Power output method and apparatus for generator, generator, and electricity generation and energy storage system

By detecting the power demand of the energy storage device and asking whether it agrees to switch to the rated power generation, the problem of low fuel utilization of the generator when the load power is not within the rated range is solved, achieving efficient operation and energy saving.

WO2024199020A1PCT designated stage expired Publication Date: 2024-10-03ECOFLOW INC
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/082553
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-24
Filing Date
2024-03-20
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

When the load power of the generator is not within the rated range, the fuel utilization rate is low, resulting in energy waste.

Method used

By detecting the power demand of the energy storage device when it is connected to the generator, it sends an inquiry command to ask whether it agrees to switch to the rated power generation power, and adjusts the target power generation power according to the feedback signal to ensure that the generator works in the efficient operation zone.

Benefits of technology

It improves fuel utilization, saves energy, meets the charging needs of energy storage equipment, and improves the use experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024082553_03102024_PF_FP_ABST
    Figure CN2024082553_03102024_PF_FP_ABST
Patent Text Reader

Abstract

A power output method and apparatus for a generator, a generator, and an electricity generation and energy storage system. The method comprises: when connection of an energy storage device is detected, acquiring required power of the energy storage device; sending a first inquiry instruction to the energy storage device, the first inquiry instruction being used for inquiring whether the energy storage device consents to switch the required power to rated electricity generation power or not, wherein the rated electricity generation power is corresponding power of a generator when the fuel utilization rate reaches a preset fuel utilization rate; upon receiving a first consent signal fed back by the energy storage device, generating electricity by taking the rated electricity generation power as target electricity generation power so as to supply the electricity to the energy storage device; and upon receiving a first rejection signal fed back by the energy storage device, generating electricity by taking the required power as the target electricity generation power so as to supply the electricity to the energy storage device.
Need to check novelty before this filing date? Find Prior Art

Description

Power output method and device of generator, generator and power generation and energy storage system

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This application claims priority to the Chinese patent application filed with the China Patent Office on March 24, 2023, with application number 2023103521565 and invention name “Power output method, device, generator and power generation and energy storage system of generator”, the entire contents of which are incorporated by reference into this application. Technical Field

[0003] The present application relates to the field of power generation technology, and in particular to a power output method and device for a generator, a generator, and a power generation and energy storage system. Background Art

[0004] The statements herein merely provide background information related to the present application and do not necessarily constitute exemplary techniques.

[0005] When the generator is supplying power to the load at rated speed, its output power is rated power. When the generator is operating near the rated power (high-efficiency operating power range), the fuel can be used efficiently and the fuel conversion rate is high.

[0006] However, the actual output power of a generator depends on the connected load. When the power required by the load is less than the rated power of the generator, or when the power required by the load is greater than the rated power of the generator, the generator often does not operate within the efficient operating power range, resulting in low fuel utilization and energy waste.

[0007] Summary of the Invention

[0008] According to various embodiments of the present application, a power output method and device for a generator, a generator, and a power generation and energy storage system are provided.

[0009] An embodiment of the present application provides a power output method of a generator, the method comprising:

[0010] When it is detected that the energy storage device is connected to the generator, the required power of the energy storage device is obtained;

[0011] Sending a first inquiry instruction to the energy storage device, wherein the first inquiry instruction is used to inquire whether the energy storage device agrees to switch the required power to the rated power generation power; wherein the rated power generation power is the power corresponding to when the fuel utilization rate of the generator reaches a preset fuel utilization rate;

[0012] After receiving a first consent signal fed back by the energy storage device, generating electricity using the rated power as the target power to supply power to the energy storage device;

[0013] After receiving the first rejection signal fed back by the energy storage device, power is generated using the required power as the target power generation power to supply power to the energy storage device.

[0014] An embodiment of the present application provides a power output device for a generator, the device comprising a processor and a memory, wherein the memory stores a computer program, and the processor executes the aforementioned power output method for the generator by calling the computer program stored in the memory.

[0015] An embodiment of the present application provides a generator, which includes the aforementioned power output device of the generator.

[0016] An embodiment of the present application provides a power generation and energy storage system, comprising an energy storage device and the aforementioned generator;

[0017] The generator is electrically connected to the energy storage device and is used to charge the energy storage device.

[0018] The details of one or more embodiments of the present application are set forth in the following drawings and description. Other features, objects, and advantages of the present application will become apparent from the description, drawings, and claims. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following is a brief introduction to the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.

[0020] FIG1 is an application scenario diagram of a power output method of a generator provided in an embodiment of the present application.

[0021] FIG2 is an application scenario diagram of another power output method of a generator provided in an embodiment of the present application.

[0022] FIG3 is a flow chart of a power output method of a generator provided in one embodiment of the present application.

[0023] FIG4 is a flow chart of another method for outputting power of a generator provided in an embodiment of the present application.

[0024] FIG5 is a flow chart of another method for outputting power of a generator provided in an embodiment of the present application.

[0025] FIG6 is a flow chart of another method for outputting power of a generator provided in an embodiment of the present application.

[0026] FIG7 is a schematic block diagram of the structure of a power output device of a generator provided in one embodiment of the present application. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of this application to clearly and completely describe the technical solutions in the embodiments of this application. Obviously, the embodiments described are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of this application.

[0028] The flowcharts shown in the accompanying drawings are for illustrative purposes only and do not necessarily include all contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps may be decomposed, combined, or partially merged, so the actual execution order may vary depending on the actual situation.

[0029] It should be noted that the terms "first" and "second" in the description, claims and drawings of this application are used to distinguish similar objects, rather than to describe a specific order or sequence.

[0030] It should be understood that the terms used in this specification are only for the purpose of describing specific embodiments and are not intended to limit the present application. As used in this specification and the appended claims, the singular forms "a", "an", and "the" are intended to include the plural forms unless the context clearly indicates otherwise.

[0031] The following will describe some embodiments with reference to the accompanying drawings. In the absence of conflict, the following embodiments and features therein may be combined with each other.

[0032] The embodiments of the present application provide a power output method and device for a generator, a generator, and a power generation and energy storage system.

[0033] Please refer to FIG1 , which is an application scenario diagram of a power output method of a generator provided in an embodiment of the present application.

[0034] As shown in Figure 1, the power output method of the generator can be applied to a generator. A generator can be a device that includes both power generation and power supply functions. Examples of generators include diesel generators, gasoline generators, gas generators, permanent magnet generators, wind turbines, hydroelectric generators, and the like. The generator can be connected to an energy storage device. For example, the generator can convert other forms of energy into electrical energy using an engine, a magnetic motor, a rectifier circuit, an inverter circuit, and a DC-DC converter, and then supply power to an energy storage device connected to the generator. The inverter circuit can be an INV circuit (inverter). An inverter is a device that converts direct current (DC) into alternating current (AC). An inverter generally consists of an inverter bridge, control logic, and a filter circuit. For example, a generator can output power to an energy storage device through an AC output port or a DC output port. When the generator needs to supply power to the energy storage device, the generator can determine a target power generation based on the generator's power output method and control the generator to generate power at the target power generation to supply power to the energy storage device. The energy storage device can include a DC-DC converter, an AC-DC converter, and a battery pack. The DC-DC circuit is connected to the DC output port of the generator. It converts the DC power output from the generator to DC before outputting it to the battery pack for charging. The AC-DC circuit is connected to the AC output port of the generator. It converts the AC power output from the AC output port to DC before outputting it to the AC-DC circuit for charging the battery pack.

[0035] As shown in Figures 1 and 2, the power output method of the generator can be applied to the power output device of the generator. The power output device of the generator is, for example, provided in the generator, and power can be supplied to the device connected to the generator through the power output device of the generator. The device connected to the generator includes, for example, an energy storage device, and loads other than the energy storage device (such as a first load, a second load, a third load, etc.). When the generator needs to supply power to a connected device such as an energy storage device, the power output device of the generator can determine the target power generation according to the power output method of the generator, and control the generator to generate power at the target power generation. Alternatively, the power output method of the generator can also be applied to a power generation and energy storage system, which includes, for example, an energy storage device and a generator, and the generator is electrically connected to the energy storage device. For example, the generator in the power generation and energy storage system can output power to the energy storage device in the power generation and energy storage system through an AC output port (alternating current output port) or a DC output port (direct current output port). When the generator in the power generation and energy storage system needs to supply power to the energy storage device in the power generation and energy storage system, the generator can determine the target power generation according to the power output method of the generator, and control the generator to generate power at the target power generation.

[0036] In some embodiments, after the target power generation power of the generator is determined using the generator power output method, the generator may continue to generate power at the target power generation power. For example, a power loop may be combined with a current loop control loop to control the generator to continue generating power at the target power generation power. This is of course not limited to this and is not intended to be limiting herein.

[0037] The power output method of the generator includes: when detecting that the energy storage device is connected to the generator, obtaining the required power of the energy storage device. The generator sends a first inquiry instruction to the energy storage device, and the first inquiry instruction is used to inquire whether the energy storage device agrees to switch the required power to the rated power generation power. The rated power generation power is the power corresponding to when the fuel utilization rate of the generator reaches the preset fuel utilization rate. After receiving the first consent signal fed back by the energy storage device, the rated power generation power is used as the target power generation power to generate electricity to supply power to the energy storage device. After receiving the first rejection signal fed back by the energy storage device, the required power is used as the target power generation power to generate electricity to supply power to the energy storage device.

[0038] For example, after obtaining the power demand of the energy storage device, if it is determined that the demanded power does not fall within the generator's efficient operating power within the fuel-efficient operating range, for example, if the demanded power does not match the rated power, it is understood that the rated power can be a fixed value or a range. If the rated power is within a range, then if the demanded power differs from any of the ranges, the demanded power is considered inconsistent with the rated power. The rated power is then transmitted to the energy storage device, which communicates with the device and chooses whether to accept the rated power. If the energy storage device accepts the rated power, it generates power using the generator's rated power as the target power and transmits this target power as output power to the energy storage device to charge the device. Because the rated power corresponds to the power when the generator's fuel utilization reaches the preset fuel utilization rate, the generator can operate efficiently when charging the energy storage device. This improves fuel utilization and conserves energy.

[0039] The following embodiments of the present application are described in detail with reference to the accompanying drawings. In the absence of conflict, the following embodiments and features in the embodiments may be combined with each other.

[0040] Please refer to FIG3 , which is a flow chart of a power output method of a generator provided in an embodiment of the present application.

[0041] As shown in FIG3 , the power output method of the generator includes steps S101 to S104 .

[0042] S101. When it is detected that an energy storage device is connected to a generator, the required power of the energy storage device is obtained.

[0043] Exemplarily, the generator can be used to connect to the energy storage device to supply power to the energy storage device. For example, the generator can be connected to the energy storage device through an AC output port or a DC output port. When it is detected that the energy storage device is connected to the generator, the generator can communicate with the energy storage device. For example, the generator can communicate with the energy storage device through a controller area network bus (CAN), PLC or wireless communication. When the generator communicates with the energy storage device, the generator can receive the required power sent by the energy storage device. The required power includes, for example, the required charging power range of the energy storage device, the required charging voltage range of the energy storage device, the required charging current range of the energy storage device, etc., and of course it is not limited thereto. The required power of the energy storage device also includes, for example, the required charging power value of the energy storage device, the required charging voltage value of the energy storage device, the required charging current value of the energy storage device, etc., which are not limited here.

[0044] For example, when a generator receives a power demand from an energy storage device, it can determine its target power generation based on the power demand of the energy storage device during the subsequent power supply process. By detecting that an energy storage device is connected to the generator, the generator can obtain the power demand of the energy storage device and subsequently determine the target power generation of the generator.

[0045] S102: Send a first inquiry instruction to the energy storage device, wherein the first inquiry instruction is used to inquire whether the energy storage device agrees to switch the required power to the rated power generation power. The rated power generation power is the power corresponding to when the fuel utilization rate of the generator reaches a preset fuel utilization rate.

[0046] Exemplarily, the rated power generation can be a rated power generation value or a rated power generation range. For example, the rated power generation can include 3 kilowatts, and 3 kilowatts can be abbreviated as 3kW. The rated power generation can also include [3kW-ΔP, 3kW], where ΔP represents the power difference. The rated power generation can also be an interval range. For example, when a generator has a high-efficiency operating zone of multiple fuels, the rated power generation corresponding to the high-efficiency operating zones of different numbers of fuels is also different. For example, the rated power generation can be [1kW, 2kW]∪[2.5kW, 3.5kW]∪[4kW, 5kW], etc., which can be set according to actual conditions and is not limited here.

[0047] For example, a generator may have at least one rated power generation. When the generator supplies power to a load device, such as an energy storage device, at the rated power generation, the fuel utilization of the generator reaches a preset fuel utilization. Accordingly, the preset fuel utilization may be a fuel utilization value. The preset fuel utilization may also be a fuel utilization range. For example, the preset fuel utilization may include 85%, or 75% to 100%, and so on. In some embodiments, when the fuel utilization of the generator reaches the preset fuel utilization, it can be determined that the generator has a high fuel utilization, which is equivalent to the generator operating in the efficient operating area of ​​the fuel. Therefore, the rated power generation is also referred to as the efficient operating power corresponding to the efficient operating area of ​​the fuel. Among them, the generator may have one or more efficient operating areas of the fuel, and the number of efficient operating areas or the efficient operating power corresponding to the efficient operating areas can be determined according to the engine in the generator, the generator model, etc., and is not limited here.

[0048] In some embodiments, after obtaining the required power of the energy storage device, the generator may determine whether the required power of the energy storage device falls within the efficient operating power corresponding to the generator's fuel efficient operating range. In other words, it may determine whether the required power of the energy storage device is consistent with the rated power generation capacity.

[0049] When the energy storage device's required power does not fall within the generator's efficient operating power within the generator's fuel-efficient operating range, that is, when the energy storage device's required power does not match the generator's rated power, it can be determined that when the generator supplies power to the energy storage device at the energy storage device's required power, the preset fuel utilization rate cannot be achieved, resulting in low fuel utilization and wasted fuel energy. However, the energy storage device's required power is the optimal safe charging power for the energy storage device. For example, when the energy storage device is supplied with power at the energy storage device's required power, the energy storage device can be safely fully charged in the shortest possible time. However, some energy storage devices can be safely charged at a power level other than the required power level, but the charging time is longer. Therefore, some energy storage devices can accept charging at a power level other than the required power level in order to control the generator to operate at the rated power level as much as possible and maximize fuel utilization. The generator can send a first query command to the energy storage device to inquire whether the energy storage device agrees to switch the required power level to the rated power level. For example, the first query command can be used to inquire whether the energy storage device agrees to switch the required power level to a rated power level. The first query instruction can also be used to inquire whether the energy storage device agrees to switch the required power to the rated power range, but is not limited to this. Upon receiving the first query instruction, the energy storage device can make a choice based on the actual situation.

[0050] By sending a first query instruction to the energy storage device, the first query instruction is used to inquire whether the energy storage device agrees to switch the required power to the rated power generation power. The energy storage device can then choose whether to switch the required power to the rated power generation power based on the actual situation. Sending the first query instruction to the energy storage device helps improve the interactive convenience and flexibility of determining the power supply of the generator to the energy storage device. In addition, the generator can subsequently determine the power supply to the energy storage device based on the selection of the energy storage device, which helps to improve the convenience of subsequently determining the power supply of the generator to the energy storage device.

[0051] In one embodiment, after obtaining the required power of the energy storage device, the generator may not determine whether the required power of the energy storage device falls within the efficient operating power corresponding to the generator's fuel efficient operating range. That is, the generator directly sends a first query instruction to the energy storage device. It can be understood that when the required power is consistent with the rated legal power, the first query instruction is used to inquire whether the energy storage device agrees to switch the required power to the rated power generation power. At this time, the required power and the rated power generation power are consistent. When the required power does not match the rated legal power, the first query instruction is used to inquire whether the energy storage device agrees to switch the required power to the rated power generation power. At this time, the required power and the rated power generation power are inconsistent.

[0052] S103 : After receiving the first consent signal fed back by the energy storage device, generate electricity using the rated power as the target power to supply power to the energy storage device.

[0053] For example, upon receiving a first query command from a generator, the energy storage device may provide feedback to the generator. This feedback may include a first consent signal, which indicates that the energy storage device agrees to switch the required power to the rated power. It is understood that when the feedback is the first consent signal, it indicates that the energy storage device agrees to accept the rated power from the generator.

[0054] In some embodiments, when the first inquiry instruction is used to inquire whether the energy storage device agrees to switch the demand power to a rated power generation value, if the energy storage device chooses to agree to switch the demand power to the rated power generation value, it can be determined that the energy storage device has fed back a first consent signal to the generator. The first consent signal, for example, carries the rated power generation value. When the first inquiry instruction is used to inquire whether the energy storage device agrees to switch the demand power to the rated power generation range, if the energy storage device chooses to agree to switch the demand power to the rated power generation range, or the energy storage device selects at least one new rated power generation value within the rated power generation range, or at least one new rated power generation range to indicate that the energy storage device agrees to switch the demand power to the rated power generation range, it can be determined that the energy storage device has fed back a first consent signal to the generator. The first consent signal, for example, carries the rated power generation range, or at least one new rated power value or at least one new rated power range within the rated power generation range.

[0055] For example, after the generator receives the first consent signal fed back by the energy storage device, the generator can determine that the target power generation power is the rated power generation power. The generator generates electricity according to the rated power generation power to power the energy storage device. For example, the generator generates electricity according to at least one rated power generation power value or at least one rated power range carried by the first consent signal as the target power generation power to power the energy storage device. Because the target power generation power falls within the efficient operating power corresponding to the generator's efficient fuel operating range, that is, the rated power generation power, the generator can be controlled to operate at the efficient operating power, thereby improving fuel utilization.

[0056] After receiving the first consent signal from the energy storage device, the generator uses the rated power as the target power to supply power to the energy storage device. Receiving the first consent signal allows the generator to generate power at the rated power, facilitating efficient control of the generator's operation. Furthermore, using the rated power as the target power improves fuel utilization and conserves energy.

[0057] S104 : After receiving the first rejection signal fed back by the energy storage device, generate electricity using the required power as the target generated power to supply power to the energy storage device.

[0058] For example, upon receiving the first query instruction sent by the generator, the energy storage device may provide feedback to the generator. The feedback information may include a first rejection signal, which is used to instruct the energy storage device to refuse to switch the required power to the rated power.

[0059] In some embodiments, when the first query instruction inquires whether the energy storage device agrees to switch the demanded power to the rated generated power value, if the energy storage device chooses to refuse to switch the demanded power to the rated generated power value, the energy storage device feeds back a first rejection signal to the generator. When the first query instruction is used to inquire whether the energy storage device agrees to switch the demanded power to the rated generated power range, if the energy storage device chooses to refuse to switch the demanded power to the rated generated power range, the energy storage device feeds back the first rejection signal to the generator.

[0060] For example, after the generator receives a first rejection signal from the energy storage device, if the user urgently needs to use the energy storage device, low-power charging of the energy storage device cannot meet the demand. Or, if the energy storage device is in either a fully charged or nearly fully charged state and cannot receive high-power charging, and thus returns the first rejection signal, the generator should generate electricity at the required power. In other words, the generator can determine that the target power generation is the required power and generate electricity according to the required power to power the energy storage device.

[0061] By setting the generator to generate electricity with the required power as the target generated power after receiving the first rejection signal fed back by the energy storage device, so as to supply power to the energy storage device, it is helpful to meet the charging needs of the energy storage device and improve the energy storage device's user experience of the generator.

[0062] In some embodiments, when it is detected that the energy storage device is connected to the generator and the target power generation of the generator needs to be determined, if the generator does not send a first query instruction to the energy storage device and directly determines that the target power generation of the generator is the rated power generation, then when the generator operates at a high-efficiency operating power, the power generation demand of the energy storage device for the generator is not met, which may easily lead to a poor user experience of the energy storage device for the generator. If the generator does not send a first query instruction to the energy storage device and directly determines that the target power generation of the generator is the required power, then while the power demand of the energy storage device for the generator is met, the generator fails to operate at a high-efficiency operating power, which may easily lead to low fuel utilization and energy waste.

[0063] In the method adopted in the embodiment of the present application, based on the settings of the first inquiry instruction, the first consent signal and the first rejection signal, the energy storage device can choose to feedback the first consent signal or the first rejection signal corresponding to the first inquiry instruction to the generator according to the actual situation, so as to flexibly select the target power generation of the generator, and then the generator can be controlled to operate at the target power generation required by the energy storage device. For example, when the first consent information fed back by the energy storage device is received, it can be determined that the rated power generation is the efficient operating power corresponding to the efficient operating area of ​​the fuel of the generator. At the same time, the rated power generation is also the required power of the energy storage device. By setting the rated power generation to the power generation of the energy storage device, it is beneficial to improve the convenience of controlling the generator to operate at the efficient operating power. By setting the rated power generation to the power generation of the energy storage device, it is also beneficial to improve the fuel utilization rate, save energy, and meet the charging needs of the energy storage device, so as to enhance the user experience of the energy storage device for the generator.

[0064] For example, as shown in FIG2 , the energy storage device can be used to connect to a first load. When the energy storage device is connected to a generator and the energy storage device is connected to a first load, for example, the energy storage device can be connected to both the AC output port and the DC output port of the generator. At this time, the energy storage device turns on the bypass function so that the generator supplies power to the battery pack in the energy storage device through the DC output port, and the generator supplies power to the first load through the AC output port. When the generator supplies power to the energy storage device and the first load, the power demand of the energy storage device includes both the power demand of the battery pack in the energy storage device or the circuit in the energy storage device itself, as well as the power demand of the first load.

[0065] For example, the power requirement of the energy storage device itself can be determined based on the charge level of the battery pack in the energy storage device. In this case, the power requirement of the energy storage device itself can be referred to as the first battery pack power. Correspondingly, the power requirement of the first load can be referred to as the first load power corresponding to the first load.

[0066] In some embodiments, if the required power includes a first load power and a first battery pack power, the generator may determine a first surplus power based on the rated power generation power and the first load power. The generator then sends a second query instruction to the energy storage device, inquiring whether the energy storage device agrees to switch the first battery pack power to the first surplus power.

[0067] When the first load is connected to the energy storage device, it can be determined that the user needs the energy storage device to supply power to the first load, which is equivalent to the charging demand of the first load taking precedence over the charging demand of the energy storage device. Then, when the generator supplies power to the energy storage device and the first load, it can give priority to supplying power to the first load. In addition, in order to control the generator to operate at an efficient operating power as much as possible, the actual power that can be allocated to the first battery pack in the energy storage device when the generator operates at the rated power generation power, such as the first residual power, can be determined based on the rated power generation power and the first load power. It can be understood that the first residual power is obtained by subtracting the first load power from the rated power generation power, that is, the rated power generation power gives priority to meeting the power supply demand of the first load. Among them, the first residual power can include the first residual power value, and can also include the first residual power range, which is not limited here.

[0068] For example, the first residual power is obtained by subtracting the first load power from the rated power generation power of the generator. Based on the determination of the first residual power, the generator sends a second query instruction to the energy storage device to inquire whether the energy storage device agrees to switch the first battery pack power to the first residual power. If the energy storage device agrees to switch the first battery pack power to the first residual power, the sum of the first load power and the first battery pack power falls within the rated power generation power. This helps control the generator's efficient operating power corresponding to the fuel's efficient operating area, improves the generator's fuel utilization, and saves energy.

[0069] By determining the first remaining power and sending a second query instruction to the energy storage device, the energy storage device can choose whether to switch the first battery pack power to the first remaining power based on actual conditions, which helps improve the interactive convenience and flexibility of the generator in determining the power supply to the energy storage device. Furthermore, the generator can subsequently determine the power supply to the energy storage device and the first load based on the energy storage device's selection, which helps improve the convenience of the generator in supplying power to the energy storage device and the first load.

[0070] In some embodiments, after receiving the second consent signal fed back by the energy storage device, the generator generates electricity using the rated power as the target power.

[0071] For example, upon receiving the second query instruction sent by the generator, the energy storage device may provide feedback to the generator, where the feedback information may include a second consent signal indicating that the energy storage device agrees to switch the power of the first battery pack to the first residual power.

[0072] For example, after the generator receives the second consent signal fed back by the energy storage device, the power of the first battery pack can be switched to the first surplus power, which is equivalent to the sum of the first surplus power and the first load power falling within the rated power generation power. The generator can then determine that the target power generation power is the rated power generation power, and generate electricity according to the rated power generation power, as well as supply power to the energy storage device and the first load. In this way, the generator generates electricity at the rated power generation power, wherein the first load power is used to supply power to the first load, and the first surplus power is used to charge the first battery pack in the energy storage device. By adopting the above method, the generator can operate at an efficient operating power, which is beneficial to improving fuel utilization and saving energy.

[0073] After receiving the second consent signal from the energy storage device, the generator generates electricity using the rated power as its target power. Receiving the second consent signal allows the generator to generate electricity at the rated power, making it easier to control the generator to operate at efficient power. Furthermore, using the rated power as its target power improves fuel utilization and conserves energy.

[0074] In some embodiments, after receiving the second rejection signal fed back by the energy storage device, power generation is performed using the required power as the target power generation power.

[0075] For example, upon receiving the second query command from the generator, the energy storage device may provide feedback to the generator. The feedback information may include a second rejection signal. The second rejection signal is used to instruct the energy storage device to reject switching the first battery pack power to the first residual power. The first residual power may include a first residual power value or a first residual power range, without limitation herein.

[0076] For example, after the generator receives the second rejection signal from the energy storage device, if the energy storage device is in urgent need of use and low-power charging of the energy storage device cannot meet the demand, or the energy storage device is in either a fully charged state or a nearly fully charged state and cannot receive high-power charging, and thus returns the second rejection signal, the generator can determine that the target generated power is the required power and generate power according to the required power to power the first battery pack in the energy storage device and the first load.

[0077] After receiving the second rejection signal from the energy storage device, the generator generates power using the required power as the target power, thereby supplying power to the first battery pack and the first load in the energy storage device. This method, by receiving the second rejection signal, controls the generator to generate power at the required power, thereby meeting the charging needs of the energy storage device and the first load, and improving the user experience of the generator for the energy storage device and the first load.

[0078] In an exemplary embodiment, as shown in FIG4 , taking the generator power output method as an example, the steps involved in the generator power output method include:

[0079] S201. When the generator detects that an energy storage device is connected and the energy storage device is connected to a first load, the generator obtains a required power of the energy storage device, where the required power includes the first load power and the first battery pack power.

[0080] S202: Determine a first residual power according to the rated generated power and the first load power, and send a second inquiry instruction to the energy storage device, where the second inquiry instruction is used to inquire whether the energy storage device agrees to switch the first battery pack power to the first residual power.

[0081] S203 : After receiving the second consent signal fed back by the energy storage device, generate electricity using the rated power as the target power.

[0082] S204 : After receiving the second rejection signal fed back by the energy storage device, generate electricity using the required power as the target generated power.

[0083] As shown in Figures 2 and 4, when the energy storage device is connected to a first load, the energy storage device's power demand includes the first load power and the first battery pack power. If the energy storage device's power demand does not fall within the generator's rated power, operating the generator at the demanded power can easily lead to low fuel utilization and energy waste. Furthermore, when the energy storage device is connected to the first load and a user requires the energy storage device to charge the first load, the generator must prioritize the first load's charging needs when supplying power to the first load and the energy storage device. Therefore, the generator can determine a first surplus power based on the generator's rated power and the first load power corresponding to the first load. The generator then sends a second query command to the energy storage device, inquiring whether the energy storage device agrees to switch the first battery pack power to the first surplus power. If the energy storage device agrees to switch the first battery pack power to the first surplus power, the energy storage device sends a second approval signal back to the generator, causing the generator to generate power at the rated power as the target power. If the energy storage device refuses to switch the first battery pack power to the first surplus power, the energy storage device sends a second rejection signal back to the generator, causing the generator to generate power at the demanded power as the target power.

[0084] By determining the first residual power, setting the second query instruction, the second approval signal, and the second rejection signal, the energy storage device can, based on actual conditions, choose to feed back the second approval signal or the second rejection signal corresponding to the second query instruction to the generator, thereby flexibly selecting the target power generation of the generator. This allows the generator to be controlled to operate at the target power generation required by the energy storage device and the first load. The above method facilitates controlling the generator to operate at a high-efficiency operating power, improves fuel utilization, conserves energy, and meets the charging requirements of the energy storage device and the first load, thereby enhancing the user experience of the energy storage device with the generator.

[0085] For example, as shown in FIG2 , the generator can also be used to connect devices other than the energy storage device, such as a second load. In some embodiments, when the energy storage device and the second load are connected to the generator, the generator supplies power to the energy storage device through the DC output port, and supplies power to the second load through the AC output port. The generator can also supply power to the energy storage device through the DC output port, and supply power to the second load through the energy storage device, for example, without limitation. When the generator supplies power to the energy storage device and the second load, the generator needs to meet both the power demand of the energy storage device and the power demand of the second load. The power demand of the second load can be referred to as the second load power corresponding to the second load.

[0086] For example, because the energy storage device has energy storage capabilities, while the second load does not, when both the energy storage device and the second load are connected to a generator, the user's urgency to charge the energy storage device is generally lower than the urgency to charge the second load. Therefore, the generator needs to prioritize the charging needs of the second load.

[0087] In some embodiments, when it is detected that the second load is connected to the generator, a second load power corresponding to the second load is obtained, a second surplus power is determined based on the rated generated power and the second load power, and a third query instruction is sent to the energy storage device. The third query instruction is used to inquire whether the energy storage device agrees to switch the required power to the second surplus power.

[0088] When a second load is detected connected to the generator, that is, when both the energy storage device and the second load are detected connected to the generator, the generator must prioritize meeting the charging needs of the second load. To maximize the generator's efficiency, the actual power requirement of the energy storage device, such as the second residual power, can be determined based on the rated power generation and the second load power when the generator is operating at the rated power generation. The second residual power can include either a second residual power value or a second residual power range, without limitation.

[0089] For example, the second residual power can be obtained by subtracting the second load power from the rated power generation power of the generator. Based on the determination of the second residual power, the generator sends a third inquiry instruction to the energy storage device to inquire whether the energy storage device agrees to switch the required power to the second residual power. If the energy storage device agrees to switch the required power to the second residual power, it indicates that the energy storage device can accept charging with the second residual power. This indicates that the sum of the second load power and the required power falls within the rated power generation power. By adopting the above method, it is beneficial to control the efficient operating power corresponding to the efficient operating area of ​​the fuel of the generator, improve the utilization rate of the fuel by the generator, and save energy.

[0090] By determining the second surplus power and sending a third query command to the energy storage device, the energy storage device can choose whether to switch the required power to the second surplus power based on actual conditions, which helps improve the interactive convenience and flexibility of the generator in determining the power supply to the energy storage device. Furthermore, the generator can subsequently determine the power supply to the energy storage device and the second load based on the energy storage device's selection, which helps improve the convenience of determining the power supply to the energy storage device and the second load.

[0091] In some embodiments, after receiving the third consent signal fed back by the energy storage device, power generation is performed using the rated power generation power as the target power generation power.

[0092] For example, upon receiving the third query instruction from the generator, the energy storage device may provide feedback to the generator. The feedback information may include a third consent signal. The third consent signal indicates that the energy storage device agrees to switch the required power to the second surplus power, indicating that the energy storage device is willing to charge at the second surplus power.

[0093] For example, after receiving the third consent signal from the energy storage device, the generator can switch the required power to the second surplus power, which is equivalent to the sum of the second surplus power and the second load power falling within the rated power generation power. The generator can then determine that the target power generation power is the rated power generation power and generate power according to the rated power generation power to power the energy storage device and the second load. In this way, the generator can operate at high-efficiency operating power when powering the energy storage device and the second load, which helps improve fuel utilization and save energy.

[0094] After receiving the third consent signal from the energy storage device, the generator generates electricity using the rated power as its target power. Receiving the third consent signal allows the generator to generate electricity at the rated power, which facilitates efficient control of the generator's operation. Furthermore, using the rated power as its target power improves fuel utilization and conserves energy.

[0095] In some embodiments, after receiving the third rejection signal fed back by the energy storage device, power generation is performed using the sum of the required power and the second load power as the target power generation power.

[0096] Exemplarily, upon receiving the third query command from the generator, the energy storage device may provide feedback to the generator, where the feedback may include a third rejection signal. The third rejection signal is used to instruct the energy storage device to reject the switch from the required power to the second surplus power. The third rejection signal indicates that the energy storage device does not accept charging with the second surplus power. In this case, the generator should generate electricity at the sum of the required power and the second load power to supply power to the energy storage device and the second load.

[0097] For example, if a user urgently needs to use the energy storage device, low-power charging of the energy storage device cannot meet the demand, or the energy storage device is in either a fully charged state or a nearly fully charged state and cannot receive high-power charging, the energy storage device will feedback a third rejection signal. After the generator receives the third rejection signal feedback from the energy storage device, it can determine that the target power generation power includes the required power of the energy storage device and the second load power of the second load. For example, the target power generation power is determined to be the sum of the required power and the second load power, and power is generated based on the sum of the required power and the second load power to supply power to the energy storage device and the second load.

[0098] After receiving the third rejection signal from the energy storage device, the generator generates electricity at the target power, equal to the sum of the required power and the second load power, to supply power to the energy storage device and the second load. Receiving the third rejection signal allows the generator to generate electricity at the sum of the required power and the second load power, thereby meeting the charging needs of the energy storage device and the second load and improving the user experience of the generator for the energy storage device and the second load.

[0099] In an exemplary embodiment, as shown in FIG5 , taking the generator power output method as an example, the steps involved in the generator power output method include:

[0100] S301. When the generator detects that an energy storage device is connected and that a second load is connected, the generator obtains the required power of the energy storage device and the second load power corresponding to the second load.

[0101] S302 : Determine a second surplus power according to the rated generated power and the second load power, and send a third inquiry instruction to the energy storage device. The third inquiry instruction is used to inquire whether the energy storage device agrees to switch the required power to the second surplus power.

[0102] S303: After receiving the third consent signal fed back by the energy storage device, generate electricity using the rated power as the target power.

[0103] S304 : After receiving the third rejection signal fed back by the energy storage device, generate electricity using the sum of the required power and the second load power as the target generated power.

[0104] As shown in Figures 2 and 5, if both the energy storage device and the second load are connected to the generator, it can be determined that both the energy storage device and the second load have charging requirements. If the sum of the energy storage device's required power and the second load power corresponding to the second load does not fall within the generator's rated power, directly generating power at the sum of the required power and the second load power can easily lead to low fuel utilization and energy waste. Furthermore, when the generator is connected to the second load, the user's demand for charging the second load takes precedence over the user's demand for charging the energy storage device, so the second load's charging requirement must be met first. Therefore, the second surplus power can be determined based on the generator's rated power and the second load power corresponding to the second load. The generator sends a third query command to the energy storage device, asking whether the energy storage device agrees to switch the required power to the second surplus power. If the energy storage device agrees to switch the required power to the second surplus power, a third consent signal is fed back to the generator. The generator then generates power at the rated power as the target power. At this point, the generator powers the second load at the second load power and the energy storage device at the second surplus power. If the energy storage device refuses to switch the required power to the second surplus power, a third refusal signal is fed back to the generator, and the generator can generate electricity using the sum of the required power and the second load power as the target generated power.

[0105] By determining the second residual power, setting the third inquiry instruction, the third approval signal, and the third rejection signal, the energy storage device can choose to feed back the third approval signal or the third rejection signal corresponding to the third inquiry instruction to the generator according to the actual situation, so as to flexibly select the target power generation power of the generator. By adopting the above method, the generator can be controlled to operate at the target power generation power required by the energy storage device and the second load, which is conducive to improving the convenience of controlling the generator to operate at an efficient operating power and improving fuel utilization. While saving energy, the respective charging needs of the energy storage device and the second load are met, so as to enhance the user experience of the energy storage device and the second load for the generator.

[0106] For example, as shown in FIG2 , during the process of the generator supplying power to connected devices such as an energy storage device and a second load, a third load may be connected to the energy storage device. At this time, the generator is generating electricity with the rated power as the target power. Since the generator has determined the power generation ratio between the second load and the energy storage device, in order to make the generator operate at the high-efficiency operating power corresponding to the high-efficiency operating area as much as possible, it is necessary to determine the power generation ratio between the energy storage device and the third load based on the original power demand of the energy storage device or the second residual power. For example, after the third load is connected to the energy storage device, the power demand of the new energy storage device includes both the power demand of the energy storage device itself (for example, the second battery pack power of the second battery pack) and the power demand of the third load (for example, the third load power).

[0107] For example, the power requirement of the energy storage device itself can be determined based on the power level of the battery pack in the energy storage device, and the power requirement of the energy storage device itself can be referred to as the second battery pack power. Correspondingly, the power requirement of the third load can be referred to as the third load power.

[0108] In some embodiments, if it is detected that a third load is connected to the energy storage device, the third load power and the second battery pack power corresponding to the third load are obtained. The generator then determines the third residual power based on the required power or the second residual power (i.e., the power used to charge the energy storage device when the third load is not connected) and the third load power, and sends a fourth query instruction to the energy storage device. The third residual power is the required power or the second residual power minus the third load. The fourth query instruction is used to inquire whether the energy storage device agrees to switch the second battery pack power to the third residual power.

[0109] During the process of the generator generating electricity with the rated power as the target power to supply power to the energy storage device and the second load, if it is detected that the third load is connected to the energy storage device. That is, when the energy storage device, the second load and the third load are all connected to the generator, based on the need for the energy storage device to supply power to the third load, it is equivalent to determining that the charging demand of the third load is superior to the charging demand of the energy storage device, and the generator needs to give priority to meeting the charging demand of the second load and the charging demand of the third load. In addition, in order to control the generator to operate at an efficient operating power as much as possible, the actual battery pack power of the energy storage device, such as the third residual power, can be determined based on the required power of the energy storage device, that is, the second residual power, combined with the third load power when the generator operates at the rated power. Among them, the third residual power can include a third residual power value, and can also include a third residual power range, which is not limited here.

[0110] For example, the third residual power can be obtained by subtracting the third load power from the second residual power or by subtracting the third load power from the demand power. Based on the determination of the third residual power, the generator sends a fourth inquiry instruction to the energy storage device to inquire whether the energy storage device agrees to switch the second battery pack power to the third residual power. If the energy storage device agrees to switch the second battery pack power to the third residual power, it means that the sum of the second battery pack power, the second load power and the third load power falls within the rated power generation power. The above method is used to help control the efficient operating power of the generator corresponding to the efficient operating area of ​​the fuel, improve the utilization rate of the generator to the fuel, and save energy.

[0111] By determining the third residual power and sending a fourth query instruction to the energy storage device, the energy storage device can choose whether to switch the second battery pack power to the third residual power based on actual conditions, which helps improve the interactive convenience and flexibility of the generator in determining the power supply to the energy storage device. Furthermore, the generator can subsequently determine the power supply to the energy storage device, the second load, and the third load based on the energy storage device's selection, which helps improve the convenience of subsequently determining the power supply to the energy storage device, the second load, and the third load.

[0112] In some embodiments, after receiving the fourth consent signal fed back by the energy storage device, power generation is performed using the rated power generation power as the target power generation power.

[0113] For example, upon receiving the fourth query instruction sent by the generator, the energy storage device may provide feedback to the generator. The feedback information may include a fourth consent signal indicating that the energy storage device agrees to switch the second battery pack power to the third residual power.

[0114] For example, after the generator receives the third consent signal fed back by the energy storage device, it can switch the second battery pack power to the third residual power, which is equivalent to the sum of the second load power, the third load power, and the second battery pack power falling within the rated power generation power. The generator can then determine that the target power generation power is the rated power generation power and generate power according to the rated power generation power to power the energy storage device, the second load, and the third load. In this way, when the generator supplies power to the energy storage device, the second load, and the third load, it can operate at a high-efficiency operating power, which is conducive to improving fuel utilization and saving energy.

[0115] After receiving the fourth consent signal from the energy storage device, the generator generates electricity using the rated power as the target power. Receiving the fourth consent signal allows the generator to generate electricity at the rated power, which facilitates controlling the generator to operate at efficient power. Furthermore, using the rated power as the target power improves fuel utilization and conserves energy.

[0116] In some embodiments, after receiving the fourth rejection signal fed back by the energy storage device, power generation is performed using the sum of the second load power, the third load power, and the required power of the second battery pack as the target power generation power.

[0117] Exemplarily, when the energy storage device receives the fourth inquiry instruction sent by the generator, the energy storage device may feedback information to the generator, and the feedback information may include a fourth rejection signal, which is used to instruct the energy storage device to refuse to switch the second battery pack power to the third residual power.

[0118] For example, if the energy storage device is in urgent need of use by the user, low-power charging of the energy storage device cannot meet the demand. Or the energy storage device cannot receive high-power charging because it is in any of the fully charged state and the nearly fully charged state, so the energy storage device feeds back a fourth rejection signal to the generator. After the generator receives the fourth rejection signal fed back by the energy storage device, the generator needs to meet the charging needs of the energy storage device, the second load and the third load. For example, the target power generation power is determined to be the sum of the second load power, the third load power and the second battery pack power, and power is generated according to the sum of the second load power, the third load power and the second battery pack power to supply power to the energy storage device, the second load and the third load.

[0119] After receiving the fourth rejection signal from the energy storage device, the generator generates electricity using the sum of the second load power, the third load power, and the second battery pack power as the target power, to supply power to the energy storage device, the second load, and the third load. Receipt of the fourth rejection signal allows the generator to generate electricity using the sum of the second load power, the third load power, and the second battery pack power. This helps meet the charging needs of the energy storage device, the second load, and the third load, and can improve the user experience of the energy storage device, the second load, and the third load with the generator.

[0120] In an exemplary embodiment, as shown in FIG6 , taking the generator power output method as an example, the steps involved in the generator power output method include:

[0121] S401: When the generator detects that the energy storage device and the second load are connected and generates electricity with the rated power as the target power, if it detects that the third load is connected to the energy storage device, the third load power and the second battery pack power corresponding to the third load are obtained.

[0122] S402: Determine a third residual power according to the required power and the third load power, and send a fourth inquiry instruction to the energy storage device, where the fourth inquiry instruction is used to inquire whether the energy storage device agrees to switch the second battery pack power to the third residual power.

[0123] S403: After receiving the fourth consent signal fed back by the energy storage device, generate electricity using the rated power as the target power.

[0124] S404 : After receiving the fourth rejection signal fed back by the energy storage device, generate electricity using the sum of the second load power, the third load power, and the second battery pack power as the target generated power.

[0125] As shown in Figures 2 and 6 , when the energy storage device and the second load are both connected to the generator, a third load is also connected to the energy storage device. In this case, the energy storage device, the second load, and the third load all have charging requirements. If the sum of the energy storage device's second battery pack power, the second load power corresponding to the second load, and the third load power corresponding to the third load does not fall within the generator's rated power, operating the generator directly at the sum of the second battery pack power, the second load power, and the third load power can easily lead to low fuel utilization and energy waste. Furthermore, when the generator is connected to the second load and the energy storage device is connected to the third load, if the user's charging requirements for the second load and the third load outweigh the user's charging requirements for the energy storage device, the charging requirements of the second and third loads must be met first. Therefore, the generator can determine a third residual power based on the energy storage device's original power requirements (i.e., the second residual power) and the third load power, and send a fourth query command to the energy storage device to inquire whether the energy storage device agrees to switch the second battery pack power to the third residual power. If the energy storage device agrees to switch the second battery pack power to the third residual power, it sends a fourth consent signal back to the generator. The generator is capable of generating electricity using the rated power as the target power. In this case, the generator supplies power to the second load at the second load power, supplies power to the third load at the third load power, and supplies power to the second battery pack at the third surplus power. If the energy storage device refuses to switch the second battery pack power to the third surplus power, it feeds back a fourth rejection signal to the generator, causing the generator to generate electricity using the sum of the second battery pack power, the second load power, and the third load power as the target power.

[0126] By determining the third surplus power, setting the fourth query instruction, the fourth approval signal, and the fourth rejection signal, the energy storage device can, based on actual conditions, choose to provide the generator with either the fourth approval signal or the fourth rejection signal corresponding to the fourth query instruction, thereby flexibly selecting the generator's target power generation. This method allows the generator to operate at the target power generation required by the energy storage device, facilitating efficient control of the generator's operation and improving fuel utilization. While conserving energy, it also meets the charging requirements of the energy storage device, the second load, and the third load, thereby enhancing the energy storage device's user experience with the generator.

[0127] Exemplarily, the generator's power supply process can be controlled by an energy storage device or a device other than the energy storage device. For example, the generator can communicate with the energy storage device, and the generator can also communicate with devices other than the energy storage device. For example, the energy storage device can power the generator's control circuit via the CAN bus, allowing the generator to maintain communication with the energy storage device and with devices other than the energy storage device. In this way, the generator can receive power generation control instructions sent by the energy storage device and devices other than the energy storage device. The power generation control instructions may include instructions to stop power generation or start power generation.

[0128] In some embodiments, after receiving a stop power generation instruction fed back by the energy storage device, the generator is controlled to stop power generation.

[0129] For example, if the energy storage device is fully charged and the generator is no longer needed to charge the energy storage device, the energy storage device can provide a stop-generation instruction to the generator, which then stops generating power accordingly. For example, a user can send a stop-generation instruction to the generator through an application such as an app, which can then stop generating power accordingly. The generator stops generating power based on the received stop-generation instruction, making it easier to control the generator's shutdown.

[0130] In some embodiments, after receiving the power generation start instruction fed back by the energy storage device, the generator starts power generation.

[0131] For example, when the energy storage device needs to be charged again, it can send a start-generation instruction to the generator, which can then start generating electricity based on the received start-generation instruction. For example, a user can send a start-generation instruction to the generator through an application such as an app, and the generator can then start generating electricity based on the received start-generation instruction. The generator starts generating electricity based on the received start-generation instruction, which helps improve the convenience of controlling the generator's start-up power generation.

[0132] For example, when it is detected that the energy storage device is connected to a generator, the power demand of the energy storage device will change with the charge level of the battery pack in the energy storage device. For example, as the generator supplies power to the energy storage device, the charge level of the battery pack in the energy storage device increases, and the power demand of the energy storage device decreases. The power demand of the energy storage device will also change with the load connection status of the energy storage device. For example, if a first load or a third load is connected to the energy storage device while the generator is supplying power to the energy storage device, the power demand of the energy storage device will increase accordingly. The increase may be, for example, the first load power corresponding to the first load or the third load power corresponding to the third load.

[0133] In some embodiments, as the required power of the energy storage device changes, the target power generation of the generator also needs to change accordingly.

[0134] For example, the power demand of the energy storage device is obtained in real time, and whether the power demand has changed is detected. If so, the target power generation power is re-determined.

[0135] When the generator detects that an energy storage device is connected to the energy storage device, the generator obtains the energy storage device's power demand in real time. If changes are detected in the energy storage device's power demand, such as when the energy storage device's power demand decreases as the energy storage device nears full charge and the energy storage device cannot receive high charging power, the target power generation power can be re-determined. For example, adjusting the target power generation power from the rated power generation power to the energy storage device's power demand allows the generator to flexibly respond to the energy storage device's power demand, increasing the generator's flexibility in supplying power to the energy storage device.

[0136] When it is detected that the energy storage device is connected to the generator and the energy storage device is connected to the first load, the generator obtains the required power of the energy storage device in real time. The first load may include equipment with intermittent working capabilities such as refrigerators and air conditioners. When it is detected that the required power of the energy storage device has changed, the first load can redetermine the target power generation power when, for example, it switches from suspending work to resuming work. For example, the power generation ratio between the energy storage device and the first load corresponding to the target power generation power is adjusted. For another example, a corresponding query instruction is sent to the energy storage device, and the target power generation power is changed according to the corresponding approval signal or rejection signal fed back by the energy storage device. In this way, the generator can flexibly respond to the required power of the energy storage device and improve the flexibility of the generator in supplying power to the energy storage device and the first load.

[0137] Of course, the method for re-determining the target power generation is not limited to this. For example, when it is detected that the energy storage device is connected to the generator and that a second load is connected to the generator, the generator can obtain the second load power corresponding to the second load in real time, and detect whether the second load power has changed and whether the required power of the energy storage device has changed. When at least one of the second load power and the required power changes, the target power generation power of the generator is re-determined based on the rated power generation power, the second load power, and the required power.

[0138] By obtaining the required power of the energy storage device in real time and redetermining the target power generation power when a change in the required power is detected, it is beneficial to timely adjust the target power generation power of the generator, so that the generator can flexibly respond to the required power of the energy storage device and improve the flexibility of the generator in supplying power to the energy storage device.

[0139] Exemplarily, generating electricity using the rated power as the target power includes controlling the generator to generate electricity according to the target power and adjusting the target power based on demand information from devices connected to the generator. The demand information includes safe charging power, safe charging voltage, and safe charging current.

[0140] For example, when the energy storage device is connected to a generator, and the generator generates electricity with the rated power as the target power, it is necessary to switch the required power of the energy storage device to the rated power. However, in order to ensure the charging safety of the energy storage device, the energy storage device is provided with demand information, which is used to indicate the safe charging power, safe charging voltage and safe charging current that the energy storage device can accept while ensuring charging safety. At this time, when the generator supplies power to the energy storage device, it is necessary to adjust the target power according to the demand information of the energy storage device. For example, when the rated power is greater than the safe charging power, the target power of the generator can be adjusted to the safe charging power. For another example, the generator can also be connected to a first load, a second load, a third load and other equipment. When the rated power is greater than the safe charging power of the energy storage device, the power generation ratio between the energy storage device and the first load, the second load, the third load and other equipment can be adjusted so that the required power of the energy storage device falls within the safe charging power.

[0141] Similarly, when the devices connected to the generator, such as the first load, the second load, and the third load, are provided with demand information, the target power generation of the generator can also be adjusted according to the demand information of the devices connected to the generator, which will not be elaborated here.

[0142] By controlling the generator to generate power according to the target power and adjusting the target power according to the demand information of the equipment connected to the generator, it is beneficial to ensure the charging safety of the equipment connected to the generator while controlling the generator to operate at high power efficiency.

[0143] Please refer to FIG7 in conjunction with the above embodiment. FIG7 is a schematic block diagram of a power output device 500 for a generator provided in an embodiment of the present application. The power output device 500 for a generator can be provided in the generator. The power output device 500 includes a processor 501 and a memory 502.

[0144] For example, the processor 501 and the memory 502 are connected via a system bus 503, which is, for example, an I 2 C (Inter-integrated Circuit) bus.

[0145] Specifically, the processor 601 may be a micro-controller unit (MCU), a central processing unit (CPU), or a digital signal processor (DSP).

[0146] Specifically, the memory 502 may be a Flash chip, a read-only memory (ROM) disk, an optical disk, a USB flash drive, or a mobile hard disk.

[0147] The processor 501 is configured to run a computer program stored in the memory 502 and implement the aforementioned method for outputting power to the generator when executing the computer program.

[0148] Exemplarily, the processor 501 is configured to run a computer program stored in the memory 502 and implement the steps of the above-mentioned method for outputting power of a generator when the computer program is called.

[0149] The specific principles and implementation methods of the power output device of the generator provided in the embodiment of the present application are similar to the power output method of the generator in the aforementioned embodiment, and will not be repeated here.

[0150] The present application also provides, for example, a generator comprising the power output device 500 of the aforementioned embodiment. The generator can be a device that includes both power generation and power supply functions. Examples of the generator include permanent magnet generators, wind turbines, hydroelectric generators, and the like, without limitation.

[0151] Exemplarily, the generator is used to implement the steps of the above-mentioned method for outputting power of the generator.

[0152] The specific principles and implementation methods of the generator provided in the embodiments of the present application are similar to the power output methods of the generators in the aforementioned embodiments, and will not be repeated here.

[0153] An embodiment of the present application further provides, for example, a power generation and energy storage system, which includes an energy storage device and the aforementioned generator, wherein the generator is electrically connected to the energy storage device for charging the energy storage device.

[0154] Exemplarily, the power generation and energy storage system is used to implement the steps of the above-mentioned generator power output method.

[0155] The specific principles and implementation methods of the power generation and energy storage system provided in the embodiments of the present application are similar to the power output method of the generator in the aforementioned embodiments, and will not be repeated here.

[0156] The embodiments of the present application further provide, for example, a computer-readable storage medium, which stores a computer program. When the computer program is called by a processor, the processor implements the steps of the power output method of the generator provided in the above embodiment.

[0157] The computer-readable storage medium may be an internal storage unit of the power output device of the generator, the generator, or the power generation and energy storage system described in any of the aforementioned embodiments, such as a hard disk or memory of the power output device of the generator, a hard disk or memory of the generator, or a hard disk or memory of the power generation and energy storage system. The computer-readable storage medium may also be an external storage device of the power output device of the generator, the generator, or the power generation and energy storage system, such as a plug-in hard disk equipped on the power output device of the generator, a smart memory card (SMC), a secure digital (SD) card, a flash card, etc.

[0158] It should be understood that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the present application.

[0159] It will also be understood that the term "and / or" as used in this application and the appended claims refers to and includes any and all possible combinations of one or more of the associated listed items.

[0160] The above description is merely a specific embodiment of the present application, but the scope of protection of the present application is not limited thereto. Any person skilled in the art can easily conceive of various equivalent modifications or substitutions within the technical scope disclosed in the present application, and such modifications or substitutions should be included in the scope of protection of the present application. Therefore, the scope of protection of the present application should be based on the scope of protection of the claims.

Claims

1. A power output method of a generator, the method comprising: When it is detected that the energy storage device is connected to the generator, the required power of the energy storage device is obtained; Sending a first inquiry instruction to the energy storage device, wherein the first inquiry instruction is used to inquire whether the energy storage device agrees to switch the required power to the rated power generation; wherein the rated power generation is the power corresponding to when the fuel utilization rate of the generator reaches a preset fuel utilization rate; After receiving the first consent signal fed back by the energy storage device, generating electricity with the rated power generation as the target power generation to supply power to the energy storage device; After receiving the first rejection signal fed back by the energy storage device, power is generated using the required power as the target power generation power to supply power to the energy storage device.

2. The power output method of a generator according to claim 1, wherein: The method further comprises: If the required power includes a first load power and a first battery pack power, a first residual power is determined according to the rated power generation power and the first load power, and a second inquiry instruction is sent to the energy storage device; the second inquiry instruction is used to inquire whether the energy storage device agrees to switch the first battery pack power to the first residual power; After receiving the second consent signal fed back by the energy storage device, generating electricity with the rated power generation as the target power generation; After receiving the second rejection signal fed back by the energy storage device, power generation is performed using the required power as the target power generation power.

3. The power output method of a generator according to claim 1, wherein: The method further comprises: When it is detected that a second load is connected to the generator, a second load power corresponding to the second load is obtained, a second residual power is determined according to the rated power generation power and the second load power, and a third inquiry instruction is sent to the energy storage device; the third inquiry instruction is used to inquire whether the energy storage device agrees to switch the required power to the second residual power; After receiving the third consent signal fed back by the energy storage device, generating electricity with the rated power generation as the target power generation; After receiving the third rejection signal fed back by the energy storage device, power generation is performed using the sum of the required power and the second load power as the target power generation power.

4. The power output method of a generator according to claim 3, wherein: After the rated power generation is used as the target power generation for power generation, the method further includes: If it is detected that a third load is connected to the energy storage device, a third load power and a second battery pack power corresponding to the third load are obtained, a third remaining power is determined according to the required power and the third load power, and a fourth inquiry instruction is sent to the energy storage device; the fourth inquiry instruction is used to inquire whether the energy storage device agrees to switch the second battery pack power to the third remaining power; After receiving a fourth consent signal fed back by the energy storage device, generating electricity using the rated power generation as the target power generation; After receiving the fourth rejection signal fed back by the energy storage device, power generation is performed using the sum of the second load power, the third load power and the second battery pack power as the target power generation power.

5. The power output method of a generator according to any one of claims 1 to 4, wherein: The method further comprises: After receiving the stop power generation instruction fed back by the energy storage device, the generator is controlled to stop power generation.

6. The power output method of a generator according to any one of claims 1 to 4, wherein: The method further comprises: Acquire the required power of the energy storage device in real time, and detect whether the required power changes; If yes, the target power generation power is re-determined.

7. The power output method of a generator according to any one of claims 1 to 4, wherein: The step of generating electricity by taking the rated power generation as the target power generation comprises: The generator is controlled to generate electricity according to the target power generation, and the target power generation is adjusted according to demand information of a device connected to the generator, wherein the demand information includes safe charging power, safe charging voltage and safe charging current.

8. A power output device for a generator, the device comprising a processor and a memory, wherein a computer program is stored in the memory, and the processor is used to execute the power output method for the generator according to any one of claims 1 to 7 by calling the computer program stored in the memory.

9. A generator, comprising the power output device of the generator according to claim 8.

10. A power generation and energy storage system, comprising an energy storage device and the generator according to claim 9; The generator is electrically connected to the energy storage device and is used to charge the energy storage device.

Citation Information

Patent Citations

  • Method and device for controlling energy storage system in micro-grid

    CN114123261A

  • Hybrid power station energy management control method, storage medium and electronic equipment

    CN115632427A

  • Power output method and device of generator, generator and power generation energy storage system

    CN116436054A

  • Hybrid power generation system with power output smoothing operation

    US20210408794A1