Control device for hydrogen production facility, hydrogen production facility, control method for hydrogen production facility, and control program for hydrogen production facility

The control device for water electrolysis systems adjusts current supply based on real-time hydrogen flow rate differences to address delayed responses and supply inconsistencies, ensuring efficient hydrogen production and pressure stability.

JP7573569B2Active Publication Date: 2024-10-25MITSUBISHI HEAVY IND LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2022104240
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-06-29
Publication Date
2024-10-25
Estimated Expiration
2042-06-29

AI Technical Summary

Technical Problem

Conventional control methods for water electrolysis devices based on storage section pressure lead to delayed responses and potential hydrogen supply shortages due to changes in hydrogen consumption, and are affected by electrolyzer deterioration and rectifier control errors, resulting in insufficient hydrogen production.

Method used

A control device that calculates a current command value by converting required hydrogen flow rate into a provisional current, corrected using a first correction term based on the difference between required and actual hydrogen flow rates, to accurately supply hydrogen and maintain reservoir pressure.

Benefits of technology

This approach enables timely hydrogen production matching consumption demands, reduces response delays, and maintains reservoir pressure stability, even with electrolyzer and rectifier variations, ensuring consistent hydrogen supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007573569000001
    Figure 0007573569000001
  • Figure 0007573569000002
    Figure 0007573569000002
  • Figure 0007573569000003
    Figure 0007573569000003
Patent Text Reader

Abstract

To provide a control apparatus for a hydrogen manufacturing facility, the hydrogen manufacturing facility, a control method of the hydrogen manufacturing facility, and a control program for the hydrogen manufacturing facility, in which a required amount of hydrogen can be appropriately manufactured while suppressing delay of a response corresponding to a load transition.SOLUTION: A control apparatus for a hydrogen manufacturing facility, which is a control apparatus for controlling the operation of the hydrogen manufacturing facility including at least one water electrolysis apparatus, comprises: a required hydrogen flow rate acquisition unit configured to acquire a required hydrogen flow rate that is a hydrogen production amount required for the water electrolysis apparatus; a conversion unit configured to acquire a provisional required current by converting the required hydrogen flow rate to an electric current required for generating hydrogen of the required hydrogen flow rate in the water electrolysis apparatus; and a first correction unit configured to acquire a current command value given to the water electrolysis apparatus by correcting the provisional required current using a first correction term based on the difference between the required hydrogen flow rate and an actual hydrogen flow rate that is the actual hydrogen production amount in the water electrolysis apparatus.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a control device for a hydrogen production facility, a hydrogen production facility, a control method for a hydrogen production facility, and a control program for a hydrogen production facility. [Background technology]

[0002] 2. Description of the Related Art Water electrolysis devices are known as devices for producing hydrogen.

[0003] Patent Document 1 discloses a system for producing hydrogen by electrolyzing water in a water electrolysis device having an electrolysis cell including a solid electrolyte membrane. In the system of Patent Document 1, in order to generate hydrogen efficiently, the current supplied to the electrolysis cell is controlled based on the detection result of the pressure of hydrogen generated in the electrolysis cell. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2002-129372 A Summary of the Invention [Problem to be solved by the invention]

[0005] Conventionally, the control of the current supplied to the water electrolysis device is often performed based on the pressure of a storage unit (storage header, etc.) in which hydrogen gas generated by the water electrolysis device is stored. However, when the control is performed based only on the pressure of the storage unit, the control is performed after a change in the amount of hydrogen consumed at the supply destination of hydrogen from the storage unit (hydrogen consuming equipment) appears as a pressure change in the storage unit, which may delay the response of the water electrolysis device and make it impossible to maintain the pressure in the storage unit required by the hydrogen consuming equipment. In addition, the relationship between the amount of hydrogen generated in the water electrolysis device and the current value of the rectifier for supplying current to the water electrolysis device may change due to factors such as deterioration of the water electrolysis cell and control error of the rectifier. In this case, the amount of hydrogen generated in the water electrolysis device may be less than expected, making it impossible to maintain the pressure in the storage unit required by the hydrogen consuming equipment.

[0006] In view of the above circumstances, at least one embodiment of the present invention aims to provide a control device for a hydrogen production equipment, a hydrogen production equipment, a control method for a hydrogen production equipment, and a control program for a hydrogen production equipment, which are capable of appropriately producing the required amount of hydrogen while suppressing delays in response to load changes. [Means for solving the problem]

[0007] A control device for a hydrogen production facility according to at least one embodiment of the present invention includes: A control device for controlling operation of a hydrogen production facility including at least one water electrolysis device, a required hydrogen flow rate acquisition unit configured to acquire a required hydrogen flow rate, which is a hydrogen production amount required for the water electrolysis apparatus; a conversion unit configured to convert the required hydrogen flow rate into a current required for producing hydrogen at the required hydrogen flow rate in the water electrolysis apparatus to obtain a provisional required current; a first correction unit configured to correct the tentative required current using a first correction term based on a difference between the required hydrogen flow rate and an actual hydrogen flow rate, which is an actual amount of hydrogen produced in the water electrolysis device, to obtain a current command value to be provided to the water electrolysis device; Equipped with.

[0008] Further, the hydrogen production equipment according to at least one embodiment of the present invention includes: at least one water electrolysis device; a control device as described above configured to control the operation of the at least one water electrolysis device; Equipped with.

[0009] In addition, a method for controlling a hydrogen production facility according to at least one embodiment of the present invention includes the steps of: A method for controlling operation of a hydrogen production facility including at least one water electrolysis device, comprising: obtaining a required hydrogen flow rate, which is a hydrogen production amount required for the water electrolysis device; converting the required hydrogen flow rate into a current required for producing hydrogen at the required hydrogen flow rate in the water electrolysis device to obtain a provisional required current; obtaining a current command value to be provided to the water electrolysis device by correcting the provisional required current using a first correction term based on a difference between the required hydrogen flow rate and an actual hydrogen flow rate, which is an actual amount of hydrogen produced in the water electrolysis device; Equipped with.

[0010] In addition, a control program for a hydrogen production facility according to at least one embodiment of the present invention includes: A control program for controlling an operation of a hydrogen production facility including at least one water electrolysis device, comprising: On the computer, obtaining a required hydrogen flow rate, which is a hydrogen production amount required for the water electrolysis device; obtaining a provisional required current by converting the required hydrogen flow rate into a current required for producing hydrogen at the required hydrogen flow rate in the water electrolysis apparatus; correcting the provisional required current using a first correction term based on a difference between the required hydrogen flow rate and an actual hydrogen flow rate, which is an actual amount of hydrogen produced in the water electrolysis device, to obtain a current command value to be provided to the water electrolysis device; The present invention is configured to execute the following steps. Effect of the Invention

[0011] According to at least one embodiment of the present invention, there is provided a control device for a hydrogen production equipment, a hydrogen production equipment, a control method for a hydrogen production equipment, and a control program for a hydrogen production equipment, which are capable of appropriately producing the required amount of hydrogen while suppressing delays in response to load changes. [Brief description of the drawings]

[0012] [Figure 1] 1 is a schematic diagram of a hydrogen production facility according to one embodiment. [Diagram 2] FIG. 2 is a block diagram showing a configuration of a control device according to an embodiment. [Diagram 3] 1 is a schematic diagram of a hydrogen production facility according to one embodiment. [Figure 4] FIG. 2 is a block diagram showing a configuration of a control device according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] Hereinafter, some embodiments of the present invention will be described with reference to the accompanying drawings. However, the dimensions, materials, shapes, relative arrangements, etc. of components described as the embodiments or shown in the drawings are merely illustrative examples and are not intended to limit the scope of the present invention.

[0014] (Configuration of hydrogen production facility) 1 and 3 are schematic diagrams of hydrogen production facilities to which a control device according to an embodiment is applied. As shown in Fig. 1 and 3, the hydrogen production facility 100 includes at least one water electrolysis device 2 (hydrogen production device) configured to generate hydrogen, a storage unit 4 for storing hydrogen generated by the water electrolysis device 2, and a control device 10 for controlling the operation of the water electrolysis device 2.

[0015] The storage unit 4 is adapted to store gaseous hydrogen. The hydrogen stored in the storage unit 4 may be supplied to the hydrogen consuming equipment 6. The storage unit 4 may have characteristics suitable for supplying hydrogen to the hydrogen consuming equipment 6. The storage unit 4 may include, for example, a storage header (header tank).

[0016] There is no particular limitation on the hydrogen consumption equipment 6. The hydrogen consumption equipment 6 may include, for example, a hydrogen combustion equipment configured to burn hydrogen (e.g., a gas turbine equipment or a steelmaking equipment, etc.), a hydrogen liquefaction equipment configured to liquefy hydrogen, an equipment that generates electricity by a chemical reaction using hydrogen as fuel (e.g., a power generation equipment including a fuel cell such as a SOFC (Solid Oxide Fuel Cell), etc.), an equipment that manufactures fuel using hydrogen as a raw material (e.g., a fuel synthesis equipment, etc.), or a hydrogen gas station configured to supply hydrogen to equipment.

[0017] The water electrolysis device 2 is configured to generate hydrogen by electrolysis of water. There is no limitation on the type of the water electrolysis device 2. The water electrolysis device 2 may be, for example, an alkaline water electrolysis device, a polymer electrolyte membrane (PEM) type water electrolysis device, an anion exchange membrane (AEM) type water electrolysis device, or a solid oxide electrolysis cell (SOEC) water electrolysis device.

[0018] Although not shown in detail, the water electrolysis device 2 includes an electrolytic cell for electrolyzing water. Water is supplied to the electrolytic cell. A current is supplied to the electrolytic cell via a rectifier 8. As a result, a voltage is applied between a pair of electrodes provided in the electrolytic cell to pass a current, thereby electrolyzing the water in the electrolytic cell, generating hydrogen on the cathode side and oxygen on the anode side. Water in which an electrolyte is dissolved (electrolyte solution) is supplied to the electrolytic cell, and the water (water constituting the electrolyte solution) may be electrolyzed. The electrolyte may be an alkaline substance such as potassium hydroxide (KOH).

[0019] The hydrogen gas generated on the cathode side is guided to a gas-liquid separator and / or a dehumidifier to remove moisture, and then guided to the storage section 4. The oxygen gas generated on the anode side may be guided to a gas-liquid separator and / or a dehumidifier to remove moisture, and then supplied to an oxygen consuming facility, or may be released to the outside.

[0020] 1 and 3, the rectifier 8 is supplied with current from a power source 90 via a power transmission line 92. The power source 90 may be a power system or another power source (such as a power generator or a battery).

[0021] In some embodiments, the hydrogen production facility 100 may include multiple water electrolysis devices 2. In the exemplary embodiment shown in Fig. 3, the hydrogen production facility 100 includes multiple (specifically, two) water electrolysis devices 2 (2A, 2B). Current is supplied to the multiple water electrolysis devices 2 (2A, 2B) from multiple rectifiers 8 (8A, 8B), respectively. The number of water electrolysis devices 2 included in the hydrogen production facility 100 is not limited.

[0022] The hydrogen production facility 100 may include a pressure sensor 16 configured to measure the pressure in the reservoir 4 .

[0023] The hydrogen production facility 100 may include a flow rate sensor 12 (12A, 12B) for measuring the flow rate of hydrogen generated in the water electrolysis device 2 (2A, 2B). The flow rate sensor 12 may be provided in a line for guiding hydrogen from the water electrolysis device 2 to the storage unit 4, as shown in Figs. 1 and 3.

[0024] The hydrogen production equipment 100 may include a flow rate sensor 14 for measuring the flow rate of hydrogen consumed in the hydrogen consumption equipment 6. The flow rate sensor 14 may be provided in a line for leading hydrogen from the storage unit 4 to the hydrogen consumption equipment 6, as shown in Figures 1 and 3.

[0025] Pressure sensor 16, flow sensor 12 and / or flow sensor 14 may be electrically connected to controller 10 so as to provide signals to controller 10 indicative of measurements made by these sensors.

[0026] The control device 10 calculates a command value for a current (current command value I) to be applied to the rectifier 8 (water electrolysis device 2) based on signals received from the pressure sensor 16, the flow rate sensor 12, and / or the flow rate sensor 14, etc. Then, the control device 10 is configured to control the rectifier 8 so that the current supplied to the water electrolysis device 2 matches the calculated current command value I. In this manner, the control device 10 controls the current supplied to the water electrolysis device 2.

[0027] In order to meet the demand for hydrogen from the hydrogen consumption equipment 6, it is desirable to generate hydrogen in the water electrolysis device 2 in an amount corresponding to the amount of hydrogen consumed, and to maintain the pressure in the storage section 4 at or above a predetermined set pressure.

[0028] (Control of hydrogen production equipment) Hereinafter, a control device and a control method for a hydrogen production facility according to several embodiments will be described. Fig. 2 and Fig. 4 are block diagrams each showing the configuration of a control device according to one embodiment. The control device according to the block diagram shown in Fig. 2 can be applied to the hydrogen production facility shown in Fig. 1, for example. The control device according to the block diagram shown in Fig. 4 can be applied to the hydrogen production facility shown in Fig. 2, for example.

[0029] As shown in FIGS. 2 and 4, the control device 10 according to one embodiment includes a required hydrogen flow rate acquisition unit 20, a conversion unit 31, and a first correction unit .

[0030] The required hydrogen flow rate acquisition unit 20 acquires a required hydrogen flow rate F D The method is configured to obtain

[0031] The required hydrogen flow rate acquisition unit 20 may include a consumption flow rate acquisition unit 21 configured to acquire the hydrogen consumption flow rate in the hydrogen consumption equipment 6 to which hydrogen is supplied from the storage unit 4. The required hydrogen flow rate acquisition unit 20 converts the consumption flow rate acquired by the consumption flow rate acquisition unit 21 into a required hydrogen flow rate F D Alternatively, the required hydrogen flow rate acquisition unit 20 may acquire the required hydrogen flow rate F by correcting the consumption flow rate acquired by the consumption flow rate acquisition unit 21 using a second correction unit 22 (to be described later). D It may be obtained as.

[0032] 2 and 4, the consumption flow rate obtaining unit 21 may calculate the hydrogen consumption flow rate based on a fuel command value, which is a command value for the fuel flow rate supplied to the hydrogen consuming equipment 6 (e.g., a gas turbine). In this case, the consumption flow rate obtaining unit 21 may include a converter 24 that converts the fuel command value into the hydrogen flow rate. The converter 24 may be configured to convert the fuel command value into the hydrogen flow rate using a function that indicates the correlation between the fuel command value and the hydrogen flow rate. The consumption flow rate obtaining unit 21 may obtain the fuel command value from a control device for controlling the hydrogen consuming equipment 6.

[0033] Alternatively, the consumption flow rate acquisition unit 21 may acquire the flow rate of hydrogen supplied from the storage unit 4 to the hydrogen consumption equipment 6 as the consumption flow rate. In this case, the measurement value of the hydrogen flow rate by the flow rate sensor 14 (see FIGS. 1 and 3) may be acquired as the consumption flow rate.

[0034] The conversion unit 31 converts the required hydrogen flow rate F D The required hydrogen flow rate F D The current required to generate hydrogen is calculated by converting the current required to I D The conversion unit 31 is configured to obtain the required hydrogen flow rate F D and the required hydrogen flow rate F D The required hydrogen flow rate F is calculated using a function that correlates the current required to generate hydrogen. D The input may include a converter 32 configured to convert the input to a current value.

[0035] The first correction unit 34 corrects the required hydrogen flow rate F D and the actual hydrogen flow rate F, which is the actual amount of hydrogen produced in the water electrolysis device 2. A Difference from (F D -F A ) based on the first correction term to obtain the provisional required current I D Thus, the current command value I to be given to the water electrolysis apparatus 2 is obtained.

[0036] The first correction unit 34 shown in FIG. 2 and FIG. 4 calculates the required hydrogen flow rate F D and actual hydrogen flow rate F A Difference from (F D -F A ), and a subtraction unit 36 ​​for calculating the difference (F D -F A ) to calculate a first correction term by performing proportional and integral calculations based on the provisional required current I D and an adder 40 configured to add a first correction term to the actual hydrogen production amount in the water electrolysis device 2. A can be obtained as a measurement value by the flow rate sensor 12 (see FIGS. 1 and 3), for example.

[0037] In the above embodiment, the required hydrogen flow rate F corresponding to the hydrogen consumption amount is D Since the current command value I is calculated based on the pressure in the storage section 4 alone, the response delay to changes in the load (hydrogen consumption amount) can be reduced, compared to the case where the current command value is calculated based on the pressure in the storage section 4 alone. D Provisional required current I calculated from D , the required hydrogen flow rate F D and actual hydrogen flow rate F ASince the current command value I is calculated by correcting the amount of hydrogen generated in the water electrolysis device 2 using a first correction term based on the difference between these two, even if the relationship between the amount of hydrogen generated in the water electrolysis device 2 and the current value of the rectifier 8 for providing current to the water electrolysis device 2 changes due to deterioration of the electrolytic cell, a control error of the rectifier 8, or the like, it is possible to calculate an appropriate current command value I in response to this change. Therefore, by controlling the current of the water electrolysis device 2 based on the current command value I calculated in this manner, it is possible to appropriately produce the required amount of hydrogen while suppressing delays in response to load changes.

[0038] Furthermore, according to the above-described embodiment, the responsiveness to load changes is good, which makes it possible to suppress mismatches between hydrogen demand and supply and improve the pressure stability of the storage section 4. As a result, for example, the capacity of the storage section 4 can be reduced, and equipment costs can be reduced.

[0039] As mentioned above, the required hydrogen flow rate F D and actual hydrogen flow rate F A The first correction term is calculated by performing proportional and integral calculations based on the difference between the current I and the provisional required current I D to obtain the current command value I. As a result, even if there is a change in the relationship between the amount of hydrogen generated in the water electrolysis device 2 and the current value of the rectifier 8 that provides a current to the water electrolysis device 2, it is possible to calculate an appropriate current command value I in response to this change. As a result, it is possible to appropriately produce the required amount of hydrogen while suppressing delays in response to load changes.

[0040] In some embodiments, as described above, the required hydrogen flow rate acquisition unit 20 calculates the required hydrogen flow rate F by correcting the consumption flow rate acquired by the consumption flow rate acquisition unit 21 using the second correction unit 22. D The second correction unit 22 may acquire the preset pressure P S and the actual pressure P A Difference from (P S -P A The consumption flow rate acquired by the consumption flow rate acquisition unit 21 is corrected using the second correction term based onD The method is configured to obtain

[0041] The second correction unit 22 shown in FIG. 2 and FIG. 4 is a pressure compensation unit for compensating for the set pressure P S and actual pressure P A Difference from (P S -P A ), and a subtraction unit 26 for calculating the difference (P S -P A The storage unit 4 includes a proportional-integral calculator 28 for calculating a second correction term by performing proportional and integral calculations based on the set pressure P S may be stored in advance in a storage device or the like of the control device 10, and the second correction unit 22 obtains the set pressure P S The second correction unit 22 may also obtain the actual pressure P A It may be obtained as.

[0042] As described above, the required hydrogen flow rate F corresponding to the hydrogen consumption amount is D By calculating the current command value I based on the current command value I and operating the water electrolysis device 2 based on the current command value I, it becomes possible to generate and supply an amount of hydrogen equivalent to the amount consumed. On the other hand, if there is a delay in supply relative to consumption, the pressure in the storage unit 4 will return to the original value (set pressure P S In this respect, in the above embodiment, the set pressure P S and actual pressure P A Difference from (P S -P A ) is used to correct the flow rate (consumption flow rate) of hydrogen supplied from the storage unit 4 to the supply destination (hydrogen consumption equipment 6) to obtain the required hydrogen flow rate F D Therefore, the required hydrogen flow rate F D The current command value I is calculated based on the above. The current command value I is used to control the current of the water electrolysis device 2. The pressure in the storage unit 4 is controlled to a set pressure P S Therefore, the pressure in the reservoir 4 can be made closer to the set pressure P SThis makes it possible to appropriately produce the required amount of hydrogen while making it easier to maintain the required fuel consumption at a constant rate and suppressing delays in response to load changes.

[0043] Also, as described above, in some embodiments, the set pressure P S and actual pressure P A The second correction term is calculated by performing proportional and integral calculations based on the difference between the flow rate and the required hydrogen flow rate F D is obtained. Therefore, the required hydrogen flow rate F D The current command value I is calculated based on the above. The current command value I is used to control the current of the water electrolysis device 2. The pressure in the storage unit 4 is controlled to a set pressure P S Therefore, the pressure in the reservoir 4 can be made closer to the set pressure P S This makes it possible to appropriately produce the required amount of hydrogen while making it easier to maintain the required fuel consumption at a constant rate and suppressing delays in response to load changes.

[0044] In the exemplary embodiment shown in FIG. 4, the control device 10 receives the required hydrogen flow rate F D is divided by the number N of the water electrolysis devices 2 to obtain the required hydrogen flow rate (F D A divider 42 is provided which is configured to obtain a division factor (N) of

[0045] In this embodiment, the conversion unit 31 is configured to convert the required hydrogen flow rate (F D / N) to obtain the provisional required current I per unit of water electrolysis device 2. D The first correction unit 34 also calculates a first correction term for each of the water electrolysis devices 2. That is, the flow rates of hydrogen generated in the water electrolysis devices 2 (actual hydrogen flow rates F A ) is obtained for each water electrolysis device 2, and the actual hydrogen flow rate F A The first correction term is calculated using the actual hydrogen flow rate F Acan be obtained using the flow rate sensors 12A, 12B (see FIG. 3). The first correction terms for the multiple water electrolysis devices 2 calculated by the first correction unit 34 are then used to calculate the provisional required current I D ._N, a current command value I_N for each of the multiple water electrolysis devices 2 is obtained.

[0046] When the hydrogen production facility 100 includes multiple water electrolysis devices 2, the relationship between the amount of hydrogen generated and the current value of the rectifier 8 is likely to change differently for each of the multiple water electrolysis devices 2 due to individual differences in the electrolytic cells and rectifiers 8. In this regard, according to the above-described embodiment, the required hydrogen flow rate F D Divide by the number of water electrolysis devices N to obtain the required hydrogen flow rate (F D / N) is obtained, and based on this, the provisional required current I per unit of water electrolysis equipment 2 is calculated. D _N is obtained, and the provisional required current I is calculated using the first correction term calculated for each water electrolysis device 2. D _N is corrected to obtain a current command value I_N for each water electrolysis apparatus 2. This makes it possible to calculate an appropriate current command value for each water electrolysis apparatus in response to changes in the relationship between the amount of hydrogen generated and the current value of the rectifier 8, while reducing the influence of individual differences between the devices. Therefore, by controlling the currents of the multiple water electrolysis apparatuses 2 based on the current command value I_N calculated in this manner, it is possible to appropriately produce the required amount of hydrogen while suppressing delays in response to load changes.

[0047] The contents described in each of the above embodiments can be understood, for example, as follows.

[0048] (1) At least one embodiment of the present invention relates to a control device (10) for a hydrogen production facility (100), A control device for controlling operation of a hydrogen production facility including at least one water electrolysis device (2), The required hydrogen flow rate (F D A required hydrogen flow rate acquisition unit (20) configured to acquire a required hydrogen flow rate (H2 flow rate); The required hydrogen flow rate is converted into a current required for generating hydrogen at the required hydrogen flow rate in the water electrolysis device to obtain a provisional required current (I D ) a conversion unit (31) configured to obtain The required hydrogen flow rate and the actual hydrogen flow rate (F A a first correction unit (34) configured to correct the provisional required current using a first correction term based on a difference between the provisional required current and the current command value (I) to be given to the water electrolysis device; Equipped with.

[0049] In the above configuration (1), the current command value is calculated from the required hydrogen flow rate corresponding to the hydrogen consumption rate, so that the response delay to a change in the load (hydrogen consumption rate) can be reduced. In addition, the current command value is calculated by correcting the provisional required current calculated from the required hydrogen flow rate using a first correction term based on the difference between the required hydrogen flow rate and the actual hydrogen flow rate. Therefore, even if the relationship between the amount of hydrogen generated in the water electrolysis device and the current value of the rectifier that provides current to the water electrolysis device changes, an appropriate current command value can be calculated in response to this change. Therefore, by controlling the current of the water electrolysis device based on the current command value calculated in this manner, the required amount of hydrogen can be appropriately produced while suppressing the response delay to load changes.

[0050] (2) In some embodiments, in the configuration of (1) above, The first correction unit is configured to add the first correction term to the provisional required current to obtain the current command value.

[0051] According to the above configuration (2), the current command value is calculated by adding a first correction term based on the difference between the required hydrogen flow rate and the actual hydrogen flow rate to the provisional required current calculated from the required hydrogen flow rate. Therefore, even if the relationship between the amount of hydrogen generated in the water electrolysis device and the current value of the rectifier that provides current to the water electrolysis device changes, an appropriate current command value can be calculated in response to this change. Therefore, the required amount of hydrogen can be appropriately produced while suppressing delays in response to load changes.

[0052] (3) In some embodiments, in the configuration of (1) or (2), The first correction unit is configured to calculate the first correction term by performing proportional and integral calculations based on the difference between the required hydrogen flow rate and the actual hydrogen flow rate.

[0053] According to the above configuration (3), the first correction term is calculated by performing proportional and integral calculations based on the difference between the required hydrogen flow rate and the actual hydrogen flow rate. Therefore, by correcting the provisional required current using the first correction term, even if the relationship between the amount of hydrogen generated in the water electrolysis apparatus and the current value of the rectifier that provides current to the water electrolysis apparatus changes, an appropriate current command value can be calculated in response to this change. Therefore, the required amount of hydrogen can be appropriately produced while suppressing delays in response to load changes.

[0054] (4) In some embodiments, in any one of the configurations (1) to (3) above, The required hydrogen flow rate acquisition unit a consumption flow rate acquisition unit (21) configured to acquire a consumption flow rate of hydrogen in a hydrogen consumption facility (6) to which hydrogen is supplied from a storage unit (4) in which hydrogen produced by the water electrolysis device is stored; The predetermined set pressure of the storage section (P S ) and the actual pressure of the reservoir (P A a second correction unit (22) configured to obtain the required hydrogen flow rate by correcting the consumption flow rate using a second correction term based on a difference between the consumption flow rate and the required hydrogen flow rate; Includes.

[0055] As described in (1) above, a current command value is calculated based on a required hydrogen flow rate corresponding to the amount of hydrogen consumed, and the water electrolysis device is operated based on the current command value, thereby making it possible to generate and supply hydrogen in an amount equivalent to the amount consumed. On the other hand, if there is a delay in supply relative to consumption, the pressure in the storage unit cannot reach the original value (set pressure). In this regard, in the configuration of (4) above, the flow rate (consumed flow rate) of hydrogen supplied from the storage unit to the supply destination (hydrogen consumption equipment) is corrected using a second correction term based on the difference between the set pressure and the actual pressure of the storage unit to obtain the required hydrogen flow rate. Therefore, by controlling the current of the water electrolysis device based on the current command value calculated based on the required hydrogen flow rate, the pressure in the storage unit can be brought close to the set pressure. Thus, according to the configuration of (4) above, it is possible to appropriately produce the required amount of hydrogen while easily maintaining the pressure in the storage unit at the set pressure and suppressing delays in response to load changes.

[0056] (5) In some embodiments, in the configuration of (4), The second correction unit is configured to add the second correction term to the consumption flow rate to obtain the required hydrogen flow rate.

[0057] According to the above configuration (5), the required hydrogen flow rate is obtained by adding a second correction term based on the difference between the set pressure and the actual pressure of the storage unit to the flow rate (consumed flow rate) of hydrogen supplied from the storage unit to the supply destination (hydrogen consumption equipment). Therefore, the pressure in the storage unit can be brought closer to the set pressure by controlling the current of the water electrolysis apparatus based on a current command value calculated based on the required hydrogen flow rate. Therefore, the required amount of hydrogen can be appropriately produced while making it easier to maintain the pressure in the storage unit at the set pressure and suppressing delays in response to load changes.

[0058] (6) In some embodiments, in the configuration of (4) or (5), The second correction unit is configured to calculate the second correction term by performing proportional and integral calculations based on a difference between the set pressure and the actual pressure of the storage unit.

[0059] According to the above configuration (6), the second correction term is calculated by performing proportional and integral calculations based on the difference between the set pressure and the actual pressure of the storage unit. Thus, the second correction term is used to correct the hydrogen consumption flow rate to obtain the required hydrogen flow rate, and the current of the water electrolysis apparatus is controlled based on a current command value calculated based on the required hydrogen flow rate, thereby making it possible to bring the pressure in the storage unit closer to the set pressure. Thus, the required amount of hydrogen can be appropriately produced while making it easier to maintain the pressure in the storage unit at the set pressure and suppressing delays in response to load changes.

[0060] (7) In some embodiments, in any one of the configurations (1) to (6) above, The at least one water electrolysis device includes a plurality of water electrolysis devices (2A, 2B), a division unit (42) configured to divide the required hydrogen flow rate by a number (N) of the plurality of water electrolysis devices to obtain a required hydrogen flow rate per one of the water electrolysis devices; The conversion unit converts the required hydrogen flow rate per one of the water electrolysis devices to obtain a provisional required current (I D _N), The first correction unit is configured to add the first correction term calculated for each of the plurality of water electrolysis devices to the provisional required current for each of the plurality of water electrolysis devices to obtain a current command value (I_N) for each of the plurality of water electrolysis devices.

[0061] When the hydrogen production facility includes multiple water electrolysis devices, the relationship between the amount of hydrogen generated and the current value of the rectifier is expected to change differently for each of the multiple water electrolysis devices due to individual differences in the electrolytic cells and rectifiers. In this regard, according to the configuration of (7) above, the required hydrogen flow rate is divided by the number of water electrolysis devices to obtain the required hydrogen flow rate per water electrolysis device, and the provisional required current per water electrolysis device is obtained based on this, and the provisional required current is corrected using the first correction term calculated for each water electrolysis device to obtain a current command value for each water electrolysis device. This makes it possible to calculate an appropriate current command value for each water electrolysis device in response to changes in the relationship between the amount of hydrogen generated and the current value of the rectifier while reducing the influence of individual differences between the devices. Therefore, by controlling the current of the multiple water electrolysis devices based on the current command value calculated in this manner, it is possible to appropriately produce the required amount of hydrogen while suppressing delays in response to load changes.

[0062] (8) At least one embodiment of the hydrogen production equipment (100) according to the present invention comprises: At least one water electrolysis device (2); A control device (10) according to any one of (1) to (7) above, configured to control an operation of the at least one water electrolysis device; Equipped with.

[0063] In the above configuration (8), the current command value is calculated from the required hydrogen flow rate corresponding to the hydrogen consumption rate, so that the response delay to a change in the load (hydrogen consumption rate) can be reduced. In addition, the current command value is calculated by correcting the provisional required current calculated from the required hydrogen flow rate using a first correction term based on the difference between the required hydrogen flow rate and the actual hydrogen flow rate. Therefore, even if the relationship between the amount of hydrogen generated in the water electrolysis device and the current value of the rectifier that provides current to the water electrolysis device changes, an appropriate current command value can be calculated in response to this change. Therefore, by controlling the current of the water electrolysis device based on the current command value calculated in this manner, the required amount of hydrogen can be appropriately produced while suppressing the response delay to load changes.

[0064] (9) A method for controlling a hydrogen production facility according to at least one embodiment of the present invention includes the steps of: A method for controlling operation of a hydrogen production facility (100) including at least one water electrolysis device (2), comprising: The required hydrogen flow rate (F D ) and The required hydrogen flow rate is converted into a current required for generating hydrogen at the required hydrogen flow rate in the water electrolysis device to obtain a provisional required current (I D ) and The required hydrogen flow rate and the actual hydrogen flow rate (F A correcting the provisional required current using a first correction term based on a difference between the provisional required current and the current command value (I) to be given to the water electrolysis device; Equipped with.

[0065] In the method of (9) above, the current command value is calculated from the required hydrogen flow rate corresponding to the hydrogen consumption rate, so that the response delay to a change in the load (hydrogen consumption rate) can be reduced. In addition, the current command value is calculated by correcting the provisional required current calculated from the required hydrogen flow rate using a first correction term based on the difference between the required hydrogen flow rate and the actual hydrogen flow rate. Therefore, even if the relationship between the amount of hydrogen generated in the water electrolysis device and the current value of the rectifier that provides current to the water electrolysis device changes, an appropriate current command value can be calculated in response to this change. Therefore, by controlling the current of the water electrolysis device based on the current command value calculated in this manner, the required amount of hydrogen can be appropriately produced while suppressing the response delay to load changes.

[0066] (10) A control program for a hydrogen production facility according to at least one embodiment of the present invention, A control program for controlling an operation of a hydrogen production facility (100) including at least one water electrolysis device (2), comprising: On the computer, The required hydrogen flow rate (F D ) and the procedure for obtaining it. The required hydrogen flow rate is converted into a current required for generating hydrogen at the required hydrogen flow rate in the water electrolysis device to obtain a provisional required current (I D ) and the procedure for obtaining it. The required hydrogen flow rate and the actual hydrogen flow rate (F A correcting the provisional required current using a first correction term based on a difference between the provisional required current and the current command value (I) to be given to the water electrolysis device; The present invention is configured to execute the following steps.

[0067] In the above configuration (10), the current command value is calculated from the required hydrogen flow rate corresponding to the hydrogen consumption rate, so that the response delay to a change in the load (hydrogen consumption rate) can be reduced. In addition, the current command value is calculated by correcting the provisional required current calculated from the required hydrogen flow rate using a first correction term based on the difference between the required hydrogen flow rate and the actual hydrogen flow rate. Therefore, even if the relationship between the amount of hydrogen generated in the water electrolysis device and the current value of the rectifier that provides current to the water electrolysis device changes, an appropriate current command value can be calculated in response to this change. Therefore, by controlling the current of the water electrolysis device based on the current command value calculated in this manner, the required amount of hydrogen can be appropriately produced while suppressing the response delay to load changes.

[0068] Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and also includes modifications to the above-described embodiments and appropriate combinations of these modifications.

[0069] In this specification, expressions expressing relative or absolute configuration, such as "in a certain direction," "along a certain direction," "parallel," "orthogonal," "center," "concentric," or "coaxial," do not only strictly represent such a configuration, but also represent a state in which there is a relative displacement with a tolerance or an angle or distance to the extent that the same function is obtained. For example, expressions indicating that things are in an equal state, such as "identical," "equal," and "homogeneous," not only indicate a state of strict equality, but also indicate a state in which there is a tolerance or a difference to the extent that the same function is obtained. Furthermore, in this specification, expressions describing shapes such as a rectangular shape or a cylindrical shape do not only refer to shapes such as a rectangular shape or a cylindrical shape in the strict geometric sense, but also refer to shapes that include uneven portions, chamfered portions, etc., to the extent that the same effect is obtained. In addition, in this specification, the expressions "comprise," "include," or "have" a certain element are not exclusive expressions that exclude the presence of other elements. [Explanation of symbols]

[0070] 2 Water electrolysis device 4. Storage section 6 Hydrogen consumption equipment 8 rectifier 8A rectifier 8B rectifier 10 Control device 12 Flow Sensor 12A Flow Sensor 12B Flow Sensor 14 Flow Sensor 16 Pressure Sensor 20 Required hydrogen flow rate acquisition unit 21 Consumption flow rate acquisition section 22 Second Correction Section 24 Converter 26 Subtraction section 28 Proportional integral calculator 30 Adder 31 Conversion section 32 Converter 34 First Correction Section 36 Subtraction section 38 Proportional integral calculator 40 Adder 42 Division part 90 power supply 92 Power Lines 100 Hydrogen production facility

Claims

1. A control device for controlling an operation of a hydrogen production facility including at least one water electrolysis device, comprising: a required hydrogen flow rate acquisition unit configured to acquire a required hydrogen flow rate, which is a hydrogen production amount required for the water electrolysis apparatus; a conversion unit configured to convert the required hydrogen flow rate into a current required for producing hydrogen at the required hydrogen flow rate in the water electrolysis apparatus to obtain a provisional required current; a first correction unit configured to correct the tentative required current using a first correction term based on a difference between the required hydrogen flow rate and an actual hydrogen flow rate, which is an actual amount of hydrogen produced in the water electrolysis device, to obtain a current command value to be provided to the water electrolysis device; A control device for a hydrogen production facility comprising:

2. The first correction unit is configured to add the first correction term to the provisional required current to obtain the current command value. A control device for a hydrogen production facility according to claim 1.

3. The first correction unit is configured to calculate the first correction term by performing proportional and integral calculations based on the difference between the required hydrogen flow rate and the actual hydrogen flow rate. A control device for a hydrogen production facility according to claim 1 or 2.

4. The required hydrogen flow rate acquisition unit a consumption flow rate acquisition unit configured to acquire a consumption flow rate of hydrogen in a hydrogen consumption facility to which hydrogen is supplied from a storage unit in which hydrogen produced by the water electrolysis device is stored; a second correction unit configured to obtain the required hydrogen flow rate by correcting the consumption flow rate using a second correction term based on a difference between a predetermined set pressure of the storage unit and an actual pressure of the storage unit; Includes A control device for a hydrogen production facility according to claim 1 or 2.

5. The second correction unit is configured to add the second correction term to the consumption flow rate to obtain the required hydrogen flow rate. The control device for a hydrogen production facility according to claim 4.

6. The second correction unit is configured to calculate the second correction term by performing proportional and integral calculations based on a difference between the set pressure and the actual pressure of the storage unit. The control device for a hydrogen production facility according to claim 4.

7. the at least one water electrolysis device includes a plurality of water electrolysis devices; a division unit configured to divide the required hydrogen flow rate by the number of the plurality of water electrolysis devices to obtain a required hydrogen flow rate per one of the water electrolysis devices; the conversion unit is configured to convert the required hydrogen flow rate per one of the water electrolysis devices to obtain a tentative required current per one of the water electrolysis devices; the first correction unit is configured to add the first correction term calculated for each of the plurality of water electrolysis devices to the provisional required current for each of the plurality of water electrolysis devices to obtain a current command value for each of the plurality of water electrolysis devices. A control device for a hydrogen production facility according to claim 1 or 2.

8. at least one water electrolysis device; A control device according to claim 1 or 2, configured to control the operation of the at least one water electrolysis device; Hydrogen production facility equipped with:

9. A method for controlling operation of a hydrogen production facility including at least one water electrolysis device, comprising: obtaining a required hydrogen flow rate, which is a hydrogen production amount required for the water electrolysis device; converting the required hydrogen flow rate into a current required for producing hydrogen at the required hydrogen flow rate in the water electrolysis device to obtain a provisional required current; obtaining a current command value to be provided to the water electrolysis device by correcting the provisional required current using a first correction term based on a difference between the required hydrogen flow rate and an actual hydrogen flow rate, which is an actual amount of hydrogen produced in the water electrolysis device; A method for controlling a hydrogen production facility comprising the steps of:

10. A control program for controlling an operation of a hydrogen production facility including at least one water electrolysis device, comprising: On the computer, obtaining a required hydrogen flow rate, which is a hydrogen production amount required for the water electrolysis device; obtaining a provisional required current by converting the required hydrogen flow rate into a current required for producing hydrogen at the required hydrogen flow rate in the water electrolysis apparatus; correcting the provisional required current using a first correction term based on a difference between the required hydrogen flow rate and an actual hydrogen flow rate, which is an actual amount of hydrogen produced in the water electrolysis device, to obtain a current command value to be provided to the water electrolysis device; A control program for hydrogen production equipment to execute the above.

Citation Information

Patent Citations

  • Instant hydrogen suction system

    CN113897620A

  • Hydrogen / oxygen supply system

    JP2002129372A

  • Compressed hydrogen production system

    JP2018165386A

  • Hypoxia training device

    US20170326327A1

  • Apparatus and method for generating hydrogen and oxygen by electrolytic dissociation of water

    US5037518A