【0014】 本開示によれば、設置を容易に行うことができると共に地盤の沈下を抑制することができる。
Smart Images

Figure 0007637043000001 
Figure 0007637043000002 
Figure 0007637043000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a method for removing an earth retaining wall. [Background technology]
[0002] Various methods for removing an earth retaining wall have been conventionally known. Patent Publication No. 3940735 describes an earth retaining method. In the earth retaining method, sheet piles are driven into the ground. A hardener injection pipe is attached to the sheet pile by an attachment means and a fastener. The hardener injection pipe is attached to the sheet pile in the longitudinal direction. An outlet is formed at the tip of the hardener injection pipe from which the hardener is sprayed.
[0003] When the sheet pile is driven into the ground, the hardening agent injection pipe also penetrates into the ground, making it possible to inject the hardening agent into the ground from the hardening agent injection pipe. The tip of the hardening agent injection pipe is equipped with a plug that opens and closes the above-mentioned outlet, and a biasing means that biases the plug so that it closes the outlet. When injecting the hardening agent into the ground, the plug is moved against the biasing force of the biasing means by the injection pressure, and the outlet is opened into the ground, thereby spraying the hardening agent into the ground.
[0004] JP 2016-148137 A describes a method for removing an earth retaining portion. In the method for removing an earth retaining portion, an earth retaining member, which is a steel sheet pile with a hat-shaped cross section, is excavated around the earth retaining member to form a recess on the ground surface around the earth retaining member, and the recess is filled with liquefied treated soil, and the earth retaining member is pulled out with a crane. When the earth retaining member is pulled out, a gap is formed between the earth retaining member and the ground that communicates with the recess, and the liquefied treated soil flows from the recess into the gap. In this way, the liquefied treated soil flows into the gap formed when the earth retaining member is pulled out, thereby reducing the impact on the surrounding ground, etc. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Patent No. 3940735 [Patent Document 2] JP 2016-148137 A Summary of the Invention [Problem to be solved by the invention]
[0006] The above-mentioned earth retaining construction method requires the installation of hardener injection pipes in advance on the sheet piles, which can cause the problem of difficult installation. In addition, in a method in which a recess formed on the ground surface is filled with liquefied treated soil, and then the retaining member is pulled out and the liquefied treated soil is poured into the gap between the retaining member and the ground, the gap may not be filled sufficiently with liquefied treated soil. Specifically, when the retaining member is pulled out, a gap is first formed between the bottom end of the retaining member and the ground.
[0007] However, since the void does not communicate with the depression located on the ground surface, the liquefied treated soil is not filled into the void. Therefore, in the above-mentioned retaining portion removal method, the void in the ground is not filled sufficiently with liquefied treated soil, and there is a concern that the void will be left behind. In this case, there is a concern that the ground will subside due to the void being left inside. In other words, since the void does not communicate with the depression located on the ground surface, the liquefied treated soil is only filled into the void after the retaining member has been completely pulled out. In this case, there is a concern that the ground will subside due to the surrounding ground collapsing into the void before the liquefied treated soil is filled.
[0008] The present disclosure aims to provide a retaining wall removal method that can be easily installed and suppresses ground subsidence. [Means for solving the problem]
[0009] The method for removing an earth-retaining wall according to the present disclosure includes the steps of: casting an earth-retaining wall into the ground; excavating the ground located on one side of the earth-retaining wall in a plan view; constructing a skeleton in a space formed by the excavation; filling the space between the earth-retaining wall and the skeleton with a filler material that hardens over time; and pulling out the earth-retaining wall from the ground before the filler material hardens. The method includes, after the step of constructing the main body, a step of installing a formwork between the retaining wall and the main body, and a step of backfilling between the formwork and the main body, and the step of filling with filler further includes a step of filling the space between the retaining wall and the formwork after the backfilling step, and a step of pulling the formwork out of the ground after the step of filling with filler, and the step of installing the formwork includes a step of interposing a camber between the retaining wall and the formwork, and the step of pulling out the formwork includes a step of pulling out the camber from the filler.
[0010] In this method of removing an earth retaining wall, a skeleton is constructed in a space formed by excavating the ground located on one side of the earth retaining wall, and then the earth retaining wall is pulled out from the ground. After the skeleton is constructed, a filler that hardens over time is filled in, and the earth retaining wall is pulled out before the filler hardens. Since the earth retaining wall is pulled out from the ground before the filler hardens, the filler can be densely filled in the gap left after the earth retaining wall is pulled out as the earth retaining wall is pulled out. By densely filling the gap with the filler, it is possible to prevent the ground around the earth retaining wall from collapsing into the gap. Therefore, it is possible to prevent the ground from subsiding after the earth retaining wall is pulled out. In addition, since it is only necessary to fill the gap between the earth retaining wall and the skeleton with the filler and pull out the earth retaining wall, it is not necessary to perform work such as attaching a pipe to the earth retaining wall in advance. Therefore, it is easy to install equipment for preventing ground subsidence.
[0011] The retaining wall removal method may include, after the step of constructing the skeleton, a step of installing a formwork between the retaining wall and the skeleton, and a step of backfilling between the formwork and the skeleton. In the step of filling with filler, the filler may be filled between the retaining wall and the formwork after the backfilling step. The retaining wall removal method may further include a step of pulling out the formwork from the ground after the step of filling with filler. In this case, the formwork is placed between the retaining wall and the skeleton, and the filler is filled between the retaining wall and the formwork. Therefore, the amount of filler can be reduced compared to when the filler is filled between the retaining wall and the skeleton. As a result, the amount of filler used can be reduced, and the cost of the filler can be reduced.
[0012] The step of installing the formwork may include a step of interposing a camber between the earth retaining wall and the formwork. The step of extracting the formwork may include a step of extracting the camber from the filler. In this case, since the camber is disposed between the earth retaining wall and the formwork, the formwork can be easily extracted.
[0013] The camber may be connected to the surface of the formwork facing the retaining wall via a hinge. In the step of pulling out the camber, the camber may be pulled out together with the formwork in a state in which it can rotate via the hinge. In this case, since the camber is connected to the formwork, it is possible to pull out the camber together with the formwork. Therefore, it is possible to easily pull out the formwork and the camber. Furthermore, the camber is rotatably connected to the formwork via a hinge. Therefore, it is possible to rotate the camber relative to the formwork when pulling out the formwork, which prevents the camber from getting caught during pulling out and becoming difficult to pull out. Therefore, it is possible to even more easily pull out the formwork and the camber. Effect of the Invention
[0014] According to the present disclosure, installation can be easily performed and ground subsidence can be suppressed. [Brief description of the drawings]
[0015] [Figure 1] 1(a) is a vertical cross-sectional view showing a site where a retaining wall removal method according to an embodiment is applied, and FIG. 1(b) is a cross-sectional view taken along line AA in FIG. [Diagram 2] 2(a) is a vertical cross-sectional view showing the state in which the earth retaining wall and the skeleton are constructed at the construction site of FIG. 1(a), and FIG. 2(b) is a cross-sectional view taken along line BB of FIG. 2(a). [Diagram 3] 3(a) is a vertical cross-sectional view showing a state in which a formwork and a camber are installed at the site of FIG. 2(a), and FIG. 3(b) is a cross-sectional view taken along line CC of FIG. 3(a). [Figure 4] 1A is an enlarged side view of a camber, and FIG. 1B is a side view of a camber according to a modified example. [Diagram 5] 5(a) is a vertical cross-sectional view showing the state where backfilling has been performed between the skeleton and the formwork at the construction site of FIG. 4(a), and FIG. 5(b) is a cross-sectional view taken along line DD of FIG. 5(a). [Figure 6] 6(a) is a vertical cross-sectional view showing a state where the filling material has been filled at the site of FIG. 5(a), and FIG. 6(b) is a cross-sectional view taken along line EE of FIG. 6(a). [Figure 7] FIG. 13 is a side view showing a schematic view of a camber that rotates when the form is pulled out. [Figure 8] FIG. 11 is a side view showing a schematic diagram of a camber that rotates when an earth retaining wall is pulled out in a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Hereinafter, an embodiment of the retaining wall removal method according to the present disclosure will be described with reference to the drawings. In the description of the drawings, the same or corresponding elements are given the same reference numerals, and duplicated descriptions are omitted as appropriate. In addition, the drawings may be partially simplified or exaggerated for ease of understanding, and the dimensions, ratios, angles, etc. are not limited to those shown in the drawings.
[0017] Fig. 1(a) is a vertical cross-sectional view showing a site S to which the retaining wall removal method according to the present embodiment is applied. Fig. 1(b) is a cross-sectional view taken along line AA in Fig. 1(a). As shown in Figs. 1(a) and 1(b), for example, a structure T, which is an underground structure, is constructed at the site S. A layer K formed by hardening a filler material 10, which will be described later, is provided around the structure T in a plan view. The layer K has a flat first surface K1 facing the structure T and a corrugated second surface K2 facing the opposite side to the structure T.
[0018] For example, the skeleton T is an underground structure constructed underground and buried in the ground B. As an example, the skeleton T includes a subway platform. In this case, the skeleton T has a space T1 inside the skeleton T through which a railroad passes. However, the skeleton T does not have to be a subway platform and may include various structures.
[0019] The filler 10 is not hardened and has fluidity when filled. The filler 10 hardens over time. For example, the filler 10 is liquefied treated soil. The liquefied treated soil contains cement, soil (construction waste soil as an example), and water. The liquefied treated soil may be soil mixed with water and a solidifying material.
[0020] For example, at a construction site S, a structure T is constructed in an underground space formed by an earth-retaining wall 1 (see FIG. 2) described below, and after the structure T is constructed, backfilling is performed and the earth-retaining wall 1 is pulled out from the ground B. However, simply pulling out the earth-retaining wall 1 results in a void formed in the ground B equivalent to the thickness of the earth-retaining wall 1. If the void is left in the ground B, the ground B may collapse into the void, causing subsidence of the ground B, which is undesirable as it may also affect the building X constructed on the ground surface U. Therefore, a construction method is required that prevents voids from being formed in the ground B after the earth-retaining wall 1 is pulled out.
[0021] The retaining wall 1 is used when constructing the structure T, and is removed after the structure T is constructed. As an example, the thickness of the retaining wall 1 is 15 mm. For example, the retaining wall 1 is a leased material, and use of the retaining wall 1 is costly, so it is desirable to remove it from the ground B. Furthermore, if the retaining wall 1 is left on the ground B for a long period of time, there is a possibility that it will hinder the flow of groundwater, and therefore it is desirable to remove the retaining wall 1 from this point of view as well.
[0022] The method for removing an earth-retaining wall according to this embodiment will be described below. As shown in Fig. 2(a) and Fig. 2(b), first, an earth-retaining wall 1 is cast into the ground B (a process of casting an earth-retaining wall). The earth-retaining wall 1 is composed of, for example, a plurality of steel sheet piles 1b. The steel sheet piles 1b each have a trapezoidal shape in a cross section cut along a plane perpendicular to the longitudinal direction of the steel sheet piles 1b. In this cross section, the steel sheet piles 1b have a bottom 1c and a pair of legs 1d extending obliquely from both ends of the bottom 1c.
[0023] A connection portion 1f to which another steel sheet pile 1b is connected is provided at the end of the leg portion 1d opposite to the bottom portion 1c. The multiple steel sheet piles 1b are connected to each other by connecting a pair of connection portions 1f to each other. As an example, the connection portion 1f is U-shaped, and the pair of U-shaped connection portions 1f fit together to connect the pair of steel sheet piles 1b. The multiple steel sheet piles 1b are connected to each other so as to form a wave-shaped shape in a plan view. In a plan view, the retaining wall 1 is formed, for example, to form a rectangular frame shape.
[0024] After the retaining wall 1 is cast into the ground B, the ground B located on one side of the retaining wall 1 in a plan view is excavated (the process of excavating the ground). As an example, the inside portion of the frame-shaped retaining wall 1 in a plan view is excavated. This excavation of the ground B forms a space C below the ground surface U for constructing the structure T. After the space C is formed, formwork is installed and concrete is poured, etc., to construct the structure T (the process of constructing the structure).
[0025] Then, as shown in Figures 3(a) and 3(b), the formwork 2 is installed between the structure T and the retaining wall 1 (the process of installing the formwork). As an example, the formwork 2 is made of wood. The formwork 2 has a first surface 2b facing the structure T side and a second surface 2c facing the retaining wall 1 side. For example, the coefficient of friction of the first surface 2b is smaller than the coefficient of friction of the second surface 2c. This allows the formwork 2 to be smoothly pulled out of the backfill soil Y, which will be described later.
[0026] For example, a support member 3 is interposed between the formwork 2 and the structure T (step of interposing a support member). The support member 3 is provided to prevent the formwork 2 from tipping over towards the structure T. As an example, a plurality of support members 3 are arranged in a line along the vertical direction. The plurality of support members 3 are removed one by one from the support member 3 located below as the backfill soil Y is backfilled.
[0027] A camber 5 is interposed between the formwork 2 and the retaining wall 1 (step of interposing a camber). The camber 5 is interposed between the formwork 2 and the retaining wall 1. The camber 5 ensures a gap W, making it possible to fill the filler 10 with fewer pours when pouring the filler 10. In other words, when the camber 5 is provided, it becomes possible to fill a wide area with the filler 10 at one time. The camber 5 is made of wood, for example. FIG. 4(a) is an enlarged side view of the camber 5.
[0028] 4(a), the camber 5 has an upper surface 5b facing vertically upward, a lower surface 5c facing vertically downward, a first side surface 5d facing the formwork 2, and a second side surface 5f facing the retaining wall 1. The camber 5 is rotatably supported on the formwork 2, for example, via a hinge 6. As an example, the hinge 6 is fixed to the formwork 2 and between the first side surface 5d and the lower surface 5c (the lower end of the first side surface 5d), and the camber 5 is rotatable about the hinge 6.
[0029] For example, the vertical length of the second side surface 5f is shorter than the vertical length of the first side surface 5d. As an example, the camber 5 has an inclined surface 5g located between the upper surface 5b and the second side surface 5f. Since the inclined surface 5g is formed between the upper surface 5b and the second side surface 5f and the vertical length of the second side surface 5f is shorter than the length of the first side surface 5d, it is possible to easily pull up the formwork 2 relative to the retaining wall 1.
[0030] An exemplary camber 5 has been described above. However, the camber interposed between the formwork 2 and the retaining wall 1 may have a configuration other than the camber 5, for example, the camber 5A shown in FIG. 4(b). The camber 5A has a columnar portion 5h that contacts the formwork 2 and an inclined portion 5j that contacts the retaining wall 1. For example, the inclined portion 5j is in the shape of a truncated cone.
[0031] 3(a) and 3(b), the camber 5 is interposed between the formwork 2 and a bottom 1c of the retaining wall 1 that protrudes toward the formwork 2. This forms a gap W of the length of the camber 5 between the retaining wall 1 and the formwork 2. For example, multiple cambers 5 are arranged lined up in the vertical direction.
[0032] Then, backfilling is performed between the formwork 2 and the structure T (backfilling process). At this time, backfill soil Y is filled from below into the space C between the formwork 2 and the structure T. As described above, the support members 3 are removed while the backfill soil Y is being filled. As shown in Figures 5(a) and 5(b), for example, backfilling with backfill soil Y is performed until the backfill soil Y reaches the ground surface U. Even in this state, the space C formed between the retaining wall 1 and the formwork 2 is maintained by the multiple cambers 5.
[0033] Thereafter, as shown in Figures 6(a) and 6(b), the filler 10 is filled into the space C between the retaining wall 1 and the formwork 2. At this point, the filler 10 has not hardened and is fluid. At this time, the filler 10 is filled between the steel sheet piles 1b and the formwork 2, and the camber 5 is filled with the filler 10. More specifically, the filler 10 is filled between the bottom portions 1c and the legs 1d and the second surface 2c of the formwork 2. The filler 10 is filled from the bottom surface of the space C to a height equal to or higher than the height of the ground surface U.
[0034] After filling the space C with the filler 10 as described above and before the filler 10 hardens, the formwork 2 is pulled out from the ground B (step of pulling out the formwork). As described above, the camber 5 is rotatably attached to the second surface 2c of the formwork 2 via the hinge 6, and therefore, as the formwork 2 is pulled out, the camber 5 is pulled out from the filler 10 together with the formwork 2, as shown in Fig. 7 (step of pulling out the camber). At this time, the camber 5 is pulled out from the filler 10 together with the formwork 2 in a state where it rotates obliquely downward around the hinge 6 located at the lower end of the first side surface 5d.
[0035] Then, the retaining wall 1 is pulled out from the ground B before the filling material 10 hardens (the process of pulling out the retaining wall). The retaining wall 1 is pulled out, for example, by a hydraulic press-in and pull-out machine that grasps the retaining wall 1 and pulls it up from the ground B. The formwork 2 described above may also be pulled out by this hydraulic press-in and pull-out machine. For example, the formwork 2 is pulled out before the retaining wall 1 is pulled out. However, the formwork 2 may be pulled out after the retaining wall 1 is pulled out, and the order of the process of pulling out the formwork and the process of pulling out the retaining wall can be changed as appropriate.
[0036] When the retaining wall 1 is pulled out, the filler 10 enters laterally into the space in the ground B that is formed when the retaining wall 1 is pulled out, and the space is filled with the filler 10. As described above, the retaining wall 1 is pulled out and the space is densely filled with the filler 10. After a certain period of time has passed and the filler 10 has hardened, the series of steps are completed as shown in Figures 1(a) and 1(b).
[0037] Next, the effects of the retaining wall removal method according to this embodiment will be described. As shown in Figures 3(a), 3(b), 6(a) and 6(b), in the retaining wall removal method according to this embodiment, a structure T is constructed in a space C formed by excavating the ground B located on one side of the retaining wall 1, and then the retaining wall 1 is pulled out from the ground B. After the structure T is constructed, a filler 10 that hardens over time is filled in, and the retaining wall 1 is pulled out before the filler 10 hardens. Since the retaining wall 1 is pulled out from the ground B before the filler 10 hardens, the filler 10 can be densely filled into the gaps in the retaining wall 1 as the retaining wall 1 is pulled out.
[0038] Filling the ground B densely with the filler 10 can prevent voids from being left in the ground B. Therefore, settlement of the ground B after the retaining wall 1 is pulled out can be prevented. Furthermore, since it is only necessary to fill the gap between the retaining wall 1 and the structure T with the filler 10 and then pull out the retaining wall 1, work such as attaching pipes to the retaining wall 1 in advance is not required. Therefore, equipment for preventing settlement of the ground B can be easily installed.
[0039] The retaining wall removal method according to this embodiment includes, after the step of constructing a structure T, a step of installing a formwork 2 between the retaining wall 1 and the structure T, and a step of backfilling between the formwork 2 and the structure T. In the step of filling with filler 10, the filler 10 is filled between the retaining wall 1 and the formwork 2 after the backfilling step. The retaining wall removal method according to this embodiment further includes a step of pulling out the formwork 2 from the ground B after the step of filling with filler 10.
[0040] Therefore, the formwork 2 is placed between the retaining wall 1 and the skeleton T, and the filler 10 is filled between the retaining wall 1 and the formwork 2. Therefore, the amount of filler 10 can be reduced compared to when the filler 10 is filled between the retaining wall 1 and the skeleton T. As a result, the amount of filler 10 used can be reduced, and the cost of the filler 10 can be reduced.
[0041] As described above, when the filler 10 is liquefied treated soil, the cost of liquefied treated soil is generally high, which leads to an increase in costs. However, when the formwork 2 is arranged as in this embodiment and the filler 10 is filled between the formwork 2 and the retaining wall 1, the amount of filler 10 can be kept to a minimum. Therefore, the cost of the filler 10 can be kept low.
[0042] In this embodiment, the step of installing the formwork 2 includes a step of interposing the camber 5 between the retaining wall 1 and the formwork 2, and the step of pulling out the formwork 2 includes a step of pulling out the camber 5 from the filler 10. Therefore, since the camber 5 is disposed between the retaining wall 1 and the formwork 2, the formwork 2 can be easily pulled out.
[0043] In the retaining wall removal method according to this embodiment, as shown in Figures 4(a) and 7, a formwork 2 with a camber 5 is used that abuts against the retaining wall 1 before the retaining wall 1 is pulled out. By attaching the camber 5 to the formwork 2 in this way, the gap W is ensured and the filler 10 can be poured in a smaller number of times.
[0044] In this embodiment, the camber 5 is connected to the second surface 2c of the formwork 2 facing the retaining wall 1 via a hinge 6, and in the process of pulling out the camber 5, the camber 5 is pulled out together with the formwork 2 in a rotatable state via the hinge 6. Therefore, since the camber 5 is connected to the formwork 2, the camber 5 can be pulled out together with the formwork 2.
[0045] Therefore, the formwork 2 and the camber 5 can be easily pulled out. Furthermore, the camber 5 is rotatably connected to the formwork 2 via the hinge 6. Therefore, when the formwork 2 is pulled out, it is possible to rotate the camber 5 relative to the formwork 2, which prevents the camber 5 from getting caught and becoming difficult to pull out. This makes it even easier to pull out the formwork 2 and the camber 5.
[0046] The embodiment of the retaining wall removal method according to the present disclosure has been described above. However, the present invention is not limited to the above embodiment, and can be modified as appropriate within the scope of the claims. In other words, the content and order of the steps of the retaining wall removal method according to the present disclosure can be modified as appropriate within the scope of the above-mentioned gist.
[0047] In the above-described embodiment, an example was described in which the filler 10 was liquefied treated soil. However, the filler may be something other than liquefied treated soil, such as mortar. In the above-described embodiment, an example was described in which the camber 5 was attached to the formwork 2. However, the camber may be attached to a retaining wall.
[0048] Fig. 8 shows an example in which the camber 15 is attached to the retaining wall 11 via a hinge 16. As shown in Fig. 8, the camber 15 has an upper surface 15b facing vertically upward, a lower surface 15c facing vertically downward, a first side surface 15d facing the retaining wall 11, and a second side surface 15f facing the formwork 12, and the hinge 16 is fixed between the first side surface 15d and the lower surface 15c and to the retaining wall 11. In the retaining wall 11 to which the camber 15 is attached via the hinge 16, the retaining wall 11 and the camber 15 can be easily pulled out, similar to the formwork 2 described above.
[0049] In the above-described embodiment, an example has been described in which the formwork 2 and the camber 5 are arranged. However, it is also possible to omit at least one of the formwork 2 and the camber 5. For example, when the formwork 2 is omitted, after the structure T is constructed in the space C, the filler 10 is filled between the retaining wall 1 and the structure T, and the retaining wall 1 is pulled out before the filler 10 hardens. Even in this case, the same effect as that of the retaining wall removal method according to the embodiment can be obtained.
[0050] In the above-described embodiment, the retaining wall 1, which is a steel sheet pile 1b, has been described. However, the retaining wall may be something other than the steel sheet pile 1b, for example, a parent pile. Also, in the above-described embodiment, an example has been described in which the retaining wall removal method according to the present embodiment is applied to a site S where a structure T, which is an underground structure, is constructed. However, the retaining wall removal method according to the present disclosure is not limited to the site S, and can be applied to various sites. [Explanation of symbols]
[0051] 1,11…soil retaining wall, 1b…steel plate, 1c…bottom, 1d…leg, 1f…joining part, 2,12…profile, 2b…first surface, 2c…second surface, 3…supporting member, 5,5A,15…camber, 5b,15b…upper surface, 5c,15c…lower surface, 5d…first side surface, 5f…second side surface, 5g…inclined surface, 5h…columnar part, 5j…inclined part, 6,16…hinge, 10…filling material, 15d…first side surface, 15f…second side surface, B…ground, C…space, K…layer, K1…first surface, K2…second surface, S…site, T…body, T1…space, U…ground surface, W…interval, X…building, Y…buried soil
Claims
1. A process of casting an earth retaining wall into the ground; excavating the ground located on one side of the earth retaining wall in a plan view; constructing a structure in the space formed by the excavation; filling a gap between the retaining wall and the framework with a filler that hardens over time; Pulling out the earth retaining wall from the ground before the filler hardens; Equipped with After the step of constructing the skeleton, a step of installing a form between the retaining wall and the skeleton, and a step of backfilling the space between the form and the skeleton, In the step of filling the filler, the filler is filled between the retaining wall and the formwork after the step of backfilling, The method further includes a step of extracting the formwork from the ground after the step of filling the filler. The step of installing the formwork includes a step of interposing a camber between the retaining wall and the formwork, The step of extracting the form includes extracting the camber from the filler. How to remove earth retaining walls.
2. The camber is connected to a surface of the formwork facing the retaining wall via a hinge, In the step of extracting the camber, the camber is extracted together with the formwork in a rotatable state via the hinge. The method for removing an earth retaining wall according to claim 1.
Citation Information
Patent Citations
Construction method for permanently protecting existing pipeline during road reconstruction
CN111021270A
Deformation-preventing work for ground after drawing steel sheet pile
JP1987117913A
Method for constructing underground wall body, and the underground wall body
JP2010270442A
Earth retaining wall and method of constructing the same
JP2011084938A
Sheet pile pulled-out part filling method
JP2013159960A