Setup decision device and setup decision method

The setup determining device and method optimize component supply arrangements to reduce external setups and enhance production efficiency by creating external and internal setup groups, addressing the inefficiencies in existing setup change processes.

JP7591747B2Active Publication Date: 2024-11-29PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2020189524
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-11-13
Publication Date
2024-11-29
Estimated Expiration
2040-11-13

AI Technical Summary

Technical Problem

Existing setup change processes in component mounting lines require significant man-hours and lead to increased downtime due to external setups, especially when producing multiple types of circuit boards, which reduces production efficiency.

Method used

A setup determining device and method that optimizes the arrangement of component supplies on carts by creating external and internal setup groups, allowing for reduced external setups and improved efficiency by associating component supplies across multiple types of boards.

Benefits of technology

Reduces the number of external setups and improves production efficiency by minimizing setup man-hours and equipment downtime through optimized setup group creation and arrangement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007591747000001
    Figure 0007591747000001
  • Figure 0007591747000002
    Figure 0007591747000002
  • Figure 0007591747000003
    Figure 0007591747000003
Patent Text Reader

Abstract

To provide a setup determination device capable of improving the production efficiency of substrates while reducing the number of external setups in the production of multiple types of substrates.SOLUTION: The setup determination device includes: an external setup group creation unit that is communicable with a component mounting device to which a component supply carriage is detachably attached, the component supply carriage having multiple slots to which a component to be supplied used for the production of multiple types of substrates can be placed, and creates multiple external setup groups which perform external setup for arranging the component to be supplied in at least one slot of the multiple slots in the production of different types of substrates in a state where the component supply carriage is not connected to the component mounting device; and an internal setup group creation unit that creates at least one internal setup group while associating with one external setup group in which an internal setup to replace the component to be supplied of at least one slot of the multiple slots in a state where the component supply carriage is connected to the component mounting device by using the multiple types of substrates belonging to at least one external setup group of the multiple external setup groups.SELECTED DRAWING: Figure 15
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a setup decision device and a setup decision method. [Background technology]

[0002] Patent Document 1 discloses a changeover support system for a component mounting line in which a plurality of component mounters arranged along a transport path of the circuit board mount components on a circuit board. In the changeover support system, a batch replacement unit for replacing a plurality of feeders for supplying components or a plurality of nozzles for suctioning components and mounting them on a circuit board is set in each of the plurality of component mounters. In addition, a plurality of batch replacement units that can be replaced with the set batch replacement unit are prepared. Furthermore, the changeover support system stores information on the feeders or nozzles held by each of the plurality of replaceable batch replacement units as setup information, and determines a combination of batch replacement units that includes all the feeders or nozzles to be used in the production after the changeover from among the plurality of prepared batch replacement units based on information on the feeders or nozzles held by the batch replacement units used in the production before the changeover and the stored setup information, and notifies the worker of the combination. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] International Publication No. 2016 / 084143 Summary of the Invention [Problem to be solved by the invention]

[0004] In Patent Document 1, it is possible to reduce the cycle time of production using batch replaceable units by reducing the time required for the process of changeover by an operator, and by selecting the combination that provides the shortest production cycle time when there are multiple combinations of batch replaceable units. However, if there is no combination of batch replaceable units that includes all the feeders to be used in production after the changeover, there is a possibility that the changeover cannot be supported.

[0005] Here, the man-hours for changeover (hereinafter, referred to as "changeover man-hours") will be explained. Changeover requires 1 to 2 minutes of changeover man-hours for changing one carrier tape (component), even for an experienced worker. In particular, external changeover, which is performed on a cart not connected to a component mounting device between production of boards, is a changeover in which many of the carrier tapes (components) required for the production of a group of boards including multiple different types of boards are mounted on carts (for example, 10 or 20 cars) connected to each of multiple component mounting devices, and therefore requires significantly more man-hours of changeover than internal changeover, which is performed on a cart connected to a component mounting device by temporarily stopping the production line for the boards. In addition, external changeover is often performed during the production of other boards, but when external changeover is performed by a small number of workers, it may not be completed before the production of other board groups is completed. Therefore, if the number of external changeovers increases, the time the production line is stopped increases, which can have a significant impact on the decrease in the production efficiency of boards in the entire factory or on the entire floor, for example.

[0006] In addition, in order to reduce the amount of setup man-hours in conventional setup changes, workers could input board groups that group multiple different types of boards that have similar component mounting positions or types of components, and receive support for setup changes that can reduce the amount of setup man-hours for external setup from, for example, a setup change support system for a component mounting line. However, because the production of boards using conventional methods required external setup for each board group input by the worker, when the number of board groups increased, the number of carts used for external setup was insufficient, and waiting times for setup changes sometimes occurred.

[0007] The present disclosure has been devised in consideration of the above-described conventional circumstances, and aims to provide a setup determination device and a setup determination method that can reduce the number of external setups in the production of multiple types of boards and improve the production efficiency of the boards. [Means for solving the problem]

[0008] The present disclosure provides a setup determination device capable of communicating with a component mounting device to which a component supply cart having a plurality of slots in which component supplies used in the production of a plurality of types of boards can be detachably attached, the device including: an external setup group creation unit that creates a plurality of external setup groups that perform external setup between the production of different types of boards, in which the component supply cart has a plurality of slots in which component supplies can be placed, when the component supply cart is not connected to the component mounting device; and an internal setup group creation unit that creates at least one internal setup group by associating internal setup, in which the component supply cart is connected to the component mounting device and the plurality of types of boards belonging to at least one of the plurality of external setup groups, with the one external setup group, to create at least one internal setup group. The external setup group creation unit creates the multiple external setup groups in which the component supplies necessary for the production of each of the multiple types of boards are arranged in extended cart data in which the number of slots of the component supply cart is extended, and the internal setup group creation unit restores the number of slots of the component supply cart from the extended cart data to create at least one internal setup group in which the component supplies used for the production of the multiple types of boards associated with the at least one external setup group are accommodated in the number of slots of the component supply cart. The present invention provides a setup decision device. The present disclosure also provides a setup determination device capable of communicating with a component mounting device to which a component supply cart having a plurality of slots in which component supplies used in the production of a plurality of types of boards can be detachably attached, the setup determination device comprising: an external setup group creation unit that creates a plurality of external setup groups for performing external setup, for placing component supplies in at least one of the plurality of slots, between the production of different types of boards, when the plurality of types of boards are not connected to the component mounting device, and an internal setup group creation unit that creates at least one internal setup group by associating internal setup, for replacing component supplies in at least one of the plurality of slots, with the one external setup group, when the plurality of types of boards belonging to at least one of the plurality of external setup groups is connected to the component mounting device; and when the internal setup group creation unit determines that the number of internal setup groups to be created is equal to or greater than a predetermined number, creates and outputs an error notification notifying that the internal setup group cannot be created.

[0009] The present disclosure also provides a setup determination method for a setup determination device that supports setup in the production of multiple types of boards performed by a component mounting device to which a component supply cart having multiple slots in which component supplies can be placed is detachably attached, the setup determination method creating multiple external setup groups for performing external setup between the production of different types of boards, in which the multiple types of boards are arranged to place component supplies in at least one of the multiple slots when the component supply cart is not connected to the component mounting device, and creating at least one internal setup group by corresponding to the one external setup group an internal setup for replacing component supplies in at least one of the multiple slots when the component supply cart is connected to the component mounting device, using the multiple types of boards belonging to at least one of the multiple external setup groups. The present disclosure also provides a setup determination method for a setup determination device that supports setup in the production of multiple types of boards performed by a component mounting device to which a component supply cart having multiple slots in which component supplies can be placed is detachably attached, the setup determination method including the steps of: creating multiple external setup groups in which external setup is performed between the production of different types of boards, for placing component supplies in at least one of the multiple slots while the component supply cart is not connected to the component mounting device, for the multiple types of boards; and creating at least one internal setup group by associating internal setup, for replacing component supplies in at least one of the multiple slots while the component supply cart is connected to the component mounting device, with the one external setup group, using the multiple types of boards belonging to at least one of the multiple external setup groups; and in the step of creating the at least one internal setup group, if it is determined that the number of internal setup groups created is equal to or greater than a predetermined number, the setup determination method creates and outputs an error notification notifying that the internal setup group cannot be created. Effect of the Invention

[0010] According to the present disclosure, the number of external setups required in the production of multiple types of boards can be reduced, thereby improving the production efficiency of the boards. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 is a top view of the interior of a floor on which a component mounting system according to a first embodiment is arranged. [Diagram 2] FIG. 1 is a diagram for explaining a component mounting line according to the first embodiment. [Diagram 3] FIG. 1 is a top view of a component mounting device according to a first embodiment. [Figure 4] FIG. 4 is a cross-sectional view of the component mounting device shown in FIG. 3 from the base to the component supply unit taken along the AA cross-sectional line. [Diagram 5] FIG. 1 is a diagram showing an example of an internal configuration of a management computer according to a first embodiment; [Figure 6A] FIG. 1 is a diagram for explaining a setup table according to the first embodiment. [Figure 6B] FIG. 1 is a diagram for explaining an external setup group and an internal setup group according to the first embodiment. [Figure 7A]FIG. 1 is a diagram for explaining the relationship between a component arrangement table of a first external setup group and a component arrangement table of a first internal setup group according to the first embodiment; [Figure 7B] FIG. 1 is a diagram for explaining the relationship between a component arrangement table of a first internal setup group and a component arrangement table of a fourth internal setup group according to the first embodiment; [Figure 7C] FIG. 1 is a diagram for explaining the relationship between a component arrangement table of a first off-site setup group and a component arrangement table of a second off-site setup group according to the first embodiment; [Figure 8] FIG. 10 is a diagram for explaining an example of an operation procedure (step 10) of a management computer according to the first embodiment. [Figure 9] FIG. 11 is a diagram for explaining an example of an operation procedure (step 11) of a management computer according to the first embodiment. [Figure 10] FIG. 12 is a diagram for explaining an example of an operation procedure (step 12) of a management computer according to the first embodiment. [Figure 11] FIG. 11 is a diagram for explaining an example of an operation procedure (step 14) of the management computer according to the first embodiment. [Figure 12] FIG. 1 is a diagram for explaining an example of an operation procedure (step 20) of a management computer according to the first embodiment. [Figure 13] 1 is a flowchart showing an example of an operation procedure of a management computer according to the first embodiment. [Figure 14] A flowchart showing an example of a procedure for creating an internal setup group in a management computer according to the first embodiment. [Figure 15] FIG. 1 is a diagram for explaining the difference between a conventional setup table and the setup table according to the first embodiment. [Figure 16] FIG. 13 is a diagram for explaining an example of an operation procedure (step 30) of a management computer according to the first modification of the first embodiment. [Figure 17] FIG. 1 is a diagram for explaining an example of an operation procedure (step 33, step 100) of a management computer according to the first embodiment. [Figure 18] FIG. 13 is a diagram for explaining an example of an operation procedure (step 32) of the management computer according to the first embodiment. [Figure 19]A flowchart showing an example of an operation procedure of a management computer according to a first modification of the first embodiment. [Figure 20] A flowchart showing an example of an operation procedure of a management computer according to a second modification of the first embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, with reference to the drawings as appropriate, each embodiment specifically disclosing the setup determination device and setup determination method according to the present disclosure will be described in detail. However, more detailed explanation than necessary may be omitted. For example, detailed explanation of already well-known matters and duplicate explanation of substantially the same configuration may be omitted. This is to avoid the following explanation becoming unnecessarily redundant and to facilitate understanding by those skilled in the art. Note that the attached drawings and the following explanation are provided to enable those skilled in the art to fully understand the present disclosure, and are not intended to limit the subject matter described in the claims.

[0013] It should be noted that the terminology used in the following description is illustrative and not limiting, for example the term "carrier tape" includes components that are contained and deliverable on the carrier tape.

[0014] Additionally, the term "external setup" used in the following description refers to setup performed on a carriage not connected to a component mounting device, in which one or more carrier tapes are placed or replaced in each of the carriage's multiple slots. The term "internal setup" refers to setup performed on a carriage connected to a component mounting device, in which one or more carrier tapes are placed or replaced in each of the carriage's multiple slots.

[0015] (Embodiment 1) 1 is a top view of the inside of floor F on which a component mounting system 1 according to embodiment 1 is arranged. The component mounting system 1 according to embodiment 1 is a system that executes a solder printing process of printing solder on a board, a print inspection process of inspecting the solder printed on the board for printing defects, a component mounting process of mounting components on the board after solder printing, a mounting inspection process of inspecting the components mounted on the board, and a reflow process of reflowing the solder printed on the board.

[0016] The component mounting system 1 according to the first embodiment includes a plurality of component mounting lines L1, L2, and L3, a communication network 2, a management computer 3, a setup operation support device 4, and a plurality of carts S1, S2, S3, S4, ... (examples of component supply carts). Although an example of three component mounting lines is shown in Fig. 1, the number of component mounting lines may be one, two, or four or more.

[0017] The communication network 2 connects the management computer 3, each of the multiple component mounting lines L1 to L3, and the setup operation support device 4 so as to enable data communication between them. Note that, although the communication network 2 in the example of Fig. 1 shows an example in which it is connected so as to enable wired communication, it may also be capable of wireless communication. The wireless communication here is a communication method provided in accordance with a wireless communication standard such as wireless LAN (Local Area Network), Bluetooth (registered trademark), or Wi-Fi (registered trademark).

[0018] A management computer 3 as an example of a setup determination device is, for example, a PC (Personal Computer), a tablet, or the like, and is communicatively connected to each of the multiple component mounting lines L1 to L3 (i.e., each of the component mounting devices constituting each of the multiple component mounting lines L1 to L3) and a setup operation support device 4 via a communication network 2. In addition, the management computer 3 includes a user interface (for example, a mouse, keyboard, touch panel, touch pad, pointing device, etc.) capable of receiving user operations, and converts input based on the user operations into control signals.

[0019] The management computer 3 controls the production process including the solder printing process, the print inspection process, and the component mounting process, which are performed by each component mounting device constituting each of the component mounting lines L1 to L3. For example, the management computer 3 generates production information related to the production process input or set in advance by an operator, and an execution command for executing the production process, and transmits them to the component mounting lines that execute these production processes.

[0020] Further, the management computer 3 creates a setup table G0 (see FIG. 6A) for each of the multiple carts used for setup (i.e., all setup including external setup and internal setup) for producing multiple types of boards based on production data for producing these boards input or set in advance by the worker. Specifically, the management computer 3 acquires cart information (e.g., cart identification information, the number of slots the cart has, a part arrangement table of the cart, etc.) for each of the multiple carts S1, ... connected to the setup work support device 4 so as to be able to perform data communication, and creates the setup table G0 based on the acquired cart information and the production data input or set in advance by the worker. In creating the setup table G0, the management computer 3 may refer to the part arrangement table for each of the carts S1, ... stored in the management storage unit 32 (see FIG. 5), or may refer to the part arrangement table for each of the carts S1, ... transmitted from the setup work support device 4. The management computer 3 outputs the created setup table G0 to the display unit 34 (see FIG. 5) and records it in the management storage unit 32 (see FIG. 5).

[0021] The setup table G0 here refers to all setup plans including external setup and internal setup carried out in the production of each type of board. Specifically, the setup table G0 is created by including information on external setup groups OG1, OG2, OG3 (see FIG. 6A) showing information on each external setup, and information on each internal setup group IG11, IG12, IG13, IG14, IG21, IG22, IG23, IG24, IG31, IG32, IG33, IG34 (see FIG. 6A) for each of the multiple carts S1, ... that are set up by each external setup. The setup table G0 does not need to include information on the internal setup groups if internal setup is not required.

[0022] The production data referred to here is information used in the execution of the component mounting process by the component mounting device, and is generated by the management computer 3 and recorded in the management storage unit 32. The production data includes, for example, the size of the board, the position of the board recognition mark, the size of the component, the nozzle suction time, the mounting position, the board (mounting) height, suction nozzle information, the number of boards produced, etc. Note that the production data is not limited to the data of the above items.

[0023] The setup work support device 4 is disposed in the off-site setup area Ap, and is connected to the management computer 3 and each of the multiple carts S1, ... via the communication network 2 so as to be able to communicate data with each other. The setup work support device 4 may be included in the management computer 3 and formed integrally therewith. The setup work support device 4 acquires a part placement table from each of the multiple carts S1, ... and transmits it to the management computer 3.

[0024] Each of the multiple carts S1, ... is arranged in the off-site setup area Ap, and is connected to the setup work support device 4 so as to be able to communicate data with it. Each of the multiple carts S1, ... is detachably attached to a component mounting device, and includes a tape feeder (slot) that supplies one or more components to be mounted on a board in a component mounting process executed by a predetermined component mounting device. Each of the multiple carts S1, ... transmits to the setup work support device 4 at least identification information of the cart and a component placement table including information on the components (carrier tapes) placed in each tape feeder (slot).

[0025] Next, each component mounting device constituting the component mounting line L1 will be described with reference to Fig. 2. Fig. 2 is a diagram illustrating the component mounting line L1 according to the first embodiment. Each of the multiple component mounting lines L1 to L3 has the same configuration, and Fig. 2 describes the production of the board B performed by the component mounting line L1.

[0026] The component mounting line L1 includes a solder printing device M1 as each component mounting device, a print inspection device M2, a plurality of component mounting devices M3 to M6, a mounting inspection device M7, and a reflow device M8. Each of these component mounting devices constituting the component mounting line L1 is connected to a management computer 3 via a communication network 2 so as to be able to communicate data with the management computer 3, and executes control based on a production process execution command sent from the management computer 3.

[0027] Although the component mounting line L1 in the component mounting system 1 according to the first embodiment is illustrated as including a solder printing device M1, a print inspection device M2, each of the component mounting devices M3 to M6, a mounting inspection device M7, and a reflow device M8, it is sufficient that the component mounting line L1 includes at least one component mounting device. In other words, the component mounting line L1 may include at least one component mounting device and a mounting inspection device M7.

[0028] The solder printer M1 executes a solder printing process of printing solder through a mask onto the board B carried in from the upstream side of the component mounting line L1 (the left side of the solder printer M1 shown in FIG. 2) based on solder data (e.g., solder print pattern, etc.) of the board B transmitted from the management computer 3. The solder printer M1 carries out the board B after solder printing to the print inspection device M2.

[0029] The print inspection device M2 executes a print inspection process to inspect the state of the solder printed on the board B carried in from the solder printing device M1 based on the solder data (e.g., solder print pattern, etc.) of the board B transmitted from the management computer 3. The print inspection device M2 is equipped with a camera that captures the carried-in board B, and inspects the state of the solder (i.e., the presence or absence of solder printing defects) using the captured image captured by the camera. The print inspection device M2 records the solder print inspection results of the board B in a memory (not shown) in the print inspection device M2, and carries out the boards B that pass the inspection to the component mounting device M3.

[0030] Each of the multiple component mounting devices M3-M6 executes a component mounting process of mounting one or more components on the board B carried in from the print inspection device M2, based on an execution command transmitted from the management computer 3. Note that the component mounting line L1 is not limited to a configuration of four component mounting devices M3-M6, and may include, for example, one to three component mounting devices M3-M6, or five or more component mounting devices M3-M6.

[0031] Each of the multiple component mounting devices M3 to M6 controls the suction nozzle based on production data of the board B transmitted from the management computer 3, and picks up and removes components from a tape feeder arranged on a dolly attached to the component mounting device. Each of the multiple component mounting devices M3 to M6 transports the components picked up by the suction nozzle to a predetermined position on the board B and mounts them. Each of the multiple component mounting devices M3 to M5 carries out the board B after components are mounted to the next connected component mounting device. In addition, the component mounting device M6 carries out the board B after components are mounted to a mounting inspection device M7.

[0032] The mounting inspection device M7 executes a mounting inspection process to inspect the state of components mounted on the board B carried in from the component mounting device M6 (e.g., whether or not there is a defective mounting position of the components) based on the production data of the board B transmitted from the management computer 3. The mounting inspection device M7 is equipped with a camera that captures the carried-in board B, and inspects the state of the mounted components using the captured image by the camera. The mounting inspection device M7 records the component mounting inspection results of the board B in a memory (not shown) in the mounting inspection device M7, and carries out the board B that passes the inspection to the reflow device M8.

[0033] Based on reflow data for board B sent from management computer 3 (e.g., the transport speed of the conveyor transporting board B, heating temperature, etc.), reflow equipment M8 executes a reflow process of bonding the electrode parts of board B carried in from mounting inspection equipment M7 to one or more mounted components. Reflow equipment M8 heats board B carried in the equipment while transporting it on a conveyer belt, hardening the solder on board B and bonding the electrode parts of board B to one or more mounted components. Reflow equipment M8 carries out board B after reflow to the downstream side of component mounting line L1 (to the right of reflow equipment M8 in FIG. 2).

[0034] Next, the configuration of the component mounting apparatuses M3 to M6 will be described with reference to FIG. 3 and FIG. 4. Each of the component mounting apparatuses M3 to M6 has the same configuration, and only the component mounting apparatus M3 will be described here. FIG. 3 is a top view of the component mounting apparatus M3 according to the first embodiment. FIG. 4 is a cross-sectional view of the component mounting apparatus M3 shown in FIG. 3, taken along the AA cross-sectional line, from the base 6 to the component supply unit SRA. Each of the component mounting apparatuses M3 to M6 according to the first embodiment includes a plurality of component supply units SRA and SRB on both sides (Y direction, −Y direction) of a pair of board transport mechanisms 7 that transport the board B, but the component supply units may be provided only on one side. Furthermore, each of the component mounting apparatuses M3 to M6 according to the first embodiment shows an example having a single lane configuration (i.e., a pair of board transport mechanisms 7 capable of transporting one board B), but may have a dual lane configuration capable of mounting components simultaneously on each of a plurality of boards.

[0035] The component mounting apparatus M3 shown in Figure 3 is composed of a base 6, a board transport mechanism 7, multiple component supply units SRA, SRB, a Y-axis beam 10, an X-axis beam 11, a mounting head 12, a component recognition camera 13, a board recognition camera 14, one or more carrier tapes 15, and multiple reels 16.

[0036] The base 6 is provided with a board transport mechanism 7 for transporting the board B to the central position of the base 6. The board transport mechanism 7 transports and holds the board B carried in from the connected print inspection device M2 (the connected component mounting device in the case of component mounting devices M4 to M6) to a predetermined component mounting position in the central position of the base 6. The board transport mechanism 7 also carries out the board B after components are mounted to the next connected component mounting device M4 (the connected mounting inspection device M7 in the case of component mounting device M6).

[0037] Each of the multiple component supply units SRA, SRB includes multiple tape feeders arranged in parallel to supply components to be mounted on the board B. In the component mounting apparatus M3 according to the first embodiment, an example will be described in which the tape feeder is a double feeder capable of loading two carrier tapes, but the tape feeder may be a single feeder capable of loading one carrier tape. In other words, the component mounting apparatus M3 may be configured with a component supply unit that can load a single feeder and a double feeder at will.

[0038] 3 shows an example in which each of the multiple component supply units SRA, SRB has a function of attaching a carrier tape storing components to be mounted on board B to a tape feeder, and pitch-feeding the components stored on this carrier tape to a component pick-up position by suction nozzle 12b. Each of the multiple component supply units SRA, SRB pitch-feeds each of the carrier tapes storing components in a predetermined tape feed direction, thereby supplying each of the components to the component pick-up position by mounting head 12, which will be described below.

[0039] The component supply unit SRA includes a plurality of tape feeders SRA1, SRA2, ..., SRAK. A tape feeder address is set for each of the plurality of tape feeders SRA1, SRA2, ..., SRAK to specify the position of the tape feeder to which a carrier tape (component) can be attached.

[0040] The component supply unit SRB includes a plurality of tape feeders SRB1, SRB2, ..., SRBK. A tape feeder address is set for each of the plurality of tape feeders SRB1, SRB2, ..., SRBK to specify the position of each tape feeder to which a carrier tape (component) can be attached.

[0041] The management computer 3 stores data of a component placement table created by associating the tape feeder addresses of each of the tape feeders SRA1, SRA2, ..., SRAK in the component supply unit SRA with information on the carrier tape (components) in the management storage unit 32 (see FIG. 5). Similarly, the management computer 3 stores data of a component placement table created by associating the tape feeder addresses of each of the tape feeders SRB1, SRB2, ..., SRBK in the component supply unit SRB with information on the carrier tape (components) in the management storage unit 32 (see FIG. 5).

[0042] A Y-axis beam 10 equipped with a linear drive mechanism is disposed along the Y direction at one end of the upper surface of the base 6 in the X direction. Two X-axis beams 11 similarly equipped with linear drive mechanisms are coupled to the Y-axis beam 10 so as to be movable in the Y and -Y directions. Each of the two X-axis beams 11 is disposed along the X direction. Each of the two X-axis beams 11 is provided with a plate 11a. A mounting head 12 and a board recognition camera 14, which are driven integrally with the X-axis beam 11, are attached to the X-axis beam 11 on the plate 11a.

[0043] The mounting head 12 is driven (moved) integrally with the board recognition camera 14 by the X-axis beam 11, and sucks and holds the component D stored on the carrier tape attached to each of the multiple tape feeders SRA1, ..., SRAK, SRB1, ..., SRBK, and transports it to a mounting position on the board B for mounting. The mounting head 12 includes a suction unit 12a and a suction nozzle 12b. The suction unit 12a executes suction control to suck up the component D. In addition, a suction nozzle 12b is provided at the tip of the suction unit 12a. The suction nozzle 12b sucks and holds the component D or releases the suction and mounts it on the board B based on the execution of the suction control of the suction unit 12a.

[0044] The board recognition camera 14 is driven (moved) integrally with the mounting head 12 by the X-axis beam 11, and captures an image of a board mark (not shown) provided at a predetermined position on the board B from above the board B positioned by the board transport mechanism 7. The board recognition camera 14 transmits the captured image to the management control unit 31 (see FIG. 5) in the component mounting device M3.

[0045] The multiple component recognition cameras 13 are provided between the component supply unit SRA on the base 6 and the board transport mechanism 7, and between the component supply unit SRB on the base 6 and the board transport mechanism 7. Each of the multiple component recognition cameras 13 captures an image of the component D held by the mounting head 12 when the mounting head 12 moves above the component recognition camera 13 after picking up a component stored in the carrier tape 15 in the component supply units SRA and SRB. Each of the multiple component recognition cameras 13 recognizes the holding posture of the component D based on the captured image. Each of the multiple component recognition cameras 13 transmits the captured image to the management control unit 31 (see FIG. 5) in the component mounting device M3.

[0046] The component mounting device M3 processes the captured image of the component D sent from the component recognition camera 13, and acquires the holding attitude of the component D sucked and held by the suction nozzle 12b. The component mounting device M3 also processes the captured image of the board B sent from the board recognition camera 14, and calculates the amount of positional deviation of the board B based on the position information of the board recognition mark of the board B recorded in the production data, the amount of positional deviation of the electrodes (not shown) provided on the board B, and the like. The component mounting device M3 corrects the mounting position or angle of the component D based on the calculated amount of positional deviation of the board B or the amount of positional deviation of the electrodes and the acquired holding attitude of the component D.

[0047] The dolly S0 is configured to be detachable from the base 6, and when attached to the base 6, a control unit (not shown) in the dolly S0 and a control unit (not shown) in the component mounting device M3 are electrically connected. The dolly S0 has a reel 16 that stores, in a wound state, each of the carrier tapes 15 attached to the tape feeder SRAL (the tape feeder SRAL indicates any one of the tape feeders SRA1 to SRAK). The dolly S0 has a reel 16 that stores, in a wound state, each of the carrier tapes 15 attached to the tape feeder SRAL.

[0048] A carrier tape 15 as an example of a component supply is pulled out from a reel 16, and one end side is attached to a tape feeder SRAL. The tape feeder SRAL pitch-feeds the carrier tape 15 to a component pick-up position by the suction nozzle 12b.

[0049] Next, the internal configuration of the management computer 3 according to the first embodiment will be described with reference to Fig. 5. Fig. 5 is a diagram showing an example of the internal configuration of the management computer according to the first embodiment. Note that the management computer 3 according to the first embodiment does not have to be configured to include the setup man-hour calculation unit 31b, the production time calculation unit 31c, and the total production time calculation unit 31d in the management control unit 31, and the setup table information 32d in the management storage unit 32, because these components are not essential components.

[0050] The management computer 3 is connected to the setup operation support device 4 and each of the component mounting lines L1 to L3 so that data communication can be performed between them. For ease of understanding, Fig. 5 shows only each of the component mounting devices M3 to M6 as components included in each of the component mounting lines L1 to L3. The management computer 3 includes a management control unit 31, a management storage unit 32, an input unit 33, a display unit 34, and a communication unit 35.

[0051] The management control unit 31 is configured using, for example, a CPU (Central Processing Unit) or an FPGA (Field Programmable Gate Array), and performs various processes and controls in cooperation with the management storage unit 32. Specifically, the management control unit 31 refers to the programs and data stored in the management storage unit 32 and executes the programs to realize the functions of each unit. The units referred to here are, for example, a setup table creation unit 31a (an example of an external setup group creation unit, an internal setup group creation unit, and an expansion slot change unit), a setup man-hour calculation unit 31b, a production time calculation unit 31c, a total production time calculation unit 31d, and a setup table determination unit 31e. The management control unit 31 executes each function required to create and determine the setup tables required for the production of all boards by using each of these units.

[0052] Furthermore, the management control unit 31 creates production data for each board or component, a component placement table for each cart S1, ... to be attached to and detached from the component mounting device, etc. based on input operations by the worker accepted by the input unit 33, and outputs and stores them in the management storage unit 32. The management control unit 31 creates and outputs a setup table G0 including all the setup plans for producing each of all the boards input by the worker. Furthermore, the management control unit 31 generates execution commands to cause each component mounting device to execute each production process, and outputs and transmits them to the communication unit 35.

[0053] Here, the setup table G0 in the present embodiment 1 will be described with reference to Fig. 6A. Fig. 6A is a diagram for explaining the setup table G0 according to the embodiment 1. Fig. 6B is a diagram for explaining the external setup group OG1 and the internal setup groups IG11, IG12, IG13, IG14 according to the embodiment 1. Note that Fig. 6A shows, as an example, an example in which the setup table G0 is created including three external setup groups OG1 to OG3 used in the production of each of all boards (i.e., three external setups are performed), and four internal setup groups IG11 to IG34 in each of the external setup groups OG1 to OG3 (i.e., four internal setups are performed after each external setup), but it goes without saying that the present invention is not limited to this example. FIG. 6B shows an example in which the external setup group OG1 and the internal setup groups IG11, IG12, IG13, and IG14 perform setups for four carriages SZ1, SZ2, SZ3, and SZ4, respectively.

[0054] Each of the multiple external setup groups OG1 to OG3 shown in Fig. 6A is an external setup plan for producing five or more types of boards among all boards, and is created by including information on the board group to be produced, information on each of the multiple carriages used to produce these boards, and information on the component allocation table of each of these carriages. It goes without saying that the number of types of boards produced by each of the multiple external setup groups OG1 to OG3 shown in Fig. 6A is merely an example and is not limited to this. The number of types of boards produced using the component allocation table indicated by each external setup group and each internal setup group may be at least one type.

[0055] The external setup group OG1 is created to include each of the multiple internal setup groups IG11 to IG14. The internal setup group IG11 is created to include information on component placement tables TBZ21, TBZ22, TBZ23, and TBZ24 in which the placement of one or more carrier tapes (components) has been changed for each of the component placement tables TBZ11, TBZ12, TBZ13, and TBZ14 of the multiple carriages SZ1 to SZ4 set up according to the external setup plan indicated by the external setup group OG1, and information on boards to be produced by this internal setup. The internal setup group IG12 is created to include information on component placement tables in which the placement of one or more carrier tapes (components) has been changed for each of the component placement tables of the multiple carriages SZ1 to SZ4 set up according to the internal setup plan indicated by the internal setup group IG11, and information on boards to be produced by this internal setup. The internal setup group IG13 is created by including information on component placement tables in which the placement of one or more carrier tapes (components) has been changed for each of the component placement tables of the multiple carriages SZ1 to SZ4 set up according to the internal setup plan indicated by the immediately preceding internal setup group IG12, and information on boards to be produced by this internal setup. The internal setup group IG14 is created by including information on component placement tables TBZ31, TBZ32, TBZ33, TBZ34 in which the placement of one or more carrier tapes (components) has been changed for each of the component placement tables of the multiple carriages SZ1 to SZ4 set up according to the internal setup plan indicated by the immediately preceding internal setup group IG13, and information on boards to be produced by this internal setup.

[0056] The external setup group OG2 is created by including each of the multiple internal setup groups IG21 to IG24. The internal setup group IG21 is created by including information on component layout tables in which the layout of one or more carrier tapes (components) has been changed for each of the multiple carts set up by the external setup plan indicated by the external setup group OG2, and information on boards to be produced by this internal setup. The internal setup group IG22 is created by including information on component layout tables in which the layout of one or more carrier tapes (components) has been changed for each of the multiple carts set up by the internal setup plan indicated by the internal setup group IG21, and information on boards to be produced by this internal setup. Each of the internal setup groups IG23 and IG24 is created by including information on component layout tables in which the layout of one or more carrier tapes (components) has been changed for each of the multiple carts set up by the internal setup plan indicated by the previous internal setup group, and information on boards to be produced by this internal setup.

[0057] The external setup group OG3 is created by including each of the multiple internal setup groups IG31 to IG34. The internal setup group IG31 is created by including information on component layout tables in which the layout of one or more carrier tapes (components) has been changed for each component layout table of the multiple carts set up according to the external setup plan indicated by the external setup group OG3, and information on boards to be produced by this internal setup. The internal setup group IG32 is created by including information on component layout tables in which the layout of one or more carrier tapes (components) has been changed for each component layout table of the multiple carts set up according to the internal setup plan indicated by the internal setup group IG31, and information on boards to be produced by this internal setup. Each of the internal setup groups IG33 and IG34 is created by including information on component layout tables in which the layout of one or more carrier tapes (components) has been changed for each component layout table of the multiple carts set up according to the internal setup plan indicated by the previous internal setup group, and information on boards to be produced by this internal setup.

[0058] (Creating off-site setup groups) The setup table creation unit 31a refers to the production data 32a in the management storage unit 32, and acquires a list of all parts used in the production of all boards (i.e., multiple types of boards) to be produced, based on the production data of each of these boards input by the worker. The setup table creation unit 31a creates board groups including multiple types of boards produced by each external setup group (i.e., one external setup, or one external setup and one or more internal setups) among all boards, based on the number or ratio of common parts commonly used in each of all boards. The board groups may be input or set by the worker. The creation of external setup groups for producing one board group will be described below.

[0059] The setup table creation unit 31a acquires the component placement table of each of the carts S1, ... that are not connected to the component mounting device, and creates a plurality of extended cart data each having a component placement table in which the number of slots of each of the carts S1, ... indicated in the setup table is expanded by a predetermined number (for example, N (N: an integer equal to or greater than 1) slots). Note that the setup table creation unit 31a may compare a list of components used in the boards included in the board group with the component placement table of each of the plurality of extended cart data, and create empty slots by deleting all components unnecessary for the production of the board group.

[0060] The setup table creation unit 31a assigns all the components used in any one of the board groups to the empty slots to which no components have been assigned and the expanded slots in the component placement table of each of the multiple expansion cart data created. Here, the setup table creation unit 31a assigns the components to the component placement table of each of the multiple expansion cart data so as to minimize the setup man-hours of the external setup performed for the production of this board group.

[0061] For example, the setup table creation unit 31a preferentially assigns unassigned parts or frequently used parts to empty slots or expansion slots of a cart having a part arrangement table that is highly consistent or similar to the list of parts used in this board group, or preferentially assigns parts that are frequently used in all boards including other board groups or parts that are commonly used in multiple board groups. Furthermore, when the production order of each board group is determined, the setup table creation unit 31a may preferentially assign parts that are frequently used in board groups with higher production orders or parts that are commonly used, or may preferentially assign parts that are used in boards with high production frequencies regardless of production order.

[0062] The setup table creation unit 31a executes the above-mentioned process of creating extended cart data and the process of allocating components to the component allocation table of each of the created extended cart data for each board group, and creates each of a plurality of external setup groups (e.g., each of the external setup groups OG1 to OG3 shown in FIG. 6A) including information on the board group to be produced, information on each of a plurality of carts (i.e., carts from which the extended cart data is created) used in the production of the board group, and a component allocation table for each of the plurality of extended cart data. The setup table creation unit 31a also creates a setup table (e.g., setup table G0 shown in FIG. 6A) including each of the created external setup groups. Note that, if an upper limit is set in advance for the number of external setup groups that can be created by an operator (i.e., the upper limit of the number of external setups performed for the production of all boards), the setup table creation unit 31a may create a number of external setup groups equal to or less than this upper limit, and create a setup table including each of these external setup groups. In addition, if the setup table creation unit 31a determines that a setup table cannot be created with the number of external setup groups below a preset upper limit, it may create an error notification to the effect that a setup table cannot be created, and output the error notification to the display unit 34.

[0063] The setup table creation unit 31a executes a process of returning the number of slots in the part arrangement table of each of the multiple extended cart data included in each of the multiple external setup groups created to the number of slots before the expansion. Here, after returning the number of slots in the part arrangement table to the number of slots before the expansion, if there are parts that cannot be allocated to the slots and there are free slots in other part arrangement tables, the setup table creation unit 31a may allocate the parts that cannot be allocated to the free slots so as to minimize the setup man-hours.

[0064] After restoring the number of slots to the number before expansion, the setup table creation unit 31a judges whether or not all the parts used for the production of the board group produced in each of the external setup groups have been allocated (mounted) in the part arrangement tables of the multiple carriages in all the external setup groups. When the setup table creation unit 31a judges that the parts required for the production of the board group have been allocated (mounted) in all the external setup groups, it creates a setup table including information on the external setup group for each board group, and outputs the setup table to the setup table determination unit 31e.

[0065] (Internal setup group creation process) On the other hand, when the setup table creation unit 31a determines that the components required for the production of the board group have not been allocated (mounted) in all the external setup groups, it selects one of the external setup groups determined to have no components allocated, and executes a process of creating one or more internal setup groups for the selected external setup group. The process of creating an internal setup group for one external setup group will be described below. Note that the internal setup group is a setup plan for making it possible to produce any one type of board included in the board group by replacing the components (carrier tapes) that cannot be allocated by the number of slots that each of the multiple carts has before expansion, by internal setup. Also, the component placement table included in the internal setup group indicates the component placement of each of the multiple carts after the replacement of the components (carrier tapes) by internal setup.

[0066] The setup table creation unit 31a extracts parts that have not been allocated in the selected external setup group (i.e., parts that are necessary for the production of any type of board and are not allocated to the part arrangement table in the external setup group). The setup table creation unit 31a initializes the number of internal setup groups in this external setup group (i.e., initializes the number of internal setup groups to 0 (zero)). The setup table creation unit 31a increments the number of internal setup groups in this external setup group and determines whether the number of internal setup groups after the increment is equal to or greater than a preset upper limit value for the number of internal setup groups. The upper limit value for the number of internal setup groups is set by an operator and stored in the setup upper limit count information 32c in the management storage unit 32. The number of internal setup groups here refers to the number of internal setups performed by an operator during the production of one board group.

[0067] If the setup table creation unit 31a determines that the number of internal setup groups after the increment is equal to or greater than the upper limit value for the number of internal setup groups set in advance, it generates an error notification to the effect that the setup table cannot be created, and outputs the error notification to the display unit 34.

[0068] On the other hand, if the setup table creation unit 31a determines that the number of internal setup groups after the increment is not equal to or greater than the upper limit of the number of internal setup groups set in advance, it creates a component allocation table for each of the multiple carts so that any one type of board included in the board group can be produced with the currently set number of internal setup groups (i.e., the number of internal setups).The setup table creation unit 31a determines whether or not all unallocated parts have been allocated (mounted) in the component allocation table for each of the multiple carts in all the created internal setup groups.

[0069] When the setup table creation unit 31a determines that all unassigned parts have been assigned (mounted) in the component arrangement tables of the multiple carriages in all the created internal setup groups, it creates one or more internal setup groups and creates an external setup group including information on the one or more created internal setup groups. If two or more internal setup groups are created, the setup table creation unit 31a creates an external setup group in which the order information of the internal setup indicated by these internal setup groups and the information on the boards produced by the internal setup indicated by these internal setup groups are associated with each internal setup group. This allows the worker to confirm the order of the internal setup and the production order of each of the multiple types of boards included in the board group produced by the external setup group. The setup table creation unit 31a re-determines whether all parts used in the production of the board group produced by each external setup group have been assigned (mounted) in the setup tables of the multiple carriages in all the external setup groups.

[0070] If the setup table creation unit 31a determines as a result of the re-evaluation that all of the components necessary to produce the board group have been assigned (mounted) in all of the created external setup groups, it creates a setup table including information on all of the created external setup groups and outputs it to the setup man-hour calculation unit 31b and the production time calculation unit 31c, or the setup table determination unit 31e.

[0071] If the setup table creation unit 31a determines as a result of the re-evaluation that all components used in the production of multiple types of boards belonging to each of all external setup groups have not yet been assigned (mounted), it proceeds to the creation process of an internal setup group in any one of the external setup groups to which all components have not yet been assigned (mounted).

[0072] The setup man-hour calculation unit 31b calculates the external setup man-hours (time) required for the external setup indicated by each external setup group and the internal setup man-hours (time) required for the internal setup indicated by each internal setup group based on the setup table created by the setup table creation unit 31a. When the setup man-hour calculation unit 31b calculates the external setup man-hours or the internal setup man-hours, if the information on the setup man-hours (for example, the man-hours required to place or replace one component (carrier tape) in the external setup, or the man-hours required to replace one component (carrier tape) in the internal setup) is set in advance by the worker, the setup man-hour calculation unit 31b may perform the calculation by referring to the information on the setup man-hours. When the number of workers who will perform each external setup or each internal setup is set in advance by the worker, the setup man-hour calculation unit 31b may calculate the setup man-hours (time) based on the number of workers. Furthermore, when the number of workers is not set, the setup man-hour calculation unit 31b may calculate the setup man-hour (time) for each number of workers (for example, the setup man-hour when there is one, two, three, or four workers). The setup man-hour calculation unit 31b outputs the external setup man-hours of each external setup group and the internal setup man-hours of each internal setup group calculated by either the setup table creation unit 31a, the total production time calculation unit 31d, or the setup table determination unit 31e.

[0073] The production time calculation unit 31c calculates the production time required for the production of each board (i.e., the component mounting process performed by each of the multiple component mounting devices M3 to M6) based on the setup table created by the setup table creation unit 31a (specifically, each component placement table in each external setup group and each internal setup group) and the component mounting time (cycle time) per board and the number of boards produced. The production time calculation unit 31c outputs the calculated production time for each board to the total production time calculation unit 31d.

[0074] Total production time calculation unit 31d calculates the total production time required for producing each board (i.e., the total time from the start of external setup to the completion of mounting components on all boards by each of component mounting devices M3 to M6) based on the external setup man-hours of each external setup group and the internal setup man-hours of each internal setup group calculated by setup man-hour calculation unit 31b and the production time of each board calculated by production time calculation unit 31c. Total production time calculation unit 31d outputs the total production time required for producing each board calculated for each setup table or setup table candidate to setup table determination unit 31e.

[0075] The setup table determination unit 31e, which is an example of a minimum production time candidate extraction unit, selects one of the setup table candidates that provides the minimum total production time based on the total production time calculated for each setup table candidate, outputs the setup table candidate to be stored in the setup table information 32d in the management storage unit 32, and outputs the setup table candidate to the display unit 34. When a predetermined upper limit time is set in advance by the operator for the total production time, the setup table determination unit 31e may determine whether the total production time of the setup table output from the total production time calculation unit 31d is equal to or less than the predetermined upper limit time, and when it is determined that the total production time is equal to or less than the predetermined upper limit time, may output the setup table to the setup table information 32d in the management storage unit 32 for storage, and output the setup table candidate to the display unit 34.

[0076] Furthermore, the setup table determination unit 31e in the first embodiment may output the setup table output from the setup table creation unit 31a to the setup table information 32d for storage, and may also output it to the display unit .

[0077] In addition, the setup table determination unit 31e in embodiment 1, like the setup table determination unit 31e in variant example 2 of embodiment 1, may execute calculation processing of the external setup man-hours of each external setup group and the internal setup man-hours of each internal setup group by the setup table calculation unit 31b, calculation processing of the production time of each board by the production time calculation unit 31c, and calculation processing of the total production time of each board by the total production time calculation unit 31d, based on the setup table output from the setup table creation unit 31a.

[0078] The management storage unit 32 has, for example, a RAM (Random Access Memory) as a work memory used when executing each process of the management control unit 31, and a ROM (Read Only Memory) that stores programs and data that define the operation of the management control unit 31. The RAM temporarily stores data or information generated or acquired by the management control unit 31. The ROM has written therein programs that define the operation of the management control unit 31. The management storage unit 32 stores production data 32a, group information 32b, setup upper limit count information 32c, and setup table information 32d.

[0079] The production data 32a is generated for each board and stores the production data for producing the board. The group information 32b stores information on board groups that group all boards to be produced on one component mounting line input by an operator.

[0080] The setup upper limit count information 32c stores the upper limit count of external setup (i.e., the upper limit of the number of external setup groups), the upper limit count of internal setup (i.e., the upper limit of the number of internal setup groups), etc. for each production of all boards entered by the worker.

[0081] The setup table information 32d stores, for each of all boards produced by one component mounting line input by an operator, any one of the setup tables selected by the setup table determination unit 31e, or any one of the setup table candidates selected for each extended group.

[0082] The input unit 33 is a user interface that accepts input operations by an operator, and is configured using, for example, a mouse, a keyboard, a touch panel, a touch pad, a pointing device, etc. The input unit 33 outputs a signal based on the input operation by the operator to the management control unit 31.

[0083] The display unit 34 is configured using, for example, a display such as an LCD (Liquid Crystal Display) or an organic EL (Electroluminescence) display, etc. The display unit 34 displays the setup table created by the management control unit 31, error notifications, etc.

[0084] The communication unit 35 is connected to enable data communication between the setup operation support device 4 and each of the component mounting devices M3 to M6 via the communication network 2. The communication unit 35 transmits a control command based on an input operation by an operator received by the input unit 33 to each of the component mounting devices M3 to M6.

[0085] Here, an example of each part placement table created by the management computer 3 according to embodiment 1 will be described with reference to Fig. 7A to Fig. 7C. Specifically, Fig. 7A to Fig. 7C are diagrams for explaining each part placement table of the carriages SZ1 to SZ4 included in each of the external setup groups OG1, OG2 and the internal setup groups IG11, IG14 created by the management computer 3.

[0086] FIG. 7A is a diagram for explaining the relationship between the component arrangement tables TBZ11-TBZ14 of the first external setup group OG1 and the component arrangement tables TBZ21-TBZ24 of the first internal setup group IG11 according to the first embodiment. FIG. 7B is a diagram for explaining the relationship between the component arrangement tables TBZ21-TBZ24 of the first internal setup group IG11 and the component arrangement tables TBZ31-TBZ34 of the fourth internal setup group IG14 according to the first embodiment. FIG. 7C is a diagram for explaining the relationship between the component arrangement tables TBZ11-TBZ14 of the first external setup group OG1 and the component arrangement tables TBZ41-TBZ44 of the second external setup group OG2 according to the first embodiment. Note that each of "Part 1" to "Part 114" shown in FIG. 7A to FIG. 7C indicates the part name of the part used in production, the identification number assigned to the part, etc.

[0087] Note that the external setup groups OG1, OG2 and the internal setup groups IG11, IG14 shown in Fig. 7A to Fig. 7C correspond to the external setup groups OG1, OG2 and the internal setup groups IG11, IG14 shown in Fig. 6A and Fig. 6B. It goes without saying that the carts and the part arrangement tables shown in Fig. 7A to Fig. 7C are merely examples and are not intended to be limiting. Also, Fig. 7A to Fig. 7C show an example in which the upper limit of the number of internal setup groups is 4 or less (i.e., the upper limit of the number of internal setups is 4), and an example in which four internal setup groups IG11 to IG14 are created in the first external setup group OG1 will be described.

[0088] First, with reference to FIG. 7A, component placement tables TBZ11-TBZ14 of the first external setup group OG1 and component placement tables TBZ21-TBZ24 of the first internal setup group IG11 created by the management computer 3 will be described.

[0089] The management computer 3 assigns the components used in the group of boards produced by the first off-site setup group OG1 to the respective slots of the four carts SZ1 to SZ4, and creates component placement tables TBZ11 to TBZ14.

[0090] The component placement table TBZ11 for the trolley SZ1 can accommodate 12 components (carrier tapes), and is created by assigning each of the 12 components (carrier tapes) indicated by "component 1" to "component 12". The component placement table TBZ12 for the trolley SZ2 can accommodate 12 components (carrier tapes), and is created by assigning each of the 12 components (carrier tapes) indicated by "component 13" to "component 24". The component placement table TBZ13 for the trolley SZ3 can accommodate 12 components (carrier tapes), and is created by assigning each of the 12 components (carrier tapes) indicated by "component 25" to "component 36". The component placement table TBZ14 for the trolley SZ4 can accommodate 12 components (carrier tapes), and is created by assigning each of the 12 components (carrier tapes) indicated by "component 37" to "component 48".

[0091] When the management computer 3 determines that there are parts that could not be allocated to the component allocation tables TBZ11-TBZ14 among all the parts used in the board group produced by the first external setup group OG1, the management computer 3 creates a first internal setup group IG11 including the component allocation tables TBZ21-TBZ24 of the four carriages SZ1-SZ4 so that any one type of board included in the board group can be produced. Note that in the example shown in Fig. 7A, the management computer 3 creates an internal setup group IG11 including the component allocation tables TBZ21-TBZ24 of the four carriages SZ1-SZ4 to which the management computer 3 has assigned each of the eight "parts 49"-"parts 56" capable of producing any one type of board included in the board group.

[0092] Here, the parts arrangement tables TBZ21 to TBZ24 of the four carts SZ1 to SZ4 included in the first internal setup group IG11 shown in FIG. 7A will be described. The parts arrangement table TBZ21 for the cart SZ1 is created with the same parts arrangement as the parts arrangement in the parts arrangement table TBZ11 at the time of the first external setup. The parts arrangement table TBZ22 for the cart SZ2 is created by assigning "part 49" to the position of "part 13", "part 50" to the position of "part 22", and "part 51" to the position of "part 24" in the parts arrangement table TBZ12 at the time of the first external setup. The parts arrangement table TBZ23 for the cart SZ3 is created by assigning "part 52" to the position of "part 25", "part 53" to the position of "part 27", and "part 54" to the position of "part 31" in the parts arrangement table TBZ13 at the time of the first external setup. The part placement table TBZ24 for the trolley SZ4 is created by assigning "part 55" to the position of "part 46" and "part 56" to the position of "part 47" in the part placement table TBZ14 for the first off-site setup.

[0093] As described above, the management computer 3 according to the first embodiment creates an internal setup group IG11 by changing a small number of component layouts shown in the component layout table TBZ11 corresponding to the external setup group OG1. This allows the management computer 3 to create a setup table G0 with a reduced number of external setups. By performing internal setup that changes some of the component layouts using the component layouts on the carts that have been set up in the external setup, a worker can shorten the downtime of various devices that make up the mounting line and improve the operation rate of the mounting line.

[0094] 7B, the component layout tables TBZ21-TBZ24 of the first internal setup group IG11 and the component layout tables TBZ31-TBZ34 of the fourth internal setup group IG14 created by the management computer 3 are compared. Note that illustration and description of example component layout tables of the second internal setup group IG12 and the third internal setup group IG13 are omitted.

[0095] After creating the third internal setup group, if the management computer 3 determines that there are any parts that have not been allocated among all the parts used in the group of boards produced in the first external setup group OG1, it creates a fourth internal setup group IG14 that includes component placement tables TBZ31 to TBZ34 for each of the four carts SZ1 to SZ4 that can produce any one type of board.

[0096] Here, the component arrangement tables TBZ31 to TBZ34 of the four carts SZ1 to SZ4 included in the fourth internal setup group IG14 shown in Fig. 7B will be described. The component arrangement table TBZ31 for cart SZ1 is created with the same component arrangement as that of the component arrangement table TBZ11 at the time of the first external setup. The component arrangement table TBZ32 for cart SZ2 is created with three changes to the component arrangement from the component arrangement table TBZ12 at the time of the first internal setup, and with multiple new parts "part 59" to "part 61" assigned to each of the parts. The component arrangement table TBZ33 for cart SZ3 is created with three changes to the component arrangement from the part arrangement table TBZ13 at the time of the first internal setup, and with multiple new parts "part 62" to "part 64" assigned to each of the parts. The part placement table TBZ34 for the cart SZ4 has five different part placements from the part placement table TBZ14 for the first internal setup, and is created by newly assigning multiple parts, "part 65" to "part 69." Note that each of the above-mentioned parts, "part 59" to "part 69," only needs to be assigned to the part placement table in either the second internal setup group IG12, the third internal setup group IG13, or the fourth internal setup group IG14.

[0097] As described above, the management computer 3 according to the first embodiment creates a plurality of internal setup groups by changing the layout of components shown in the component layout table TBZ11 corresponding to the external setup group by small increments, based on the upper limit of the number of internal setup groups set by the worker. This allows the management computer 3 to create a setup table G0 with a reduced number of external setups. By performing internal setup multiple times in which some of the component layouts are changed using the component layouts on the carts set up in the external setup, the worker can shorten the downtime of various devices constituting the mounting line and improve the operation rate of the mounting line.

[0098] The management computer 3 may create a part placement table that reduces the number of carts whose part placement is changed when creating an internal setup group. The management computer 3 may create a part placement table so that the part placement of one or more carts does not change during multiple internal setups, as shown in, for example, part placement table TBZ21 of the first internal setup group IG11 and part placement table TBZ31 of the fourth internal setup group IG14. This allows workers to perform internal setups more efficiently.

[0099] Next, referring to Fig. 7C, the component arrangement tables TBZ11-TBZ14 of the first off-site setup group OG1 and the component arrangement tables TBZ41-TBZ44 of the second off-site setup group OG2 created by the management computer 3 are compared. Note that in the example shown in Fig. 7C, the number of carts included in the second off-site setup group OG2 and the number of slots each cart has are the same as the number of carts included in the first off-site setup group OG1 and the number of slots each cart has, but it goes without saying that the present invention is not limited to this.

[0100] Management computer 3 assigns all of the components used in the group of boards produced by the second off-site setup group OG2 to the slots of the four carts SZ1-SZ4, respectively, to create component arrangement tables TBZ41-TBZ44. As shown in Fig. 7C, the types and arrangements of the components mounted on the carts set up by workers in each off-site setup are significantly different.

[0101] The component placement table TBZ41 for the trolley SZ1 can accommodate 12 components (carrier tapes), and is created by allocating one component indicated as "part 12" and each of the 11 components (carrier tapes) indicated as "part 70" to "part 80" in the component placement table TBZ31 included in the fourth internal setup group IG14 of the first external setup group OG1. The component placement table TBZ42 for the trolley SZ2 can accommodate 12 components (carrier tapes), and is created by allocating two components indicated as "part 17" and "part 61" and each of the 10 components (carrier tapes) indicated as "part 81" to "part 90" in the component placement table TBZ32 included in the fourth internal setup group IG14 of the first external setup group OG1. The component placement table TBZ43 for the cart SZ3 can accommodate 12 components (carrier tapes), and is created by allocating each of the 12 components (carrier tapes) indicated by "component 91" to "component 102." The component placement table TBZ44 for the cart SZ4 can accommodate 12 components (carrier tapes), and is created by allocating each of the 12 components (carrier tapes) indicated by "component 103" to "component 114."

[0102] The management computer 3 according to the first embodiment is used for the production of each of a plurality of types of boards, and can collectively optimize the setup man-hours for all setups including external setups and internal setups, while automatically creating a setup table that suppresses an increase in the number of external setups (for example, the setup table G0 shown in FIG. 6A). The management computer 3 according to the first embodiment can also create one or more internal setup groups in which the layout of components shown in the component layout table corresponding to the external setup group is changed by a small number of times. This allows the management computer 3 to create the setup table G0 in which the number of external setups is reduced. Therefore, a worker can shorten the downtime of various devices constituting the mounting line and improve the operation rate of the mounting line by performing internal setup in which some component layouts are changed using the component layouts of the carts that have been set up in the external setup.

[0103] Next, an example of an operation procedure of the management computer 3 according to the first embodiment shown in Fig. 13 and Fig. 14 will be described with reference to the diagrams illustrating each process of the management computer 3 shown in Fig. 8 to Fig. 12. Fig. 13 is a flowchart showing an example of an operation procedure of the management computer 3 according to the first embodiment. Fig. 14 is a flowchart showing an example of a procedure for creating an internal setup group by the management computer 3 according to the first embodiment.

[0104] The management computer 3 acquires the component placement tables TB1, ... of the carts S1, ... that are placed, for example, in the setup area Ap or on other floors and are not connected to a component mounting device, and creates a plurality of extended cart data each having component placement tables TBA1, ... in which the number of slots in the component placement tables TB1, ... is extended by a predetermined number i (i: an integer greater than or equal to 1) (St10).

[0105] Here, the process of expanding the part placement tables TB1, ... in step St10 will be described with reference to Fig. 8. Fig. 8 is a diagram for explaining an example of the operation procedure (step St10) of the management computer 3 according to the first embodiment. Note that Fig. 8 shows an example in which each of the multiple carts S1, ... has the same K (K: an integer equal to or greater than 1) slots, but it goes without saying that the number of slots may be different for each cart.

[0106] Each of the trolleys S1, ... has a part placement table TB1, ... having K slots SR1, SR2, ..., SRK, respectively. The management computer 3 creates a plurality of extended trolley data by extending the part placement table TB1, ... of each of the trolleys S1, ... by i slots. Each of the part placement tables TBA1, ... of the extended extended trolley data after extension has (K+i) slots SR1, SR2, ..., SRK, SR(K+1), ..., SR(K+i), respectively. Note that in step St10, the management computer 3 does not assign parts to each of the extended slots.

[0107] The management computer 3 assigns all the components used in the production of any one of the board groups to the empty slots to which no components have been assigned and the expanded slots in the component allocation tables TBA1, ... of each of the multiple expansion cart data created. Here, the management computer 3 determines each of the component allocation tables TBA1, ... in which components have been assigned to the component allocation tables TBA1, ... of each of the multiple expansion cart data so as to minimize the amount of setup man-hours for the external setup performed for the production of this board group (St11). The management computer 3 creates each of the multiple external setup groups GR11, ..., GRN1 including each of the multiple expansion cart data used in the production of this board group based on the component allocation tables TBA1, ... of each of the multiple expansion cart data after the component allocation process (St11).

[0108] The management computer 3 executes the above-mentioned creation of the external setup group for each board group, and creates a plurality of external setup groups capable of producing each of all boards input by the operator. If an upper limit value for the number of external setup groups (i.e., the upper limit number of external setups) is set in advance by the operator, the setup table creation unit 31a may create an external setup group whose number is equal to or less than this upper limit. Furthermore, the management computer 3 may obtain information (such as the number of suction nozzles, the size and weight of components that can be picked up, and the pickup speed) regarding the mounting heads 12 provided on each of the component mounting devices M3 to M6 that produce the board group, and create the component placement tables TBA1, ... so that the time (i.e., the cycle time) for mounting components on each board by each of the component mounting devices M3 to M6 is minimized.

[0109] Here, the process of determining each of the multiple off-site setup groups GR11, ..., GRN1 in step St11 will be described with reference to Fig. 9. Fig. 9 is a diagram for explaining an example of the operation procedure (step St11) of the management computer 3 according to the first embodiment. In the explanation of Fig. 9, an example is shown in which the number of board groups is N (N: an integer equal to or greater than 1), as an example. Also, an example is shown in which the number of carts used in the off-site setup indicated by each of the off-site setup groups GR1, ... is 6, as an example.

[0110] The management computer 3 creates N external setup groups GR11, ..., GRN1 for producing each board group. For example, the first external setup group GR11, indicated by group "1", is created by including each of the component arrangement tables TBA11, TBA12, TBA13, TBB11, TBB12, and TBB13 of the data of six extension carriages. The external setup group is created by further including information on the board group (not shown) and information on each of the six carriages corresponding to each of the data of the six extension carriages, but is not shown here for ease of explanation. Each of the six component arrangement tables TBA11 to TBA13, TBB11 to TBB13 indicates the component arrangement of each carriage. The Nth external setup group GRN1, indicated by group "N", includes each of the component arrangement tables TBAN1, TBAN2, TBAN3, TBBN1, TBBN2, and TBBN3 of the data of six extension carriages. Each of the six part arrangement tables TBAN1 to TBAN3, TBBN1 to TBBN3 indicates the arrangement of parts on each cart.

[0111] The management computer 3 executes a process of returning the number of slots in the part placement table of each of the multiple extended cart data included in each of the multiple created off-site setup groups GR11 to GRN1 to the number of slots before the expansion (i.e., returning the number of slots from (K+i) to K) (St12).

[0112] Here, the process of returning the number of slots in the part placement tables TBA1, ... in the multiple expansion cart data in step St12 to the number of slots before expansion will be described with reference to Fig. 10. Fig. 10 is a diagram for explaining an example of the operation procedure (step St12) of the management computer 3 according to the first embodiment. Note that Fig. 10 describes an example in which the processing in step St12 results in the occurrence of parts that cannot be allocated to the part placement table (i.e., cannot be loaded on the cart), but it goes without saying that the present invention is not limited to this.

[0113] The first external setup group GR12 indicated by group "1" in FIG. 10 indicates a state in which the number of slots ((K+i) pieces) in each of the component placement tables TBA11 to TBA13, TBB11 to TBB13 has been returned to the number of slots (K pieces) before the expansion. In the first external setup group GR12, the processing in step St12 makes it impossible to allocate each of the multiple components P11, P12, ..., P16, ..., PG1, ..., PG6 that were assigned to the expanded slots. In addition, the first external setup group GRN2 indicated by group "N" indicates a state in which the number of slots ((K+i) pieces) in each of the component placement tables TBAN1 to TBAN3, TBBN1 to TBBN3 has been returned to the number of slots (K pieces) before the expansion. In the Nth external setup group GRN2, the processing in step St12 makes it impossible to allocate each of the multiple components PN1, ... that were assigned to the expanded slots.

[0114] Here, after restoring the number of slots in the component placement table to the number of slots before expansion, if there are any components that cannot be allocated to slots and there are free slots in another component placement table, the management computer 3 may allocate the remaining parts to the free slots so as to minimize the setup man-hours.

[0115] The management computer 3 determines whether or not all components used in the production of multiple types of boards belonging to each of the created off-site setup groups have been assigned (mounted) in the component placement tables of the multiple carts in all of the off-site setup groups GR12, ..., GRN2 (St13).

[0116] When the management computer 3 determines that all components used in the production of multiple types of boards belonging to each off-site setup group have been assigned (mounted) (St13, YES), it creates a setup table including information on the off-site setup group for each board group and outputs it to the display unit 34.

[0117] On the other hand, when the management computer 3 determines that all the components used in the production of the multiple types of boards belonging to each off-site setup group have not been allocated (mounted) (St13, NO), it selects one of the off-site setup groups (for example, the off-site setup group GR12 shown in FIG. 11) to which it has been determined that all the components have not been allocated (St14). Here, the off-site setup group GR12 to which it has been determined that all the components have not been allocated will be described with reference to FIG. 11. FIG. 11 is a diagram for explaining an example of the operation procedure (step St14) of the management computer 3 according to the first embodiment.

[0118] In the process of step St14, the management computer 3 selects the first off-site setup group GR12 indicated by group "1" as any one off-site setup group to which all components used in the production of the board group have not yet been assigned. In the off-site setup group GR12, each of the components P11, P12, ... P16, ... PG1, ... PG6 that were mounted in each of the expanded slots is in an unassigned state in the multiple component placement tables TBA11-TBA13, TBB11-TBB13.

[0119] The management computer 3 proceeds to an internal setup group creation process for creating one or more internal setup groups for the selected external setup group GR12 (St15). Note that the following description will be given of an example of the internal setup group creation process for the external setup group GR12 shown in FIG. 11.

[0120] The management computer 3 initializes the number of internal setup groups of this external setup group GR12 (that is, initializes the number of internal setup groups to 0 (zero)) (St16).

[0121] The management computer 3 increments the number of internal setup groups in this external setup group GR12 (St17), and determines whether the number of internal setup groups after the increment is equal to or greater than a preset upper limit for the number of internal setup groups (St18). The upper limit for the number of internal setup groups is set by an operator, and is stored in the upper setup count information 32c in the management storage unit 32. By setting an upper limit for the number of internal setups, an operator can suppress an increase in setup man-hours due to an increase in the number of internal setups, and can easily adjust the number and placement of operators performing internal setups.

[0122] If the management computer 3 determines in the processing of step St18 that the number of internal setup groups after the increment is equal to or greater than the upper limit value of the number of internal setup groups that was set in advance (St18, YES), it creates an error notification to the effect that the setup table cannot be created, and outputs the error notification to the display unit 34 (St19).

[0123] On the other hand, if the management computer 3 determines in the processing of step St18 that the number of internal setup groups after the increment is not greater than or equal to the upper limit value of the number of internal setup groups set in advance (St18, NO), it creates internal setup groups GR131, ..., GR13G for each of the multiple carts so that any one type of board included in the board group can be produced with the currently set number of internal setup groups (i.e., the number of internal setups) (St20).

[0124] Here, the internal setup groups created in the processing of step St20 will be described with reference to Fig. 12. Fig. 12 is a diagram for explaining an example of the operation procedure (step St20) of the management computer 3 according to the first embodiment. Note that an example in which G (g: integer equal to or greater than 1) internal setup groups are created will be described. Also, each of the parts P11, P12, P13, P14, P15, P16, PG1, PG2, PG3, PG4, PG5, and PG6 shown below indicates a different type of part (carrier tape).

[0125] The management computer 3 creates G internal setup groups GR131, ..., GR13G so that production of all boards included in the board group can be executed by replacing one or more components (carrier tapes) through G internal setups. For example, the first internal setup group GR131 indicated by group "1-1" is created by assigning component P11 to component placement table TBA11, component P12 to component placement table TBA12, component P13 to component placement table TBA13, component P14 to component placement table TBB11, component P15 to component placement table TBB12, and component P16 to component placement table TBB13. Further, the Gth internal setup group GR13G indicated by group "1-G" is created by assigning part PG1 to part placement table TBAG1, part PG2 to part placement table TBAG2, part PG3 to part placement table TBAG3, part PG4 to part placement table TBBG1, part PG5 to part placement table TBBG2, and part PG6 to part placement table TBBG3.

[0126] The management computer 3 determines whether or not all the components used in the production of all the boards included in the board group (e.g., the board group produced by the external setup group GR12) are loaded, based on the part placement tables of the multiple carts of each of all the internal setup groups GR131, ..., GR13G created in the processing of step St20 (St21).

[0127] When the management computer 3 determines in the processing of step St21 that all the components used in the production of all the boards included in the board group have been mounted (St21, YES), it creates an external setup group GR12 including information on each of the created internal setup groups GR131, ..., GR13G. The management computer 3 proceeds to the processing of step St13, and re-determines whether or not all the components used in the production of all the boards have been assigned (mounted) to each of the external setup groups GR12, ..., GRN2, based on the component arrangement tables of each of the multiple carts in all the created external setup groups GR12, ..., GRN2.

[0128] On the other hand, if the management computer 3 determines in the processing of step St21 that all of the components used in the production of the board group have not been mounted (St21, NO), it proceeds to the processing of step St17, increments the number of internal setup groups currently set, and executes the internal setup group creation process again.

[0129] Here, the difference between a conventional setup table and the setup table G0 created by the management computer 3 according to embodiment 1 will be described with reference to Fig. 15. Fig. 15 is a diagram for explaining the difference between the conventional setup table and the setup table G0 in embodiment 1.

[0130] An operator inputs information on a plurality of board groups, each including a plurality of types of boards having similar parts arrangements, or a parts list to be used in production, into a management computer, etc. Conventionally, the management computer creates and outputs a plurality of external setup groups OGA1, OGA2, OGA3, OGA4, OGA5, and OGA6 as a setup table for external setup corresponding to each of the board groups, based on the information on the plurality of board groups input by the operator.

[0131] On the other hand, the management computer 3 according to the first embodiment creates a plurality of external setup groups OG1-OG3 so as to minimize the external setup man-hours based on the production data of all boards input by the worker or the component arrangement tables of the plurality of carts S1, ... as described above, and creates a plurality of internal setup groups corresponding to the created plurality of external setup groups OG1-OG3. For example, in the example shown in Fig. 15, the management computer 3 creates four internal setup groups IG11-IG14 for the external setup group OG1, four internal setup groups IG21-IG24 for the external setup group OG2, and four internal setup groups IG31-IG34 for the external setup group OG3. The management computer 3 creates and outputs a setup table G0 including each of the created plurality of external setup groups OG1-OG3 and one or more internal setup groups corresponding to each of the plurality of external setup groups OG1-OG3. 15 shows an example in which four internal setup groups are created for each of the external setup groups OG1 to OG3, but the number of internal setup groups created for each external setup group may be different. For example, the management computer 3 may create three internal setup groups for the external setup group OG1, two internal setup groups for the external setup group OG2, and four internal setup groups for the external setup group OG1.

[0132] As described above, the management computer 3 according to the first embodiment can automatically create a setup table that is used in the production of each of a plurality of types of boards and that collectively optimizes the setup man-hours for all setups, including external setup and internal setup. Therefore, the setup man-hours T1 when using the setup table G0 created by the management computer 3 according to the first embodiment is shorter than the setup man-hours T2 when using a setup table created by the conventional method (i.e., each of the plurality of external setup groups OGA1 to OGA6), and the setup man-hours can be reduced.

[0133] Furthermore, the setup table G0 created by the management computer 3 according to the first embodiment optimizes the setup man-hours for all setups, including external setups and internal setups, all together, thereby shortening the equipment downtime of various devices that make up the mounting line. Also, if an operator sets a lower upper limit for the number of internal setups in advance, the operator can increase the amount of external setup work performed at one time and secure work time that can be allocated to other tasks (jobs). On the other hand, when there are few operators performing setup work, the operator can set a higher upper limit for the number of internal setups in advance, reduce the amount of external setup work performed at one time, and perform detailed internal setup work to shorten the equipment downtime of each component mounting device.

[0134] In addition, when an upper limit number of internal setups is set in advance by an operator, the management computer 3 creates each external setup group including an internal setup group with a number equal to or less than the upper limit number, thereby suppressing an increase in the number of internal setups and creating a setup table. In other words, the management computer 3 can improve the operation rate of the mounting line that produces each of the multiple types of boards, and can improve the productivity of the boards by reducing the setup man-hours. Therefore, the operator can reduce the effort required to create a setup table, such as collating parts lists used in the production of all boards to be produced and creating board groups by identifying common parts included in the parts lists. In addition, based on the created setup table, the operator can more easily select the operator who will perform the setup work and allocate the setup work to each operator.

[0135] (First Modification of First Embodiment) The above-mentioned management computer 3 according to the first embodiment creates one setup table (for example, setup table G0 shown in FIG. 6A) for multiple types of boards input by an operator. An example will be described in which the management computer 3 according to the first modification of the first embodiment creates two or more setup table candidates (for example, each of multiple setup table candidates G1, ..., GM shown in FIG. 18) with different numbers of expanded slots for multiple types of boards input by an operator.

[0136] In the management computer 3 according to the first modified example of the first embodiment, a plurality of extension patterns (for example, four patterns of 1, 3, 5, and 7) are set in advance by an operator for the number of slots to be extended. The management computer 3 creates each of the extended cart data in which the number of slots in each of the part arrangement tables of the plurality of carts is extended based on the plurality of extension patterns that have been set. Specifically, when four patterns of 1, 3, 5, and 7 are set as the plurality of extension patterns, the management computer 3 creates four types of extended cart data each having a different number of extended slots (that is, each of the plurality of extended cart data in which the number of slots in each of the part arrangement tables of the plurality of carts is extended by one each, each of the plurality of extended cart data in which the number of slots is extended by three each, each of the plurality of extended cart data in which the number of slots is extended by five each, and each of the plurality of extended cart data in which the number of slots is extended by seven each). The management computer 3 creates and outputs a setup table candidate for each of the different extension patterns described above.

[0137] The internal configuration of the management computer 3 according to the first modification of the first embodiment is similar to that of the management computer 3 according to the first embodiment, and therefore a description thereof will be omitted.

[0138] An example of the operation procedure of the management computer 3 according to the first modification of the first embodiment shown in Fig. 19 will be described with reference to the diagrams illustrating each process of the management computer 3 shown in Fig. 16 to Fig. 18. Fig. 19 is a flowchart showing an example of the operation procedure of the management computer 3 according to the first modification of the first embodiment.

[0139] The management computer 3 is arranged, for example, in the setup area Ap or other floors, etc., and acquires the respective component arrangement tables TB1,... of the carts S1,... that are not connected to the component mounting apparatus. The management computer 3 creates each of a plurality of extended cart data EX11,..., EXM1 having a plurality of extended component arrangement tables TBC1,..., TBD1,... that are extended based on each of the previously set extension patterns (for example, the extension patterns "1-1",..., "1-M" shown in FIG. 16, etc.) according to the number of slots each of the carts S1,... has indicated by the component arrangement tables TB1,... (St30).

[0140] Here, with reference to FIG. 16, the extension process executed in the process of step St30 will be described. FIG. 16 is a diagram for explaining an example of the operation procedure (step St30) of the management computer 3 according to Modification 1 of Embodiment 1. Here, M (M: an integer of 1 or more) extension patterns are set, and an example of creating M types of extended cart data will be described. Note that in FIG. 16, an example is shown in which each of the plurality of carts S1,... has the same K slots, but the number of slots may be different for each cart.

[0141] The first type of extended cart data EX11 indicated by the extension pattern "1-1" is created by having each of the component arrangement tables TBC1,... obtained by extending the number of slots of the component arrangement tables of each of the plurality of carts S1,... by i (i: an integer of 1 or more). Each of the plurality of component arrangement tables TBC1,... in the created extended cart data EX11 has a total of (K + i) slots. Also, the Mth type of extended cart data EXM1 indicated by the extension pattern "1-M" is created by having each of the component arrangement tables TBC1,... obtained by extending the number of slots of the component arrangement tables of each of the plurality of carts S1,... by h (h: an integer of 2 or more and i < h). Each of the plurality of component arrangement tables TBD1,... in the created extended cart data EXM1 has a total of (K + h) slots.

[0142] The management computer 3 determines whether or not the setup table candidates (that is, the setup tables for the respective extension patterns) have been created using the extended carriage data EX11, . . . , EXM1 corresponding to all the extension patterns (St31).

[0143] If the management computer 3 determines in the processing of step St31 that setup table candidates have been created for the extended carriage data EX11, ..., EXM1 corresponding to each of all extended patterns (St31, YES), it stores the setup table candidates for each of the created extended carriage patterns (i.e., each of all extended carriage data EX11, ..., EXM1) in the management memory unit 32 and outputs them to the display unit 34 (St32).

[0144] On the other hand, if the management computer 3 determines in the processing of step St31 that a setup table candidate has not been created for each of all extended carriage patterns (i.e., each of all extended carriage data EX11, ..., EXM1) (St31, NO), it selects any one of all extended patterns (i.e., extended carriage data) for which a setup table candidate has not been created (St33).

[0145] The management computer 3 executes (St100) creation of a setup table candidate that minimizes the number of steps of setup work in the selected extension car pattern (i.e., creation of an external setup group and an internal setup group that minimize the number of steps of setup work for producing each of all boards) based on each of the extension car data created in the selected extension car pattern. Note that the process of step St100 here is each of the processes of steps St11 to St21 described in the first embodiment.

[0146] Here, the processing executed in the processing of step St33 and step St100 will be described with reference to Fig. 17. Fig. 17 is a diagram for explaining an example of the operation procedure (step St33, step St100) of the management computer 3 according to the first embodiment. Note that the processing of step St33 shown in Fig. 17 shows an example in which the first type of extended cart data EX11 shown in the pattern extension pattern "1-1" in Fig. 16 is selected.

[0147] Based on the selected extension cart data EX11, the management computer 3 executes the process of step St100 and creates a setup table candidate G1 when the number of slots to be extended is i. It goes without saying that the number of external setup groups shown in Fig. 17 and the number of internal setup groups created for each external setup group are merely examples and are not limited to these. Also, the number of internal setup groups created for each external setup group need only be equal to or less than the upper limit of the internal setup groups set by the operator, and need not be the same number.

[0148] The setup table candidate G1 includes three external setup groups OG11, OG12, OG13, and is created including information on each of the four internal setup groups IG111, IG112, IG113, IG114 created for the external setup group OG11, each of the four internal setup groups IG121, IG122, IG123, IG124 created for the external setup group OG12, and each of the four internal setup groups IG131, IG132, IG133, IG134 created for the external setup group OG13.

[0149] Moreover, the process executed in the process of step St32 will be described with reference to Fig. 18. Fig. 18 is a diagram for explaining an example of the operation procedure (step St33) of the management computer 3 according to the first embodiment.

[0150] In the process of step St32, the management computer 3 creates and outputs setup table candidates G1, ..., GM for each of the extended carriage data EX11, ..., EXM1 corresponding to all the extended patterns created in the processes of steps St33 and St100.

[0151] As described above, the management computer 3 according to the first modification of the first embodiment creates a plurality of setup table candidates corresponding to each of the extension patterns set in advance. This enables the worker to compare the created plurality of setup table candidates and select a setup table suited to the situation at the site, such as the number of workers available for setup.

[0152] (Modification 2 of the First Embodiment) The above-mentioned management computer 3 according to the first modification of the first embodiment has been described as an example in which two or more setup table candidates corresponding to each extension pattern are created and output. An example will be described in which the management computer 3 according to the second modification of the first embodiment determines and outputs one of the two or more created setup table candidates corresponding to each extension pattern, which determines the total production time required for the production of all the boards to be the shortest.

[0153] The internal configuration of the management computer 3 according to the second modification of the first embodiment essentially includes a setup man-hour calculation unit 31b, a production time calculation unit 31c, a total production time calculation unit 31d, and a setup table determination unit 31e shown in FIG.

[0154] An example of an operation procedure of the management computer 3 according to the second modification of the first embodiment will be described with reference to Fig. 20. Fig. 20 is a flowchart showing an example of an operation procedure of the management computer 3 according to the second modification of the first embodiment. Note that the process of step St200 shown in Fig. 20 is a process of creating two or more setup table candidates executed by the operation procedure of the management computer 3 according to the first modification of the first embodiment shown in Fig. 19, and therefore a detailed description thereof will be omitted.

[0155] The management computer 3 calculates the external setup man-hours (hours) and the internal setup man-hours (hours) for each of the setup table candidates G1, ..., GM based on each of the multiple setup table candidates G1, ..., GM corresponding to each of the created extension patterns (St41). For example, the management computer 3 calculates the external setup man-hours of each of the external setup groups included in each of the setup table candidates G1, ..., GM, and the internal setup man-hours of each of the internal setup groups included in each of the external setup groups.

[0156] The management computer 3 calculates the production time required for producing each board (i.e., the component mounting process performed by each of the multiple component mounting devices M3 to M6) based on the component mounting time (cycle time) per board and the number of boards produced of each type (St42).

[0157] The management computer 3 calculates the total production time required to produce each board (i.e., the total time from the start of external setup to the completion of mounting components on all boards by each of the component mounting devices M3 to M6) based on the external setup man-hours in each external setup group of the setup table candidates G1, ..., GM, and the internal setup man-hours in each internal setup group, and the production time of each board (St43).

[0158] The management computer 3 determines and outputs any one of the setup table candidates G1, . . . , GM, which has the shortest total production time, based on the total production time calculated for each of the setup table candidates G1, . . . , GM (St44).

[0159] As a result, the management computer 3 according to the second modification of the first embodiment can output one of the multiple setup table candidates corresponding to each of the created extension patterns that minimizes the total production time required to produce all the boards. This allows the worker to easily obtain the setup table that minimizes the total production time.

[0160] In addition, when the total setup man-hours, which are the external setup man-hours (hours) and the internal setup man-hours (hours), are set by the worker, the management computer 3 may determine and output one setup table candidate that is equal to or less than the set total setup man-hours (hours) and has the shortest calculated production time. In this way, the management computer 3 according to the second modification of the first embodiment can create a setup table candidate that satisfies the total setup man-hours (hours) set as the upper limit of the time required for the setup work of the worker. In addition, since the worker can obtain a setup table candidate that is equal to or less than the total setup man-hours (hours), the worker can secure time to handle various tasks other than the setup work (for example, tasks when an abnormality occurs in any of the equipment on the floor F). Therefore, the management computer 3 according to the second modification of the first embodiment can support the worker in securing time to handle various tasks other than the setup work.

[0161] As described above, the management computers 3 according to embodiment 1, variant 1 and variant 2 of embodiment 1 are capable of communicating with component mounting devices M3-M6 to which carts S1, ... having multiple slots SR1, ... in which carrier tapes 15 (i.e., components) used in the production of multiple types of boards can be attached and detached. The setup table creation unit 31a (an example of an external setup group creation unit and an internal setup group creation unit) in the management computer 3 creates multiple external setup groups OG1, ... in which external setup is performed between the production of different types of boards, in which a carrier tape (component) is placed in at least one slot of the multiple slots SR1, ... when the carts S1, ... are not connected to the component mounting devices M3 to M6, and creates at least one internal setup group (for example, each of the four internal setup groups IG11 to IG14 corresponding to one external setup group OG1 shown in Figure 6A) by associating internal setup, in which a carrier tape 15 (component) is replaced in at least one slot of the multiple slots SR1, ... when the carts are connected to the component mounting device, using multiple types of boards belonging to at least one external setup group among the multiple external setup groups OG1, ...

[0162] As a result, the management computer 3 according to the first embodiment, the first modification of the first embodiment, and the second modification of the first embodiment can automatically create a setup table (for example, the setup table G0 shown in FIG. 6A) that is used in the production of each of a plurality of types of boards, and that collectively optimizes the setup man-hours for all setups, including external setups and internal setups, while suppressing an increase in the number of external setups. Therefore, by using the setup table created by the management computer 3, the worker can further reduce the equipment downtime of various devices for producing boards. Therefore, the management computer 3 can further improve the operating rate of various devices that make up the mounting line, and further improve the production efficiency of boards by the mounting line.

[0163] As described above, the management computer 3 according to the first embodiment, the first modification of the first embodiment, and the second modification of the first embodiment creates a plurality of external setup groups in which the carrier tapes 15 (components) required for the production of each of the plurality of types of boards are arranged in the extended cart data in which the number of slots of the cart is extended (for example, the extended cart data having the component arrangement table TBA1, ... in which i slots are extended as shown in FIG. 8), and creates at least one internal setup group in which the carrier tapes 15 (components) used for the production of the plurality of types of boards associated with at least one external setup group are accommodated in the number of slots of the cart by restoring the number of slots of the cart from the extended cart data. As a result, the management computer 3 according to the first embodiment, the first modification of the first embodiment, and the second modification of the first embodiment can automatically create a setup table that allows internal setup of all the carrier tapes 15 (components) used for the production of the plurality of types of boards belonging to the external setup group.

[0164] Further, as described above, the setup table creating unit 31a (an example of an extension slot changing unit) in the management computer 3 according to the first modification of the first embodiment changes the number of extension slots in the extension car data. The management computer 3 creates a plurality of candidates for the external setup group and the internal setup group (for example, each of the multiple setup table candidates G1, ..., GM corresponding to each extension pattern shown in FIG. 18) using each of the multiple types of extension car data that have been set (for example, each of the multiple extension car data EX11, ..., EXM1 corresponding to each extension pattern shown in FIG. 16). This allows the management computer 3 according to the first modification of the first embodiment to create each of the multiple setup table candidates based on the set extension pattern. Therefore, the worker can compare each of the multiple created setup table candidates and select a setup table suitable for the site where all boards are produced.

[0165] As described above, the management computer 3 according to the second modification of the first embodiment further includes a total production time calculation unit 31d that calculates the total production time of each of the multiple external setup group and internal setup group candidates (for example, each of the multiple setup table candidates G1, ..., GM corresponding to each extension pattern shown in Fig. 18), and a setup table determination unit 31e (an example of a minimum production time candidate extraction unit) that extracts and outputs multiple external setup group and internal setup group candidates with the shortest total production time from each of the multiple external setup group and internal setup group candidates calculated by the total production time calculation unit. As a result, the management computer 3 according to the second modification of the first embodiment can output any one of the multiple setup table candidates corresponding to each extension pattern created, which has the shortest total production time required to produce all boards.

[0166] As described above, when the management computer 3 according to the first embodiment and the first modification of the first embodiment determines that the number of internal setup groups to be created is equal to or greater than a predetermined number set in advance, it creates and outputs an error notification notifying that the internal setup group cannot be created. As a result, when an upper limit number of internal setups is set in advance by an operator, the management computer 3 according to the first embodiment and the first modification of the first embodiment can create a setup table while suppressing an increase in the number of internal setups by creating each external setup group including an internal setup group that is equal to or less than the upper limit number. In other words, since the management computer 3 can create a setup table that optimizes not only external setups but also internal setups, it is possible to improve the operation rate of a mounting line that produces each of a plurality of types of boards, and to improve the productivity of boards by reducing the number of setup man-hours.

[0167] Although various embodiments have been described above with reference to the accompanying drawings, the present disclosure is not limited to such examples. It is clear that a person skilled in the art can conceive of various modifications, corrections, substitutions, additions, deletions, and equivalents within the scope of the claims, and it is understood that these also belong to the technical scope of the present disclosure. In addition, the components in the various embodiments described above may be arbitrarily combined within the scope of the invention. [Industrial Applicability]

[0168] The present disclosure is useful as a setup determination device and a setup determination method that can reduce the number of external setups in the production of multiple types of boards and improve the production efficiency of the boards. [Explanation of symbols]

[0169] 1 Component mounting system 3 Management Computer 31 Management and Control Unit 31a Setup table creation section 31b Setup man-hour calculation section 31c Production time calculation section 31d Total production time calculation section 31e Setup table determination section 32 Management storage unit 32a Production Data 32b Group Information 32c Setup limit information 32d Setup table information 33 Input section 34 Display section 35 Communications Department M3, M4, M5, M6 component mounting equipment G0 Setup Table G1,GM Setup table candidates S0, S1, S2, S3, S4 trolley SRA,SRB Parts Supply Department SRA1, SRA2, SRAK, SRB1, SRB2, SRBK Tape feeder SR1,SR2,SRK,SR(K+1),SR(K+i),SR(K+h) slots

Claims

1. A setup determination device capable of communicating with a component mounting device to which a component supply cart having a plurality of slots on which component supplies used in the production of a plurality of types of boards can be detachably attached, an external setup group creation unit that creates a plurality of external setup groups that perform external setup between production of different types of boards, in which a component supply item is placed in at least one of the plurality of slots while the component supply cart is not connected to the component mounting device, for the plurality of types of boards; an internal setup group creation unit that creates at least one internal setup group by associating an internal setup of replacing component supplies for at least one slot of the plurality of slots with the one external setup group while the component supply cart is connected to the component mounting device, using the plurality of types of boards belonging to at least one external setup group among the plurality of external setup groups; the off-site setup group creation unit creates the plurality of off-site setup groups in which component supplies necessary for the production of each of the plurality of types of boards are arranged in extended cart data in which the number of slots of the component supply cart is extended; the internal setup group creation unit restores the number of slots of the component supply cart from the extension cart data, and creates the at least one internal setup group in which the component supplies used for production of the multiple types of boards associated with the at least one external setup group are accommodated in the number of slots of the component supply cart. Setup decision device.

2. An extension slot change unit that changes the number of extension slots of the extension cart data, the external setup group creation unit and the internal setup group creation unit create the plurality of candidates for the external setup group and the internal setup group by using each of the plurality of types of extension carriage data set by the extension slot changing unit. The setup determination device according to claim 1 .

3. a total production time calculation unit for calculating a total production time for each of the plurality of candidates for the external setup group and the internal setup group; a minimum production time candidate extraction unit which extracts and outputs a plurality of candidates for the external setup group and the internal setup group which have a minimum total production time from the plurality of candidates for the external setup group and the internal setup group calculated by the total production time calculation unit, The setup determination device according to claim 2 .

4. A setup determination device capable of communicating with a component mounting device to which a component supply cart having a plurality of slots in which component supplies used in the production of a plurality of types of circuit boards can be detachably attached, an external setup group creation unit that creates a plurality of external setup groups that perform external setup between production of different types of boards, in which a component supply item is placed in at least one of the plurality of slots while the component supply cart is not connected to the component mounting device, for the plurality of types of boards; an internal setup group creation unit that creates at least one internal setup group by associating an internal setup of replacing component supplies for at least one slot of the plurality of slots with the one external setup group while the component supply cart is connected to the component mounting device, using the plurality of types of boards belonging to at least one external setup group among the plurality of external setup groups; when it is determined that the number of the internal setup groups to be created is equal to or greater than a predetermined number set in advance, the internal setup group creation unit creates and outputs an error notification to the effect that the internal setup group cannot be created. Setup decision device.

5. A setup determination method for a setup determination device that supports setup in the production of a plurality of types of boards performed by a component mounting device to which a component supply cart having a plurality of slots in which component supplies can be placed is detachably attached, comprising: creating a plurality of off-site setup groups for performing off-site setup between production of different types of boards, in which a component supply is placed in at least one of the plurality of slots while the component supply cart is not connected to the component mounting device; and creating at least one internal setup group by associating an internal setup for replacing component supplies in at least one slot of the plurality of slots with the one external setup group while the component supply cart is connected to the component mounting device, using the plurality of types of boards belonging to at least one external setup group among the plurality of external setup groups; In the step of creating the plurality of off-site setup groups, the plurality of off-site setup groups are created in which component supplies necessary for the production of each of the plurality of types of boards are arranged in extended cart data in which the number of slots of the component supply cart is extended, In the step of creating the at least one internal setup group, the expansion cart data is converted back to the number of slots of the component supply cart, and the at least one internal setup group is created in which the component supplies used for the production of the multiple types of boards associated with the at least one external setup group are accommodated in the number of slots of the component supply cart. How to decide on the setup.

6. A setup determination method for a setup determination device that supports setup in the production of multiple types of boards performed by a component mounting device to which a component supply cart having a plurality of slots into which component supplies can be placed is detachably attached, comprising: creating a plurality of off-site setup groups for performing off-site setup between production of different types of boards, in which a component supply is placed in at least one of the plurality of slots while the component supply cart is not connected to the component mounting device; and creating at least one internal setup group by associating an internal setup for replacing component supplies in at least one slot of the plurality of slots with the one external setup group while the component supply cart is connected to the component mounting device, using the plurality of types of boards belonging to at least one external setup group among the plurality of external setup groups; and when it is determined that the number of the internal setup groups to be created is equal to or greater than a predetermined number set in advance in the step of creating at least one internal setup group, creating and outputting an error notification notifying that the internal setup group cannot be created. How to decide on the setup.

Citation Information

Patent Citations

  • Part mounting method and surface mounting machine

    JP2006012946A

  • Component mounting system

    JP2007318091A

  • Mounter component allocation simulation method, and mounter component allocation simulation device

    JP2017050362A

  • Group determination method and group determination device

    JP2018116990A

  • Tool exchange assistance system and tool exchange assistance method for component mounting line

    WO2016084143A1