Steel pipe pile installation method and steel pipe pile

The steel pipe pile construction method with an enlarged wing and cutting corners addresses ground disturbance and cost issues by enabling efficient excavation and soil removal, ensuring stable ground support.

JP7582826B2Active Publication Date: 2024-11-13JAPAN HOME SHIELD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2020162428
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-09-28
Publication Date
2024-11-13
Estimated Expiration
2040-09-28

AI Technical Summary

Technical Problem

Existing methods for constructing steel pipe piles face challenges in efficiently removing earth and sand at the tip, leading to ground disturbance and reduced supporting capacity, and require labor-intensive and costly pre-processing for cutting claws.

Method used

A steel pipe pile construction method using a square steel pipe with a flat, enlarged wing at the lower end, featuring corners that act as cutting edges, allowing for efficient excavation and soil removal with minimal ground disturbance by rotating and applying downward pressure.

Benefits of technology

The method reduces labor and costs associated with processing while maintaining stable ground support by minimizing soil disturbance and enhancing the pile's bearing capacity through efficient excavation and soil removal.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007582826000001
    Figure 0007582826000001
  • Figure 0007582826000002
    Figure 0007582826000002
  • Figure 0007582826000003
    Figure 0007582826000003
Patent Text Reader

Abstract

To provide a construction method for a steel pipe pile and a steel pipe pile which reduce labor and a cost for working due to a configuration that can be simply worked, and can eliminate disturbance of a lower ground.SOLUTION: In a construction method for a steel pipe pile 1 installed in the ground G, the steel pipe pile 1 includes a pile body 2 composed of a steel pipe, and a plate-like expansion blade 3 that blocks a lower end 2a of the pile body 2 by a plate surface perpendicular to a pile axis O direction, is expanded by an outer peripheral surface 2b of the pile body 2 when viewed from the pile axis O direction, and has at least one corner part 3c formed on a plate outer peripheral edge, and the construction method includes a step of applying a pressure to the lower side of the steel pipe pile 1, and press fitting the expansion blade 3 to the ground G in a state where a lower surface 3b of the expansion blade 3 is brought into direct contact with the ground G, and a step of rotating the steel pipe pile 1, and excavating the ground G.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a steel pipe pile installation method and a steel pipe pile. [Background technology]

[0002] Conventionally, when driving steel pipe piles into the ground, the method used is to drive the steel pipe pile while pushing the soil to the side with a large pressure, or to cut the soil at the tip of the steel pipe pile and gradually remove it upwards to drive the pile. In contrast, in order to drive the steel pipe pile into the ground by rotating it with a small pressure, it is necessary to efficiently cut the soil at the tip and efficiently remove it upwards, so it is common to provide a spiral-shaped blade at the tip of the pile and drive the steel pipe pile into the ground while rotating it. In the case of such a pile with a spiral-shaped tip, the spiral-shaped blade disturbs the ground around the tip of the pile, causing it to become turbulent, and the tip of the pile rests on this loose ground during and after excavation, which inevitably reduces the bearing capacity.

[0003] In response to this, a method for exerting the bearing capacity of the tip of a pile is known, as shown in Patent Document 1, in which a nearly horizontal, plate-shaped support member with cutting claws is attached to the lower end of a steel pipe pile driven into relatively soft ground, and the underside of this support plate supports the steel pipe pile by receiving upward earth pressure, thereby preventing the steel pipe pile from sinking. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 2981463 Summary of the Invention [Problem to be solved by the invention]

[0005] In Patent Document 1, when processing the support plate to be installed at the bottom end of the steel pipe pile, the support plate with cutting claws molded on the outer periphery is cut out from a plate material, the cutting claws are bent at right angles to the support plate, and the support plate is then joined to the tip of the pile. This causes problems such as increased effort and cost required for pre-processing to form the cutting claws, and disturbance of the ground below due to the cutting claws protruding downward, leaving room for improvement in this regard.

[0006] The present disclosure provides a steel pipe pile construction method and a steel pipe pile that have a configuration that can be easily processed, thereby reducing the effort and cost required for processing and eliminating disturbance to the underlying ground. [Means for solving the problem]

[0007] In one embodiment of the present disclosure, a steel pipe pile construction method is a steel pipe pile construction method for installing a steel pipe pile in the ground, the steel pipe pile is provided with a pile body made of a square steel pipe, and a flat expansion wing in which the lower end of the pile body is closed by a plate surface perpendicular to the pile axis direction, and which is expanded from the outer circumferential surface of the pile body when viewed from the pile axis direction, and at least one first corner portion forming a cutting blade is formed on the outer circumferential edge of the plate, and the pile body is provided with at least one second corner portion, and the second corner portion has a function of stirring the excavated soil between the wall of the borehole excavated by the expansion wing, The cross section of the expansion wing and the pile main body viewed from the pile axial direction has a similar square shape, and the positions of the first corner and the second corner coincide with each other on the same line in the radial direction, The expansion wing is The corner of the square is the first corner, The entire surface is of uniform thickness and has a protrusion on the underside of the expansion wing. The protruding portion protrudes in the axial direction of the pile without The expansion wing is a plate-like member that does not move in a straight line and does not penetrate the ground. The method includes the steps of applying downward pressure to the steel pipe pile with the underside of the expansion wing in direct contact with the ground to press the expansion wing into the ground, and rotating the steel pipe pile to excavate the ground.

[0008] Another aspect of the steel pipe pile of the present disclosure is a steel pipe pile that is installed in the ground by the above-mentioned steel pipe pile construction method, in which the pile body and the expansion wing provided at the lower end of the pile body are integrally formed. [Brief description of the drawings]

[0009] [Figure 1]FIG. 1 is a perspective view showing a construction state of a steel pipe pile according to an embodiment of the present disclosure. [Diagram 2] FIG. [Diagram 3] FIG. 2 is a plan view of the enlarged wing of the steel pipe pile viewed from above. [Figure 4] FIG. 2 is a plan view of the pile body of the steel pipe pile viewed from above. [Diagram 5] FIG. 13 is a side view of the main part showing the construction procedure of the steel pipe pile, showing the state in which the expansion wings are placed on the ground. [Figure 6] FIG. 6 is a side view of the main part showing the construction procedure of the steel pipe pile following FIG. 5, showing the state during pressing. [Figure 7] FIG. 7 is a side view of the main part showing the construction procedure of the steel pipe pile subsequent to FIG. 6, showing the state during press-in rotation. [Figure 8] FIG. 2 is a side view showing the construction state of the steel pipe pile. [Figure 9] FIG. 11 is a plan view of an enlarged wing of a steel pipe pile according to a first modified example, viewed from above. [Figure 10] FIG. 11 is a plan view of the enlarged wing of the steel pipe pile according to the second modified example, viewed from above. [Figure 11] FIG. 13 is a plan view of an enlarged wing of a steel pipe pile according to a third modified example, viewed from above. [Figure 12] FIG. 13 is a plan view of the enlarged wing of the steel pipe pile according to the fourth modified example, viewed from above. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] As shown in Fig. 1, the steel pipe pile construction method of this embodiment is a construction method for installing a steel pipe pile 1 in the ground G. In the construction method of this embodiment, the steel pipe pile 1 is driven into the ground G by a driving device (not shown) using a rotational force and a downward load (press-in).

[0011] The steel pipe pile 1 used in this construction method comprises a pile body 2 made of a steel pipe, and a flat expansion wing 3 whose lower end 2a of the pile body 2 is closed by a plate surface perpendicular to the pile axis O direction, and which is expanded from the outer peripheral surface 2b of the pile body 2 when viewed from the pile axis O direction, and has at least one corner 3c (four in this embodiment) formed on the plate outer peripheral edge 3d.

[0012] A rectangular steel pipe with a square cross section is used for the pile body 2. The lower end 2a of the pile body 2 is perpendicular to the pile axis O. A rectangular steel pipe with a relatively small cross section, in which a first width dimension L1 of one side shown in FIG. 2 is, for example, 80 to 120 mm, is used for the pile body 2. The pile body 2 can be constructed by joining multiple steel pipes in the longitudinal direction according to the length of the steel pipe pile 1.

[0013] The above-mentioned pile axis O is an axis line passing through the central axis of the pile main body 2. In the direction of the pile axis O, the side of the expansion wing 3 is defined as the lower side, and the side opposite the expansion wing 3 is defined as the upper side. In the following description, the direction going around the pile axis O as viewed from the pile axis O direction is defined as the circumferential direction.

[0014] As shown in Figures 1 to 3, the expansion wing 3 is a member that has the function of cutting the ground G when the steel pipe pile 1 is excavated, and presses the ground G downward around the lower end 2a of the pile main body 2, ensuring sufficient tip bearing capacity. The expansion wing 3 is a plate-shaped member with a certain thickness dimension D. The expansion wing 3 is integrally joined by a fixing means such as welding, for example, in a factory or a work site, with the plate surface center aligned with the pile axis O and one surface (upper surface 3a) of the expansion wing 3 abutting against the lower end 2a of the pile main body 2. The expansion wing 3 is provided so that the plate surfaces (upper surface 3a and lower surface 3b) are oriented in a direction perpendicular to the pile axis O.

[0015] The expansion wing 3 has a square plate shape when viewed from the pile axis O direction, and the four corners 3c of the expansion wing 3 (1st corner)and the angle between the extension wing 3 and the pile body 2 is 90 degrees. The extension wing 3 is arranged in a similar shape to the pile body 2 when viewed from the pile axis O direction. That is, the corner 3c of the extension wing 3 is located on an extension line of the line connecting the pile axis O and the corner 2c of the pile body 2. As shown in FIG. 2, the second width dimension L2 of one side of the extension wing 3 is set to be larger than the first width dimension L1 of one side of the pile body 2, and can be set to, for example, 100 to 200 mm. The thickness dimension D of the extension wing 3 can be, for example, 16 mm.

[0016] When driving the steel pipe pile 1 into the ground G, the underside 3b of the expansion wing 3 comes into direct contact with the ground G being excavated when the pile axis O of the pile main body 2 is pressed into the ground G in an approximately vertical direction (see Figures 5 to 7).

[0017] As shown in Fig. 3, the expansion wing 3 rotates in the circumferential direction around the pile axis O together with the pile body 2. The corner 3c of the expansion wing 3 has a cutting function that cuts the ground G located around the corner 3c by rotating in the circumferential direction. The rotation direction of the expansion wing 3 is clockwise (arrow E direction) when viewed from above in the figure, but it may also be counterclockwise. Since the center of the expansion wing 3 coincides with the rotation center of the steel pipe pile 1, the rotation trajectory of the corner 3c of the expansion wing 3 (symbol W shown in Fig. 3) is circular.

[0018] As shown in FIG. 4, the pile body 2 rotates together with the expansion wing 3 in the circumferential direction around the pile axis O. (2nd corner) has a stirring function of stirring the excavated soil Ga placed in the excavation gap S between the corner 2c and the borehole wall 10 by rotating in the circumferential direction. The rotation direction of the pile body 2 is clockwise (arrow E direction) when viewed from above in the figure, but it may be counterclockwise.

[0019] Next, a construction method for driving the above-mentioned steel pipe pile 1 into the ground G will be described with reference to the drawings. This construction method includes a step of applying downward pressure to the steel pipe pile 1 with the lower surface 3b of the expansion wing 3 in direct contact with the ground G to press the expansion wing 3 into the ground G, and a step of rotating the steel pipe pile 1 to excavate the ground G.

[0020] The steel pipe pile 1 to be used is prefabricated in a factory or a work site by joining the expansion wing 3 to the lower end 2a of the pile body 2 by a fixing means such as welding.

[0021] First, the processed steel pipe pile 1 is attached to a pile driving device (not shown). As shown in Fig. 5, the steel pipe pile 1, with the expansion wing 3 integrally joined to the tip (lower end 2a) of the pile body 2, is placed on the ground G. At this time, the pile axis O faces vertically, so the lower surface 3b of the expansion wing 3 is horizontal. The steel pipe pile 1 is held by a leader for raising and lowering provided on the driving device (not shown) so that the pile axis O is vertical.

[0022] The driving device includes a leader and a rotary drive unit that is guided up and down by the leader. The steel pipe pile 1 has a pile body 2 supported by the rotary drive unit, and a downward load P (pressure) is applied by the weight of the rotary drive unit and the weight of the steel pipe pile 1, and the steel pipe pile 1 is rotated in a predetermined direction by the rotary drive of the rotary drive unit. In this embodiment, the pile axis O of the steel pipe pile 1 is arranged in the vertical direction, but depending on the construction conditions, the pile axis O may be oriented in a direction inclined relative to the vertical direction during construction.

[0023] Next, as shown in Fig. 6, the leader of the above-mentioned driving device is lowered, so that a downward load P due to the weight of the rotary drive unit and the weight of the steel pipe pile 1 is applied to the steel pipe pile 1. As a result, the steel pipe pile 1 is pressed into the ground G by the expanding wing 3 to which pressure is applied, and the steel pipe pile 1 sinks.

[0024] Next, as shown in Fig. 7, the rotary drive unit is rotated at the same time as the downward load P is applied to the steel pipe pile 1, and a rotational force F is applied to the steel pipe pile 1 to rotate it. As a result, the expansion wing 3 rotates in a horizontal plane around the pile axis O, and the four corners 3c each act as cutting blades to cut the non-deformed part of the ground G that has not been deformed by the pressing.

[0025] As shown in Figure 8, by continuously applying a downward load P and a rotational force F to the steel pipe pile 1, the corner 3c of the expansion wing 3 cuts the ground G, and the expansion wing 3 is pressed into the ground G on the underside 3b side and descends, thereby driving the steel pipe pile 1 into the ground G.

[0026] 3 and 7, an outlet 31 is formed between the expansion wing 3 and the borehole wall 10, and the excavated soil is discharged from this outlet 31 above the expansion wing 3. By passing the excavated soil Ga directly below the expansion wing 3 through the outlet 31 formed around the expansion wing 3, the ground around the tip of the steel pipe pile 1 is disturbed less, and the steel pipe pile 1 can be penetrated into the ground G with a small pressure force.

[0027] As shown in Fig. 4, the excavated soil Ga discharged above the expansion wing 3 is stirred by the rotation of the pile body 2 in the excavation gap S between the borehole wall 10 and the pile body 2. In this way, by using a square steel pipe for the pile body 2, the excavated soil Ga excavated by the expansion wing 3 can be stirred in the excavation gap S around the pile body 2, so that the consolidation of the excavated soil Ga can be prevented and the excavated soil Ga can be smoothly sent upward, allowing efficient soil discharge.

[0028] The steel pipe pile 1 thus excavated is driven into the ground until it reaches a predetermined depth, completing the work of constructing the steel pipe pile 1 in the ground G.

[0029] Next, a construction method for a steel pipe pile and an action of the steel pipe pile according to this embodiment will be described in detail with reference to the drawings.

[0030] As shown in Fig. 3 and Fig. 7, in this embodiment, a corner 3c is formed in a part of the expansion wing 3 at the tip of the steel pipe pile 1, so that the edge of the corner 3c is effective and acts as an excavation blade. Therefore, the expansion wing 3 is given a rotational force and a downward load, so that the ground G can be excavated. In this embodiment, the expansion wing 3 is a flat plate extending horizontally, and the lower surface 3b of the expansion wing 3 is in direct contact with the ground G below, so that disturbance of the tip soil below the expansion wing 3 can be suppressed, and a stable and highly efficient bearing force can be obtained. In other words, by making the lower surface 3b of the expansion wing 3 flat, the pressure-deformed ground G can be cut, and soil can be efficiently discharged from the soil discharge port 31, which is the gap between the outer periphery 3d of the expansion wing 3 and the borehole wall 10, into the excavation gap S above the expansion wing 3, so that the steel pipe pile 1 can exhibit a high bearing force.

[0031] In this embodiment, the expansion wing 3 made of a flat plate member can be easily joined to the lower end 2a of the pile main body 2 made of a steel pipe by fixing means such as welding, eliminating the need for the time-consuming and costly process of providing cutting claws on a plate-shaped member as in the conventional method.

[0032] In this embodiment, the expansion wing 3 has a square shape and the angle of the corners 3c is 90 degrees, so that the corners 3c of the expansion wing 3 can be sufficiently engaged with the ground G while suppressing slippage, allowing for efficient excavation and soil removal.

[0033] In this embodiment, the corner 3c of the expansion wing 3 is 90 degrees or less, so in the cross-sectional view shown in Figure 3, a certain gap (corresponding to the soil discharge port 31) is always formed during cutting between the circular cross-sectional area of ​​the borehole wall 10 (see the area within the rotation path W of the expansion wing 3) and the square cross-sectional area of ​​the expansion wing 3). Soil can be efficiently discharged upward from this gap.

[0034] As described above, the steel pipe pile construction method and steel pipe pile according to this embodiment are configured to be easily processed, thereby reducing the effort and cost required for processing and eliminating disturbance to the underlying ground.

[0035] Although the embodiment of the steel pipe pile and the construction method for a steel pipe pile according to the present disclosure have been described above, the present disclosure is not limited to the above-described embodiment.

[0036] For example, in the above embodiment, the shape of the expansion wing 3 is a square when viewed from the pile axis O direction, but it is not limited to a square. In short, it is sufficient that the expansion wing is a flat expansion wing with at least one corner formed on the outer periphery of the plate. For example, the shape of the expansion wing can be other regular polygons such as an equilateral triangle, a regular pentagon, or a regular hexagon. The first modified example shown in FIG. 9 may employ an expansion wing 3A that is an equilateral triangle having three corners 3c of 90 degrees or less.

[0037] In addition, if the corners of the expansion wing are regular polygons such as a regular pentagon or regular hexagon with angles exceeding 90 degrees, the external shape approaches a circle, making it difficult to function as a digging blade, and the gap between the expansion wing and the borehole wall (soil discharge port) becomes small, reducing the efficiency of soil discharge. Therefore, a regular polygon with an angle of 90 degrees or less is preferable.

[0038] In the modified examples shown in Fig. 10 to Fig. 12, it is also possible to adopt a shape other than a regular polygon as the shape of the expansion wing. For example, the expansion wing 3B according to the second modified example shown in Fig. 10 is rectangular with four corners 3c when viewed from the pile axis O direction. The expansion wing 3C according to the third modified example shown in Fig. 11 is trapezoidal when viewed from the pile axis O direction. In the third modified example, the corners P1 and P2 at both ends of the trapezoid base of the expansion wing 3 form a circular locus W1 that forms the borehole wall 10. The expansion wing 3D according to the fourth modified example shown in Fig. 12 is cross-shaped when viewed from the pile axis O direction.

[0039] In this embodiment, a square steel pipe is used as the pile body 2, but the pile body 2 is not limited to a square steel pipe, and a cylindrical steel pipe may also be used.

[0040] In this embodiment, a fixing means by welding is exemplified as a method for joining the pile main body 2 and the expansion wing 3, but this is not limited to this, and a joining method using, for example, a splice plate and bolts may also be used.

[0041] In addition, the components in the above-described embodiments can be replaced with well-known components as appropriate without departing from the spirit of the present disclosure. [Explanation of symbols]

[0042] 1...Steel pipe pile, 2...Pile body, 2a...Lower end, 3, 3A, 3B, 3C, 3D...Enlarged wing, 3b... Bottom surface, 3c... corner (1st corner) , 3d... outer edge of plate, 10... wall of excavation hole, G... ground, Ga... excavated soil, O... pile shaft, S... excavation gap

Claims

1. In a construction method for steel pipe piles installed in the ground, The steel pipe pile includes a pile body made of a square steel pipe, and a flat expansion wing in which a lower end of the pile body is closed by a plate surface perpendicular to the pile axis direction, and which is expanded from the outer circumferential surface of the pile body when viewed from the pile axis direction, and a first corner portion forming at least one cutting blade is formed on the outer circumferential edge of the plate; The pile body has at least one second corner portion, and the second corner portion has a function of stirring the excavated soil between the excavated hole wall excavated by the expansion wing, The cross section of the expansion wing and the pile main body viewed from the pile axial direction has a similar square shape, and the positions of the first corner and the second corner coincide on the same line in the radial direction, The expansion wing is a plate-like member having a square corner as the first corner, a constant thickness as a whole, no protrusion on the lower surface of the expansion wing, and the protrusion does not protrude in the pile axial direction; A step of applying downward pressure to the steel pipe pile with the lower surface of the expansion wing directly in contact with the ground to press the expansion wing into the ground; A step of excavating the ground by rotating the steel pipe pile; 1. A method for constructing a steel pipe pile comprising the steps of:

2. A steel pipe pile installed in the ground by the steel pipe pile installation method according to claim 1, A steel pipe pile, characterized in that the pile body and the enlarged wing provided at the lower end of the pile body are integrally formed.

Citation Information

Patent Citations

  • Cutter head for muddy soil pressure type underground boring machine

    JP2003074293A

  • Soil improvement method and management method for the same

    JP2012149503A

  • Steel pipe pile device, steel pipe pile and method for installing steel pipe pile

    JP2018168552A

  • Tip support plate type steel pipe pile and method for supporting steel pipe pile with plate-shaped member

    JP2981463B1

  • JPP2981463B