Reinforcement structure for existing tower foundations
The reinforcement of steel tower foundations by replacing soil with lightweight embankments and buoyancy-suppressing concrete addresses compressive strength issues, ensuring safety without new pile driving, thus reducing construction time and costs.
Patent Information
- Application Number
- JP2021142565
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-09-01
- Publication Date
- 2024-11-13
- Estimated Expiration
- 2041-09-01
AI Technical Summary
Existing steel tower foundations often lack sufficient compressive strength, and driving new piles into the ground for reinforcement is time-consuming and faces spatial restrictions due to overhead wires and equipment.
Replace a portion of the soil above the foundation floor plate with a lightweight embankment and use buoyancy-suppressing concrete to enhance the safety factor without new pile driving, utilizing lightweight materials like waste glass foam or high-density foamed polystyrene.
Enhances the safety factor against compressive loads efficiently, reducing construction time and costs while avoiding spatial restrictions, and maintaining work efficiency.
Smart Images

Figure 0007582129000001 
Figure 0007582129000002 
Figure 0007582129000003
Abstract
Description
[Technical field]
[0001] This invention relates to a reinforcement structure for an existing steel tower foundation that has been found to have insufficient compressive strength. [Background technology]
[0002] Generally, in the design of the foundations of existing electricity transmission towers, when it is found that the existing tower foundation is insufficient in strength to withstand compressive loads, the compressive bearing capacity of the existing tower foundation is increased to ensure the safety factor of the existing tower foundation against compressive loads.
[0003] 4 is a diagram showing a conventional reinforcement structure for an existing tower foundation 101, and is a diagram showing a mat-type pile foundation 102 adopted to reinforce the existing tower foundation 101. This mat-type pile foundation 102 is configured by integrating the existing tower foundation 101 (four inverted T-shaped concrete foundations 103) with the mat-type pile foundation 102, and multiple piles 104 integrated with the mat-type pile foundation 102 increase the compressive bearing capacity. Note that a construction method for constructing the mat-type pile foundation 102 on the existing tower foundation 101 is disclosed in Patent Document 1. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2002-256573 A Summary of the Invention [Problem to be solved by the invention]
[0005] The mat-type pile foundation 102 shown in FIG. 4 has the problem that when driving piles 104 into soil 106 on a site where existing facilities exist, it takes time for preparatory work such as confirming the position of the foundation floor plate 105 buried in the ground in advance, and the piles 104 cannot be positioned efficiently due to headroom restrictions (restrictions on aboveground space to prevent piles to be driven into the ground from contacting overhead wires or cross arms supporting the overhead wires).
[0006] Therefore, an object of the present invention is to efficiently ensure the safety factor against compressive loads of existing steel tower foundations without driving new piles into the ground. [Means for solving the problem]
[0007] The present invention relates to a reinforcement structure for an existing tower foundation 2, in which an inverted T-shaped concrete foundation 6 corresponding one-to-one to each of the four legs 5 of a tower 1 is buried in soil 8, and one of the four legs 5 of the tower 1 is supported by the inverted T-shaped concrete foundation 6. The present invention replaces at least a part of the soil 8 directly above the foundation floor plate 7 of the existing tower foundation 2, on which a compressive load acts, with a lightweight embankment 10 that is lighter than the soil 8, lays a buoyancy-suppressing concrete 11 on the lightweight embankment 10, suppresses the lifting of the lightweight embankment 10 due to the buoyancy acting on the lightweight embankment 10 with the weight of the buoyancy-suppressing concrete 11, and determines the weight of the lightweight embankment 10 so that the safety factor of the existing tower foundation 2 is at least 2.00, thereby reducing the compressive load acting on the foundation floor plate 7. The safety factor (Fc) is determined as follows, in accordance with the concept of Article 60 of the Technical Standard for Electrical Equipment and the Power Transmission Support Structure Design Standard. Fc=(QC+KC) / (C+WC+WS+WS3)≧2.00 QC: Compressive bearing capacity KC: Bearing capacity of pile 17 C: Compressive force from tower 1 WC: concrete weight WS: Weight of soil 8 directly above foundation slab 7 WS3: Weight of Lightweight Embankment 10 Effect of the Invention
[0008] The present invention can efficiently ensure the safety factor of the existing tower foundation against compressive loads by making at least a portion of the soil directly above the foundation floor plate of the existing tower foundation, which is subjected to compressive loads, into lightweight embankment that is lighter than the soil, without driving new piles into the ground. [Brief description of the drawings]
[0009] [Figure 1] These are simplified diagrams of a steel tower, where Fig. 1(a) is a front view of the tower and Fig. 1(b) is a plan view of the tower as viewed from the direction of arrow C in Fig. 1(a) (plan view showing the state of load application). [Diagram 2] 2(a) and 2(b) are diagrams showing the reinforcing structure of an existing tower foundation, where FIG. 2(a) is a plan view showing the reinforcing structure of an existing tower foundation, and FIG. 2(b) is a cross-sectional view taken along line A1-A1 in FIG. 2(a). [Diagram 3] FIG. 3(a) is an enlarged cross-sectional view of part B in FIG. 2(b), and FIG. 3(b) is a diagram showing a modified example of the reinforcing structure of the existing tower foundation shown in FIG. 3(a). [Figure 4] 4(a) and 4(b) are diagrams showing a conventional reinforcement structure for an existing tower foundation, in which FIG. 4(a) is a plan view showing the conventional reinforcement structure for an existing tower foundation, and FIG. 4(b) is a cross-sectional view taken along line A2-A2 in FIG. 4(a). DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.
[0011] FIG. 1 is a simplified diagram of a steel tower 1, with FIG. 1(a) being a front view of the steel tower 1 and FIG. 1(b) being a plan view of the steel tower 1 as viewed from the direction of arrow C in FIG. 1(a) (plan view showing the state in which a load is applied). FIG. 2 is a diagram showing the reinforcing structure of an existing steel tower foundation 2. In FIG. 2, FIG. 2(a) is a plan view showing the reinforcing structure of the existing steel tower foundation 2, and FIG. 2(b) is a cross-sectional view taken along line A1-A1 in FIG. 2(a). FIG. 3(a) is an enlarged cross-sectional view of part B in FIG. 2(b), and FIG. 3(b) is a diagram showing a modified example of the reinforcing structure of the existing steel tower foundation 2 shown in FIG. 3(a).
[0012] As shown in Fig. 1, for example, when a power transmission line 4 is erected on cross arm 3a (3b, 3c) of a steel tower 1 at an angle smaller than 180° (θ<180°), a horizontal angular load P (load P toward the left in Fig. 1) due to the tension of the power transmission line 4 acts on the steel tower 1. If the four legs 5 of the steel tower 1 are legs a, b, c, and d in the clockwise direction, the horizontal angular load P acting on the steel tower 1 generates a compressive load on legs b and c and a lifting load on legs a and d. As a result, a larger compressive load acts on the existing steel tower foundations 2 of legs b and c of the steel tower 1 compared to the existing steel tower foundations 2 of legs a and d. The compressive load acting on the existing tower foundations 2 of legs b and c is the sum of the tower load (the sum of 1 / 4 of the tower 1's own weight, the compressive load due to the horizontal angle load P, 1 / 2 the own weight of the transmission lines 4 between the adjacent towers 1, 1, and the compressive load due to the crosswind blowing on the tower 1), the weight of the inverted T-shaped concrete foundation 6, the weight of the soil, etc. located on top of the foundation floor slab 7 of the inverted T-shaped concrete foundation 6 (soil 8, lightweight embankment 10 described below, and buoyancy-suppressing concrete 11), and the underwater concrete 12 (see Figures 2 and 3(a)).
[0013] In the case of a steel tower 1 as shown in Figure 1, if it is found that the existing steel tower foundation 2 of legs b and c does not have enough strength to withstand the compressive load, it will be difficult to reduce the tower load and the weight of the inverted T-shaped concrete foundation 6, so the weight of the soil 8 located on top of the foundation floor plate 7 is reduced (see Figures 2 and 3(a)).
[0014] (Reinforcement structure for existing tower foundations) As shown in Fig. 2 and Fig. 3(a), the reinforcing structure of the existing tower foundation 2 according to this embodiment is such that a part of the soil 8 located directly above the foundation floor plate 7 of the inverted T-shaped concrete foundation 6 (within a range partitioned by an imaginary line 14 extending the outer edge of the foundation floor plate 7 upward) is replaced with a lightweight embankment 10, and buoyancy-suppressing concrete 11 is laid on the lightweight embankment 10. The buoyancy-suppressing concrete 11 is placed on the lightweight embankment 10 to suppress the lightweight embankment 10 from floating up due to buoyancy caused by moisture in the soil 8. Note that the reinforcing structure of the existing tower foundation 2 according to this embodiment is not limited to that shown in Fig. 2 and Fig. 3(a), and as shown in Fig. 3(b), a roadbed 13 may be laid on the buoyancy-suppressing concrete 11 so that heavy machinery and the like can move on the roadbed 13.
[0015] As shown in Fig. 3(b), in the modified example of the reinforcement structure of the existing tower foundation 2 according to this embodiment, soil 8 is positioned on the foundation floor plate 7 of the inverted T-shaped concrete foundation 6, lightweight embankment 10 is positioned on the soil 8, buoyancy-suppressing concrete 11 is positioned on the lightweight embankment 10, and roadbed 13 is positioned on the buoyancy-suppressing concrete 11. In the modified example of the reinforcement structure of the existing tower foundation 2 according to this embodiment, the compressive load acting on the existing tower foundations 2 of legs b and c is the sum of the weight of the roadbed 13 and the weight of the concrete 15 wrapped around the roots, in addition to the compressive load in the reinforcement structure of the existing tower foundation 2 according to this embodiment.
[0016] In Figures 3(a) and 3(b), the existing tower foundation 2 of legs b and c of the tower 1 is designed to support a compressive load by soil 8 located below the bottom surface 7a of the foundation floor plate 7 of the inverted T-shaped concrete foundation 6, with underwater concrete 12 and pebbles 16 between them, and by a number of piles 17 extending downward into the ground from the foundation floor plate 7 of the inverted T-shaped concrete foundation 6.
[0017] As shown in Fig. 3(a), the existing tower foundation 2 of the legs a and d in this embodiment is designed to withstand the lifting load of the weight of the soil 8 directly above the foundation floor plate 7 of the inverted T-shaped concrete foundation 6, the weight of the lightweight embankment 10, and the weight of the buoyancy-suppressing concrete 11. As shown in Fig. 3(b), the existing tower foundation 2 of the legs a and d in this modified embodiment is designed to withstand the lifting load of the weight of the soil 8 directly above the foundation floor plate 7 of the inverted T-shaped concrete foundation 6, the weight of the lightweight embankment 10, the weight of the buoyancy-suppressing concrete 11, the weight of the roadbed 13, and the weight of the concrete 15 wrapped around the roots. In Figs. 3(a) and 3(b), the underwater concrete 12 is located in contact with the bottom surface 7a of the foundation floor plate 7 of the inverted T-shaped concrete foundation 6, and the cobblestones 16 are located in contact with the underwater concrete 12, and the soil 8 supporting the compressive load is located adjacent to the cobblestones 16.
[0018] (Thickness of buoyancy-reducing concrete) In the reinforcing structure for the existing steel tower foundation 2 of this embodiment shown in Fig. 2(b) and Fig. 3(a), as described above, the buoyancy-suppressing concrete 11 is intended to suppress the buoyancy acting on the lightweight embankment 10. The buoyancy-suppressing concrete 11 has a weight per cubic meter of 2.3 g (kN / m 3 ), and the buoyancy per square meter acting on the lightweight embankment 10 is 1.0 g (kN / m 2 ), the thickness (t1) is calculated by the following formula 1. (Number 1) t1=1.0·g(kN / m 2 ) / 2.3·g(kN / m 3 )=0.44m Equation 1
[0019] In other words, if the buoyancy-suppressing concrete 11 has a thickness of 0.44 m or more, it can resist the buoyancy acting on the lightweight embankment 10 and suppress the floating of the lightweight embankment 10. In this embodiment, the lightweight embankment 10 uses a waste glass foam material that has high weather resistance. The buoyancy of this lightweight embankment 10 is 1.0 g (kN / m) because the lightweight embankment 10 has some water absorption. 2), but to be on the safe side, a buoyancy force of 1.0 g(kN / m 2 ) is used as the base value for calculating the thickness (t1) of the buoyancy-suppressing concrete 11. The lightweight embankment 10 is not limited to the waste glass foam material, and high-density expanded polystyrene, resin storage material, etc. may be used as appropriate depending on the conditions of the construction site of the steel tower 1.
[0020] The modified reinforcement structure of the existing tower foundation 2 shown in Fig. 3(b) has a structure in which a roadbed 13 is laid on top of the buoyancy-suppressing concrete 11 shown in Fig. 3(a). In the modified example shown in Fig. 3(b), the roadbed 13 has a compressive strength of 2.4 g (kN / m 3 ) of high-strength concrete is laid to a thickness of 0.15 m. In this modified example, the thickness (t1) of the buoyancy-suppressing concrete 11 is calculated as follows. In FIG. 3(b), the upper end side of the inverted T-shaped concrete foundation 6 is covered with root-wrapped concrete 15. This root-wrapped concrete 15 is placed up to a position where it protrudes above the roadbed 13 from within the buoyancy-suppressing concrete 11, and is designed to prevent water puddles from forming between the upper end 6a of the inverted T-shaped concrete foundation 6 and the upper surface 13a of the roadbed 13.
[0021] In such a modified example of the reinforcement structure of the existing steel tower foundation 2 shown in FIG. 3(b), the weight per square meter of the roadbed 13 (kN / m 2 ) is calculated using the following formula 2. (Number 2) 0.15(m)×2.4·g(kN / m 3 )=0.36·g(kN / m 2 )···Equation 2
[0022] In the modified example of the reinforcing structure of the existing steel tower foundation 2 shown in FIG. 3(b), the thickness (t1) of the buoyancy-reducing concrete 11 is calculated by the following Equation 3. (Number 3) t1=(1.0·g(kN / m 2 )-0.36·g(kN / m 2 )) / 2.3·g(kN / m 3)=0.28m Equation 3
[0023] In other words, in the modified reinforcement structure of the existing tower foundation 2 shown in Figure 3(b), if the buoyancy-suppressing concrete 11 has a thickness t1 of 0.28 m or more, it can resist the buoyancy acting on the lightweight embankment 10 and suppress the floating of the lightweight embankment 10.
[0024] (Volume of lightweight embankment) In the reinforcing structure of an existing tower foundation 2 according to this embodiment shown in Fig. 3(a) and the modified example of the reinforcing structure of an existing tower foundation 2 shown in Fig. 3(b), the range in which the lightweight embankment 10 is arranged is directly above the foundation floor plate 7 of the inverted T-shaped concrete foundation 6. The weight of the lightweight embankment 10 is determined so that the safety factor (Fc) is at least 2.00 in Formula 4 prepared in accordance with "Article 60 of the Interpretation of Technical Standards for Electrical Equipment" and "Design Standard for Power Transmission Support Structures (JEC-127)." (Number 4) Fc = (QC + KC) / (C + WC + WS + WS3) ≧ 2.00 Formula 4 Assuming Fc = 2.00, transform equation 4 to find the weight of the lightweight embankment (WS3) 10. (Number 5) WS3 = (QC + KC) / 2.00 - (C + WC + WS) Equation 5 WS3: Weight of lightweight embankment 10 (kN) QC: Compressive bearing capacity (kN) KC: Bearing capacity of pile 17 (kN) C: Compressive force from tower 1 (kN) WC: concrete weight (kN) WS: Weight of soil 8 directly above foundation slab 7 (kN) Here, the weight per unit volume of the lightweight embankment 10 is γ g (kN / m 3 ), the volume of lightweight embankment 10 VS3 (m 3 ) can be calculated using Equation 6. (Number 6) VS3 = WS3 / γ g Equation 6 The lightweight embankment 10 having the volume (VS3) calculated by the above formula 6 is used to replace a part (or the whole) of the soil 8 directly above the foundation floor plate 7 of the inverted T-shaped concrete foundation 6.
[0025] (Effects of the embodiment) As described above, the reinforcement structure for the existing tower foundation 2 according to this embodiment can efficiently ensure the safety factor against the compressive load of the existing tower foundation 2 by making at least a part (part or all) of the soil 8 directly above the foundation floor plate 7 of the existing tower foundation 2, on which the compressive load acts, into lightweight embankment 10 that is lighter than the soil 8, without driving new piles into the ground. Therefore, compared to the reinforcement structure for the existing tower foundation 2 of the present embodiment, which uses the conventional mat-type pile foundation 102 to reinforce the existing tower foundation 101, the reinforcement structure for the existing tower foundation 2 according to this embodiment does not require much time for preparatory work such as checking the foundation floor plate 7 of the existing tower foundation 2, and there is no restriction on work due to headroom restrictions, so that it is possible to improve work efficiency and significantly reduce construction costs.
[0026] In addition, the reinforcement structure of the existing tower foundation 2 according to this embodiment is applied only to the existing tower foundation 2 on which a compressive load acts, and is not applied to the existing tower foundation 2 on which a lifting load acts, so that it is possible to narrow down the locations to be subjected to construction. As a result, the reinforcement structure of the existing tower foundation 2 according to this embodiment can narrow the construction scope, shorten the construction period, and shorten the power outage time, compared to the reinforcement structure of the existing tower foundation 101 using the conventional mat-type pile foundation 102.
[0027] In addition, the reinforcement structure of the existing tower foundation 2 in this embodiment does not use special construction methods like the conventional mat-type pile foundation 102, so it can be constructed using conventional construction methods such as excavation, backfilling, compaction, and leveling, and therefore construction can be carried out more easily than in the reinforcement structure of the existing tower foundation 101 using the conventional mat-type pile foundation 102. [Explanation of symbols]
[0028] 1... Tower, 2... Existing tower foundation, 5... Leg, 6... Inverted T-shaped concrete foundation, 7... Foundation slab, 8... Soil, 10... Lightweight embankment, 11... Buoyancy-reducing concrete, 17... Pile
Claims
1. In a reinforcement structure for an existing steel tower foundation, an inverted T-shaped concrete foundation is buried in the soil in one-to-one correspondence with each of the four legs of a steel tower, and one of the four legs of the steel tower is supported by the inverted T-shaped concrete foundation. at least a portion of the soil directly above the foundation floor plate of the existing tower foundation on which a compressive load acts is replaced with lightweight embankment that is lighter than the soil, buoyancy-suppressing concrete is laid on the lightweight embankment, the lifting of the lightweight embankment due to buoyancy acting on the lightweight embankment is suppressed by the weight of the buoyancy-suppressing concrete, and the weight of the lightweight embankment is determined so that the safety factor of the existing tower foundation is at least 2.00, thereby reducing the compressive load acting on the foundation floor plate, The safety factor (Fc) is determined according to the following formula in accordance with Article 60 of the Technical Standard for Electrical Equipment and the Standard for Design of Support Structures for Power Transmission: Fc=(QC+KC) / (C+WC+WS+WS3)≧2.00 QC: Compressive bearing capacity KC: Bearing capacity of pile C: Compressive force from the tower WC: concrete weight WS: Weight of soil directly above the foundation slab WS3: Weight of lightweight embankment This is a reinforcement structure for existing steel tower foundations.
2. The lightweight embankment is a waste glass foam material. The reinforcing structure for an existing steel tower foundation according to claim 1.
3. The soil is positioned on the foundation floor plate, the lightweight embankment is positioned on the soil, the buoyancy-reducing concrete is positioned on the lightweight embankment, and the roadbed is positioned on the buoyancy-reducing concrete. The reinforcing structure for an existing steel tower foundation according to claim 1 or 2.
Citation Information
Patent Citations
Anchor pier type power transmission tower foundation reinforcing structure
CN210946871U
Foundation for existing foundation reinforcing steel tower and construction method for it