Deck crane system, deck crane control device, and deck crane control method
The deck crane system optimizes cargo handling by calculating and controlling the revolving and elevating motions of the crane components based on coordinate data, enhancing operational efficiency and reducing interference.
Patent Information
- Application Number
- JP2021030304
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-02-26
- Publication Date
- 2024-12-05
- Estimated Expiration
- 2041-02-26
AI Technical Summary
Existing deck crane operations on ships require efficient cargo handling while minimizing variations in driver actions to prevent operational inconsistencies.
A deck crane system and control method that utilizes a revolving body, jib, and lifting wire, with a control device that calculates and controls the turning and elevation angles based on acquired post, hook, and target point coordinates to optimize cargo handling operations.
The system enables efficient cargo handling by reducing operational variations, avoiding interference with the ship's hull and other cranes, and minimizing time required for operations.
Smart Images

Figure 0007594939000001 
Figure 0007594939000002 
Figure 0007594939000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a deck crane system, a deck crane control device, and a deck crane control method. [Background technology]
[0002] A deck crane used for cargo handling operations on a ship is known. The deck crane includes a rotating body that rotates about a rotating shaft, a jib that rotates about a lifting shaft, and a hoisting wire that extends downward from the tip of the jib and has a holder attached to its lower end. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2002-220189 A Summary of the Invention [Problem to be solved by the invention]
[0004] In the loading and unloading operation using the deck crane as described above, the operator cooperates with the signalman to operate the rotation of the rotating body, the elevation of the jib, and the lifting and lowering of the holding tool to move the holding tool to the target location. In such loading and unloading operation, it is required to perform the work efficiently while suppressing the variation in the operation by the operator.
[0005] The present invention has been made in consideration of the above, and aims to provide a deck crane system, a deck crane control device, and a deck crane control method that are capable of efficiently performing loading and unloading operations while suppressing variation in operations by the operator. [Means for solving the problem]
[0006] The deck crane system of the present invention has a deck crane which has a rotating body supported on the deck of a ship and rotates around a rotating axis, a jib connected to the rotating body and which raises and lowers, and a holding device which is arranged at the lower end of a lifting wire extending downward from the tip of the jib and which raises and lowers, and which performs cargo handling operations between the ship and a port, and a control device which acquires post coordinates indicating the horizontal position of the rotating axis, hook coordinates indicating the horizontal position of the holding device, and target point coordinates indicating the horizontal position of a target point to which the holding device is moved, calculates the rotation angle of the rotating body and the elevation angle of the jib based on the acquired post coordinates, hook coordinates and target point coordinates, and causes the rotating body to perform a rotation operation and the jib to perform a elevation operation based on the calculation results.
[0007] The deck crane control device of the present invention is a deck crane control device that performs cargo handling operations between a ship and a port by rotating the rotating body of a deck crane placed on the deck of a ship around a rotating axis, tilting and raising a jib connected to the rotating body, and raising and lowering a holding device attached to the lower end of a lifting wire extending downward from the tip of the jib, and is equipped with a coordinate acquisition unit that acquires post coordinates indicating the horizontal position of the rotating axis of the deck crane, hook coordinates indicating the horizontal position of the holding device, and target point coordinates indicating the horizontal position of a target point to which the holding device is moved, a calculation unit that calculates the rotation angle of the rotating body and the elevation angle of the jib based on the acquired post coordinates, hook coordinates and target point coordinates, and a drive control unit that causes the rotating body to perform a rotation operation and the jib to perform a raising and lowering operation based on the calculation results of the calculation unit.
[0008] The control method for a deck crane of the present invention is a control method for a deck crane that performs cargo handling operations between a ship and a port by rotating the rotating body of the deck crane around a rotating axis, tilting and raising a jib connected to the rotating body, and raising and lowering a holding device attached to the lower end of a lifting wire extending downward from the tip of the jib, and includes obtaining post coordinates indicating the horizontal position of the rotating axis of the deck crane, hook coordinates indicating the horizontal position of the holding device, and target point coordinates indicating the horizontal position of a target point to which the holding device is moved, calculating the rotation angle of the rotating body and the elevation angle of the jib based on the obtained post coordinates, hook coordinates and target point coordinates, and causing the rotating body to perform a rotation operation and the jib to perform a elevation operation based on the calculation results of the calculation unit. Effect of the Invention
[0009] According to the present invention, it is possible to provide a deck crane system, a deck crane control device, and a deck crane control method that are capable of efficiently performing loading and unloading operations while suppressing variation in operations by operators. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a diagram showing an example of a deck crane system according to this embodiment. [Diagram 2] FIG. 2 is a diagram showing an example of a deck crane according to this embodiment. [Diagram 3] FIG. 3 is a functional block diagram showing an example of the control device 20. As shown in FIG. [Figure 4] FIG. 4 is a diagram showing a schematic diagram of the calculation contents by the coordinate calculation unit. [Diagram 5] FIG. 5 is a diagram showing a schematic diagram of the calculation contents by the coordinate calculation unit. [Figure 6] FIG. 6 is a diagram showing a schematic diagram of the calculation contents by the tilt / depression operation control unit. [Figure 7] FIG. 7 is a diagram for explaining the height position of the lifting and lowering operation. [Figure 8] FIG. 8 is a diagram for explaining the height position of the lifting and lowering operation. [Figure 9] FIG. 9 is a diagram showing an example of adjusting the height position of the holder in a lifting / lowering operation. [Figure 10] FIG. 10 is a diagram showing an example of adjusting the height position of the holder during lifting and lowering operations. [Figure 11] FIG. 11 is a diagram showing an example of adjusting the height position of the holder during lifting and lowering operations. [Figure 12] FIG. 12 is a diagram showing an example of adjusting the height position of the holder during lifting and lowering operations. [Figure 13] FIG. 13 is a diagram showing an example of an operation for avoiding interference between deck cranes. [Figure 14] FIG. 14 is a diagram showing an example of an operation for avoiding interference between deck cranes. [Figure 15] FIG. 15 is a diagram showing an example of an operation for avoiding interference between deck cranes. [Figure 16] FIG. 16 is a flowchart showing an example of a cargo handling operation by the deck crane system according to this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, an embodiment of a deck crane system, a deck crane control device, and a deck crane control method according to the present invention will be described with reference to the drawings. Note that the present invention is not limited to the embodiment. In addition, the components in the following embodiments include those that are replaceable and easy for a person skilled in the art, or those that are substantially the same.
[0012] 1 is a diagram showing an example of a deck crane system 100 according to this embodiment. The deck crane system 100 is a work machine used for loading and unloading operations on a ship 101. The deck crane system 100 includes a deck crane 10, a control device 20, and a remote controller 30.
[0013] The deck crane system 100 is installed on a deck 102 of a ship 101. A plurality of deck cranes 10 may be installed on the deck 102, or a single deck crane 10 may be installed on the deck 102. FIG. 1 shows an example in which four deck cranes 10 are installed on the deck 102. The control device 20 includes a computer system. The control device 20 controls the deck crane 10. The control device 20 is disposed in, for example, each of the plurality of deck cranes 10. Information can be transmitted between the respective control devices 20, for example, by communication. Note that a higher-level device (not shown) that controls the respective control devices 20 may be provided. The remote controller 30 is a terminal for remotely operating the deck crane 10.
[0014] Fig. 2 is a diagram showing an example of a deck crane 10 according to this embodiment. As shown in Fig. 2, the deck crane system 100 performs loading and unloading work of cargo C between a cargo hold 103 of a ship 101 and a port 104. The deck crane 10 has a rotating body 11, a jib 12, a rotating device 13, a tilting device 14, and a lifting device 15.
[0015] A platform 16 is disposed on a deck 102 of a ship 101. The rotating body 11 is supported by a swivel bearing 16S of the platform 16 so as to be rotatable about a rotation axis AX1. A post coordinate detection unit S1 is provided on the platform 16. The post coordinate detection unit S1 detects post coordinates. The post coordinates are plane coordinates that indicate the position of the rotation axis AX1 in the horizontal direction.
[0016] The jib 12 is connected to the rotating body 11. The jib 12 is a rod-shaped member. A base end of the jib 12 is connected to the rotating body 11. The jib 12 is connected to the rotating body 11 so as to be rotatable about a tilt-and-pitch axis AX2.
[0017] A pulley 17 is provided at the tip of the jib 12. A lifting wire 18 for lifting and lowering cargo C is hung on the pulley 17. A base end of the lifting wire 18 is attached to the drum 15D of the lifting device 15. A holder 18H for holding the cargo is provided at the tip of the lifting wire 18. Examples of the holder 18H include a grab bucket for gripping cargo or a hook for hanging cargo.
[0018] A tilt-and-lift wire 19 is attached to the jib 12. One end of the tilt-and-lift wire 19 is attached to the middle part of the jib 12, and the other end of the tilt-and-lift wire 19 is attached to the drum 14D of the tilt device 14.
[0019] A hook coordinate detection unit S2 is provided at the tip of the jib 12. The hook coordinate detection unit S2 detects hook coordinates. The hook coordinates are plane coordinates that indicate the position of the holder 18H in the horizontal direction.
[0020] The swivel device 13 rotates the rotating body 11 about the rotation axis AX1. The swivel device 13 has a rotation motor 13M that drives the rotating body 11 and a rotation brake 13B that brakes the rotating body 11. The rotating body 11 rotates about the rotation axis AX1 due to the driving force generated by the swivel motor 13M. The rotating body 11 stops due to the braking force generated by the swivel brake 13B.
[0021] The tilt-tilt device 14 rotates the jib 12 about the tilt-tilt axis AX2. The tilt-tilt device 14 has a tilt-tilt motor 14M that drives the jib 12 and a tilt-tilt brake 14B that brakes the jib 12. The driving force of the tilt-tilt motor 14M rotates the jib 12 about the tilt-tilt axis AX2. The braking force of the tilt-tilt brake 14B stops the jib 12.
[0022] The lifting device 15 lifts and lowers the lifting wire 18. The lifting device 15 has a lifting motor 15M that drives the lifting wire 18, and a lifting brake 15B that brakes the lifting wire 18. The lifting wire 18 is lifted and lowered by the driving force of the lifting motor 15M. The lifting wire 18 is stopped by the braking force of the lifting brake 15B.
[0023] The tilt motor 14M generates a driving force to rotate the drum 14D. When the drum 14D rotates and the tilt / tilt lifting wire 19 is wound around the drum 14D, the jib 12 rotates in the tilt direction. The tilt direction refers to the direction in which the tip of the jib 12 moves upward. When the drum 14D rotates and the tilt / tilt lifting wire 19 is unwound from the drum 14D, the jib 12 rotates in the tilt direction. The tilt direction refers to the direction in which the tip of the jib 12 moves downward.
[0024] The lift motor 15M generates a driving force to rotate the drum 15D. When the drum 15D rotates, the lift wire 18 is wound around the drum 15D, and the holder 18H is raised. When the drum 15D rotates, the lift wire 18 is unwound from the drum 15D, and the holder 18H is lowered.
[0025] The slewing motor 13M is an electric motor that drives the slewing body 11, which is a rotating body. The tilt / tilt motor 14M is an electric motor that drives the drum 14D, which is a rotating body. The lift / lower motor 15M is an electric motor that drives the drum 15D, which is a rotating body. The deck crane 10 is an electric deck crane that operates by the driving force generated by the electric motor. The slewing brake 13B is a disc brake that brakes the slewing body 11. The tilt / tilt brake 14B is a disc brake that brakes the drum 14D. The lift / lower brake 15B is a disc brake that brakes the drum 15D.
[0026] Cargo C is placed or loaded in the cargo hold 103 and the port 104. In the loading and unloading operation by the deck crane 10, the holding tool 18H is moved to a position corresponding to the cargo C to be handled, and slinging is performed on the holding tool 18H. In other words, the cargo C to be handled becomes the target point to which the holding tool 18H is moved. For example, the worker can install a target point coordinate detection unit S3 for the cargo C to be handled. The target point coordinate detection unit S3 detects the target point coordinates. The target point coordinates are plane coordinates that indicate the horizontal position of the target point to which the holding tool 18H is moved. After slinging is performed on the cargo C to be handled, the worker can remove the target point coordinate detection unit S3 from the cargo C.
[0027] The control device 20 controls the deck crane 10. The control device 20 controls the slewing motor 13M, the slewing brake 13B, the tilt motor 14M, the tilt brake 14B, the lift motor 15M, and the lift brake 15B. A driver's cab D is provided on the stand 16. In the driver's cab D, an operation device and the like are arranged to enable the driver to operate the deck crane 10. Note that the remote controller 30 enables the same operations as those of the deck crane 10 in the driver's cab D. For example, the control device 20 may be arranged in the driver's cab D.
[0028] Fig. 3 is a functional block diagram showing an example of the control device 20. As shown in Fig. 3, the control device 20 has a coordinate data acquisition unit 21, a coordinate calculation unit 22, a rotation operation control unit 23, a tilt operation control unit 24, a lift operation control unit 25, a storage unit 26, and a determination unit 27.
[0029] The coordinate data acquisition unit 21 acquires post coordinates detected by a post coordinate detection unit S1, hook coordinates detected by a hook coordinate detection unit S2, and target value coordinates detected by a target point coordinate detection unit S3.
[0030] The coordinate calculation unit 22 performs calculations to set a plane coordinate system based on the post coordinates, hook coordinates, and target point coordinates acquired by the coordinate data acquisition unit 21. The coordinate calculation unit 22 sets the plane coordinate system so that a virtual line connecting a point indicated by the post coordinates and a point indicated by the hook coordinates becomes a first reference axis in the plane coordinate system, and a virtual line passing through the point indicated by the post coordinates and perpendicular to the first reference axis becomes a second reference axis in the plane coordinate system.
[0031] 4 and 5 are diagrams showing the calculation contents by the coordinate calculation unit 22. In Fig. 4, the positions of the post coordinates, hook coordinates and target point coordinates are shown in a plane coordinate system in which mutually orthogonal reference axes X0 and Y0 are set.
[0032] From this state, the coordinate calculation unit 22 sets a plane coordinate system so that a virtual line L1 connecting the post position P indicated by the post coordinates and the hook position H indicated by the hook coordinates becomes the first reference axis Y1 in the plane coordinate system, and a virtual line L2 passing through the post position P and perpendicular to the first reference axis Y1 becomes the second reference axis X1 in the plane coordinate system, as shown in Fig. 5. As a result, in the plane coordinate system, the rotation axis AX1 becomes the origin, and the first reference axis Y1 along the jib 12 is set as one of the reference axes. Therefore, the positional relationship between the rotation axis AX1, the jib 12, and the target point G at the time when the post coordinates, the hook coordinates, and the target point coordinates are acquired is simplified.
[0033] The turning operation control unit 23 generates a command signal for turning operation by the turning device 13 based on the post coordinates, hook coordinates, and target point coordinates acquired by the coordinate data acquisition unit 21 and the calculation result by the coordinate calculation unit 22. In the example shown in Fig. 5, the turning operation control unit 23 can generate, for example, a command signal to turn the turning body 11 by an angle θ2 in the clockwise direction in Fig. 5.
[0034] The elevation / tilt operation control unit 24 generates a command signal for the elevation / tilt operation by the elevation device 14 based on the post coordinates, hook coordinates, and target point coordinates acquired by the coordinate data acquisition unit 21 and the calculation result of the coordinate calculation unit 22. FIG. 6 is a diagram showing the calculation contents by the elevation / tilt operation control unit 24. FIG. 6 is a diagram showing the configuration seen from the direction of the arrow A in FIG. 5. In the example shown in FIG. 6, the elevation / tilt operation control unit 24 can generate a command signal to elevate the jib 12 by an angle θ4 in the clockwise direction in FIG. 6. The elevation / tilt angle θ4 of the jib 12 can be calculated based on the difference between the coordinates of the hook position H of the jib 12 at the time of coordinate acquisition and the coordinates of the target point G of the holder 18H.
[0035] The lifting / lowering operation control section 25 generates a command signal for the lifting / lowering operation of the lifting device 15 based on information on the height position stored in the memory section 26 or an operation signal from the remote controller 30. If the height position is not stored in the memory section 26, the lifting / lowering operation is performed so that the holder 18H is positioned at a maximum height position set in advance. In this case, the loading / unloading process can be performed smoothly without being delayed. The height position will be described later.
[0036] The memory unit 26 stores various information. The memory unit 26 stores information relating to the height position during the lifting and lowering operation. The height position is a vertical position based on the deck 102 of the ship 101. The height position includes the hull height position Mb and the on-board height position Ms. Figures 7 and 8 are diagrams for explaining the height positions during the lifting and lowering operation. Figure 7 is a diagram relating to the hull height position Mb, and Figure 8 is a diagram relating to the hull height position Ms.
[0037] 7, the hull height position Mb is a height position that is set so that the cargo C does not interfere with the hull 101A. The hull height position Mb can be set to a position higher than the height position of the upper edge of the hull 101A plus the height of the cargo C, for example.
[0038] As shown in Fig. 8, the onboard height position Ms is a height position set so that the cargo C does not interfere with other cargo C, etc., stacked at a position higher than the upper edge of the hull 101A. The onboard height position Ms can be set at a position higher than the height position of the upper end of the cargo C stacked on the hull 101A. The onboard height position Ms is a position higher than the above-mentioned hull height position Mb.
[0039] When the cargo C placed or loaded in the cargo hold 103 is moved to a target point G in the port 104 by the above-mentioned deck crane system 100, first, the holding tool 18H placed on the cargo hold 103 side or the port 104 side is moved to a position corresponding to the cargo C in the cargo hold 103. Next, the holding tool 18H is sling-hooked onto the cargo C, and the lifting wire 18 is pulled upward to lift the cargo C from the ground, thereby lifting the holding tool 18H and the cargo C. Next, the rotating body 11 is rotated and the jib 12 is elevated and raised, thereby moving the holding tool 18H to a position corresponding to the target point G (a position above the target point G). Thereafter, the holding tool 18H is lowered to place the cargo C at the target point G.
[0040] Furthermore, when the above-mentioned deck crane system 100 is used to move cargo C placed or loaded in the port 104 to a target point G in the cargo hold 103, first, the holding tool 18H placed on the cargo hold 103 side or the port 104 side is moved to a position corresponding to the cargo C in the port 104. Next, the holding tool 18H is sling-hooked onto the cargo C, and the lifting wire 18 is pulled upward to perform ground lifting, thereby lifting the holding tool 18H and the cargo C. Next, the rotating body 11 is rotated and the jib 12 is elevated and raised, thereby moving the holding tool 18H to a position corresponding to the target point G (a position above the target point G). Thereafter, the holding tool 18H is lowered to place the cargo C at the target point G.
[0041] Figures 9 to 12 are diagrams showing an example of adjusting the height position of the holder 18H during lifting and lowering operations. In loading and unloading operations, cargo C is transported in four different modes shown in Figures 9 to 12. Hereinafter, the mode shown in Figure 9 will be referred to as the first mode, the mode shown in Figure 10 as the second mode, the mode shown in Figure 11 as the third mode, and the mode shown in Figure 12 as the fourth mode.
[0042] The first mode shown in FIG. 9 shows a case where the cargo C loaded in the cargo hold 103 and located at a position higher than the upper edge of the hull 101A is moved to a target point G in the port 104. In the first mode shown in FIG. 9, when the cargo C is raised, it takes time to raise the holding tool 18H to a preset maximum height. Therefore, by raising the holding tool 18H to the shipboard height position Ms, the time can be reduced compared to the case of raising it to the maximum height. Note that the first mode can also be used in the case where the holding tool 18H that is located at a position higher than the upper edge of the hull 101A and does not hold the cargo C is moved to the target point G in the port 104.
[0043] In the second embodiment shown in FIG. 10, the cargo C loaded in the cargo hold 103 and located at a position lower than the upper edge of the hull 101A is moved to the target point G of the harbor 104. In the second embodiment shown in FIG. 10, when the cargo C is raised, it takes time to raise the holding tool 18H to the onboard height position Ms or a preset maximum height. In addition, when the holding tool 18H is placed on the harbor 104 side, it is necessary to avoid interference with the upper edge of the hull 101A when moving the holding tool 18H placed on the harbor 104 side to a position corresponding to the cargo C. Therefore, by raising the holding tool 18H to the hull height position Mb, the time can be shortened compared to the case of raising the holding tool 18H to the onboard height position Ms or the maximum height, and interference with the upper edge of the hull 101A can be avoided. In addition, the second aspect can also be used in the case where a holder 18H that is positioned lower than the upper edge of the hull 101A and is not holding cargo C is moved to a target point G in the port 104.
[0044] The third embodiment shown in FIG. 11 shows a case where cargo C arranged in the port 104 is moved to a target point G that is higher than the upper edge of the hull 101A among the cargo C loaded in the cargo hold 103. In the third embodiment shown in FIG. 11, when the cargo C is raised, it is necessary to avoid interference with the cargo C stacked at a position higher than the upper edge of the hull 101A. In addition, when the holding tool 18H is arranged on the cargo hold 103 side, it takes time to raise the holding tool 18H to a preset maximum height when moving the holding tool 18H to a position corresponding to the cargo C. Therefore, by raising the holding tool 18H to the onboard height position Ms, interference with other cargo C can be avoided, and the time can be reduced compared to the case of raising it to the maximum height. Note that the third embodiment can also be used in the case where the holding tool 18H arranged on the port 104 side and not holding the cargo C is moved to a target point G that is higher than the upper edge of the hull 101A.
[0045] The fourth embodiment shown in FIG. 12 shows a case where the cargo C placed at the target point G of the port 104 is moved to a position lower than the upper edge of the hull 101A among the cargo C loaded in the cargo hold 103. In the fourth embodiment shown in FIG. 12, when the cargo C is raised, it is necessary to avoid interference with the upper edge of the hull 101A. In addition, when the holding tool 18H is placed on the port 104 side, it takes time to raise the holding tool 18H to the onboard height position Ms or a preset maximum height when moving the holding tool 18H placed on the port 104 side to a position corresponding to the cargo C. Therefore, by raising the holding tool 18H to the hull height position Mb, interference with the upper edge of the hull 101A can be avoided, and the time can be shortened compared to the case of raising it to the onboard height position Ms or the maximum height. In addition, the fourth aspect can also be used in the case where, for example, a holding device 18H that is positioned on the port 104 side and is not holding cargo C is moved to a target point G that is at a height lower than the upper edge of the hull 101A.
[0046] In this way, when the height position of the target point G of the holding tool 18H is higher than the ship's height position Mb, the holding tool 18H is positioned at the ship's height position Ms, and in other cases, the holding tool 18H is raised and lowered so as to be positioned at the ship's height position Mb. This avoids interference with the loaded cargo C, and shortens the time required to hoist the holding tool 18H.
[0047] Furthermore, when multiple deck cranes 10 are provided, as in the deck crane system 100 of this embodiment, it is necessary to avoid interference between the deck cranes 10. Figures 13 to 15 are diagrams showing an example of an operation for avoiding interference between the deck cranes 10. Hereinafter, one deck crane 10 of the multiple deck cranes 10 will be referred to as a first deck crane 10A, and the other deck crane 10 will be referred to as a second deck crane 10B.
[0048] In the control device 20 (hereinafter referred to as the control device 20A) of the first deck crane 10A, the determination unit 27 (see FIG. 3) determines whether or not the first deck crane 10A will interfere with the second deck crane 10B when the first deck crane 10A performs a rotation operation of the rotating body 11 and a lifting operation of the jib 12. For example, as shown in FIG. 13, the determination unit 27 can determine that the first deck crane 10A will interfere with the second deck crane 10B when the moving trajectory of the rotating body 11, jib 12, holding tool 18H, etc. of the first deck crane 10A overlaps with the positions of the rotating body 11, jib 12, holding tool 18H, etc. of the second deck crane 10B in a plan view. When the determination unit 27 determines that the first deck crane 10A will interfere with the second deck crane 10B, the rotation operation control unit 23 and the lifting operation control unit 24 of the control device 20A control the first deck crane 10A not to perform the rotation operation and the lifting operation.
[0049] In addition, in the control device 20 of the second deck crane 10B (hereinafter referred to as the control device 20B), the slewing operation control unit 23 and the hoisting operation control unit 24, during a period in which the first deck crane 10A is controlled not to perform slewing and hoisting operations as shown in Fig. 14, retract the second deck crane 10B from the trajectory of the rotating body 11, jib 12, holder 18H, etc. of the first deck crane 10A so as not to interfere with the first deck crane 10A. Note that, when the second deck crane 10B is transporting cargo C, the control device 20B retracts the second deck crane 10B after completing the transport operation of the cargo C.
[0050] As shown in Fig. 15, after the second deck crane 10B has been retracted, the control device 20A starts the rotation and hoisting operations of the first deck crane 10A. Through this control, cargo handling operations can be carried out efficiently while avoiding interference between the first deck crane 10A and the second deck crane 10B.
[0051] FIG. 16 is a flow chart showing an example of a loading / unloading operation by the deck crane system 100 according to this embodiment. The following describes an example in which a holding tool 18H not holding cargo C is moved to a position corresponding to the cargo C that is the target of the loading / unloading operation for one deck crane 10. The worker places the target point coordinate detection unit S3 on the cargo C that is the target of the loading / unloading operation. The driver also inputs which of the first to fourth modes shown in FIG. 9 to FIG. 12 the loading / unloading operation mode is. This input can be made by the operating device in the driver's cab D or the remote controller 30.
[0052] When the cargo handling operation mode is input, as shown in FIG. 16, the coordinate data acquisition unit 21 acquires the post coordinates detected by the post coordinate detection unit S1, the hook coordinates detected by the hook coordinate detection unit S2, and the target value coordinates detected by the target point coordinate detection unit S3 (step S10). In this case, the target point coordinates are the plane coordinates of the cargo C. The lifting / lowering operation control unit 25 judges whether or not the height position information corresponding to the input mode is stored in the storage unit 26 (step S20). If it is judged that the corresponding height position information is stored (Yes in step S20), the lifting / lowering operation control unit 25 specifies the stored height position (step S30). On the other hand, if it is judged that the corresponding height position information is not stored (No in step S20), the lifting / lowering operation control unit 25 specifies the maximum height position set in advance (step S40). If the height position is specified in step S30 or step S40, the lifting / lowering operation control unit 25 winds up the lifting / lowering wire 18 so that the holder 18H is located at the specified height position, and raises the holder 18H (step S50).
[0053] After raising the holder 18H, the coordinate calculation unit 22 performs calculations to set a plane coordinate system based on the post coordinates, hook coordinates, and target point coordinates acquired by the coordinate data acquisition unit 21 (step S60). The rotation operation control unit 23 and the elevation / deceleration operation control unit 24 calculate the rotation angle by the rotation device 13 and the elevation / deceleration angle by the elevation device 14 based on the post coordinates, hook coordinates, and target point coordinates acquired by the coordinate data acquisition unit 21 and the calculation results of the coordinate calculation unit 22 (step S70).
[0054] The swing operation control unit 23 and the tilt / tilt operation control unit 24 determine whether interference will occur with another deck crane 10 (step S80), and if it is determined that no interference will occur (Yes in step S80), they control the swing operation and tilt / tilt operation of the deck crane 10 based on the calculated swing angle and tilt / tilt angle (step S90). The swing operation and tilt / tilt operation place the holder 18H at a position corresponding to the target point G. On the other hand, if it is determined that interference will occur with another deck crane 10 (No in step S80), the determination process of step S80 is repeated. The swing operation and tilt / tilt operation are not performed while the above determination process is repeated.
[0055] After the turning and elevation operations are performed, the control device 20 judges whether the difference between the position of the holder 18H after turning and elevation and the target point coordinate is equal to or less than the set value of the turning error and elevation error (step S100). In step S100, the data acquisition unit 21 acquires the post coordinate, the hook coordinate, and the target point coordinate, and the coordinate calculation unit 22 performs calculation to set a plane coordinate system. The coordinate calculation unit 22 can convert the plane coordinate system so that the post coordinate is the origin and the X coordinate of the hook coordinate is 0, for example. In this case, the value calculated as the X coordinate of the target point is the difference between the X coordinate of the holder 18H and the target point G. Also, the difference obtained by subtracting the Y coordinate of the hook coordinate from the Y coordinate of the target point is the difference between the Y coordinate of the holder 18H and the target point G. The turning operation control unit 23 judges whether the X coordinate of the target point is equal to or less than the set value of the turning error. The tilt operation control unit 24 also judges whether the difference obtained by subtracting the Y coordinate of the hook coordinate from the Y coordinate of the target point is equal to or less than the set value of the tilt error. If it is judged that the X coordinate of the target point is greater than the set value of the turning error, or the difference obtained by subtracting the Y coordinate of the hook coordinate from the Y coordinate of the target point is greater than the set value of the tilt error (No in step S100), the turning operation control unit 23 and the tilt operation control unit 24 repeat the operations from step S60 onwards. If it is judged that the X coordinate of the target point is equal to or less than the set value of the turning error and the difference obtained by subtracting the Y coordinate of the hook coordinate from the Y coordinate of the target point is equal to or less than the set value of the tilt error (Yes in step S100), the lifting operation control unit 25 winds down the lifting wire 18 to lower the holder 18H to a height position corresponding to the cargo C (step S110). After lowering the holder 18H, the lifting / lowering operation control unit 25 determines whether the position of the holder 18H is on the ship and higher than the ship height Mb (step S120). The determination in step S110 can be made, for example, based on an input by the driver using an operating device in the cab D or the remote controller 30. When the lifting / lowering operation control unit 25 determines that the position of the holder 18H is on the ship and higher than the ship height Mb (Yes in step S120), it stores the height position of the holder 18H in the memory unit 26 as an onboard height position Ms (step S130).On the other hand, if the lifting / lowering operation control unit 25 determines that the position of the holder 18H is not on the ship or is not higher than the ship height Mb (No in step S120), it skips the processing of step S130. After step S130, or if a No determination is made in step S120, slinging is performed to hold the cargo C on the holder 18H. After slinging is performed, the lifting / lowering operation control unit 25 pulls the lifting wire 18 upward to lift the cargo C off the ground (step S140).
[0056] In addition, the above-mentioned processing from step S10 onwards can be performed in the same manner when the holding tool 18H holding the cargo C is moved to the position of the destination of the cargo C. In this processing, when the cargo C is on the ship and at a position higher than the ship height Mb, the value of the ship height position Ms stored in step S120 of the previous processing can be used as the height position of step S50 for raising the holding tool 18H. The height of the ship hull 101A changes in the vertical direction relative to the port 104 due to vibration or tides during loading and unloading of the cargo C. In contrast, by using the value of the ship height position Ms stored in step S110 of the previous processing as the height position of step S50 for raising the holding tool 18H, interference with the loaded cargo C can be avoided without adjusting the height position of the holding tool 18H, and the time required to hoist the holding tool 18H can be shortened.
[0057] As described above, the deck crane system 100 of this embodiment has a rotating body 11 supported on the deck 102 of the ship 101 and rotating around the rotating axis AX1, a jib 12 connected to the rotating body 11 and raised and lowered, and a holder 18H arranged at the lower end of a hoisting wire 18 extending downward from the tip of the jib 12 and raised and lowered, and is equipped with a deck crane 10 that performs loading and unloading operations of cargo C between the ship 101 and a port 104, and a control device 20 that acquires post coordinates indicating the horizontal position of the rotating axis AX1, hook coordinates indicating the horizontal position of the holder 18H, and target point coordinates indicating the horizontal position of the target point to which the holder 18H is moved, calculates the rotation angle of the rotating body 11 and the elevation angle of the jib 12 based on the acquired post coordinates, hook coordinates and target point coordinates, and causes the rotating body 11 to perform a rotation operation and the jib 12 to perform an elevation operation based on the calculation results.
[0058] The control device 20 for the deck crane according to this embodiment is a control device 20 for the deck crane 10 which performs loading and unloading work of cargo C between the ship 101 and the port 104 by rotating the rotating body 11 of the deck crane 10 arranged on the deck 102 of the ship 101 about the rotating axis AX1, raising and lowering the jib 12 connected to the rotating body 11, and raising and lowering the holder 18H provided at the lower end of the hoisting wire 18 extending downward from the tip of the jib 12. The system is equipped with a coordinate data acquisition unit 21 that acquires post coordinates indicating the horizontal position of the holder 18H, hook coordinates indicating the horizontal position of the holder 18H, and target point coordinates indicating the horizontal position of the target point to which the holder 18H is moved, a coordinate calculation unit 22 that calculates the rotation angle of the rotating body 11 and the elevation angle of the jib 12 based on the acquired post coordinates, hook coordinates and target point coordinates, and a rotation operation control unit 23 and an elevation operation control unit 24 that cause the rotating body 11 to perform a rotation operation and the jib 12 to perform an elevation operation based on the calculation results of the calculation unit.
[0059] The control method of the deck crane according to the present embodiment is a control method of the deck crane 10 for performing loading and unloading work of cargo C between the ship 101 and the port 104 by rotating the rotating body 11 of the deck crane 10 arranged on the deck 102 of the ship 101 about the rotation axis AX1, raising and lowering the jib 12 connected to the rotating body 11, and raising and lowering the holder 18H provided at the lower end of the lifting and lowering wire 18 extending downward from the tip of the jib 12. This includes acquiring post coordinates indicating the horizontal position of X1, hook coordinates indicating the horizontal position of the holder 18H, and target point coordinates indicating the horizontal position of the target point to which the holder 18H is moved, calculating the rotation angle of the rotating body 11 and the elevation angle of the jib 12 based on the acquired post coordinates, hook coordinates and target point coordinates, and causing the rotating body 11 to perform a rotation operation and the jib 12 to perform an elevation operation based on the calculation results of the calculation unit.
[0060] According to this configuration, the post coordinates, hook coordinates and target point coordinates are acquired, the rotation angle of the rotating body 11 and the elevation angle of the jib 12 are calculated based on the acquired post coordinates, hook coordinates and target point coordinates, and based on the calculation results, the rotating body 11 is rotated and the jib 12 is elevated. This makes it possible to efficiently carry out loading and unloading operations while suppressing variation in the operations by the operator.
[0061] In the deck crane system 100 according to this embodiment, the controller 20 sets a plane coordinate system so that a virtual line L1 connecting post position P indicated by the post coordinates and hook position H indicated by the hook coordinates becomes a first reference axis Y1 in the plane coordinate system, and a virtual line L2 passing through post position P and perpendicular to the first reference axis Y1 becomes a second reference axis X1 in the plane coordinate system, and calculates the slewing angle and the elevation angle based on the setting result. Therefore, a coordinate system can be set that enables easy calculation of the positional relationship between the rotating body 11, jib 12, and holder 18H of the deck crane 10.
[0062] In the deck crane system 100 according to this embodiment, the control device 20 has a memory unit 26 that stores at least one of the height positions of the hull height position Mb corresponding to the height of the upper edge of the hull of the ship 101 and the ship height position Ms corresponding to the height of the upper end of the cargo C loaded on the ship 101, and causes the holding tool 18H to be raised and lowered based on the height position stored in the memory unit 26. Therefore, interference between the upper edge of the hull 101A and the loaded cargo C can be avoided, and the time required to hoist the holding tool 18H can be shortened.
[0063] In the deck crane system 100 according to this embodiment, the control device 20 performs a lifting operation so that the holding tool 18H is located at the shipboard height position Ms when the height position of the target point G of the holding tool 18H is higher than the shipboard height position, and performs a lifting operation so that the holding tool 18H is located at the shipboard height position Mb in other cases. This makes it possible to avoid interference with the loaded cargo C and shorten the time required to hoist the holding tool 18H.
[0064] In the deck crane system 100 according to this embodiment, when the height position is not stored in the memory unit 26, the control device 20 performs a lifting operation so that the holder 18H is located at a preset maximum height position. Therefore, the loading and unloading process can be performed smoothly without stagnation.
[0065] In the deck crane system 100 according to this embodiment, a plurality of deck cranes 10 are arranged on the ship 101, and the control device 20 determines whether or not the first deck crane 10A among the plurality of deck cranes 10 will interfere with a second deck crane 10B different from the first deck crane 10A when the first deck crane 10A performs a rotation operation of the rotating body 11 and a lifting operation of the jib 12 based on the calculation results of the rotation angle and the elevation angle, and if interference is determined, the control device 20 prevents the first deck crane 10A from performing the rotation operation and the lifting operation. Thus, interference between the plurality of deck cranes 10 can be suppressed.
[0066] In the deck crane system 100 according to this embodiment, the control device 20 retracts the second deck crane 10B so as not to interfere with the first deck crane 10A during the period when the first deck crane 10A is not performing its slewing and hoisting operations. This makes it possible to prevent the period when the first deck crane 10A is not performing its slewing and hoisting operations from being prolonged.
[0067] The technical scope of the present invention is not limited to the above-mentioned embodiment, and appropriate modifications can be made without departing from the spirit of the present invention. For example, in the above-mentioned embodiment, at least one of the operations of setting the height position during winding and lowering, the winding and lowering operations, the rotation operation, and the elevation operation may be performed by the remote controller 30. [Explanation of symbols]
[0068] 10 Deck crane 10A No. 1 Deck Crane 10B No. 2 Deck Crane 11 Rotating body 12 Jib 13 Swivel 13B Swing brake 13M Swivel Motor 14 Elevation device 14B Pitch / elevation brake 14D,15D drum 14M elevation motor 15 Lifting device 15B Lifting brake 15M Lifting motor 16 Mounting stand 16S Slewing bearing 17 Pulley 18 Lifting wire 18H holder 19 Lifting wire for elevation 20, 20A, 20B Control device 21 Coordinate data acquisition section 22 Coordinate calculation section 23 Swing operation control section 24 Elevation motion control section 25 Lifting and lowering operation control section 26 Memory section 27 Judgment section 30 Remote Controller 100 Deck Crane System 101 Ships 101A Hull 102 Deck 103 Cargo hold 104 Port AX1 Swivel axis AX2 Elevation axis C Cargo D. Driver's cab G target point H hook position L1, L2 Virtual line Mb Hull height position Ms shipboard height position P Post Position R Control Room S1 Post coordinate detector S2 Hook coordinate detector S3 Target coordinate detection unit X0,Y0 Reference axis X1 2nd reference axis Y1 1st reference axis
Claims
1. a deck crane which has a rotating body supported on the deck of a ship and which rotates around a rotating shaft, a jib which is connected to the rotating body and which moves up and down, and a holder which is disposed at the lower end of a hoisting wire which extends downward from the tip of the jib and which moves up and down, and which is used for loading and unloading cargo between the ship and a port; a control device which acquires post coordinates indicating the horizontal position of the rotating shaft, hook coordinates indicating the horizontal position of the holding tool, and target point coordinates indicating the horizontal position of a target point to which the holding tool is to be moved, calculates a rotation angle of the rotating body and an elevation angle of the jib based on the acquired post coordinates, hook coordinates, and target point coordinates, and causes the rotating body to perform a rotation operation and the jib to perform an elevation operation based on the calculation results; Equipped with The control device has a memory unit that stores at least one of a hull height position corresponding to the height of the upper edge of the hull of the ship and a shipboard height position corresponding to the height of the upper end of the cargo loaded on the ship, and performs a lifting and lowering operation of the holding device based on the height position stored in the memory unit. Deck crane system.
2. The control device sets a plane coordinate system so that a virtual line connecting a point indicated by the post coordinates and a point indicated by the hook coordinates becomes a first reference axis in the plane coordinate system, and a virtual line passing through the point indicated by the post coordinates and perpendicular to the first reference axis becomes a second reference axis in the plane coordinate system, and calculates the turning angle and the elevation angle based on the setting result. The deck crane system according to claim 1 .
3. The control device performs a lifting operation so that the holding tool is positioned at the shipboard height position when the height position of the target point of the holding tool is higher than the shipboard height position, and performs a lifting operation so that the holding tool is positioned at the shipboard height position in other cases. The deck crane system according to claim 1 or 2.
4. When the height position is not stored in the storage unit, the control device performs a lifting operation so that the holder is placed at a preset maximum height position. A deck crane system according to any one of claims 1 to 3.
5. The deck crane is provided in plurality on the ship, The control device determines whether or not a second deck crane different from the first deck crane will interfere with the first deck crane when the first deck crane performs a rotation operation of the rotating body and a lifting operation of the jib based on the calculation results of the rotation angle and the lifting angle, and when it is determined that the first deck crane will interfere with the second deck crane, the control device prevents the first deck crane from performing the rotation operation and the lifting operation. A deck crane system according to any one of claims 1 to 4.
6. The control device retracts the second deck crane so as not to interfere with the first deck crane during a period in which the first deck crane is not rotating or hoisting. The deck crane system according to claim 5.
7. A control device for a deck crane that performs cargo handling operations between a ship and a port by rotating a rotating body of the deck crane placed on the deck of the ship around a rotating shaft, raising and lowering a jib connected to the rotating body, and raising and lowering a holder provided at a lower end of a hoisting wire extending downward from a tip of the jib, a coordinate acquisition unit that acquires post coordinates indicating a horizontal position of the rotation axis of the deck crane, hook coordinates indicating a horizontal position of the holding tool, and target point coordinates indicating a horizontal position of a target point to which the holding tool is moved; A calculation unit that calculates a rotation angle of the rotating body and an elevation angle of the jib based on the acquired post coordinates, the hook coordinates, and the target point coordinates; A drive control unit that causes the rotating body to perform a rotating operation and the jib to perform a lifting and lowering operation based on the calculation result of the calculation unit; a storage unit that stores at least one of a hull height position corresponding to the height of an upper edge of a hull of a ship and a shipboard height position corresponding to the height of an upper end of the cargo loaded on the ship; a lifting operation drive unit that lifts and lowers the holder based on the height position stored in the memory unit; A control device for a deck crane comprising:
8. A method for controlling a deck crane which performs cargo handling operations between a ship and a port by rotating a rotating body of the deck crane disposed on the deck of the ship around a rotating shaft, raising and lowering a jib connected to the rotating body, and raising and lowering a holder provided at a lower end of a hoisting wire extending downward from a tip of the jib, comprising: Acquiring post coordinates indicating a horizontal position of a rotation axis of the deck crane, hook coordinates indicating a horizontal position of the holding tool, and target point coordinates indicating a horizontal position of a target point to which the holding tool is moved; Calculating a rotation angle of the rotating body and an elevation angle of the jib based on the acquired post coordinates, the hook coordinates, and the target point coordinates; Based on the calculation results of the rotation angle of the rotating body and the elevation angle of the jib, causing the rotating body to perform a rotation operation and causing the jib to perform an elevation operation; When at least one of a hull height position corresponding to the height of the upper edge of the hull of a ship and a shipboard height position corresponding to the height of the upper end of the cargo loaded on the ship is stored in a memory unit, the holding device is raised and lowered based on the height position stored in the memory unit; A method for controlling a deck crane comprising:
Citation Information
Patent Citations
Automatic material handling controller for ships
JP1980031784A
Hydraulic motor, hydraulic winch, and deck crane
JP2002220189A
Sequential operation device for jib crane
JP2008030925A
Onboard deck crane equipment, method for controlling the same, and program
JP2016182907A
