information about the supply parts corresponding to the first work line L1 is transmitted to the receiving unit 52 of the first mobile terminal 50A assigned to the first work line L1, and information about the supply parts corresponding to the second work line L2 is transmitted to the receiving unit 52 of the second mobile terminal 50B assigned to the second work line L2. Also, information about the supply parts corresponding to the third work line L3 is transmitted to the receiving unit 52 of the third mobile terminal 50C assigned to the third work line L3.

[0048] Thereafter, the management device 30 proceeds to the process of step S47, and stores the carry-over information in the carry-over information storage unit 37. In the first example, the carry-over information is updated to indicate that there is no carried-over storage box 80.

[0049] After executing the process of step S47, the component supply system 10 ends the series of processes related to the component supply process. Through this process, information about the storage boxes 80 to be supplied to the work line L is transmitted to each mobile terminal 50. The suppliers P who possess each mobile terminal 50 perform the work of supplying parts from the parts storage area S to each work line L based on the information transmitted to the mobile terminal 50 that they possess.

[0050] Next, a case where the total of the work values ​​of the storage boxes 80 assigned in the process of step S43 exceeds the work upper limit value will be described as a second example. That is, in the second example, as shown in Fig. 6, the sum of the work values ​​of the storage boxes 80 assigned to the first mobile terminal 50A is 18, and the sum of the work values ​​of the storage boxes 80 assigned to the third mobile terminal 50C is 19. On the other hand, the sum of the work values ​​of the storage boxes 80 assigned to the second mobile terminal 50B is 22 (>upper work limit value). In this case, the determination is negative in the process of step S45 in Fig. 4 (step S45: NO).

[0051] When the determination is negative in this way, the process proceeds to step S48, where a storage box 80 to be allocated to each mobile terminal 50 is reselected. In the example shown in Fig. 6, the last allocated storage box 80 (2LHd) is selected from the storage boxes 80 allocated to the second mobile terminal 50B, whose total work value exceeds the work upper limit value, and allocated to the other mobile terminal 50. In this embodiment, the range of storage boxes 80 that can be allocated by the selection unit 36 ​​is set in advance as follows.

[0052] That is, the storage boxes 80 supplied to the first left component shelf TL1 and the first right component shelf TR1 on the first work line L1 and the second left component shelf TL2 on the second work line L2 can be assigned to the first mobile terminal 50A. Also, the storage boxes 80 supplied to the first right component shelf TR1 on the first work line L1, the second left component shelf TL2 and the second right component shelf TR2 on the second work line L2, and the third left component shelf TL3 on the third work line L3 can be assigned to the second mobile terminal 50B. Also, the storage boxes 80 supplied to the third left component shelf TL3 and the third right component shelf TR3 on the third work line L3 and the second right component shelf TR2 on the second work line L2 can be assigned to the third mobile terminal 50C.

[0053] Therefore, in the process of step S48, the selection unit 36 ​​reselects the above-mentioned container 80 (2LHd) in the second mobile terminal 50B by changing the allocation to the first mobile terminal 50A. After that, the selection unit 36 ​​executes the processes of steps S44 and S45 in Fig. 4 again, and determines whether each total is equal to or less than the work upper limit value.

[0054] 7, after the reselection of the above-mentioned storage box 80 (2LHd), the total work value of the storage box 80 assigned to the first mobile terminal 50A is 19.5, and the total work value of the storage box 80 assigned to the second mobile terminal 50B is 20.5. Also, the total work value of the storage box 80 assigned to the third mobile terminal 50C remains unchanged at 19.

[0055] In this case, since the total of the work values ​​of the containers 80 assigned to the second mobile terminal 50B still exceeds the work upper limit value, a negative determination is made in the process of step S45 in FIG. 4 (step S45: NO).

[0056] Therefore, next, the process proceeds to step S48 again, and the storage boxes 80 to be assigned to each mobile terminal 50 are reselected. That is, the storage box 80 (2RHd) assigned second to last among the storage boxes 80 assigned to the second mobile terminal 50B is selected and assigned to another mobile terminal 50. Since this storage box 80 (2RHd) is supplied to the second right parts shelf TR2 and can be assigned to the third mobile terminal 50C, the selection unit 36 ​​changes the assignment of the storage box 80 (2RHd) to the third mobile terminal 50C and reselects it. Thereafter, the processes of steps S44 and S45 in FIG. 4 are executed, and it is determined whether the total number of storage boxes 80 assigned to each mobile terminal 50 is equal to or less than the work upper limit value.

[0057] As shown in FIG. 8, after reselecting the above storage box 80 (2RHd), the total work value of the storage box 80 assigned to the first mobile terminal 50A is 19.5, the total work value of the storage box 80 assigned to the second mobile terminal 50B is 20.0, and the total work value of the storage box 80 assigned to the third mobile terminal 50C is 19.5.

[0058] In this case, since each total is equal to or less than 20, the determination in the process of step S45 in Fig. 4 is affirmative (step S45: YES), so the process proceeds to step S46.

[0059] In the process of step S46, the designation unit 31 of the management device 30 transmits information on the container 80 selected by the selection unit 36 ​​to the receiving unit 52 of each mobile terminal 50 as information on the supply parts. Therefore, information including both the supply parts corresponding to the first work line L1 and the supply parts corresponding to the second work line L2 is transmitted to the receiving unit 52 of the first mobile terminal 50A assigned to the first work line L1. Moreover, information on the supply parts corresponding to the second work line L2 is transmitted to the receiving unit 52 of the second mobile terminal 50B assigned to the second work line L2. Moreover, information including both the supply parts corresponding to the third work line L3 and the supply parts corresponding to the second work line L2 is transmitted to the receiving unit 52 of the third mobile terminal 50C assigned to the third work line L3. Thus, in the second example, the designation unit 31 of the management device 30 transmits information regarding the supply parts to the receiving unit 52 of each of the first mobile terminal 50A and the third mobile terminal 50C, the information including both the supply parts corresponding to the assigned work line L and the supply parts corresponding to a work line L other than the assigned work line L.

[0060] Thereafter, the management device 30 proceeds to the process of step S47, and stores the carry-over information in the carry-over information storage unit 37. In this example, the carry-over information is updated assuming that there are no carried-over storage boxes 80.

[0061] After executing the process of step S47, the component supply system 10 ends the series of processes related to the component supply process. Through this process, information on the containers 80 to be supplied to the work line L is transmitted to each mobile terminal 50. The suppliers P who possess each mobile terminal 50 perform the work of supplying parts from the parts storage area S to each work line L based on the information transmitted to the mobile terminal 50 that they possess. That is, the first supplier P1 who possesses the first mobile terminal 50A mainly supplies parts to the first work line L1, but also supplies parts to the second work line L2. The third supplier P3 who possesses the third mobile terminal 50C mainly supplies parts to the third work line L3, but also supplies parts to the second work line L2.

[0062] As a result, as shown in FIG. 9, for the first supplier P1 and the third supplier P3, the work value can be increased within a range not exceeding the work upper limit (solid line in FIG. 9) compared to the case where the storage box 80 is selected without considering the parts to be supplied to other work lines L (dashed line in FIG. 9). This allows the waiting time of the first supplier P1 and the third supplier P3 to be reduced. In addition, for the second supplier P2, the work that exceeded the work upper limit can be distributed to the first supplier P1 and the third supplier P3, so that the work value can be reduced within a range not exceeding the work upper limit (solid line in FIG. 9) compared to the case where the storage box 80 is selected without considering the parts to be supplied to other work lines L (dashed line in FIG. 9). This prevents the work load of the second supplier P2 from becoming so excessive that the work time required for one part supply exceeds the execution period of the part supply process. Therefore, it is possible to level the work load for part supply between the suppliers P.

[0063] Next, as a third example, a case will be described in which, in the processing of step S48 in the second example described above, when the allocation of the storage box 80 (2LHd) allocated to the second mobile terminal 50B is changed to the first mobile terminal 50A, the sum of the work values ​​in the first mobile terminal 50A exceeds the work upper limit value.

[0064] 4, the allocation of the storage box 80 (2LHd) of the second mobile terminal 50B is changed to the first mobile terminal 50A and reselected, and then the process proceeds to step S44 to calculate the total work value. Note that in the third example, in this process, the total work value of the storage box 80 allocated to the first mobile terminal 50A is calculated to be 20.5 (>upper work limit), the total work value of the storage box 80 allocated to the second mobile terminal 50B is calculated to be 19.5, and the total work value of the storage box 80 allocated to the third mobile terminal 50C is calculated to be 19.

[0065] Therefore, the process in the next step S45 makes a negative determination (step S45: NO), and the process proceeds to step S48 again. If the selection unit 36 ​​re-assigns a storage box 80 assigned to one mobile terminal 50 to another mobile terminal 50 by re-selection, and as a result the total of the work values ​​in the other mobile terminal 50 exceeds the upper limit value, in the process of step S48, the selection unit 36 ​​selects the storage box 80 with the lowest priority among all the storage boxes 80 assigned to the mobile terminal 50 as the carry-over storage box 80.

[0066] Therefore, as shown in FIG. 10, in the third example, the selection unit 36 ​​sets the lowest priority storage box 80 (1LHc) with the priority set to "low" among the storage boxes 80 (1RHa, 1RHb, 1RHc, 1LHa, 1LHb, 1LHc, 2LHd) assigned to the first mobile terminal 50A as the carryover storage box 80. In this case, the storage box 80 (1LHc) is not assigned to any mobile terminal 50, and the process of step S48 in FIG. 4 ends. Thereafter, the process proceeds to step S44 to calculate the total of the work values. In the third example, the storage box 80 (1LHc) is carried over, and the total of the work values ​​of the storage boxes 80 assigned to the first mobile terminal 50A becomes 19.5. Therefore, the process of step S45 in FIG. 4 is judged to be positive (step S45: YES), and the process proceeds to step S46.

[0067] In the process of step S46, the designation unit 31 of the management device 30 transmits information on the containers 80 that the selection unit 36 ​​has assigned and selected to each mobile terminal 50 to the reception unit 52 of each mobile terminal 50 as information on the supplied part.

[0068] Thereafter, the management device 30 proceeds to the process of step S47 and stores the carry-over information in the carry-over information storage unit 37. In the third example, storage box 80 (1LHc) is stored as information on the carry-over storage box 80. Furthermore, the priority level raising unit 38 raises the priority level of storage box 80 (1LHc) by one, sets the priority level to "medium", and stores this as the raising information. As a result, in the next parts supply process, the priority level of storage box 80 (1LHc) will be raised by one and will be less likely to be set as a carry-over storage box 80, so that the storage box will be assigned to the mobile terminal 50 and parts will be supplied.

[0069] After executing the process of step S47, the component supply system 10 ends the series of processes related to the component supply process. In addition, each time the management device 30 completes a part supply process, it may transmit information about the parts used and information about the specified storage box 80, i.e., information about the supplied parts and information about the carryover storage box 80, to the server 40 and store them in the database DB.

[0070] Next, the operation and effects of this embodiment will be described. (1) In this embodiment, the designation unit 31 transmits to the receiving unit 52 information including both the supply parts corresponding to the work line L to which the receiving unit 52 is assigned and the supply parts corresponding to the work line L different from the work line L to which the receiving unit 52 is assigned as information related to the supply parts. Therefore, information on the supply parts including not only the assigned work line L but also other unassigned work lines L is transmitted to the mobile terminal 50 provided with each receiving unit 52. Therefore, based on the information transmitted to the receiving unit 52, the supplier P can supply parts not only to the assigned work line L but also to the unassigned work line L. That is, as described above, when there are many supply parts to the second work line L2 and few supply parts to the first work line L1 and the third work line L3, information including the supply parts corresponding to the second work line L2 can be transmitted to each receiving unit 52 of the first mobile terminal 50A and the third mobile terminal 50C.

[0071] In this way, information on supplied parts corresponding to the second work line L2 is distributed and transmitted not only to the receiving unit 52 assigned to the second work line L2 but also to the receiving unit 52 assigned to the first work line L1 and the receiving unit 52 assigned to the third work line L3. This makes it possible to equalize the workload when supplying parts based on the information transmitted to each receiving unit 52. Therefore, it is possible to realize a parts supply system 10 in which the workload for supplying parts is equalized.

[0072] (2) In this embodiment, a work upper limit is set in advance for one part supply operation, and the storage boxes 80 are selected so that the sum of the work values ​​set for each storage box 80 does not exceed the work upper limit. Any amount exceeding the work upper limit is carried over to the next part supply process.

[0073] 11, when supplier P supplies parts based on information transmitted to receiver 52 of mobile terminal 50, the load on a single part supply operation is prevented from exceeding the upper limit and becoming excessively large. In addition, since the amount of work that exceeds the upper limit in a part supply operation can be carried over to the next or subsequent part supply operation, it is also possible to level out the workload of supplier P in the part supply operation for each cycle.

[0074] (3) In this embodiment, the selection unit 36 ​​uses a distance coefficient Kd that is set for each storage box 80 and is set to a larger value for a storage box 80 whose placement position is farther from the component storage site S as the work value of the storage box 80. The transport distance of a storage box 80 placed at a position farther from the component storage site S is longer, and therefore the time required for supplying the storage box 80 from the component storage site S to the component shelf T is longer. In this embodiment, the distance coefficient Kd that correlates with the placement position of the component shelf T is used as the work value of the storage box 80, and is set to a larger work value for a storage box 80 that is transported to a farther position. As a result, when a storage box 80 whose placement position is farther is included as a supply part, the number of storage boxes 80 selected by the selection unit 36 ​​can be reduced compared to when this is not the case. This makes it possible to select a storage box 80 taking the transport distance into consideration, which can further contribute to leveling out the workload.

[0075] (4) In this embodiment, the selection unit 36 ​​uses a volume coefficient Kv, which is set for each storage box 80 and is set to a larger value for a storage box 80 with a larger volume, as the work value for the storage box 80. In the part supply work, the supplier P loads a plurality of designated storage boxes 80 on the dolly D and transports them at once. The dolly D is set to a load capacity that allows safe transportation. In this embodiment, the volume coefficient Kv is used as the work value for the storage box 80, and is set so that the work value becomes larger for a storage box 80 with a larger volume. As a result, when a storage box 80 with a large volume is included as a supply part, the number of storage boxes 80 selected by the selection unit 36 ​​can be reduced compared to when not including such a case. Therefore, it becomes possible to select a storage box 80 taking into consideration the load capacity of the dolly D, which contributes to improving safety during transportation in the part supply work.

[0076] (5) In this embodiment, a priority is set for each storage box 80, and when the total of the work values ​​exceeds the work upper limit value, the selection unit 36 ​​carries over the storage box 80 with the lowest priority. Therefore, by setting a high priority for a storage box 80 that is frequently used or otherwise prone to shortages, it is possible to prevent unintentional carryover and to prevent delays in the supply of parts.

[0077] (6) In this embodiment, the priority of a storage box 80 that was not designated in the previous component supply process and was carried over is raised by one. Therefore, the priority of a supply part that is a storage box 80 with a low priority and was not designated in the previous component supply process can be raised in the next component supply process. In this way, even if a supply part originally had a low priority, if it was not designated in the component supply process, the priority is raised so that it is more likely to be designated in the next component supply process, thereby preventing the supply interval for a supply part with a low priority from becoming excessively long. Therefore, even in a configuration in which supply parts are designated based on priority, it is possible to prevent stockouts of supply parts with a low priority.

[0078] This embodiment can be modified as follows: This embodiment and the following modifications can be combined with each other to the extent that there is no technical contradiction. In the above embodiment, when selecting a storage box 80 in the part supply process, first, all of the storage boxes 80 corresponding to the used parts and the carried-over storage boxes 80 are assigned to each mobile terminal 50 to select the storage box 80. The method of selecting the storage box 80 is not limited to this. For example, after the process of step S42 in FIG. 4, only the storage boxes 80 set to the highest priority level "high" from among the storage boxes 80 corresponding to the used parts and the carried-over storage boxes 80 are assigned to each mobile terminal 50 to select the storage box 80. Then, the work value of each mobile terminal 50 is calculated (step S44) and compared with the work upper limit value (step S45). In this process, for a mobile terminal 50 whose total work value exceeds the work upper limit value, some of the assigned storage boxes 80 are reassigned to a mobile terminal 50 whose total work value does not exceed the work upper limit value, and reselected.

[0079] Thereafter, the processes of steps S44 and S45 are executed again, and a storage box 80 is selected so that the sum of the work values ​​does not exceed the work upper limit value. Then, for a mobile terminal 50 whose sum of the work values ​​has dropped significantly compared to the work upper limit value, the storage box 80 with the next highest priority set to "medium" is assigned from among the storage box 80 corresponding to the next used part and the carried-over storage box 80. In this case, as in the previous case, a storage box 80 is selected so that the sum of the work values ​​in each mobile terminal 50 does not exceed the work upper limit value. By repeating this process, it becomes possible to select the storage boxes 80 specified in the part supply process in order of priority. Even with this configuration, it is possible to obtain the same actions and effects as those of (1) to (6) above.

[0080] In the above embodiment, the range of storage boxes 80 that can be assigned to each mobile terminal 50 in the selection unit 36 ​​may be changed as appropriate. For example, the storage boxes 80 supplied to the first left component shelf TL1 and the first right component shelf TR1 on the first work line L1 and the second left component shelf TL2 and the second right component shelf TR2 on the second work line L2 may be assigned to the first mobile terminal 50A. Also, it is not necessary to set a range of storage boxes 80 that can be assigned.

[0081] In the above embodiment, the display device 60 is provided to display the progress information of each supplier P, but this configuration may be omitted. In such an omitted configuration, the collection of progress information in the management device 30 may be performed or may be omitted.

[0082] In the above embodiment, the priority level moving up unit 38 moves up the priority level of the storage box 80 that was not designated in the previous part supply process and was carried over, and stores the moved up priority level. Instead of this configuration, the priority level moving up unit 38 may move up the priority level of the carried over storage box 80 by two or more, or may change the number of moves for each set priority level. That is, when a storage box 80 with a medium priority level is carried over, the priority level may be moved up by one and stored, when a storage box 80 with a low priority level is carried over, the priority level may be moved up by two and stored, and when a storage box 80 with a rare priority level is carried over, the priority level may be moved up by three and stored. In this configuration, when a storage box 80 is carried over once, the priority level is moved up to the highest setting.

[0083] It is also possible to omit the priority advancement unit 38 and not advance the priority when the storage box 80 is carried over. In the above embodiment, four levels of priority, namely high, medium, low, and rare, are set for each storage box 80, but it is also possible to set three or fewer levels or five or more levels of priority. Also, it is not necessary to set a priority for each storage box 80.

[0084] In the above embodiment, both the distance coefficient Kd and the volume coefficient Kv are used as the work value, but at least one of them may be omitted. Also, instead of the distance coefficient Kd and the volume coefficient Kv, the total number of storage boxes 80 may be used as the work value. In this configuration, the selection unit 36 ​​selects storage boxes 80 so that the number of storage boxes 80 does not exceed the work upper limit value.

[0085] In the above embodiment, the storage boxes 80 are selected so that the sum of the work values ​​in the storage boxes 80 does not exceed a preset work upper limit value. Instead of this configuration, a configuration in which the work upper limit value is not set may be used. In this case, the selection unit 36 ​​assigns all of the storage boxes 80 corresponding to the used parts to each mobile terminal 50 so as to supply them as supply parts in one part supply process, and selects the storage boxes 80. Note that even in this configuration, the receiving unit 52 of each mobile terminal 50 can transmit, as information on the supply parts, information including both the supply parts corresponding to the work line L to which the receiving unit 52 is assigned and the supply parts corresponding to the work line L different from the work line L to which the receiving unit 52 is assigned. Therefore, even in this configuration, it is possible to obtain the same action and effect as the action and effect of (1) above.

[0086] In the above embodiment, the receiving unit 52 is provided in the mobile terminal 50, and the supplier P supplies parts based on the information received by the receiving unit 52. Instead of this configuration, it is also possible to omit the mobile terminal 50 by providing a plurality of robots configured to transport the storage boxes 80 from the parts storage site S to each work line L and providing the receiving unit 52 on the robots. In this configuration, parts can be supplied from the parts storage site S to each work line L without human intervention.

[0087] In the above embodiment, the takt time of the part supply work in each work line L is the same, but the takt time of the part supply work in each work line L may be different. When the takt times are different, in the part supply process for the target work line L, a supply part may be selected based on the used part information acquired up to the last moment. The acquired used part information includes information on the used parts used in all work lines. Therefore, it is possible to transmit, to the receiving unit 52 assigned to the target work line L, information including both the supply part corresponding to the work line L and the supply part corresponding to a work line L different from the work line L to which the receiving unit 52 is assigned, as information on the supply part. Therefore, it is possible to obtain the same action and effect as the action and effect of (1) above.

[0088] In the above embodiment, a component supply system 10 for supplying components to a work line L having a component shelf T on which storage boxes 80 are placed has been described. A configuration similar to that of the above embodiment can be applied to a component supply system for supplying components to a work line L that does not have a component shelf T. In this case, for example, the storage box 80 may be stored on a work table, or the storage box 80 may be placed around the work table.

[0089] In the above embodiment, the supply parts are supplied in a state of being stored in the storage box 80, but it is also possible to supply the supply parts to each work line L without storing them in the storage box 80. The number of receiving units 52 and the number of work lines L can be changed as appropriate. In addition, the number of receiving units 52 does not necessarily have to be the same as the number of work lines L, so long as there are more than one receiving units 52.

[0090] In the above embodiment, the part-used information is obtained from the kanban K fitted in the storage box 80 at each part factory R, ​​but this configuration is not essential. For example, a tag storing the part-used information may be attached to the storage box 80 in the part storage area S, and the part-used information may be obtained from the tag. Also, it is not necessary to obtain the part-used information at the collection post 20. For example, when a worker first removes a part from the storage box 80 on the work line L, the part-used information may be obtained by reading the information from the tag with a scanner carried by the worker. In this case, the scanner functions as the acquisition unit.

[0091] In the above embodiment, the parts supply system 10 is configured with the collection post 20, the management device 30, the server 40, the mobile terminal 50, and the display device 60, and these component devices are provided with each functional unit. The arrangement of the functional units can be changed as appropriate. For example, the management device 30 may be provided with a database DB and a priority storage unit, or the display device 60 may be provided with a progress information collection unit 39. In addition, it is not necessary for all of the component devices of the parts supply system 10 to be located within the production factory Q. For example, the server 40 may be located outside the production factory Q. Even with such a configuration, as long as the component devices are capable of communicating with each other in the parts supply system, the same configuration as in the above embodiment can be applied. [Explanation of symbols]

[0092] 10. Parts supply system 20…Collection post 21…Acquisition part 22…1st Communications Department 30…Management device 31...Specified part 32…Second Communications Department 33... Parts information reader 34...Parameter reading section 35...Upper limit memory section 36…Selection department 37... Carry-over information storage section 38…Priority Advancement Section 39…Progress Information Collection Department 40…Server 41…Third Communications Department 50…Mobile device 50A…First mobile terminal 50B…Second mobile terminal 50C…Third mobile terminal 51…4th Communications Department 52...Receiver 53...Transmitter 54...1st display section 55...Operation unit 60…Display device 61…5th Communications Department 62...Second display section 80…Storage box 80A…First storage box D…Trolley DB...database K: Kanban L: Work line L1: First work line L2: Second production line L3: Third work line P…Supplier P1…1st supplier P2…Second supplier P3…Third supplier Q: Production plant R…Parts factory R1…First parts factory R2: Second parts factory R3…Third parts factory S: Parts storage area T…Parts shelf TL1…First left parts shelf TL2: Second left parts shelf TL3…3rd left parts shelf TR1…1st right parts shelf TR2: Second right parts shelf TR3…Third right parts shelf

Claims

1. 1. A parts supply system for supplying parts from a parts storage location located at a position different from a plurality of work lines in a factory having the plurality of work lines, to the plurality of work lines, comprising: The parts are placed in a container in the part storage area, The supply part is supplied to the work line in a state where it is contained in the container, an acquisition unit that acquires used part information, which is information on used parts in the plurality of work lines; a designation unit that designates a supply part to be supplied from the parts storage area to each of the work lines based on the used part information acquired by the acquisition unit; a receiving unit that receives information about the supply part designated by the designation unit, The receiving unit is provided in a plurality of units assigned to each of the work lines, the designation unit transmits to the receiving unit information including both the supply parts corresponding to the work line to which the receiving unit is assigned and the supply parts corresponding to a work line different from the work line to which the receiving unit is assigned as information related to the supply parts, and has a part usage information reading unit that reads the part usage information from the acquisition unit, an upper limit value storage unit that stores a work upper limit value that is set in advance for one part supply operation, a selection unit that selects the storage box based on the part usage information read by the part usage information reading unit such that a total of work values ​​set for each storage box does not exceed the work upper limit value, and a communication unit that transmits information about the storage box selected by the selection unit as information related to the supply parts, The selection unit selects the receiving box corresponding to the work line to which the receiving unit is assigned and the receiving box corresponding to a work line different from the work line to which the receiving unit is assigned. Parts supply system.

2. The work line is provided with a parts shelf on which the storage box is placed, The component shelf is provided with placement positions corresponding to the respective storage boxes, the selection unit uses a distance coefficient set for each of the storage boxes as the operation value for the storage box, The distance coefficient is set to a larger value for the container whose placement position is farther from the part placement area. The parts supply system according to claim 1 .

3. The selection unit uses a volume coefficient set for each of the storage boxes as the working value of the storage box, The volume coefficient is set to a larger value for the storage box having a larger volume.

3. A parts supply system according to claim 1 or 2.

4. A priority order storage unit that stores a priority order set for each of the storage boxes, The selection unit selects the container based on the priority order stored in the priority order storage unit and the used part information read by the used part information reading unit. The parts supply system according to any one of claims 1 to 3.

5. A carryover information storage unit that stores information on the storage box that was not designated and carried over in a previous parts supply process; a priority advancement unit that advances the priority of the storage box stored in the carryover information storage unit by one and stores the priority, The selection unit selects the storage boxes including the carried-over storage box based on the used part information, the storage box information stored in the carry-over information storage unit, and the priority order information stored in the priority order advancement unit, and selects the storage box using the priority order stored in the priority order advancement unit for the carried-over storage box.

5. The parts supply system according to claim 4.

Citation Information

Patent Citations

  • Method and system for controlling stock of parts to be supplied to manufacture line

    JP1995061536A

  • Management device

    JP2016115739A

  • Component storage body management device and component storage body storage cabinet, and component preparation instruction method

    JP2018164018A

  • Component mounting system

    JP2018201021A

  • Information processing device, mounting system, and information processing method

    JP2021002672A