Component installation device and component installation method

The member installation device addresses the inefficiencies of large-scale bridge deck slab replacement by employing a compact, vertically expandable frame with telescopic jacks and hinge mechanisms, facilitating efficient and streamlined installation of bridge components.

JP7578115B2Active Publication Date: 2024-11-06JFE ENGINEERING CORP
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
JP2022064133
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-04-07
Publication Date
2024-11-06
Estimated Expiration
2042-04-07

AI Technical Summary

Technical Problem

Existing methods for replacing deck slabs in bridges, such as those using portal cranes, require large-scale devices that are cumbersome and time-consuming to install, often necessitating complex setups that are difficult to deploy in certain site conditions.

Method used

A member installation device with a vertically expandable and retractable frame, featuring cantilevered projections, hinge mechanisms, and telescopic jacks, allowing for efficient installation of bridge components without the need for large-scale equipment, enabling compact transportation and setup.

Benefits of technology

The device allows for efficient and streamlined installation of bridge components, reducing installation time and complexity while maintaining a compact structure, suitable for use on public roads and minimizing on-site labor requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007578115000001
    Figure 0007578115000001
  • Figure 0007578115000002
    Figure 0007578115000002
  • Figure 0007578115000003
    Figure 0007578115000003
Patent Text Reader

Abstract

To provide a member installation apparatus that is configured to be compact as a whole and can streamline an installation work of the apparatus, and a member installation method using the member installation apparatus.SOLUTION: An installation apparatus for installation of a member includes a frame main body portion 12 that is vertically extendable and contractive, a cantilever overhang portion 14 that is coupled to the frame main body portion 12 and is cantilevered overhanging from the frame main body portion 12, and a suspension portion 16 that is configured to suspend and support the installed member with a predetermined length downward from the cantilever overhang portion 14 and is configured to be movable along a longitudinal direction of the cantilever overhang portion 14. The installation of the installed member to a predetermined position is done by a downward contraction of the frame main body portion 12.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a member installation device and a member installation method, and more particularly to a member installation device and a member installation method that can be suitably used for installing components of a bridge superstructure. [Background technology]

[0002] In deck replacement work, the existing deck is removed and a new deck is erected, which is generally done using a crane truck installed on the bridge surface. However, depending on the site conditions, it may be difficult to use a crane truck.

[0003] As a deck replacement method that is thought to be able to deal with this problem, there is a deck replacement method in which a gantry crane 200 (see FIG. 40) described in Patent Document 1 is used to replace the deck.

[0004] As shown in FIG. 40, the gantry crane 200 described in Patent Document 1 includes a pair of leg frames 215, 215 to which a moving means 212 capable of moving on an existing deck 304 is attached, a top frame 214 that connects the upper ends of the pair of leg frames 215, 215 to form a roughly gantry-shaped gantry crane main body 210, and a tip support part 220 provided at one end of the gantry crane main body 210. The tip support part 220 is provided so as to be able to abut against a steel girder 302 of a bridge 300. The length of the top frame 214 along the longitudinal direction of the bridge 300 is formed longer than the leg frame 215, and thus a working space 260 is formed between the tip support part 220 and the gantry crane main body 210. The crane part 230 removes the existing deck 304 and installs a new deck 306.

[0005] However, the gantry crane 200 described in Patent Document 1 requires a tip support part 220 that is abutted against and erected against the steel girder 302 of the bridge 300, making the device large-scale and requiring a lot of work to install the device. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2019-019477 A Summary of the Invention [Problem to be solved by the invention]

[0007] The present invention has been made in consideration of the above points, and has an object to provide a component installation device that is compact overall in configuration and can make installation work of the device more efficient, and a component installation method using the component installation device. [Means for solving the problem]

[0008] The present invention is an invention for solving the above-mentioned problems, and provides a member installation device and a member installation method as described below.

[0009] In other words, a first aspect of the component installation device of the present invention is an installation device for installing a component, comprising a frame main body portion which is expandable and contractable in the vertical direction, a cantilever extension portion which is connected to the frame main body portion and extends from the frame main body portion at a cantilever, and a hanging portion which is configured to support the component to be installed by suspending it downwardly from the cantilever extension portion by a predetermined length and is configured to be movable along the longitudinal direction of the cantilever extension portion, and which is characterized in that the component to be installed is installed at a predetermined position by contracting the frame main body portion downward.

[0010] A second aspect of the component installation device according to the present invention is the first aspect, wherein the frame main body is configured to have at least four legs that are extendable and contractable in the vertical direction.

[0011] A third aspect of the component installation device of the present invention is an aspect of the second aspect, wherein the frame main body has at least four beam portions, each of which is connected to the upper part of each of the at least four legs so as to be approximately perpendicular to the leg, and each of the beam portions has a hinge mechanism at the end opposite the leg to which it is connected, and the beam portions are rotatable about the hinge mechanism having a plane approximately perpendicular to the leg to which it is connected.

[0012] A fourth aspect of the component installation device of the present invention is an aspect of the second aspect, in which the frame main body has at least four beam portions that are slidable in a substantially horizontal direction substantially perpendicular to the cantilever extension portion, and each of the at least four beam portions is connected to one end of the leg portion such that the leg portion is substantially perpendicular to the beam portion.

[0013] A fifth aspect of the component installation device according to the present invention is any one of the first to fourth aspects, wherein the cantilever protrusion is configured to be detachable from the frame main body.

[0014] A sixth aspect of the component installation device according to the present invention is any one of the first to fifth aspects, wherein the cantilevered extension portion has a hinge mechanism and is configured to be foldable.

[0015] A seventh aspect of the component installation device according to the present invention is any one of the first to fifth aspects, wherein the cantilever protruding portion is configured to be slidable in its longitudinal direction.

[0016] An eighth aspect of the component installation device of the present invention is any of the first to seventh aspects, wherein the hanging portion is provided with a rotation means for rotating the component supported from above in an approximately horizontal plane, and the rotation means is configured to adjust the rotation angle of the component in the approximately horizontal plane.

[0017] A ninth aspect of the member installation device according to the present invention is the eighth aspect, wherein the rotating means is a mechanism equipped with a rotary reducer.

[0018] A tenth aspect of the member installation device of the present invention is an aspect in which, in any of the first to ninth aspects, the hanging portion comprises a vertical support member extending in an approximately vertical direction, a two-dimensional support member having three or more fixing points that are approximately on the same plane extending in two dimensions but are not on the same straight line, and the member to be installed can be fixed from above at the three or more fixing points, and a two-axis pivot axis mechanism having two pivot axes extending in different directions that connect the lower end of the vertical support member to the vicinity of the center of the two-dimensional support member, and is configured so that the inclination state of the member to be installed relative to the horizontal plane can be adjusted by rotating the member to be installed fixed from above to the two-dimensional support member around at least one of the two pivot axes.

[0019] An eleventh aspect of the member installation device according to the present invention is the tenth aspect, wherein the two rotation axes extending in different directions are configured to be substantially perpendicular to each other.

[0020] A twelfth aspect of the member installation device of the present invention is the tenth or eleventh aspect, wherein the hanging section includes a diagonal telescopic jack provided between the vertical support member and the two-dimensional support member, and is configured so that the diagonal telescopic jack can adjust the inclination of the member to be installed and fixed from above to the two-dimensional support member with respect to the horizontal plane.

[0021] A thirteenth aspect of the member installation device according to the present invention is the tenth or eleventh aspect, wherein the suspending section includes a plurality of diagonal telescopic jacks provided between the vertical support member and the two-dimensional support member, the plurality of diagonal telescopic jacks extend and retract in different directions, and the plurality of diagonal telescopic jacks are configured to adjust the inclination state of the member to be installed and fixed from above to the two-dimensional support member with respect to a horizontal plane.

[0022] A 14th aspect of the member installation device according to the present invention is the 11th aspect, wherein the suspending section includes two diagonal telescopic jacks provided between the vertical support member and the two-dimensional support member, the two diagonal telescopic jacks extend and retract in different directions, and when the extension and retraction directions of the two diagonal telescopic jacks are projected from above onto a horizontal plane, the extension and retraction direction of one of the two diagonal telescopic jacks is approximately perpendicular to one of the two pivot axes, and the extension and retraction direction of the other of the two diagonal telescopic jacks is approximately perpendicular to the other of the two pivot axes, and the two diagonal telescopic jacks are configured to adjust the inclination state of the member to be installed and fixed from above to the two-dimensional support member with respect to the horizontal plane.

[0023] A fifteenth aspect of the component installation device according to the present invention is any one of the second to fourteenth aspects, wherein a traveling device is configured to be connected to the lower end of the leg.

[0024] A sixteenth aspect of the member installation device according to the present invention is any one of the first to fifteenth aspects, in which the member is a member of a superstructure of a bridge.

[0025] A 17th aspect of the component installation device of the present invention is any of the first to sixteenth aspects, wherein the frame main body portion can be loaded onto a single trailer without disassembly, and the single trailer carrying the frame main body portion without disassembly can be legally driven on public roads in Japan.

[0026] A first aspect of the component installation method according to the present invention is a component installation method for installing a component using any of the component installation devices of the first to seventeenth aspects, the method comprising: a preparation step of preparing the component installation device at a predetermined location; a connection step of contracting the component installation device prepared in the preparation step downward and connecting the component to be installed to the hanging part of the component installation device; and, after connecting the component to the hanging part of the component installation device in the connection step, extending the component installation device so that the hanging part lifts the member up. a raising step of raising the component installation device while supporting the component from above; a moving step of moving the hanging part along the cantilever extension portion toward the tip end in the extension direction of the cantilever extension portion while the hanging part is supporting the component from above; and an installation step of contracting the component installation device downward after the hanging part has moved to the tip end in the extension direction of the cantilever extension portion in the moving step, and installing the component supported from above by the hanging part in a predetermined position.

[0027] A second aspect of the member installation method according to the present invention is a member installation method for installing a member using any of the member installation devices of the twelfth to fourteenth aspects equipped with the diagonal telescopic jack, the method including a preparation step of preparing the member installation device at a predetermined location, a connection step of contracting the member installation device prepared in the preparation step downward and connecting the member to be installed to the hanging part of the member installation device, and a raising step of extending the member installation device after connecting the member to the hanging part of the member installation device in the connection step, and raising the member installation device in a state where the hanging part supports the member from above. a moving step in which the hanging part moves along the cantilever extension part toward the tip end of the cantilever extension part in the protruding direction while the hanging part supports the part from above; an inclination adjustment step in which, after the hanging part has moved toward the tip end of the cantilever extension part in the protruding direction in the moving step, the diagonal telescopic jack is used to adjust the inclination of the part fixed to the two-dimensional support member from above with respect to a horizontal plane; and an installation step in which, after the inclination adjustment step, the part installation device is contracted downward and the part supported by the hanging part from above is installed in a predetermined position. Effect of the Invention

[0028] According to the present invention, it is possible to provide a member installation device that is compact in overall configuration and that can improve the efficiency of the installation work of the device, and a member installation method using the member installation device. [Brief description of the drawings]

[0029] [Figure 1] FIG. 1 is a perspective view showing an example of a state in which a new deck 102 is being installed by the component installation device 10 according to the first embodiment of the present invention. [Diagram 2] FIG. 1 is a side view showing a component installation device 10 according to a first embodiment of the present invention. [Diagram 3] FIG. 1 is a front view showing a component installation device 10 according to a first embodiment of the present invention. [Figure 4] FIG. 1 is a plan view showing a component installation device 10 according to a first embodiment of the present invention. [Diagram 5] FIG. 1 is a perspective view showing an example of a state in which a member installation device 10 according to a first embodiment of the present invention is loaded onto a trailer 80. [Figure 6] FIG. 1 is an enlarged side view showing a hanging portion 16 of a member installation device 10 according to a first embodiment of the present invention. [Figure 7] FIG. 1 is an enlarged front view of a hanging portion 16 of a component installation device 10 according to a first embodiment of the present invention. [Figure 8] 8 is a vertical cross-sectional view of the hanging portion 16 of the member installation device 10 according to the first embodiment of the present invention, as viewed from the side (cross-sectional view taken along line VIII-VIII in FIG. 4). [Figure 9] IX-IX line cross-sectional view of FIG. 4 showing a vertical cross-sectional view of a hanging portion 16 of a member installation device 10 according to a first embodiment of the present invention. [Figure 10] 4 is a vertical cross-sectional view of the member fixing jig 36 of the hanging portion 16 of the member installation device 10 according to the first embodiment of the present invention, as viewed from the side (cross-sectional view taken along line XX in FIG. 4). [Figure 11] FIG. 1 is a schematic diagram showing one step (step S1a) of an installation procedure (in the case of bulk transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 12] FIG. 1 is a schematic diagram showing one step (step S2a) of the installation procedure (in the case of bulk transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 13] FIG. 1 is a schematic diagram showing one step (step S3a) of the installation procedure (in the case of bulk transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 14] FIG. 1 is a schematic diagram showing one step (step S4a) of the installation procedure (in the case of bulk transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 15] FIG. 1 is a schematic diagram showing one step (step S5a) of the installation procedure (in the case of bulk transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 16] FIG. 1 is a schematic diagram showing one step (step S6a) of the installation procedure (in the case of bulk transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 17]FIG. 1 is a schematic diagram showing one step (step S7a) of the installation procedure (in the case of bulk transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 18] FIG. 1 is a schematic diagram showing one step (step S8a) of the installation procedure (in the case of bulk transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 19] FIG. 1 is a schematic diagram showing one step (step S9a) of the installation procedure (in the case of bulk transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 20] FIG. 1 is a schematic diagram showing one step (step S1b) of an installation procedure (in the case of divided transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 21] FIG. 1 is a schematic diagram showing one step (step S2b) of the installation procedure (in the case of divided transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 22] FIG. 1 is a schematic diagram showing one step (step S3b) of the installation procedure (in the case of divided transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 23] FIG. 1 is a schematic diagram showing one step (step S4b) of an installation procedure (in the case of divided transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 24] FIG. 1 is a schematic diagram showing one step (step S5b) of the installation procedure (in the case of divided transportation) of the component installation device 10 according to the first embodiment of the present invention; [Diagram 25] FIG. 1 is a schematic diagram showing one step (step S6b) of the installation procedure (in the case of divided transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 26] FIG. 1 is a schematic diagram showing one step (step S7b) of an installation procedure (in the case of divided transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 27] FIG. 1 is a schematic diagram showing one step (step S8b) of the installation procedure (in the case of divided transportation) of the component installation device 10 according to the first embodiment of the present invention; [Figure 28]FIG. 1 is a schematic diagram showing one step (step S1c) of a procedure for installing a new deck 102 using the component installation device 10 according to the first embodiment of the present invention. [Figure 29] FIG. 1 is a schematic diagram showing one step (step S2c) of a procedure for installing a new deck 102 using the component installation device 10 according to the first embodiment of the present invention. [Diagram 30] FIG. 1 is a schematic diagram showing one step (step S3c) of a procedure for installing a new deck 102 using the component installation device 10 according to the first embodiment of the present invention. [Diagram 31] FIG. 1 is a schematic diagram showing one step (step S4c) of a procedure for installing a new deck 102 using the component installation device 10 according to the first embodiment of the present invention. [Diagram 32] FIG. 1 is a schematic diagram showing one step (step S5c) of a procedure for installing a new deck 102 using the component installation device 10 according to the first embodiment of the present invention. [Diagram 33] FIG. 1 is a schematic diagram showing one step (step S6c) of a procedure for installing a new deck 102 using the component installation device 10 according to the first embodiment of the present invention. [Diagram 34] FIG. 1 is a schematic diagram showing one step (step S7c) of a procedure for installing a new deck 102 using the component installation device 10 according to the first embodiment of the present invention. [Diagram 35] FIG. 1 is a schematic diagram showing one step (step S8c) of a procedure for installing a new deck 102 using the component installation device 10 according to the first embodiment of the present invention. [Diagram 36] FIG. 1 is a schematic diagram showing one step (step S9c) of a procedure for installing a new deck 102 using the component installation device 10 according to the first embodiment of the present invention. [Figure 37] FIG. 1 is a schematic diagram showing one step (step S10c) of a procedure for installing a new deck 102 using the component installation device 10 according to the first embodiment of the present invention. [Figure 38] FIG. 11 is a schematic diagram showing one step (step S11c) of a procedure for installing a new deck 102 using the component installation device 10 according to the first embodiment of the present invention. [Figure 39] FIG. 11 is a perspective view showing an example of a state in which a new deck 104 is being installed by a component installation device 60 according to a second embodiment of the present invention. [Diagram 40] FIG. 1 is a diagram for explaining an overview of a gantry crane 200 described in Patent Document 1. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0030] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. In the description of the embodiment of the present invention, the installation of a new bridge deck is taken up, but the application of the present invention is not limited to the installation of a new deck, and the present invention can also be applied to, for example, the removal of an existing bridge deck, and can also be applied to the installation and removal of not only bridge decks but also other bridge components. Also, the present invention can be applied not only to steel bridges but also to concrete bridges. Furthermore, the present invention can be applied to fields other than bridges, and the application of the present invention is not limited to bridge components.

[0031] (1) First embodiment (1-1) Configuration FIG. 1 is a perspective view showing an example of a situation in which a new deck 102 is being installed by a component installation apparatus 10 according to the first embodiment of the present invention, FIG. 2 is a side view showing the component installation apparatus 10 according to the first embodiment of the present invention, FIG. 3 is a front view showing the component installation apparatus 10 according to the first embodiment of the present invention, FIG. 4 is a plan view (a plan view seen from above) showing the component installation apparatus 10 according to the first embodiment of the present invention, FIG. 5 is a perspective view showing an example of a state in which the component installation apparatus 10 according to the first embodiment of the present invention has been loaded onto a trailer 80, and FIG. 6 is a view showing the hanging position of the component installation apparatus 10 according to the first embodiment of the present invention. Fig. 7 is a side view showing an enlarged portion 16 of the suspending portion 16 of the member installation device 10 according to the first embodiment of the present invention, Fig. 8 is a vertical cross-sectional view (cross-sectional view along line VIII-VIII in Fig. 4) of the suspending portion 16 of the member installation device 10 according to the first embodiment of the present invention seen from the side, Fig. 9 is a vertical cross-sectional view (cross-sectional view along line IX-IX in Fig. 4) of the suspending portion 16 of the member installation device 10 according to the first embodiment of the present invention seen from the front, and Fig. 10 is a vertical cross-sectional view (cross-sectional view along line XX in Fig. 4) of the member fixing jig 36 of the suspending portion 16 of the member installation device 10 according to the first embodiment of the present invention seen from the side. However, Fig. 10 shows a state in which the new deck 102 is fixed by the member fixing jig 36.

[0032] The member installation device 10 according to the first embodiment of the present invention comprises a frame main body 12, a cantilever protruding portion 14, and a hanging portion 16, and the size of the member installation device 10 in the width direction of a bridge 100 is such that it fits within the width of approximately one lane, as shown in Fig. 1, and it can be used for half-section construction in which only one lane is restricted and construction is carried out lane by lane. By rotating the four beams 22 of the frame main body 12 so that they are parallel to the cantilever protruding portion 14 by the hinge mechanism 22A, it is also possible to load it onto a trailer 80, as shown in Fig. 5.

[0033] The frame main body 12 has a ceiling 18, four legs 20, and four beams 22, and is a portion that forms the skeleton of the component installation device 10. In the frame main body 12, the four beams 22 are connected to the ceiling 18 via hinge mechanisms 22A (see FIG. 1) so as to be rotatable within a horizontal plane, and the outer end of each beam 22 (the end opposite the hinge mechanism 22A) is connected to the upper portion of the leg 20. The four beams 22 can be opened and closed by rotating 90° in a horizontal plane by means of hinge mechanisms 22A, as indicated by arrow A in the plan view of FIG. 4 (in the present application, the state in which the beams 22 are rotated so as to be perpendicular to the cantilevered protrusions 14 (the state shown in FIG. 4) may be described as the open state of the beams 22, and the state in which the beams 22 are rotated so as to be parallel to the cantilevered protrusions 14 (the state shown in FIG. 5) may be described as the closed state of the beams 22. The same applies to the opening and closing arms 52 described later). When the member installation device 10 is in use, the opening angle of the beams 22 can be adjusted according to the space (width in the width direction of the bridge 100) that can be secured for installing the member installation device 10, and the beams 22 can be opened at a maximum so as to be perpendicular to the cantilevered protrusions 14 (the state shown in FIGS. 1 to 4), and when the opening angle must be made smaller, the beams 22 can be closed at a minimum so as to be parallel to the cantilevered protrusions 14 (the state shown in FIG. 5). By adjusting the opening angle of the beam section 22, the distance between adjacent leg sections 20 in the width direction of the bridge 100 can be adjusted. When the member installation device 10 is mounted on the trailer 80, the beam section 22 is in a closed state (state shown in FIG. 5) (opening angle 0°) so as to be parallel to the cantilever protruding section 14. Note that since the beam section 22 cannot be opened or closed when the leg section 20 is supporting the load of the frame main body section 12, the beam section 22 is opened or closed with the load of the frame main body section 12 transferred to the load transferring jack 28 as shown in FIG. 13 and FIG. 22.

[0034] Each of the four legs 20 has a hydraulic jack (not shown) built in, and each of the four legs 20 is configured to be extendable and retractable. The member installation device 10 is provided with a control mechanism that controls the four legs 20 to extend and retract in unison, and the frame body 12 is configured to extend and retract uniformly in the vertical direction as a whole. A commonly used control mechanism can be used as the control mechanism that extends and retracts the four legs 20 in unison. In the member installation device 10, the entire frame body 12 extends and retracts uniformly in the vertical direction, so that the hanging part 16 attached to the cantilever protruding part 14 moves up and down, and the new floor slab 102 supported from above by the hanging part 16 can be moved up and down to be installed at the target installation position. For this reason, in the component installation device 10 of this first embodiment, it is not necessary to provide the suspending part 16 with a means for vertically moving the component to be installed (here, the new deck slab 102), and the suspending part 16 does not have a means for vertically moving the component to be installed, making the configuration of the suspending part 16 compact (the configuration of the suspending part 16 will be described in detail later).

[0035] 1 to 4, a self-propelled traveling device 24 is detachably attached to the bottom end of each of the four legs 20, so that the member installation device 10 according to the first embodiment can move on its own. Therefore, the member installation device 10 according to the first embodiment can move in response to changes in the member installation position as the member installation work progresses.

[0036] The cantilevered extension 14 is a long steel member that extends from the frame body 12 to the member installation side, and is formed by arranging two I-shaped steels 14A in parallel as shown in Figs. 1, 4, 5, 7, 9, etc., and as shown in Figs. 1, 2, 4, 6, etc., a channel steel 14B is attached as a cross member to the upper surface of the upper flange 14A1 of the two I-shaped steels 14A, and a channel steel 14B is also attached as a cross member to the end of the lower surface of the lower flange 14A2 of the I-shaped steel 14A in the extension direction. As shown in Figs. 1, 2, 6 to 9, etc., wheels 50A of the electric trolley 50 are arranged on the upper surface of the lower flange 14A2 of the I-shaped steel 14A, so that the electric trolley 50 can move along the longitudinal direction of the cantilevered extension 14. A hanging part 16 is connected to the lower part of the electric trolley 50, so that the hanging part 16 can move along the longitudinal direction of the cantilevered extension 14. The legs 20 of the frame main body 12 are extended, and the new deck 102 is hoisted from above the trailer 80 with the suspending part 16 supporting the new deck 102 from above, and then the suspending part 16 is moved in the extending direction along the longitudinal direction of the cantilever extending part 14, thereby moving the new deck 102 above the targeted installation position. After the new deck 102 has been moved above the targeted installation position, the installation posture of the new deck 102 is adjusted (described in detail later), and the legs 20 of the frame main body 12 are contracted, and the new deck 102 is installed at the targeted installation position.

[0037] Also, in order to prevent the load balance from being lost when the hanging part 16 moves along the longitudinal direction of the cantilever protruding part 14 toward the tip side of the protruding direction of the cantilever protruding part 14 while supporting the new deck slab 102 from above, a counterweight 26 is provided at the end opposite the protruding direction of the cantilever protruding part 14, as shown in Figures 1 and 2. In the member installation device 10 according to the first embodiment, the counterweight 26 is made of steel, but may be made of other materials as long as it has the necessary weight.

[0038] Two hinge mechanisms (not shown) are provided in the region on the end side in the opposite direction to the protruding direction (region slightly toward the center from the end in the opposite direction to the protruding direction) of the cantilever protruding portion 14, and the cantilever protruding portion 14 can be folded up in a substantially J-shape when viewed from above. Depending on the size of the trailer 80 when transporting the member installation device 10 according to the first embodiment, it may be difficult to load the cantilever protruding portion 14 onto the trailer 80 in its extended state. In that case, the cantilever protruding portion 14 can be folded up into a substantially J-shape so that it can be loaded onto the trailer 80.

[0039] In the member installation device 10 according to the first embodiment, the frame main body 12 is fitted with a cantilever protruding portion 14, and the cantilever protruding portion 14 is further fitted with a hanging portion 16, but the cantilever protruding portion 14 and the hanging portion 16 can be removed from the frame main body 12, and as described above, the cantilever protruding portion 14 has two hinge mechanisms and is configured to be folded into a substantially J-shape. For this reason, by removing the cantilever protruding portion 14 and the hanging portion 16 from the frame main body 12 and further folding the cantilever protruding portion 14 into a substantially J-shape as necessary, it is possible to transport all of the members constituting the member installation device 10 (the frame main body 12, the cantilever protruding portion 14, the hanging portion 16, etc.) together on a single trailer that can legally travel on public roads in Japan, without disassembling the frame main body 12, as shown in FIG. 5. However, depending on the size of the trailer used for transportation, it is also possible to load the frame main body 12 onto one trailer and the cantilever extension portion 14 and the hanging portion 16 onto another trailer, and transport the components that make up the component installation device 10 separately (more details will be described later in "(1-2) Installation Work Procedure").

[0040] The hanging section 16 comprises a vertical support member 30, a two-dimensional support member 32, a two-axis rotating shaft mechanism 34, a member fixing jig 36, diagonal telescopic jacks 38, 40, and a rotating means 42, and is the part that directly connects to the installation target component (here, the newly constructed deck slab 102) to fix the installation target component. It transports the connected and fixed installation target component above the targeted installation position using an electric trolley 50, and further adjusts the rotation angle of the installation target component in the horizontal plane and the inclination state of the installation target component relative to the horizontal plane, so as to install the installation target component in an appropriate installation posture. However, the suspending part 16 does not have a means for vertically moving the member to be installed, and the role of the suspending part 16 is only to adjust the member to be installed to an appropriate installation position above the target installation position, and the member to be installed that has been adjusted to an appropriate installation position by the suspending part 16 is lowered to the target installation position by the contraction of the legs 20 of the frame main body 12, and is installed at the target installation position. In this application, the "means for vertically moving the member to be installed" refers to a means intended to substantially change the vertical position of the member to be installed, and specifically, for example, a means intended to move a load in the vertical direction, such as a hoist, and does not include a means intended to rotate the member to be installed in an approximately horizontal plane or a means intended to change the inclination state of the member to be installed relative to the horizontal plane.

[0041] The suspending unit 16 is connected to the lower part of the electric trolley 50, and from the top, the rotating means 42, the vertical support member 30, and the two-dimensional support member 32 in that order. The rotating means 42 and the vertical support member 30 are connected by a pin 30A (see Figs. 8 and 9), and are structured to facilitate separation between the rotating means 42 and the vertical support member 30. In the <Installation procedure for collective transportation> in "(1-2) Installation procedure" described later, the rotating means 42 and the vertical support member 30 are separated from each other during transportation and loaded onto the trailer 80. In the present application, the portion of the suspending unit 16 excluding the rotating means 42 may be referred to as the suspending unit main body 16A.

[0042] The suspending unit 16 supports the member to be installed (here, the new deck 102) from above, and the electric trolley 50 moves along the longitudinal direction of the cantilevered protruding unit 14 to transport the member to be installed above the target installation position, and adjusts the rotation angle of the member to be installed in the horizontal plane by the rotating means 42. The vertical support member 30 and the two-dimensional support member 32 are connected via a two-axis rotating shaft mechanism 34, and as shown in Figs. 6 to 9, two diagonal telescopic jacks 38, 40 that extend and retract in a diagonal direction relative to the horizontal plane are provided between the vertical support member 30 and the two-dimensional support member 32, and the inclination state of the member to be installed relative to the horizontal plane can be accurately adjusted by appropriately extending and retracting the two diagonal telescopic jacks 38, 40, and the suspending unit 16 also adjusts the inclination state of the member to be installed relative to the horizontal plane. Therefore, by installing a component using the component installation device 10 of this first embodiment, the component to be installed can be installed in an appropriate installation posture (appropriate rotation angle in the horizontal plane and appropriate inclination state relative to the horizontal plane).

[0043] However, as described above, in the member installation device 10, the entire frame main body 12 expands and contracts uniformly in the vertical direction, causing the suspending part 16 attached to the cantilever protruding part 14 to move in the vertical direction. Therefore, the new floor slab 102, which is supported from above by adjusting it to an appropriate installation position, can be lowered by the entire frame main body 12 contracting uniformly, and installed at the target installation position. Therefore, in the member installation device 10 according to the first embodiment, it is not necessary to provide the suspending part 16 with a means for moving the member to be installed up and down, and the configuration of the suspending part 16 is compact. Therefore, it is less likely to violate height restrictions when transported by the trailer 80.

[0044] The vertical support member 30 is a rigid member made of metal, such as a steel material having a relatively large rectangular or circular cross section. Specifically, for example, when a rectangular steel pipe is used for the vertical support member 30, the shape of the cross section (cross section perpendicular to the longitudinal direction of the vertical support member 30) is a rectangular (square) shape with a side length of about 100 to 200 mm and a thickness of about 6 to 12 mm. Therefore, the torsion moment applied to the upper part of the vertical support member 30 by the rotating means 42 described later is transmitted in real time to the two-dimensional support member 32 connected to the lower part of the vertical support member 30, and the rotation angle of the two-dimensional support member 32 can be controlled in real time by the torsion angle applied to the upper part of the vertical support member 30 by the rotating means 42, and the rotation angle of the new floor slab 102 fixed to the two-dimensional support member 32 can be controlled in real time. Furthermore, since the vertical support member 30 is a rigid member, the inclination of the two-dimensional support member 32 relative to the vertical support member 30 can be controlled in real time by extending and retracting the two diagonal telescopic jacks 38, 40 described below, the inclination of the two-dimensional support member 32 relative to the horizontal plane can be controlled in real time, and the inclination of the newly constructed deck slab 102 fixed to the two-dimensional support member 32 relative to the horizontal plane can be controlled in real time. Furthermore, even if the new deck 102 fixed to the two-dimensional support member 32 is moved along the cantilever extension portion 14 by the electric trolley 50, rotated a predetermined angle in the horizontal plane by the rotating means 42 described later, or the two diagonal telescopic jacks 38, 40 described later are extended and retracted to adjust the inclination of the new deck 102 relative to the horizontal plane, the vertical support member 30 is a rigid member, so the new deck 102 is prevented from swinging, and in principle, it is not necessary for workers at the site to suppress the swinging. It is also possible to appropriately control the installation position and installation posture of the new deck 102 by remotely operating the electric trolley 50, the rotating means 42, and the diagonal telescopic jacks 38, 40.

[0045] As shown in Figs. 1 and 4, the two-dimensional support member 32 is a member extending in a two-dimensional direction formed by connecting channel steels vertically and horizontally in a well shape in a planar direction (two-dimensional direction), and the two-dimensional support member 32 is provided with four fixing points (i.e., three or more fixing points not on the same line) that are on approximately the same plane extending in this two-dimensional direction and not all of the points are on the same line, and is a two-dimensional support member that fixes the installation target member (here, the new deck slab 102) from above at the four fixing points. In the two-dimensional support member 32 of the member installation device 10 according to the first embodiment, the number of fixing points for fixing the new deck slab 102 is four, but it is sufficient that the number of fixing points of the two-dimensional support member 32 that fixes the new deck slab 102 is four as long as they are on approximately the same plane extending in the two-dimensional direction and are not on the same line, and the number of fixing points of the two-dimensional support member 32 that fixes the new deck slab 102 is not limited to four.

[0046] Specifically, member fixing jigs 36 are arranged at the four fixing points of the two-dimensional support member 32, and the new deck slab 102 is fixed to the two-dimensional support member 32 by the member fixing jigs 36.

[0047] As shown in Figures 8 and 9, the two-axis rotating shaft mechanism 34 includes two pins 34A and two pins 34B, and the longitudinal directions of the two pins 34A are aligned on the same line in a horizontal plane to form a first rotating shaft, and the longitudinal directions of the two pins 34B are aligned on the same line in a horizontal plane to form a second rotating shaft. The first rotating shaft and the second rotating shaft are substantially perpendicular to each other. In other words, the two-axis rotating shaft mechanism 34 is a mechanism that includes two rotating shafts that are aligned on the same horizontal plane and substantially perpendicular to each other.

[0048] The two-axis rotating shaft mechanism 34 is provided near the center of the two-dimensional support member 32, and the lower end of the vertical support member 30 is connected to the upper end of the two-axis rotating shaft mechanism 34. Therefore, the two-dimensional support member 32 can be tilted in any direction relative to the vertical support member 30, and can be tilted in any direction relative to the horizontal plane.

[0049] As shown in Fig. 10 (cross-sectional view of line XX in Fig. 4), the member fixing jig 36 includes a lower connector 36A, an intermediate connector 36B, an upper connector 36C, a pin 36D, a box-shaped fastener 36X, and a threaded rod 36Y, and is a jig for fixing the new deck slab 102 to the two-dimensional support member 32. The lower end 36B1 of the intermediate connector 36B is inserted through the through-hole of the lower connector 36A, and the intermediate connector 36B is connected to the lower connector 36A, and the upper end 36B2 of the intermediate connector 36B is connected to the upper connector 36C via the pin 36D. The box-shaped fixing device 36X includes a sidewall member 36X1 and a ceiling beam member 36X2. The sidewall member 36X1 is connected to the upper surface of the channel steel of the two-dimensional support member 32. The ceiling beam member 36X2 is disposed on the upper surface of the opposing sidewall member 36X1 so as to bridge between the opposing sidewall members 36X1. The upper connector 36C includes two opposing opposing plate-like bodies 36C1 and a connector 36C2 that connects the upper portions of the two opposing plate-like bodies 36C1. The two opposing opposing plate-like bodies 36C1 are disposed so as to sandwich the ceiling beam member 36X2. The outer peripheral surface of the threaded rod 36Y is threaded, and the threaded rod 36Y is screwed into and penetrates the connector 36C2 of the upper connector 36C, and the lower end of the threaded rod 36Y abuts against the upper surface of the ceiling beam member 36X2. When the threaded rod 36Y is rotated about the central axis of its cross section (a cross section perpendicular to the longitudinal direction of the threaded rod 36Y), the upper connector 36C moves up and down relative to the ceiling beam member 36X2 of the box-shaped fastener 36X. When the threaded rod 36Y is rotated in a direction that raises the upper connector 36C, the upper connector 36C rises, pulling the intermediate connector 36B upward via the pin 36D, which in turn pulls the lower connector 36A upward.

[0050] 10, an anchor 102B is provided below the recess 102A of the new deck 102, with its head and its vicinity remaining within the recess 102A and its lower portion embedded inside the new deck 102. The lower connector 36A of the component fixing jig 36 engages with the head of the anchor 102B.

[0051] Therefore, when the threaded rod 36Y is rotated in a direction that raises the upper connecting device 36C, the lower connecting device 36A, which is pulled upward, pulls the head of the anchor 102B upward, and the reaction force is transmitted to the two-dimensional support member 32 via the box-shaped fixing device 36X of the member fixing jig 36, allowing the newly constructed deck slab 102 to be suspended.

[0052] The diagonal telescopic jacks 38 and 40 are clevis jacks provided between the vertical support member 30 and the two-dimensional support member 32, and extend and retract in a diagonal direction relative to the horizontal plane. Specifically, one end of the diagonal telescopic jack 38 is connected to the upper part of the vertical support member 30 via a clevis joint 38A, and the other end is connected to the upper surface of the two-dimensional support member 32 via a clevis joint 38B (a point shifted from the center of the two-dimensional support member 32 toward the end in the longitudinal direction by a distance of about a quarter of the longitudinal length of the two-dimensional support member 32), and one end of the diagonal telescopic jack 40 is connected to the upper part of the vertical support member 30 via a clevis joint 40A, and the other end is connected to the upper surface of the two-dimensional support member 32 (a point from the center of the two-dimensional support member 32 near the end in the lateral direction of the two-dimensional support member 32) via a clevis joint 40B.

[0053] More specifically, the relationship between the two rotation axes of the two-axis rotating shaft mechanism 34 (the first rotation axis by pin 34A and the second rotation axis by pin 34B) and the extension and contraction directions of the two diagonal telescopic jacks 38, 40 is as follows: When the extension and contraction direction of the diagonal telescopic jack 38 is projected onto a horizontal plane from above, the extension and contraction direction is approximately perpendicular to the first rotation axis by pin 34A, and when the extension and contraction direction of the diagonal telescopic jack 40 is projected onto a horizontal plane from above, the extension and contraction direction is approximately perpendicular to the second rotation axis by pin 34B.

[0054] As described above, since the vertical support member 30 is a rigid member and the two-dimensional support member 32 is connected to the lower end of the vertical support member 30 via the two-axis rotating shaft mechanism 34, the inclination state of the two-dimensional support member 32 relative to the vertical support member 30 can be controlled in real time by extending and retracting the two diagonal telescopic jacks 38, 40, the inclination state of the two-dimensional support member 32 relative to the horizontal plane can be controlled in real time, and the inclination state of the new floor slab 102 fixed to the two-dimensional support member 32 relative to the horizontal plane can be controlled in real time. Therefore, by appropriately extending and retracting the two diagonal telescopic jacks 38, 40, the inclination state of the new floor slab 102 relative to the horizontal plane can be accurately adjusted.

[0055] The rotating means 42 is provided between the lower part of the electric trolley 50 and the upper part of the vertical support member 30, and is a means for rotating the vertical support member 30 around the central axis of its cross section (cross section perpendicular to the longitudinal direction of the vertical support member 30). The rotating means 42 is equipped with a rotary reducer 42A, and the rotary reducer 42A rotates the vertical support member 30 around the central axis of its cross section (cross section perpendicular to the longitudinal direction of the vertical support member 30). As described above, the vertical support member 30 is a rigid member, and the torsional moment applied to the upper part of the vertical support member 30 by the rotary reducer 42A is transmitted in real time to the two-dimensional support member 32 connected to the lower part of the vertical support member 30, and the rotation angle of the two-dimensional support member 32 can be controlled in real time by the torsional angle applied to the upper part of the vertical support member 30 by the rotating means 42, and the rotation angle of the new floor slab 102 fixed to the two-dimensional support member 32 can be controlled in real time. As a result, the rotation angle in the horizontal plane of the new deck 102 fixed to the two-dimensional support member 32 by the member fixing jig 36 can be accurately adjusted.

[0056] As described above, when installing the new deck 102 using the component installation device 10 of this first embodiment, the new deck 102 is fixed to the two-dimensional support member 32 of the hanging portion 16 of the component installation device 10 by the component fixing jig 36, and since the vertical support member 30 is a steel member with a relatively large angular or circular cross-section and is a rigid member, the rotation angle of the new deck 102 in the horizontal plane can be controlled in real time by the rotation means 42 that applies a torsion angle to the upper part of the vertical support member 30, and the inclination state of the new deck 102 relative to the horizontal plane can be controlled in real time by extending and retracting the two diagonal telescopic jacks 38, 40 provided between the vertical support member 30 and the two-dimensional support member 32. In addition, even if the new deck 102 fixed to the two-dimensional support member 32 of the hanging part 16 is moved along the cantilever protruding part 14 by the electric trolley 50, rotated by a predetermined angle in the horizontal plane by the rotating means 42, or adjusted inclination state of the new deck 102 with respect to the horizontal plane by extending and retracting the two diagonal telescopic jacks 38, 40, the vertical support member 30 is a rigid member, so that the new deck 102 is prevented from swinging, and in principle, it is not necessary for workers at the site to suppress the swinging. Therefore, by installing the new deck 102 using the member installation device 10 according to the first embodiment, it is possible to appropriately control the installation position and installation posture (rotation angle in the horizontal plane and inclination state with respect to the horizontal plane) of the new deck 102 by remotely operating the electric trolley 50, the rotating means 42, and the diagonal telescopic jacks 38, 40, and it is also possible to reduce the number of workers to be deployed at the site.

[0057] On the other hand, in the crane section 230 (crane section 230 that suspends the deck) in the gantry crane 200 described in Patent Document 1 and the hoist (hoist that suspends the deck) in a conventional deck erection device, a wire is used as the member for suspending the deck, and when the deck suspended by the wire is moved using an electric trolley or the like, the deck swaying occurs, and it is necessary for a worker on-site to suppress the swaying. Furthermore, in order to properly install the deck in the designated position, it is necessary for a worker on-site to manually adjust the installation position of the suspended deck, the rotation angle of the suspended deck in the horizontal plane, and the inclination state relative to the horizontal plane. With the conventional technology, it was difficult to reduce the number of workers deployed on-site during deck installation work.

[0058] In addition, in the member installation device 10 according to the first embodiment, the electric trolley 50 moves along the cantilever extension 14, and the new deck 102 supported from above by the suspending unit 16 moves to the installation position, so there is no need for a member such as the tip support unit 220 in the gantry crane 200 described in Patent Document 1, and the entire device is configured compactly. In addition, in the member installation device 10 according to the first embodiment, the new deck 102 supported from above by the suspending unit 16 is raised and lowered by the extension and contraction of the legs 20, so no means for moving the member to be installed up and down is provided in the suspending unit 16, which also contributes to the compactness of the entire member installation device 10 according to the first embodiment.

[0059] (1-2) Installation procedure The member installation device 10 according to the first embodiment does not require a member such as the tip support part 220 in the gantry crane 200 described in Patent Document 1, and the installation work is made more efficient. With reference to Figs. 11 to 27, the installation work procedure of the member installation device 10 according to the first embodiment will be described. Figs. 11 to 19 are drawings that show the installation work procedure when all members and parts of the member installation device 10 according to the first embodiment are transported together by one trailer 80 that can legally travel on public roads in Japan, and Figs. 20 to 27 are drawings that show the installation work procedure when the members and parts of the member installation device 10 according to the first embodiment are transported separately by two trailers 82 and 84 that can legally travel on public roads in Japan. In the following, the installation work will be described separately for the case of transporting all at once and the case of transporting separately, with the member installation device 10 being installed at a specified point on the bridge 100 in mind. 11 to 27 each show two views, A and B, where A is a side view seen from the side (a side view seen from a direction perpendicular to the bridge axis of the bridge 100) and B is a front view seen from the bridge axis direction of the bridge 100. Also, in B of Figs. 11 to 16 and Figs. 25 and 26, the electric trolley 50 and the rotating means 42 are not drawn for convenience of illustration.

[0060] <Installation procedure for bulk transportation> (Step S1a) FIG. 11 is a schematic diagram showing the state (step S1a) of the member installation device 10 according to the first embodiment being transported by one trailer 80. As shown in FIG. 11, the member installation device 10 according to the first embodiment can be transported collectively by loading all members and parts onto one trailer 80 that can legally run on public roads in Japan. Although it depends on the relationship between the size of the member installation device 10 and the size of the trailer 80, in the case of transportation, in the normal case, the cantilever protruding portion 14 and the hanging portion 16 are removed from the frame main body portion 12 and loaded onto the trailer 80. In addition, as described above, the cantilever protruding portion 14 is provided with two hinge mechanisms (not shown) in the region on the end side in the opposite direction to the protruding direction (region slightly toward the center from the end in the opposite direction to the protruding direction), and can be folded in a substantially J-shape when viewed from above. Depending on the size of the trailer 80 when transporting the component installation device 10 of this first embodiment, it may be difficult to load the cantilever extension portion 14 onto the trailer 80 in its extended state. In that case, however, it is possible to fold the cantilever extension portion 14 into an approximately J-shape so that it can be loaded onto the trailer 80.

[0061] (Step S2a) Fig. 12 is a schematic diagram showing a state (step S2a) in which the traveling device 24 of the member installation device 10 is being unloaded from the trailer 80 onto the installation surface. When the trailer 80 arrives at a predetermined location (the location where the member installation device 10 is to be installed) by the transportation in step S1a, first, as shown in Fig. 12, the traveling device 24 is unloaded onto the installation surface on the side of the trailer 80. In this case, the traveling device 24 is lifted up by the wire 52A attached to the tip side of the opening / closing arm 52, and in this state, the opening / closing arm 52 is opened so that the tip side of the opening / closing arm 52 is positioned outside the width direction of the trailer 80 when viewed from above. Then, the traveling device 24 is lifted down onto the installation surface on the side of the trailer 80 by the wire 52A.

[0062] (Step S3a) 13 is a schematic diagram showing a state (step S3a) in which the load of the frame main body 12 is transferred to the load transfer jack 28, and the beam 22 is opened to move the leg 20 to the side of the trailer 80. By transferring the load of the frame main body 12 to the load transfer jack 28, the load of the frame main body 12 is no longer applied to the leg 20, and the beam 22 can be opened to move the leg 20 to the side of the trailer 80. After transferring the load of the frame main body 12 to the load transfer jack 28, the beam 22 is opened and the leg 20 is moved to the outside in the width direction of the trailer 80 when viewed from above, and then the traveling device 24 that was lowered to the installation surface earlier is placed directly under each of the four legs 20.

[0063] (Step S4a) FIG. 14 is a schematic diagram showing the state (step S4a) in which the legs 20 are extended and the running devices 24 are attached to the lower ends of the legs 20. The running devices 24, which have been lowered onto the installation surface, are placed directly below each of the four legs 20 in step S3a, and then the legs 20 are extended in step S4a and the running devices 24 are attached to the lower ends of the legs 20. When the installation of the running devices 24 to the lower ends of the legs 20 is completed, the load transfer jack 28 is contracted. By attaching the running devices 24 to the lower ends of the legs 20, the frame main body 12 can move in the front-rear direction. Also, if the cantilever extension 14 is folded into an approximately J-shape, the cantilever extension 14 is straightened out at this stage.

[0064] (Step S5a) 15 is a schematic diagram showing a state (step S5a) in which the mounting portion of the frame main body 12 and the mounting portion of the cantilever protruding portion 14 have been aligned in the front-rear direction. Specifically, the trailer 80 is moved forward, and the mounting portion (not shown) of the cantilever protruding portion 14 loaded on the trailer 80 to the frame main body 12 is aligned directly below the mounting portion (not shown) of the cantilever protruding portion 14 of the frame main body 12. Here, the mounting portion (not shown) of the frame main body 12 and the mounting portion (not shown) of the cantilever protruding portion 14 are aligned in the front-rear direction by moving the trailer 80 forward, but the frame main body 12 to which the running device 24 is attached at the lower end of the leg 20 may be moved forward or backward to perform the alignment depending on the situation.

[0065] (Step S6a) FIG. 16 is a schematic diagram showing a state (step S6a) in which the leg 20 of the frame main body 12 is contracted and the cantilever extension 14 is connected to the frame main body 12. Specifically, in this step S6a, the leg 20 of the frame main body 12 is contracted to align the mounting portion (not shown) of the frame main body 12 with the mounting portion (not shown) of the cantilever extension 14 in the height direction, and the two are connected with a bolt (not shown). Note that at this stage, the suspending portion main body 16A of the suspending portion 16 is not connected to the cantilever extension 14. In the member installation device 10 according to the first embodiment, the rotating means 42 is a part of the suspending portion 16, but during the collective transportation described here, the suspending portion 16 is divided between the rotating means 42 and the vertical support member 30, and is divided into the rotating means 42 and the suspending portion main body 16A.

[0066] (Step S7a) FIG. 17 is a schematic diagram showing a state (step S7a) in which the legs 20 of the frame main body 12 to which the cantilevered extensions 14 are connected are extended to cause the frame main body 12 to stand up.

[0067] In step S6a, the cantilever extension 14 is attached to the frame main body 12, but at this stage, the suspending body 16A is not yet attached to the cantilever extension 14. In order to attach the suspending body 16A to the cantilever extension 14, in step S7a, the legs 20 are once extended to raise the frame main body 12 so that the frame main body 12 and the trailer 80 can move relative to each other in the front-to-rear direction.

[0068] (Step S8a) FIG. 18 is a schematic diagram showing a state in which the legs 20 of the frame main body 12 are contracted and the hanging portion 16 is attached to the cantilevered protruding portion 14 (step S8a).

[0069] An electric trolley 50 is attached to the cantilevered extension 14, and a rotating means 42 is attached to the bottom of the electric trolley 50. After the frame main body 12 is raised in step S7a to allow relative movement in the front-rear direction between the frame main body 12 and the trailer 80, in step S8a, the trailer 80 is moved in the front-rear direction to align the vertical support member 30 of the suspending unit main body 16A so that it is located directly below the rotating means 42 attached to the bottom of the electric trolley 50. Thereafter, the legs 20 of the frame main body 12 are contracted, and the vertical support member 30 is connected to the rotating means 42 attached to the bottom of the electric trolley 50, completing the assembly of the suspending unit 16.

[0070] When the assembly of the hanging portion 16 is completed in step S8a and the attachment of the hanging portion 16 to the cantilever extension portion 14 is completed, all of the members and parts, etc. of the member installation device 10 are assembled.

[0071] (Step S9a) FIG. 19 is a schematic diagram showing a state (step S9a) in which the trailer 80 has been moved from the installation location of the member installation device 10 after the fully assembled member installation device 10 has been erected.

[0072] When installing components using the fully assembled component installation device 10, the trailer 80 used for transportation is no longer necessary, so in this step S9a, the legs 20 of the frame main body 12 are extended to raise the fully assembled component installation device 10, the connection between the component installation device 10 and the trailer 80 is severed, and the trailer 80 is moved from the installation location of the component installation device 10.

[0073] <Installation procedure when transporting in separate units> When the members and parts of the member installation device 10 according to the first embodiment are transported separately by two trailers 82, 84, the frame main body 12 and the traveling device 24 are transported by the first trailer 82, and the frame main body 12 is first erected at the installation site. Then, the remaining members and parts (cantilever extension portion 14, hanging portion 16, etc.) are carried into the installation site by the second trailer 84 and attached to the frame main body 12 that was erected earlier, and the member installation device 10 is assembled.

[0074] (Step S1b) Fig. 20 is a schematic diagram showing a state (step S1b) in which the frame main body 12 and the traveling device 24 of the member installation device 10 according to the first embodiment are being transported by the first trailer 82. As shown in Fig. 20, the trailer 82 is not carrying any members and parts (such as the cantilever extension portion 14 and the hanging portion 16) other than the frame main body 12 and the traveling device 24, so that in some cases the trailer 82 can be made smaller than the trailer 80 used for bulk transportation.

[0075] (Step S2b) Fig. 21 is a schematic diagram showing a state in which the traveling device 24 of the member installation device 10 is being unloaded from the trailer 80 onto the installation surface (step S2b). When the trailer 82 arrives at a predetermined location (the location where the member installation device 10 is to be installed) by the transportation in step S1b, first, as shown in Fig. 21, the traveling device 24 is unloaded onto the installation surface on the side of the trailer 80. In this case, the traveling device 24 is lifted up by the wire 52A attached to the tip side of the opening / closing arm 52, and in this state, the opening / closing arm 52 is opened so that the tip side of the opening / closing arm 52 is positioned outside the width direction of the trailer 82 when viewed from above. Then, the traveling device 24 is lifted down onto the installation surface on the side of the trailer 82 by the wire 52A.

[0076] (Step S3b) 22 is a schematic diagram showing a state (step S3b) in which the load of the frame main body 12 is transferred to the load transfer jack 28, and the beam 22 is opened to move the leg 20 to the side of the trailer 80. By transferring the load of the frame main body 12 to the load transfer jack 28, the load of the frame main body 12 is no longer applied to the leg 20, and the beam 22 can be opened to move the leg 20 to the side of the trailer 80. After transferring the load of the frame main body 12 to the load transfer jack 28, the beam 22 is opened and the leg 20 is moved to the outside in the width direction of the trailer 80 when viewed from above, and then the traveling device 24 that was lowered to the installation surface earlier is placed directly under each of the four legs 20.

[0077] (Step S4b) 23 is a schematic diagram showing the state in which the legs 20 are extended and the traveling devices 24 are attached to the lower ends of the legs 20 (step S4b). The traveling devices 24, which were previously lowered onto the installation surface, are positioned directly below each of the four legs 20 in step S3b, and then the legs 20 are extended in step S4b and the traveling devices 24 are attached to the lower ends of the legs 20. Once the attachment of the traveling devices 24 to the lower ends of the legs 20 is complete, the load transfer jacks 28 are contracted. By attaching the traveling devices 24 to the lower ends of the legs 20, the frame main body 12 becomes capable of moving in the front-rear direction.

[0078] (Step S5b) Figure 24 is a schematic diagram showing the state (step S5b) in which the first trailer 82 has been moved from the installation location of the component installation device 10 after the traveling device 24 has been attached to the lower end of the leg 20 to erect the frame main body 12.

[0079] After the running device 24 is attached to the lower end of the leg 20 and the frame main body 12 is erected, the first trailer 82 used for transportation is no longer needed, so in this step S5b, the first trailer 82 is moved from the location where the frame main body 12 was erected (the installation location of the component installation device 10).

[0080] (Step S6b) FIG. 25 is a schematic diagram showing the state (step S6b) in which a second trailer 84 carrying the cantilever extension portion 14, the hanging portion 16, etc. is placed at the location where the frame main body portion 12 is erected.

[0081] When the trailer 84 is disposed at the location where the frame main body 12 is erected, the trailer 84 is disposed so that the attachment portion (not shown) of the frame main body 12 and the attachment portion (not shown) of the cantilever protrusion 14 are aligned in the front-rear and left-right directions. Specifically, the trailer 84 is disposed so that the attachment portion (not shown) of the cantilever protrusion 14 loaded on the trailer 84 to the frame main body 12 is located directly below the attachment portion (not shown) of the cantilever protrusion 14 to the frame main body 12. Also, if the cantilever protrusion 14 has been folded in a substantially J-shape, the cantilever protrusion 14 is straightened out at this stage.

[0082] The cantilever extension 14 loaded on the second trailer 84 is supported by a loading platform 86, leaving space below, and the electric trolley 50 is attached to the cantilever extension 14 loaded on the loading platform 86, the rotating means 42 is attached to the bottom of the electric trolley 50, and the vertical support member 30 of the suspending portion main body 16A is attached to the rotating means 42, and the cantilever extension 14 loaded on the second trailer 84 is transported to the site with the suspending portion 16 assembled and attached. Therefore, there is no need to attach the suspending portion main body 16A to the cantilever extension 14 on site.

[0083] (Step S7b) 26 is a schematic diagram showing a state (step S7b) in which the leg portions 20 of the frame main body portion 12 are contracted and the cantilever protruding portion 14 is connected to the frame main body portion 12. Specifically, in this step S7b, the leg portions 20 of the frame main body portion 12 are contracted to align the mounting portion (not shown) of the frame main body portion 12 with the mounting portion (not shown) of the cantilever protruding portion 14 in the height direction, and the two are connected with a bolt or the like (not shown).

[0084] When the attachment of the cantilever extension portion 14 to the frame main body portion 12 is completed in step S7b, all of the members and parts, etc. of the member installation device 10 have been assembled.

[0085] (Step S8b) FIG. 27 is a schematic diagram showing a state (step S8b) in which the trailer 84 has been moved from the installation location of the member installation device 10 after the fully assembled member installation device 10 has been erected.

[0086] When installing components using the fully assembled component installation device 10, the trailer 84 used for transportation is no longer necessary, so in this step S8b, the legs 20 of the frame main body 12 are extended to raise the fully assembled component installation device 10, the connection between the component installation device 10 and the trailer 84 is severed, and the trailer 84 is moved from the installation location of the component installation device 10.

[0087] <Efficient installation work of the component installation device 10> The above has described the installation work of the component installation device 10 according to the first embodiment of the present invention in the cases of transporting all at once and transporting in parts. In either case, the installation work of the component installation device 10 can be completed by extending and retracting the frame main body 12 by extending and retracting the legs 20 and aligning the device in the horizontal plane (mainly in the fore-and-aft direction) using the trailer. This eliminates the need to use other large-scale equipment such as a crane on site, making the installation work of the component installation device 10 more efficient.

[0088] In addition, the installation work of the component installation device 10 in this first embodiment can be carried out either in the case of bulk transportation or in the case of divided transportation, and the more efficient method can be selected depending on the relationship between the size of the component installation device 10 and the size of the trailer that has been arranged and the site conditions, etc., which makes it possible to select the more efficient method, and in this respect too, the installation work of the component installation device 10 is made more efficient.

[0089] When loading the component installation device 10 of this first embodiment onto a trailer, whether it is transported all at once or in parts, the procedure described above can be reversed, making the work of loading onto the trailer more efficient.

[0090] As described above, the installation work of the component installation device 10 in this first embodiment and the loading work onto the trailer are made efficient, so that the device can be suitably used even in construction work that involves restricting traffic only at night and opening up traffic during the day.

[0091] (1-3) Component installation method The procedure for installing a new deck 102 at a target installation point using the member installation device 10 according to the first embodiment of the present invention will be described with reference to Figures 28 to 38. Here, the explanation will be given with a case in mind where the new deck 102 is to be installed at a target installation point on a bridge 100.

[0092] (Step S1c) First, at a predetermined installation location on the bridge 100 (a location near the target installation point), the component installation device 10 is assembled and installed in accordance with the above-mentioned "(1-2) Installation Work Procedure" as shown in Figure 28 (step S1c).

[0093] (Step S2c) As shown in FIG. 29, a new deck slab 102 is carried into the frame main body 12 of the member installation device 10 assembled and installed in step S1c by a trailer 88 (step S2c).

[0094] (Step S3c) The legs 20 of the frame main body 12 of the component installation device 10 are contracted, and the new deck slab 102 on the trailer 88 brought in in step S2c is fixed to the two-dimensional support member 32 of the hanging portion 16, as shown in FIG. 30 (step S3c).

[0095] (Step S4c) The legs 20 of the frame main body 12 of the component installation device 10 are extended to raise the frame main body 12, and the new deck 102 on the trailer 88 brought in in step S2c is lifted up while being supported from above by the lifting part 16, as shown in Figure 31 (step S4c).

[0096] (Step S5c) In step S4c, the new deck 102 on the trailer 88 is lifted while being supported from above by the hoisting section 16, and then the trailer 88 is moved from inside the frame main body 12 (step S5c). Figure 32 shows the state after the trailer 88 has been moved from inside the frame main body 12.

[0097] (Step S6c) The electric trolley 50 is moved along the cantilever extension portion 14 to near the tip of the cantilever extension portion 14 in the extension direction, and the new deck slab 102 supported from above by the hanging portion 16 is moved to near the tip of the cantilever extension portion 14 in the extension direction (step S6c) as shown in Figure 33. Note that this step S6c may be performed prior to step S5c, and the order of steps S5c and S6c may not matter.

[0098] (Step S7c) After the newly constructed deck 102 supported from above by the hanging portion 16 is moved to near the tip of the cantilever extension portion 14 in the extension direction, as shown in Figure 34, the newly constructed deck 102 supported from above by the hanging portion 16 is rotated 90° in the horizontal plane using the rotation means 42 so that the direction of the main rebar of the newly constructed deck 102 is perpendicular to the bridge axis of the bridge 100 (step S7c).

[0099] (Step S8c) The legs 20 of the frame body 12 of the member installation device 10 are contracted to contract the frame body 12 downward, and the new deck 102 is rotated so that the direction of the main rebars is perpendicular to the bridge axis of the bridge 100, and then installed at the target installation point of the bridge 100 as shown in Figure 35 (Step S8c). After installation, the new deck 102 is released from its fixation to the two-dimensional support member 32, and the connection with the hanging part 16 is released.

[0100] (Step S9c) As shown in FIG. 36, the legs 20 of the frame main body 12 of the member installation device 10 are extended to raise the frame main body 12 upright (step S9c).

[0101] (Step S10c) As shown in FIG. 37, the two-dimensional support member 32 is rotated by 90° in a horizontal plane by the rotating means 42 so that the long side direction of the two-dimensional support member 32 coincides with the bridge axis direction of the bridge 100 (step S10c).

[0102] (Step S11c) As shown in Figure 38, the electric trolley 50 is moved along the cantilever extension portion 14 in the opposite direction to the extension direction of the cantilever extension portion 14, the hanging portion 16 is pulled back inside the frame main body portion 12, and the entire component installation device 10 is advanced in the extension direction of the cantilever extension portion 14 by the traveling device 24 until the tip of the cantilever extension portion 14 is positioned above the targeted installation position of the next new deck slab 102 (step S11c).

[0103] (2) Second embodiment FIG. 39 is a perspective view showing an example of a situation in which a new deck slab 104 is being installed using a component installation device 60 according to the second embodiment of the present invention.

[0104] The component installation device 60 of this second embodiment is a component installation device consisting of two component installation devices 10 of the first embodiment arranged side by side in the width direction of the bridge 100, and since the explanation of the component installation device 10 itself is as explained above in "(1) First embodiment", explanations of the individual components and parts of the component installation device 10 will be omitted.

[0105] As described above, the size of the component installation device 10 according to the first embodiment of the present invention is, as shown in FIG. 1, such that it fits within the width of approximately one lane of the bridge 100 in the width direction, and the component installation device 10 according to the first embodiment can be suitably used for half-section construction in which only one lane is restricted and construction is carried out lane by lane.

[0106] On the other hand, as shown in Figure 39, by arranging two component installation devices 10 of the first embodiment side by side in the width direction of the bridge 100 to form a component installation device 60 of the second embodiment, it becomes possible to install a new deck 104 with a width equivalent to two lanes, in other words, to perform construction on the entire cross section of the bridge 100.

[0107] However, since the new deck 104, which is the width of two lanes and is supported from above by the two hanging parts 16, cannot be moved in the bridge axis direction of the bridge 100 so as to pass through the position of the leg 20, when installing the new deck 104, which is the width of two lanes, using the component installation device 60 of this second embodiment, the component installation device 60 is moved back a predetermined distance in the bridge axis direction of the bridge 100 from the installation position of the new deck 104 to secure space between the installation position and the component installation device 60, and within that space, the new deck 104 is rotated 90° in the horizontal plane, and then, as shown in Figure 39, the new deck 104 is supported from above by the two hanging parts 16 and installed in the predetermined installation location.

[0108] (3) Supplementary Information As explained above, the component installation device 10 of the first embodiment, as shown in FIG. 1, has a size in the width direction of the bridge 100 that fits within the width of approximately one lane, and can be used for half-section construction of the bridge 100 where only one lane is restricted and construction is performed lane by lane. The component installation device 60 of the second embodiment, as shown in FIG. 39, is configured by arranging two component installation devices 10 of the first embodiment side by side in the width direction of the bridge 100, and is capable of installing a new deck 104 with a width of two lanes, in other words, of constructing the entire cross section of the bridge 100. However, by arranging three or more component installation devices 10 of the first embodiment side by side in the width direction of the target bridge to configure a component installation device, it is also possible to install a new deck slab with a width of three or more lanes on a bridge with three or more lanes.

[0109] In addition, in the member installation device 10 according to the first embodiment, the beam portion 22 is configured to be able to be opened and closed by rotating 90° in a horizontal plane by the hinge mechanism 22A, and the distance between the adjacent legs 20 in the width direction of the bridge 100 can be adjusted by adjusting the opening angle of the beam portion 22, but a sliding mechanism may be used in place of the hinge mechanism 22A in the beam portion 22 so that the distance between the adjacent legs 20 in the width direction of the bridge 100 can be adjusted. Specifically, for example, a cylinder that houses the beam portion 22 so that it can slide in a direction perpendicular to the cantilever protruding portion 14 may be provided in the frame main body 12, and the beam portion 22 may be housed in the cylinder so that it can slide.

[0110] In addition, in the member installation device 10 according to the first embodiment, the cantilever protrusion 14 has two hinge mechanisms and is configured to be able to be folded in a substantially J-shape, and the longitudinal length of the cantilever protrusion 14 can be shortened by folding it in a substantially J-shape, but a slide mechanism may be used instead of the two hinge mechanisms to adjust the longitudinal length of the cantilever protrusion 14. Specifically, for example, a beam member of about 60 to 70% of the overall length of the cantilever protrusion 14 may be used as the cantilever protrusion 14, and a cylinder that houses the beam member so that it can slide in the longitudinal direction may be provided in the frame main body 12, and the beam member may be housed in the cylinder so that it can slide.

[0111] Furthermore, in the component installation device 10 according to the first embodiment, four legs 20 and four beams 22 are provided, but more than four of each may be provided.

[0112] Furthermore, in member installation device 10 according to the first embodiment, load transferring jack 28 is provided on frame main body 12, but a load transferring jack may also be provided on a trailer used for transportation. [Explanation of symbols]

[0113] 10, 60...Component installation device 12...Frame body 14…Cantilevered protrusion 14A…I-shaped steel 14A1...Upper flange 14A2…Lower flange 14B…Channel steel 16…Hanging part 16A…Hanging part body 18…Ceiling 20...legs 22...beam part 22A…hinge mechanism 24…Travel gear 26…Counterweight 28...Load transfer jack 30...Vertical support member 30A…pin 32...2-dimensional support member 34…2-axis rotation axis mechanism 34A, 34B…pin 36…Component fixing jig 36A…Lower connector 36B…Intermediate connector 36B1…Lower end 36B2…Top end 36C...Top connector 36C1...Facing plate-shaped body 36C2…Connection body 36D…Pin 36X...Box-shaped fixing device 36X1…Side wall member 36X2…Ceiling beam material 36Y…Threaded rod 38, 40...Diagonal telescopic jack 38A, 38B, 40A, 40B...Clevis fittings 42...Rotation means 42A...Rotational reducer 50...Electric trolley 50A…Wheels 52…Opening and closing arm 52A…Wire 80, 82, 84, 88… Trailer 86…Cargo bed 100…Bridge 102, 104...New deck 102A…Concave 102B...Anchor

Claims

1. An installation device for installing a component, comprising: a frame main body portion expandable and contractable in the vertical direction; a cantilever extension portion connected to the frame main body portion and extending from the frame main body portion as a cantilever; and a hanging portion configured to suspend and support the component to be installed at a predetermined length downward from the cantilever extension portion and configured to be movable along the longitudinal direction of the cantilever extension portion, wherein the component to be installed is installed at a predetermined position by contracting the frame main body portion downward, The hanging portion is A vertical support member extending in a substantially vertical direction; A two-dimensional support member having three or more fixing points that are on substantially the same plane extending in a two-dimensional direction but are not on the same straight line, and capable of fixing the member to be installed from above at the three or more fixing points; A two-axis rotation shaft mechanism including two rotation shafts extending in different directions that connect a lower end of the vertical support member and a central portion of the two-dimensional support member; and The member fixed to the two-dimensional support member from above can be rotated around at least one of the two rotation axes to adjust the inclination of the member relative to a horizontal plane; Furthermore, the hanging section is equipped with a diagonal telescopic jack provided between the vertical support member and the two-dimensional support member, and the member installation device is characterized in that the diagonal telescopic jack can adjust the inclination state of the member to be installed and fixed to the two-dimensional support member from above with respect to a horizontal plane.

2. An installation device for installing a component, comprising: a frame main body portion expandable and contractable in the vertical direction; a cantilever extension portion connected to the frame main body portion and extending from the frame main body portion as a cantilever; and a hanging portion configured to suspend and support the component to be installed at a predetermined length downward from the cantilever extension portion and configured to be movable along the longitudinal direction of the cantilever extension portion, wherein the component to be installed is installed at a predetermined position by contracting the frame main body portion downward, The hanging portion is A vertical support member extending in a substantially vertical direction; A two-dimensional support member having three or more fixing points that are on substantially the same plane extending in a two-dimensional direction but are not on the same straight line, and capable of fixing the member to be installed from above at the three or more fixing points; A two-axis rotation shaft mechanism including two rotation shafts extending in different directions that connect a lower end of the vertical support member and a central portion of the two-dimensional support member; and The member fixed to the two-dimensional support member from above can be rotated around at least one of the two rotation axes to adjust the inclination of the member relative to a horizontal plane; Furthermore, the hanging section is provided with a plurality of diagonal telescopic jacks provided between the vertical support member and the two-dimensional support member, the plurality of diagonal telescopic jacks extending and retracting in different directions, and the member fixed to the two-dimensional support member from above can be fixed in a tilted state relative to a horizontal plane by the plurality of diagonal telescopic jacks.

3. An installation device for installing a component, comprising: a frame main body portion expandable and contractable in the vertical direction; a cantilever extension portion connected to the frame main body portion and extending from the frame main body portion at a cantilever; and a hanging portion configured to suspend and support the component to be installed at a predetermined length downward from the cantilever extension portion and configured to be movable along the longitudinal direction of the cantilever extension portion, wherein the component to be installed is installed at a predetermined position by contracting the frame main body portion downward, The hanging portion is A vertical support member extending in a substantially vertical direction; A two-dimensional support member having three or more fixing points that are on substantially the same plane extending in a two-dimensional direction but are not on the same straight line, and capable of fixing the member to be installed from above at the three or more fixing points; A two-axis rotation shaft mechanism including two rotation shafts extending in different directions that connect a lower end of the vertical support member and a central portion of the two-dimensional support member; and The member fixed to the two-dimensional support member from above can be rotated around at least one of the two rotation axes to adjust the inclination of the member relative to a horizontal plane; The two rotation axes extending in different directions are substantially perpendicular to each other, Furthermore, the hanging section is provided with two diagonal telescopic jacks provided between the vertical support member and the two-dimensional support member, the two diagonal telescopic jacks telescopically extend in different directions, and when the telescopic directions of the two diagonal telescopic jacks are projected from above onto a horizontal plane, the telescopic direction of one of the two diagonal telescopic jacks is approximately perpendicular to one of the two rotating shafts, and the telescopic direction of the other of the two diagonal telescopic jacks is approximately perpendicular to the other of the two rotating shafts, and the two diagonal telescopic jacks allow the inclination of the member fixed from above to the two-dimensional support member with respect to the horizontal plane to be adjusted.

4. 4. The member installation device according to claim 1, wherein the frame body has at least four legs that are extendable and contractable in the vertical direction.

5. The component installation device described in claim 4, characterized in that the frame main body has at least four beam portions, each of which is connected to the upper part of each of the at least four legs so as to be approximately perpendicular to the leg, and each of the beam portions has a hinge mechanism at the end opposite the leg to which it is connected, and is rotatable about the hinge mechanism having a plane approximately perpendicular to the leg to which it is connected.

6. The component installation device described in claim 4, characterized in that the frame main body has at least four beam portions that can slide in a substantially horizontal direction substantially perpendicular to the cantilever extension portion, and each of the at least four beam portions has one leg portion connected to one end thereof so as to be substantially perpendicular to the beam portion.

7. A member installation method for installing a member using the member installation device according to any one of claims 1 to 3, comprising: a preparation step of preparing the component installation device at a predetermined location; a connecting step of contracting the member installation device prepared in the preparing step downward and connecting the member to be installed to the hanging portion of the member installation device; a raising process in which, after the member is connected to the hanging portion of the member installation device in the connecting process, the member installation device is extended to raise the member installation device in a state in which the hanging portion supports the member from above; a moving step of moving the hanging portion along the cantilever protruding portion toward a tip end side in a protruding direction of the cantilever protruding portion while the hanging portion supports the member from above; an inclination adjustment process in which, after the hanging portion moves to the tip side of the cantilever protruding portion in the protruding direction in the moving process, the inclination state of the member fixed to the two-dimensional support member from above is adjusted with respect to a horizontal plane by the oblique telescopic jack; an installation step of contracting the member installation device downward after the inclination state adjustment step, and installing the member supported by the hanging portion from above in a predetermined position; A component installation method comprising the steps of:

Citation Information

Patent Citations

  • - Crane which device

    JP1983137689U

  • Floor panel laying apparatus

    JP2004232426A

  • Mobile pre-cast floor slab erection machine

    JP2004300689A

  • Replacement method for concrete floor slab of overpass

    JP2016098489A

  • Floor slab replacement device and installation method for floor slab replacement device

    JP2018155017A