Vehicle and vehicle control method

The vehicle control method and system address the issue of interrupted charging due to failed current sensors by dynamically adjusting duty ratios and controlling relays and temperature, ensuring continuous and safe battery charging.

JP7573408B2Active Publication Date: 2024-10-25HYUNDAI MOTOR CO LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2020175257
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-06-05
Filing Date
2020-10-19
Publication Date
2024-10-25
Estimated Expiration
2040-10-19

AI Technical Summary

Technical Problem

Existing vehicles face inconvenience and potential damage when a current sensor that measures three-phase current fails during battery charging, leading to interrupted charging processes.

Method used

A vehicle control method and system that utilizes a motor, inverter, and current sensors to determine and adjust duty ratios of pulse width modulation signals for the inverter's switching elements, even if one or more current sensors fail, ensuring continuous charging by controlling relays and temperature sensors to manage charging modes.

Benefits of technology

Enables continuous battery charging despite sensor failures, enhancing user convenience and safety by preventing damage to vehicle components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007573408000001
    Figure 0007573408000001
  • Figure 0007573408000002
    Figure 0007573408000002
  • Figure 0007573408000003
    Figure 0007573408000003
Patent Text Reader

Abstract

To provide a vehicle and a control method of the vehicle which can continue charging by using a sensor free from a failure even when a current sensor which measures three-phase current fails during the charging of a battery.SOLUTION: A vehicle comprises: a motor 130 including first to third windings 130a to 130c coupled to a neutral stage N to which a charger supplies charging voltage; an inverter 120 including first to third switching elements S11 to S16 coupled to the first to third coils to boost the charging voltage; a battery 110 to which boosted voltage to be boosted by the inverter is provided; and a controller which determines an average duty ratio of a pulse width modulation signal to be provided to the inverter on the basis of first to third current sensors 121a to 121c which measure first to third phase current of the first to third windings, the charging voltage and battery voltage. The controller determines a duty ratio to a signal to a first element on the basis of the average duty ratio to the signal to the inverter, and the duty ratio of signals to the second and third elements when the first current sensor fails.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a vehicle and a vehicle control method, and more particularly to a vehicle and a vehicle control method that can continue charging using a non-failed current sensor even if a current sensor that measures three-phase current fails during charging of a battery. [Background technology]

[0002] In general, an electric vehicle or a plug-in hybrid vehicle receives power from an external charger to charge an in-vehicle battery, and uses the electric energy stored in the charged battery to drive a motor to generate power for the vehicle.

[0003] Methods for charging in-vehicle batteries can be broadly divided into slow charging methods, in which the battery is charged at a relatively slow rate using an on-board charger that receives external AC charging power and converts it into DC charging power of a size suitable for charging the battery, and quick charging methods, in which external DC charging power is provided directly to the battery to quickly charge it.

[0004] In the case of the quick charging method, the battery can be charged at high power by supplying direct current (DC) power converted by an external charger to the vehicle's battery. Summary of the Invention [Problem to be solved by the invention]

[0005] The present disclosure provides a vehicle and a vehicle control method capable of continuously charging a battery even if a current sensor that measures three-phase current fails. [Means for solving the problem]

[0006] A vehicle according to one embodiment for achieving the above-mentioned object includes a motor including a neutral stage to which a charging voltage is supplied from a charger and first, second and third windings connected to the neutral stage; an inverter including a first switching element connected to the first winding, a second switching element connected to the second winding and a third switching element connected to the third winding, and configured to boost the charging voltage supplied from the charger; a battery to which a boosted voltage boosted by the inverter is provided; a first current sensor for measuring a first phase current flowing through the first winding; a second current sensor for measuring a second phase current flowing through the second winding; a third current sensor for measuring a third phase current flowing through the third winding; and a current sensor for measuring the charging voltage and the battery. a controller that determines an average duty ratio of the pulse-width modulated signal provided to the inverter based on a battery voltage of the inverter and determines the duty ratios of the pulse-width modulated signals provided to each of the first, second and third switching elements based on the first phase, second phase and third phase currents, wherein when the first current sensor fails, the controller can determine the duty ratio of the pulse-width modulated signal provided to the first switching element based on the average duty ratio of the pulse-width modulated signal provided to the inverter, the duty ratio of the pulse-width modulated signal provided to the second switching element and the duty ratio of the pulse-width modulated signal provided to the third switching element.

[0007] In addition, the controller may determine a duty ratio of the pulse-width modulated signal provided to the first switching element such that an average of a duty ratio of the pulse-width modulated signal provided to the first switching element, a duty ratio of the pulse-width modulated signal provided to the second switching element, and a duty ratio of the pulse-width modulated signal provided to the third switching element becomes an average duty ratio of the pulse-width modulated signal provided to the inverter.

[0008] In addition, when the first current sensor and the second current sensor fail, the controller may determine the duty ratios of the pulse-width modulated signals provided to the first and second switching elements based on an average duty ratio of the pulse-width modulated signal provided to the inverter and a duty ratio of the pulse-width modulated signal provided to the third switching element.

[0009] In addition, the controller may determine the duty ratios of the pulse-width modulated signals provided to the first and second switching elements such that an average of a duty ratio of the pulse-width modulated signal provided to the first switching element, a duty ratio of the pulse-width modulated signal provided to the second switching element, and a duty ratio of the pulse-width modulated signal provided to the third switching element becomes an average duty ratio of the pulse-width modulated signal provided to the inverter.

[0010] Also, the controller may determine that the duty ratios of the pulse width modulation signals provided to the first and second switching elements are the same.

[0011] Also, the controller may perform pulse width modulation control on the inverter only when at least one of the first, second and third current sensors operates normally.

[0012] The inverter may further include a temperature sensor for measuring temperatures of the first switching element, the second switching element, and the third switching element, and the controller may perform pulse width modulation control on the inverter only when the temperature measured by the temperature sensor is equal to or lower than a preset temperature.

[0013] In addition, the controller may perform pulse width modulation control on the inverter such that an On period of a pulse width modulation signal provided to the first switching element, an On period of a pulse width modulation signal provided to the second switching element, and an On period of a pulse width modulation signal provided to the third switching element are interleaved.

[0014] The inverter further includes an input / output port connected to the charger; a first relay connected between an upper switching element of the inverter and the input / output port; a second relay connected between the neutral stage and the input / output port; and a third relay connected between a lower switching element of the inverter and the input / output port; and the controller may close the second relay and the third relay and open the first relay if the magnitude of the charging voltage provided from the charger is lower than the magnitude of the battery voltage of the battery.

[0015] In addition, the controller may close the first relay and the third relay and open the second relay if the magnitude of the charging voltage provided by the charger is equal to or greater than the magnitude of the battery voltage of the battery.

[0016] In addition, a vehicle control method according to one embodiment for achieving the above object includes: a charging voltage is supplied from a charger through a neutral stage of a motor; an inverter connected to the motor boosts the charging voltage supplied from the charger; a boosted voltage boosted by the inverter is provided to a battery; a first current sensor measures a first phase current flowing through a first winding of the motor; a second current sensor measures a second phase current flowing through a second winding of the motor; a third current sensor measures a third phase current flowing through a third winding of the motor; a pulse current provided to the inverter based on the charging voltage and a battery voltage of the battery; determining an average duty ratio of a pulse-width modulated signal provided to each of the first, second and third switching elements of the inverter based on the first phase, second phase and third phase currents; and when the first current sensor fails, determining a duty ratio of the pulse-width modulated signal provided to the first switching element based on the average duty ratio of the pulse-width modulated signal provided to the inverter, the duty ratio of the pulse-width modulated signal provided to the second switching element and the duty ratio of the pulse-width modulated signal provided to the third switching element.

[0017] Also, determining the duty ratio of the pulse-width modulated signal provided to the first switching element may include determining the duty ratio of the pulse-width modulated signal provided to the first switching element such that an average of the duty ratio of the pulse-width modulated signal provided to the first switching element, the duty ratio of the pulse-width modulated signal provided to the second switching element, and the duty ratio of the pulse-width modulated signal provided to the third switching element becomes an average duty ratio of the pulse-width modulated signal provided to the inverter.

[0018] The method may further include: when the first current sensor and the second current sensor fail, determining a duty ratio of the pulse width modulated signal provided to the first and second switching elements based on an average duty ratio of the pulse width modulated signal provided to the inverter and a duty ratio of the pulse width modulated signal provided to the third switching element.

[0019] In addition, determining the duty ratios of the pulse-width modulated signals provided to the first and second switching elements may include determining the duty ratios of the pulse-width modulated signals provided to the first and second switching elements such that an average of the duty ratio of the pulse-width modulated signal provided to the first switching element, the duty ratio of the pulse-width modulated signal provided to the second switching element, and the duty ratio of the pulse-width modulated signal provided to the third switching element becomes an average duty ratio of the pulse-width modulated signal provided to the inverter.

[0020] Also, determining the duty ratios of the pulse width modulation signals provided to the first and second switching elements may include determining that the duty ratios of the pulse width modulation signals provided to the first and second switching elements are the same.

[0021] Also, the method may further include: performing pulse width modulation control on the inverter only when at least one of the first, second, and third current sensors operates normally.

[0022] The method may further include measuring temperatures of the first switching elements, the second switching elements, and the third switching elements; and performing pulse width modulation control on the inverter only when the temperatures measured at the first switching elements, the second switching elements, and the third switching elements are equal to or lower than a preset temperature.

[0023] The present invention may further include performing pulse width modulation control on the inverter such that an On period of a pulse width modulation signal provided to the first switching element, an On period of a pulse width modulation signal provided to the second switching element, and an On period of a pulse width modulation signal provided to the third switching element are interleaved.

[0024] The method may further include: if a magnitude of a charging voltage provided by the charger is lower than a magnitude of a battery voltage of the battery, closing a second relay connected between an input / output port connected to the charger and the neutral stage and a third relay connected between a lower switching element of the inverter and the input / output port, and opening a first relay connected between an upper switching element of the inverter and the input / output port.

[0025] The method may further include: closing the first relay and the third relay, and opening the second relay, if a magnitude of a charging voltage provided from the charger is equal to or greater than a magnitude of a battery voltage of the battery. Effect of the Invention

[0026] According to the present disclosure, even if a current sensor that measures three-phase current fails while charging a battery, charging can be continued using a non-failed current sensor, thereby providing convenience to the user. [Brief description of the drawings]

[0027] [Figure 1] 1 is a block diagram of a charging system included in a vehicle according to an embodiment; [Diagram 2] FIG. 2 is a control block diagram of a vehicle according to an embodiment. [Diagram 3] 4 is a control flowchart for a vehicle according to an embodiment. [Figure 4] 2 is an example diagram showing pulse width modulation (PWM) signals applied to an inverter and the resulting three-phase currents over time. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0028] The advantages and features of the disclosed invention, as well as the method and apparatus for achieving the same, will become apparent from the following description of the embodiments in conjunction with the accompanying drawings. However, the disclosed invention is not limited to the embodiments disclosed below, and may be embodied in various different forms, but the disclosed embodiments are provided to complete the disclosure of the disclosed invention and to fully inform those skilled in the art of the scope of the invention, and the disclosed invention is only defined by the scope of the claims.

[0029] The terms used in the disclosed specification will be briefly explained, and the disclosed invention will be specifically explained.

[0030] The terms used in the disclosed invention are currently selected as widely used as possible while taking into consideration the functions of the disclosed invention, but these may change depending on the intentions of the technical personnel in the field, legal precedents, the emergence of new technology, etc. In addition, in certain cases, the applicant may arbitrarily select some terms, and in such cases, the meanings of the terms are described in detail in the description of the relevant invention. Therefore, the terms used in the disclosed invention should be defined based on the meanings of the terms and the overall content of the disclosed invention, rather than simply the names of the terms.

[0031] Throughout the specification, when a part "includes" a certain component, this does not mean excluding other components, but may further include other components, unless otherwise specified to the contrary. In addition, the term "module" as used in the specification means a software or hardware component such as an FPGA or ASIC, and the "module" performs a certain function. However, the term "module" is not limited to software or hardware. A "module" may be configured to reside on an addressable storage medium or to execute one or more processors. Thus, by way of example, a "module" includes components such as software components, object-oriented software components, class components, and task components, as well as processes, functions, attributes, procedures, subroutines, program code segments, drivers, firmware, microcode, circuits, data, databases, data structures, tables, arrays, and variables. The components and functions provided within the "modules" may be combined into a smaller number of components and "modules" or further separated into additional components and "modules".

[0032] Hereinafter, an embodiment of a vehicle and a vehicle control method will be described in detail with reference to the accompanying drawings so that a person having ordinary skill in the art to which the disclosed invention belongs can easily carry out the embodiment. In order to clearly explain the disclosed invention in the drawings, parts that are not related to the description will be omitted. In addition, the same reference numerals in the drawings indicate the same components, and duplicate descriptions thereof will be omitted.

[0033] FIG. 1 is a configuration diagram of a charging system included in a vehicle according to an embodiment, and FIG. 2 is a control block diagram of the vehicle according to an embodiment.

[0034] In the case of a quick charging method, an external quick charger may not be able to provide a voltage large enough to charge the vehicle battery. For example, an external quick charger for quick charging may be manufactured to output a single voltage standard of 400V, while the battery used in the vehicle may be designed to have a voltage standard of 800V or more.

[0035] In such cases, the quick charger provides a charging voltage of 400V, but since the battery used in the vehicle has a voltage rating of 800V or more, it is not possible to charge the battery by directly connecting the quick charger to the vehicle. In order to charge the battery, a separate boost converter is required to boost the voltage provided by the external charger.

[0036] However, a boost converter for boosting the voltage provided by an external charger is not only very heavy and bulky but also expensive, which can increase the price of the vehicle.

[0037] To solve this problem, a vehicle according to an embodiment can charge a battery at a high voltage by boosting the charging voltage of a charger using a conventional motor and inverter without a separate converter.

[0038] Referring to FIG. 1, a charging system included in a vehicle 1 according to an embodiment includes a battery 110, an inverter 120, a motor 130, and a plurality of relays R 1 , R 2 , R 3 may include.

[0039] In general, a system for driving a motor 130 may include a battery 110, which is an energy storage device that stores power for driving the motor 130, and an inverter 120 that converts the DC power stored in the battery 110 into three-phase AC and provides it to the motor 130.

[0040] The inverter 120 may have a DC connection stage including a positive (+) terminal 121p and a negative (-) terminal 121n respectively connected to both ends of the battery 110, and three legs connected in parallel between the DC connection stage, and two switching elements (S11 and S12, or S13 and S14, or S15 and S16) are connected in series to each other in each leg, and the connection nodes of the two switching elements may be connected to each winding 130a, 130b, 130c of the motor 130, respectively.

[0041] In other words, the inverter 120 is composed of three upper switching elements S11, S13, S15 and three lower switching elements S12, S14, S16, each of the upper switching elements S11, S13, S15 is connected to one of the three lower switching elements S12, S14, S16, and the connection nodes to which the upper switching elements S11, S13, S15 and the lower switching elements S12, S14, S16 are connected may be connected to the windings 130a, 130b, 130c of the motor 130, respectively.

[0042] A plurality of switching elements S11 to S16 included in the inverter 120 may represent insulated gate bipolar transistors (IGBTs), and the on / off of the switching elements S11 to S16 may be controlled by a gate voltage provided to the gate.

[0043] For ease of explanation, the upper switching element S11 and the lower switching element S12 connected to the first winding 130a of the motor 130 will be referred to as the first switching elements S11, S12, the upper switching element S13 and the lower switching element S14 connected to the second winding 130b of the motor 130 will be referred to as the second switching elements S13, S14, and the upper switching element S15 and the lower switching element S16 connected to the third winding 130c of the motor 130 will be referred to as the third switching elements S15, S16.

[0044] Pulse Width Modulation (PWM) control may be performed on the switching elements S11 to S16 in the inverter 120 so that a current corresponding to a desired torque of the motor 130 can be provided to the motor 130 through the driving of the motor 130. In this manner, the flow of energy for driving the motor 130 is from the battery 110 to the motor 130.

[0045] On the other hand, the flow of energy for charging the battery 110 is from the motor 130 to the battery 110 .

[0046] Specifically, power may be fed from the neutral stage N of the motor 130 to the DC connection stages 121p, 121n of the inverter 120. At this time, the first switching elements S11, S12, the second switching elements S13, S14, and the third switching elements S15, S16, respectively, and the first winding 130a, the second winding 130b, and the third winding 130c, respectively, may constitute a DC converter circuit that can boost and provide a voltage provided to the neutral stage N connected to the first winding 130a, the second winding 130b, and the third winding 130c to the DC connection stages 121p, 121n.

[0047] Therefore, the connection structure of the inverter 120 and the windings 130a, 130b, and 130c in the motor 130 is the same as a total of three converter circuits connected in parallel, and the controller 150 controls the switching elements S11 to S16 to operate the parallel-connected multiple DC converters simultaneously or selectively, or to operate in an interleaved manner, thereby boosting the voltage of the neutral stage N and providing it to the battery 110.

[0048] According to the vehicle 1 according to an embodiment, the maximum voltage magnitude (V EVSE.max ) and the battery voltage V of battery 110BAT A first charging mode in which external charging power is directly provided to the battery 110 based on the above, and a second charging mode in which external charging power is provided to the neutral stage N of the motor 130, and then the voltage provided to the neutral stage N is boosted through control of the switching element of the inverter 120 and provided to the battery 110 can be selectively used.

[0049] The process of charging the battery 110 using the charging system of the vehicle 1 has been briefly described above.

[0050] Meanwhile, in the vehicle 1 according to the above-described embodiment, if any one of the current sensors measuring the three-phase current breaks down, charging of the battery may have to be interrupted. If charging is interrupted due to a current sensor failure, the battery cannot be charged any further unless the current sensor is repaired or replaced, which may cause inconvenience to the user.

[0051] Hereinafter, the role of each component of the charging system included inside the vehicle 1 according to one embodiment will be described in detail, and a method for continuously charging the battery without interruption even when the current sensor fails will be described.

[0052] 1 and 2, a vehicle 1 according to one embodiment may include a sensing unit 160 for sensing an output value of each component of a charging system, a relay unit R for changing a battery charging mode, an inverter 120 for boosting a voltage provided from a charger 200, and a controller 150 for controlling the relay unit R and the inverter 120 based on a detection value of the sensing unit 160 and information on a charging voltage received from the charger 200.

[0053] The sensing unit 160 according to an embodiment detects a first phase current I 1 a current sensor (hereinafter referred to as the “first current sensor”) 121a that measures a second phase current I 2 a current sensor (hereinafter referred to as the “second current sensor”) 121b that measures a third phase current I3 (hereinafter, a "third current sensor") 121c for measuring the current. As an example, Hall type current sensors may be employed as the current sensors 121a, 121b, and 121c.

[0054] 1st phase current I 1 , second phase current I 2 and the third phase current I 3 can respectively mean any one of the U-phase current, the V-phase current, and the W-phase current. For example, the first phase current I 1 is the U-phase current, and the second-phase current I 2 is the V phase current, and the third phase current I 3 may mean, but is not limited to, the W-phase current.

[0055] The current sensors 121 a , 121 b , 121 c can communicate the measured current to the controller 150 .

[0056] The sensing unit 160 may include temperature sensors T11, T12, T13, T14, T15, and T16 provided in the plurality of switching elements S11 to S16 included in the inverter 120, respectively.

[0057] The sensing unit 160 includes a first capacitor C n The potential difference is measured to determine the voltage V provided to the neutral stage N of the motor 130. n A first voltage sensor (not shown) that can measure b Measure the potential difference between the battery 110 and the battery voltage V BAT A second voltage sensor (not shown) may be included that can measure

[0058] The voltage measured by the first voltage sensor (not shown) and the voltage measured by the second voltage sensor (not shown) may be transmitted to the controller 150.

[0059] The sensing unit 160 may also include temperature sensors T11-T16 that measure the temperatures of the switching elements S11-S16 included in the inverter 120. As an example, chip-type temperature sensors may be used as the temperature sensors T11-T16.

[0060] The temperature values ​​of the switching elements S11 to S16 measured by the temperature sensors T1 to T16 can be transmitted to the controller 150.

[0061] The relay unit R according to the embodiment includes a plurality of relays R provided between an input / output port 140 connected to an external charger 200 and a battery 110. 1 , R 2 , R 3 may include.

[0062] Specifically, the relay unit R includes a relay (hereinafter, a "first relay") R connected between the upper switching elements S11, S13, and S15 of the inverter 120 and the input / output port 140. 1 and a relay (hereinafter, “second relay”) R connected between the neutral stage N of the motor 130 and the input / output port 140. 2 and a relay (hereinafter, a "third relay") R connected between the lower switching elements S12, S14, and S16 of the inverter 120 and the input / output port 140. 3 may include.

[0063] Multiple relays R 1 , R 2 , R 3 Each of them can be closed or opened by a control signal from the controller 150 to change the charging mode of the battery 110 .

[0064] As described above, the inverter 120 may include a plurality of switching elements S11 to S16, and may boost the voltage provided to the neutral stage N of the motor 130 and provide the boosted voltage to the battery 110.

[0065] The controller 150 receives various outputs from the sensing unit 160 and / or the maximum charging voltage (V EVSE.max ) based on which the relay unit R and the inverter 120 can be controlled.

[0066] For example, the controller 150 may be configured to detect the maximum charging voltage (V EVSE.max ) or the first capacitor C n The voltage V measured across n and the second capacitor C b The battery voltage V of battery 110 is the voltage measured across BAT The relay unit R can be controlled based on the above.

[0067] Specifically, the controller 150 controls the charging voltage V n The magnitude of the battery voltage V BAT If the magnitude is smaller than the second relay R 2 and the third relay R 3 Close the first relay R 1 Accordingly, the charging mode of the battery 110 may be changed to the second charging mode.

[0068] The controller 150 also detects the charging voltage V n The magnitude of the battery voltage V BAT If the magnitude is greater than or equal to the first relay R 1 and the third relay R 3 Closes the second relay R 2 Accordingly, the charging mode of the battery 110 may be changed to the first charging mode.

[0069] The controller 150 controls the charging voltage V provided to the neutral stage N of the motor 130. n and the battery voltage V of battery 110 BATBased on this, an average duty ratio D of the pulse width modulation signal provided to the inverter 120 can be determined, and pulse width modulation control can be performed on the inverter 120 based on the determined average duty ratio D.

[0070] However, the controller 150 can perform pulse width modulation control on the inverter 120 only when it is determined that at least one of the current sensors 121a, 121b, 121c is operating normally or when the temperatures of all of the switching elements S11 to S16 are below a preset temperature.

[0071] In other words, if it is determined that all of the current sensors 121a, 121b, and 121c have failed or the temperature of at least one of the switching elements S11 to S16 is higher than a preset temperature, the charging process may be stopped for safety reasons.

[0072] The controller 150 for performing the above-mentioned operations or the operations described below may be embodied as a memory that stores data for an algorithm or a program that reproduces the algorithm for controlling various components in the vehicle 1, such as the inverter 120 and the relay unit R, and a processor that performs the above-mentioned operations using the data stored in the memory.

[0073] In this case, the memory and the processor may be implemented as separate chips, or the memory and the processor may be implemented as a single chip.

[0074] The controller 150 may be implemented in the form of a vehicle controller, a motor controller, or a battery management system that is already installed in a vehicle, or may be additionally installed in a vehicle.

[0075] The specific operation and effects of the controller 150 will be described in detail later.

[0076] FIG. 3 is a control flowchart of a vehicle according to an embodiment.

[0077] Referring to FIG. 3, the controller 150 detects the connection of the charger 200 and receives the maximum charging voltage (V EVSE.max ) can receive information for the

[0078] As described above, the controller 150 controls the battery voltage V BAT and the maximum charging voltage of the charger 200 (V EVSE.max ), the charging mode of the battery 110 can be determined based on the above-mentioned charging mode. In the following, however, it is assumed that the charging mode of the battery 110 is the second charging mode.

[0079] The controller 150 controls the charging voltage V provided to the neutral stage N of the motor 130. n and the battery voltage V of battery 110 BAT The average duty ratio D of the pulse width modulated signal provided to the inverter 120 can be determined based on

[0080] Specifically, the controller 150 can determine the average duty ratio D of the pulse width modulated signal based on the following Equation 1.

[0081] [Formula 1]D=1-V n / V BAT

[0082] For example, the battery voltage V of battery 110 BAT is 800V, and the charging voltage V n is 400V, the average duty ratio D can be determined to be 0.5.

[0083] In this case, the duty ratio may mean the ratio between the (On period+Off period) and the (On period) of the switching elements S11 to S16. For example, if the (On period+Off period) of the switching elements S11 to S16 is 2 seconds and the (On period) is 1 second, the duty ratio may be determined to be 0.5.

[0084] The first current sensor 121a detects the first phase current I 1 The second current sensor 121b measures the second phase current I 2 The third current sensor 121c measures the third phase current I 3 can be measured, and the controller 150 can receive 1200 the measured current values ​​from the first current sensor 121a, the second current sensor 121b, and the third current sensor 121c.

[0085] The controller 150 calculates the first phase current I based on the current values ​​measured by the current sensors 121a, 121b, and 121c. 1 , second phase current I 2 and the third phase current I 3 The duty ratio D of the pulse width modulation signal provided to the first switching elements S11 and S12 is set to be equal to 1 The duty ratio D of the pulse width modulation signal provided to the second switching elements S13 and S14 2 and the duty ratio D of the pulse width modulation signal provided to the third switching elements S15 and S16. 3 can be determined.

[0086] For example, the first phase current I 1 and the magnitude of the second phase current I 2 are the same in magnitude, and the third phase current I 3 The magnitude of the first phase current I 1 If the magnitude of the duty ratio (D 1 , D 2 ) and the duty ratio D of the pulse width modulation signal provided to the third switching elements S15 and S16 is reduced. 3 can be increased.

[0087] In this manner, the controller 150 can perform feedback control on the current values ​​measured by the current sensors 121a, 121b, and 121c to determine the individual duty ratios of the pulse width modulated signals provided to the first switching elements S11, S12, the second switching elements S13, S14, and the third switching elements S15, S16.

[0088] If the current value measured by the current sensor 121a, 121b, or 121c does not fall within a preset range, the controller 150 can determine that the current sensor 121a, 121b, or 121c that measured the corresponding current value is faulty.

[0089] For example, the controller 150 may detect the first phase current I measured by the first current sensor 121a. 1 is not within a preset range, it can be determined that the first current sensor 121a has failed.

[0090] When all the current sensors are operating normally (example 1300), the controller 150 calculates the average duty ratio D and the individual duty ratios D determined by the current values ​​measured by the current sensors 121a, 121b, and 121c. 1 , D 2 , D 3 A pulse width modulation control may be performed on the inverter 120 based on the input signal (1350).

[0091] When the controller 150 determines that one of the current sensors 121a, 121b, and 121c (121a, 121b, or 121c) has failed (example 1400), it can determine the duty ratio of the pulse width modulation signal to be provided to the switching element to which the failed current sensor is connected based on the current measured by the non-faulty current sensor.

[0092] For example, when the first current sensor 121a fails, the controller 150 determines whether the average duty ratio D of the pulse width modulation signal provided to the inverter 120 and the duty ratio D of the pulse width modulation signal provided to the second switching elements S13 and S14 are equal to or smaller than the first current sensor 121a.2 and the duty ratio D of the pulse width modulation signal provided to the third switching elements S15 and S16. 3 The duty ratio D of the pulse width modulation signal provided to the first switching elements S11 and S12 based on 1 can be determined (1450).

[0093] Specifically, the controller 150 controls the duty ratio D of the pulse width modulation signal provided to the first switching elements S11 and S12. 1 , the duty ratio D of the pulse width modulation signal provided to the second switching elements S13 and S14 2 and the duty ratio D of the pulse width modulation signal provided to the third switching elements S15 and S16. 3 The duty ratio D of the pulse width modulation signal provided to the first switching elements S11 and S12 is set so that the average of the duty ratios D of the pulse width modulation signal provided to the inverter 120 is equal to the average duty ratio D of the pulse width modulation signal provided to the inverter 120. 1 can be determined.

[0094] That is, the controller controls the duty ratio D of the pulse width modulation signal provided to the first switching elements S11 and S12 so that the following [Equation 2] is satisfied: 1 can be determined

[0095] [Formula 2]D 1 =3*DD 2 -D 3

[0096] Thereafter, the controller 150 controls the determined individual duty ratios D 1 , D 2 , D 3 A pulse width modulation control may be performed on the inverter 120 based on the input signal (1700).

[0097] When the controller 150 determines that two of the current sensors 121a, 121b, and 121c (two of 121a, 121b, or 121c) have failed (example 1500), it can determine the duty ratio of the pulse width modulated signal to be provided to the switching element to which the failed current sensor is coupled based on the current measured by the non-faulty current sensor.

[0098] For example, when the first current sensor 121a and the second current sensor 121b fail, the controller 150 determines whether the average duty ratio D of the pulse width modulation signal provided to the inverter 120 and the duty ratio D of the pulse width modulation signal provided to the third switching elements S15 and S16 are equal to or smaller than the duty ratio D of the pulse width modulation signal provided to the third switching elements S15 and S16. 3 Based on this, the duty ratio D of the pulse width modulation signal provided to the first switching elements S11 and S12 is 1 and the duty ratio D of the pulse width modulation signal provided to the second switching elements S13 and S14. 2 can be determined (1550).

[0099] Specifically, the controller 150 controls the duty ratio D of the pulse width modulation signal provided to the first switching elements S11 and S12. 1 , the duty ratio D of the pulse width modulation signal provided to the second switching elements S13 and S14 2 and the duty ratio D of the pulse width modulation signal provided to the third switching elements S15 and S16. 3 The duty ratio D of the pulse width modulation signal provided to the first switching elements S11 and S12 is set so that the average of the duty ratios D of the pulse width modulation signal provided to the inverter 120 is equal to the average duty ratio D of the pulse width modulation signal provided to the inverter 120. 1 and the duty ratio D of the pulse width modulation signal provided to the second switching elements S13 and S14. 2 can be determined.

[0100] At this time, the controller 150 adjusts the duty ratio D of the pulse width modulation signal provided to the first switching elements S11 and S12. 1 and the duty ratio D of the pulse width modulation signal provided to the second switching elements S13 and S14. 2can be determined identically.

[0101] That is, the controller controls the duty ratio D of the pulse width modulation signal provided to the first switching elements S11 and S12 so that the following [Equation 3] is satisfied: 1 and the duty ratio D of the pulse width modulation signal provided to the second switching elements S13 and S14. 2 can be determined

[0102] [Formula 3]D 1 =D 2 =(3*DD 3 ) / 2

[0103] Thereafter, the controller 150 controls the determined individual duty ratios D 1 , D 2 , D 3 A pulse width modulation control may be performed on the inverter 120 based on the input signal (1700).

[0104] If the controller 150 determines that all of the current sensors 121a, 121b, 121c have failed (1500 - No), the controller 150 may abort the charging process (1600).

[0105] For example, the controller 150 may include multiple relays R 1 , R 2 , R 3 13, the input / output port 140 and the battery 110 can be controlled to be disconnected by opening all of the input / output ports 140 and the battery 110.

[0106] That is, the controller 150 can perform pulse width modulation control on the inverter 120 only when at least one of the first current sensor 121a, the second current sensor 121b, and the third current sensor 121c operates normally.

[0107] As described above, according to an embodiment of the present disclosure, if any one of the current sensors operates normally, the charging process can be carried out, thereby providing convenience to the user.

[0108] However, if the switching element fails, the current measured by the current sensor will no longer be within the preset range. If this is interpreted as a failure of the current sensor and the charging process is continued, it may cause damage to internal components of the vehicle.

[0109] Therefore, the controller 150 can interrupt the charging process if the temperatures of any one of the first switching elements S11, S12, the second switching elements S13, S14, and the third switching elements S15, S16 are all higher than a preset temperature.

[0110] That is, the controller 150 can perform pulse width modulation control on the inverter 120 only when the temperatures measured at the first switching elements S11, S12, the second switching elements S13, S14, and the third switching elements S15, S16 are all below a preset temperature.

[0111] FIG. 4 is a diagram showing an example of pulse width modulation (PWM) signals applied to the inverter 120 and the resulting three-phase currents over time.

[0112] Referring to FIG. 4, the controller 150 controls the pulse width modulation signal (V 1 ) and the On period of the pulse width modulation signal (V 2 ) and the On period of the pulse width modulation signal (V 3 ) may be interleaved to perform pulse width modulation control on the inverter 120.

[0113] Accordingly, the first phase current I 1 and the second phase current I 2 and the third phase current I 3 The ripple of the sum of the two voltages is reduced, thereby increasing the charging efficiency of the battery 110.

[0114] On the other hand, some components of the vehicle 1 may be software and / or hardware components such as Field Programmable Gate Arrays (FPGAs) and on-demand semiconductors (ASICs, Application Specific Integrated Circuits).

[0115] Meanwhile, the disclosed embodiments may be embodied in the form of a recording medium storing instructions executable by a computer. The instructions may be stored in the form of program code, and when executed by a processor, may generate program modules to perform the operations of the disclosed embodiments. The recording medium may be embodied in a computer-readable recording medium.

[0116] The computer-readable recording medium includes all kinds of recording media in which instructions that can be decoded by a computer are stored, such as Read Only Memory (ROM), Random Access Memory (RAM), magnetic tape, magnetic disk, flash memory, optical data storage device, etc.

[0117] The disclosed embodiments have been described above with reference to the attached drawings. Those skilled in the art will understand that the present invention can be embodied in a form different from the disclosed embodiments without changing the technical idea or essential features of the present invention. The disclosed embodiments are illustrative and should not be interpreted as being limited. [Explanation of symbols]

[0118] 1: Vehicle 110: Battery 120: Inverter 121a: first current sensor 121b: second current sensor 121c: 3rd current sensor 130: Motor 130a: First winding 130b: Second winding 130c: 3rd winding 140: Input / Output port 150: Controller 160: Sensing section 200: Charger R: Relay section R 1 :First relay R 2 : Second relay R 3 : 3rd Relay

Claims

1. a motor including a neutral stage to which a charging voltage is supplied from a charger, and first, second and third windings connected to the neutral stage; an inverter including a first switching element connected to the first winding, a second switching element connected to the second winding, and a third switching element connected to the third winding, and configured to boost a charging voltage supplied from the charger; a battery to which a boosted voltage is provided by the inverter; a first current sensor for measuring a first phase current flowing through the first winding; a second current sensor for measuring a second phase current flowing through the second winding; a third current sensor for measuring a third phase current through the third winding; and a controller that determines an average duty ratio of a pulse width modulated signal provided to the inverter based on the charging voltage and a battery voltage of the battery, and determines duty ratios of pulse width modulated signals provided to the first, second and third switching elements, respectively, based on the first phase, second phase and third phase currents; The controller: and determining, when the first current sensor fails, a duty ratio of the pulse width modulated signal provided to the first switching element based on an average duty ratio of the pulse width modulated signal provided to the inverter, a duty ratio of the pulse width modulated signal provided to the second switching element, and a duty ratio of the pulse width modulated signal provided to the third switching element.

2. The controller:

2. The vehicle according to claim 1, wherein a duty ratio of the pulse width modulated signal provided to the first switching element is determined such that an average of a duty ratio of the pulse width modulated signal provided to the first switching element, a duty ratio of the pulse width modulated signal provided to the second switching element, and a duty ratio of the pulse width modulated signal provided to the third switching element becomes an average duty ratio of the pulse width modulated signal provided to the inverter.

3. The controller:

2. The vehicle according to claim 1, wherein, when the first current sensor and the second current sensor fail, a duty ratio of the pulse width modulated signal provided to the first and second switching elements is determined based on an average duty ratio of the pulse width modulated signal provided to the inverter and a duty ratio of the pulse width modulated signal provided to the third switching element.

4. The controller:

4. The vehicle according to claim 3, wherein the duty ratios of the pulse width modulated signals provided to the first and second switching elements are determined such that an average of a duty ratio of the pulse width modulated signal provided to the first switching element, a duty ratio of the pulse width modulated signal provided to the second switching element, and a duty ratio of the pulse width modulated signal provided to the third switching element becomes an average duty ratio of the pulse width modulated signal provided to the inverter.

5. The controller:

5. The vehicle according to claim 4, wherein the duty ratios of the pulse width modulation signals provided to the first and second switching elements are determined to be the same.

6. The controller:

2. The vehicle of claim 1, wherein pulse width modulation control is performed on the inverter only when at least one of the first, second and third current sensors is operating normally.

7. a temperature sensor for measuring a temperature of each of the first switching elements, each of the second switching elements, and each of the third switching elements; The controller:

2. The vehicle according to claim 1, wherein pulse width modulation control is performed on the inverter only when the temperature measured by the temperature sensor is equal to or lower than a preset temperature.

8. The controller:

2. The vehicle of claim 1, wherein pulse width modulation control is performed on the inverter such that an On period of the pulse width modulation signal provided to the first switching element, an On period of the pulse width modulation signal provided to the second switching element, and an On period of the pulse width modulation signal provided to the third switching element are interleaved.

9. an input / output port coupled to the charger; a first relay coupled between an upper switching element of the inverter and the input / output port; a second relay coupled between the neutral stage and the input / output port; and a third relay connected between a lower switching element of the inverter and the input / output port; The controller:

2. The vehicle of claim 1, wherein if the magnitude of the charging voltage provided by the charger is lower than the magnitude of the battery voltage of the battery, the second relay and the third relay are closed and the first relay is opened.

10. The controller:

10. The vehicle of claim 9, wherein the first relay and the third relay are closed and the second relay is opened if the magnitude of the charging voltage provided by the charger is equal to or greater than the magnitude of the battery voltage of the battery.

11. A charging voltage is supplied from the charger through the neutral stage of the motor; an inverter coupled to the motor boosts a charging voltage provided by the charger; A boosted voltage boosted by the inverter is provided to a battery; a first current sensor measuring a first phase current through a first winding of the motor; a second current sensor measuring a second phase current through a second winding of the motor; a third current sensor measuring a third phase current through a third winding of the motor; determining an average duty ratio of a pulse width modulated signal provided to the inverter based on the charging voltage and a battery voltage of the battery; determining duty ratios of pulse width modulated signals provided to first, second and third switching elements of the inverter, respectively, based on the first, second and third phase currents; determining a duty ratio of the pulse-width modulated signal provided to the first switching element based on an average duty ratio of the pulse-width modulated signal provided to the inverter, a duty ratio of the pulse-width modulated signal provided to the second switching element, and a duty ratio of the pulse-width modulated signal provided to the third switching element when the first current sensor fails.

12. Determining a duty ratio of a pulse width modulation signal provided to the first switching element includes:

12. The method of claim 11, further comprising: determining a duty ratio of the pulse width modulated signal provided to the first switching element such that an average of a duty ratio of the pulse width modulated signal provided to the first switching element, a duty ratio of the pulse width modulated signal provided to the second switching element, and a duty ratio of the pulse width modulated signal provided to the third switching element becomes an average duty ratio of the pulse width modulated signal provided to the inverter.

13. 12. The method of claim 11, further comprising: when the first current sensor and the second current sensor fail, determining a duty ratio of the pulse width modulated signal provided to the first and second switching elements based on an average duty ratio of the pulse width modulated signal provided to the inverter and a duty ratio of the pulse width modulated signal provided to the third switching element.

14. Determining a duty ratio of a pulse width modulation signal provided to the first and second switching elements includes:

14. The method of claim 13, further comprising: determining a duty ratio of the pulse width modulated signal provided to the first and second switching elements such that an average of a duty ratio of the pulse width modulated signal provided to the first switching element, a duty ratio of the pulse width modulated signal provided to the second switching element, and a duty ratio of the pulse width modulated signal provided to the third switching element becomes an average duty ratio of the pulse width modulated signal provided to the inverter.

15. Determining a duty ratio of a pulse width modulation signal provided to the first and second switching elements includes:

15. The method of claim 14, further comprising: determining that the duty ratios of the pulse width modulation signals provided to the first and second switching elements are the same.

16. 12. The method of claim 11, further comprising: performing pulse width modulation control on the inverter only when at least one of the first, second, and third current sensors operates normally.

17. measuring temperatures of each of the first switching elements, each of the second switching elements, and each of the third switching elements; 12. The method of claim 11, further comprising: performing pulse width modulation control on the inverter only when temperatures measured at each of the first switching elements, each of the second switching elements, and each of the third switching elements are equal to or lower than a preset temperature.

18. 12. The method of claim 11, further comprising: performing pulse width modulation control on the inverter such that an On period of the pulse width modulation signal provided to the first switching element, an On period of the pulse width modulation signal provided to the second switching element, and an On period of the pulse width modulation signal provided to the third switching element are interleaved.

19. 12. The method of claim 11, further comprising: if a magnitude of a charging voltage provided by the charger is lower than a magnitude of a battery voltage of the battery, closing a second relay connected between an input / output port connected to the charger and the neutral stage and a third relay connected between a lower switching element of the inverter and the input / output port, and opening a first relay connected between an upper switching element of the inverter and the input / output port.

20. 20. The method of claim 19, further comprising: closing the first relay and the third relay, and opening the second relay, if a magnitude of a charging voltage provided by the charger is equal to or greater than a magnitude of a battery voltage of the battery.

Citation Information

Patent Citations

  • Drive system, vehicle, and charging method for electricity storing unit

    JP2010016954A

  • Charging apparatus for electric vehicle

    US20190291585A1

  • Charging system for vehicle and battery charging stop method thereof

    US20210316630A1