The conveyor belt system inverts fibers in multiple stages to uniformly impregnate sol, addressing uneven impregnation and dust issues in aerogel blanket manufacturing, enhancing product uniformity and water repellency.
Patent Information
- Application Number
- JP2023560165
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2021-05-31
- Filing Date
- 2022-05-26
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-05-26
AI Technical Summary
Existing methods for manufacturing aerogel blankets result in uneven impregnation of fibers with sol, leading to differences in sol amount on upper and lower surfaces, decreased surface water repellency, and increased dust generation due to heavy additives sinking during gelation.
A conveyor belt system is used to move fibers in multiple stages while inverting them before the sol loses fluidity, ensuring uniform impregnation and reducing dust generation by guiding separated sol back onto the fibers.
The solution achieves uniform sol impregnation, reduces dust generation by 80%, lowers surface moisture impregnation rate to 50% or less, and improves water repellency, maintaining surface moisture resistance.
Smart Images

Figure 0007580854000002 
Figure 0007580854000003 
Figure 0007580854000004
Abstract
Description
[Technical field]
[0001] This application claims the benefit of priority based on Korean Patent Application No. 10-2021-0070447 filed on May 31, 2021, the entire contents of which are incorporated herein by reference.
[0002] The present invention relates to an apparatus and method for manufacturing an aerogel blanket. [Background technology]
[0003] Aerogel is a highly porous material composed of nanoparticles, and has a high porosity, specific surface area, and low thermal conductivity, and is attracting attention as a highly efficient heat insulating material, soundproofing material, etc. Since aerogel has very low mechanical strength due to its porous structure, aerogel composites have been developed in which aerogel is impregnated and bonded to a fibrous blanket such as inorganic fiber or organic fiber, which is an existing heat insulating fiber. As an example, a silica aerogel-containing blanket using silica aerogel is manufactured through a silica sol manufacturing process, a gelation process, an aging process, a surface modification process, and a drying process.
[0004] When the fibers are immersed in a sol liquid containing silica and moved, the low viscosity sol sinks under the fibers before the fibers become gelled.
[0005] This causes a difference in the amount of sol impregnated between the upper and lower surfaces of the fiber, resulting in the formation of an uneven cross section, and the upper surface of the fiber is exposed, resulting in a decrease in surface water repellency.
[0006] In particular, heavy additives sink to the bottom of the sol during gelation and form a layer, which can cause serious dust generation problems. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] Korean Patent Publication No. 10-2011-0125773 Summary of the Invention [Problem to be solved by the invention]
[0008] One aspect of the present invention is to provide an apparatus and method for manufacturing an aerogel blanket that allows the fibers to be uniformly impregnated with a sol. [Means for solving the problem]
[0009] An apparatus for manufacturing an aerogel blanket according to an embodiment of the present invention includes a supply unit for supplying fibers containing a sol, and a conveyor belt for moving the fibers supplied from the supply unit, the conveyor belt being provided in multiple stages and moving the fibers while inverting them, and the conveyor belt may start inverting the fibers before the fluidity of the sol is completely lost.
[0010] Meanwhile, a method for manufacturing an aerogel blanket according to an embodiment of the present invention includes a supplying step of supplying fibers containing a sol, and a moving step of moving the fibers supplied by the supplying step via a conveyor belt, in which the conveyor belt is provided in multiple stages and moves the fibers while flipping them, and the start point of flipping the fibers in the moving step may be before the fluidity of the sol is completely lost. Effect of the Invention
[0011] According to the present invention, the conveyor belt for moving the fibers is arranged in multiple stages, so that the fibers can be moved while rotating in a reverse direction, and the sol can be uniformly impregnated into the fibers.
[0012] In addition, the conveyor belts that move the fibers can be arranged in multiple stages in the vertical direction to reduce the horizontal space occupied by the conveyor belts. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is a front view illustrating an example of an apparatus for manufacturing an aerogel blanket according to one embodiment of the present invention. [Diagram 2] FIG. 2 is an enlarged front view showing a portion where a guide unit is installed in the aerogel blanket manufacturing apparatus according to one embodiment of the present invention. [Diagram 3] FIG. 13 is a front view illustrating an example of an apparatus for manufacturing an aerogel blanket according to another embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] The object, particular advantages and novel features of the present invention will become more apparent from the following detailed description and preferred embodiments in conjunction with the accompanying drawings. In this specification, when referring to components in each drawing, it should be noted that the same components are numbered as much as possible even if they are displayed on different drawings. In addition, the present invention can be realized in various different forms and is not limited to the embodiments described herein. In addition, in describing the present invention, detailed descriptions of related known technologies that may obscure the gist of the present invention will be omitted.
[0015] An apparatus for manufacturing an aerogel blanket according to one embodiment FIG. 1 is a front view illustrating an example of an apparatus for manufacturing an aerogel blanket according to one embodiment of the present invention.
[0016] 1, an apparatus 100 for manufacturing an aerogel blanket according to an embodiment of the present invention includes a supply unit S for supplying fibers 10 containing a sol, and a conveyor belt 130 for moving the fibers 10 supplied from the supply unit S. The conveyor belt 130 is provided in multiple stages and moves the fibers 10 while rotating them. In addition, the apparatus 100 for manufacturing an aerogel blanket according to an embodiment of the present invention may further include guide units 141, 142, 143, and 144, a heater unit 150, and a heat-insulating cover unit 160.
[0017] More specifically, the supply unit S can supply fibers containing a sol. Here, the supply unit S can supply the fibers 10 impregnated with the sol to the conveyor belt 130 in a movable manner.
[0018] The supply section S may include a pair of moving rollers 110 that intermesh with and move the fibers 10, and an impregnation section 120 that causes the fibers 10 to be impregnated with the sol.
[0019] The pair of moving rollers 110 can include a first roller 111 and a second roller 112. Here, the pair of moving rollers 110 rotate in opposite directions to each other, and can move the fiber 10 while passing it between the opposing rollers. That is, the supply step can move the fiber 10 while passing it between the first roller 111 and the second roller 112.
[0020] The impregnation unit 120 may inject a sol onto the fibers 10 to impregnate the fibers 10 with the sol. Here, the impregnation unit 120 is located above the pair of moving rollers 110 and may inject the sol onto the top of the fibers 10 injected between the pair of moving rollers 110 so that the sol flows down to the space between the pair of moving rollers 110.
[0021] However, the impregnation unit 120 of the aerogel blanket manufacturing apparatus 100 according to one embodiment of the present invention is not necessarily limited to spraying the sol to impregnate the fibers 10 with the sol, and various impregnation means can be used, for example, the fibers 10 can be impregnated with the sol while passing the fibers 10 through an impregnation container containing the sol.
[0022] The sol may be composed of a precursor solution containing, for example, silica sol and an additive.
[0023] Silica sol can be produced, for example, by mixing TEOS (tetraethyl orthosilicate), ethanol, H2O, and hydrogen chloride (HCL).
[0024] Additives can include, for example, flame retardants and opacifiers.
[0025] Alternatively, the sol may further include a base catalyst that induces gelation of the sol impregnated in the fibers.
[0026] Here, the gel time can be adjusted to a predetermined time by using a base catalyst.
[0027] Here, the base catalyst may be, for example, NaOH (sodium hydroxide), but the type of base catalyst used in the aerogel blanket manufacturing apparatus 100 according to one embodiment of the present invention is not necessarily limited to NaOH.
[0028] The base catalyst can be used so that the pH of the sol becomes 6-8, for example.
[0029] FIG. 2 is an enlarged front view showing a portion where a guide unit is provided in the aerogel blanket manufacturing apparatus according to one embodiment of the present invention.
[0030] 1 and 2, the conveyor belt 130 is provided in multiple stages and can move the fibers 10 supplied from the supply section S while reversing the movement.
[0031] Here, the conveyor belt 130 can start to reverse the fibers 10 before the fluidity of the sol is completely lost.
[0032] The start time when the conveyor belt 130 reverses the fibers 10 may be, for example, 1 minute before the fluidity of the sol is completely lost. Here, the point when the fluidity of the sol is completely lost may be the point when gelation of the liquid sol is completed. Here, the start time when the conveyor belt 130 reverses the fibers 10 may be, for example, before 9 minutes have elapsed after the fibers 10 are immersed in the sol.
[0033] Meanwhile, in the conveyor belt 130 configured in multiple stages, each conveyor belt 130 may include a plurality of rollers 131a, 131b, 132b, and a belt attached to the plurality of rollers 131a, 131b, 132b.
[0034] Moreover, the conveyor belts 130 provided in multiple stages can each be arranged horizontally.
[0035] The conveyor belt 130 may be arranged in two to five stages in the vertical direction. Here, the conveyor belt 130 may be arranged in two or more stages in the vertical direction to turn over the fibers 10, and may be arranged in five or less stages to prevent the device from becoming unnecessarily complicated and to prevent excessive space from being occupied, thereby reducing space efficiency.
[0036] Meanwhile, when the conveyor belt 130 is provided in two stages, it may include a first conveyor belt 131 and a second conveyor belt 132, for example.
[0037] In addition, as another example, when the conveyor belt 130 is provided in five stages, it may include a first conveyor belt 131, a second conveyor belt 132, a third conveyor belt 133, a fourth conveyor belt 134, and a fifth conveyor belt 135.
[0038] The guide units 141, 142, 143, and 144 are located at a predetermined distance from the lower corners of the conveyor belt 130 to guide the movement of the fibers 10. Here, the guide units 141, 142, 143, and 144 can reabsorb the sol that falls downward from the fibers 10 rotating at the end of the conveyor belt 130 into the fibers 10. That is, for example, in the multi-stage conveyor belts 130, the sol that falls downward when the fibers 10 rotate while passing through the end of the first conveyor belt 131 located at the upper stage can be directed by the guide units 141, 142, 143, and 144 to the upper part of the second conveyor belt 132 located at the lower end, and can be reabsorbed by the part of the fibers 10 passing through the second conveyor belt 132.
[0039] In addition, the guide parts 141 , 142 , 143 , and 144 are formed in a shape corresponding to the conveyor belt 130 and can contact the lower surface of the fiber 10 .
[0040] The guide portions 141, 142, 143, and 144 include a contact portion 141a that contacts the fibers 10 and a support portion 141b that supports the contact portion 141a, and the contact portion 141a may be formed in a round shape. Here, the lower portion of the contact portion 141a may be provided toward the upper portion of the conveyor belt 130 located at the lower end.
[0041] The heater unit 150 is located on the conveyor belt 130 and can apply heat to the fibers 10. This can promote gelation of the sol impregnated in the fibers 10.
[0042] The heat-retaining cover unit 160 can house the conveyor belt 130 and can keep the fibers 10 moving via the conveyor belt 130 warm. This can prevent loss of heat applied to the fibers 10 via the heater unit 150 and allow the heat to be transferred to the fibers 10 uniformly.
[0043] Meanwhile, the sol impregnated in the fiber 10 can gel over time while passing through the conveyor belt 130. Next, the fiber 10 in which the gelation of the sol is complete can pass through the conveyor belt 130 and be wound up on a take-up roll.
[0044] The aerogel blanket manufacturing apparatus 100 according to an embodiment of the present invention configured as described above has a conveyor belt 130 for moving the fibers 10 arranged in multiple stages, and the fibers 10 can be moved while being turned over, so that the sol can be uniformly impregnated into both sides of the fibers 10, thereby increasing the uniformity of the product. In addition, dust generation can be reduced by about 80%, and the surface water impregnation rate can be reduced to 50% or less, improving the surface water repellency and maintaining water repellency.
[0045] In addition, the conveyor belts 130 that move the fibers 10 can be arranged in multiple stages in the vertical direction to reduce the horizontal space occupied by the conveyor belts 130, resulting in high space efficiency.
[0046] Another embodiment of the aerogel blanket manufacturing apparatus FIG. 3 is a front view illustrating an example of an apparatus for manufacturing an aerogel blanket according to another embodiment of the present invention.
[0047] 3, the aerogel blanket manufacturing apparatus 200 according to another embodiment of the present invention includes a supply unit S that supplies the fiber 10 impregnated with a sol, and a conveyor belt 230 that moves the fiber 10 supplied from the supply unit S, and the conveyor belt 230 is provided in multiple stages to move the fiber 10 while turning it over. In addition, the aerogel blanket manufacturing apparatus 200 according to another embodiment of the present invention may further include guide units 141, 142, 143, and 144, a heater unit 150, and a heat-insulating cover unit 160.
[0048] The aerogel blanket manufacturing apparatus 200 according to another embodiment of the present invention is different from the aerogel blanket manufacturing apparatus according to the above-mentioned embodiment of the present invention in that both sides of the conveyor belt 230 are provided with a curved shape. Therefore, the aerogel blanket manufacturing apparatus 200 according to the other embodiment of the present invention will be described by omitting or briefly describing the contents that overlap with the above-mentioned embodiment and focusing on the differences.
[0049] More specifically, the conveyor belt 230 is provided in multiple stages, and can move the fibers 10 supplied from the supply section S while reversing the movement.
[0050] Here, the conveyor belt 230 can start to reverse the fibers 10 before the fluidity of the sol is completely lost.
[0051] The start time when the conveyor belt 230 reverses the fibers 10 may be, for example, 1 minute before the fluidity of the sol is completely lost. Here, the point when the fluidity of the sol is completely lost may be the point when gelation of the liquid sol is completed. Here, the start time when the conveyor belt 230 reverses the fibers 10 may be, for example, before 9 minutes have elapsed after the fibers 10 are immersed in the sol.
[0052] The conveyor belts 230 can be arranged in two to five stages in the vertical direction.
[0053] Here, in the conveyor belt 230 configured in multiple stages, each conveyor belt 230 may include a plurality of rollers and a belt attached to the plurality of rollers.
[0054] In addition, at least one or more of the conveyor belts 230 provided in multiple stages may have one or the other side bent upward. Here, the conveyor belts 230 provided in multiple stages may have one and the other side alternately bent upward with respect to the center. Here, for example, one side of the conveyor belt 230 may be an end of the conveyor belt 230 in one side O direction, and the other side may be an end of the conveyor belt 230 in the other side I direction. That is, the one or the other side of the conveyor belt 230 may be, for example, a right end and a left end with reference to FIG. 3. In addition, the one and the other side bent upward in the multi-stage conveyor belt 230 may be formed to extend further than the end of the conveyor belt 230 located at the top. That is, the bent portion of the conveyor belt 230 may be formed to extend.
[0055] As a result, the sol detached from the fiber 10 that is inverted at the end of the conveyor belt 230 located at the upper side of the multi-stage conveyor belt 230 falls onto the upper surface of the conveyor belt 230 located at the lower side and can be reabsorbed into the part of the fiber 10 passing through the conveyor belt 230 located at the lower side.
[0056] Meanwhile, when the conveyor belt 230 is provided in two stages, it may include a first conveyor belt 231 and a second conveyor belt 232. Here, the first conveyor belt 231 located at the top of the two-stage conveyor belt 230 may be horizontally positioned, and the second conveyor belt 232 located below the first conveyor belt 231 may be bent upward at one side. In addition, when the conveyor belt 230 is provided in five stages, it may include a first conveyor belt 231, a second conveyor belt 232, a third conveyor belt 233, a fourth conveyor belt 234, and a fifth conveyor belt 235. Here, the first conveyor belt 231 located at the top of the five tiered conveyor belts 230 may be positioned horizontally, the second conveyor belt 232 located below the first conveyor belt 231 may be bent upward at one side, the third conveyor belt 233 located below the second conveyor belt 232 may be bent upward at the other side, the fourth conveyor belt 234 located below the third conveyor belt 233 may be bent upward at one side, and the fifth conveyor belt 235 located below the fourth conveyor belt 234 may be bent upward at the other side.
[0057] The guide units 141, 142, 143, and 144 are located at a predetermined distance from the lower corners of the conveyor belt 230 to guide the movement of the fibers 10. Here, the guide units 141, 142, 143, and 144 can reabsorb into the fibers 10 the sol that falls to the bottom after being separated from the fibers 10 that are turned over at the end of the conveyor belt 230.
[0058] Meanwhile, the sol impregnated in the fiber 10 may gel over time while passing through the conveyor belt 230. Next, the fiber 10 in which the sol has been completely gelled may pass through the conveyor belt 230 and be wound up on the take-up roll 270.
[0059] Method for manufacturing an aerogel blanket according to one embodiment Hereinafter, a method for manufacturing an aerogel blanket according to one embodiment of the present invention will be described.
[0060] 1, the method for producing an aerogel blanket according to one embodiment of the present invention includes a supply step of supplying fibers 10 containing a sol, and a moving step of moving the fibers 10 supplied by the supply step via a conveyor belt 130, and in the moving step, the conveyor belt 130 is provided in multiple stages and can move the fibers 10 while reversing them. In addition, in the method for producing an aerogel blanket according to one embodiment of the present invention, the moving step can include a guiding process and a heating process.
[0061] The method for manufacturing an aerogel blanket according to one embodiment of the present invention is a method for manufacturing an aerogel blanket using the above-mentioned apparatus for manufacturing an aerogel blanket according to one embodiment of the present invention. Therefore, the embodiment of the method for manufacturing an aerogel blanket will be described by omitting or briefly describing the overlapping content with the embodiment of the above-mentioned apparatus for manufacturing an aerogel blanket, and focusing on the differences.
[0062] More specifically, the supply step can supply the fiber 10 containing the sol. Here, the supply step can supply the fiber 10 impregnated with the sol to the conveyor belt 130 via the supply section S in a movable manner.
[0063] The supply section S may include a pair of moving rollers 110 that intermesh and move the fibers 10, and an impregnation section 120 that allows the fibers 10 to be impregnated with the sol.
[0064] The pair of movable rollers 110 can include a first roller 111 and a second roller 112. Here, the pair of movable rollers 110 rotate in opposite directions to each other, and can move the fiber 10 while passing it between the opposing rollers. That is, the supply step can move the fiber 10 while passing it between the first roller 111 and the second roller 112.
[0065] Also, the supplying step may include, for example, spraying the sol onto the fibers 10 through the impregnating unit 120 to impregnate the fibers 10 with the sol. Here, the supplying step may include positioning the impregnating unit 120 above the pair of moving rollers 110 and spraying the sol onto the top of the fibers 10 injected between the pair of moving rollers 110 so that the sol flows down to the space between the pair of moving rollers 110. However, in the method for producing an aerogel blanket according to an embodiment of the present invention, the method is not necessarily limited to the impregnating unit 120 spraying the sol to impregnate the fibers 10 with the sol, and various impregnation methods may be used. For example, the fibers 10 may be impregnated with the sol while passing the fibers 10 through an impregnation vessel containing the sol.
[0066] The sol may be composed of a precursor solution containing, for example, silica sol and an additive.
[0067] Silica sol can be produced, for example, by mixing TEOS (tetraethyl orthosilicate), ethanol, H2O, and hydrogen chloride (HCL).
[0068] Additives can include, for example, flame retardants and opacifiers.
[0069] Alternatively, the sol may further include a base catalyst that induces gelation of the sol impregnated in the fibers.
[0070] Here, the gel time can be adjusted to a predetermined time by using a base catalyst.
[0071] Here, the base catalyst may be, for example, NaOH (sodium hydroxide), but the type of base catalyst used in the aerogel blanket manufacturing apparatus 100 according to one embodiment of the present invention is not necessarily limited to NaOH.
[0072] The base catalyst can be used so that the pH of the sol becomes 7 to 9, for example.
[0073] The moving step can move the fibers 10 supplied by the supplying step via a conveyor belt 130 .
[0074] In addition, in the moving step, the conveyor belt 130 is provided in multiple stages so that the fibers 10 can be moved while being turned over.
[0075] Here, in the moving step, the start point of reversing the fiber 10 can be performed before the fluidity of the sol is completely lost.
[0076] In addition, in the moving step, the start time of the conveyor belt 130 reversing the fiber 10 may be, for example, 1 minute 30 seconds to 30 seconds before the time when the fluidity of the sol is completely lost. Here, in the moving step, the start time of reversing the fiber 10 may be, specifically, for example, 1 minute (min) before the time when the fluidity of the sol is completely lost. Here, the time when the fluidity of the sol is completely lost may be the time when gelation of the liquid sol is completed. As a result, in the moving step, the start time of reversing the fiber 10 may be 1 minute (min) before the time when the fluidity of the sol is completely lost, so that the sol can be uniformly permeated into both sides of the fiber 10.
[0077] Meanwhile, the start time when the conveyor belt 130 reverses the fiber 10 in the moving step can be, for example, before 9 minutes have elapsed after the fiber 10 is impregnated with the sol. Here, the start time when the conveyor belt 130 reverses the fiber 10 in the moving step can be, for example, before 7 minutes have elapsed after the fiber 10 is impregnated with the sol. Here, the start time when the conveyor belt 130 reverses the fiber 10 in the moving step can be, for example, before 4 minutes have elapsed after the fiber 10 is impregnated with the sol.
[0078] Meanwhile, the final time point at which the conveyor belt 130 reverses the fibers 10 in the moving step can be within 20 to 30 minutes, for example.
[0079] Meanwhile, in the conveyor belt 130 configured in multiple stages, each conveyor belt 130 may include a plurality of rollers 131a, 131b, 132b, and a belt attached to the plurality of rollers 131a, 131b, 132b.
[0080] Moreover, the conveyor belts 130 provided in multiple stages can each be arranged horizontally.
[0081] The conveyor belts 130 can be arranged in two to five stages in the vertical direction.
[0082] In addition, in the moving step, the fiber 10 can be turned over 1 to 4 times.
[0083] On the other hand, the moving step can include a guiding process and a heating process.
[0084] The guiding process can guide the movement of the fibers 10 by positioning the guide portions 141, 142, 143, and 144 at a predetermined distance from the lower corners of the conveyor belt 130.
[0085] Here, the guiding step allows the sol that separates from the fibers 10 that are inverted at the end of the conveyor belt 130 and falls to the bottom to be reabsorbed by the fibers 10 via the guide portions 141, 142, 143, and 144.
[0086] In the heating process, a heater unit 150 may be placed on the conveyor belt 130 to apply heat to the fibers 10. This may promote gelation of the sol impregnated in the fibers 10.
[0087] Meanwhile, in the moving step, the heat-insulating cover unit 160 is positioned to accommodate the conveyor belt 130, so that the fibers 10 moving via the conveyor belt 130 can be kept warm. This makes it possible to prevent loss of heat applied to the fibers 10 via the heater unit 150 in the heating process, and to allow the heat to be transferred to the fibers 10 uniformly.
[0088] Meanwhile, the sol impregnated into the fibers 10 in the moving step can gel over time while passing through the conveyor belt 130. That is, the moving step can include a gelling process.
[0089] Meanwhile, the method for manufacturing an aerogel blanket according to an embodiment of the present invention may further include a winding step in which the fiber 10 in which the sol has been gelled passes through a conveyor belt 130 and is wound on a winding roll after the moving step.
[0090] Method for manufacturing an aerogel blanket according to another embodiment 3, the method for manufacturing an aerogel blanket according to another embodiment of the present invention includes a supply step of supplying fibers 10 containing a sol, and a moving step of moving the fibers 10 supplied by the supply step via a conveyor belt 230, and in the moving step, the conveyor belt 230 is provided in multiple stages and can move the fibers 10 while turning them over. In addition, in the method for manufacturing an aerogel blanket according to another embodiment of the present invention, the moving step can include a guiding process and a heating process.
[0091] The method for manufacturing an aerogel blanket according to another embodiment of the present invention is different from the method for manufacturing an aerogel blanket according to the above-mentioned embodiment of the present invention in that both sides of the conveyor belt 230 are provided with a curved shape in the moving step. Therefore, the method for manufacturing an aerogel blanket according to this another embodiment of the present invention will be described by focusing on the differences and omitting or briefly describing the overlapping content with the above-mentioned embodiment.
[0092] More specifically, the moving step can move the fibers 10 provided by the providing step via a conveyor belt 130 .
[0093] In addition, in the moving step, the conveyor belt 230 is provided in multiple stages and can move the fibers 10 supplied from the supply section S while turning over the fibers 10.
[0094] Here, in the moving step, the conveyor belt 230 starts to reverse the fibers 10 before the fluidity of the sol is completely lost.
[0095] In addition, in the moving step, the start time point at which the conveyor belt 230 reverses the fibers 10 can be, for example, 1 minute 30 seconds to 30 seconds before the fluidity of the sol is completely lost. Here, the start time point at which the conveyor belt 230 reverses the fibers 10 in the moving step can be, specifically, for example, 1 minute (min) before the fluidity of the sol is completely lost.
[0096] Here, the time when the fluidity of the sol is completely lost may be the time when gelation of the liquid sol is completed. Here, the time when the conveyor belt 230 starts to reverse the fiber 10 may be, for example, before 9 minutes have elapsed after the fiber 10 is immersed in the sol.
[0097] The conveyor belts 230 can be arranged in two to five stages in the vertical direction.
[0098] Here, in the conveyor belt 230 configured in multiple stages, each conveyor belt 230 may include a plurality of rollers and a belt attached to the plurality of rollers.
[0099] In addition, at least one of the conveyor belts 230 provided in multiple stages may have one side or the other side bent upward. Here, the conveyor belts 230 provided in multiple stages may have one side and the other side bent upward alternately with respect to the center. In addition, the one side and the other side bent upward in the multi-stage conveyor belt 230 may be formed to extend further than the end of the conveyor belt 230 located at the upper end. That is, the bent portion of the conveyor belt 230 may be formed to extend. As a result, the sol detached from the fiber 10 that is inverted at the end of the conveyor belt 230 located at the upper side of the multi-stage conveyor belts 230 in the moving step falls onto the upper surface of the conveyor belt 230 provided at the lower side, and may be reabsorbed by the portion of the fiber 10 passing through the conveyor belt 230 provided at the lower side.
[0100] <Example 1> A sol solution, which is a precursor solution containing silica sol and additives, was prepared. Here, silica sol was prepared by mixing TEOS (tetraethyl orthosilicate), ethanol, H2O, and HCL, and additives such as flame retardant and opacifier were added to the electrode body solution.
[0101] The catalyst was added to the precursor solution so that the gel time was 10 minutes.
[0102] After the fibers were impregnated (soaked) with the sol, the total residence time of the fibers on the conveyor belt was assumed to be 20 minutes, and the fibers were inverted twice on a three-stage conveyor belt for 7 minutes and 14 minutes.
[0103] Next, an aerogel blanket was manufactured through an aging process, a hydrophobic surface modification process, and a supercritical drying process.
[0104] <Example 2> The same process as in Example 1 was carried out, except that after the fibers were immersed in the sol solution, the fibers were turned over three times on a four-stage conveyor belt for 5 minutes, 10 minutes, and 15 minutes.
[0105] <Example 3> The same process as in Example 1 was carried out, except that after the fibers were immersed in the sol solution, the fibers were inverted four times on a five-stage conveyor belt for 4 minutes, 8 minutes, 12 minutes, and 16 minutes.
[0106] <Comparative Example 1> The same process as in Example 1 was carried out, except that the fibers were not covered on the conveyer belt after immersion in the sol solution.
[0107] <Comparative Example 2> The same process as in Example 1 was carried out, except that after the fibers were immersed in the sol solution, the fibers were turned over once every 10 minutes on a two-stage conveyor belt.
[0108] <Experimental Example 1> The thermal conductivity, moisture absorption rate, and dust of the aerogel blankets manufactured in the examples and comparative examples were measured.
[0109] The thermal conductivity was measured at room temperature (25° C.) using an HFM 436 (Netzsch) instrument.
[0110] The moisture absorption rate was measured in accordance with ASTM C1511.
[0111] The dust was subjected to a test piece size of 100 x 100 mm, vibration at 24 Hz with an up and down amplitude of 3 mm for 12 hours, and then the change in weight was measured.
[0112] The thermal conductivity, moisture impregnation rate, and dust measured in the experiment of Experimental Example 1 are shown in Table 1 below.
[0113] [Table 1]
[0114] Referring to Table 1, it can be seen that the moisture absorption rates of Examples 1 to 3 are only 5 to 7 (wt%), while the moisture absorption rates of Comparative Examples 1 and 2 are high, at 11 to 12 (wt%). In other words, it can be seen that the water repellency of the aerogel blankets of Examples 1 to 3 is significantly superior to that of Comparative Examples 1 and 2. In addition, it can be seen that the dust of Examples 1 to 3 is only 0.17 to 0.22 (wt%), while the dust of Comparative Examples 1 and 2 is significantly higher, at 1.1 to 1.3 (wt%). In other words, it can be seen that the dust generation of Examples 1 to 3 is significantly lower than that of Comparative Examples 1 and 2. In other words, it can be seen that there is almost no improvement in the physical properties in Comparative Example 1, where the fibers are not covered, and Comparative Example 2, where the time when the fibers are first covered is after the gel time (the time when the fluidity of the sol completely disappears).
[0115] Although the present invention has been described in detail above with reference to specific examples, these are merely for the purpose of specifically explaining the present invention, and the present invention is not limited thereto. It can be said that various implementations are possible within the technical concept of the present invention by those having ordinary skill in the art.
[0116] Moreover, the specific scope of protection of the invention will be clarified by the appended claims. [Explanation of symbols]
[0117] 10. Fiber 100, 200 Aerogel blanket manufacturing equipment 110 Pair of moving rollers 111 Roll 1 112 Roll 2 120 Impregnation section 130 Conveyor Belt 131a, 131b, 132b Lola 141, 142, 143, 144 Guide part 141a Contact part 141b Support part 150 Heater section 160 Heat retention cover part S supply section
Claims
1. An apparatus for producing an aerogel blanket, comprising: A supply unit that supplies fibers containing a sol; a conveyor belt that moves the fibers supplied from the supply section, The conveyor belt is provided in multiple stages, and moves the fibers while rotating them in a reverse direction. The conveyor belt starts to reverse the fibers before the fluidity of the sol is completely lost.
2. 2. The apparatus for manufacturing an aerogel blanket according to claim 1, wherein the conveyor belt starts to reverse the fibers 1 minute (min) before the fluidity of the sol is completely lost.
3. The aerogel blanket manufacturing apparatus according to claim 1, wherein the conveyor belts are arranged in two to five stages in the vertical direction.
4. The aerogel blanket manufacturing apparatus according to claim 1 , wherein the conveyor belts provided in multiple stages are arranged in a vertical direction and are each arranged horizontally.
5. 2. The apparatus for manufacturing an aerogel blanket according to claim 1, wherein at least one of the conveyor belts in the multiple conveyor belts is bent upward at one or the other side.
6. The apparatus for manufacturing an aerogel blanket according to claim 5 , wherein the conveyor belts provided in multiple stages are provided in a form in which one side and the other side are alternately bent upward with respect to a center portion.
7. 2. The apparatus for manufacturing an aerogel blanket according to claim 1, further comprising a guide portion located at a predetermined distance from a lower corner of the conveyor belt to guide the movement of the fibers.
8. The apparatus for manufacturing an aerogel blanket according to claim 7 , wherein the guide portion is formed in a shape corresponding to the conveyor belt and contacts a lower surface of the fiber.
9. The guide portion includes a contact portion that contacts the fiber and a support portion that supports the contact portion, The apparatus for manufacturing an aerogel blanket according to claim 7 , wherein the contact portion is formed in a round shape.
10. 2. The apparatus for manufacturing an aerogel blanket according to claim 1, further comprising a heater unit located on the conveyor belt and configured to apply heat to the fibers.
11. The apparatus for manufacturing an aerogel blanket according to claim 10, further comprising a heat-insulating cover section that houses the conveyor belt and insulates the fibers moving via the conveyor belt.
12. A method for producing an aerogel blanket, comprising: A supplying step of supplying fibers containing a sol; and a moving step of moving the fibers supplied by the supplying step through a conveyor belt, In the moving step, the conveyor belt is provided in multiple stages, and moves the fibers while inverting them, In the moving step, the start time of inverting the fibers is performed before the fluidity of the sol is completely lost.
13. 13. The method of claim 12, wherein the fiber is reversed in the moving step 1 minute before the sol completely loses fluidity.
14. The method for producing an aerogel blanket according to claim 12, wherein the moving step rotates the fibers 1 to 4 times.
Citation Information
Patent Citations
Method of recovering water from air apparatus therefore and process for preparing silicagel and apparatus therefore
JP1977134896A
Gel sheet manufacturing method
JP2007524528A
Manufacturing method and manufacturing equipment for composite sheets including airgel sheets
JP2018537311A
Aerogel sheet manufacturing method and device
JP2019501094A
Manufacturing method of hydrophobic silica aerogel and hydrophobic silica aerogel manufactured therefrom
KR1020110125773A