Method for calculating remaining required amount of fresh concrete, system for calculating remaining required amount of fresh concrete, and system for supporting ordering of fresh concrete

By using measurement modules to detect the remaining concrete volume during pouring, the method addresses the challenge of excess concrete return, ensuring accurate ordering and reducing waste through real-time estimation.

JP7573469B2Active Publication Date: 2024-10-25TAIHEIYO CEMENT CORP
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2021053468
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-26
Publication Date
2024-10-25
Estimated Expiration
2041-03-26

AI Technical Summary

Technical Problem

The challenge of accurately calculating the remaining amount of fresh concrete during pouring work leads to excess concrete being returned to the manufacturing plant, causing economic and environmental issues, due to difficulties in estimating the exact amount needed and delays in concrete delivery.

Method used

A method and system that utilize measurement modules equipped with position and distance sensors to continuously calculate the remaining concrete amount by detecting the liquid level and formwork area, allowing real-time estimation of the required concrete volume, even in the presence of obstacles like reinforcing bars.

Benefits of technology

This approach reduces the amount of leftover and returned concrete by enabling precise ordering based on real-time data, minimizing waste and optimizing construction management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007573469000001
    Figure 0007573469000001
  • Figure 0007573469000002
    Figure 0007573469000002
  • Figure 0007573469000003
    Figure 0007573469000003
Patent Text Reader

Abstract

To provide a method for calculating a remaining amount of fresh concrete necessary for completing placement work, in the middle of the placement work.SOLUTION: This method includes: (a) a step of continuously or intermittently detecting remaining height corresponding to a distance related to the vertical direction from a crown position of a mold to a liquid level of fresh concrete, during placement work; (b) a step of calculating a reference area when a placement scheduled region is viewed from vertically above based on the position information of the mold, during the placement work or before starting the placement work; and (c) a step of continuously or intermittently calculating the remaining necessary amount of the fresh concrete by performing arithmetic processing based on the information of the remaining height and the information of the reference area.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method and system for calculating the remaining amount of fresh concrete required for pouring work. The present invention also relates to a system for supporting ordering processing of fresh concrete. [Background technology]

[0002] When constructing a concrete structure, fresh concrete (also called "ready mixed concrete") is poured (casting) into an area surrounded by formwork designed and arranged to match the shape of the concrete structure to be constructed. After that, as the poured fresh concrete hydrates and develops a certain level of strength, the formwork is removed (de-molding).

[0003] In the pouring stage of fresh concrete, it is often the case that fresh concrete is ordered with an estimated quantity slightly larger than the expected amount. In this case, the unused remaining fresh concrete (hereinafter referred to as "remaining concrete") is returned to the fresh concrete manufacturing plant (ready-mixed concrete plant), and its disposal has been a problem for a long time.

[0004] The amount of fresh concrete returned to the ready-mix concrete plant (hereinafter referred to as "returned concrete") is 100 m per month. 3 There are also factories that produce more than 1.5 to 2 million m of wood per year nationwide. 3 For this reason, the existence of returned concrete is an issue not only in terms of costs for ready-mix concrete companies, but also in terms of the environment for the industry.

[0005] As a method for suppressing the amount of return capacitance, for example, the technology described in Patent Document 1 below is known. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2018-199950 A Summary of the Invention [Problem to be solved by the invention]

[0007] The reason why leftover concrete and returned concrete occur is that it is difficult to calculate the amount of fresh concrete required for pouring, and therefore difficult to order the exact amount in advance. For this reason, the procedure often adopted is to first order a slightly smaller amount of concrete than is estimated to be required, and then check the rising behavior of the concrete liquid level while observing the pouring location, and determine the required amount by eyeballing it or measuring the distance from the top of the formwork with a tape measure, and then place an additional order.

[0008] When ordering the final amount of concrete, if the arrival of the concrete mixer truck (agitator truck) is delayed due to traffic conditions, construction defects such as poor pouring joints may occur at the interface with the surface of the already poured concrete. For this reason, from the perspective of construction management, there is a tendency to order more concrete than necessary when placing additional orders, and the remaining concrete ends up as leftover concrete or returned concrete.

[0009] In view of the above, in order to suppress the generation of residual concrete and returned concrete, it is required to detect the remaining required amount of fresh concrete as accurately as possible, especially during pouring. In other words, it is preferable to be able to detect the remaining required amount of fresh concrete as quickly as possible in real time as pouring progresses.

[0010] The technology of the above-mentioned Patent Document 1 is to obtain the volume inside the formwork by a depth sensor or image capture before the start of pouring work, and to detect the required amount of fresh concrete based on this obtained information. However, with this method, it is not possible to estimate the remaining required amount of fresh concrete based on the current pouring situation during the pouring work (for example, in the final stage of pouring work).

[0011] In view of the above problems, the present invention aims to provide a method and system for calculating the remaining amount of fresh concrete required to complete a concrete pouring operation, particularly during the pouring operation, and a support system for ordering fresh concrete using the method. [Means for solving the problem]

[0012] The method for calculating the remaining required amount of fresh concrete according to the present invention comprises the steps of: A step (a) of continuously or intermittently detecting a remaining height corresponding to a vertical distance from a top end of the formwork to a liquid surface of the fresh concrete during a pouring operation of pouring fresh concrete into a planned pouring area surrounded by the formwork; A step (b) of calculating a reference area when the casting planned area is viewed vertically from above based on the position information of the formwork during the casting work or before the start of the casting work; and a step (c) of calculating continuously or intermittently the remaining required amount of fresh concrete by performing a calculation process based on the information on the remaining height obtained in the step (a) and the information on the reference area obtained in the step (b).

[0013] According to the above method, the area (reference area) of the area to be poured surrounded by the formwork as viewed from above is calculated in step (b). In addition, the remaining height due to the liquid level of the fresh concrete, which changes during pouring, is calculated in step (a). Therefore, by performing a calculation process based on the results obtained in steps (a) and (b), the remaining required amount of fresh concrete can be calculated continuously or intermittently.

[0014] This allows workers at a construction site, for example, to determine the remaining amount of fresh concrete required and order additional fresh concrete based on this amount, thereby reducing the amount of leftover concrete and returned concrete more than before.

[0015] The method for calculating the remaining required amount of fresh concrete further comprises: Before the start of the pouring work, a measurement module equipped with a position information detection unit that detects position information by receiving radio waves is attached to three or more different positions on the formwork as viewed vertically from above. The step (b) may be a step of calculating the reference area by a calculation process based on information on the positions at which the measurement modules are attached.

[0016] According to the above method, the cross-sectional area of ​​the area to be poured inside the formwork can be calculated by automatic calculation processing simply by attaching the measurement module to a predetermined location in advance. In other words, even if detailed design drawings cannot be obtained in advance, workers are not burdened with additional work such as measuring during the pouring work.

[0017] The position information detection unit may take any form as long as it has the function of detecting position information. For example, a method of estimating the self-position by receiving radio waves from a positioning satellite, radio waves from Wi-Fi (registered trademark), infrared rays, etc. is available. However, from the viewpoint of improving the estimation accuracy of the position information, it is preferable to use RTK (Real Time Kinematic) positioning. In this case, since the accuracy error of the position information can be suppressed to within a few centimeters, the cross-sectional area (i.e., the reference area) of the planned pouring area can be estimated with high accuracy by performing calculations based on this position information.

[0018] The calculation method used by the calculation unit may be a geometric method, such as a closed traverse calculation, in which the installation positions of the measurement modules as viewed vertically from above are recognized as components of a polygon having each vertex, and the area of ​​the region enclosed by this polygon is calculated.

[0019] The measurement module attached in step (d) is equipped with a distance measurement unit capable of measuring a distance to an object, The step (a) may be a step of detecting the remaining height by measuring the vertical distance from the installation position of the measurement module to the liquid surface of the fresh concrete using the distance measuring unit mounted on the measurement module.

[0020] According to the above method, the remaining required amount of fresh concrete is automatically calculated by installing measurement modules equipped with both a distance measurement function for measuring the remaining height and a position information detection function for calculating the reference area in multiple locations in advance. This significantly reduces the workload. For example, a laser range finder can be used as the distance measurement unit.

[0021] The method for calculating the remaining required amount of fresh concrete includes a step (e) of calculating an exclusion area, which is an area of ​​an obstacle present in the planned pouring area when the planned pouring area is viewed vertically from above, The step (c) may be a calculation process including a process of multiplying a value obtained by subtracting the excluded area obtained in the step (e) from the reference area obtained in the step (b) by the remaining height obtained in the step (a) to calculate the remaining required amount of the fresh concrete.

[0022] In general, reinforcing bars and the like are placed within the area to be poured, which is surrounded by formwork. Particularly toward the end of the pouring work, the reinforcing bars extend vertically, and the amount of change in the area occupied by these reinforcing bars when viewed vertically from above is small. Therefore, if the area occupied by the reinforcing bars when viewed vertically from above is known, the area of ​​the area in which fresh concrete is to be buried, as viewed vertically from above, can be calculated with greater accuracy by excluding the area occupied by these reinforcing bars (excluded area) from the reference area calculated in step (b).

[0023] The excluded area can be calculated, for example, based on the amount of fresh concrete poured into the formwork from the agitator vehicle within a predetermined time during the pouring operation and the amount of change in the liquid level of the fresh concrete within this predetermined time. Details will be described later in the section "Description of the Preferred Embodiments of the Invention."

[0024] The present invention also provides a system for calculating a remaining required amount of fresh concrete during a pouring operation in which fresh concrete is poured into a planned pouring area surrounded by a formwork, A plurality of measurement modules each having a location information detection unit that detects location information by receiving radio waves and a distance measurement unit that measures the distance between the target object and the location information detection unit; A calculation unit that calculates a remaining required amount of fresh concrete by calculation processing based on first information regarding the installation positions of the plurality of measurement modules when viewed vertically from above and second information regarding the vertical distance from the measurement modules to the liquid surface of the fresh concrete; The present invention is characterized in that it includes a server that records remaining amount information regarding the remaining required amount of fresh concrete calculated by the calculation unit and is configured to be able to transmit the remaining amount information to one or more operation terminals.

[0025] According to the above system, workers at the construction site of a concrete structure can easily recognize the current remaining required amount of fresh concrete by accessing the server using an operating terminal such as a smartphone or tablet PC. This provides criteria for determining the order amount and timing when ordering additional fresh concrete.

[0026] In addition, a construction site of a concrete structure generally involves multiple workers from different employers, such as a construction worker who supervises the site, a production worker at the ready-mix concrete plant who produces and supplies fresh concrete, and a transporter who transports the fresh concrete from the ready-mix concrete plant to the site. For this reason, it is preferable that the server be a server that utilizes a public cloud system that can be accessed regardless of the type of operating terminal, so that these workers can check the current pouring status, i.e., the remaining required amount of fresh concrete, in real time and on multiple devices. In addition, for convenience, it is preferable that the ID and password for authentication at the time of access be common to each construction site.

[0027] The calculation unit may calculate a reference area of ​​the planned pouring area when viewed vertically from above from the first information, and detect a remaining height corresponding to the vertical distance from the top position of the formwork to the liquid level of the fresh concrete from the second information, and perform a calculation process that includes multiplying the reference area by the remaining height to calculate the remaining required amount of the fresh concrete.

[0028] the calculation unit is mounted in at least one of the plurality of measurement modules, The measurement module equipped with the calculation unit may transmit the remaining amount information obtained by calculation processing to the server, thereby updating the remaining amount information recorded in the server.

[0029] In this case, one of the multiple measurement modules may be designated as a "parent module" and the others as "child modules." For example, the parent module receives first information from the multiple child modules regarding their respective installation positions. The calculation unit of the parent module then calculates the remaining required amount of fresh concrete by calculation processing based on the first information transmitted from the child modules, the first information detected by the parent module itself, and second information detected by the parent module regarding the vertical distance from the measurement module to the liquid surface of the fresh concrete, and transmits the calculated amount to the server.

[0030] In the above case, the second information transmitted from each slave module may also be used when calculating the remaining required amount of fresh concrete. As an example, the average value of the second information transmitted from each measurement module may be used as the vertical distance to the liquid surface of the fresh concrete.

[0031] The computing unit is mounted on the server, The first information and the second information are transmitted from the measurement module to the server, The calculation unit mounted on the server may calculate the remaining amount information based on the received first information and second information.

[0032] The fresh concrete ordering support system according to the present invention includes the fresh concrete remaining required amount calculation system, The operation terminal is characterized by having an order processing unit that instructs the sending of order information to a supplier to order the amount of fresh concrete required to be ordered based on the remaining amount information.

[0033] According to the above configuration, fresh concrete can be ordered based on the required amount of fresh concrete that is accurately estimated at the present time, so the amount of leftover concrete and returned concrete can be reduced more than ever before. Also, workers who manage the ordering of fresh concrete at the construction site can easily process the order using their own operation terminal such as a smartphone. Examples of the order destination include ready-mix concrete plants.

[0034] The server may store the ordered but unused amount of fresh concrete in an updatable state, calculate the required order amount by subtracting the ordered but unused amount from the remaining required amount of fresh concrete listed in the remaining amount information, and transmit the calculated amount to the operation terminal.

[0035] The amount of fresh concrete ordered but unused is calculated, for example, by calculating the amount of fresh concrete that has been used or is currently being used from the number of agitator trucks that have arrived at the construction site and the volume of fresh concrete that can be accommodated in the agitator truck, and then subtracting this amount from the total amount ordered to date. Effect of the Invention

[0036] According to the present invention, it is possible to accurately calculate the remaining amount of fresh concrete required to complete a pouring operation, even in the middle of the pouring operation. [Brief description of the drawings]

[0037] [Figure 1] 1 is a schematic diagram showing a state in which a measurement module is installed at a construction site. [Diagram 2] FIG. 2 is a block diagram showing the functional configuration of a measurement module. [Diagram 3] 11 is a schematic diagram for explaining a method for calculating the area of ​​the inner region of the formwork by a calculation unit. [Figure 4] This is a schematic diagram for explaining the calculation method of the calculation unit when taking into account the presence of obstacles within the planned pouring area. [Diagram 5] FIG. 1 is a block diagram illustrating a configuration of a first embodiment of a system for calculating a remaining required amount of fresh concrete. [Figure 6] FIG. 2 is a block diagram illustrating a schematic configuration of another embodiment of the system for calculating a remaining required amount of fresh concrete. [Figure 7] FIG. 2 is a block diagram illustrating a schematic configuration of another embodiment of the system for calculating a remaining required amount of fresh concrete. [Figure 8] FIG. 11 is a block diagram illustrating a configuration of a second embodiment of a system for calculating a remaining required amount of fresh concrete. [Figure 9] FIG. 11 is a block diagram illustrating another configuration of the second embodiment of the system for calculating a remaining required amount of fresh concrete. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0038] Hereinafter, embodiments of a method for calculating a required remaining amount of fresh concrete, a system for calculating a required remaining amount of fresh concrete, and a system for supporting ordering of fresh concrete according to the present invention will be described in detail with reference to the drawings.

[0039] [First embodiment] Fig. 1 is a schematic diagram showing a state in which a measurement module 10, which is an element of the system for calculating the remaining required amount of fresh concrete according to the present invention, is installed at a construction site. At the construction site 1, an operation is carried out to pour fresh concrete 3 into a planned pouring area surrounded by formwork 2. Reinforcing bars 4 are arranged at predetermined locations in the planned pouring area. The +Z direction in Fig. 1 is vertically upward.

[0040] As described below, the measurement module 10 can measure the liquid level of the fresh concrete 3 by irradiating laser light 10L vertically downward. Also, as described below, the measurement module 10 can detect position information of the position where the measurement module 10 is attached. As shown in Fig. 1, the measurement module 10 is attached at multiple points when viewed vertically from above.

[0041] 2 is a block diagram showing the functional configuration of the measurement module 10. The measurement module 10 includes a position information detection unit 11, a distance measurement unit 12, a calculation unit 13, and a transmission / reception unit 15.

[0042] The position information detection unit 11 is a functional means for detecting the position of the installed measurement module 10. Specifically, the position information detection unit 11 receives radio waves to detect the position information, and preferably employs a method based on RTK positioning using radio waves from a positioning satellite. RTK positioning is a method in which a base station and a receiver (referred to as the position information detection unit 11 here) (not shown) each receive carrier waves from a positioning satellite and detect the installation position of the receiver with high accuracy based on correction information transmitted from the base station to the receiver. With this method, the installation position can be detected with high accuracy with an error of within a few centimeters.

[0043] The distance measuring unit 12 is a functional means for measuring the distance in the vertical direction (Z direction in FIG. 1) from the installation position of the measuring module 10 to the liquid surface of the fresh concrete 3. Specifically, a laser distance meter can be adopted as the distance measuring unit 12. The laser distance meter is a device that irradiates a laser beam 10L (see FIG. 1) to an object and receives the reflected light, and measures the distance based on the time from emitting the laser beam 10L to receiving the reflected light. For example, as shown in FIG. 1, the measuring module 10 (distance measuring unit 12) irradiates the laser beam 10L vertically downward, and the reflected light reflected by the liquid surface of the fresh concrete 3 is received by the measuring module 10. The timing of receiving the reflected light depends on the vertical distance from the installation position of the measuring module 10 to the liquid surface of the fresh concrete 3, so that the distance can be measured by this time lag. Note that the timing of measuring the distance by the distance measuring unit 12 is preferably after the formwork 2 is filled with the fresh concrete 3 to every corner, that is, after compaction, but is not particularly limited. For example, in the case of highly fluid concrete, compaction is not required, and measurements can be performed at any time.

[0044] The calculation unit 13 is a functional means for calculating the amount of fresh concrete required from the present time until the completion of pouring (remaining required amount) by calculation processing based on the position information (corresponding to "first information") detected by the position information detection unit 11 and the distance information (corresponding to "second information") measured by the distance measurement unit 12, and is composed of a processor such as a CPU or an MPU. A specific example of the calculation method in the calculation unit 13 will be described later.

[0045] The transmitting / receiving unit 15 is a communication interface for transmitting and receiving information to and from other devices. As will be described later, the measurement module 10 of this embodiment transmits information relating to the remaining required amount of fresh concrete calculated by the calculation unit 13 to a server 20 (described later in FIG. 5) via the transmitting / receiving unit 15.

[0046] The calculation unit 13 estimates, by calculation, the area (i.e., cross-sectional area) of the region related to the inside of the formwork 2 when viewed vertically from above (in the -Z direction) based on the position information detected by the position information detection unit 11 included in each measurement module 10. Fig. 3 is a diagram for explaining this calculation method in schematic form.

[0047] As described above, each measurement module 10 is attached to a plurality of locations when viewed vertically from above. Here, as an example, a description will be given assuming that eight measurement modules 10 (10a, 10b, ..., 10h) are attached to the construction site 1 where concrete is to be poured.

[0048] The measurement module 10 may be attached to the top of the formwork 2 as shown diagrammatically in FIG. 1, or may be attached to construction materials (temporary scaffolding, single-tube pipes, etc.) not shown that are installed above the formwork 2.

[0049] As an example, the position information detected by the position information detection unit 11 of each measurement module 10 (10a, 10b, ..., 10h) is sent to the calculation unit 13 of one of the measurement modules (for convenience, here, measurement module 10a). In this example, measurement module 10a is the parent module, and the other measurement modules (10b, 10c, ..., 10h) are child modules. The parent module and child modules are configured to be able to communicate with each other via the transmission / reception unit 15. Note that this communication means is arbitrary.

[0050] The calculation unit 13 mounted on the measurement module 10a calculates the area of ​​the region 11A inside the formwork 2 by a geometric method based on the position information of each measurement module 10 (10a, 10b, ..., 10h). As the geometric method, for example, a traverse surveying technique can be used. More specifically, after recognizing a polygon connecting the positions of each measurement module 10 (10a, 10b, ..., 10h), the coordinates of the unknown point are obtained by calculating the distance and azimuth angle between the reference point and the unknown point, and a closed traverse is recognized, and the area inside the closed traverse is calculated by a known method such as the double horizontal distance method or the coordinate method.

[0051] The calculation unit 13 calculates the remaining required amount of fresh concrete by calculation processing based on the area of ​​the region surrounded by the formwork 2 calculated by the above method and the vertical distance from the installation position of the measurement module 10 to the liquid surface of the fresh concrete 3 (i.e., the remaining height) measured by the distance measurement unit 12. When the measurement module 10 is attached to a construction material above the formwork 2, the calculation unit 13 may calculate the remaining height by subtracting the difference between the planned height of the top end of the fresh concrete 3 and the installation height of the measurement module 10 from the distance measured by the distance measurement unit 12. In this case, information on the difference between the planned height of the top end of the fresh concrete 3 and the installation height of the measurement module 10 may be input to the measurement module 10 in advance and recorded in the measurement module 10. Even when the measurement module 10 is attached at the same height as the formwork 2, when the distance measurement unit 12 is an optical measurement means such as a laser range finder, the measurement module 10 is attached so that its light receiving surface is located above the position of the top end of the formwork 2. In this case, the calculation unit 13 may calculate the remaining height by subtracting the difference between the planned height of the top edge of the fresh concrete 3 and the height of the light receiving surface from the distance measured by the distance measurement unit 12.

[0052] The above-mentioned calculation process for calculating the remaining height may also be performed by the calculation unit 13 included in the parent measurement module 10a, which is one of the measurement modules 10 (10a, 10b, . . . , 10h).

[0053] The information on the remaining height used in the calculation process may be based only on the measurement results of the distance measurement unit 12 mounted on the parent measurement module 10a, or may take into consideration the measurement results of the distance measurement units 12 mounted on each of the other measurement modules (10b, 10c, ..., 10h) in addition to the measurement module 10a. In the latter case, the measurement results of the distance measurement units 12 are transmitted from the child measurement modules (10b, 10c, ..., 10h) to the parent measurement module 10a. At this time, the calculation unit 13 of the measurement module 10a may use, for example, the average value of the measurement results of all the measurement modules 10 (10a, 10b, ..., 10h) as the remaining height.

[0054] The calculation unit 13 calculates an estimated value of the remaining required amount of fresh concrete by multiplying the area of ​​the region surrounded by the formwork 2 by the remaining height. At the construction site 1, as the pouring of the fresh concrete 3 progresses, the liquid level of the fresh concrete 3 rises over time, and the remaining height decreases over time accordingly. The calculation unit 13 of the measurement module 10a is configured to receive the measurement results from the distance measurement unit 12 continuously or intermittently, and calculates an estimated value of the remaining required amount of fresh concrete using the value of the remaining height that changes over time based on this information. In other words, according to this configuration, the calculation unit 13 of the measurement module 10a calculates an estimated value of the remaining required amount of fresh concrete at the current time, taking into account the degree of rise in the liquid level of the fresh concrete 3 as pouring progresses.

[0055] The calculation unit 13 may be configured to estimate the remaining required amount of fresh concrete with higher accuracy by taking into account obstacles present in the planned casting area. Any method can be adopted as a method for estimating the volume of the obstacle. As an example, a method can be used in which information on the volume of objects to be excluded from casting, such as reinforcing bars 4, is obtained in advance from three-dimensional CAD data or dimension drawings of the structure. As another example, a method can be used in which an image of the inside of the formwork 2, which is the casting target, is taken from above the area in which the formwork 2 is installed using an imaging device provided on a UAV (drone) or the like, and the cross-sectional area of ​​the upper end of the formwork 2 and the amount of reinforcing bars are estimated by image processing. Even if CAD data or a drone cannot be prepared, it is possible to estimate by calculation processing using the following method. FIG. 4 is a schematic diagram for explaining a calculation method of the calculation unit 13 when the presence of obstacles is taken into account.

[0056] By the above-mentioned method, the calculation unit 13 calculates the cross-sectional area of ​​the planned pouring area, that is, the area of ​​the area surrounded by the formwork 2 (area S2 in FIG. 4). This area S2 corresponds to the "reference area."

[0057] The calculation unit 13 calculates a difference value H(T12) by subtracting the remaining height h(t2) ​​at time t2 from the remaining height h(t1) at time t1 based on the measurement result of the distance measurement unit 12. This difference value H(T12) corresponds to the rise value of the liquid level of the fresh concrete 3 within the time T12 from time t1 to time t2.

[0058] The calculation unit 13 multiplies the previously measured volume per unit time (i.e., flow rate) of the fresh concrete 3 poured from the agitator vehicle into the planned pouring area by the time T12. This calculates the flow rate V3(T12) of the fresh concrete 3 actually poured within the time T12 from time t1 to time t2.

[0059] The calculation unit 13 subtracts the flow rate V3(T12) of the fresh concrete 3 actually poured from the product of the reference area S and the rise value H(T12) of the liquid level of the fresh concrete 3 during the time T12 from time t1 to time t2. This calculates the volume V4(T12) of the reinforcing bar 4 embedded by the fresh concrete 3 during the time T12 from time t1 to time t2.

[0060] The calculation unit 13 calculates the cross-sectional area S4 of the reinforcing bar 4 by dividing the volume V4(T12) by the rise value H(T12) of the liquid level of the fresh concrete 3 during the time T12 from time t1 to time t2. This cross-sectional area S4 corresponds to the excluded area.

[0061] The calculation unit 13 calculates an estimated value Vr(t2) of the remaining required amount of fresh concrete 3 at time t2 by multiplying the value obtained by subtracting the excluded area S4 from the area of ​​the region surrounded by the formwork 2, i.e., the reference area S2, by the remaining height h(t2) ​​at time t2. According to this method, the remaining required amount of fresh concrete 3 can be estimated while taking into account obstacles such as reinforcing bars 4.

[0062] Especially in the final stage of the concrete pouring work, it is difficult to imagine that the cross-sectional area S4 of obstacles such as the reinforcing bar 4 will change over time. Therefore, the cross-sectional area S4 of the reinforcing bar 4 protruding above the liquid level of the fresh concrete 3 at time t2 can be determined based on the estimated value of the cross-sectional area S4 of the reinforcing bar 4 calculated based on the value of the rise H(T12) of the liquid level of the fresh concrete 3 during the time T12 from time t1 to time t2.

[0063] The final stage of the pouring work varies depending on the size of the planned pouring area enclosed by formwork 2, but as a guideline, it is the stage where there are approximately 20 or fewer agitator trucks remaining to enter the site before pouring is completed in the planned pouring area according to the concrete pouring plan.

[0064] In addition, information regarding the flow rate of fresh concrete 3 poured from the agitator truck into the planned pouring area may be measured in advance by a worker and then transmitted to the measurement module 10, and may be recorded in a memory unit (not shown) provided in the measurement module 10.

[0065] In addition, if the volume of an obstacle such as a reinforcing bar 4 does not change in the vertical direction from the bottom to the top of the formwork, the excluded area S4 calculated in calculating the initial estimated value Vr may be used as the excluded area S4 in calculating subsequent estimated values ​​Vr.

[0066] Information relating to the required remaining amount of fresh concrete 3 calculated by the calculation unit 13 included in the measurement module 10 is transmitted to the server 20. FIG.

[0067] The server 20 is installed at a location away from the construction site 1 (see FIG. 1), and is preferably a server that utilizes a public cloud system that can be connected regardless of the type of equipment. The server 20 includes a memory unit 21 for storing information, and a transmission / reception unit 22 that is an interface for transmitting and receiving information between multiple terminals and devices.

[0068] Information regarding the remaining required amount of fresh concrete 3 calculated by the measurement module 10 is transmitted to the server 20 via the network line NW and stored in the memory unit 21. As described above, the measurement module 10 continuously or intermittently calculates an estimate of the remaining required amount of fresh concrete 3 at the current time, and therefore information regarding this calculation result is transmitted to the server 20 substantially in real time.

[0069] The server 20 is configured to be connectable from an operation terminal 30 held by a worker or the like at the construction site 1. When connecting to the server 20 from the operation terminal 30, a predetermined authentication process for requesting input of a user ID and password may be performed in advance. By setting a common user ID and password according to the location of the construction site 1, each worker involved in the construction site 1 can easily connect to the server 20. For example, a smartphone, a tablet PC, a notebook PC, or a wearable device can be used as the operation terminal 30. The operation terminal 30 may be connected to the server 20 by executing an application provided by the operator of the system 100.

[0070] When a worker at the construction site 1 operates the operation terminal 30 to connect to the server 20 from the transmission / reception unit 32, information regarding the remaining required amount of fresh concrete 3 recorded in the memory unit 21 of the server 20 is received by the operation terminal 30 via the network line NW. By checking the display unit 31 of the operation terminal 30, the worker can recognize the remaining required amount of fresh concrete 3 at the construction site 1 at the current time.

[0071] As described above, information on the required remaining amount of fresh concrete 3 is continuously or intermittently transmitted from the measurement module 10 to the server 20. Therefore, the memory unit 21 of the server 20 is capable of recording the change over time of the required remaining amount of fresh concrete 3. The display unit 31 of the operation terminal 30 may display, for example, a graph or the like, the manner of change over time of the required remaining amount of fresh concrete 3 based on the information from the server 20. This graphing function is realized, for example, by an application provided by the operator of the system 100.

[0072] According to this system 100, a plurality of workers at the construction site 1 can recognize the current remaining required amount of fresh concrete 3 in real time by operating their own operation terminals 30 to connect to the server 20. This can be used as a criterion for determining the order amount and ordering timing when ordering additional fresh concrete 3.

[0073] As shown in Fig. 5, an in-factory terminal 40 installed in the ready-mixed concrete factory may also be connected to the server 20. This allows the ready-mixed concrete factory to recognize the remaining required amount of fresh concrete 3 at the construction site 1 in real time.

[0074] As shown in FIG. 6, the operation terminal 30 may include an order processing unit 33. This allows a worker in charge of ordering fresh concrete 3 at the construction site 1 to recognize the remaining required amount of fresh concrete 3 at the present time using his / her own operation terminal 30, and to order additional fresh concrete 3 in an amount corresponding to the remaining required amount (required order amount). This order information is transmitted to the supplier via the network line NW. The supplier may be, for example, an in-plant terminal 40 of a ready-mixed concrete plant, but may also be a terminal installed at a base of the supplier other than the ready-mixed concrete plant or a mobile terminal of a person in charge of the supplier. At the ready-mixed concrete plant, the fresh concrete 3 is manufactured (mixed) in an order amount corresponding to the order information, and is prepared for shipment to the construction site 1. In other words, the system 100 shown in FIG. 6 makes it possible to support the ordering process of fresh concrete 3. The order information includes at least information related to the required order amount and information related to the supplier, such as the place to ship, but may also include other information.

[0075] The communication method of the network line NW used in this system 100 is arbitrary, but considering that the production of fresh concrete is usually completed within 10 minutes, it is preferable to adopt high-speed communication with a communication frequency of several hundred MHz or more with little data delay.

[0076] Incidentally, at the time when information on the remaining required amount of fresh concrete 3 is stored in the memory unit 21 of the server 20, there may be cases where an order for fresh concrete 3 has already been placed with the ready-mixed concrete plant but an amount that has not yet been used (ordered but unused amount) exists. Specifically, the amount of fresh concrete 3 being transported from the ready-mixed concrete plant to the construction site 1 and the amount of fresh concrete 3 that has just arrived at the construction site 1 correspond to the ordered but unused amount.

[0077] 7, when the server 20 includes a calculation unit 23, the calculation unit 23 may calculate the amount of fresh concrete 3 that needs to be ordered by subtracting the ordered but unused amount from the remaining amount of fresh concrete 3 that is required and transmitted from the measurement module 10. Information on this amount of fresh concrete 3 that needs to be ordered is transmitted from the server 20 to the operation terminal 30. When an order processing is performed in the order processing unit 33 of the operation terminal 30, order information on the fresh concrete 3 that includes the amount of fresh concrete 3 that needs to be ordered (order amount) and information on the ordering site is transmitted to an in-plant terminal 40 of a ready-mixed concrete plant, which is an example of a supplier.

[0078] The memory unit 21 of the server 20 may store order information up to now. The construction site 1 may be provided with a gate equipped with a function for detecting the arrival of an agitator truck for transporting fresh concrete 3. In this case, when the arrival of the agitator truck is detected by the gate, information to that effect is transmitted to the server 20, so that it is possible to recognize that the agitator truck has arrived at the construction site 1. Since the amount of fresh concrete that has arrived at the site can be recognized based on the capacity of fresh concrete 3 that the agitator truck can transport and the number of arriving vehicles, the amount that has been ordered but has not yet arrived can be detected by subtracting this arriving amount from the total amount already ordered. However, the method of detecting the ordered but unused amount is not limited to this method.

[0079] [Second embodiment] In the first embodiment, the calculation unit 13 included in the measurement module 10 calculates the remaining required amount of fresh concrete 3, and information on this remaining required amount is transmitted from the measurement module 10 to the server 20. However, this calculation process may be performed at a location other than the measurement module 10.

[0080] For example, as shown in Fig. 8, a calculation unit 23 provided in the server 20 may perform calculation processing for estimating the remaining required amount of fresh concrete 3. In this case, each measurement module 10 transmits position information detected by its respective position information detection unit 11 and distance information measured by its distance measurement unit 12 to the server 20 via the network line NW. The calculation unit 23 of the server 20 performs calculation processing in the same manner as in the first embodiment, and an estimate of the remaining required amount of fresh concrete is calculated. That is, in this case, each measurement module 10 (10a, 10b, ...) may not be provided with the calculation unit 13.

[0081] Also, as shown in FIG. 9, a calculation device 50 capable of transmitting and receiving information to and from the measurement modules 10 (10a, 10b, ...) may be installed near the construction site 1. In this case, each measurement module 10 transmits position information detected by its position information detection unit 11 and distance information measured by its distance measurement unit 12 to the calculation device 50. A calculation unit 51 included in the calculation device 50 performs calculation processing based on this information in the same manner as in the first embodiment, and calculates an estimated value of the remaining required amount of fresh concrete. Information related to the calculation result is transmitted from a transmission / reception unit 52 of the calculation device 50 to the server 20 through the network line NW. The calculation device 50 can be, for example, a router equipped with a calculation function.

[0082] The rest is the same as in the first embodiment, so the explanation will be omitted.

[0083] [Another embodiment] Another embodiment will now be described.

[0084] <1> In the above embodiment, the measurement module 10 has been described as a single device equipped with both the position information detection unit 11 and the distance measurement unit 12. However, the position information detection unit 11 and the distance measurement unit 12 may be configured separately.

[0085] <2> As described above, each piece of position information detected by the position information detection units 11 mounted on the multiple measurement modules 10 is used to calculate the cross-sectional area of ​​the region surrounded by the formwork 2. The value of this cross-sectional area does not change as the pouring of the fresh concrete 3 progresses. On the other hand, the remaining height measured by the distance measurement units 12 mounted on the measurement modules 10 changes over time as the pouring of the fresh concrete 3 progresses and the liquid level rises.

[0086] The information on the remaining height used for calculation in the calculation unit (13, 23, 51) may use the measurement results of the distance measurement unit 12 mounted on a single measurement module 10. For this reason, before pouring, information on the installation position of each formwork 2 is detected by the position information detection units 11 mounted on the multiple measurement modules 10, and this information is recorded in a specific measurement module 10 (for example, the measurement module 10a as the above-mentioned parent unit). Then, the measurement modules (10b, 10c, ...) other than the measurement module 10a may be removed thereafter, and only the measurement module 10a may be attached to the construction site 1 during pouring. [Explanation of symbols]

[0087] 1: Construction site 2: Formwork 3: Fresh concrete 4: Reinforced concrete 10(10a,10b,...,10h): Measurement module 10L: Laser light emitted from the measurement module 11: Location information detection unit 12: Distance measurement section 13: Arithmetic section 15: Transmitter / receiver 20: Server 21: Storage section 22: Transmitter / receiver 23: Arithmetic section 30: Operation terminal 31:Display section 32: Transmitter / receiver 33: Order processing section 40: Factory terminal 50: Arithmetic device 51: Arithmetic section 52: Transmitter / receiver 100: System NW: Network line

Claims

1. A step (a) of continuously or intermittently detecting a remaining height corresponding to a vertical distance from a top end of the formwork to a liquid surface of the fresh concrete during a pouring operation of pouring fresh concrete into a planned pouring area surrounded by the formwork; A step (b) of calculating a reference area, which is the area of ​​the planned casting area when viewed vertically from above, based on the position information of the formwork during or before the start of the casting work; A step (c) of continuously or intermittently calculating the remaining required amount of fresh concrete by performing a calculation process based on the remaining height information obtained in the step (a) and the reference area information obtained in the step (b); Before the start of the pouring work, a measurement module equipped with a position information detection unit that detects position information by receiving radio waves is attached to three or more different positions on the formwork as viewed vertically from above. The method for calculating the remaining required amount of fresh concrete, characterized in that the step (b) is a step of calculating the reference area by calculation processing using a geometric method based on position information of where each of the measurement modules is attached.

2. The measurement module attached in step (d) is equipped with a distance measurement unit capable of measuring a distance to an object, 2. The method for calculating the remaining required amount of fresh concrete according to claim 1, wherein the step (a) is a step of detecting the remaining height by measuring the vertical distance from the installation position of the measurement module to the liquid surface of the fresh concrete by the distance measuring unit mounted on the measurement module.

3. A step (e) of calculating an exclusion area, which is an area of ​​an obstacle present in the planned casting area when the planned casting area is viewed vertically from above; 3. The method for calculating the remaining required amount of fresh concrete according to claim 1, wherein the step (c) calculates the remaining required amount of the fresh concrete by performing an arithmetic process including a process of multiplying a value obtained by subtracting the excluded area obtained in the step (e) from the reference area obtained in the step (b) by the remaining height obtained in the step (a).

4. A system for calculating a remaining required amount of fresh concrete during a pouring operation in which fresh concrete is poured into a planned pouring area surrounded by a formwork, A plurality of measurement modules each having a location information detection unit that detects location information by receiving radio waves and a distance measurement unit that measures the distance between the target object and the location information detection unit; A calculation unit that calculates a remaining required amount of fresh concrete by calculation processing based on first information regarding the installation positions of the plurality of measurement modules when viewed vertically from above and second information regarding the vertical distance from the measurement modules to the liquid surface of the fresh concrete; a server configured to record remaining amount information regarding a remaining required amount of the fresh concrete calculated by the calculation unit and to transmit the remaining amount information to one or more operation terminals; The plurality of measurement modules are attached to three or more different positions on the formwork when viewed vertically from above, The calculation unit calculates a reference area, which is the area of ​​the planned pouring area when viewed vertically from above, using a geometric method based on the first information, and detects a remaining height corresponding to the vertical distance from the top position of the formwork to the liquid level of the fresh concrete from the second information, and performs a calculation process including multiplying the reference area by the remaining height to calculate the remaining required amount of fresh concrete.

5. The system for calculating the remaining required amount of fresh concrete as described in claim 4, characterized in that the geometric method includes a closed traverse calculation using a polygon whose vertices are the installation positions of the multiple measurement modules when the planned pouring area is viewed vertically from above.

6. The system for calculating the remaining required amount of fresh concrete as described in claim 4 or 5, characterized in that the position information detection unit mounted on the plurality of measurement modules detects the installation positions of each of the plurality of measurement modules when viewed vertically from above by RTK positioning.

7. the calculation unit is mounted in at least one of the plurality of measurement modules, The system for calculating the remaining required amount of fresh concrete according to any one of claims 4 to 6, characterized in that the measurement module equipped with the calculation unit transmits the remaining amount information obtained by calculation processing to the server, thereby updating the remaining amount information recorded in the server.

8. The computing unit is mounted on the server, The first information and the second information are transmitted from the measurement module to the server, The system for calculating the remaining required amount of fresh concrete according to any one of claims 4 to 7, characterized in that the calculation unit mounted on the server calculates the remaining amount information based on the received first information and second information.

9. A fresh concrete ordering support system, The system for calculating the remaining required amount of fresh concrete according to any one of claims 4 to 8 is provided, A fresh concrete ordering support system characterized in that the operation terminal is equipped with an ordering processing unit that instructs the supplier to send ordering information to order the amount of fresh concrete required based on the remaining amount information.

10. The fresh concrete ordering support system according to claim 9, characterized in that the server stores the ordered but unused amount of fresh concrete in an updatable state, calculates the required order amount by subtracting the ordered but unused amount from the remaining required amount of fresh concrete described in the remaining amount information, and transmits the calculated amount to the operation terminal.

Citation Information

Patent Citations

  • Automation operation system of green-cut machine

    JP2002285702A

  • Concreting management method and apparatus

    JP2012172375A

  • Ready mixed concrete misdelivery prevention program and system

    JP2014233914A

  • Measuring apparatus and measuring method for remaining filling amount to be needed in installation in mold frame of ready mixed concrete

    JP2018084131A

  • Capacity calculation device, capacity calculation method, and program

    JP2018199950A