Hydrogen Production Equipment

The hydrogen production device addresses pressure release challenges by using a locking mechanism with rods that disengage under pressure to open the top of the door safely, reducing damage and ensuring safety during explosions.

JP7572253B2Active Publication Date: 2024-10-23HONDA MOTOR CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
JP2021009862
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-01-25
Publication Date
2024-10-23
Estimated Expiration
2041-01-25

AI Technical Summary

Technical Problem

Existing hydrogen production devices with water electrolysis units face challenges in safely releasing pressure during explosions, as locking mechanisms at corners are prone to failure under high pressure, leading to potential damage and safety hazards.

Method used

A hydrogen production device with a casing designed to include a locking mechanism for the opening/closing door, featuring a pair of rods with enlarged diameter portions that disengage under pressure to selectively open and release pressure from the top while maintaining the bottom closed, ensuring safe pressure relief.

Benefits of technology

The solution effectively releases pressure from the top of the door, preventing the door from fully opening and minimizing damage, ensuring safety by avoiding contact with people and reducing structural deformation during explosions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007572253000001
    Figure 0007572253000001
  • Figure 0007572253000002
    Figure 0007572253000002
  • Figure 0007572253000003
    Figure 0007572253000003
Patent Text Reader

Abstract

To provide a hydrogen production apparatus equipped with a locking mechanism of an opening / closing door, which can reliably release pressure to outside by opening a desired part when an excessive pressure is generated in its inside.SOLUTION: A hydrogen production apparatus 10, in which the upper end 86a of an upper rod 86 and the lower end 88a of a lower rod 88 in an open / close switching mechanism 78 are positioned behind first and second front frame pieces 36, 44 of a housing 12, with the front end 70 of the housing 12 in the state of closed by an opening / closing door 72. The axial distance between the upper end of a lower collar member 104 provided on the lower rod 88 and a second stopper 112 is set larger than the axial distance between the upper end of an upper collar member 102 provided on the upper end 86a of the upper rod 86 and a first stopper 110.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a hydrogen production device including a water electrolysis unit that electrolyzes water to generate hydrogen gas. [Background technology]

[0002] Hydrogen production devices equipped with a water electrolysis device that generates hydrogen gas by electrolyzing water have been known for some time. In such hydrogen production devices, if the generated hydrogen gas leaks from inside the device and ignites due to some cause such as electrical components or static electricity, there is a risk of an explosion and scattering the components of the hydrogen production device into the surrounding area.

[0003] In order to reduce damage from such explosions, explosion relief ports that can quickly release excessive pressure caused by an explosion to the outside have been provided in the housing. For example, a gas chromatograph oven disclosed in Patent Document 1 has an oven chamber body that is substantially rectangular and has an entirely open front, and a door that opens and closes the front opening of the oven chamber body, and the oven chamber body is formed by fitting or screwing together a number of metal plate members. In addition, a substantially frame-shaped front frame metal plate member is attached to the outer metal plate member in a similar manner to the front opening that is opened and closed by the door.

[0004] If hydrogen gas or the like accumulates in the oven chamber body and ignites, an explosion occurs, and the gas pressure in the internal space rises rapidly as a result, causing damage, breakage, and deformation in the upper left and right corners of the oven chamber body, which have relatively low strength, and in the attachment parts between the front frame metal plate member and the outer metal plate member. This forms an opening in the oven chamber body, and the hydrogen gas or the like can flow out through this opening, reducing damage to the gas chromatograph oven. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2018-194300 A Summary of the Invention [Problem to be solved by the invention]

[0006] However, for example, if a locking mechanism is provided for a door that can be opened and closed as described above, which can lock the front opening of the oven chamber body in a closed state, and the locking mechanism is configured to engage with the ceiling or corners of the oven chamber body, there is a problem in that the strength of the corners, etc., is set lower than that of other parts, making it difficult to open the corners due to the pressure at the time of explosion and release the pressure to the outside.

[0007] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a hydrogen production device that is capable of reliably releasing pressure to the outside by opening a desired area when excessive pressure is generated inside, even when the device is equipped with a locking mechanism for opening and closing the door. [Means for solving the problem]

[0008] In order to achieve the above object, one aspect of the present invention provides a hydrogen production device including a water electrolysis unit that electrolyzes water to generate hydrogen gas, a storage unit that stores the hydrogen gas generated in the water electrolysis unit, a supply unit that supplies the hydrogen gas stored in the storage unit to an outside, an electrical equipment unit that drives and controls at least the water electrolysis unit, and a housing that accommodates the water electrolysis unit, the storage unit, the supply unit, and the electrical equipment unit, The housing is formed of at least an upper frame and a lower frame provided at an upper portion and a lower portion along a height direction, and has an opening end that opens toward a side perpendicular to the height direction, an opening / closing door that is rotatably supported on the housing and opens and closes an opening end; a lock mechanism provided on the door for restricting the opening of the door when the opening end is closed; Equipped with The lock mechanism has a pair of first and second rods that are movably provided along a height direction of the opening and closing door that is perpendicular to the opening direction of the opening end, In an opening operation restricted state in which the opening end is closed by the opening / closing door and the opening operation of the opening / closing door is restricted by the locking mechanism, an axial upper end of the first rod is disposed on the opposite side of the opening / closing door with respect to the upper frame, and an axial lower end of the second rod is disposed on the opposite side of the opening / closing door with respect to the lower frame, In the opening operation restricted state, a first expanded diameter portion formed near the axial upper end of the first rod and expanded radially outward is inserted into a first guide portion provided on the opening / closing door and extending in the opposite direction to the opening end of the opening, and a second expanded diameter portion formed near the axial lower end of the second rod and expanded radially outward is inserted into a second guide portion provided on the opening / closing door and extending in the opposite direction to the opening end of the opening, The axial distance between the upper end of the second enlarged diameter portion and the second guide portion is set to be larger than the axial distance between the lower end of the first enlarged diameter portion and the first guide portion.

[0009] According to the present invention, when the open end of the housing of the hydrogen production device is closed by the door, if hydrogen gas produced inside leaks and ignites, causing an explosion, and the door is pressed outward by a sudden increase in pressure, the locking mechanism is pressed outward together with the door, and the first enlarged diameter portion provided near the upper end of the first rod is released from the first guide portion and deforms before the second enlarged diameter portion provided near the lower end of the second rod, thereby releasing the engagement with the upper frame and releasing the restriction on the opening operation of the door near the upper part by the first rod. Meanwhile, the second enlarged diameter portion remains inserted into the second guide portion, and the opening operation of the door near the lower part by the second rod is maintained in a restricted state.

[0010] As a result, even if excessive pressure occurs inside the housing, the opening operation restriction state near the top of the opening / closing door can be released and the door opened, allowing the pressure to be reliably released to the outside from the open area near the top. Therefore, even if there is a person near the opening / closing door, for example, contact with the person can be reliably avoided and the person can be protected by preventing the lower side of the opening / closing door from opening or coming off. Effect of the Invention

[0011] According to the present invention, the following effects can be obtained.

[0012] In other words, in a hydrogen production device in which the opening end of the housing is closed by an opening / closing door, even if an explosion occurs due to leakage and ignition of hydrogen gas produced internally and the opening / closing door is pushed outward by the suddenly increased pressure, the first expansion portion provided near the upper end of the first rod in the locking mechanism will detach from the first guide portion and deform before the second expansion portion provided near the lower end of the second rod, thereby releasing the engagement with the upper frame, and as a result, the state in which the first rod restricts the opening operation near the upper part of the opening / closing door can be released.

[0013] As a result, even if excessive pressure occurs inside the housing, by first opening and releasing only the upper portion of the opening / closing door, the pressure can be reliably released to the outside from the open area near the upper portion, preventing the lower portion of the opening / closing door from opening or coming off. This makes it possible, for example, to reliably avoid contact with the opening / closing door if there is a person near the opening / closing door. [Brief description of the drawings]

[0014] [Figure 1] 1 is an external perspective view of a hydrogen production device according to an embodiment of the present invention. [Diagram 2] FIG. 2 is an overall front view of the hydrogen production device shown in FIG. [Diagram 3] 3 is an overall front view showing the hydrogen production device in FIG. 2 with the door open. FIG. [Figure 4] 4 is a cross-sectional view taken along line IV-IV in FIG. 2, with some parts omitted. [Diagram 5] 2 is a cross-sectional view taken along line VV in FIG. 1. [Figure 6] 6A is an enlarged front view of the opening / closing door constituting the hydrogen production device of FIG. 2, as viewed from the inside of the housing, and FIG. 6B is an enlarged configuration diagram of the opening / closing switching mechanism in FIG. 6A, with some parts omitted. [Figure 7]7A is an enlarged cross-sectional view showing the vicinity of an upper rod of the open / close switching mechanism in FIG. 4, and FIG. 7B is an enlarged cross-sectional view showing the vicinity of a lower rod of the open / close switching mechanism in FIG. [Figure 8] 8A is an enlarged front view of the open / close door unlocked by the open / close switching mechanism, as viewed from inside the housing, and FIG. 8B is an enlarged, partially omitted, configuration diagram of the open / close switching mechanism in FIG. 8A. [Figure 9] 9A is an enlarged cross-sectional view showing the vicinity of an upper rod of the open / close switching mechanism in FIG. 8A, and FIG. 9B is an enlarged cross-sectional view showing the vicinity of a lower rod of the open / close switching mechanism in FIG. 8A. [Figure 10] 5 is an overall cross-sectional view showing a case where excessive pressure is generated inside the hydrogen production device of FIG. 4 and a part of the opening and closing door is opened. FIG. [Figure 11] 11A is an enlarged cross-sectional view showing the vicinity of an upper rod of the open / close switching mechanism in FIG. 10, and FIG. 11B is an enlarged cross-sectional view showing the vicinity of a lower rod of the open / close switching mechanism in FIG. [Figure 12] FIG. 12A is an enlarged cross-sectional view of the vicinity of an upper rod in an open / close switching mechanism according to a modified example, and FIG. 12B is an enlarged cross-sectional view of the vicinity of a lower rod in the open / close switching mechanism. [Figure 13] Figure 13A is an enlarged cross-sectional view showing the vicinity of the upper rod when excessive pressure occurs inside a hydrogen production device having the opening / closing switching mechanism of Figure 12A, and Figure 13B is an enlarged cross-sectional view showing the vicinity of the lower rod when excessive pressure occurs inside a hydrogen production device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A hydrogen production apparatus according to a preferred embodiment of the present invention will be described in detail below with reference to the accompanying drawings.

[0016] As shown in Figures 1 to 4, this hydrogen production device 10 is configured as a so-called hydrogen gas station that supplies hydrogen as fuel gas to, for example, a fuel cell vehicle (target object) not shown, and includes a housing 12 and a water electrolysis system 14 housed inside the housing 12.

[0017] The housing 12 is formed, for example, in a generally rectangular cross-section that is elongated in the width direction (direction of arrows A1 and A2) when viewed from above, and has a frame 16, a set of side panels 18a, 18b provided on both sides in the width direction, a rear panel 20 provided on the rear end side of the side panels 18a, 18b, a bottom panel 22 provided at the lower ends of the side panels 18a, 18b and the rear panel 20, and a ceiling panel (ceiling board) 24 provided at the upper ends of the side panels 18a, 18b and the rear panel 20, and the side panels 18a, 18b, the rear panel 20, the bottom panel 22 and the ceiling panel 24 are each attached to the frame 16.

[0018] Frame 16 consists of an upper frame portion 26 that forms the upper end of housing 12, a lower frame portion 28 that forms the lower end of housing 12, and a connecting frame portion 30 that extends in the vertical direction (in the direction of arrows B1 and B2) and connects upper frame portion 26 and lower frame portion 28.

[0019] The upper frame portion 26 has first front and rear frame pieces 32a, 32b that extend horizontally in the front-rear direction (the directions of arrows C1, C2) at both widthwise ends, a first rear frame piece 34 that extends in the widthwise direction (the directions of arrows A1, A2) and connects the rear ends of the first front and rear frame pieces 32a, 32b, and a first front frame piece (upper frame) 36 that extends in the widthwise direction (the directions of arrows A1, A2) and connects the front ends of the first front and rear frame pieces 32a, 32b. The first front and rear frame pieces 32a, 32b are arranged substantially parallel to each other, and the first rear frame piece 34 and the first front frame piece 36 are arranged substantially parallel to each other.

[0020] In addition, the first front frame piece 36 is formed in a generally rectangular cross section when viewed from its extension direction, and has a first wall portion 38 at its rear end (in the direction of arrow C2) extending in the vertical direction (in the direction of arrows B1, B2), and the first wall portion 38 is formed flat along the vertical direction and is formed with the same cross-sectional shape along the width direction (in the direction of arrows A1, A2) from one first front-rear frame piece 32a to the other first front-rear frame piece 32b.

[0021] The lower frame portion 28 has second front and rear frame pieces 40a, 40b extending horizontally along the front and rear direction (in the direction of arrows C1 and C2) at both widthwise ends, a second rear frame piece 42 extending along the width direction (in the direction of arrows A1 and A2) and connecting the rear ends of the second front and rear frame pieces 40a, 40b, and a second front frame piece (lower frame) 44 extending along the width direction and connecting the front ends of the first front and rear frame pieces 32a, 32b.

[0022] The second front frame piece 44 has a generally rectangular cross section when viewed from the direction in which it extends, and has a second wall portion 46 extending in the vertical direction (in the direction of arrows B1, B2) at its rear end side (in the direction of arrow C2). The second wall portion 46 is formed flat along the vertical direction and is formed with the same cross section along the width direction (in the direction of arrows A1, A2) from one second front-rear frame piece 40a to the other second front-rear frame piece 40b, and is formed so as to be at the same position in the vertical direction as the first wall portion 38 of the upper frame portion 26 (see FIG. 4).

[0023] The second front and rear frame pieces 40a, 40b are arranged substantially parallel to each other, and the second rear frame piece 42 and the second front frame piece 44 are arranged substantially parallel to each other.

[0024] In addition, the second front and rear frame pieces 40a, 40b are arranged approximately parallel to the first front and rear frame pieces 32a, 32b, and the second front frame piece 44 and the second rear frame piece 42 are arranged approximately parallel to the first front frame piece 36 and the first rear frame piece 34, respectively.

[0025] The connecting frame portion 30 includes a set of rear end frame pieces 48a, 48b that respectively connect the rear ends of the first front and rear frame pieces 32a, 32b and the second front and rear frame pieces 40a, 40b and the ends of the first and second rear frame pieces 34, 42, and a set of front end frame pieces 50a, 50b that respectively connect the front ends of the first front and rear frame pieces 32a, 32b and the second front and rear frame pieces 40a, 40b and the ends of the first and second front frame pieces 36, 44. The rear end frame pieces 48a, 48b and the front end frame pieces 50a, 50b are formed approximately parallel to each other, and are connected approximately perpendicular to the first front and rear frame pieces 32a, 32b and the second front and rear frame pieces 40a, 40b, the first and second front frame pieces 36, 44, and the first and second rear frame pieces 34, 42, respectively.

[0026] The set of side panels 18a, 18b are fitted so as to cover the spaces between the first front and rear frame pieces 32a, 32b in the upper frame portion 26, the second front and rear frame pieces 40a, 40b in the lower frame portion 28, the rear end frame pieces 48a, 48b, and the front end frame pieces 50a, 50b, and are fixed to the frame 16 by fastening screws (not shown). In this way, the set of side panels 18a, 18b form side walls on both sides in the width direction of the housing 12.

[0027] The rear panel 20 is fitted over and between the first rear frame piece 34 of the upper frame portion 26, the second rear frame piece 42 of the lower frame portion 28, and the pair of rear end frame pieces 48a, 48b, and is fixed to the frame 16 by a number of fastening screws (not shown).

[0028] The bottom panel 22 is fitted so as to cover the spaces between the second front and rear frame pieces 40a, 40b, the second rear frame piece 42, and the second front frame piece 44 in the lower frame portion 28, and is fixed to the frame 16 by a plurality of fastening screws (not shown). In this way, the bottom panel 22 forms the bottom wall of the housing 12.

[0029] The ceiling panel 24 is fitted so as to cover the gap between the first front and rear frame pieces 32a, 32b, the first rear frame piece 34, and the first front frame piece 36 in the upper frame portion 26, and is composed of a first panel body (divided piece) 52 provided on one side in the width direction (arrow A1 direction), and a second panel body (divided piece) 54 provided on the other side in the width direction (arrow A2 direction) adjacent to the first panel body 52. ​​In other words, the ceiling panel 24 is divided into two in the width direction of the housing 12 (arrows A1, A2 directions).

[0030] The second panel body 54 is provided to face an upper portion of a water electrolysis unit 122 in the water electrolysis system 14 described below, and is provided with a substantially rectangular ventilation opening (opening) 56. The ventilation opening 56 penetrating the ceiling panel 24 provides communication between the inside and the outside of the housing 12.

[0031] The first panel body 52 is firmly fixed to the first front / rear frame piece 32a, the first rear frame piece 34 and the first front frame piece 36 by a plurality of (for example, four) fastening screws 55.

[0032] On the other hand, the second panel body 54 has one widthwise end on the first panel body 52 side (arrow A1 direction) placed on the first rear frame piece 34 and the first front frame piece 36, and the other widthwise end (arrow A2 direction) placed on the first front and rear frame pieces 32b, and each of the outer edge portions placed on the first rear frame piece 34, the first front frame piece 36, and the first front and rear frame pieces 32b has a panel hole 58 penetrating in the up-down direction (arrow B1, B2 direction). The three panel holes 58 are arranged along the outer edge portion of the second panel body 54 so as to be spaced apart from one another.

[0033] Then, with its outer edge placed on the first rear frame piece 34, the first front frame piece 36, and the first front and rear frame pieces 32b, the second panel body 54 is fixed to the frame 16 by engaging three rivets 62 with the panel hole 58 and each of the frame holes 60 in the first rear frame piece 34, the first front frame piece 36, and the first front and rear frame pieces 32b that open toward the panel hole 58.

[0034] As shown in Figure 5, the rivet 62 is formed, for example, from a plastically deformable metal material, and is composed of a main body portion 64 that is inserted into each panel hole 58 of the ceiling panel 24 and the frame holes 60 of each frame piece 32b, 34, 36, a flange portion 66 provided at one end of the main body portion 64, and a fastening portion 68 provided at the other end of the main body portion 64, the main body portion 64 being formed in an axial shape with a circular cross section, while the flange portion 66 is formed in a disk shape that expands radially outward from the main body portion 64.

[0035] Then, with the outer edge portion of the second panel body 54 placed on the first rear frame piece 34, the first front frame piece 36, and the first front and rear frame pieces 32b, the main body portion 64 of the rivet 62 is inserted from the second panel body 54 side into the panel holes 58 and the frame holes 60 of each frame piece 32b, 34, 36 that are arranged in a straight line in the vertical direction (in the directions of arrows B1 and B2), and with the flange portion 66 abutting the upper surface of the second panel body 54, the lower end of the main body portion 64 protruding from the lower surfaces of the first rear frame piece 34, the first front frame piece 36, and the first front and rear frame pieces 32b is crushed in the axial direction (upward, in the direction of arrow B1) to form a crimped portion 68 that is expanded radially outward.

[0036] The second panel body 54 is fixed to each frame 16 by the crimping portion 68 in a state in which removal and attachment in the up and down directions (the directions of arrows B1 and B2) is restricted, and the upper wall of the housing 12 is formed from the ceiling panel 24 including the first and second panel bodies 52, 54. As a result, in the above-mentioned ceiling panel 24, the fixing strength of the second panel body 54 fixed to the frame 16 by three rivets 62 is lower than the fixing strength of the first panel body 52 fixed to the frame 16 by four fastening screws 55. In other words, the second panel body 54 is fixed to the housing 12 with a lower fixing strength than the first panel body 52 so that it is more likely to come off.

[0037] In addition, the second panel body 54 is fixed at one widthwise end side (in the direction of arrow A1) by two rivets 62 and at the other widthwise end side (in the direction of arrow A2) by one rivet 62, and is therefore fixed to the frame 16 such that the fixing strength at the other widthwise end side is lower than the fixing strength at the one widthwise end side.

[0038] As described above, the housing 12 has its side panels 18a, 18b erected in the vertical direction (arrows B1, B2 directions), one side panel 18a and the other side panel 18b arranged substantially parallel to each other, and the bottom panel 22 and the ceiling panel 24 are provided substantially horizontally, with their widthwise ends connected substantially perpendicular to the side panels 18a, 18b. That is, the housing 12 is formed in a box shape recessed from its front end (opening end) 70 toward the rear side (arrow C2 direction), and the front end 70 is substantially rectangular in shape elongated in the width direction from the first and second front frame pieces 36, 44 and the front end frame pieces 50a, 50b, and opens toward the front side (arrow C1 direction, opening direction).

[0039] An opening / closing door 72 is provided at a front end 70 of the housing 12, which is divided at the center in the width direction and can freely open and close the front end 70. This opening / closing door 72 is made up of a pair of door bodies 74a, 74b divided into two in the width direction of the housing 12 (the directions of arrows A1 and A2), for example.

[0040] The door bodies 74a, 74b are formed, for example, in the shape of flat panels with approximately the same height as the side panels 18a, 18b, and their widthwise ends are rotatably supported by shafts 76 extending in the up-down direction (in the directions of arrows B1, B2) relative to the front ends 70 of the side panels 18a, 18b. That is, the pair of door bodies 74a, 74b are of a double door type that open laterally in the left-right direction (in the directions of arrows A1, A2) with the shafts 76 supported on the widthwise ends of the housing 12 from the center of the width of the housing 12 as fulcrums.

[0041] As shown in Figures 1, 2 and 4, the opening / closing door 72 is arranged, for example, approximately parallel to the rear panel 20 when the front end 70 of the housing 12 is closed, while as shown in Figure 3, when the door 72 is opened relative to the front end 70, it rotates, for example, until its widthwise central sides become approximately parallel to the side panels 18a, 18b so as to be spaced apart from each other (see the dashed double-dashed line shape in Figure 1).

[0042] Furthermore, as shown in Figures 2 to 4 and 6A to 9B, the end of each door body 74a, 74b which is located on the widthwise central end side of the opening / closing door 72 is provided with an opening / closing switching mechanism (locking mechanism) 78 for switching the open / closed state of the opening / closing door 72 relative to the front end 70 of the housing 12, and a support mechanism 80 for supporting an upper rod (first rod) 86 and a lower rod (second rod) 88 of the opening / closing switching mechanism 78.

[0043] The open / close switching mechanism 78 is provided at the widthwise end of the pair of door bodies 74a, 74b on the widthwise center side of the open / close door 72, and is arranged so as to extend in the up-down direction (in the direction of arrows B1, B2) along the widthwise end. The open / close switching mechanism 78 includes an open / close lever (operation member) 82 provided outside the open / close door 72, a cam plate (connecting body) 84 provided inside the open / close door 72 and connected to the open / close lever 82, and a pair of upper rods 86 and lower rods 88 provided inside the open / close door 72, each extending in the up-down direction (in the direction of arrows B1, B2) from the heightwise center and connected to the cam plate 84. The open / close switching mechanism 78 is provided on one door body 74a and the other door body 74b, respectively.

[0044] The opening / closing lever 82 is formed, for example, in a substantially L-shape, and is provided near the center in the height direction of the door bodies 74a, 74b, and includes an axis portion 90 that extends linearly toward the opening / closing door 72 and is inserted therethrough, and a grip portion 92 that is spaced a predetermined distance from the door bodies 74a, 74b and is formed substantially perpendicular to an end of the axis portion 90. The opening / closing lever 82 is supported rotatably relative to the opening / closing door 72 by inserting one end of the axis portion 90 into a hole (not shown) opened in the opening / closing door 72, and is provided so that an operator (not shown) can grip the grip portion 92 and turn the opening / closing door 72 when opening or closing the opening / closing door 72.

[0045] The opening / closing lever 82 is arranged so that, in a locked state in which the opening operation of the opening / closing door 72 is restricted by the opening / closing switching mechanism 78, the grip portion 92 extends in the vertical direction (in the direction of arrows B1, B2), while in an unlocked state in which the opening / closing door 72 can be opened, the grip portion 92 is arranged to be in an inclined position rotated a predetermined angle relative to the vertical direction (in the direction of arrows B1, B2).

[0046] As shown in Figures 4, 6A, 6B, 8A and 8B, the cam plate 84 is formed approximately in a T-shape, has a shaft portion 90 of the opening / closing lever 82 connected to its center, and has a first connection portion 94 extending from the center to one side, and a second connection portion 96 extending to the other side opposite the first connection portion 94, across the center.

[0047] The first connection part 94 is disposed so as to face substantially upward on the opening and closing door 72, and is formed so as to protrude a predetermined length from the center of the cam plate 84, and has a support hole 98 formed therethrough in the vicinity of its tip. The lower end of an upper rod 86, which will be described later, is rotatably inserted into this support hole 98.

[0048] The second connection part 96 is disposed so as to face substantially downward on the opening and closing door 72, protrudes a predetermined length from the center of the cam plate 84, and is formed so as to be in a straight line with the first connection part 94. A support hole 100 is formed to pass through the second connection part 96 near its tip. The upper end of a lower rod 88, which will be described later, is rotatably inserted into this support hole 100.

[0049] The cam plate 84 rotates integrally with the opening / closing lever 82 to which the shaft portion 90 is connected by rotating the same, and the first and second connection portions 94, 96 rotate a predetermined angle around the center, and as shown in Figures 1, 2, 4, 6A and 6B, when the opening operation of the opening / closing door 72 is restricted, the cam plate 84 is positioned so that the first and second connection portions 94, 96 are respectively in the vertical direction. On the other hand, when the opening / closing door 72 is in an unlocked state shown in Figures 8A and 8B and capable of opening, the cam plate 84 is positioned so that the first and second connection portions 94, 96 are inclined at a predetermined angle from the vertical direction.

[0050] The upper rod 86 consists, for example, of a shaft formed with a constant diameter from a metal material, and is arranged along the vertical direction above the center of the height of the opening / closing door 72 (in the direction of arrow B1), with its lower end bent at approximately a right angle toward the opening / closing door 72, i.e., toward the front side (in the direction of arrow C1), and inserted into a support hole 98 of the first connection portion 94 in the cam plate 84 (see Figure 4).

[0051] In addition, as shown in Figures 4, 6A, 6B, 7A, and 8A to 9A, the upper rod 86 is supported so as to be freely movable in the vertical direction (in the directions of arrows B1 and B2) by being inserted into a first rod hole 118a of a first slider 106, which will be described later, provided on the inner surface of the opening and closing door 72.

[0052] Furthermore, the upper end (upper axial end) 86a of the upper rod 86 is covered by a bottomed, cylindrical first cap member 101 having a bottom on the upper side (in the direction of arrow B1), and a cylindrical upper collar member (first enlarged diameter portion) 102 is attached near the upper end 86a so as to cover the outer circumferential surface. The first cap member 101 is made of an elastic material such as rubber or resin.

[0053] The upper collar member 102 has a predetermined length along the axial direction (direction of arrows B1 and B2) of the upper rod 86, and is fixed integrally at a position a predetermined distance downward (direction of arrow B2) from the upper end 86a by, for example, welding etc. That is, the vicinity of the upper end 86a of the upper rod 86 functions as an expanded diameter portion whose shaft diameter is increased by attaching the upper collar member 102 and whose strength is enhanced.

[0054] The upper rod 86 has a portion (first enlarged diameter portion) to which the upper collar member 102 is attached inserted into a second rod hole 120a of a first stopper (first guide portion) 110, which will be described later.

[0055] The upper rod 86 moves in the vertical direction (in the direction of arrows B1 and B2) as the cam plate 84 rotates together with the opening / closing lever 82, and as shown in Figures 6A to 7A, in a locked state in which the opening operation of the opening / closing door 72 is restricted, the first connection portion 94 and the upper rod 86 are arranged in approximately a straight line, and the upper end 86a of the upper rod 86 is positioned rearward (in the direction of arrow C2) relative to the first wall portion 38 of the first front frame piece 36, and above the lower end of the first wall portion 38 (in the direction of arrow B1).

[0056] On the other hand, as shown in Figures 8A to 9A, in an unlocked state in which the restriction on the opening operation of the opening / closing door 72 is released, the first connection portion 94 is inclined at a predetermined angle and the upper rod 86 is pulled downward (in the direction of arrow B2) and descends, so that the upper end 86a of the upper rod 86 is lower than the lower end of the first wall portion 38 (in the direction of arrow B2).

[0057] The lower rod 88, like the upper rod 86, consists of a shaft formed with a constant diameter from a metal material, and is arranged along the vertical direction below the height center of the opening and closing door 72 (in the direction of arrow B2) and is arranged coaxially with the upper rod 86, with its upper end bent at approximately a right angle toward the opening and closing door 72, i.e., the forward side (in the direction of arrow C1), and inserted into the support hole 100 of the second connection portion 96 in the cam plate 84 (see Figure 4).

[0058] In addition, as shown in Figures 4, 6A, 6B, 7B, and 8A to 9B, the lower rod 88 is supported so as to be freely movable in the vertical direction (in the directions of arrows B1 and B2) by being inserted into a first rod hole 118b of a second slider 108 (described later) provided on the inner surface of the opening and closing door 72.

[0059] Furthermore, the lower end (lower axial end) 88a of the lower rod 88 is covered by a bottomed, cylindrical second cap member 103 having a bottom facing downward (in the direction of arrow B2), and a cylindrical lower collar member (second enlarged diameter portion) 104 is attached near the lower end 88a so as to cover the outer circumferential surface. The second cap member 103 is made of an elastic material such as rubber or resin.

[0060] The lower collar member 104 has a predetermined length along the axial direction (direction of arrows B1 and B2) of the lower rod 88, and is fixed integrally therewith by, for example, welding at a position a predetermined distance upward (direction of arrow B1) from the lower end 88a. The lower collar member 104 is disposed such that the axial distance between its lower end and the lower end 88a of the lower rod 88 is the same as the axial distance from the upper end 86a of the upper rod 86 to the upper end of the upper collar member 102. That is, the vicinity of the lower end 88a of the lower rod 88 functions as an enlarged diameter portion whose axial diameter is increased by attaching the lower collar member 104 and whose strength is enhanced.

[0061] In addition, the portion of the lower rod 88 to which the lower collar member 104 is attached is inserted into the second rod hole 120b of the second stopper (second guide portion) 112 described later, and in a locked state in which the opening / closing door 72 shown in Figures 4, 6A to 7B is closed and the opening operation is restricted by the opening / closing switching mechanism 78, the axial distance L2 from the second stopper 112 to the upper end of the lower collar member 104 is set larger than the axial distance L1 from the first stopper 110 to the lower end of the upper collar member 102 (L2>L1).

[0062] The lower rod 88 moves in the vertical direction (in the direction of arrows B1 and B2) as the cam plate 84 rotates together with the opening / closing lever 82, and as shown in Figures 6A to 7B, in a locked state in which the opening operation of the opening / closing door 72 is restricted, the second connection portion 96 and the lower rod 88 are arranged in approximately a straight line, and the lower end 88a of the lower rod 88 is positioned rearward (in the direction of arrow C2) relative to the second wall portion 46 of the second front frame piece 44, and lower than the upper end of the second wall portion 46 (in the direction of arrow B2).

[0063] On the other hand, as shown in Figures 8A to 9B, in an unlocked state in which the restriction on the opening operation of the opening / closing door 72 is released, the second connection portion 96 is inclined at a predetermined angle and the lower rod 88 is pulled upward (in the direction of arrow B1) and rises, so that the lower end 88a of the lower rod 88 is higher (in the direction of arrow B1) than the upper end of the second wall portion 46.

[0064] As shown in Figures 4, 6A to 9B, the support mechanism 80 includes a first slider 106 that is provided on the inner surface near the widthwise central end of the opening / closing door 72 and guides the upper rod 86 to be movable in the vertical direction (directions of arrows B1 and B2), a second slider 108 that guides the lower rod 88 to be movable in the vertical direction, a first stopper 110 that is provided above the first slider 106 and through which the upper rod 86 is inserted, and a second stopper 112 that is provided below the second slider 108 and through which the lower rod 88 is inserted.

[0065] The first and second sliders 106, 108 are formed in substantially the same shape, protrude from the inner surface of the opening / closing door 72 toward the rear side (arrow C2 direction) at right angles, and are provided at positions near the upper end and the lower end of the opening / closing door 72, respectively. Specifically, the first slider 106 and the second slider 108 are disposed at positions symmetrical with respect to the center of the height of the opening / closing door 72. In addition, first rod holes 118a, 118b through which the upper rod 86 and the lower rod 88 can be inserted are formed near the rear ends of the first and second sliders 106, 108, respectively. The upper rod 86 and the lower rod 88 are inserted into the first rod holes 118a, 118b of the first and second sliders 106, 108, respectively, and are guided to be movable in the vertical direction (arrows B1, B2 direction).

[0066] The first and second stoppers 110, 112 are formed in approximately the same shape and, like the first and second sliders 106, 108, protrude perpendicularly from the inner surface of the opening and closing door 72 toward the rear side (in the direction of arrow C2). The first stopper 110 is disposed approximately parallel to the first slider 106 and spaced a predetermined distance upward (in the direction of arrow B1), and the second stopper 112 is disposed approximately parallel to the second slider 108 and spaced a predetermined distance downward (in the direction of arrow B2).

[0067] Second rod holes 120a, 120b are formed in the first and second stoppers 110, 112 near their rear ends, respectively, and the second rod holes 120a, 120b are formed coaxially with the first rod holes 118a, 118b of the first and second sliders 106, 108, respectively. In this manner, by making the second rod holes 120a, 120b larger in diameter than the first rod holes 118a, 118b, the upper collar member 102 and the lower collar member 104 can be inserted therethrough, and the upper rod 86 and the lower rod 88 can be tilted when the opening / closing door 72 is opened.

[0068] In a locked state in which the opening operation of the opening / closing door 72 is locked by the opening / closing switching mechanism 78, the upper end 86a of the upper rod 86 is disposed on the rear side of the first front frame piece 36, the first cap member 101 is in sliding contact with the first wall portion 38, and the lower end 88a of the lower rod 88 is disposed on the rear side of the second front frame piece 44, and the second cap member 103 is in sliding contact with the second wall portion 46. The first cap member 101 is disposed so as to protrude slightly downward (in the direction of arrow B2) from the lower end of the first wall portion 38, and the second cap member 103 is disposed so as to protrude slightly upward (in the direction of arrow B1) from the upper end of the second wall portion 46.

[0069] 3, the water electrolysis system 14 includes a water electrolysis unit 122, a storage unit 124, a supply unit 126, and an electrical unit 128. Inside the housing 12, the water electrolysis unit 122 and the electrical unit 128 are disposed on the front side (in the direction of arrow C1), and the supply unit 126 and the storage unit 124 are disposed on the rear side (in the direction of arrow C2). The electrical unit 128 is disposed on an upper side on one side in the width direction (in the direction of arrow A1), and the water electrolysis unit 122 is disposed on the other side in the width direction (in the direction of arrow A2). The electrical unit 128 is provided for the purpose of controlling the drive of the supply unit 126 and the water electrolysis unit 122.

[0070] The hydrogen production device 10 according to the embodiment of the present invention is basically constructed as described above. Next, its operation and effects will be described.

[0071] First, water (pure water) is supplied to a water electrolysis stack (not shown) under the driving action of a circulation pump (not shown) constituting the water electrolysis unit 122, and the water is electrolyzed in the water electrolysis stack to which a voltage is applied, to obtain hydrogen gas. This hydrogen gas is then sent to and stored in the storage unit 124 after moisture is removed, and the hydrogen gas stored in the storage unit 124 is supplied from a supply unit 126 to an external device (not shown) (e.g., a fuel cell electric vehicle) as necessary.

[0072] Next, the opening and closing of the opening and closing door 72 of the hydrogen production device 10 will be described.

[0073] 2, 4, 6A to 7B, the gripping portion 92 of the opening / closing lever 82 extends in the vertical direction (the direction of the arrows B1 and B2) when the opening / closing door 72 is in a locked state, the first and second connecting portions 94, 96 of the cam plate 84 are arranged in a straight line along the vertical direction, the upper end 86a of the upper rod 86 is arranged on the rear side (the direction of the arrow C2) of the first wall portion 38 of the first front frame piece 36, and similarly, the lower end 88a of the lower rod 88 is arranged on the rear side (the direction of the arrow C2) of the second wall portion 46 of the second front frame piece 44. In addition, the upper collar member 102 is inserted through the second rod hole 120a of the first stopper 110, and the lower collar member 104 is inserted through the second rod hole 120b of the second stopper 112.

[0074] In this way, the upper end 86a of the upper rod 86 and the lower end 88a of the lower rod 88 provided together with the opening / closing door 72 are positioned on the rear side (in the direction of arrow C2) of the first and second front frame pieces 36, 44, and the first and second cap members 101, 103 slide against the first and second wall portions 38, 46, thereby restricting the movement of the opening / closing door 72 toward the front side (in the direction of arrow C1) and placing it in a locked state (opening operation restricted state), so that when the opening / closing door 72 closes the front end 70 of the housing 12, the opening operation is restricted and the door will not open.

[0075] Furthermore, when the opening / closing door 72 is closed and locked by the opening / closing switching mechanism 78, the inside of the housing 12 is kept airtight.

[0076] Next, when opening the above-mentioned opening / closing door 72, an operator (not shown) grasps the gripping portions 92 of the pair of opening / closing levers 82 and, for example, rotates the lower ends of the gripping portions 92 outward in the width direction, using the shaft portion 90 as a fulcrum, so as to move them away from each other.

[0077] 8A and 8B, the cam plate 84 rotates together with the shaft portion 90 by a predetermined angle inside the opening / closing door 72, and the first and second connection portions 94, 96 are inclined by a predetermined angle with respect to the vertical direction, so that the lower end of the upper rod 86 inserted into the support hole 98 is pulled downward (in the direction of arrow B2), and the lower end 88a of the lower rod 88 inserted into the support hole 100 is pulled upward (in the direction of arrow B1). In detail, the second connection portions 96 of the pair of cam plates 84 approach each other, and the pair of first connection portions 94 are in a position separated from each other. As a result, the upper rod 86 and the lower rod 88 move in a direction approaching each other due to the rotation of the cam plate 84, and are in a state of being inclined by a predetermined angle with respect to the vertical direction (in the direction of arrows B1, B2).

[0078] As a result, the upper rod 86 tilts in the vertical direction and descends under the guiding action of the first rod hole 118a in the first slider 106, and the upper collar member 102 tilts in the width direction within the second rod hole 120a of the first stopper 110, so that its upper end 86a together with the first cap member 101 is lower (in the direction of arrow B2) than the lower end of the first front frame piece 36 (see Figure 8B).

[0079] On the other hand, as the lower rod 88 tilts in the vertical direction, it rises under the guiding action of the first rod hole 118b in the second slider 108, and the lower collar member 104 tilts in the width direction within the second rod hole 120b of the second stopper 112, so that its lower end 88a, together with the second cap member 103, is above the upper end of the second front frame piece 44 (in the direction of arrow B1) (see Figure 8B).

[0080] As a result, the engagement between the upper rod 86 and the first front frame piece 36 and the engagement between the lower rod 88 and the second front frame piece 44 are simultaneously released, and the opening / closing door 72 having the opening / closing switching mechanism 78 becomes capable of freely opening forward (in the direction of arrow C1). Then, when an operator (not shown) pulls the opening / closing lever 82 forward (in the direction of arrow C1) while still holding it, the pair of door bodies 74a, 74b open laterally in the left and right directions (in the directions of arrows A1, A2) with the support shaft 76 as a fulcrum (see the two-dot chain line shape in FIG. 1).

[0081] On the other hand, when closing the opening / closing door 72 again, an operator (not shown) rotates the pair of door bodies 74a, 74b to close the front end 70 of the housing 12, and then rotates the lower ends of the opening / closing levers 82 closer to each other and aligns them in the vertical direction, causing the first and second connection portions 94, 96 of the cam plate 84 to rotate so as to form a straight line in the vertical direction, and accordingly, the upper rod 86 rises and the upper end 86a moves to a position rear of the first wall portion 38 of the first front frame piece 36, and the lower rod 88 descends and the lower end 88a moves to a position rear of the second wall portion 46 of the second front frame piece 44.

[0082] As a result, the upper end 86a of the upper rod 86 engages with the first front frame piece 36 and restricts movement forward (in the direction of arrow C1), and the lower end 88a of the lower rod 88 engages with the second front frame piece 44 and restricts movement forward (in the direction of arrow C1). As a result, a locked state is established in which movement of the opening / closing door 72 from the front end 70 to the front side (in the direction of arrow C1) is restricted by the opening / closing switching mechanism 78.

[0083] Next, in the hydrogen production device 10 in which the front end 70 of the housing 12 is closed by the opening / closing door 72 as shown in FIG. 1, a case in which hydrogen gas produced in the water electrolysis unit 122 leaks and accumulates inside the housing 12 for some reason and is ignited by sparks, static electricity, or the like generated in the electrical unit 128, resulting in an explosion, will be described with reference to FIGS. 9A to 11B.

[0084] First, hydrogen gas accumulated inside the housing 12 explodes, causing a sudden increase in internal pressure, and excessive pressure is applied so as to press outward against the side panels 18a, 18b, rear panel 20, ceiling panel 24, and opening / closing door 72 that constitute the housing 12. At this time, part of the pressure is released to the outside through the ventilation opening 56 opened in the ceiling panel 24, and the pressure presses the ceiling panel 24 upward (in the direction of arrow B1).

[0085] As a result, as shown in Figure 3, the second panel body 54 of the ceiling panel 24, which has a lower fixing strength compared to the first panel body 52, is released from its fixing to the frame 16 by the three rivets 62 and pushed upward, detaching it from the housing 12 and entering an open state (see the dotted line shape in Figure 3).

[0086] 3, the other widthwise end of the second panel body 54, which was fixed by one rivet 62, comes off the frame 16 before the one widthwise end of the second panel body 54, which is fixed by two rivets 62, comes off the frame 16, and the one widthwise end is left in place. As a result, part of the pressure is released to the outside, in addition to the ventilation opening 56, from the upper part of the housing 12 that has been opened by the detachment of part of the second panel body 54.

[0087] Furthermore, the vicinity of the center in the height direction of the opening / closing door 72 is pressed outward (toward the front) by the pressure remaining in the housing 12, and accordingly, the cam plate 84 of the opening / closing switching mechanism 78, the lower end of the upper rod 86 supported by the cam plate 84, and the upper end of the lower rod 88 move forward (in the direction of the arrow C1) together with the opening / closing door 72. Furthermore, as the opening / closing door 72 moves forward, the first and second sliders 106, 108 and the first and second stoppers 110, 112 also move integrally forward (in the direction of the arrow C1).

[0088] 11A, the upper rod 86 is deformed so as to be inclined at a predetermined angle by moving forward with its upper end 86a engaged with the first front frame piece 36 and inserted into the first rod hole 118a of the first slider 106, and the upper collar member 102 is removed upward (in the direction of arrow B1) from the second rod hole 120a of the first stopper 110, and the upper end 86a side is further bent rearward (in the direction of arrow C2) from the position that is the lower end of the upper collar member 102. As a result, with the deformation of the upper rod 86, the upper end 86a climbs downward over the lower end of the first wall portion 38 of the first front frame piece 36 and moves forward (in the direction of arrow C1).

[0089] On the other hand, as shown in FIG. 11B, the lower rod 88 is deformed so as to tilt at a predetermined angle by moving forward with its lower end 88a engaged with the second front frame piece 44 and inserted into the first rod hole 118b of the second slider 108. However, since the axial distance L2 from the second stopper 112 to the upper end of the lower collar member 104 is set to be greater than the axial distance L1 from the first stopper 110 to the lower end of the upper collar member 102, the lower collar member 104 remains inserted into the second rod hole 120b of the second stopper 112 without coming out of the second rod hole 120b.

[0090] Therefore, the lower rod 88 will not bend like the upper rod 86, because the portion (second expanded portion) of the lower rod 88 which is expanded by the attachment of the lower collar member 104 and has high strength is suitably held by the second stopper 112 (second rod hole 120b), and the lower end 88a of the lower rod 88 will not overcome the second wall portion 46 of the second front frame piece 44, so that the lower rod 88 is maintained in an engaged state with the rear side (in the direction of arrow C2) of the second front frame piece 44, and movement to the front side (in the direction of arrow C1) remains restricted.

[0091] As a result, when the opening / closing door 72 is pressed outward by the excessive pressure caused by the explosion, the upper rod 86 is disengaged from the first front frame piece 36 (first wall portion 38) which is the upper side (arrow B1 direction) of the housing 12, and the lower rod 88 is not disengaged and is maintained from the second front frame piece 44 (second wall portion 46) which is the lower side (arrow B2 direction) of the housing 12. Therefore, as shown in FIG. 10, the upper vicinity of the opening / closing door 72 moves outward (forward) from the front end 70 of the housing 12 and opens to be in a slightly open state, while the lower vicinity keeps the front end 70 closed. In other words, the opening / closing door 72 is deformed so that the upper side (arrow B1 direction) from the center in the height direction is inclined forward to be opened when viewed from the width direction of the hydrogen production device 10 shown in FIG. 10.

[0092] Then, the pressure applied to the opening / closing door 72 and remaining inside the housing 12 is released to the outside through an opening portion between the upper portion of the opening / closing door 72 and the housing 12, thereby reducing the pressure inside the housing 12.

[0093] In this way, even if hydrogen gas produced in the hydrogen production device 10 leaks and ignites inside the housing 12, causing an explosion, the excessive pressure that rises rapidly inside can be released to the outside through the ventilation opening 56 opened in the ceiling panel 24, and the upper part of the housing 12 can be opened and released to the outside by detaching the second panel body 54 of the ceiling panel 24 from the frame 16 under the biasing action of the pressure. Furthermore, when excessive pressure is applied to the opening door 72, the upper rod 86 of the opening / closing switching mechanism 78 can be made to release the opening operation restriction state of the opening door 72, so that only the vicinity of the upper part of the opening / closing door 72 can be opened and the pressure can be released to the outside.

[0094] As described above, in this embodiment, in the hydrogen production device 10 with the opening / closing door 72 closed, even if an explosion occurs due to the produced hydrogen gas leaking and igniting inside the housing 12 and the opening / closing door 72 is pressed outward due to the suddenly increased pressure, the upper rod 86 and lower rod 88 of the opening / closing switching mechanism 78 provided on the opening / closing door 72 will be pushed outward (forward) together with the cam plate 84, and as a result, the upper collar member 102 provided near the upper end 86a of the upper rod 86 will detach from the first stopper 110 and deform, so that the lower collar member 104 provided near the lower end 88a of the lower rod 88 will remain held by the second stopper 112.

[0095] Therefore, in a locked state in which the opening operation of the opening / closing door 72 by the opening / closing switching mechanism 78 is restricted, the upper end 86a of the upper rod 86 can be moved forward over the lower end of the first front frame piece 36, allowing only the upper side of the opening / closing door 72 to be opened, and the door can be opened by opening the area near the upper part away from the front end 70 of the housing 12.

[0096] As a result, even if excessive pressure is generated inside the hydrogen production device 10, the vicinity of the upper part of the opening / closing door 72 is opened first, so that the pressure can be released to the outside from the open portion between the opening / closing door 72 and the housing 12. This reduces damage to the water electrolysis system 14 housed in the housing 12 due to pressure, and, for example, even if a person is present around the opening / closing door 72 when an explosion occurs, the opening / closing door 72 will not be fully open or come off the frame 16, so that contact with the person can be reliably avoided and the person can be protected.

[0097] In addition, by opening the upper portion of the opening / closing door 72 and reducing the pressure inside the housing 12, it is possible to prevent the side panels 18a, 18b, rear panel 20, etc. that constitute the housing 12 from coming off and flying apart due to the pressure.

[0098] Furthermore, the ceiling panel 24 attached to the upper surface of the housing 12 is composed of first and second panel bodies 52, 54 which can be freely separated in the width direction (arrows A1, A2 directions), and the first panel body 52 arranged on one side in the width direction (arrow A1 direction) is fixed to the frame 16 by a plurality of fastening screws 55, and the second panel body 54 adjacent to the first panel body 52 and arranged on the other side in the width direction (arrow A2 direction) is fixed to the frame 16 by a rivet 62, thereby making the fixing strength of the second panel body 54 to the frame 16 lower than the fixing strength of the first panel body 52 to the frame 16.

[0099] As a result, if the pressure inside the housing 12 suddenly rises due to an explosion, the ceiling panel 24 is pushed outward by the pressure, and the second panel body 54, which has a lower fixing strength, will detach upward from the frame 16 before the first panel body 52, making it possible to remove only a portion of the ceiling panel 24 and open it without removing the entire ceiling panel 24 from the frame 16. In other words, by setting the fixing strengths of the first and second panel bodies 52, 54 that make up the ceiling panel 24 to be different, it is possible to freely control the portion of the ceiling panel 24 that opens in the event of an explosion.

[0100] Furthermore, the ceiling panel 24 is provided with the ventilation opening 56 that opens to a position facing the water electrolysis unit 122. Therefore, even if hydrogen gas that has leaked inside the housing 12 ignites and an explosion occurs, the suddenly increasing internal pressure can be suitably released to the outside by utilizing the ventilation opening 56, thereby suppressing a sudden pressure increase inside the housing 12.

[0101] Furthermore, since the fixing strength of the ceiling panel 24 to the housing 12 is set lower than the fixing strength of the opening and closing door 72 to the housing 12, when the internal pressure rises due to an explosion, the ceiling panel 24 detaches from the housing 12 before the opening and closing door 72, and the internal pressure can be released to the outside from the detached part of the ceiling panel 24. Therefore, it is possible to suppress deformation and scattering of the opening and closing door 72 in the event of an explosion, and for example, even if there is a person near the opening and closing door 72, contact with the opening and closing door 72 can be suitably avoided.

[0102] In addition, the upper end 86a of the upper rod 86 and the lower end 88a of the lower rod 88 are covered with first and second cap members 101, 103 made of an elastic material. Therefore, when the opening movement of the opening / closing door 72 is restricted in a locked state, the contact noise and impact generated when the upper end 86a contacts the first front frame piece 36 and when the lower end 88a contacts the second front frame piece 44 can be suitably mitigated.

[0103] Furthermore, in the opening / closing switching mechanism 78 that constitutes the above-mentioned hydrogen production device 10, when the opening / closing door 72 is closed and in a locked state in which the opening operation is restricted, the axial distance L2 from the second stopper 112 to the upper end of the lower collar member 104 is set to be larger than the axial distance L1 from the first stopper 110 to the lower end of the upper collar member 102 (L2>L1), but this configuration is not limited to this.

[0104] For example, like the opening / closing switching mechanism 130 according to the modification shown in FIGS. 12A to 13B, the axial distance (axial wrap distance) L4 from the upper end of the second front frame piece 44 to the lower end 132a of the lower rod 132 may be set to be larger than the axial distance (axial wrap distance) L3 from the lower end of the first front frame piece 36 to the upper end 134a of the upper rod 134 (L3 < L4). In addition, when realizing the above configuration, the axial lengths of the upper rod 134 and the lower rod 132 may be made different, or the lower end position of the first front frame piece 36 with respect to the upper rod 134 and the upper end position of the second front frame piece 44 with respect to the lower rod 132 may be relatively changed.

[0105] As a result, even when hydrogen gas leaks inside the housing 12 in the hydrogen production apparatus 10, catches fire and explodes, and the opening / closing door 72 is pressed outward by the rapidly increasing pressure, the upper end 134a of the upper rod 134 precedes the lower rod 132 and disengages downward (in the direction of arrow B2) from the first front frame piece 36, so that the state in which the opening operation of the vicinity of the upper part of the opening / closing door 72 is restricted by the upper rod 134 is released, and the state in which the opening operation of the vicinity of the lower part of the opening / closing door 72 by the lower rod 132 is restricted can be maintained.

[0106] As a result, only the vicinity of the upper part of the opening / closing door 72 can be opened so as to be separated from the front end 70 of the housing 12. Therefore, even when a person is present around the hydrogen production apparatus 10 while appropriately releasing the pressure inside the housing 12 to the outside, by opening only the vicinity of the upper part of the opening / closing door 72, it is possible to preferably avoid contact with the opening / closing door 72 that has been pushed out and deformed outward and protect it.

[0107] That is, when an excessive pressure is applied to the opening / closing door 72 from the inside of the housing 12 outward, as long as the upper rod 134 is disengaged from the frame 16 constituting the housing 12 earlier than the lower rod 132 so that the upper side of the opening / closing door 72 is opened earlier than the lower side, and the structure can release the restricted state of the opening operation, the structure is not particularly limited.

[0108] The hydrogen production device according to the present invention is not limited to the above-described embodiment, and it goes without saying that various configurations can be adopted without departing from the gist of the present invention. [Explanation of symbols]

[0109] 10... Hydrogen production device 12... Housing 14...Water electrolysis system 16...Frame 24…Ceiling panel 36…First front frame piece 44...Second front frame piece 70...Front end 72...opening and closing door 74a, 74b...door body 78, 130...Opening / closing switching mechanism 80...Support mechanism 86, 134...Upper rod 88, 132...Lower rod 102...upper collar member 104...lower collar member 110: First stopper 112: Second stopper 122...water electrolysis unit 124...storage unit 126...supply unit 128...electrical unit

Claims

1. A hydrogen production apparatus comprising: a water electrolysis unit that electrolyzes water to generate hydrogen gas; a storage unit that stores the hydrogen gas generated in the water electrolysis unit; a supply unit that supplies the hydrogen gas stored in the storage unit to an outside; an electrical equipment unit that drives and controls at least the water electrolysis unit; and a housing that accommodates the water electrolysis unit, the storage unit, the supply unit, and the electrical equipment unit, the housing is at least composed of an upper frame and a lower frame provided at an upper portion and a lower portion along a height direction, and has an opening end opening toward a side perpendicular to the height direction, an opening / closing door that is rotatably supported on the housing and opens and closes the opening end; a lock mechanism provided on the door and configured to restrict an opening operation of the door when the opening end is closed; Equipped with the lock mechanism has a pair of first and second rods that are movably provided along a height direction of the opening and closing door that is perpendicular to an opening direction of the opening end, in an opening operation restricted state in which the opening end is closed by the opening / closing door and the opening operation of the opening / closing door is restricted by the locking mechanism, an axial upper end of the first rod is disposed on the opposite side of the opening / closing door with respect to the upper frame, and an axial lower end of the second rod is disposed on the opposite side of the opening / closing door with respect to the lower frame, In the opening operation restricted state, a first expanded diameter portion formed near an axial upper end of the first rod and expanded radially outward is inserted into a first guide portion provided on the opening / closing door and extending in a direction opposite to the opening direction of the opening end, and a second expanded diameter portion formed near an axial lower end of the second rod and expanded radially outward is inserted into a second guide portion provided on the opening / closing door and extending in a direction opposite to the opening direction of the opening end, A hydrogen production device, wherein an axial distance between an upper end of the second enlarged diameter portion and the second guide portion is set to be larger than an axial distance between a lower end of the first enlarged diameter portion and the first guide portion.

2. A hydrogen production apparatus comprising: a water electrolysis unit that electrolyzes water to generate hydrogen gas; a storage unit that stores the hydrogen gas generated in the water electrolysis unit; a supply unit that supplies the hydrogen gas stored in the storage unit to an outside; an electrical equipment unit that drives and controls at least the water electrolysis unit; and a housing that accommodates the water electrolysis unit, the storage unit, the supply unit, and the electrical equipment unit, the housing is at least composed of an upper frame and a lower frame provided at an upper portion and a lower portion along a height direction, and has an opening end opening toward a side perpendicular to the height direction, an opening / closing door that is rotatably supported on the housing and opens and closes the opening end; a lock mechanism provided on the door and configured to restrict an opening operation of the door when the opening end is closed; Equipped with the lock mechanism has a pair of first and second rods that are movably provided along a height direction of the opening and closing door that is perpendicular to an opening direction of the opening end, In an opening operation restricted state in which the opening end is closed by the opening / closing door and the opening operation of the opening / closing door is restricted by the locking mechanism, an axial upper end of the first rod is disposed on the opposite side of the opening / closing door with respect to the upper frame, and an axial lower end of the second rod is disposed on the opposite side of the opening / closing door with respect to the lower frame, A hydrogen production device, wherein an axial overlap distance between the lower frame and the second rod is set to be larger than an axial overlap distance between the upper frame and the first rod.

3. The hydrogen production device according to claim 1 or 2, A ceiling panel is attached to the upper surface of the housing perpendicular to the opening direction of the opening end, the ceiling panel being composed of at least two or more divided pieces, and the fixing strength of one of the divided pieces to the housing is set lower than the fixing strength of the other of the divided pieces to the housing.

4. The hydrogen production device according to claim 3, the ceiling panel has an opening facing the water electrolysis unit.

5. The hydrogen production device according to claim 3 or 4, A hydrogen production device, wherein a fixing strength of the ceiling panel to the housing is set lower than a fixing strength of the opening and closing door to the housing.

6. The hydrogen production device according to any one of claims 1 to 5, The lock mechanism includes an operating member that is provided on the outside of the opening and closing door and supported so as to be freely rotatable; A connector that is provided on the inside of the opening / closing door and is connected to the operating member and rotates integrally with the operating member; Equipped with A hydrogen production device in which the lower end of the first rod is journaled on one end of the connecting body that is radially outward from the rotation center of the connecting body, and the upper end of the second rod is journaled on the other end of the connecting body that is opposite the one end, and as the operating member and the connecting body rotate, the first rod and the second rod move in directions approaching or moving away from each other.

Citation Information

Patent Citations

  • Explosion-proof intelligent hydrolysis instrument and control method thereof

    CN111394744A

  • JP1975020278U

  • Cubicle

    JP1979144132U

  • The cubicle door front fixing device

    JP1981052407U

  • Cabinet

    JP1996191511A