Power generation system, and control method and program thereof
The power generation system addresses output decreases by calculating a correction value to increase generator output through boiler control, effectively compensating for environmental and equipment-related issues.
Patent Information
- Application Number
- JP2020201637
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-04
- Publication Date
- 2024-12-09
- Estimated Expiration
- 2040-12-04
AI Technical Summary
Thermal power plants face generator output decreases due to increased condenser vacuum pressure in summer and equipment aging, leading to insufficient power generation.
A power generation system with a system control device that calculates a correction value based on the deviation between generator request and output, increasing the generator request output by controlling the boiler when the load state is above a threshold and load change is within a predetermined range, using a boiler control unit to generate a boiler input command.
The system effectively increases generator output, compensating for deficiencies caused by environmental changes or equipment deterioration, ensuring stable power generation.
Smart Images

Figure 0007596129000001 
Figure 0007596129000002 
Figure 0007596129000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a power generation system, and a control method and program thereof. [Background technology]
[0002] 2. Description of the Related Art Power generation systems including a boiler and a steam turbine as main components are widely used in thermal power plants and the like. These power generation systems generate electricity using the steam turbine by using steam generated in the boiler. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 11-182212 [Patent Document 2] JP 2018-185600 A Summary of the Invention [Problem to be solved by the invention]
[0004] For example, in the summer, a phenomenon occurs in which the vacuum pressure of the condenser decreases as the outside air temperature rises. In such a case, the generator output is likely to decrease (for example, Patent Document 1), and there are cases in which the output of the rated load cannot be obtained. In addition, the output may decrease due to, for example, the deterioration of the equipment over time (for example, Patent Document 2). If the generator output is shorted in this way, it may not be possible to obtain a sufficient amount of electricity, resulting in a power generation shortage.
[0005] The present disclosure has been made in consideration of the above circumstances, and has an object to provide a power generation system capable of increasing generator output, and a control method and program therefor. [Means for solving the problem]
[0006] A first aspect of the present disclosure is a power generation system comprising a boiler, a steam turbine that rotates using steam generated in the boiler, a generator that generates electricity by the rotation of the steam turbine, and a system control device that controls the boiler, wherein the system control device comprises a correction value setting unit that calculates a correction value based on the deviation between the generator required output and the generator output when the load state is above a threshold value and the load change width is within a predetermined range, and a boiler control unit that increases the generator required output based on the correction value and generates a boiler input command that is a command for controlling the boiler.
[0007] A second aspect of the present disclosure is a control method for a power generation system including a boiler, a steam turbine that rotates using steam generated in the boiler, and a generator that generates power by the rotation of the steam turbine, the control method including the steps of: calculating a correction value based on the deviation between the generator required output and the generator output when the load state is equal to or higher than a threshold value and the load change width is within a predetermined range; and increasing the generator required output based on the correction value, and generating a boiler input command that is a command for controlling the boiler.
[0008] A third aspect of the present disclosure is a control program for a power generation system including a boiler, a steam turbine that rotates using steam generated in the boiler, and a generator that generates electricity by the rotation of the steam turbine, the control program causing a computer to execute the following processes: when a load state is above a threshold value and a load change range is within a predetermined range, a process of calculating a correction value based on a deviation between the generator required output and the generator output; and a process of increasing the generator required output based on the correction value and generating a boiler input command, which is a command for controlling the boiler. Effect of the Invention
[0009] According to the present disclosure, an effect of increasing generator output is achieved. [Brief description of the drawings]
[0010] [Figure 1]1 is a block diagram illustrating a schematic overall configuration of a power generation system according to an embodiment of the present disclosure. [Diagram 2] FIG. 2 is a diagram illustrating an example of a hardware configuration of a system control device according to an embodiment of the present disclosure. [Diagram 3] FIG. 1 is a diagram illustrating a schematic configuration of a system control device according to an embodiment of the present disclosure. [Figure 4] 5 is a flowchart illustrating an example of processing by a system control device according to an embodiment of the present disclosure. [Diagram 5] 11A and 11B are diagrams for explaining the effect of processing by a system control device according to an embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] A power generation system and a control method thereof according to an embodiment of the present invention will be described below with reference to the drawings. Fig. 1 is a block diagram showing a schematic overall configuration of a power generation system 1 according to this embodiment. In Fig. 1, the power generation system 1 includes a boiler 10, a steam turbine 3 that rotates using steam generated in the boiler 10, a generator 5 that generates electricity by the rotation of the steam turbine 3, and a system control device 15 that controls the steam turbine 3. The boiler 10 is not limited to a CFB, and can also be applied to other types of boilers such as HRSG. A furnace 2 for burning fuel is provided in the boiler 10. Steam generated in a water-cooled wall 2' provided in the furnace 2 is supplied to a steam turbine 3 through a steam pipe L1. A primary superheater 4a, an attemperator 16, and a secondary superheater 4b are provided in series in the steam pipe L1. Although FIG. 1 shows a case where one attemperator 16 is provided, a configuration in which an additional attemperator 16 is provided in a stage subsequent to the secondary superheater 4b may also be used.
[0012] A steam control valve 6 is provided in the steam pipe L1 between the boiler 10 and the steam turbine 3 to adjust the amount of steam supplied to the steam turbine 3. When a fully variable pressure operation mode is adopted, the steam control valve 6 may be maintained in a fully open state regardless of the generator required output (power generation required output) MWD.
[0013] The power generation system 1 includes a feedwater pump 8 that supplies water to a water-cooled wall 2' installed in the furnace 2, a condenser 9 that recovers steam discharged from the steam turbine 3 and converts it back to water (liquid), and piping L2 that guides the water generated in the condenser 9 to the feedwater pump 8.
[0014] In addition, a pressure sensor 11 for measuring the main steam pressure is provided in the steam pipe L1 between the secondary superheater 4b and the steam control valve 6. The measurement value of the pressure sensor 11 is output to the system control device 15 and used for controlling the steam turbine 3.
[0015] In the power generation system 1 having such a configuration, fuel is combusted in the furnace 2, and the water supply pump 8 is started to circulate water through a water-cooled wall 2' provided in the furnace 2, thereby generating steam. Steam generated in the water-cooled wall 2' of the furnace 2 is guided to the primary superheater 4a and superheated, then cooled in the attemperator 16 and resuperheated in the secondary superheater 4b. The steam resuperheated in the secondary superheater 4b is guided to the steam turbine 3 and used to drive the steam turbine 3. The generator 5 generates electricity by the rotation of the steam turbine 3, and the generated electricity is sent to, for example, an electric power system (not shown).
[0016] The steam after driving the steam turbine 3 is guided to a condenser 9 and is converted back into water (liquid) by the condenser 9. The water generated in the condenser 9 is returned to the feedwater pump 8 again via various devices (not shown) provided in the pipe L2, and is reused in the boiler 10.
[0017] The system control device 15 controls the boiler 10 and the like.
[0018] FIG. 2 is a diagram showing an example of a hardware configuration of the system control device 15 according to the present embodiment. 2, the system control device 15 is a computer system, and includes, for example, a CPU 110, a ROM (Read Only Memory) 120 for storing programs executed by the CPU 110, a RAM (Random Access Memory) 130 that functions as a work area when each program is executed, a hard disk drive (HDD) 140 as a large-capacity storage device, and a communication unit 150 for connecting to a network or the like. Note that a solid-state drive (SSD) may be used as the large-capacity storage device. These units are connected via a bus 180.
[0019] The system control device 15 may also include an input unit including a keyboard and a mouse, and a display unit including a liquid crystal display device for displaying data.
[0020] It should be noted that the storage medium for storing the programs executed by the CPU 110 is not limited to the ROM 120. For example, it may be other auxiliary storage devices such as a magnetic disk, a magneto-optical disk, or a semiconductor memory.
[0021] A series of processing steps for realizing various functions described below are recorded in the form of a program on the hard disk drive 140, etc., and the CPU 110 reads this program into the RAM 130, etc., and executes information processing and arithmetic processing to realize various functions described below. The program may be installed in the ROM 120 or other storage medium in advance, may be provided in a state stored in a computer-readable storage medium, or may be distributed via wired or wireless communication means. Examples of computer-readable storage media include magnetic disks, magneto-optical disks, CD-ROMs, DVD-ROMs, and semiconductor memories.
[0022] Fig. 3 is a diagram showing a schematic configuration of the system control device 15. As shown in Fig. 3, the system control device 15 includes a correction value setting unit 20, a main steam pressure setting unit 30, a boiler control unit 40, and a governor control unit 50.
[0023] The correction value setting unit 20 calculates a correction value AM1 based on the deviation between the generator required output MWD and the generator output when the load state is equal to or higher than a threshold value and the load change width is within a predetermined range. Specifically, the correction value setting unit 20 includes a subtraction unit 21, a condition determination unit 22, a signal switching unit 23, a smoothing processing unit 24, a PI control unit 25, a change rate limiting unit 26, a holding unit 27, and a signal switching unit 28.
[0024] The subtraction unit 21 calculates the deviation (difference) between the generator required output MWD and the actual output (generator output), and outputs it to the PI control unit 25. In the following description, the deviation is indicated as ΔMW. The deviation (ΔMW) is a value obtained by subtracting the actual output from the generator required output MWD.
[0025] The condition determination unit 22 performs a condition determination and outputs whether the condition is satisfied or not satisfied. For example, as shown in Fig. 3, a first condition, a second condition, and a third condition are set in the condition determination unit 22 (logical AND). Note that only the first condition and the second condition may be set, or other conditions may be added. The condition determination unit 22 outputs "condition satisfied" when all the set conditions are satisfied, and outputs "condition not satisfied" if even one condition is not satisfied.
[0026] The first condition is that the load state is equal to or greater than a threshold value. The threshold value is set based on the rated load. Specifically, the threshold value is set near the rated load (for example, a value that is lower than the rated load by a predetermined margin). That is, the first condition determines that the load state is close to the rated load. The generator required output MWD can be used for the load state. That is, the first condition can be that the generator required output MWD is equal to or greater than a preset threshold value β. In this way, the first condition determines that the load state is (or is close to) the rated load state.
[0027] The second condition is that the load change width (load change amount per predetermined time) is within a predetermined range. The predetermined range is set in advance as a range that can be considered as a steady state without load change. That is, ideally, the second condition determines that there is no load change (the load is not changing). The load is not changing may be determined, for example, by the absence of a load increase (change) request signal. The load increase request signal is a signal that is input remotely or manually by an operator when the required load of the power plant (generator required output MWD) is increased by an instruction from the central load dispatching center until the target load (generator output) is reached. If there is no load increase request signal, it can also be determined that there is no load change (the load change width is within a predetermined range).
[0028] The third condition is that the opening degree of the steam control valve 6 is equal to or greater than the threshold value α. Specifically, the third condition is that the opening degree of the steam control valve 6 is fully open. For this reason, the threshold value α is set in advance to a value that allows the steam control valve 6 to be determined to be fully open. Note that the threshold value α may be set by adding a predetermined margin to the fully open state.
[0029] In this manner, the condition determination section 22 determines whether all of the first, second, and third conditions are satisfied, with the first, second, and third conditions being AND conditions.
[0030] Furthermore, the condition determination unit 22 may determine, as an additional condition (fourth condition), at least one of the following: the outside air temperature is equal to or higher than a predetermined value; and the deviation between the generator required output MWD and the generator output is equal to or higher than a predetermined value.
[0031] For example, when the outside air temperature is high in summer, the generator output is likely to be insufficient due to a drop in the vacuum pressure of the condenser 9. That is, by determining that the outside air temperature is equal to or higher than a predetermined value, it is possible to determine the possibility of an output shortage due to an increase in the outside air temperature. The threshold value is set in advance based on the relationship between the outside air temperature and the amount of shortage of the generator output.
[0032] Also, by determining that the deviation between the generator required output MWD and the generator output is equal to or greater than a predetermined value, it is possible to determine that there is a shortage of output in summer. The predetermined value is set, for example, based on an allowable value of the deviation between the generator required output MWD and the generator output. Note that the phenomenon of a shortage of generator output can occur due to, for example, equipment deterioration, regardless of the outside air temperature. Therefore, by determining that the deviation between the generator required output MWD and the generator output is equal to or greater than a predetermined value, it is possible to determine that there is a shortage of generator output, regardless of the cause.
[0033] That is, it is more preferable that the condition determination section 22 determines whether all of the first condition, the second condition, the third condition, and the fourth condition are satisfied, with the first condition being treated as an AND condition.
[0034] The signal switching unit 23 outputs either the selection port B1 or the selection port B2 to the output port C1 according to the input of the input port A1. Specifically, when a signal indicating that the condition is satisfied is input to the input port A1, the input to the selection port B1 is output to the output port C1. On the other hand, when a signal indicating that the condition is not satisfied is input to the input port A1, the input to the selection port B2 is output to the output port C1. That is, when the condition determination unit 22 determines that the condition is satisfied, ΔMW is output, and when the condition determination unit 22 determines that the condition is not satisfied, the signal generated by the signal generator (zero signal) is output.
[0035] The smoothing processor 24 performs smoothing processing on the signal from the signal switching unit 23. Specifically, the smoothing processor 24 performs a change suppression process that suppresses changes over time in ΔMW, which is the deviation between the generator required output MWD and the actual output. Specifically, the change suppression process is performed using a moving average. In other words, ΔMW is smoothed. The smoothing process is also performed when a zero signal is input from the signal switching unit 23, but since there is no change over time in the zero signal, the input is output as is.
[0036] In this way, the correction value setting unit 20 performs a change suppression process for suppressing the time change in ΔMW and calculates the correction value AM1 described later, so that abrupt time changes in the calculated correction value AM1 are suppressed. That is, the time change in the correction value AM1 is also gentle, and abrupt generator output is suppressed.
[0037] The PI control unit 25 performs PI control based on the signal (i.e., ΔMW) output from the smoothing unit 24, and outputs a control value. A lower limit value and an upper limit value are set in the PI control unit 25. For example, the lower limit value is 0, and the upper limit value is a (>0). In this way, the control value is limited within the upper and lower limit range, and the range of the output value can be limited.
[0038] The rate-of-change limiting unit 26 performs processing to suppress changes over time in the control signal output from the PI control unit 25. This suppresses sudden changes over time in the control signal.
[0039] The holding unit 27 holds the value when the signal output from the change rate limiting unit 26 reaches the actual MW target value. The actual MW target value is the rated output of the plant. In other words, the actual MW target value is the maximum value of the output correction value AM1.
[0040] The signal switching unit 28 outputs either the selection port E1 or the selection port E2 to the output port F1 according to the input of the input port D1. Specifically, when a signal indicating that the condition is satisfied is input to the input port D1, the input to the selection port E1 is output to the output port F1. On the other hand, when a signal indicating that the condition is not satisfied is input to the input port D1, the input to the selection port E2 is output to the output port F1. That is, when the condition determination unit 22 determines that the condition is satisfied, the signal input from the holding unit 27 is output, and when the condition determination unit 22 determines that the condition is not satisfied, the signal generated by the signal generator (zero signal) is output.
[0041] In this manner, the correction value AM1 is calculated based on ΔMW. The correction value AM1 is based on ΔMW, and the larger ΔMW is, that is, the smaller the actual output is relative to the generator required output MWD, the larger the value is. The calculated correction value AM1 is output to the main steam pressure setting unit 30. Note that when the condition is not satisfied and a zero signal is output from the signal switching unit 28, the correction value AM1 is zero and does not affect subsequent stages.
[0042] The main steam pressure setting unit 30 sets a main steam pressure command CM2 based on the generator required output MWD and the correction value AM1. To this end, the main steam pressure setting unit 30 includes a function unit 31 and an adder unit 32.
[0043] The function unit 31 converts the generator required output MWD into a main steam pressure command (before correction) CM1. That is, the function unit 31 performs the conversion based on the relationship between the generator required output MWD and the main steam pressure command CM1 that is preset based on the specifications of the power generation system 1.
[0044] The adder 32 corrects the main steam pressure command CM1 by adding the correction value AM1 set by the correction value setting unit 20 to the main steam pressure command CM1 output from the function unit 31, and outputs the main steam pressure command (corrected) CM2. In this way, the main steam pressure command is corrected to increase.
[0045] In this manner, the main steam pressure command CM2 is generated in the main steam pressure setting unit 30. The generated main steam pressure command CM2 is output to the boiler control unit 40.
[0046] The boiler control unit 40 generates a boiler input command BID (Boiler Input Demand), which is a command for controlling the boiler 10. As described later, the boiler control unit 40 uses a main steam pressure command CM2 reflecting a correction value AM1, and therefore performs processing to increase the generator required output MWD based on the correction value AM1. Specifically, the boiler control unit 40 increases the generator required output MWD based on the deviation between the main steam pressure command CM2 and the main steam pressure, and generates the boiler input command BID.
[0047] For this purpose, the boiler control unit 40 includes a subtraction unit 41, a PI control unit 42, an addition unit 43, and a function unit 44.
[0048] The subtraction unit 41 calculates the deviation (difference) between the main steam pressure command CM2 and the main steam pressure (actual value), and outputs it to the PI control unit 42. The deviation is a value obtained by subtracting the main steam pressure from the main steam pressure command CM2.
[0049] The PI control unit 42 performs PI control based on the signal output from the subtraction unit 41 (i.e., the deviation between the main steam pressure command CM2 and the main steam pressure) and outputs a control value. This control value is based on the correction value AM1 output from the correction value setting unit 20, and becomes a correction value AM2 for the generator required output MWD.
[0050] The correction value AM2 for the generator required output MWD is based on the deviation between the main steam pressure command CM2 and the main steam pressure, and the smaller the main steam pressure is with respect to the main steam pressure command CM2, the larger the correction value AM2 for the generator required output MWD becomes. In other words, since the main steam pressure command CM2 is calculated based on the correction value AM1 generated by correction value setting unit 20, the larger ΔMW is, that is, the smaller the actual output is with respect to the generator required output MWD, the larger the correction value AM2 becomes.
[0051] The adder 43 corrects the generator required output MWD by adding the generator required output MWD to the control value (correction value AM2 for the generator required output MWD) output from the PI control unit 42. Since the correction value AM2 is added to the generator required output MWD, the generator required output MWD is corrected to increase.
[0052] The function unit 44 converts the corrected generator required output MWD output from the adder unit 43 into a boiler input command BID and outputs it. The boiler input command BID is used, for example, to create a fuel flow command in the furnace 2 and a feedwater flow command in the water wall 2'. FIG. 3 shows a case where it is used to control a discharge conveyor. If the boiler input command BID increases, the fuel flow command in the furnace 2 and the feedwater flow command to the water wall 2' also increase, resulting in an increase in the main steam pressure. In other words, the generator output increases.
[0053] The boiler input command BID is not limited to the above-mentioned fuel flow command in the furnace 2, etc., so long as it is a parameter that can increase the main steam pressure and increase the generator output.
[0054] The governor control unit 50 controls the opening of the steam control valve (governor) 6. Specifically, a subtraction unit 51 calculates the deviation between the generator required output MWD and the generator output, and the difference is converted into a control signal in a PI control unit 52. The opening of the steam control valve 6 is controlled by this control signal, and the governor opening adjustment control is performed so that the deviation between the generator required output MWD and the generator output becomes zero.
[0055] Next, an example of the processing by the above-mentioned system control device 15 will be described with reference to Fig. 4. Fig. 4 is a flowchart showing an example of the procedure of the boiler input command output processing according to this embodiment. The flow shown in Fig. 4 is repeatedly executed, for example, at a predetermined control period. In the flow of Fig. 4, a case where all of the first condition, the second condition, the third condition, and the fourth condition are used will be described, but the processing will be similar even if the number of conditions is different.
[0056] First, it is determined whether or not a first condition is satisfied (S101). If the first condition is not satisfied (NO in S101), the process proceeds to S106.
[0057] If the first condition is satisfied (YES in S101), it is determined whether the second condition is satisfied (S102). If the second condition is not satisfied (NO in S102), the process proceeds to S106.
[0058] If the second condition is satisfied (YES in S102), it is determined whether or not the third condition is satisfied (S103). If the third condition is not satisfied (NO in S103), the process proceeds to S106.
[0059] If the third condition is satisfied (YES in S103), it is determined whether or not the fourth condition is satisfied (S104). If the fourth condition is not satisfied (NO in S104), the process proceeds to S106.
[0060] If the fourth condition is satisfied (YES in S104), a correction value AM1 is calculated based on the deviation between the generator output required MWD and the generator output (S105).
[0061] On the other hand, if at least one of the first condition, the second condition, the third condition, and the fourth condition is not satisfied, the correction value AM1 becomes zero (S106).
[0062] Next, the main steam pressure command CM2 is set based on the generator required output MWD and the correction value AM1 (S107). If the correction value AM1 is zero, the main steam pressure command CM2 is set simply based on the generator required output MWD.
[0063] Next, a correction value AM2 for the generator required output MWD is calculated based on the deviation between the main steam pressure command CM2 and the main steam pressure (S108).
[0064] Next, the generator required output MWD is corrected by the correction value AM2, and the boiler input command BID is output (S109).
[0065] In this way, when the load condition is close to the rated load and there is no load fluctuation (steam control valve 6 is fully open), if the generator output is insufficient, the boiler input command BID is corrected in the increasing direction by the correction value, so that the output can be increased to make up for the output deficiency.
[0066] Next, the effect of the processing by the above-mentioned system control device 15 will be described with reference to Fig. 5. Fig. 5 shows pattern A and pattern B, with the vertical axis (left axis) representing the main steam pressure, the vertical axis (right axis) representing the steam control valve opening, and the horizontal axis representing the main steam flow rate. In pattern A, the steam control valve 6 is kept constant by being fully open. In pattern B, the steam control valve 6 is made variable.
[0067] When the generator required output MWD increases and reaches point M, it becomes difficult to increase the generator output because the steam control valve 6 is fully open. For this reason, in the region above point M, a pressure varying operation region is set, and a correction value is calculated and a correction is made to increase the boiler input command BID, as in this embodiment. In this way, the main steam pressure can be increased, and it becomes possible to increase the generator output. In this pressure varying operation region, the turbine is under generator output control (the opening of the steam control valve 6 is constant), and the boiler 10 is under main steam pressure control (corrected by ΔMW).
[0068] In this manner, the boiler input command BID can be corrected to increase based on ΔMW, thereby making it possible to increase the generator output.
[0069] As described above, according to the power generation system and the control method and program thereof of this embodiment, in the power generation system 1 that generates power using the boiler 10 and the steam turbine 3, a correction value is calculated based on the generator required output and the generator output when the load state is a high load state where the load state is equal to or greater than a threshold value, and when there is no (small) load change where the load change width is within a predetermined range. Then, the boiler input command BID is generated by increasing the generator required output MWD using the correction value. Therefore, when the load state is equal to or greater than a threshold value and the load change width is within a predetermined range, the boiler input command BID can be increased. This makes it possible to increase the generator output.
[0070] In particular, when the load condition is above a threshold value and the load change range is within a specified range, it is usually considered unnecessary to increase the generator output, but even if a shortage in generator output occurs due to some cause (e.g., environmental changes or equipment deterioration), it is possible to cover the shortage.
[0071] In addition, a correction value is generated based on the generator required output and the generator output, thereby making it possible to reduce the difference between the generator required output and the generator output. A boiler input command BID is generated based on the deviation between the main steam pressure command CM2, which is set based on the generator required output MWD and the correction value, and the main steam pressure, so that the boiler input command BID is generated so as to suppress the difference between the main steam pressure command CM2 and the main steam pressure while taking the correction value into consideration.
[0072] The output can be increased when the outside air temperature is equal to or higher than a predetermined value, or when the deviation between the generator output required by the generator MWD and the generator output is equal to or higher than a predetermined value. For example, when the outside air temperature is high in summer, the output is likely to be insufficient due to a drop in the vacuum pressure of the condenser 9. For this reason, the output is increased by the correction value to cover the shortage.
[0073] The present disclosure is not limited to the above-described embodiment, and various modifications are possible without departing from the spirit and scope of the invention.
[0074] For example, in the above embodiment, when a request to increase the load is input, the fuel input amount to the furnace 2 and the water supply amount to the water wall 2' are increased, but the response of the water supply is faster than the response of the fuel in the furnace 2. Therefore, when the fuel flow rate command and the feedwater flow rate command are increased simultaneously, the amount of water supplied to the water wall 2' increases first, and then the temperature in the furnace 2 gradually starts to rise. For this reason, depending on the amount of feedwater supplied to the water wall 2', the outlet superheat degree of the water wall 2' may decrease. In order to avoid such a situation, a part of the feedwater amount may be supplied to the attemperator 16 installed on the steam outlet side of the primary superheater 4a, bypassing the water wall 2', and sprayed as a spray. In this case, the amount of spray in the attemperator 16 increases. In this way, by bypassing a part of the water supplied to the water-cooled wall 2' to the attemperator 16, it is possible to prevent a decrease in the degree of superheat at the outlet of the water-cooled wall 2' as described above. In addition, when a desuperheater 16 is further provided on the steam outlet side of the secondary superheater 4b, the spray amount of each desuperheater 16 may be increased.
[0075] The power generation system and the control method and program thereof described in each of the above-described embodiments can be understood, for example, as follows. The power generation system (1) of the present disclosure includes a boiler (10), a steam turbine (3) that rotates using steam generated in the boiler, a generator that generates power by the rotation of the steam turbine, and a system control device (15) that controls the boiler. The system control device includes a correction value setting unit (20) that calculates a correction value based on the deviation between a generator required output (MWD) and the generator output when the load state is equal to or higher than a threshold value and the load change width is within a predetermined range, and a boiler control unit (40) that increases the generator required output based on the correction value and generates a boiler input command (BID), which is a command for controlling the boiler.
[0076] According to the power generation system of the present disclosure, in a power generation system that generates power using a boiler or steam turbine, a correction value is calculated based on the generator required output and the generator output when the load state is a high load state where the load state is equal to or greater than a threshold value, and when there is no (small) load change where the load change width is within a predetermined range. Then, the generator required output is increased by the correction value to generate a boiler input command. Therefore, when the load state is equal to or greater than a threshold value and the load change width is within a predetermined range, the boiler input command can be increased. This makes it possible to increase the generator output.
[0077] In particular, when the load condition is above a threshold value and the load change range is within a specified range, it is usually considered unnecessary to increase the generator output, but even if a shortage in generator output occurs due to some cause (e.g., environmental changes or equipment deterioration), it is possible to cover the shortage.
[0078] Furthermore, by performing a correction based on the generator required output and the generator output, the difference between the generator required output and the generator output can be reduced.
[0079] The power generation system according to the present disclosure may include a main steam pressure setting unit (30) that sets a main steam pressure command based on the generator required output and the correction value, and the boiler control unit may increase the generator required output and generate the boiler input command based on a deviation between the main steam pressure command and the main steam pressure.
[0080] According to the power generation system of the present disclosure, a boiler input command is generated based on the deviation between the main steam pressure command, which is set based on the generator required output and a correction value, and the main steam pressure, so that the boiler input command is generated so as to suppress the difference between the main steam pressure command and the main steam pressure while taking into account the correction value.
[0081] The power generation system according to the present disclosure includes a steam control valve (6) provided in a steam pipe connecting the boiler and the steam turbine, and the correction value setting unit may calculate the correction value when the load state is equal to or greater than a threshold, the load change width is within a predetermined range, and the opening degree of the steam control valve is equal to or greater than a threshold.
[0082] According to the power generation system of the present disclosure, even when the opening degree of the steam control valve is above a threshold value and it is difficult to adjust the output increase using the steam control valve, it is possible to increase the boiler input command and increase the output.
[0083] In the power generation system of the present disclosure, the correction value setting unit may calculate the correction value in at least one of the following cases: when the outside air temperature is equal to or higher than a predetermined value, and when the deviation between the generator required output and the generator output is equal to or higher than a predetermined value.
[0084] According to the power generation system of the present disclosure, the output can be increased when the outside air temperature is equal to or higher than a predetermined value, or when the deviation between the generator output and the required output is equal to or higher than a predetermined value. For example, when the outside air temperature is high in summer, the output is likely to be insufficient due to a drop in the vacuum pressure of the condenser (9), etc. Therefore, the output is increased by the correction value to cover the shortage.
[0085] In the power generation system according to the present disclosure, the correction value setting unit may perform a change suppression process for suppressing a time change in a deviation between the generator required output and the generator output, and calculate the correction value.
[0086] According to the power generation system of the present disclosure, the change over time of the deviation between the generator required output and the generator output is suppressed, so that the change over time of the correction value also becomes gentler, and sudden increases in the generator output are suppressed.
[0087] In the power generation system according to the present disclosure, the correction value setting unit may perform the change suppression process using a moving average.
[0088] According to the power generation system according to the present disclosure, the moving average can effectively suppress the change over time.
[0089] The control method disclosed herein is a control method for a power generation system including a boiler, a steam turbine that rotates using steam generated in the boiler, and a generator that generates electricity by the rotation of the steam turbine, and includes the steps of: calculating a correction value based on the deviation between the generator required output and the generator output when the load state is above a threshold value and the load change width is within a predetermined range; and increasing the generator required output based on the correction value, and generating a boiler input command, which is a command for controlling the boiler.
[0090] The control program of the present disclosure is a control program for a power generation system including a boiler, a steam turbine that rotates using steam generated in the boiler, and a generator that generates electricity by the rotation of the steam turbine, and causes a computer to execute the following processes when the load state is above a threshold value and the load change range is within a predetermined range: calculating a correction value based on the deviation between the generator required output and the generator output; and increasing the generator required output based on the correction value, and generating a boiler input command, which is a command for controlling the boiler. [Explanation of symbols]
[0091] 1: Power generation system 2: Furnace 2´ :Water cooling wall 3: Steam turbine 4a: Primary superheater 4b:Secondary superheater 5: Generator 6: Steam control valve 8: Water supply pump 9: Condenser 10: Boiler 11: Pressure sensor 15: System control device 16: Attemperator 20: Correction value setting section 21: Subtraction section 22: Condition judgment section 23: Signal switching section 24: Smoothing processing section 25: PI control section 26: Change rate limiter 27: Holding part 28: Signal switching section 30: Main steam pressure setting section 31: Function section 32: Addition section 40: Boiler control unit 41: Subtraction section 42: PI control section 43: Addition section 44: Function section 50: Governor control unit 51: Subtraction section 52: PI control section 110: CPU 120:ROM 130:RAM 140: Hard disk drive 150: Communications Department 180: Bus A1: Input port AM1: Correction value AM2: Correction value B1: Selected port B2: Selected port BID: Boiler input command C1: Output port CM1: Main steam pressure command CM2: Main steam pressure command D1: Input port E1: Selected port E2: Selected port F1: Output port L1: Steam pipe L2: Piping MWD: Generator required output
Claims
1. Boiler and a steam turbine that rotates using steam generated in the boiler; a generator that generates electricity by rotation of the steam turbine; A system control device for controlling the boiler; Equipped with The system control device includes: a correction value setting unit that calculates a correction value based on a deviation between a generator output and a required output when the load state is equal to or greater than a threshold value and the load change width is within a predetermined range; a boiler control unit that increases the generator required output based on the correction value and generates a boiler input command that is a command for controlling the boiler; A power generation system comprising:
2. a main steam pressure setting unit that sets a main steam pressure command based on the generator required output and the correction value, The power generation system according to claim 1 , wherein the boiler control unit increases the generator required output based on a deviation between the main steam pressure command and the main steam pressure, and generates the boiler input command.
3. a steam control valve provided in a steam pipe connecting the boiler and the steam turbine; The power generation system according to claim 1 or 2, wherein the correction value setting unit calculates the correction value when the load state is equal to or greater than a threshold value, the load change width is within a predetermined range, and the opening degree of the steam control valve is equal to or greater than a threshold value.
4. The power generation system according to any one of claims 1 to 3, wherein the correction value setting unit calculates the correction value when at least one of the following occurs: the outside air temperature is equal to or higher than a predetermined value, and the deviation between the generator required output and the generator output is equal to or higher than a predetermined value.
5. The power generation system according to claim 1 , wherein the correction value setting unit calculates the correction value by performing a change suppression process for suppressing a time change in a deviation between the generator required output and the generator output.
6. The power generation system according to claim 5 , wherein the correction value setting unit performs the change suppression process using a moving average.
7. A control method for a power generation system including a boiler, a steam turbine that rotates using steam generated in the boiler, and a generator that generates power by the rotation of the steam turbine, comprising: calculating a correction value based on a deviation between a generator output request and the generator output when the load state is equal to or greater than a threshold value and the load change width is within a predetermined range; a step of increasing the generator required output based on the correction value and generating a boiler input command which is a command for controlling the boiler; The control method includes:
8. A control program for a power generation system including a boiler, a steam turbine that rotates using steam generated in the boiler, and a generator that generates power by the rotation of the steam turbine, a process of calculating a correction value based on a deviation between a generator output request and the generator output when the load state is equal to or greater than a threshold value and the load change width is within a predetermined range; A process of increasing the generator required output based on the correction value and generating a boiler input command which is a command for controlling the boiler; A control program for causing a computer to execute the above.
Citation Information
Patent Citations
Coordination control device of large-scale CFB (circulating fluidized bed) unit based on intensified combustion
CN202048569U
Governor valve controlling device of boiler
JP1991202601A
Thermal electric power station
JP1999182212A
Boiler / turbine generator control system
JP2001082701A
Load control method and apparatus of electric power plant
JP2001221010A