By vertically aligning the joints of steel sheet piles through lateral press-fitting and sequential joining with temporary piles, the method addresses the instability and strength reduction issues in constructing earth retaining walls, enhancing the structural integrity of the wall.
Patent Information
- Application Number
- JP2021180552
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-11-04
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-11-04
AI Technical Summary
The construction of earth retaining walls using steel sheet piles is hindered by the instability of the steel sheet pile press-in machine when press-fitting piles at high elevations, leading to potential damage or malfunction, and the horizontal alignment of joints results in reduced strength compared to other parts of the wall.
A method involving the lateral press-fitting of steel sheet piles with temporary piles, followed by removal and sequential joining of longer piles to align joints vertically, using a steel sheet pile press-in machine to construct an earth retaining wall with alternating temporary and permanent piles, and connecting them via splicing plates or bolts.
This method enhances the strength of the earth retaining wall by vertically shifting the joints, preventing a significant decrease in strength at the horizontal joints, thus improving the overall structural integrity.
Smart Images

Figure 0007589947000001 
Figure 0007589947000002 
Figure 0007589947000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for constructing an earth retaining wall composed of steel sheet piles. [Background technology]
[0002] Retaining walls are constructed as structures to prevent the collapse of steps of soil and sand formed by filling the soil or excavating the ground. A method of continuously placing steel sheet piles using a steel sheet pile press-in machine is known as a method of constructing the retaining walls. The press-in machine used in this case is a steel sheet pile press-in machine that is operated by an operator to press in new steel sheet piles while moving horizontally on the existing steel sheet piles that have been pressed in.
[0003] Here, when constructing an earth retaining wall with steel sheet piles using a steel sheet pile press-in machine, the following problems arise.
[0004] In other words, when the top end of the pressed-in steel sheet pile is placed at a high position in order to build a retaining wall of the target height, the steel sheet pile press-in machine, which is a heavy object, will operate in an unstable location on top of the steel sheet pile at a high altitude. This will cause the steel sheet pile press-in machine to tip over or fall, resulting in damage or breakdown.
[0005] To avoid such risks, a steel sheet pile can be pressed into place using a steel sheet pile pressing machine so that the upper end is near ground level, and then a steel sheet pile of a specified length can be joined to the upper end of the steel sheet pile to construct a retaining wall of the target height.
[0006] Incidentally, a technology for constructing an earth retaining wall with steel sheet piles is described, for example, in Patent Document 1 (JP Patent Publication No. 2014-015809). Patent Document 1 discloses a technology in which clogging material is poured into the water outside the cofferdam wall in the vicinity of the joints of the steel sheet piles, and the poured clogging material is carried along with the flow of water that flows into the cofferdam work space through gaps in the joints due to the head difference between the cofferdam work space and the water level on the outside, thereby clogging the gaps with the clogging material and suppressing the amount of water leaking into the cofferdam work space. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] JP 2014-015809 A Summary of the Invention [Problem to be solved by the invention]
[0008] However, due to the operating principle of the steel sheet pile press-in machine described above (pressing in a new steel sheet pile while moving horizontally along the existing steel sheet pile), the upper ends of the pressed-in steel sheet piles are aligned. Therefore, joining another steel sheet pile to the upper end of the pressed-in steel sheet pile means joining the steel sheet piles at the same height. In other words, the joints of the steel sheet piles that make up the retaining wall will be in a horizontal line.
[0009] Generally, when steel sheet piles are joined, the strength of the joints is approximately 70% of the strength of the steel sheet piles themselves. This means that the strength of the horizontal joints in a retaining wall constructed with steel sheet piles is significantly reduced compared to other points, causing problems with the strength quality of the retaining wall.
[0010] The present invention has been made in light of the above-mentioned technical background, and aims to provide a method for constructing an earth-retaining wall that can suppress a decrease in strength of the earth-retaining wall constructed by joining an additional steel sheet pile to the upper end of a pressed-in steel sheet pile. [Means for solving the problem]
[0011] In order to solve the above problems, the method for constructing an earth-retaining wall according to the present invention described in claim 1 is a method for constructing an earth-retaining wall by continuously arranging steel sheet piles using a steel sheet pile press-in machine that presses in new steel sheet piles while moving laterally along existing steel sheet piles pressed into the ground, the method comprising: a first press-in side steel sheet pile; a second press-in side steel sheet pile having a total length shorter than that of the first press-in side steel sheet pile; and a temporary steel sheet pile removably joined to an upper portion of the second press-in side steel sheet pile, and the first press-in side steel sheet pile and the temporary steel sheet pile form a retaining wall. The method is characterized by sequentially carrying out the following steps: a first step of alternately pressing in and installing in parallel using the steel sheet pile pressing machine the press-in side steel sheet pile units, each having the same overall length as the steel sheet pile, so that their upper ends are aligned and the temporary steel sheet pile is located on the ground; a second step of removing the temporary steel sheet pile from the press-in side steel sheet pile units; and a third step of joining a first connecting side steel sheet pile in series to the first press-in side steel sheet pile, and joining a second connecting side steel sheet pile, which is longer than the first connecting side steel sheet pile by the length of the temporary steel sheet pile, in series to the second press-in side steel sheet pile.
[0012] The method of constructing a retaining wall of the present invention described in claim 2 is characterized in that, in the invention described in claim 1, the temporary steel sheet pile and the second pressing side steel sheet pile are joined with bolts via a splice plate.
[0013] The method of constructing a retaining wall of the present invention as described in claim 3, in the invention as described in claim 1 or 2 above, is characterized in that in the third step, the first joint side steel sheet pile and the second joint side steel sheet pile are alternately joined to the first press-in side steel sheet pile and the second press-in side steel sheet pile, respectively.
[0014] The method for constructing an earth retaining wall of the present invention as described in claim 4 is characterized in that, in the invention as described in claim 1 or 2 above, in the first step, the first and last pressed-in steel sheet piles are installed so that they are the first pressed-in side steel sheet piles, and in the third step, after all of the second connecting side steel sheet piles have been joined to the second pressing-in side steel sheet piles, the first connecting side steel sheet piles are joined to the first pressing-in side steel sheet piles.
[0015] The method for constructing an earth retaining wall of the present invention as described in claim 5 is characterized in that, in the invention described in any one of claims 1 to 4 above, in the third step, the first joint side steel sheet pile and the second joint side steel sheet pile are hoisted by a crane and lowered onto the upper end of the first press-in side steel sheet pile and the upper end of the second press-in side steel sheet pile, respectively, and joined.
[0016] The method of constructing a retaining wall of the present invention described in claim 6 is characterized in that, in the invention described in any one of claims 1 to 5 above, the first joint side steel sheet pile and the first press-in side steel sheet pile, and the second joint side steel sheet pile and the second press-in side steel sheet pile are joined by bolts or by welding via splice plates. Effect of the Invention
[0017] According to the present invention, the temporary steel sheet piles constituting the press-in side steel sheet pile unit pressed into the ground alternately with the first press-in side steel sheet pile are removed, the first joint side steel sheet pile is joined to the first press-in side steel sheet pile, and the second joint side steel sheet pile is joined to the second press-in side steel sheet pile to construct an earth retaining wall. Therefore, the joint (joint) between the first joint side steel sheet pile and the first press-in side steel sheet pile and the joint (joint) between the second joint side steel sheet pile and the second press-in side steel sheet pile are shifted up and down alternately by the length of the temporary steel sheet pile.
[0018] This makes it possible to suppress the reduction in strength of the retaining wall constructed by joining further steel sheet piles (first joint side steel sheet pile and second joint side steel sheet pile) to the upper ends of the pressed-in steel sheet piles (first pressed-in side steel sheet pile and second pressed-in side steel sheet pile). [Brief description of the drawings]
[0019] [Figure 1] 1A to 1D are explanatory views showing a sequence of a steel sheet pile pressing-in operation by a steel sheet pile pressing machine used in a method for constructing an earth retaining wall according to one embodiment of the present invention. [Diagram 2] FIG. 2 is an explanatory view showing a first press-in side steel sheet pile pressed in in the method for constructing an earth retaining wall according to the embodiment of the present invention. [Diagram 3] FIG. 2 is an explanatory view showing a steel sheet pile unit pressed in adjacent to a first press-in side steel sheet pile in the method for constructing an earth-retaining wall according to the embodiment of the present invention. [Figure 4] FIG. 2 is an explanatory diagram showing a state in which a first press-in side steel sheet pile and a steel sheet pile unit are alternately pressed in in the method for constructing an earth-retaining wall according to the embodiment of the present invention. [Diagram 5] FIG. 5 is an explanatory view showing a state in which the temporary steel sheet piles joined to the steel sheet pile unit shown in FIG. 4 have been removed. [Figure 6] This is an explanatory diagram showing a retaining wall constructed by joining the first connection side steel sheet pile to the upper end of the first press-in side steel sheet pile from Figure 5 and joining the second connection side steel sheet pile to the upper end of the second press-in side steel sheet pile. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0020] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. In the drawings for explaining the embodiment, the same components are generally designated by the same reference numerals, and the repeated description will be omitted.
[0021] First, the operation of pressing in a steel sheet pile by a steel sheet pile pressing machine used in the method for constructing an earth retaining wall according to the present embodiment will be described with reference to FIG.
[0022] In this embodiment, as shown in Fig. 1, Silent Piler (registered trademark) manufactured by Giken Seisakusho Co., Ltd. is used as the steel sheet pile press-in machine 10. This steel sheet pile press-in machine 10 is a press-in machine that presses in a new steel sheet pile Pb while moving horizontally on an existing steel sheet pile Pa pressed into the ground. Note that the steel sheet pile press-in machine 10 may be any press-in machine that can press in the steel sheet pile P by such an operation, and is not limited to the Silent Piler manufactured by Giken Seisakusho Co., Ltd.
[0023] The steel sheet pile press-in machine 10 shown in Fig. 1 includes a saddle 12 provided with a plurality of clamps 11 for gripping an existing steel sheet pile Pa to obtain a reaction force, a mast 13 installed on the upper part of the saddle 12 so as to be slidable in the horizontal direction, and a chuck 14 installed on the mast 13 so as to be movable up and down, which grips the steel sheet pile P and presses it into the ground. The steel sheet pile press-in machine 10 grips the pressed-in steel sheet pile Pa with the chuck 14, raises the mast 13, and in this state, slides the saddle 12 along the mast 13 toward the chuck 14, thereby enabling the machine to move laterally (forward and backward) on the existing steel sheet pile Pa.
[0024] When starting the pressing-in of a steel sheet pile P using such a steel sheet pile pressing machine 10, a reaction frame (not shown) on which the steel sheet pile pressing machine 10 is loaded is placed on the ground, and the reaction frame is gripped by the clamp 11 to press the steel sheet pile P into the ground. This pressing operation is repeated several times to set a steel sheet pile Pa for an initial reaction force, and as shown in Fig. 1(a), when the steel sheet pile pressing machine 10 moves from the reaction frame to the pressed-in steel sheet pile Pa, the clamp 11 grips the steel sheet pile Pa and the mast 13 is slid forward to grip a new steel sheet pile Pb with the chuck 14.
[0025] Then, as shown in Fig. 1(b), the steel sheet pile Pb is pressed in while the chuck 14 is raised and lowered, and the saddle 12 is slid toward the chuck 14 along the mast 13 in the manner described above. After that, as shown in Fig. 1(c), the steel sheet pile Pb is pressed into the ground while the chuck 14 continues to be raised and lowered, and when the steel sheet pile Pb reaches the same height as the existing steel sheet pile Pa as shown in Fig. 1(d), pressing in is completed.
[0026] The steel sheet piles P have a cross-sectional shape in the width direction that is roughly U-shaped or U-shaped, and both ends in the width direction are shaped to engage with the other steel sheet piles P that are oriented in different directions. Therefore, when constructing the retaining wall RW (Figure 6), the steel sheet piles P are pressed in side by side so that their orientations are staggered.
[0027] Now, a method for constructing an earth retaining wall according to this embodiment using the steel sheet pile pressing machine 10 described above will be described with reference to Figs.
[0028] Here, there are four types of steel sheet piles P used in the construction method of the retaining wall RW in this embodiment: two types of steel sheet piles P that are pressed into the ground, namely, a first press-in side steel sheet pile Pp1 and a press-in side steel sheet pile unit Ppu, and two types of steel sheet piles P that are located on the ground, namely, a first joint side steel sheet pile Pj1 and a second joint side steel sheet pile Pj2.
[0029] The first press-in side steel sheet pile Pp1 has a total length of 5 m. The press-in side steel sheet pile unit Ppu is composed of the second press-in side steel sheet pile Pp2 with a total length of 4 m, which is shorter than the first press-in side steel sheet pile Pp1, and the temporary steel sheet pile Pr with a total length of 1 m, which is removably connected to the upper part of the second press-in side steel sheet pile Pp2. The total length of the press-in side steel sheet pile unit Ppu is 5 m, the same as the total length of the first press-in side steel sheet pile Pp1.
[0030] In addition, the total length of the second press-in side steel sheet pile Pp2 is not limited to 4 m, but only needs to be shorter than the total length of the first press-in side steel sheet pile Pp1. Therefore, the total length of the temporary steel sheet pile Pr is not limited to 1 m, but only needs to be set to the same total length as the first press-in side steel sheet pile Pp1 when combined with the total length of the second press-in side steel sheet pile Pp2. In this embodiment, the temporary steel sheet pile Pr and the second press-in side steel sheet pile Pp2 are joined by bolts (not shown) via the splice plate A, but the temporary steel sheet pile Pr is only required to be joined so as to be removable from the second press-in side steel sheet pile Pp2, and does not need to be joined in the manner of this embodiment.
[0031] The first joint side steel sheet pile Pj1 is a steel sheet pile P with a total length of 3 m. The second joint side steel sheet pile Pj2 is a steel sheet pile P with a total length of 4 m. However, the second joint side steel sheet pile Pj2 only needs to be longer than the first joint side steel sheet pile Pj1 by the length of the temporary steel sheet pile Pr, and in this embodiment, since the total length of the temporary steel sheet pile Pr is 1 m, the total length of the second joint side steel sheet pile Pj2 is 4 m, which is 1 m longer than the total length of the first joint side steel sheet pile Pj1. The second connection side steel sheet pile Pj2 is longer than the first connection side steel sheet pile Pj1 by the length of the temporary steel sheet pile Pr so that, as described below, when the first connection side steel sheet pile Pj1 is joined in series to the first press-in side steel sheet pile Pp1 and the second connection side steel sheet pile Pj2 is joined in series to the second press-in side steel sheet pile Pp2, the upper ends of both are aligned horizontally.
[0032] Furthermore, in this embodiment, the widths of these steel sheet piles P (the first press-in side steel sheet pile Pp1, the press-in side steel sheet pile unit Ppu, the first joint side steel sheet pile Pj1, and the second joint side steel sheet pile Pj2) are all 400 mm.
[0033] The above dimensions are not limited values and can be freely set as necessary. For example, in this embodiment, the first press-in side steel sheet pile Pp1 has a total length of 5 m, and the first joint side steel sheet pile Pj1 has a total length of 3 m, which are different from each other, but depending on the height of the target earth retaining wall RW, they may have the same total length.
[0034] Now, in constructing the retaining wall RW, first, in the first step, the first press-in side steel sheet pile Pp1 and the press-in side steel sheet pile unit Ppu are alternately pressed in and arranged in parallel using a steel sheet pile pressing machine 10. That is, as shown in Fig. 2, the first press-in side steel sheet pile Pp1 is pressed in to a predetermined depth (e.g., 3 m), and then, as shown in Fig. 3, the press-in side steel sheet pile unit Ppu is pressed in at an adjacent position so that the end in the width direction engages with the first press-in side steel sheet pile Pp1. At this time, the press-in side steel sheet pile unit Ppu is pressed in to a depth where the upper end of the first press-in side steel sheet pile Pp1 and the upper end of the press-in side steel sheet pile unit Ppu are aligned and the temporary steel sheet pile Pr is located on the ground. Thereafter, the first press-in side steel sheet pile Pp1 and the press-in side steel sheet pile unit Ppu are alternately pressed in in the same manner, and as shown in FIG. 4, the first press-in side steel sheet pile Pp1 and the press-in side steel sheet pile unit Ppu are arranged in parallel.
[0035] In this embodiment, both the first and last pressed-in steel sheet piles are the first press-in side steel sheet piles Pp1, but both the first and last may be the press-in side steel sheet pile units Ppu. Furthermore, the first may be the first press-in side steel sheet pile Pp1 and the last may be the press-in side steel sheet pile unit Ppu, or the first may be the press-in side steel sheet pile unit Ppu and the last may be the first press-in side steel sheet pile Pp1.
[0036] When the pressing-in of the first press-in side steel sheet pile Pp1 and the press-in side steel sheet pile unit Ppu is completed in this way, the temporary steel sheet pile Pr is removed from the press-in side steel sheet pile unit Ppu as the second step, as shown in Fig. 5. As described above, the temporary steel sheet pile Pr and the second press-in side steel sheet pile Pp2 are joined by bolts via the splice plate A, so the bolts are removed to remove the temporary steel sheet pile Pr. As a result, as shown in the figure, when viewed from the front, the first press-in side steel sheet pile Pp1 and the second press-in side steel sheet pile Pp2 are pressed into the ground with unevenness.
[0037] Now, when the temporary steel sheet pile Pr is removed from the press-in side steel sheet pile unit Ppu, the construction of the earth retaining wall RW is completed by joining the first joint side steel sheet pile Pj1 to the first press-in side steel sheet pile Pp1 in series and joining the second joint side steel sheet pile Pj2 to the second press-in side steel sheet pile Pp2 in series as the third step, as shown in Fig. 6. As described above, the second joint side steel sheet pile Pj2 is longer than the first joint side steel sheet pile Pj1 by the length of the temporary steel sheet pile Pr, so that the upper end of the earth retaining wall RW constructed by joining the first joint side steel sheet pile Pj1 to the first press-in side steel sheet pile Pp1 and joining the second joint side steel sheet pile Pj2 to the second press-in side steel sheet pile Pp2 becomes straight along the horizontal direction as shown in the figure.
[0038] Here, when joining heavy objects such as the first joining side steel sheet pile Pj1 and the second joining side steel sheet pile Pj2, for example, they are lifted by a crane (not shown) and lowered to the upper end of the first press-in side steel sheet pile Pp1 and the upper end of the second press-in side steel sheet pile Pp2, respectively, and joined. However, a method other than using a crane may be used. In the present embodiment, the first joining side steel sheet pile Pj1 and the first press-in side steel sheet pile Pp1, and the second joining side steel sheet pile Pj2 and the second press-in side steel sheet pile Pp2 are joined by bolts (not shown) via the splice plate A, but this joining form is not necessary, and they may be joined by, for example, welding.
[0039] As for the joining order, the first joining side steel sheet pile Pj1 and the second joining side steel sheet pile Pj2 can be joined alternately to the first press-in side steel sheet pile Pp1 and the second press-in side steel sheet pile Pp2, respectively. This allows the first press-in side steel sheet pile Pp1 and the second press-in side steel sheet pile Pp2 installed side by side to be joined in order from one end to the other end, and the work can be performed efficiently.
[0040] The joining order is not limited to this, and various methods can be adopted. For example, as shown in Fig. 4, in the first step, the first and last press-in steel sheet piles Pp1 may be installed, and in the third step, the second joining side steel sheet pile Pj2 may be joined to the second pressing side steel sheet pile Pp2, and then the first joining side steel sheet pile Pj1 may be joined to the first pressing side steel sheet pile Pp1. In this way, when the second joining side steel sheet pile Pj2 is joined to the second pressing side steel sheet pile Pp2 in the third step, the second joining side steel sheet pile Pj2 is sandwiched between the first pressing side steel sheet pile Pp1 and is restricted in the lateral direction, so that positioning during joining is easy. Furthermore, when the first joint side steel sheet pile Pj1 is subsequently joined to the first press-in side steel sheet pile Pp1, except in the case where the first joint side steel sheet pile Pj1 is joined to the first press-in side steel sheet pile Pp1 located at both ends, the first joint side steel sheet pile Pj1 is sandwiched between the second press-in side steel sheet pile Pp2 and restricted in the lateral direction, which similarly makes positioning during joining easier.
[0041] As described above, according to this embodiment, the temporary steel sheet piles Pr that constitute the press-in side steel sheet pile unit Ppu pressed into the ground alternately with the first press-in side steel sheet pile Pp1 are removed, and the first joint side steel sheet pile Pj1 is joined to the first press-in side steel sheet pile Pp1 and the second joint side steel sheet pile Pj2 is joined to the second press-in side steel sheet pile Pp2 to construct the retaining wall RW, so that the joint (joint) between the first joint side steel sheet pile Pj1 and the first press-in side steel sheet pile Pp1 and the joint (joint) between the second joint side steel sheet pile Pj2 and the second press-in side steel sheet pile Pp2 are shifted alternately up and down by the length of the temporary steel sheet piles Pr.
[0042] This prevents the strength of the horizontally-aligned joints of the steel sheet piles P that make up the retaining wall RW from decreasing significantly compared to other locations, making it possible to suppress any decrease in strength of the retaining wall RW constructed by joining further steel sheet piles P (first joint side steel sheet pile Pj1 and second joint side steel sheet pile Pj2) to the upper ends of the pressed-in steel sheet piles P (first press-in side steel sheet pile Pp1 and second press-in side steel sheet pile Pp2).
[0043] The invention made by the inventor has been specifically described above based on the embodiment, but the embodiment disclosed in this specification is illustrative in all respects and is not limited to the disclosed technology. In other words, the technical scope of the present invention should not be interpreted restrictively based on the description in the above embodiment, but should be interpreted strictly according to the description in the claims, and includes technologies equivalent to the described technologies in the claims and all modifications that do not deviate from the gist of the claims.
[0044] For example, the steel sheet pile press-in machine 10 used in the present embodiment does not need to be a machine dedicated to pressing in the steel sheet pile P, and may also be capable of extracting the steel sheet pile P. [Industrial Applicability]
[0045] In the present invention, since the retaining wall is constructed on the level ground, the first press-in side steel sheet pile and the press-in side steel sheet pile unit are pressed in to the same depth, but if the same depth is used to construct the retaining wall on inclined ground, the top ends will not be aligned and the inclination will be the same as the inclination of the ground. Therefore, the press-in depth of the first press-in side steel sheet pile and the press-in side steel sheet pile unit is changed according to the inclination of the ground so that the top ends are aligned. [Explanation of symbols]
[0046] 10 Steel sheet pile press-in machine 11 Clamp 12 Saddle 13 Mast 14 Chuck A attachment plate P steel sheet pile Pa Existing steel sheet pile (steel sheet pile) Pb Newly pressed steel sheet pile (steel sheet pile) Pj1 First joint side steel sheet pile (steel sheet pile) Pj2 Second joint side steel sheet pile (steel sheet pile) Pp1 First press-in side steel sheet pile (steel sheet pile) Pp2 Second press-in side steel sheet pile (steel sheet pile) Ppu Press-in side steel sheet pile unit (steel sheet pile) Pr Temporary Steel Sheet Pile RW Earth retaining wall
Claims
1. A method for constructing an earth retaining wall by continuously placing steel sheet piles using a steel sheet pile press-in machine that presses in new steel sheet piles while moving laterally along existing steel sheet piles pressed into the ground, comprising the steps of: a first step of alternately pressing in a first press-in side steel sheet pile, a second press-in side steel sheet pile having a total length shorter than that of the first press-in side steel sheet pile, and a temporary steel sheet pile removably joined to an upper portion of the second press-in side steel sheet pile, the second press-in side steel sheet pile and the temporary steel sheet pile having the same total length as the first press-in side steel sheet pile, using the steel sheet pile pressing machine to install the first press-in side steel sheet pile unit in parallel so that their upper ends are aligned and the temporary steel sheet pile is located on the ground; A second step of removing the temporary steel sheet pile from the press-in side steel sheet pile unit; A third step of connecting a first joint side steel sheet pile to the first press-in side steel sheet pile in series, and connecting a second joint side steel sheet pile, which is longer than the first joint side steel sheet pile by the length of the temporary steel sheet pile, to the second press-in side steel sheet pile in series; A method for constructing an earth retaining wall, comprising the steps of:
2. The temporary steel sheet pile and the second press-in side steel sheet pile are joined by bolts via a splice plate. A method for constructing an earth retaining wall according to claim 1.
3. In the third step, the first joint side steel sheet pile and the second joint side steel sheet pile are alternately joined to the first press-in side steel sheet pile and the second press-in side steel sheet pile, respectively. A method for constructing an earth retaining wall according to claim 1 or 2.
4. In the first step, the first and last press-in steel sheet piles are installed so that the first press-in side steel sheet piles are the first press-in side steel sheet piles, In the third step, the second joint side steel sheet pile is joined to the second press-in side steel sheet pile, and then the first joint side steel sheet pile is joined to the first press-in side steel sheet pile. A method for constructing an earth retaining wall according to claim 1 or 2.
5. In the third step, the first joint side steel sheet pile and the second joint side steel sheet pile are lifted by a crane and lowered to the upper end of the first press-in side steel sheet pile and the upper end of the second press-in side steel sheet pile, respectively, and joined together. A method for constructing an earth retaining wall according to any one of claims 1 to 4.
6. The first joint side steel sheet pile and the first press-in side steel sheet pile, and the second joint side steel sheet pile and the second press-in side steel sheet pile are joined by bolts or welding via splice plates. A method for constructing an earth retaining wall according to any one of claims 1 to 5.
Citation Information
Patent Citations
Water-stop type corner lug steel sheet pile and construction method
CN113373904A
Driving method and driving jig for steel pipe sheet pile
JP1999036283A
Auxiliaty steel sheet pile in road excavation construction work, and driving construction method for steel sheet pile for earth retaining using the auxiliary steel sheet pile
JP2002146773A
Construction method of earth retaining wall
JP2003213686A
Jig for producing steel continuous wall member, method of producing steel continuous wall member, steel continuous wall member, and method of vertically connecting steel continuous members together
JP2007332639A