A method for repairing earthquake-resistant slits, and an earthquake-resistant slit structure repaired using this method

The method repairs and modifies existing earthquake-resistant slits by removing filling, waterproofing, and expanding their width and depth, addressing damage risks and enhancing seismic performance.

JP7580806B2Active Publication Date: 2024-11-12FUJIWARA BORING IND CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2022017563
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-02-07
Publication Date
2024-11-12
Estimated Expiration
2042-02-07

AI Technical Summary

Technical Problem

Existing earthquake-resistant slits in buildings are not effectively repaired or modified to enhance their seismic strength, and there is a risk of damage during renovation due to deterioration or cracks.

Method used

A method for repairing existing earthquake-resistant slits by removing filling, waterproofing, and expanding the width and depth of the slits, with optional crack repair and using specific cutting tools to ensure structural separation during earthquakes.

Benefits of technology

The method enhances the seismic resistance of existing slits by preventing water ingress and structural damage, ensuring reliable separation of structural members, and improving the overall seismic performance of buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007580806000001
    Figure 0007580806000001
  • Figure 0007580806000002
    Figure 0007580806000002
  • Figure 0007580806000003
    Figure 0007580806000003
Patent Text Reader

Abstract

To provide a method for retrofitting earthquake-resistant slits, especially for changing width and depth of the earthquake resistance slits that have already been installed in buildings and structures, and to provide buildings in which earthquake resistant slits have been retrofitted using the method.SOLUTION: There is provided a method for retrofitting an existing earthquake-resistant slit in a wall of a building or structure. The existing earthquake-resistant slit is formed in a form of a groove, and the method for retrofitting the existing earthquake-resistant slit comprises: a filling removal process for removing filling material in the groove; a waterproofing process for applying waterproof in the existing earthquake-resistant slit from which the filling material is removed; and a cutting process for cutting the existing earthquake-resistant slit by expanding its width after the waterproofing process.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for renovating earthquake-resistant slits, an earthquake-resistant slit structure renovated using said method, and a building whose earthquake-resistant slits have been renovated using said method, and in particular to a method for renovating earthquake-resistant slits that improves the earthquake resistance of existing earthquake-resistant slits by widening their width, an earthquake-resistant slit structure renovated using said method, and a building whose earthquake-resistant slits have been renovated using said method. [Background technology]

[0002] New earthquake resistance standards were established with the revision of the Building Standards Act in 1981, and all reinforced concrete buildings for which construction applications were submitted after this date are equipped with earthquake-resistant slits. By providing such earthquake-resistant slits, it is possible to release the restraint of columns from vertical walls and waist walls, thereby increasing the toughness of the columns themselves and increasing earthquake resistance. Such earthquake-resistant slits can be constructed by providing earthquake-resistant slit material, or, for existing buildings, they can be formed by drilling slits using tools such as grinders and core drills.

[0003] Conventionally, the drilling of such slits has been proposed in Patent Document 1 (JP Patent Publication 2002-36232 A). This document proposes a technique for easily forming groove- or through-hole-shaped slits for earthquake-proof reinforcement by machining alone, and proposes a cutting method using a cutting device equipped with a cutting machine body to which a rod-shaped cutting tool is attached, a position movement mechanism for moving the cutting machine body in a plane substantially parallel to the cutting surface, and a feed mechanism for moving the cutting machine body toward and away from the cutting surface, and driving at least one of the mechanisms to cut a through hole or recess of a predetermined shape on the cutting surface.

[0004] Also, Patent Document 2 (JP 2019-11596 A) proposes a method for forming a slit that reduces the work of removing burrs that occur when forming a slit in a concrete structure using a core drill and removing rebar exposed in the formed slit. Specifically, the method for forming a rectangular slit in a wall body includes the steps of making a cut having the depth of the slit to be formed on both long side positions of the slit to be formed in the wall body, drilling holes between the cuts with the depth of the slit and connecting the cuts with the holes at a predetermined interval, and removing the wall body left at a predetermined interval between the cuts. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2002-36232 A [Patent Document 2] JP 2019-11596 A Summary of the Invention [Problem to be solved by the invention]

[0006] As mentioned above, techniques for providing earthquake-resistant slits in concrete structures have been proposed in the past. However, these techniques were for providing new earthquake-resistant slits in walls, and were not for renovating existing earthquake-resistant slits. On the other hand, in order to further improve the earthquake resistance of existing earthquake-resistant slits, it may be desirable to renovate the width and depth of the earthquake-resistant slits depending on the structure of the building and the material of the walls.

[0007] Therefore, the present invention provides a method for renovating earthquake-resistant slits that have already been constructed, particularly for changing the width or depth of such slits, and also provides a building in which earthquake-resistant slits have been renovated using this method.

[0008] Furthermore, when repairing existing earthquake-resistant slits in a building, the strength of the wall where the earthquake-resistant slits are installed may be weakened. If the wall has deteriorated over time, there is a risk that the bottom of the earthquake-resistant slits may collapse due to the repair work. Furthermore, it cannot be denied that there is a possibility that cracks have appeared in the existing earthquake-resistant slits due to the impact of earthquakes that occurred after construction.

[0009] Therefore, the present invention provides a method for repairing earthquake-resistant slits, which can prevent damage to the wall and repair cracks while also repairing the wall, even if the wall already has earthquake-resistant slits, and also provides a building whose earthquake-resistant slits have been repaired using this method. [Means for solving the problem]

[0010] In order to solve at least one of the above problems, the present invention provides a renovation method for existing earthquake-resistant slits and an earthquake-resistant slit structure.

[0011] That is, the present invention is a method for repairing existing earthquake-resistant slits provided in a wall of a building or structure, the existing earthquake-resistant slits being formed in a groove shape, and the method includes a filler removal process for removing the filler filled in the groove, and a waterproofing process for the existing earthquake-resistant slits from which the filler has been removed. and a cutting step of expanding and cutting the width of the existing earthquake-resistant slit after the waterproofing step. The existing earthquake-resistant slit is a slit provided to improve the earthquake resistance of a building or structure, and can be a slit extending in the vertical direction as well as a slit extending in the horizontal direction.

[0012] The waterproofing process can be carried out by waterproofing the bottom of the existing earthquake-resistant slit that exists in a groove shape and the upper and lower ends of the existing earthquake-resistant slit. If necessary, the side of the existing earthquake-resistant slit that is formed in a concave shape can also be waterproofed. In addition, in relation to this waterproofing process, if the existing earthquake-resistant slit has damage such as cracks, the damage can also be repaired.

[0013] In addition, the earthquake-resistant slit repair method according to the present invention may include a remaining wall thickness measurement step of measuring the wall thickness at the bottom of the existing earthquake-resistant slit after the filling material removal step and before the waterproofing step. The wall thickness at the bottom is the remaining wall thickness of the existing earthquake-resistant slit. In addition, if the existing earthquake-resistant slit is deteriorated, its strength can be confirmed.

[0014] In addition, the cutting step can set the cutting range based on the existing earthquake-resistant slits. That is, the cutting range can be expanded in the width direction with the existing earthquake-resistant slits as the center, or the cutting range can be expanded in the width direction with the left and right edges of the existing earthquake-resistant slits as the center.

[0015] In order to solve at least one of the above problems, the present invention provides an earthquake-resistant slit structure capable of improving earthquake resistance. That is, the present invention provides an earthquake-resistant slit structure provided in a wall of a building or structure, the earthquake-resistant slit structure being formed in the wall as a groove-like slit, and the bottom surface of the groove-like slit being provided with a groove portion extending in the length direction of the slit. The present invention also provides a building or structure equipped with the earthquake-resistant slit structure. Effect of the Invention

[0016] In the earthquake-resistant slit repair method of the present invention, a cutting step is carried out after the waterproofing step to expand and cut the width of the existing earthquake-resistant slit. Therefore, it is possible to provide a method for repairing earthquake-resistant slits that can be used to change the width or depth of earthquake-resistant slits that have already been installed, and it is also possible to provide a building with earthquake-resistant slits repaired by this method.

[0017] In particular, by carrying out a waterproofing process in which waterproofing is applied to the existing earthquake-resistant slits from which the filler has been removed, it is possible to prevent water from entering the room when the cutting process is carried out. Furthermore, even if cracks or the like are present in the existing earthquake-resistant slits, carrying out the waterproofing process makes it possible to prevent water from entering the room or the wall through the cracks.

[0018] In addition, in the earthquake-resistant slit repair method of the present invention, if a remaining wall thickness measurement step is included in which the wall thickness of the bottom of the existing earthquake-resistant slit is measured after the filling material removal step and before the waterproofing step, the remaining wall thickness of the existing earthquake-resistant slit can be accurately grasped. As a result, it is possible to provide a method for repairing earthquake-resistant slits that can repair a wall that already has earthquake-resistant slits while preventing the wall from being damaged, and a building whose earthquake-resistant slits have been repaired using this method. [Brief description of the drawings]

[0019] [Figure 1] A schematic diagram showing an existing earthquake-resistant slit to be repaired in this embodiment. [Diagram 2] 1A is a perspective view showing a state where an earthquake-resistant slit has been repaired in this embodiment; FIG. 1B is a perspective view showing the earthquake-resistant slit after repair; [Diagram 3] A flow diagram showing the work process and its outline for the repair work of the earthquake-resistant slit in this embodiment. [Figure 4] A flow chart showing the work process and its outline for the repair work of earthquake-resistant slits in another embodiment [Diagram 5]A front view showing the cutting process in progress [Figure 6] FIG. 13 is a perspective view showing the shape of a groove formed by a cutting process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] Hereinafter, a method for repairing an existing earthquake-resistant slit 50 according to this embodiment and a repaired earthquake-resistant slit structure will be specifically described with reference to the drawings. In particular, in this embodiment, a method for repairing an earthquake-resistant slit in a building or the like will be specifically described, but the method can also be implemented as a method for repairing an earthquake-resistant slit installed in a structure. In addition, the following description will be mainly given using an example of a slit extending in the vertical direction (vertical direction), but it is also possible to implement the method with a slit extending in the horizontal direction (lateral direction).

[0021] Fig. 1 is a schematic diagram showing an existing earthquake-resistant slit 50 to be retrofitted in this embodiment. The earthquake-resistant slit 50 is provided to prevent shear failure of the main structural members by separating the main structural members such as columns from miscellaneous walls such as sleeve walls, hanging walls, and spandrel walls. Therefore, as shown in Fig. 1, it can be provided in the sleeve walls and spandrel walls as well as in the hanging walls. The earthquake-resistant slit 50 can be formed as a groove extending in the vertical direction, or it can be formed as a groove extending in the horizontal direction.

[0022] The earthquake-resistant slit renovation method according to this embodiment can be carried out to widen or deepen existing earthquake-resistant slits 50, and can also be carried out to change the groove shape or extension direction of existing earthquake-resistant slits 50.

[0023] In many cases, the existing earthquake-resistant slits 50 to be repaired are formed with a groove width of 3 cm to 4 cm constituting the earthquake-resistant slits 50, and the groove depth is formed so that the wall thickness remaining after the groove is cut (i.e., the "remaining wall thickness") is 3 cm. Naturally, the groove width and depth constituting the earthquake-resistant slits 50 are expected to differ depending on the structure and use of the building or structure being repaired, but the repair method according to the present embodiment can be carried out to repair the earthquake-resistant slits to at least improve their earthquake resistance.

[0024] FIG. 2 is a perspective view showing the state of repairing the earthquake-resistant slit in this embodiment, showing (A) the existing earthquake-resistant slit to be repaired, and (B) the earthquake-resistant slit 10 after repair. The embodiment shown in FIG. 2 shows a repaired state in which the width of the existing earthquake-resistant slit 50 is expanded. That is, in the existing earthquake-resistant slit 50, the earthquake-resistant slit 50 adheres to the building when the building shakes, and as a result, it is considered that the deformation of the main structural members such as columns is restricted. Therefore, by expanding the groove width of the existing earthquake-resistant slit 50, even in the case of a large amplitude shake or when the main structural members such as columns are long, the structural members and the miscellaneous wall can be separated reliably. The groove width of the earthquake-resistant slit 10 after the repair can be expanded to, for example, 35 mm or more and 80 mm or less, preferably 40 mm or more and 55 mm or less, depending on the structure and materials of the building and the construction site. In particular, if reinforcing bars, pipes, etc. are present near the existing earthquake-resistant slit 50, the slit can be extended in a direction that avoids those areas, and does not necessarily have to be extended as a groove extending in a straight line.

[0025] In the embodiment shown in Fig. 2, the depth of the earthquake-resistant slit is not particularly modified, but the depth of the groove can be modified as necessary. That is, if the remaining wall thickness of the existing slit 50 is thick, it may be difficult to separate the main structural member from the miscellaneous wall when shaking occurs. Therefore, the remaining wall thickness at the bottom of the earthquake-resistant slit 50 can be reduced to ensure the separation. For this reason, it is desirable to measure the remaining wall thickness of the existing slit 50 when carrying out the renovation work for the earthquake-resistant slit.

[0026] FIG. 3 is a flow diagram showing the work process and the outline of the earthquake-resistant slit repair work in this embodiment. When carrying out the repair work in this embodiment, the existing seal 51 applied to the existing earthquake-resistant slit 50 to be repaired is removed, and the filler 52 filled in the groove of the earthquake-resistant slit is removed. Such filler 52 includes a slit material made of foamed resin filled in the groove of the earthquake-resistant slit, a waterproof material such as a butyl rubber sheet with nonwoven fabric, or a fireproof material made of a rock wool board wrapped in a polyethylene film, and in the filler removal process, the material filled in the earthquake-resistant slit is removed. As a result, the inside of the groove of the earthquake-resistant slit 50 is exposed, and the current situation, such as whether or not a crack has occurred in the groove, can be confirmed.

[0027] Since the bottom of the existing earthquake-resistant slit 50 is exposed, it is also possible to measure the remaining wall thickness at the bottom of the groove. The remaining wall thickness of the existing structure can be measured by taking a test piece 53 as shown in the figure, or by non-destructive testing, and if the condition allows it, the remaining wall thickness can be measured by actual measurement. However, the measurement of the remaining wall thickness can be omitted if the remaining wall thickness is clear from existing construction documents.

[0028] If the remaining wall thickness of the existing structure is found to be 3 cm or more based on the results of measuring the remaining wall thickness, it is desirable to also cut the groove bottom in order to improve earthquake resistance. That is, in the renovation method according to this embodiment, the remaining wall thickness at the bottom of the existing earthquake-resistant slit 50 is measured, so that renovation work to improve earthquake resistance can be realized.

[0029] Furthermore, even if test pieces are taken to measure the remaining wall thickness or holes are drilled at the bottom of the groove, a waterproofing process is carried out afterwards, so even if a cutting process is carried out for renovation, it is possible to prevent the water used during cutting from entering the inside of the room.

[0030] The waterproofing process is performed at least on the bottom of the earthquake-resistant slit, and preferably on the upper and lower ends of the earthquake-resistant slit. Furthermore, the waterproofing process can be performed on the side of the existing slit that is recessed in a groove shape. The waterproofing process can be performed by applying various waterproofing materials, as well as by applying a waterproofing agent 12 such as a sealant. If there is a crack 54 in the groove of the earthquake-resistant slit exposed in the filling material removal process, or if the bottom of the groove is damaged due to aging, a bottoming seal or a urethane waterproofing agent 12 is applied as necessary, as shown in Figure 3 as a "crack repair process." If the bottom of the existing slit is damaged, it is also desirable to install a backup material made of polyethylene foam or the like. If the damage to the bottom of the groove is large, the existing earthquake-resistant slit 50 can be broken down to a size where the backup material can be inserted, and a bottoming seal can be installed or urethane waterproofing can be applied.

[0031] Then, after the waterproofing process and, if necessary, the crack repair process are performed on the existing earthquake-resistant slits 50, a cutting process is performed to expand the existing earthquake-resistant slits 50. This cutting process can be performed using an existing cutting tool 20. In particular, in this embodiment, the cutting process can be performed using a rotating tool 21 that can move along a rail installed on the wall surface of the existing structure, and a cutting bit 22 provided at the tip of the rotating tool. By using this cutting tool 20, the cutting tool 20 can be moved accurately in the direction in which the rail is laid. If the cutting bit 22 provided on the cutting tool 20 can be freely advanced and retreated within the groove and fixed at any position, the depth of the groove to be cut can be accurately determined.

[0032] In particular, in this embodiment, a double-sided cutting process can be performed in which both side wall surfaces are cut to align with the center of the existing slit 50, or a single-sided cutting process can be selected in which only one side wall surface of the existing slit is cut.

[0033] That is, in the both-side cutting process, by aligning the center of rotation of the cutting bit 22 with the widthwise center of the existing slit 50 and moving it, both opposing wall surfaces of the existing slit 50 can be cut simultaneously, and the slit width can be expanded. At this time, if the groove width of the existing slit 50 is 30 mm, it is necessary to use a cutting bit 22 with a diameter of at least 35 mm or more, and preferably a cutting bit 22 with a diameter of 40 mm or 50 mm is used. When the both-side cutting process is performed in this manner, both side surfaces of the existing slit 50 are cut, so that deteriorated parts of the side walls can also be cut away.

[0034] Then, at the stage where the double-sided cutting process is completed, a bottom surface with a concave stripe can be formed, where the bottom surface portion of the existing slit 50 is recessed. Due to the presence of such a concave stripe, when shaking occurs due to an earthquake or the like, stress can be concentrated on the concave stripe portion, which is inevitably weaker in strength, due to the difference in strength between the concave stripe and the groove bottom cut in the repair work, and the collapse can be ensured. Therefore, when shaking occurs due to an earthquake or the like, the groove bottom can be reliably collapsed, and the main structural members such as columns can be reliably separated from miscellaneous walls such as sleeve walls, hanging walls, and waist walls. This can significantly improve the earthquake resistance of buildings and structures that have been repaired.

[0035] After the both-side cutting process has been completed as described above, the groove of the earthquake-resistant slit 10 is subjected to a waterproofing process as necessary, and a filling and finishing process is carried out by filling the groove with a filler 11 such as a back-up material. In particular, since the both-side cutting process cuts and removes both sides of the wall surface of the existing slit 50, the filler 11 such as a waterproof material or back-up material can be installed on the newly emerged wall surface, and the retention of these materials can be increased. In addition, since the groove bottom of the earthquake-resistant slit 10 after the both-side cutting process has an uneven portion that extends in the length direction of the groove and has a step in the width direction, it is possible to prevent the back-up material or other filler 11 from shifting.

[0036] On the other hand, in the one-side cutting process, only one wall surface in the width direction of the existing slit 50 is cut. For this reason, the center of rotation of the cutting bit 22 is moved to a position eccentric from the center in the width direction of the existing slit 50 to perform the cutting process. At this time, when a cutting bit 22 having an outer diameter larger than the width of the existing slit 50 is used, the cutting bit 22 can be moved so as to follow one of the wall surfaces of the existing slit 50, and as a result, the wall surfaces on both sides of the existing slit 50 can also be cut.

[0037] Furthermore, when carrying out this one-side cutting process, it is also possible to use a cutting bit 22 having an outer diameter equal to or smaller than the groove width of the existing slit 50. Specifically, if the groove width of the existing slit 50 is 30 mm, the groove width of the existing slit 50 can be expanded using a cutting bit 22 having an outer diameter of 30 mm or less. Also, since only one side of the wall surface of the existing slit 50 is cut, the resistance to the cutting bit 22 can be significantly reduced, and the work efficiency can be improved.

[0038] As described above, when the cutting process of one side of the wall surface is completed, a stepped bottom surface can be formed, which is one step lower than the bottom surface portion of the existing slit 50. Even in this case, the stepped bottom surface has different strength due to the difference in remaining wall thickness, and stress during shaking is concentrated on the bottom of the existing slit 50, which is one step lower, and the collapse of the groove bottom of the earthquake-resistant slit 10 can be ensured. After the one-side cutting process is completed, the inside of the earthquake-resistant slit 10 is waterproofed as necessary, and a filling finish process is carried out by filling the groove with a back-up material or other filler 11, as described above. In particular, a step is generated in the width direction of the groove at the bottom of the earthquake-resistant slit 10 after the one-side cutting process has been performed, and this step extends in the length direction of the groove, preventing the back-up material or other filler 11 from shifting.

[0039] FIG. 4 is a flow diagram showing the work process and the outline of the repair work of the earthquake-resistant slit 50 in another embodiment. In the embodiment shown in this figure, the cutting process is particularly performed in two stages. That is, the cutting process is performed in a first cutting process and a second cutting process, in which one side of the wall surface of the existing earthquake-resistant slit 50 is cut in the first cutting process, and the other wall surface is cut in the second cutting process. In addition, in these first cutting process and second cutting process, the groove bottom of the existing earthquake-resistant slit 50 is also cut, and as a result, the bottom of the existing earthquake-resistant slit 50 protrudes from the center of the groove bottom of the earthquake-resistant slit 10 after repair, and exists as a convex strip. Due to the presence of such a convex strip, when shaking due to an earthquake or the like, due to the difference in strength between the convex strip and the groove bottom cut in the repair work, stress is inevitably concentrated on the groove bottom cut in the repair work, which has a weak strength, and the collapse can be ensured. In addition, due to the presence of the convex strip, when the groove bottom of the earthquake-resistant slit 10 collapses, the entire groove bottom can be collapsed in a unified state. Therefore, when shaking occurs due to an earthquake, the bottom of the groove can be collapsed reliably, and the main structural members such as columns can be securely separated from the non-structural walls such as sleeve walls, hanging walls, and spandrel walls. This can significantly improve the earthquake resistance of buildings and structures that have undergone the repair work.

[0040] Depending on the structure of the building or structure on which the repair work is to be carried out, the formation state of the earthquake-resistant slits, or the material, the bottom of the earthquake-resistant slit 10 after construction can be recessed. In this case, the bottom of the existing earthquake-resistant slit 50 is located at the deepest position, and the depth of the groove constructed in the excavation process can be set to a depth that does not reach the bottom of the existing earthquake-resistant slit 50. As a result, the remaining wall thickness becomes the thinnest at the bottom of the existing earthquake-resistant slit 50, and this portion can collapse preferentially.

[0041] After the cutting process has been completed as described above, the inside of the earthquake-resistant slit 10 is waterproofed as necessary, and a filling and finishing process is carried out by filling the groove with a filler 11 such as a back-up material. In this filling and finishing process, since the bottom of the earthquake-resistant slit 10 formed in the cutting process has uneven parts and stepped parts that extend in the length direction of the groove and have steps in the width direction, it is possible to prevent the filler 11 such as the back-up material from shifting.

[0042] The earthquake-resistant slit 10 constructed by the above process has an expanded groove width, so that when shaking occurs during an earthquake or the like, a wide space can be secured between the main structural members such as columns and miscellaneous walls such as sleeve walls, hanging walls, and waist walls, and the degree of freedom of deformation of the structural members can be increased, so that the shear stress can be significantly improved and the earthquake resistance performance can be improved. Furthermore, if the groove is constructed deep, the remaining wall thickness will be thin, and if an uneven portion or a stepped portion is formed at the bottom of the groove, the stress can be concentrated and the earthquake-resistant slit 10 can be collapsed more reliably. As a result, the structure of the earthquake-resistant slit 10 formed by implementing the repair method for the existing earthquake-resistant slit 50 can significantly improve the earthquake resistance performance of the building or structure in which it is installed.

[0043] FIG. 5 is a front view showing the cutting process. In particular, FIG. 5(A) shows an example of moving the cutting bit 22 along the widthwise center of the existing slit 50, so that the wall surfaces on both the left and right sides of the existing slit 50 can be cut. Also, FIG. 5(B) shows an example of moving the cutting bit 22 along the wall surface on one side of the widthwise direction of the existing slit 50, so that the other wall surface can be cut. In particular, when reinforcing bars or wiring are present near the existing slit 50, the direction of expanding the groove width can be adjusted to avoid the equipment. And FIG. 5(C) shows a state in which a wall surface on one side is cut, similar to FIG. 5(B), but a cutting bit 22 with a small diameter is used. As shown in this figure, even a cutting bit 22 with a width smaller than the existing slit's groove width can be used when repairing an existing slit.

[0044] As described above, in the cutting process, the existing earthquake-resistant slit 50 or the workpiece is used as a reference, and one of the wall surfaces in the width direction is cut. At that time, it is desirable to supply water to the cutting part by the cutting bit 22 for cooling or to prevent the emission of dust. As a result, the slag water generated during the cutting passes through the existing earthquake-resistant slit (the existing earthquake-resistant slit 50) and flows down below. Therefore, it is desirable to discharge the slag water at least below the existing earthquake-resistant slit 50. It is also possible to cut without supplying water to the cutting bit 22. At that time, since the cut debris falls below the existing earthquake-resistant slit 50, it is desirable to remove the debris at that part.

[0045] FIG. 6 is a perspective view showing the shape of the groove formed by the cutting process. FIG. 6(A) is an earthquake-resistant slit 10 formed as a result of performing the double-sided cutting process in FIG. 3, FIG. 6(B) is an earthquake-resistant slit 10 formed as a result of performing the single-sided cutting process in FIG. 3, and FIG. 6(C) is an earthquake-resistant slit 10 formed as a result of performing the two-stage cutting process in FIG. 4. In all of these embodiments, the depth varies in the width direction of the bottom of the groove, and a step 15, a concave stripe 16, or a convex stripe 17 is formed, which extends in the length direction of the slit. By forming such a step or unevenness on the bottom surface of the earthquake-resistant slit 10, a difference in strength is generated in the width direction of the remaining wall, and the collapse of the bottom of the hole can be reliably performed due to the concentration of stress. [Industrial Applicability]

[0046] The earthquake-resistant slit renovation method of the present invention can be used to renovate existing earthquake-resistant slits installed in buildings and structures, and the earthquake-resistant slit structure renovated using this method can be used as an earthquake-resistant slit to improve the earthquake resistance of buildings and structures. [Explanation of symbols]

[0047] 10 Earthquake-resistant slits 11 Filling material 20 cutting tools 21 Rotary tools 22 Cutting Bit 50 Existing earthquake-resistant slits 51 Existing seal 52 Filler 53 Test Piece 54 Crack

Claims

1. A method for repairing existing earthquake-resistant slits provided in a wall of a building or structure, comprising the steps of: The existing earthquake-resistant slit is formed in a groove shape, and a filler removal process is performed to remove the filler filled in the groove; A waterproofing process in which waterproofing is applied to the existing earthquake-resistant slits from which the filling material has been removed; This is a method for repairing existing earthquake-resistant slits, which comprises a cutting process, which is carried out after a waterproofing process, to expand the width of the existing earthquake-resistant slits and cut them.

2. A remaining wall thickness measuring step is included, which measures the wall thickness of the bottom of the existing earthquake-resistant slit after the filling material removing step and before the waterproofing step; 2. The method for repairing an existing earthquake-resistant slit as described in claim 1, wherein the waterproofing is performed on the bottom of the existing earthquake-resistant slit that exists in a groove shape and on the upper and lower ends of the existing earthquake-resistant slit.

3. 3. The method for repairing an existing earthquake-resistant slit according to claim 1 or 2, wherein the cutting step sets a cutting range based on the existing earthquake-resistant slit.

Citation Information

Patent Citations

  • Multi-shaft core drill

    JP2000202827A

  • Cutting device and cutting method using this device

    JP2002036232A

  • Earthquake strengthening structure and earthquake strengthening method

    JP2012046924A

  • Slit forming method