Continuous girder side span cast-in-situ segment single-end suspension support structure
By adopting a single-end suspension bracket structure in the construction of the continuous beam edge-span cast-in-place section in the water, combined with the suspension and support mechanism, the problems of complex bracket foundation processing and prevention of floating objects impact during flood season are solved, and the construction is safe, efficient and cost-effective. Save money, meet navigation requirements and improve overall stability.
Patent Information
- Application Number
- PCT/CN2023/126382
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-30
- Filing Date
- 2023-10-25
- Publication Date
- 2024-10-03
AI Technical Summary
During the construction of the continuous beam edge-span cast-in-place section in the water, especially under navigation requirements and weathered rock geological conditions, the support foundation processing is complex, and the measures to prevent floating objects from impacting during the flood season are difficult, which increases the risk of support collapse. Traditional construction methods are required. It is difficult, inefficient and costly.
It adopts a single-end suspension bracket structure. The longitudinal beams of the Bailey frame are suspended and supported through the suspension mechanism and support mechanism. Combined with the full hall bracket and the supporting method, the cover beam and steel pipe pile columns are used for suspension and support, which reduces the obstruction of the water surface. area and construction costs, and improved stability and safety.
It effectively reduces the probability of the support system being hit by floating objects, shortens the construction period, improves construction safety and efficiency, reduces costs, meets navigation requirements and improves overall stability.
Smart Images

Figure CN2023126382_03102024_PF_FP_ABST
Abstract
Description
A single-end suspended bracket structure for the cast-in-place side span of a continuous beam Technical Field
[0001] The utility model belongs to the technical field of continuous beam supports, and in particular relates to a single-end suspension support structure for a continuous beam side span cast-in-place section. Background Art
[0002] The cast-in-place side spans of continuous beams are constructed using full-frame scaffolding, scaffolding, and bracketing methods. These methods are mature, safe, and reliable, and this structural form is being widely promoted and applied. However, during the construction of the cast-in-place side spans of continuous beams in water, navigability requirements, and weathered rock riverbed conditions make scaffolding foundation treatment a complex process, and measures to prevent floating object impacts during the flood season are difficult, increasing the risk of scaffolding collapse during construction during the flood season. In the absence of an overburden layer on the riverbed and weathered rock, the traditional drilling method for the scaffolding foundation is difficult and inefficient to construct. The anchored portion of the side span cannot be removed later, increasing construction costs. Using the traditional full-frame scaffolding method prevents small boats from passing through, increases the obstructed area of the water surface, and is susceptible to impacts from floating objects during the flood season, posing a high safety risk. Using the traditional bracketing method requires additional anti-overturning measures for the piers, and the length of the cast-in-place side span is limited, resulting in high construction costs.
[0003] Utility Model Content
[0004] In order to solve the problems raised in the above background technology, the utility model provides a single-end suspension bracket structure for the cast-in-place section of the side span of a continuous beam.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a single-end suspension support structure for the cast-in-place section of the side span of a continuous beam, comprising a Bailey frame longitudinal beam, wherein the end of the Bailey frame longitudinal beam close to the bridge pier is provided with a suspension mechanism for positioning, and the Bailey frame longitudinal beam is arranged on the upper part of the bridge pier through the suspension mechanism; the end of the Bailey frame longitudinal beam away from the bridge pier is provided with a support mechanism for positioning; a wooden formwork is supported above the Bailey frame longitudinal beam by a coupler-type scaffolding structure, and the wooden formwork is used for casting the beam body of the cast-in-place section of the side span of the continuous beam.
[0006] The suspension mechanism includes a double-jointed I-beam shoulder beam placed on the upper end of the cap beam, and two parallel suspension-end double-jointed I-beam cross beams fixedly installed on both sides of the bridge pier through fine-rolled threaded steel horizontal tie rods. A pad for support is also provided between the bridge pier and the suspension-end double-jointed I-beam cross beam. Fine-rolled threaded steel vertical hangers for suspension are provided between the two ends of the double-jointed I-beam shoulder beam and the two suspension-end double-jointed I-beam cross beams. Double-nut steel pads for positioning are screwed on both ends of the fine-rolled threaded steel vertical hangers and the fine-rolled threaded steel horizontal tie rods. The suspension-end double-jointed I-beam cross beam supports one end of the Bailey frame longitudinal beam close to the bridge pier.
[0007] The support mechanism includes a steel pipe pile column inserted into a borehole in the riverbed, an underwater concrete filling pile cast between the steel pipe pile column and the borehole, and a double-jointed I-beam crossbeam at the upper end of the steel pipe pile column, which supports the end of the Bailey frame longitudinal beam away from the bridge pier.
[0008] The coupler-type scaffolding structure includes an I-beam distribution beam placed parallel to the Bailey frame longitudinal beam, and a steel pipe scaffolding placed on the upper surface of the I-beam distribution beam, a top support fixed at the upper end of the steel pipe scaffolding, and a double steel pipe stored in a storage groove at the upper end of the top support. The top support and the double steel pipe cooperate to support square timber, and a wooden formwork is provided on the square timber.
[0009] As an optimal technical solution for the single-end suspension bracket structure of the cast-in-place section of the continuous beam side span of the utility model, a limiting channel steel for positioning is fixedly installed on the inner side of the Bailey frame longitudinal beam. There are four limiting channel steels, and the four limiting channel steels are distributed on the surfaces on both sides of the bridge pier.
[0010] As an optimal technical solution for the single-end suspension bracket structure of the cast-in-place section of a continuous beam side span of the utility model, the upper surface of the Bailey frame longitudinal beam is provided with a rubber block support for support, and the rubber block support is in contact with the lower surface of the cap beam, and the cap beam is installed at the upper end of the double-piece I-beam shoulder beam.
[0011] As an optimal technical solution for the single-end suspension bracket structure of the cast-in-place section of the continuous beam side span of the utility model, a plurality of Bailey frame longitudinal beams are arranged in parallel.
[0012] As an optimal technical solution for the single-end suspension bracket structure of the cast-in-place section of the continuous beam side span of the utility model, two bridge piers and two steel pipe pile columns are arranged in parallel.
[0013] As an optimal technical solution for the single-end suspension bracket structure of the cast-in-place section of the continuous beam side span of the utility model, the Bailey frame longitudinal beam is perpendicular to the I-beam distribution beam.
[0014] Compared with the prior art, the beneficial effects of the present invention are:
[0015] 1. By adopting a suspension mechanism and a support mechanism, one end of the Bailey frame longitudinal beam is suspended, and the other end of the Bailey frame longitudinal beam adopts a temporary support mechanism on the riverbed, which solves the problem of the full-chamber support method blocking the water area and reduces the probability of the support system being hit by floating objects. At the same time, the temporary support mechanism and suspension mechanism also have the purpose of shortening the construction period, ensuring safety and efficiency, energy saving and environmental protection, and reducing costs.
[0016] 2. Through the suspension mechanism composed of fine-rolled threaded steel vertical hangers, double-jointed I-beam crossbeam at the suspension end, double-nut steel pads, wood blocks and fine-rolled threaded steel horizontal tie rods, the double-jointed I-beam shoulder beam placed on the upper end of the cap beam is connected to the double-jointed I-beam crossbeam at the suspension end through the fine-rolled threaded steel vertical hangers, and the double-jointed I-beam crossbeam at the suspension end is connected to the bridge pier through the fine-rolled threaded steel horizontal tie rods, and the double-jointed I-beam crossbeam at the suspension end is screwed and fixed with double-nut steel pads at both ends, so that the double-jointed I-beam shoulder beam suspends and supports the double-jointed I-beam crossbeam at the suspension end, and the double-jointed I-beam crossbeam at the suspension end suspends and supports the Bailey frame longitudinal beam, and wood blocks are also provided between the double-jointed I-beam crossbeam at the suspension end and the bridge pier, thereby achieving stability and convenience in suspending one end of the Bailey frame longitudinal beam.
[0017] 3. A temporary support structure is formed by underwater concrete-filled piles, steel pipe pile columns, and double-jointed I-beams at the support ends. After the lower end of the steel pipe pile column is installed in a hole drilled in the riverbed, underwater concrete-filled piles are poured in the gap between the steel pipe pile column and the hole drilled, so that the lower end of the steel pipe pile column is fixed in the riverbed, and the upper end of the steel pipe pile column supports the other end of the Bailey frame longitudinal beam through the double-jointed I-beams at the support end, thereby achieving the purpose of the support structure supporting the Bailey frame longitudinal beam.
[0018] In summary, the single-end suspended support structure measures of the cast-in-place section of the side span of this continuous beam combine the full-span support structure with the pseudo-frame structure, and use the pier column cap beam to set up a single-end suspension system, reducing the number of guide holes in the steel pipe columns of the pseudo-frame structure and lowering the height of the full-span support erected at the bottom of the beam of the full-span support structure, meeting the navigation requirements and improving the overall stability of the support system. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0020] Figure 1 is a schematic diagram of the front view structure of the present invention;
[0021] Figure 2 is a schematic diagram of the left side view of the present invention;
[0022] Figure 3 is a schematic diagram of the right side view of the present invention;
[0023] In the figure: 1. Vertical hanger of high-quality rolled threaded steel bar; 2. Double-jointed I-beam shoulder beam; 3. Cap beam; 4. Rubber block support; 5. Bailey frame longitudinal beam; 6. Double-jointed I-beam crossbeam at the hanging end; 7. Double-nut steel pad; 8. Positioning channel steel; 9. Pads; 10. Horizontal tie rod of high-quality rolled threaded steel bar; 11. Underwater concrete filling pile; 12. Steel pipe pile column; 13. Double-jointed I-beam crossbeam at the supporting end; 14. I-beam distribution beam; 15. Steel pipe scaffolding; 16. Jacking; 17. Double steel pipe; 18. Square timber; 19. Wooden formwork; 20. Beam body of the cast-in-place section of the side span of the continuous beam; 21. Bridge pier. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0025] Example
[0026] Please refer to Figures 1-3. The utility model provides a technical solution: a single-end suspension bracket structure for the cast-in-place section of the side span of a continuous beam, including a Bailey frame longitudinal beam 5, an end of the Bailey frame longitudinal beam 5 close to the bridge pier 21 is provided with a suspension mechanism for positioning, and the Bailey frame longitudinal beam 5 is arranged on the upper part of the bridge pier 21 through the suspension mechanism; an end of the Bailey frame longitudinal beam 5 away from the bridge pier 21 is provided with a support mechanism for positioning; the suspension mechanism and the support mechanism are dismantled later.
[0027] A wooden formwork 19 is supported above the Bailey frame longitudinal beam 5 by a coupler-type scaffolding structure; by adopting a suspension mechanism and a support mechanism, one end of the Bailey frame longitudinal beam 5 is suspended, and the other end of the Bailey frame longitudinal beam 5 adopts a temporary support mechanism on the riverbed, which solves the problem of the full-floor support method blocking the water area and reduces the probability of the support system being hit by floating objects. At the same time, the temporary support mechanism and the suspension mechanism also have the purpose of shortening the construction period, ensuring safety and efficiency, energy saving and environmental protection, and reducing costs.
[0028] The suspension mechanism includes a double-jointed I-beam shoulder beam 2 placed on the upper end of the cap beam 3, and two parallel suspension-end double-jointed I-beam cross beams 6 fixedly installed on both sides of the bridge pier 21 through fine-rolled threaded steel horizontal tie rods 10. A pad 9 for support is also provided between the bridge pier 21 and the suspension-end double-jointed I-beam cross beam 6. Fine-rolled threaded steel vertical suspenders 1 for suspension are provided between the two ends of the double-jointed I-beam shoulder beam 2 and the two suspension-end double-jointed I-beam cross beams 6. Double-nut steel pads 7 for positioning are screwed on both ends of the fine-rolled threaded steel vertical suspender 1 and the fine-rolled threaded steel horizontal tie rod 10. The suspension-end double-jointed I-beam cross beam 6 supports one end of the Bailey frame longitudinal beam 5 close to the bridge pier 21. Through the suspension mechanism composed of the fine-rolled threaded steel vertical hanger 1, the double-jointed I-beam cross beam 6 at the suspension end, the double-nut steel pad 7, the pad 9 and the fine-rolled threaded steel horizontal tie rod 10, the double-jointed I-beam shoulder beam 2 placed on the upper end of the cap beam 3 is connected to the double-jointed I-beam cross beam 6 at the suspension end through the fine-rolled threaded steel vertical hanger 1, and the double-jointed I-beam cross beam 6 at the suspension end is connected to the bridge pier 21 through the fine-rolled threaded steel horizontal tie rod 10, and the double-nut steel pad 7 is screwed and fixed at both ends of the fine-rolled threaded steel vertical hanger 1 and the fine-rolled threaded steel horizontal tie rod 10, so that the double-jointed I-beam shoulder beam 2 suspends and supports the double-jointed I-beam cross beam 6 at the suspension end, and the double-jointed I-beam cross beam 6 at the suspension end supports the Bailey frame longitudinal beam 5 Suspended support is provided, and a pad 9 is provided between the double-jointed I-steel cross beam 6 at the suspension end and the bridge pier 21, thereby achieving stability and convenience in suspending one end of the Bailey frame longitudinal beam 5.
[0029] The supporting mechanism includes a steel pipe pile column 12 inserted into a riverbed borehole, an underwater concrete filling pile 11 cast between the steel pipe pile column 12 and the borehole gap, and a support end double-jointed I-beam 13 arranged at the upper end of the steel pipe pile column 12, and the support end double-jointed I-beam 13 supports the end of the Bailey frame longitudinal beam 5 away from the bridge pier 21; a temporary supporting mechanism is formed by the underwater concrete filling pile 11, the steel pipe pile column 12, and the support end double-jointed I-beam 13, and after the lower end of the steel pipe pile column 12 is installed in the riverbed borehole, the underwater concrete filling pile 11 is cast in the gap between the steel pipe pile column 12 and the borehole, so that the lower end of the steel pipe pile column 12 is fixed in the riverbed, and the upper end of the steel pipe pile column 12 supports the other end of the Bailey frame longitudinal beam 5 through the support end double-jointed I-beam 13, thereby achieving the purpose of the supporting mechanism supporting the Bailey frame longitudinal beam 5.
[0030] The coupler-type scaffolding structure includes an I-beam distribution beam 14 placed parallel to the Bailey frame longitudinal beam 5, and a steel pipe scaffolding 15 placed on the upper surface of the I-beam distribution beam 14, a top support 16 fixed at the upper end of the steel pipe scaffolding 15, and a double steel pipe 17 stored in a storage groove at the upper end of the top support 16. The top support 16 and the double steel pipe 17 are supported by square timber 18, and a wooden formwork 19 for support is provided on the square timber 18. The single-end suspension bracket construction measures of the cast-in-place section of the continuous beam side span combine the full-span bracket structure with the pseudo-frame structure, and use the cap beam 3 to set up a single-end suspension system, which reduces the number of steel pipe column guide holes in the pseudo-frame structure and reduces the height of the full-span bracket erected at the bottom of the beam of the full-span bracket structure, meets the navigation requirements and improves the overall stability of the bracket system.
[0031] Specifically, a limiting channel steel 8 for positioning is fixedly installed on the inner side of the Bailey frame longitudinal beam 5 . Four limiting channel steels 8 are provided, and the four limiting channel steels 8 are distributed on the surfaces of both sides of the bridge pier 21 .
[0032] Specifically, the upper surface of the Bailey frame longitudinal beam 5 is provided with a rubber block support 4 for support, and the rubber block support 4 is in contact with the lower surface of the cap beam 3, and the cap beam 3 is installed on the upper end of the double-piece I-beam shoulder beam 2.
[0033] Specifically, several Bailey frame longitudinal beams 5 are arranged in parallel.
[0034] Specifically, two bridge piers 21 and two steel pipe pile columns 12 are provided in parallel.
[0035] Specifically, the Bailey frame longitudinal beam 5 is perpendicular to the I-beam distribution beam 14 .
[0036] The working principle and use process of the present invention are as follows: when constructing the bracket, a borehole for installing a steel pipe pile column 12 is opened at a preset position on the riverbed, and an underwater concrete filling pile 11 is poured in the gap between the steel pipe pile column 12 and the borehole, and the supporting end double-piece I-beam beam 13 is placed on the upper end of two parallel steel pipe pile columns 12, and the suspension end double-piece I-beam beam 6 is installed on both sides of the bridge pier 21 through the fine-rolled threaded steel horizontal tie rod 10, and the pads 9 are placed between the suspension end double-piece I-beam beam 6 and the bridge pier 21, and the double-piece I-beam shoulder beam 2 placed on the upper end of the cap beam 3 is connected to the suspension end double-piece I-beam beam 6 through the fine-rolled threaded steel vertical hanger 1, and double-nut steel pads 7 are screwed on both ends of the fine-rolled threaded steel vertical hanger 1 and the fine-rolled threaded steel horizontal tie rod 10 for fixation, and one end of the Bailey frame longitudinal beam 5 is placed on the suspension end double-piece I-beam beam 6 The bridge pier 21 is suspended on the top, and the other end of the Bailey frame longitudinal beam 5 is placed on the double-jointed I-steel crossbeam 13 at the supporting end for support, and four limit channel steels 8 are fixed in the Bailey frame longitudinal beam 5 so that the four limit channel steels 8 are in contact with the surfaces on both sides of the bridge pier 21, and a rubber block support 4 is placed on the Bailey frame longitudinal beam 5 to lock the double nut steel pads 7 at both ends of the fine-rolled threaded steel vertical hanger 1. At this time, the rubber block support 4 is in contact with the lower surface of the cap beam 3, and an I-steel distribution beam 14 is placed above the Bailey frame longitudinal beam 5, and a steel pipe scaffolding 15 is placed above the I-steel distribution beam 14, and the top support 16 is fixed to the upper end of the steel pipe scaffolding 15, and two double steel pipes 17 are placed in the storage groove at the upper end of the top support 16, and the square timber 18 is installed above the top support 16 and the double steel pipe 17, and the wooden formwork 19 is placed on the upper surface of the square timber 18, and the continuous beam side span cast-in-place section beam body 20 is cast in the wooden formwork 19.
[0037] Finally, it should be noted that the above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art will be able to modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein with equivalents. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the scope of protection of the present invention.
Claims
1. A single-end suspension support structure for a cast-in-place side span of a continuous beam, comprising a Bailey frame longitudinal beam (5), characterized in that: A suspension mechanism for positioning is provided at one end of the Bailey frame longitudinal beam (5) close to the bridge pier (21), and the Bailey frame longitudinal beam (5) is arranged on the upper part of the bridge pier (21) through the suspension mechanism; A support mechanism for positioning is provided at one end of the Bailey frame longitudinal beam (5) away from the bridge pier (21); a wooden formwork (19) is supported above the Bailey frame longitudinal beam (5) via a fastener-type scaffolding structure, and the wooden formwork (19) is used to cast the continuous beam side span cast-in-situ beam body (20); The suspension mechanism includes a double-jointed I-beam shoulder beam (2) placed on the upper end of the cap beam (3), and two parallel suspension end double-jointed I-beam cross beams (6) fixedly installed on both sides of the bridge pier (21) through fine-rolled threaded steel horizontal tie rods (10), a pad (9) for support is also provided between the bridge pier (21) and the suspension end double-jointed I-beam cross beam (6), fine-rolled threaded steel vertical suspenders (1) for suspension are provided between the two ends of the double-jointed I-beam shoulder beam (2) and the two suspension end double-jointed I-beam cross beams (6), both ends of the fine-rolled threaded steel vertical suspenders (1) and the fine-rolled threaded steel horizontal tie rods (10) are screwed with double-nut steel pads (7) for positioning, and the suspension end double-jointed I-beam cross beam (6) supports one end of the Bailey frame longitudinal beam (5) close to the bridge pier (21); The supporting mechanism comprises a steel pipe pile column (12) inserted into a riverbed borehole, an underwater concrete filling pile (11) cast between the steel pipe pile column (12) and the borehole gap, and a supporting end double-jointed I-steel crossbeam (13) provided at the upper end of the steel pipe pile column (12), wherein the supporting end double-jointed I-steel crossbeam (13) supports one end of the Bailey frame longitudinal beam (5) away from the bridge pier (21); The fastener-type scaffolding structure comprises an I-steel distribution beam (14) placed parallel to the Bailey frame longitudinal beam (5), a steel pipe scaffolding (15) placed on the upper surface of the I-steel distribution beam (14), a top support (16) fixed at the upper end of the steel pipe scaffolding (15), and a double steel pipe (17) stored in a storage groove at the upper end of the top support (16). The top support (16) and the double steel pipe (17) cooperate to support a square timber (18), and a wooden template (19) is provided on the square timber (18).
2. The single-end suspended bracket structure for the cast-in-place side span of a continuous beam according to claim 1, characterized in that: A positioning limit channel steel (8) is fixedly installed on the inner side of the Bailey frame longitudinal beam (5), and four positioning limit channel steels (8) are provided, and the four positioning limit channel steels (8) are distributed on the surfaces of both sides of the bridge pier (21).
3. The single-end suspended bracket structure for the cast-in-place side span of a continuous beam according to claim 1, characterized in that: The upper surface of the Bailey frame longitudinal beam (5) is provided with a rubber block support (4) for support, and the rubber block support (4) is in contact with the lower surface of the cap beam (3), and the cap beam (3) is installed on the upper end of the double-jointed I-beam shoulder beam (2).
4. The single-end suspended bracket structure for the cast-in-situ side span of a continuous beam according to claim 1, characterized in that: A plurality of Bailey frame longitudinal beams (5) are arranged in parallel.
5. The single-end suspended bracket structure for the cast-in-place side span of a continuous beam according to claim 1, characterized in that: The bridge piers (21) and the steel pipe pile columns (12) are both provided in parallel in two pieces.
6. The single-end suspended bracket structure for the cast-in-situ side span of a continuous beam according to claim 1, characterized in that: The Bailey frame longitudinal beam (5) is perpendicular to the I-beam distribution beam (14).
Citation Information
Patent Citations
Support method and device of bridge cast-in-place beam plate template
CN108708289A
Sea area cast-in-situ box girder construction support and sea area cast-in-situ box girder construction method
CN108999085A
High-pier side-span cantilever beam Bailey truss structure and construction method thereof
CN111042006A
Continuous beam side span straight section hanger support system
CN203904851U
Movable suspension support
JP2009057685A