Pipe cutting method
The pipe cutting method addresses the issue of protective material damage during pipe expansion by cutting from the inner diameter with multiple cutting parts, ensuring controlled expansion and reduced material damage.
Patent Information
- Application Number
- JP2021092910
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-06-02
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2041-06-02
AI Technical Summary
Existing methods for expanding the diameter of pipes covered with protective materials risk damaging the protective material, such as insulation, due to inward pressure during expansion.
A pipe cutting method that involves cutting the pipe from the inner diameter side using multiple cutting parts with varying diameters, allowing for incremental expansion while minimizing damage to the protective material.
The method effectively increases the inner diameter of the pipe while significantly reducing damage to protective materials, enhancing work efficiency and safety by controlled expansion through multiple cutting stages.
Smart Images

Figure 0007591823000001 
Figure 0007591823000002 
Figure 0007591823000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a pipe cutting method for cutting a pipe. [Background technology]
[0002] Patent Document 1 discloses a diameter expansion device equipped with cutting blades that expands the diameter of an existing pipe (buried plastic pipe) with a circular cross section. The diameter expansion device has an outer periphery that serves as a diameter expansion surface that expands the inner diameter of the existing pipe, and a plurality of cutting blades are arranged radially on the front side of the diameter expansion device, and the tip of a new pipe (replacement plastic pipe) is fixed to the rear of the diameter expansion device.
[0003] In the configuration described in Patent Document 1, a cutting blade is used to form an expansion notch along the pipe axis direction on the inner surface of the existing pipe, the inner diameter of the existing pipe is expanded by the expansion surface of the expansion device, and the new pipe following the expansion device is inserted into the existing pipe by widening the expansion notch and guiding the existing pipe. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Japanese Patent Application Publication No. 10-184996 Summary of the Invention [Problem to be solved by the invention]
[0005] In indoor water supply pipes and the like, protective materials are sometimes provided to cover the outside of the pipe diameter in order to maintain the temperature of the fluid flowing inside and to protect the water supply pipes and the like. However, when an existing pipe covered with a protective material is expanded in diameter by the method described in Patent Document 1, there is a risk that the existing pipe will press against the protective material from the inside of the diameter. When the protective material is pressed, it may crack or break, which is undesirable.
[0006] Therefore, an object of the present invention is to provide a pipe cutting method that can expand the inner diameter of an existing pipe, which has a protective material provided to cover the outer diameter of the existing pipe, while suppressing damage to the protective material. [Means for solving the problem]
[0007] A pipe cutting method according to the present invention is a pipe cutting method using a pipe cutting device including: a cutting unit that removes a wall thickness of an existing pipe from an inner diameter side by rotating around a center in a pipe axial direction to cut an existing pipe having a protective material provided so as to cover the outer diameter of the pipe, the cutting unit including a plurality of types having different lengths of outer diameters passing through the center; a drive unit that is disposed outside the existing pipe and applies a rotational force to the cutting unit; and a connecting unit that is capable of connecting the cutting unit and the drive unit so that a rotational force can be transmitted and is configured to be able to attach the cutting unit in a changeable type, the method including the steps of: attaching one type of cutting unit having an outer diameter larger than the inner diameter of the existing pipe to the connecting unit and applying the rotational force to the cutting unit; the cutting part attached to the connecting part in the changing step is moved along the pipe axis direction of the existing piping while applying a rotational force to the connecting part, thereby cutting a portion of the wall thickness of the existing piping over the entire range to be cut in the pipe axis direction of the existing piping; the cutting part of the one type attached to the connecting part is changed to a cutting part of another type having an outer diameter larger than the one type of cutting part and attached after completion of the first cutting step; and the cutting part of the other type attached to the connecting part in the changing step is moved along the pipe axis direction of the existing piping while applying a rotational force to the cutting part, thereby cutting at least a portion of the wall thickness of the existing piping remaining in the first cutting step over the entire range to be cut.
[0008] According to this configuration, since the cutting is performed multiple times from the inner diameter side, the inner diameter of the existing pipe can be reliably thinned and enlarged, thereby suppressing damage to the protective material. Effect of the Invention
[0009] According to the present invention, a pipe cutting method can be obtained that can expand the inner diameter of an existing pipe that has a protective material provided to cover the outer diameter of the existing pipe while suppressing damage to the protective material. [Brief description of the drawings]
[0010] [Figure 1] 1 is a schematic diagram showing an example of the arrangement of pipes in a building that are the subject of a pipe renewal method including a pipe cutting method according to one embodiment of the present invention. FIG. [Diagram 2] 3 is a diagram showing a pipe cutting device used in the pipe cutting method. FIG. [Diagram 3] 1A is a view showing a connection portion of the pipe cutting device, and FIG. [Figure 4] 1A is a front view of a first cutting part, FIG. 1B is a left side view of the first cutting part, FIG. 1C is a front view of a second cutting part, and FIG. 1D is a left side view of the second cutting part of the pipe cutting device. [Diagram 5] FIG. 2 is a view showing a feed section of the pipe cutting device. [Figure 6] 1A is a view showing a state where the intermediate guide part has passed through the curved portion, and FIG. [Figure 7] 1A is a diagram showing a first cutting step of the pipe cutting method, (a) is a diagram showing a first preparation step, (b) is a diagram showing a first cutting execution step, and (c) is a diagram showing the completion of the first cutting step. [Figure 8] 1A is a diagram showing a second cutting step of the pipe cutting method, in which (a) shows a second preparation step, (b) shows a second cutting execution step, and (c) shows the completion of the second cutting step. [Figure 9] 1A and 1B are diagrams illustrating an insertion process of the piping renewal method, in which (a) is a diagram illustrating a preparation stage of the insertion process, and (b) is a diagram illustrating the completion of the insertion process. [Figure 10] 1A is a diagram showing a second cutting step of the piping renewal method according to another embodiment of the present invention, and FIG. 1B is a diagram showing the completion of the second cutting step. [Figure 11]1A is a diagram showing a process of pulling out an existing pipe in the pipe renewal method, and FIG. 1B is a diagram showing the completion of the pulling out process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] A pipe renewal method including a pipe cutting method according to one embodiment of the present invention will be described with reference to Figures 1 to 9. For convenience of explanation, the inlet 4 and the outlet 5 will be described as the inlet 4 on the side where the cutting part 13 is inserted in the first cutting step in the axial direction of the existing pipe 10, and the outlet 5 on the opposite side. First, an overview of a hot water supply pipe 1 or a cold water supply pipe 2 that is generally used in a building will be described.
[0012] As shown in Fig. 1, generally, at least a middle portion of a hot water supply pipe 1 or a water supply pipe 2 indoors is covered in the pipe axis direction by a floor surface 3. The pipe axis direction is a direction along the axial center of the hot water supply pipe 1 or the water supply pipe 2. In addition, an inlet 4 to an outlet 5 in the pipe axis direction are exposed from the floor surface 3, and the inlet 4 which is the rear end of the hot water supply pipe 1 is connected to a water heater via, for example, a header member 6, and the outlet 5 which is the front end of the hot water supply pipe 1 is connected to, for example, a water faucet 7 in the bathroom. Note that the inlet 4 and the outlet 5 are not limited to being connected as described above, and for example, the inlet 4 may be attached to the water heater via a joint member.
[0013] Since the hot water supply pipe 1 and the water supply pipe 2 have the same configuration, the hot water supply pipe 1 will be described as being used also as the water supply pipe 2. The hot water supply pipe 1 is formed by inserting a flexible inner pipe (existing pipe 10) made of a polyethylene pipe, a cross-linked polyethylene pipe, an aluminum three-layer pipe, or the like, into a protective material 9 made of a tubular insulating material, for example, a foamed resin. In other words, the hot water supply pipe 1 (water supply pipe 2) is flexible and can be bent. The hot water supply pipe 1 is also firmly fixed at a predetermined interval in the pipe axis direction to a slab 3a or the like arranged under the floor surface 3 (not shown).
[0014] This embodiment relates to a pipe renewal method for renewing an existing pipe 10 (an inner pipe covered with a protective material 9), in which the wall thickness of the existing pipe 10 is cut from the inner diameter side, and then a new pipe 11 (see FIG. 9 ) is installed inside the protective material 9 (specifically, inside the existing pipe 10 whose wall thickness has been cut) along the pipe axis direction. Here, the new pipe 11 is installed to a hot water supply pipe 1 having an old inner pipe as the existing pipe 10 and the protective material 9.
[0015] The pipe axis direction is the direction along the axial direction of the hot water supply pipe 1, and the new pipe 11 is also inserted along the pipe axis direction of the hot water supply pipe 1. The new pipe 11 constitutes a new hot water supply pipe 1. Like the existing pipe 10, the new pipe 11 is formed from a polyethylene pipe, a cross-linked polyethylene pipe, a polybutene pipe, an aluminum three-layer pipe, or the like, and is a flexible pipe that can be bent in the axial direction. In addition, in this embodiment, the new pipe 11 is a pipe with an outer diameter smaller than that of the existing pipe 10. Furthermore, the new pipe 11 is a pipe with an outer diameter larger than the inner diameter of the existing pipe 10.
[0016] The piping renewal method according to this embodiment will be specifically described as follows: (1) a pipe wall thickness removing step of removing at least a part of the wall thickness of the existing pipe 10 by cutting the existing pipe 10 from the inlet 4 to the outlet 5 in the pipe axial direction with a cutting part 13; (2) an insertion step of inserting the new pipe 11 into the existing pipe 10 whose inner diameter has been enlarged, from the outlet 5, using an insertion tool (in this case, a pipe insertion tool 23 shown in FIG. 9 ); In this construction method, the protective material 9, the existing pipe 10, and the new pipe 11 have a circular cross section.
[0017] The above-mentioned pipe wall thickness removing process (1) will be described in more detail. The pipe wall thickness removing process (1) is performed by applying a pipe cutting method. Specifically, the pipe wall thickness removing process includes, in the order of execution, a removal process as a preparation stage for cutting, and a pipe cutting execution process for cutting and removing the pipe wall thickness.
[0018] The removal process is a process of making, for one hot water supply pipe 1, a region of the hot water supply pipe 1 exposed to the floor surface 3 into a free end, as shown by the two-dot chain line in FIG.
[0019] The method of performing the removal process involves removing one end (the end on the inlet 4 side) of the hot water supply pipe 1 from the header member 6 to form the inlet 4, removing the other end of the hot water supply pipe 1 from the faucet 7 to form the outlet 5, and forming a single protective material 9 including straight and curved regions (for example, the curved portion 8 in FIG. 1) and the existing pipe 10, with the inlet 4 and the outlet 5 being free ends. This removal process may also include a process of orienting the free end in a convenient (easy to work with) direction in a subsequent process.
[0020] In this removal process, the middle portion of the hot water supply pipe 1 remains firmly fixed to the slab 3a as described above, and therefore the hot water supply pipe 1 (protective material 9 and existing pipe 10) including the straight and curved regions remains. Also, this process makes one end and the other end in the pipe axial direction of the range to be cut in the pipe axial direction of the existing pipe 10 free ends in the pipe cutting execution process described later.
[0021] The pipe cutting execution process is a process of cutting and removing at least a part of the wall thickness of the existing pipe 10 in the hot water supply pipe 1. To cut the existing pipe 10, a pipe cutting device 12 is used that has a cutting part 13 that rotates in a rotation direction R around the center in the pipe axial direction, as shown in Figures 2 and 4.
[0022] The pipe cutting device 12 of this embodiment includes a cutting unit 13 that removes at least a part of the wall thickness of an existing pipe 10 passed through a protective material 9 by rotating the existing pipe 10 around the center in the pipe axial direction, a driving unit 14 that is disposed outside the protective material 9 and the existing pipe 10 and applies a rotational force to the cutting unit 13, and a connecting unit 15 that enables the rotational force to be transmitted between the cutting unit 13 and the driving unit 14. A detailed description will be given below.
[0023] The configuration of the pipe cutting device 12 used in the pipe cutting execution step will be described. As shown in Fig. 2, the pipe cutting device 12 includes a handle 16 that is detachable from the tip of a drive unit 14, a cutting unit 13 arranged on the tip side of the handle 16, and a connecting unit 15 that connects the handle 16 and the cutting unit 13. Also, as shown in Fig. 5 and Fig. 6, the pipe cutting device 12 includes a feed unit 17 configured to push the cutting unit 13 and the connecting unit 15 from the inlet 4 side, and a pulling unit 18 configured to pull the cutting unit 13 from the outlet 5 side.
[0024] As shown in FIG. 2, a typical rotary power tool is used for the drive unit 14, and the main body has a handle 16 connected to its tip, and the cutting part 13 is rotated so that the tube axis direction is the center of rotation.
[0025] Handle 16 in pipe cutting device 12 is formed so as to be detachably connected to the tip shape of drive unit 14. Handle 16 is formed to have a length in the pipe axial direction that can withstand being gripped by drive unit 14 so as to extend along the pipe axial direction. Handle 16 is also configured so as to be able to transmit the rotational force of drive unit 14 to coupling unit 15.
[0026] As shown in FIG. 3, the connecting portion 15 is a portion that connects the handle 16 and the cutting portion 13. The rear end of the connecting portion 15 is connected to the tip of the handle 16, and the tip is connected to the rear end of the cutting portion 13, thereby connecting the handle 16 and the tip. The connecting portion 15 can transmit the rotational force of the drive portion 14 transmitted via the handle 16 to the cutting portion 13. Furthermore, the connecting portion 15 has an attachment portion 151 at the tip to which the cutting portion 13 can be detached. The connecting portion 15 of this embodiment is configured by connecting a plurality of rod-shaped shafts 19 extending in the axial direction. Specifically, the shaft 19 has extension portions 191 at both ends in the axial direction. The extension portions 191 are configured to be connectable to other extension portions 191. That is, by connecting the extension 191 of one shaft 19 to the extension 191 of another shaft 19, the shafts 19 can be connected to each other and the axial length of the connecting portion 15 can be extended. In the shaft 19 of this embodiment, the tip extension 191A, which is the extension 191 provided at the tip, has a male thread, and the rear end extension 191B provided at the rear end has a female thread, and the shafts 19 can be connected to each other by screwing the tip extension 191A and the rear end extension 191B of the other shaft 19. In this embodiment, the tip of the shaft 19 constituting the tip of the connecting portion 15 is provided with a male thread as the mounting portion 151. The mounting portion 151 of this embodiment is a male thread of the same shape as the male thread of the tip extension 191A. That is, the male thread of the tip extension 191A of the shaft 19 provided at the tip portion is the mounting portion 151. However, the present invention is not limited to such a configuration. For example, the tip end of the shaft 19 constituting the tip of the connecting portion 15 may not be provided with the tip extension 191A, and a male screw protruding from the tip side may be provided separately to form the mounting portion 151. The tip extension 191A may be provided with a female screw, and the rear end extension 191B may be provided with a male screw. Even in this configuration, the tip extension 191A and the rear end extension 191B may be screwed together to connect the shafts 19 to each other, as in the above-mentioned case. In addition, in this configuration, a stud bolt, which is a screw having male screws at both ends in the axial direction, may be screwed into the female screw of the tip extension 191A of the shaft 19 constituting the tip of the connecting portion 15, to provide a male screw as the mounting portion 151.
[0027] Each of the shafts 19 includes a cylindrical outer tube portion 192 and a rod-shaped connecting rod portion 193 provided inside the outer tube portion 192. The connecting rod portion 193 is a rod-shaped body capable of transmitting a rotational force from one end side (rear end side) to the other end side (front end side) in the axial direction. That is, the connecting rod portion 193 rotates about the axial center by the rotational force transmitted from the handle 16, and transmits the rotational force from the rear end side to the front end side. In addition, the connecting rod portion 193 and the outer tube portion 192 are provided so as to be relatively rotatable about the axial center. That is, when the connecting rod portion 193 rotates about the axial center, the rotational force is configured not to be transmitted to the outer tube portion 192. In addition, the extension portion 191 is provided so as to be rotatable coaxially with the connecting rod portion 193. Specifically, the extension portion 191 is connected to the connecting rod portion 193 so as to be capable of transmitting the rotational force. Furthermore, the extension part 191 is provided so as to be rotatable relative to the outer cylinder part 192 around the axial center. Specifically, the extension part 191 is provided at an end of the outer cylinder part 192 via a bearing part 194. Therefore, the rotational force applied to one axial end part of the connecting part 15 is transmitted to the other axial end part of the connecting part 15 via the connecting rod part 193 and the extension part 191 of each shaft 19.
[0028] The shaft 19 has flexibility in the axial direction. That is, the connecting portion 15 is configured to be bent along the pipe axis direction of the existing piping 10 when inserted into the existing piping 10. Specifically, the connecting rod portion 193 and the outer cylinder portion 192 have flexibility so that the axis can be bent. The connecting rod portion 193 of this embodiment is composed of a torsion coil spring that is linear in its natural state. Moreover, the outer cylinder portion 192 is composed of a flexible cylindrical body. The outer cylinder portion 192 of this embodiment is composed of a flexible tube made of metal.
[0029] As shown in FIG. 4, the cutting part 13 is a part (cutting tool) that rotates (in a rotation direction R) around the pipe axis of the existing pipe 10 to cut the wall thickness of the existing pipe 10 from the inner diameter side. The cutting part 13 can rotate in the rotation direction R by receiving a rotation force transmitted to the connecting part 15. Specifically, the cutting part 13 includes a cutting base part 131 that is connected to the connecting part 15 so as to be able to transmit the rotation force, and a cutting blade part 132 that is provided radially outward of the cutting base part 131 and has a blade that can cut the wall thickness of the existing pipe 10 in contact with the existing pipe 10, as shown in FIG. 4(a)(b), and a second cutting part 13B that has an outer diameter L2 larger than the outer diameter L1 of the first cutting part 13A as shown in FIG. 4(c)(d). That is, the cutting portion 13 has two types of cutting portions 13 (first cutting portion 13A and second cutting portion 13B) with different outer diameters. Moreover, the outer diameter L2 of the second cutting portion 13B is larger than the inner diameter of the existing pipe 10 and smaller than the outer diameter. Furthermore, the outer diameter L2 of the second cutting portion 13B is larger than the outer diameter of the new pipe 11 described later. The first cutting portion 13A and the second cutting portion 13B have different cutting blade portions 132. That is, the configuration of the cutting base portion 131 in the first cutting portion 13A and the second cutting portion 13B is the same. Since the configuration of the cutting base portion 131 in the first cutting portion 13A and the second cutting portion 13B is the same, when attaching to the attachment portion 151 described later, the first cutting portion 13A and the second cutting portion 13B can be attached in the same way, which improves workability. Note that the shape of the cutting portion 13 is merely an example, and cutting portions 13 of other shapes can also be adopted. That is, the cutting portion 13 may have any configuration as long as it can cut the wall thickness of the existing pipe 10 while rotating.
[0030] The cutting base 131 includes an attachment portion 133 that can be connected to the tip of the connecting portion 15. The attachment portion 133 of this embodiment has a female thread that can be screwed into an attachment portion 151 provided at the tip of the connecting portion 15. The cutting base 131 of this embodiment is configured so that the connection with the tip of the connecting portion 15 can be released. Specifically, by releasing the screw engagement between the attachment portion 133 and the attachment portion 151, the connection between the cutting base 131 and the connecting portion 15 is released.
[0031] The cutting blade portion 132 is a blade provided so as to extend radially outward from the cutting base portion 131. In this embodiment, a plurality of cutting blade portions 132 are provided, and are provided so as to extend radially outward from the plurality of cutting base portions 131 at equal intervals in the circumferential direction. The cutting blade portion 132 is configured so that a tip portion in the rotation direction R becomes a cutting edge 134.
[0032] The first cutting blade portion 132A which is the cutting blade portion 132 of the first cutting portion 13A and the second cutting blade portion 132B which is the cutting blade portion 132 of the second cutting portion 13B have different radial lengths (protruding amount from the cutting base portion 131). Specifically, the radial length of the second cutting blade portion 132B is longer than the radial length of the first cutting blade portion 132A (protruding amount from the cutting base portion 131 is greater).
[0033] The cutting portion 13 of this embodiment is configured to be detachable from the attachment portion 151 of the connecting portion 15. Therefore, the type of cutting portion 13 attached to the connecting portion 15 (first cutting portion 13A and second cutting portion 13B) of the cutting portion 13 of this embodiment is changeable.
[0034] 5, the feed section 17 includes a feeder 171 capable of pushing out the connecting portion 15 (specifically, the shaft 19) from the rear end side toward the front end side, and a tubular auxiliary pipe 173 that connects the feeder 171 and the inlet 4 of the existing piping 10. The feeder 171 is disposed so as to push out the connecting portion 15 from the side relative to the opening of the inlet 4 of the existing piping 10. In other words, the feeder 171 is disposed so as to push out the connecting portion 15 from one radial side relative to the opening of the inlet 4.
[0035] The feeder 171 is a tool that can move the elongated body along the axial direction of the elongated body. The feeder 171 of this embodiment is circular and includes a pair of feeder bodies 172 arranged to sandwich the connecting part 15 from the sides, and the feeder bodies 172 are configured to rotate in opposite directions about an axis in the vertical direction. With this configuration, the feeder 171 can move the connecting part 15 sandwiched between the pair of feeder bodies 172 along the axial direction of the connecting part 15 by rotating the pair of feeder bodies 172. The feeder of this embodiment can operate to move the connecting part 15 to one side in the axial direction or to the other side.
[0036] The auxiliary pipe 173 is a pipe that connects the tip of the feeder 171 and the inlet 4 of the existing pipe 10. The auxiliary pipe 173 is a pipe into which the cutting portion 13 and the connecting portion 15 can be inserted. Specifically, the auxiliary pipe 173 is a pipe whose inner diameter is larger than the inner diameter of the existing pipe 10. The inner diameter of the auxiliary pipe 173 is larger than the outer diameter of the connecting portion 15. The auxiliary pipe 173 is a pipe that is flexible in the axial direction. The auxiliary pipe 173 of this embodiment is attached to the inlet 4 of the existing pipe 10 via a tubular auxiliary pipe attachment jig 174 that extends in front of the opening of the inlet 4 of the existing pipe 10. The auxiliary pipe attachment jig 174 of this embodiment is a pipe that extends linearly and does not have flexibility. At least a part of the auxiliary pipe 173 and the auxiliary pipe attachment jig 174 is configured so that the internal state can be confirmed. In this embodiment, a window through which the internal state can be confirmed is provided in a part of the auxiliary pipe attachment jig 174. By providing a window in a part of the auxiliary pipe attachment jig 174 in this way, the state of the connecting portion 15 and the cutting portion 13 immediately before being inserted into the existing piping 10 can be confirmed.
[0037] 6, the traction unit 18 includes a rope 20 extending from the cutting unit 13 toward the tip side (opposite the connecting unit 15 in the axial direction), an intermediate guide unit 21 provided at a midway point in the extending direction of the rope 20, and a rope connecting unit 22 connecting the rope 20 and the cutting unit 13. Such a traction unit 18 transmits a tensile force pulled from the exit 5 side to the cutting unit 13, and traction the cutting unit 13 toward the exit 5 side. The traction unit 18 of this embodiment is pulled from the exit 5 side by a winch W (see, for example, FIG. 7(c)).
[0038] The rope 20 is a rope having an outer diameter smaller than the inner diameter of the existing pipe 10. The rope is also capable of withstanding the tensile force that pulls the cutting section 13. The rope 20 of this embodiment is made of a metal wire. The rope 20 includes a tip-side rope 20A located on the tip side of the intermediate guide section 21 (the opposite side to the cutting section 13 in the axial direction of the existing pipe 10), and a rear-side rope 20B located on the rear-side of the intermediate guide section 21 (the cutting section 13 side).
[0039] The intermediate guide portion 21 is a portion provided in the middle of the extension direction of the rope body 20. The intermediate guide portion 21 is a portion having an outer diameter larger than the outer diameter of the rope body 20. Specifically, the intermediate guide portion 21 is a tube or column whose outer diameter is approximately the same as the inner diameter of the existing pipe 10. The intermediate guide portion 21 in this embodiment is a cylindrical body. Note that approximately the same as the inner diameter of the existing pipe 10 does not mean a diameter exactly the same as the inner diameter of the existing pipe 10, but means a diameter small enough to allow movement within the existing pipe 10 relative to the inner diameter of the existing pipe 10. That is, the intermediate guide portion 21 is a tube or column whose outer diameter is small enough to prevent clogging or getting caught when inserted into the existing pipe 10, relative to the inner diameter of the existing pipe 10. The intermediate guide portion 21 in this embodiment is disposed in the middle of the extension direction of the rope body 20 by connecting the rope body 20 to one end and the other end in the axial direction. Moreover, the intermediate guide portion 21 is configured such that one end portion in the axial direction and the other end portion in the axial direction rotate relatively around the center in the axial direction. Specifically, the portion of the intermediate guide portion 21 to which the rope body 20 is connected at one end portion and the portion to which the rope body 20 is connected at the other end portion are configured to rotate relatively around the center in the axial direction. The intermediate guide portion 21 of this embodiment is provided with a bearing inside (not shown). Such an intermediate guide portion 21 is a rotation insulating portion configured so that the rotation of the cutting portion 13 is not transmitted to the rope body 20 (tip side rope body 20A) arranged on the tip side of the intermediate guide portion 21. That is, in the rope body 20, the rotation appears on the surface only in the portion on the rear end side (rear end side rope body 20B) of the intermediate guide portion 21. Moreover, the intermediate guide portion 21 of this embodiment includes a plurality of intermediate guide portions 21 having different outer diameters. Specifically, the intermediate guide portion 21 has two types of outer diameters: a first intermediate guide portion 21A (see, for example, Figure 7(a)), which has approximately the same inner diameter and outer diameter as the existing piping 10 before processing, and a second intermediate guide portion 21B (see, for example, Figure 8(a)), which has approximately the same inner diameter and outer diameter as the existing piping 10 after the first cutting process has been completed.
[0040] The rope body connecting part 22 is provided at the tip of the cutting part 13, and is a part that connects the cutting part 13 and the rope body 20. Specifically, the rope body connecting part 22 is a part that has a maximum outer diameter that is approximately the same as the inner diameter of the existing pipe 10 and has a tapered shape. In addition, the rope body connecting part 22 is arranged on the tip side of the cutting part 13. The rope body connecting part 22 of this embodiment is detachably attached to the attachment part 151 provided at the tip of the connecting part 15 so as to be located on the tip side of the cutting part 13. In addition, the tip of the rope body connecting part 22 is configured so that the rope body 20 can be connected. In addition, the rope body connecting part 22 of this embodiment includes a plurality of rope body connecting parts 22 with different maximum outer diameters. Specifically, the rope body connecting portion 22 has two rope body connecting portions 22 with different outer diameters: a first rope body connecting portion 22A (see, for example, Figure 7(a)), which has approximately the same inner diameter and outer diameter as the existing piping 10 before processing, and a second rope body connecting portion 22B (see, for example, Figure 8(a)), which has approximately the same inner diameter and outer diameter as the existing piping 10 after the first cutting process has been completed.
[0041] A method for cutting an existing pipe 10 using the pipe cutting device 12 configured as above will be described with reference to Figures 7 and 8. Note that in Figures 7 and 8, in order to explain the pipe cutting method in a schematic manner, the feed machine 171 disposed on the inlet 4 side, the curved portion 8 of the hot water supply pipe 1, etc. are not shown.
[0042] The pipe cutting method of this embodiment includes the above-mentioned removal step, a step of directing the inlet 4 and the outlet 5 which have become free ends by the removal step toward the pipe cutting device 12, a first cutting step of cutting a part of the wall thickness of the existing pipe 10 with the cutting part 13 over the entire range of the existing pipe 10 to be cut in the pipe axial direction, a changing step of changing the type of the cutting part 13 after completion of the first cutting step, and a second cutting step of cutting at least a part of the wall thickness of the existing pipe 10 with the changed cutting part 13 over the entire range of the existing pipe 10 to be cut in the pipe axial direction. That is, in the pipe cutting method of this embodiment, the wall thickness of the existing pipe 10 is cut in two stages.
[0043] As shown in FIG. 7, the first cutting step includes a first preparation step of inserting the towing part 18 from the outlet 5 side to the inlet 4 side of the existing pipe 10, and a first cutting execution step of connecting the cutting part 13 and the connecting part 15 to the rear end of the towing part 18 exposed from the inlet 4 side, and cutting the wall thickness of the existing pipe 10 while moving the cutting part 13 from the inlet 4 side to the outlet 5 side. In addition, in the first cutting step, the inner diameter is enlarged from Φ1 to Φ2 over the entire area to be cut in the pipe axis direction of the existing pipe 10. That is, in the first cutting step, the wall thickness of the existing pipe 10 is cut by the difference between the inner diameters Φ1 and Φ2. In addition, in this embodiment, a case where the inner diameter is cut from the inlet 4 to the outlet 5 of the existing pipe 10 will be described.
[0044] As shown in Fig. 7(a), in the first preparation step, the towing section 18 is inserted from the exit 5 of the existing piping 10 toward the entrance 4. Specifically, a cord-like call line is inserted in advance into the existing piping 10, and the cord body 20 (tip side cord body 20A) is pulled and inserted from the exit 5 to the entrance 4 of the existing piping 10 by the call line. After the cord body 20 is exposed from the entrance 4, the intermediate guide section 21 (first intermediate guide section 21A), the rear end side cord body 20B, and the cord body connecting section 22 (first cord body connecting section 22A) are connected to the rear end of the cord body 20 (tip side cord body 20A), whereby the towing section 18 is inserted from the exit 5 side to the entrance 4 side of the existing piping 10, and the first preparation step is completed. In the first preparation step, the case where only the rope body 20 is inserted into the existing piping 10 using the call wire as described above, and then the intermediate guide part 21 and the rope body connecting part 22 are connected on the inlet 4 side has been described, but the present invention is not limited to this case, and the rope body 20 to which the rope body connecting part 22 and the intermediate guide part 21 are attached may be pulled by the call wire and inserted into the existing piping 10. In addition, when inserting the pulling part 18, the pulling part 18 may be inserted into the existing piping 10 by pushing it in from the outlet 5 side, not limited to the case where the pulling part 18 is inserted using the call wire.
[0045] As shown in FIG. 7(b), in the first cutting execution step, the rope body connecting part 22 exposed from the inlet 4 is connected to the cutting part 13 and the connecting part 15. Specifically, the rope body connecting part 22 is connected to the mounting part 151 at a tip side of the part of the mounting part 151 to which the first cutting part 13A is connected. Then, in a state in which the rope body connecting part 22 is connected to the cutting part 13 and the connecting part 15, the cutting part 13 is inserted from the inlet 4 side of the existing pipe 10 to cut the wall thickness of the existing pipe 10. Specifically, while the cutting part 13 is inserted from the inlet 4 of the existing pipe 10 and moved to the outlet 5 side, the driving part 14 is rotated, and the first cutting part 13A is rotated in the rotation direction R by the rotation force of the driving part 14, and the cutting blade part 132 cuts the inner diameter of the existing pipe 10. In this embodiment, the cutting part 13 is moved from the entrance 4 side to the exit 5 side by being pulled by the pulling part 18 from the exit 5 side and being pushed by the feeding part 17 from the entrance 4 side. In this embodiment, the cutting part 13 is moved from the entrance 4 side to the exit 5 side by being pushed by the feeding part 17 from the entrance 4 side mainly, and is pulled to the exit 5 side by the pulling part 18 as an auxiliary. Furthermore, in this embodiment, the cutting chips generated by cutting are blown away by air and discharged from the existing piping 10. The air forms an airflow F from the exit 5 side to the entrance 4 side, and the cutting chips flow through the existing piping 10 along the airflow F, so that the cutting chips are discharged. At this time, the insertion condition of the connecting part 15 into the existing piping 10 and the passing condition (discharge condition) of the cutting chips can be confirmed from the window of the auxiliary pipe mounting jig 174.
[0046] As shown in FIG. 7(c), when the first cutting part 13A moves from the inlet 4 to the outlet 5 and leaves the outlet 5, the first cutting process is completed. When the first cutting process is completed, the inner diameter of the entire area to be cut of the existing pipe 10, that is, the entire area from the inlet 4 to the outlet 5, is expanded from Φ1 to Φ2. In addition, the existing pipe 10 for which the first cutting process is completed has an inner diameter that is approximately equal to the outer diameter of the first cutting part 13A. That is, in the first cutting process, the inner diameter of the existing pipe 10 is expanded from Φ1, which is the inner diameter before processing, to Φ2, which is approximately equal to the outer diameter L1 of the first cutting part 13A. After the first cutting process is completed, the connection between the pulling part 18 and the connecting part 15 and the cutting part 13 is released, and the first cutting process is completed.
[0047] The changing process is a process of changing the outer diameter of the cutting portion 13. Specifically, the changing process is a process of making the outer diameter of the cutting portion 13 larger than the outer diameter of the cutting portion 13 in the first cutting process. That is, the changing process is a process of changing one type of cutting portion 13 attached to the connecting portion 15 to another type of cutting portion 13 having an outer diameter larger than the one type of cutting portion 13 and attaching it. In this embodiment, the type of cutting portion 13 is changed by changing the cutting portion 13. Specifically, in the changing process, the first cutting portion 13A attached to the attachment portion 151 is removed, and the second cutting portion 13B is attached to the attachment portion 151, thereby changing the type of cutting portion 13.
[0048] As shown in FIG. 8, the second cutting step includes a second preparation step of inserting the towing portion 18 from the outlet 5 side to the inlet 4 side of the existing pipe 10, and a second cutting execution step of connecting the cutting portion 13 and the connecting portion 15 to the rear end of the towing portion 18 exposed from the inlet 4 side, and cutting the wall thickness of the existing pipe 10 while moving the cutting portion 13 from the inlet 4 side to the outlet 5 side. In addition, in the second cutting step of this embodiment, the inner diameter is expanded from Φ2 to Φ3 over the entire area to be cut in the pipe axis direction of the existing pipe 10. That is, in the second cutting step, the wall thickness of the existing pipe 10 is cut by the difference between the inner diameters Φ2 and Φ3 in the same range as the range cut in the first cutting step. In addition, in this embodiment, a case where the inner diameter is cut from the inlet 4 to the outlet 5 of the existing pipe 10 will be described.
[0049] The second preparation step is different from the first preparation step in the configuration of the towing part 18 to be inserted. In the second preparation step, the second rope body connecting part 22B having a larger outer diameter than the first rope body connecting part 22A as the rope body connecting part 22, and the second intermediate guide part 21B having a larger outer diameter than the first intermediate guide part 21A as the intermediate guide part 21 are inserted into the existing pipe 10 from the outlet 5 side together with the rope body 20. In this embodiment, the second rope body connecting part 22B having an outer diameter substantially the same as the inner diameter Φ2 of the existing pipe 10 cut in the first cutting step, and the second intermediate guide part 21B having an outer diameter substantially the same as the inner diameter Φ2 of the existing pipe 10 cut in the first cutting step are inserted into the existing pipe 10 from the outlet 5 side together with the rope body 20, as shown in FIG. 8(a). Specifically, in the second preparation step, the towing part 18 is inserted from the outlet 5 of the existing pipe 10 toward the inlet 4 side. Specifically, a cord-like call line is inserted into the existing piping 10 in advance, and the cord 20 (tip side cord 20A) is pulled and inserted by the call line from the exit 5 to the entrance 4 of the existing piping 10. After the cord 20 is exposed from the entrance 4, the intermediate guide portion 21 (second intermediate guide portion 21B), the rear end side cord 20B, and the cord connecting portion 22 (second cord connecting portion 22B) are connected to the rear end of the cord 20 (tip side cord 20A), whereby the pulling portion 18 is inserted from the exit 5 side to the entrance 4 side of the existing piping 10, and the second preparation step is completed. In the second preparation step, the case where only the rope body 20 is inserted into the existing piping 10 using the call wire as described above, and then the intermediate guide part 21 and the rope body connecting part 22 are connected on the inlet 4 side has been described, but the present invention is not limited to this case, and the rope body 20 to which the rope body connecting part 22 and the intermediate guide part 21 are attached may be pulled by the call wire and inserted into the existing piping 10. In addition, when inserting the pulling part 18, the pulling part 18 may be inserted into the existing piping 10 by pushing it in from the outlet 5 side, not limited to the case where the pulling part 18 is inserted using the call wire.
[0050] As shown in FIG. 8(b), in the second cutting execution step, the rope body connecting part 22 exposed from the inlet 4 is connected to the cutting part 13 and the connecting part 15. Specifically, the rope body connecting part 22 is connected to the mounting part 151 at a tip side of the part of the mounting part 151 to which the second cutting part 13B is connected. Then, in a state in which the rope body connecting part 22 is connected to the cutting part 13 and the connecting part 15, the cutting part 13 is inserted from the inlet 4 side of the existing pipe 10 to cut the wall thickness of the existing pipe 10. Specifically, while the second cutting part 13B is inserted from the inlet 4 of the existing pipe 10 and moved to the outlet 5 side, the driving part 14 is rotated, and the second cutting part 13B is rotated in the rotation direction R by the rotation force of the driving part 14, and the cutting blade part 132 cuts the inner diameter of the existing pipe 10. In addition, in this embodiment, the second cutting part 13B moves from the inlet 4 side to the outlet 5 side by being pulled by the pulling part 18 from the outlet 5 side and being pushed by the feed part 17 from the inlet 4 side. In this embodiment, the cutting part 13 moves from the inlet 4 side to the outlet 5 side by being pushed mainly from the inlet 4 side by the feed part 17, and is secondarily pulled to the outlet 5 side by the pulling part 18. Furthermore, in this embodiment, the cutting chips generated by cutting are blown away by air and discharged from the existing piping 10. The air forms an airflow F from the outlet 5 side to the inlet 4 side, and the cutting chips flow through the existing piping 10 along the airflow F, so that the cutting chips are discharged. At this time, the insertion condition of the connecting part 15 into the existing piping 10 and the passing condition (discharge condition) of the cutting chips can be confirmed from the window of the auxiliary pipe mounting jig 174.
[0051] As shown in FIG. 8(c), when the second cutting section 13B moves from the inlet 4 to the outlet 5 and leaves the outlet 5, the second cutting process is completed. When the second cutting process is completed, the inner diameter of the existing pipe 10 is expanded from Φ2 to Φ3. In addition, the existing pipe 10 for which the second cutting process is completed has an outer diameter that is approximately equal to the outer diameter L2 of the second cutting section 13B. That is, in the second cutting process, the inner diameter of the existing pipe 10 is expanded from Φ2, which is the inner diameter at the completion of the first cutting process, to Φ3, which is approximately equal to the outer diameter L2 of the second cutting section 13B. In addition, in the second cutting process, the inner diameter of the existing pipe 10 is expanded to an inner diameter larger than the outer diameter of the new pipe 11 described later. After the second cutting process is completed, the connection between the pulling section 18 and the connecting section 15 and the cutting section 13 is released, and the second cutting process is completed.
[0052] The role of the intermediate guide portion 21 in the first cutting step and the second cutting step will be described with reference to FIG. 6. The intermediate guide portion 21 has a larger diameter than the rope body 20 and is approximately the same diameter as the inner diameter of the existing pipe 10, so that it can move along the pipe axis direction inside the existing pipe 10 and guide the cutting portion 13 to move along the axial direction (so as not to shift in the radial direction). In addition, since one end and the other end of the intermediate guide portion 21 rotate relatively to each other in the axial direction, it can insulate the rotation. Furthermore, when performing processing to cut the inner diameter of the existing pipe 10 having the curved portion 8 as in this embodiment, if the rope body 20 pulls the cutting portion 13 from the outlet 5 side, the rope body 20 may be positioned biased toward the inside of the curved portion 8 at the curved portion 8. In such a case, when the cutting portion 13 is pulled, a tensile force biased toward the inside of the curved portion 8 may also be applied to the cutting portion 13, and the cutting portion 13 may be inclined with respect to the pipe axis direction. If cutting is performed with the cutting part 13 tilted, the thickness of the existing pipe 10 may not be properly cut, or the cutting part 13 may move radially outward of the existing pipe 10, causing the blade to damage the protective material 9. On the other hand, in this embodiment, the intermediate guide part 21 is provided in the middle of the extension direction of the rope body 20, so that the intermediate guide part 21 can absorb the tensile force biased toward the inside of the curved part 8 generated on the tip side of the intermediate guide part 21. Therefore, the tensile force biased toward the inside of the curved part 8 applied to the cutting part 13 can be suppressed, so that the curved part 8 can also be properly cut.
[0053] As described above, when the inner diameter of the existing pipe 10 is enlarged from Φ1 to Φ3 in the two stages of the first cutting step and the second cutting step, (1) the pipe wall thickness removing step is completed.
[0054] In the piping renewal method, after the (1) pipe wall thickness removal process is completed, the process proceeds to the (2) insertion process. In the insertion process, a new pipe 11 is inserted into the inside of the existing pipe 10 whose inside diameter has been enlarged. In this embodiment, a case where a new pipe 11 having an outside diameter equal to or larger than the inside diameter and smaller than the outside diameter of the existing pipe 10 is inserted will be described. Also, in this embodiment, a case where the new pipe 11 is inserted into the existing pipe 10 using a rope body 20 and a pipe insertion tool 23 capable of fixing an end of the new pipe 11 will be described.
[0055] As shown in Figure 9, in the insertion process, the pipe insertion tool 23 attached to the rear end of the rope body 20 is attached to the tip end of the new pipe 11, and the rope body 20 is pulled to pull the new pipe 11 from the inlet 4 side to the outlet 5 side, and the new pipe 11 is inserted inside the existing pipe 10.
[0056] 9(a), in the insertion step, first, a cord-like call line is inserted into the existing pipe 10, and the cord body 20 is pulled and inserted from the exit 5 to the entrance 4 of the existing pipe 10 by the call line, and a pipe insertion tool 23 is attached to the cord body 20 exposed from the entrance 4 side. After the pipe insertion tool 23 is attached to the cord body 20 on the entrance 4 side, the tip of the new pipe 11 is fixed to the pipe insertion tool 23. As the pipe insertion tool 23, various pipe insertion tools 23 that can fix the tip of the new pipe 11 and connect the new pipe 11 and the cord body 20 can be used.
[0057] 9(b), after the tip of the new pipe 11 is fixed to the pipe insertion tool 23, the rope 20 is pulled from the exit 5 by a winch W or the like, and the tip of the new pipe 11 is moved from the entrance 4 to the exit 5. When the tip of the new pipe 11 is exposed from the exit 5, the insertion process is completed.
[0058] With the above steps, the piping renewal in this embodiment is completed.
[0059] According to the above-mentioned pipe cutting method, since cutting is performed multiple times from the inner diameter side, the inner diameter of the existing pipe 10 can be reliably thinned and enlarged. Therefore, damage to the protective material 9 can be suppressed. Specifically, by cutting the inner diameter of the existing pipe 10 in multiple steps, the resistance that the cutting portion 13 receives in one cutting can be reduced. Therefore, it is possible to suppress the cutting portion 13 from moving radially outward in an attempt to escape from the cutting resistance, thereby suppressing the cutting portion 13 from moving radially outward of the existing pipe 10 and damaging the protective material 9 with the blade.
[0060] Furthermore, since the outer diameter of the cutting portion 13 (second cutting portion 13B) used in the second cutting step is smaller than the outer diameter of the existing pipe 10, the thickness of the existing pipe 10 remains even when the second cutting step is completed, and therefore, damage to the protective material 9 by the cutting portion 13 can be suppressed. That is, since the outer diameter of the cutting portion 13 used in the final cutting step (the second cutting step in this embodiment) in the pipe cutting method is smaller than the outer diameter of the existing pipe 10, the thickness of the existing pipe 10 remains when all steps of the pipe cutting method are completed, and therefore, damage to the protective material 9 by the cutting portion 13 can be suppressed.
[0061] Furthermore, since a part of the wall thickness of the existing piping 10 is cut over the entire area in the axial direction of the existing piping 10 from the inlet 4 to the outlet 5, when the first cutting step is completed, the cutting part 13 is in a state of protruding from the outlet 5, and therefore the cutting part 13 can be removed from the connecting part 15 on the outlet 5 side to perform the modification work. Therefore, workability is improved compared to the case where the existing piping 10 is cut halfway and then the cutting part 13 is moved in the opposite direction to the cutting direction after cutting to bring the cutting part 13 out from the inlet 4 to perform the modification work.
[0062] The connecting portion 15 includes a shaft 19, which is a rod-shaped body having an outer diameter smaller than that of the cutting portion 13, and the shaft 19 can be bent in the radial direction, and can transmit a rotational force from one end side to the other end side in the axial direction of the pipe, and the other axial end of the shaft 19 can be connected to one axial end of another shaft 19 in a state in which the rotational force can be transmitted. Therefore, in the first cutting step and the second cutting step, the shaft 19 can be extended as necessary, and the length of the connecting portion 15 can be appropriately adjusted during the first cutting step and the second cutting step, so that the working space for arranging the connecting portion 15 exposed on the inlet 4 side can be reduced compared to the case where the connecting portion 15 is prepared in advance for the entire length of the area to be cut of the existing pipe 10. For example, in the above embodiment, when the length of the connecting portion 15 is insufficient to be pushed out by the feeder 171, the shaft 19 can be extended. Also, for example, when cutting the existing pipe 10 by pulling the cutting part 13 from the inlet side, when the entire shaft is located on the inlet side of the feeder, the shaft 19 can be released from connection and removed. In this way, the length of the connecting part can be appropriately adjusted by adjusting the number of shafts.
[0063] Furthermore, the pipe cutting device 12 includes a towing unit 18 that tows the cutting unit 13 on the side opposite to the side where the connecting unit 15 of the cutting unit 13 is located in the axial direction of the existing pipe 10, and the towing unit 18 includes a rope 20 that extends from the cutting unit 13 to at least the outlet 5 of the existing pipe 10, and a cylindrical intermediate guide unit 21 that is provided in the middle of the rope 20 and has an outer diameter substantially the same as the inner diameter of the existing pipe 10. Therefore, since the intermediate guide unit 21 is provided in the middle of the rope 20, when the cutting unit 13 is towed by the towing unit 18, the cutting unit 13 can be stably towed along the pipe axial direction even if the existing pipe 10 has a curved portion. In addition, the intermediate guide portion 21 includes a plurality of types of intermediate guide portions 21 having different lengths of outer diameters passing through the center in the pipe axial direction, and in the first cutting step, one type of intermediate guide portion 21 having substantially the same inner diameter and outer diameter of the existing pipe 10 is used, and in the second cutting step, another type of intermediate guide portion 21 having a larger outer diameter than the one type of intermediate guide portion 21 is used, so that the cutting portion 13 can be appropriately guided according to each stage of the pipe cutting method. In this embodiment, the intermediate guide portion 21 includes a first intermediate guide portion 21A having substantially the same inner diameter and outer diameter of the existing pipe 10 before processing, and a second intermediate guide portion 21B having substantially the same inner diameter and outer diameter of the existing pipe 10 after the first cutting step is completed, so that even if the inner diameter of the existing pipe 10 changes due to cutting, the cutting portion 13 can be stably pulled along the pipe axial direction by changing the intermediate guide portion 21.
[0064] In addition, the pipe cutting device 12 is equipped with an auxiliary pipe 173 that is connected to the inlet 4 of the existing pipe 10, and since the auxiliary pipe 173 has an inner diameter larger than that of the existing pipe 10, the cutting part 13 can first be inserted into the auxiliary pipe 173 which has the larger inner diameter, and then the cutting part 13 can be inserted into the existing pipe 10 which has the smaller inner diameter, making it easier to insert the cutting part 13 than if it were to be inserted into the existing pipe 10 from the beginning.
[0065] Furthermore, since the auxiliary pipe 173 is a tubular body that is flexible in the axial direction, when the cutting portion 13 and the connecting portion 15 are inserted sideways into the opening of the inlet 4 of the existing piping 10, the auxiliary pipe 173 can be curved from the radial direction toward the axial direction with respect to the opening of the inlet 4 of the existing piping 10 to guide the insertion of the cutting portion 13 and the connecting portion 15.
[0066] Furthermore, since the auxiliary pipe 173 is attached to the inlet 4 of the existing pipe 10 via a tubular auxiliary pipe attachment jig 174 that extends in front of the opening of the inlet 4 of the existing pipe 10, when the cutting portion 13 is inserted into the existing pipe 10 via the auxiliary pipe 173, the auxiliary pipe attachment jig 174 can bring the cutting portion 13 into a state where it is substantially directly facing the inlet 4 of the existing pipe 10 at a stage immediately before the cutting portion 13 enters the existing pipe 10. Therefore, the cutting portion 13 can be inserted into the existing pipe 10 in a stable state.
[0067] Furthermore, the connecting portion 15 is provided with a connecting rod portion 193 that rotates due to the rotational force of the driving portion 14 and transmits the rotational force from the driving portion 14 to the cutting portion 13, and an outer tube portion 192 that is arranged to cover the radially outer side of the connecting rod portion 193. Since the outer tube portion 192 and the connecting rod portion 193 are arranged to be freely rotatable relative to each other, it is possible to prevent the existing piping 10 from being scraped and damage to the protective material 9 from being caused by the rotation of the connecting rod portion 193.
[0068] Although an embodiment of the present invention has been described above by way of example, the present invention is not limited to the above embodiment, and various modifications can be made without departing from the spirit of the present invention.
[0069] For example, although a case has been described in which the cutting part 13 is moved within the existing piping 10 by pulling it from the outlet 5 side and pushing it from the inlet 4 side, the cutting part 13 may be moved by only pulling or pushing it.
[0070] In addition, although the connecting portion 15 has been described as being adjustable in axial length, it is not limited to this configuration and can also be configured as a single rod-shaped or cord-shaped body that is longer than the area to be cut of the existing piping 10.
[0071] Furthermore, although the cutting of the existing pipe 10 is performed in two stages, the first cutting step and the second cutting step, the cutting can also be performed in three or more stages. Even when the cutting is performed in three or more stages, the outer diameter of the cutting portion 13 can be replaced with an appropriately larger one to cut the existing pipe 10. That is, as long as there are two or more stages, the thickness of the existing pipe 10 can be cut in any stage (for example, between four and eight times). The number of times cutting can be selected arbitrarily depending on the thickness and hardness of the existing pipe 10.
[0072] In addition, the traction portion 18 has been described as being configured to traction the cutting portion 13 with a cord body 20, but this configuration is not limited to this, and the traction portion 18 can also be configured to traction the cutting portion 13 with a flexible rod-shaped body (e.g., shaft 19).
[0073] Furthermore, the towing section 18 has been described as including the intermediate guide section 21, but the present invention is not limited to this configuration, and the towing section 18 may be configured without including the intermediate guide section 21. When the intermediate guide section 21 is not included, for example, a bearing may be provided inside the rope body connecting section 22, and the rope body connecting section 22 may be configured as a rotation insulating section that insulates the connecting section 15 and the rope body 20 from rotation.
[0074] In addition, although the present pipe cutting method has been described as being applied to hot water supply pipes 1 or water supply pipes 2 used within a house, the present pipe cutting method can also be applied to pipes through which oil, air, etc. flow.
[0075] Furthermore, the case where the new pipe 11 having an outer diameter smaller than the outer diameter of the existing pipe 10 is inserted into the existing pipe 10 whose inner diameter has been expanded has been described, but the present invention is not limited to such a case, and the new pipe 11 having an outer diameter equal to or larger than the outer diameter of the existing pipe 10 can also be inserted. In such a case, after the second cutting step, a slit is formed in the wall thickness of the existing pipe 10 by cutting along the axial direction, and then the new pipe 11 is inserted, or the outer diameter of the existing pipe 10 is further expanded by an expanding ball having an outer diameter larger than the inner diameter of the existing pipe 10 after the second cutting step, and then the new pipe 11 is inserted. Even in such a case, since the wall thickness of the existing pipe 10 is reduced by the first cutting step and the second cutting step, the pressure on the protective material 9 can be suppressed, and damage to the protective material 9 can be suppressed.
[0076] In addition, in the changing step, the case where the type of the cutting part 13 is changed by replacing the entire cutting part 13 has been described, but the present invention is not limited to such a case. For example, the type of the cutting part 13 can be changed by replacing only the cutting blade part 132, which is a part of the cutting part 13, with another cutting blade part 132 having a larger outer diameter. In addition, when using a cutting part 13 in which the outer diameter of the cutting blade part 132 can be changed, the type of the cutting part 13 can be changed by simply changing the outer diameter of the cutting blade part 132 without replacing the cutting part 13 itself. That is, in the changing step, it is sufficient that the outer diameter of the cutting part 13 is changed, and an example of a means for doing so is replacement of the cutting part 13.
[0077] Further, although the case where a part of the wall thickness of the existing pipe 10 is cut in the second cutting step has been described, the present invention is not limited to such a case, and the entire wall thickness of the existing pipe 10 remaining in the first cutting step can be cut. When the entire wall thickness of the existing pipe 10 is cut, as shown in FIG. 10, only the middle part of the existing pipe 10 in the axial direction can be cut and the remaining part of the existing pipe 10 can be pulled out from the outlet 5 side, or the entire area of the existing pipe 10 in the pipe axial direction can be cut. When a part of the existing pipe 10 is pulled out, it is preferable that the existing pipe 10 has one or less curved parts in the area to be pulled out. In addition, in order to prevent the area to be pulled out from being cut or broken in the middle due to the pulling force, it is preferable that the area to be pulled out of the existing pipe 10 is not cut in the first cutting step and the second cutting step. When pulling out the existing pipe 10, a pipe puller 24 as shown in FIG. 11(a) can be used. The pipe puller 24 is a circular plate whose outer diameter is approximately equal to that of the existing pipe 10. When the pipe puller 24 is pulled by the rope 20 from the inlet 4 side, it comes into contact with the tip of the remaining part of the existing pipe 10 and moves from the tip side toward the outlet 5 side in a pushing manner to pull out the existing pipe 10 from the protective material 9.
[0078] In addition, the cutting part 13 cuts only while moving from the inlet 4 side to the outlet 5 side of the existing pipe 10, but the present invention is not limited to this configuration, and the moving direction of the cutting part 13 when cutting in the first cutting step and the moving direction of the cutting part 13 when cutting in the second cutting step may be reversed. In the case of such a configuration, for example, the replacement step is to change the cutting part 13 on the outlet 5 side in the first cutting step, attach one cutting part 13 (first cutting part 13A) to another cutting part 13 (second cutting part 13B) having a larger diameter so that the cutting edge 134 of the second cutting part 13B faces the inlet 4 side in the first cutting step, and in the second cutting step, the cutting part 13 can be moved along the pipe axis direction of the existing pipe 10 from the outlet 5 side to the inlet 4 side in the first cutting step. According to the above configuration, the second cutting step can be performed so that cutting is performed from the outlet 5 side toward the inlet 4 side in the first cutting step, so that the existing pipe 10 can be cut by the reciprocating motion of the cutting part 13 inside the existing pipe 10, and therefore the work efficiency is improved compared to when the cutting part 13 operates in a one-way direction from the inlet 4 side to the outlet 5 side inside the existing pipe 10. On the other hand, when the cutting part 13 operates in a one-way direction from the inlet 4 side to the outlet 5 side inside the existing pipe 10, when the cutting part 13 is pulled by the pulling part 18, if the cutting part 13 gets stuck or clogged inside the existing pipe 10, the pulling force is applied to the part of the existing pipe 10 where the cutting part 13 is clogged, so that the pulling force is prevented from being applied to the connecting part (extension part 191) of the shaft 19, and the connection of the shaft 19 can be prevented from being released inside the existing pipe 10. Furthermore, when configured as described above, the second cutting step can include a step of removing the shaft 19 located at the other end in the axial direction as necessary. According to the above-described configuration, when removing one shaft 19 does not cause any inconvenience in moving the cutting portion 13, the length of the connecting portion 15 can be adjusted by removing the shaft 19. Therefore, the working space required for positioning the connecting portion 15 exposed on the inlet 4 side can be reduced compared to the case where a single shaft 19 of the length covering the entire area to be cut of the existing piping 10 is prepared.
[0079] Furthermore, although the case where the first cutting step is performed immediately after the removal step has been described, it is also possible to configure so that a pre-treatment is performed on the existing pipe 10 before the first cutting step is performed. For example, before the first cutting step, the inlet 4 portion of the existing pipe 10 can be cut to make it easier to insert the cutting portion 13 into the existing pipe. [Explanation of symbols]
[0080] 1...hot water supply pipe, 2...water supply pipe, 3...floor surface, 4...inlet, 5...outlet, 6...header member, 7...faucet, 8...curved portion, 9...protective material, 10...existing pipe, 11...new pipe, 12...pipe cutting device, 13...cutting portion, 13A...first cutting portion, 13B...second cutting portion, 131...cutting base, 132...cutting blade portion, 132A...first cutting blade portion, 132B...second cutting blade portion, 133...mounting portion, 134...blade tip, 14...drive portion, 15...connecting portion, 151...mounting portion, 16...handle, 17... Feeding section, 171...feeding machine, 172...feeding main body, 173...auxiliary pipe, 174...auxiliary pipe mounting jig, 18...traction section, 19...shaft, 191...extension section, 191A...tip extension section, 191B...rear extension section, 192...outer tube section, 193...connecting rod section, 20...rope body, 21...intermediate guide section, 21A...first intermediate guide section, 21B...second intermediate guide section, 22...rope body connecting section, 22A...first rope body connecting section, 22B...second rope body connecting section, 23...piping insertion tool, 24...piping removal tool
Claims
[Claim 1] A pipe cutting method using a pipe cutting device including: a cutting unit that removes a wall thickness of an existing pipe from an inner diameter side by rotating around a center in a pipe axial direction to cut an existing pipe having a protective material provided so as to cover the outer diameter of the pipe, the cutting unit including a plurality of types having different outer diameter lengths passing through the center; a drive unit that is disposed outside the existing pipe and applies a rotational force to the cutting unit; and a connecting unit that is capable of connecting the cutting unit and the drive unit so that the rotational force can be transmitted and is configured to allow the cutting unit to be attached in a changeable type, a first cutting step of attaching one type of cutting unit having an outer diameter larger than an inner diameter of the existing piping to the connecting part and moving the cutting unit along the axial direction of the existing piping while applying a rotational force to the cutting unit, thereby cutting a part of the wall thickness of the existing piping over the entire range to be cut in the axial direction of the existing piping; a change process for changing the one type of cutting part attached to the connecting part to another type of cutting part having an outer diameter larger than that of the one type of cutting part and attaching the other type of cutting part after completing the first cutting process; a second cutting process in which the other type of cutting part attached to the connecting part in the modification process is moved along the pipe axis direction of the existing piping while applying a rotational force to the other type of cutting part, thereby cutting at least a portion of the wall thickness of the existing piping remaining in the first cutting process over the entire area to be cut.
Citation Information
Patent Citations
Method for changing underground buried resin pipe
JP1998184996A
Apparatus and method for repairing existing conduit
JP2002357083A
Renewing method of pipe line and reciprocatory driving device of polishing member used for this renewing method
JP2007260847A
Machining / burnishing dual geometry orbital drilling tool
JP2017205859A
Pipe installation method
JP2020034103A