Same-layer framework mutual-climbing-type automatic raising / lowering support system, climbing apparatus thereof, and raising / lowering method therefor

Through the design of the inter-climbing self-lifting support system for frames on the same floor, the problem of the existing self-lifting support system being inaccurate in position and occupying a multi-story structure during jacking operations is solved. Climbing and flexible adjustment on the same floor are achieved, improving construction efficiency. The adaptability and working stability of the steel platform expand the types of construction operations.

WO2024199028A1PCT designated stage expired Publication Date: 2024-10-03CHINA CONSTR THIRD ENG BUREAU GRP CO LTD

Patent Information

Application Number
PCT/CN2024/082649
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-27
Filing Date
2024-03-20
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

The existing self-lifting support system is susceptible to installation deviations, structural construction deviations and large loads during jacking operations, resulting in inaccurate positions and requiring a lot of time to adjust. It also occupies a multi-layered structure that is inconvenient for subsequent construction and painting operations.

Method used

It adopts the same-layer frame mutual climbing self-lifting support system. Through the same-layer climbing design of the climbing frame and the support frame, the guide structure and the buffer balance mechanism are used to achieve mutually guided climbing, and through the cooperation of the telescopic mechanism and the claw assembly, the support is ensured. The accurate position centering and flexible adjustment of the frame and climbing frame realize the lifting and lowering functions.

Benefits of technology

The support frame and climbing frame can be climbed on the same floor, which reduces the installation time, occupies one layer of structure, facilitates subsequent construction and painting operations, improves the adaptability and working stability of the construction steel platform, expands the types of construction operations, and simplifies the disassembly process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024082649_03102024_PF_FP_ABST
    Figure CN2024082649_03102024_PF_FP_ABST
Patent Text Reader

Abstract

Disclosed are a same-layer framework-type automatic raising / lowering support system, a climbing apparatus thereof, and a raising / lowering method therefor. The climbing apparatus of the same-layer framework mutual-climbing-type automatic raising / lowering support system comprises: a force-bearing piece, a climbing frame, a telescoping mechanism, and a support frame; the climbing frame and the support frame can be hung on the outside of the same force-bearing piece; a guide structure is arranged between the climbing frame and the support frame in order to achieve mutual guiding and climbing; a buffering balancing mechanism is provided above the support frame; the telescoping mechanism comprises a cylinder body and a telescoping rod; the bottom of the telescoping rod is movably connected to the bottom of the climbing frame by means of a rotating structure; the cylinder body is arranged passing through an inner cavity of the support frame; an upper flange is secured above the cylinder body so as to abut against a top end surface of the buffering balancing mechanism; a lower flange is secured below the cylinder body so as to abut against a bottom end surface of the support frame; and the cylinder body and the support frame can move horizontally. The climbing apparatus of the same-layer framework mutual-climbing-type automatic raising / lowering support system provided by the present invention combines three functions: a same-layer framework, mutual-guiding-type climbing, and good centering performance.
Need to check novelty before this filing date? Find Prior Art

Description

Same-layer frame mutual climbing self-lifting support system and its climbing device and lifting method Technical Field

[0001] The present invention relates to the technical field of top formwork construction, in particular to a same-layer frame mutual climbing self-lifting support system and a climbing device and a lifting method thereof. Background Art

[0002] The top formwork construction integrated platform used for (super) high-rise building structure construction has good bearing capacity and construction equipment integration capabilities.

[0003] However, existing self-elevating support systems are typically installed using a multi-story concrete main structure. This means that at least two floors of concrete must be constructed before the self-elevating support system can be installed. Furthermore, the self-elevating support system occupies multiple floors, making subsequent construction work such as secondary construction and exterior wall painting inconvenient.

[0004] Furthermore, existing self-elevating support systems are susceptible to multiple influences during jacking operations, including installation deviations, structural construction deviations, and heavy loads during construction. These systems can experience large displacements and deformations during jacking operations, and their poor adaptability to deviations can lead to inaccurate jacking positions. Consequently, existing self-elevating support systems require significant time and manpower to adjust for these deviations.

[0005] Summary of the Invention

[0006] The main purpose of the present invention is to provide a same-level frame mutual climbing self-lifting support system and its climbing device and lifting method, aiming to achieve same-level climbing of the support frame and the climbing frame, so that the construction integrated platform can intervene in the construction of the concrete main structure as early as possible.

[0007] To achieve the above-mentioned purpose, the present invention provides a climbing device for a same-layer frame mutual climbing self-lifting support system, comprising a load-bearing member, a climbing frame, a telescopic mechanism and a support frame, wherein:

[0008] The climbing frame and the supporting frame can be hung on the outside of the same load-bearing member, and a guide structure is provided between the climbing frame and the supporting frame to achieve mutual guided climbing. A buffer balancing mechanism is provided above the supporting frame, and the telescopic mechanism includes a cylinder body and a telescopic rod. The bottom of the telescopic rod is movably connected to the bottom of the climbing frame through a rotating structure. The cylinder body is penetrated into the inner cavity of the supporting frame, and an upper flange is fixed above the cylinder body to abut against the top surface of the buffer balancing mechanism, and a lower flange is fixed below the cylinder body to abut against the bottom end surface of the supporting frame. The cylinder body and the supporting frame can move horizontally.

[0009] Preferably, the buffer balancing mechanism is a spring box, which includes a hollow seat, a cover arranged above the seat, and a spring located in the seat, and the relative distance between the seat and the cover is adjusted by the spring.

[0010] Preferably, the spring box also includes a guide shaft fixed on the base body and a limit bolt passing through the sides of the base body and the cover body. The spring is sleeved outside the guide shaft. A limit hole for the limit bolt to pass through is opened on the side of the cover body. When the cover body moves relative to the base body, the limit bolt limits the maximum displacement of the cover body. The base body and the cover body are hollow inside for the cylinder body to pass through.

[0011] Preferably, the support frame can be accommodated in the concave groove formed by the climbing frame so that the climbing frame and the telescopic mechanism can be simultaneously hung on the outside of the same load-bearing member, and the load-bearing member is provided with an outer claw boot assembly and a first flip claw assembly, the climbing frame is provided with a second flip claw assembly that cooperates with the support arm of the outer claw boot assembly, and the support frame is provided with an inner claw boot that cooperates with the first flip claw assembly.

[0012] Preferably, the load-bearing member is set at a height corresponding to the height of one floor of the concrete wall, and the claws of the second claw assembly and the first claw assembly are both provided with locking mechanisms to lock their rotation, and an elastic material layer is installed on the mating contact surface of the claws through fasteners.

[0013] Preferably, the locking mechanism includes a limit baffle, a pin is passed through the claw to realize its rotation, a limit slot is provided on the head of the pin, and the limit baffle is inserted into the limit slot to limit the rotation of the pin; the claw width of the first claw assembly is smaller than the slot width of the inner claw boot, and the claw width of the second claw assembly is smaller than the width of the support arm on the outer claw boot assembly.

[0014] Preferably, the climbing frame includes two side plates and a base connecting the two side plates, the support frame is located in the concave space formed by the two side plates and the base and is hung on the outside of the load-bearing member, and a mounting groove is provided on the base, the rotating structure is located in the mounting groove and the mounting position is adjustable; the guide structure includes a guide assembly located on the side of the support frame and a guide groove provided on the side where the two side plates of the climbing frame are close to each other, the guide assembly is accommodated in the guide groove to guide the lifting and lowering of the support frame.

[0015] The present invention further proposes a same-layer frame mutual climbing self-lifting support system, including the above-mentioned climbing device and a supporting column, the bottom end of the supporting column is rigidly connected to the upper flange of the telescopic mechanism cylinder body, and the top end of the supporting column is rigidly connected to the construction steel platform.

[0016] The present invention further provides a jacking method for a same-layer frame mutual climbing self-lifting support system, comprising the following steps:

[0017] The cylinder body of the control telescopic mechanism is lifted upward, and the lower flange at the bottom of the cylinder body abuts against the lower end surface of the support frame to drive the support frame to be lifted as a whole;

[0018] When the support frame rises to its position, the cylinder body retracts downward and the first claw assembly cooperates with the inner claw shoe to hang the support frame on the outside of the load-bearing member;

[0019] The telescopic rod of the telescopic mechanism is controlled to retract relative to the cylinder body, thereby driving the climbing frame to rise as a whole;

[0020] When the climbing frame climbs to its proper position, the telescopic rod is extended downward to allow the turning claws of the second turning claw assembly to fall onto the outer claw shoe assembly of the load-bearing member, and the climbing frame is hung on the outer side of the load-bearing member.

[0021] The present invention further provides a method for lowering a same-layer frame mutual climbing self-elevating support system, comprising the following steps:

[0022] The telescopic rod of the telescopic mechanism is controlled to extend upward to drive the climbing frame to rise, so that the claw of the second claw assembly and the outer claw shoe assembly are separated, the claw of the second claw assembly is rotated to be stored inside the climbing frame and then locked, and the telescopic rod of the telescopic mechanism is controlled to extend downward to drive the climbing frame to descend;

[0023] When the climbing frame is lowered into place, the claw of the second claw assembly is unlocked so that it naturally extends to a horizontal state, and the telescopic rod is controlled to move so that the claw of the second claw assembly falls above the outer claw shoe assembly;

[0024] The control cylinder extends upward to separate the claw of the first claw assembly from the inner claw shoe, rotates the claw of the first claw assembly to be stored inside the load-bearing member and then locks it, and the control cylinder moves downward to drive the support frame to descend;

[0025] When the support frame is lowered into place, the claw of the first claw assembly is unlocked so that it extends naturally to a horizontal state, and the cylinder of the telescopic mechanism is controlled to move so that the claw of the first claw assembly cooperates with the slot of the inner claw shoe, and the climbing frame is hung on the outside of the load-bearing member.

[0026] The same-layer frame mutual climbing self-lifting support system proposed by the present invention has the following beneficial effects:

[0027] 1. This same-layer frame mutual climbing self-lifting support system uses a single structure that combines three functions: a same-layer frame, mutually guided climbing, and good centering. The same-layer frame refers to the fact that the climbing frame and the support frame can be hung on the outside of the same load-bearing member. Therefore, the self-lifting support system can be installed after one layer of concrete main structure construction. In addition, the self-lifting support system can only occupy one layer of structure, and subsequent construction work such as secondary structure and exterior wall painting can be carried out. Mutually guided climbing refers to the mutually guided climbing of the climbing frame and the support frame. The specific implementation methods are: first, through a guide structure (guide groove); second, the climbing frame is set as an outer frame on the outside of the support frame; and third, in conjunction with a telescopic mechanism. When the climbing frame is not climbing, the support frame climbs with the climbing frame as the fulcrum. When the support frame is not climbing, the climbing frame climbs with the support frame as the fulcrum. Mutually guided climbing is achieved through the connection method of the telescopic mechanism in conjunction with the guide structure. Good centering is achieved through two measures. First, the side panels of the climbing frame are used to ensure that the position of the support frame will not deviate too much when climbing or descending. Second, when the centering is poor in a smaller size during installation, the width of the first claw assembly is smaller than the slot width of the inner claw boot, and the width of the second claw assembly is smaller than the width of the upper support arm of the outer claw boot assembly. At the same time, with the inclined structure of the claw, the climbing frame and the support frame can rely on their gravity and the inclined self-centering structure to eliminate position deviations when they are in place, so that the climbing frame and the support frame are self-centered in a plane contact state. When the centering is poor in a larger size, the position of the support frame on the lower flange is adjusted by external force, so that the inner claw boot of the support frame and the first claw assembly can be matched, and the matching position of the second claw and the inner claw boot can be adjusted, thereby ensuring the accuracy of the position of the support frame on the load-bearing member when it is raised or lowered.

[0028] 2. The ball joint structure and the buffer balance mechanism are used in conjunction to ensure the effective release of the internal forces between the various structural components during the operation of the support lifting system. Combined with the movable space between the cylinder body and the support frame, these two points work together to ensure the accuracy of the lifting and lowering positions of the support frame and the climbing frame on the load-bearing components. On the other hand, it also improves the adaptability of the lifting operation under the multiple influences of installation deviation, structural construction deviation and large loads during construction.

[0029] 3. This support lifting system can realize the descending function, which on the one hand expands the types of construction operations (it can provide a working surface for secondary structure and exterior wall painting, etc.), and on the other hand facilitates the disassembly of the construction steel platform from below (the construction steel platform can follow the support frame to descend to the bottom of the building instead of being disassembled at a high level as in the prior art).

[0030] 4. This same-layer frame mutual climbing self-lifting support system has the advantages of simple structure, easy disassembly and stable and reliable operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] FIG1 is a schematic structural diagram of a same-layer frame mutual climbing self-lifting support system according to the present invention;

[0032] FIG2a is a schematic diagram of the main structure of the same-layer frame inter-climbing self-lifting support system during the installation of the turnover concrete structure embedded parts and the load-bearing parts;

[0033] FIG2b is a schematic side view of the structure of FIG2a;

[0034] FIG3a is a schematic diagram of the main structure of the load-bearing members in the mutual climbing self-lifting support system of the same-layer frames;

[0035] FIG3b is a schematic diagram of the exploded structure of the load-bearing members in the mutual climbing self-lifting support system of the same-layer frames;

[0036] FIG3c is a schematic structural diagram of the first flap assembly in the same-layer frame mutual climbing self-lifting support system;

[0037] Figure 3d is a schematic structural diagram of the outer claw shoe assembly in the same-layer frame mutual climbing self-lifting support system;

[0038] Figure 3e is a schematic structural diagram of the first rotating pin in the mutual climbing self-lifting support system of the same-layer frames;

[0039] FIG3f is a schematic structural diagram of the turning claw assembly in the load-bearing member of the mutual climbing self-lifting support system of the same-layer frame when it rotates;

[0040] Figure 4a is a schematic structural diagram of a climbing frame in a same-layer frame mutual climbing self-lifting support system;

[0041] FIG4b is a schematic structural diagram of the second flap assembly of the climbing frame of the mutual climbing self-lifting support system of the same-layer frames;

[0042] FIG4c is a schematic structural diagram of the second rotating pin of the climbing frame of the mutual climbing self-lifting support system of the same-layer frames;

[0043] FIG4d is a schematic structural diagram of the second flap assembly in the same-layer frame mutual climbing self-lifting support system during rotation;

[0044] Figure 4e is a schematic structural diagram of the bottom mounting groove of the climbing frame of the mutual climbing self-lifting support system of the same-layer frames;

[0045] Figure 5a is a schematic structural diagram of a support frame in a same-layer frame mutual climbing self-lifting support system;

[0046] FIG5b is a schematic structural diagram of the support frame body in the same-layer frame mutual climbing self-lifting support system;

[0047] FIG5c is a schematic structural diagram of a spring box in a support frame of a mutual climbing self-lifting support system for frames on the same floor;

[0048] Figure 5d is a schematic structural diagram of the guide assembly in the support frame of the mutual climbing self-lifting support system of the same-layer frame;

[0049] FIG6 is a schematic structural diagram of a telescopic mechanism in a same-layer frame mutual climbing self-lifting support system;

[0050] FIG7 is a schematic structural diagram of the load-bearing members and the assembly of the load-bearing members in the mutual climbing self-lifting support system of the same-layer frame;

[0051] FIG8a is a schematic structural diagram of the assembly of the climbing frame and the load-bearing member in the mutual climbing self-lifting support system of the same-layer frame;

[0052] FIG8b is a schematic structural diagram of the assembly of the climbing frame and the load-bearing member in the mutual climbing self-lifting support system of the same-layer frame;

[0053] FIG9 is a schematic structural diagram of the assembly of the support frame and the load-bearing member in the mutual climbing self-lifting support system of the same-layer frame;

[0054] Figure 10 is a schematic diagram of the guide sliding structure of the support frame and the climbing frame in the same-layer frame mutual climbing self-lifting support system;

[0055] FIG11a is a schematic diagram of the front view of the self-alignment structure of the first flap and the inner claw shoe in the same-layer frame mutual climbing self-lifting support system;

[0056] FIG11b is a side view of the structure of the self-alignment of the first flap and the inner claw shoe in the same-layer frame mutual climbing self-lifting support system;

[0057] FIG12a is a schematic structural diagram of the assembly of the telescopic mechanism, the climbing frame and the supporting frame in the mutual climbing self-lifting supporting system of the same-layer frames (jacking process);

[0058] FIG12b is a schematic structural diagram of the assembly of the telescopic mechanism, the climbing frame and the supporting frame in the mutual climbing self-lifting supporting system of the same-layer frame (jacking completed);

[0059] 13 is a schematic structural diagram of the telescopic mechanism and support column assembly in the same-layer frame mutual climbing self-lifting support system;

[0060] FIG14a is a schematic diagram of the main structure of the mutual climbing self-elevating support system of the same-layer frame;

[0061] FIG14b is a schematic side view of the main structure of the same-layer frame mutual climbing self-elevating support system;

[0062] FIG15a is a schematic structural diagram of the same-layer frame mutual climbing self-elevating support system in the initial state of the jacking working condition;

[0063] FIG15b is a schematic structural diagram of the same-layer frame mutual climbing self-elevating support system in the intermediate state of the jacking working condition;

[0064] FIG15c is a structural diagram of the same-layer frame mutual climbing self-elevating support system when the jacking condition is completed;

[0065] FIG16a is a schematic structural diagram of the same-layer frame mutual climbing self-elevating support system in the initial state of the jacking working condition;

[0066] FIG16b is a schematic structural diagram of the same-layer frame mutual climbing self-elevating support system in the intermediate state of the jacking working condition;

[0067] FIG16c is a structural diagram of the same-layer frame mutual climbing self-elevating support system when the jacking condition is completed;

[0068] FIG17a is a schematic diagram of the structure of the mutual climbing self-elevating support system of the same-layer frame in the initial state of the descending working condition;

[0069] Figure 17b is a structural diagram of the same-layer frame mutual climbing self-lifting support system in the middle state of the climbing frame during the descending working condition;

[0070] Figure 17c is a structural diagram of the same-layer frame mutual climbing self-lifting support system when the climbing frame is completed in the descending condition;

[0071] Figure 17d is a structural diagram of the mutual climbing self-lifting support system of the same-layer frame when the support frame is in the completed state of the descending working condition.

[0072] In the figure, 1-construction steel platform, 2-turnable concrete structure embedded parts, 3-load-bearing parts, 3.1-load-bearing part body, 3.1.1-first top block, 3.1.2-second top block, 3.2-bolt, 3.3-first flap claw assembly, 3.3.1-first flap claw, 3.3.2-first elastic material layer, 3.3.3-screw, 3.4-outer claw shoe assembly, 3.4.1-outer claw shoe, 3.4.2-transverse rib plate, 3.4.3-vertical rib plate, 3.5-first rotation pin Shaft assembly, 3.5.1-first pin, 3.5.2-first flat key, 3.5.3-first hexagonal head, 3.5.4-first limit baffle, 3.6-shackle, 3.7-layer height adjustment block, 4-climbing frame, 4.1-climbing frame body, 4.1.1-guide groove, 4.1.2-third top block, 4.1.3-fourth top block, 4.2-second flap assembly, 4.2.1-second flap, 4.2.2-second elastic material layer, 4.3-second rotation pin assembly, 4. 3.1-Second pin, 4.3.2-Second flat key, 4.3.3-Second limit baffle, 4.3.4-Second hexagonal head, 4.4-Sliding limit structure, 4.4.1-Mounting slot, 4.4.2-Limiting bolt group, 5-Support frame, 5.1-Support frame body, 5.1.1-Inner claw shoe, 5.2-Spring box, 5.2.1-Spring box body, 5.2.1.1-Seat body, 5.2.1.2-Cover body, 5.2.1.3-Guide shaft, 5.2.1.4- Limit bolt, 5.2.2-spring, 5.3-guide assembly, 5.3.1-guide seat, 5.3.2-wear-resistant plate, 6-telescopic mechanism, 6.1-upper flange, 6.1.1-upper flange plate, 6.1.2-upper flange plate, 6.2-lower flange, 6.2.1-lower flange plate, 6.2.2-lower flange plate, 6.3-ball hinge structure, 6.3.1-sphere, 6.3.2-ball hinge cover, 6.3.3-ball hinge seat, 6.3.4-limiting waist hole, 7-support column.

[0073] The purpose, features and advantages of the present invention will be further described with reference to the accompanying drawings and in conjunction with the embodiments. DETAILED DESCRIPTION

[0074] It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0075] It should be noted that in the description of the present invention, the terms "transverse," "longitudinal," "upper," "lower," "front," "back," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer" and the like, indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings and are intended only to facilitate the description of the present invention and simplify the description. They do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed, or operate in a specific orientation, and therefore should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0076] The present invention provides a same-layer frame-type supporting self-lifting system.

[0077] Referring to Figures 1 to 17d, in this preferred embodiment, a same-level frame mutual climbing self-lifting support system (self-lifting refers to a system with a telescopic mechanism to achieve a lifting function) includes a climbing device and a supporting column 7. The bottom end of the supporting column 7 is rigidly connected to the upper flange 6.1 of the cylinder body of the telescopic mechanism 6, and the top end of the supporting column 7 is rigidly connected to the construction steel platform 1.

[0078] The climbing device includes a load-bearing member 3, a climbing frame 4, a telescopic mechanism 6, and a support frame 5. The climbing frame 4 and the support frame 5 can be hung on the outside of the same load-bearing member 3 (i.e., on the side facing away from the concrete wall). A guide structure is provided between the climbing frame 4 and the support frame 5 to enable mutually guided climbing. A buffer balancing mechanism is provided above the support frame 5. The telescopic mechanism 6 includes a cylinder and a telescopic rod. The bottom of the telescopic rod is movably connected to the bottom of the climbing frame 4 via a rotating structure (the rotating structure allows the bottom of the telescopic rod to rotate relative to the bottom of the climbing frame 4). The cylinder is provided within the inner cavity of the support frame 5. An upper flange 6.1 is fixed above the cylinder to abut against the top surface of the buffer balancing mechanism. A lower flange 6.2 is fixed to the bottom of the cylinder to abut against the bottom surface of the support frame 5. The cylinder and the support frame 5 can move horizontally. The lower flange 6.2 is located between the upper flange 6.1 and the rotating structure.

[0079] The support column 7 can be welded from profiles. Its upper end is rigidly connected to the construction steel platform 1, and its lower end is rigidly connected to the upper flange 6.1 of the cylinder body, enabling the construction steel platform 1 to climb (as shown in Figure 13). The telescopic mechanism 6 can be a variety of linear motion mechanisms, including a hydraulic cylinder, linear guide rod, screw jack, and electric cylinder, and the present invention is not limited thereto.

[0080] Referring to Figures 3a to 3f, this embodiment provides a specific structure of a load-bearing member 3. The load-bearing member 3 includes a load-bearing member body 3.1, fasteners (e.g., bolts 3.2) for securing the load-bearing member body 3.1 to the concrete wall, and a first flap assembly 3.3 and an outer claw shoe assembly 3.4 mounted on the load-bearing member body 3.1. The load-bearing member body 3.1 is provided with at least two rows of through holes in its height for the fasteners to pass through. The height of the load-bearing member body 3.1 corresponds to the height of one floor of the concrete wall (i.e., the height of the load-bearing member body 3.1 is the height of a single floor). The load-bearing member body 3.1 can be welded from Q35B and 42CrMo metal materials to enhance overall structural strength.

[0081] FIG3 a takes the load-bearing member body 3.1 with four rows of through holes as an example for specific description, where each row has four through holes, and a total of 16 through holes are provided for installing fasteners, thereby facilitating avoiding the locations of pre-opened holes on the concrete wall.

[0082] In addition, the reusable concrete structure embedded parts 2 can be flexibly configured according to the construction load and the needs of the concrete structure, such as pre-embedding multiple layers, each layer consisting of multiple components. The load-bearing parts 3 are rigidly connected to the reusable concrete structure embedded parts 2 by fasteners (bolts 3.2), thereby improving the load-bearing capacity of the load-bearing parts 3 and the accuracy of the embedding.

[0083] In this embodiment, a load-bearing member body 3.1 with two layers of outer claw shoe assemblies 3.4 is used as an example for specific description. In this case, the load-bearing member body 3.1 can be lifted and placed in two modes: 1 / 2 floor height and 1 floor height, thereby achieving a lifting height of half the floor height. If the load-bearing member body 3.1 is equipped with three layers of outer claw shoe assemblies 3.4, the load-bearing member body 3.1 can be lifted and placed in three modes: 1 / 3 floor height, 2 / 3 floor height, and 1 floor height, thereby achieving a lifting height of 1 / 3, 2 / 3, or 1 floor height.

[0084] Furthermore, referring to Figure 3b, the load-bearing member 3 further includes a height adjustment block 3.7 detachably connected to the load-bearing member body 3.1. The height adjustment block 3.7 is connected to the top or bottom end of the load-bearing member body 3.1. Connecting plates may be provided at both the top and bottom of the load-bearing member body 3.1. The connecting plates may have apertures machined therein to facilitate bolt connection to a vertically adjacent load-bearing member 3 or height adjustment block 3.7 (see Figure 7).

[0085] The load-bearing member 3 can first be used as a template for pouring the concrete main structure. When the concrete main structure reaches the required strength, it can be used for the subsequent installation of the climbing frame 4 and the support frame 5. If the height of the main structure construction floor changes, a floor height adjustment block 3.7 can be added between the upper and lower load-bearing members 3.

[0086] In this embodiment, because the height of the load-bearing member 3.1 corresponds to the height of one floor of the concrete wall, and at least two rows of through-holes are provided along the height of the load-bearing member 3.1 for fasteners to pass through, the self-elevating support system is easily attached to the side of the concrete wall, compared to the smaller load-bearing member bodies of the prior art (where the height of the load-bearing member is significantly less than the height of the wall). Furthermore, because the height of the load-bearing member 3.1 corresponds to the height of one floor of the concrete wall, its load-bearing area is significantly increased compared to smaller wall-mounted supports of the prior art, thereby enhancing the overall structural strength of the load-bearing member 3.

[0087] Furthermore, at least two rows of outer claw shoe assemblies 3.4 are arranged in the height direction of the load-bearing member body 3.1, with outer claw shoe assemblies 3.4 provided on both the left and right sides of the load-bearing member body 3.1. The outer claw shoe assemblies 3.4 are supported below the second flap assembly 4.2 of the climbing frame 4 to support it. In other words, at least four outer claw shoe assemblies 3.4 are arranged on a single load-bearing member body 3.1, with two rows provided on each of the left and right outer walls of the load-bearing member body 3.1, to facilitate same-floor climbing of the self-elevating support system.

[0088] Specifically, referring to Figure 3d, the outer claw boot assembly 3.4 includes an outer claw boot 3.4.1 for being fitted with the second flip claw assembly 4.2, a vertical rib 3.4.3 located below the outer claw boot 3.4.1 to support it, and a transverse rib 3.4.2 connected to the side of the outer claw boot 3.4.1 close to the concrete wall. The outer claw boot 3.4.1 can be welded to the load-bearing member body 3.1. The vertical rib 3.4.3 supports the bottom of the outer claw boot 3.4.1 to improve its bearing capacity. Both the vertical rib 3.4.3 and the transverse rib 3.4.2 can be connected to the load-bearing member body 3.1 by welding, and the welded connection has the advantage of easy installation. The outer claw boot 3.4.1 can be fully penetrated and welded with 42CrMo tempered material to improve the local bearing capacity.

[0089] Referring to Figure 3d, the outer claw shoe 3.4.1 features an outwardly extending support arm with a first inclined surface, a second inclined surface, and a transitional curved surface between the first and second inclined surfaces. The first inclined surface is the top surface of the support arm, and the second inclined surface is the end surface of the support arm near the concrete wall. The transverse rib 3.4.2 is connected to the second inclined surface. The side of the support arm facing the second flap 4.2.1 is straight to mate with it. A guide inclined surface is provided on the side of the outer claw shoe 3.4.1 near the support arm to guide and limit the first flap 3.3.1.

[0090] Referring to Figure 3c, the first claw assembly 3.3 is used to cooperate with the inner claw boot 5.1.1 of the support frame 5 of the top mold self-lifting support system. The first claw assembly 3.3 includes a first claw 3.3.1 that can rotate relative to the load-bearing member body 3.1, and a first rotating pin assembly 3.5 that passes through the first claw 3.3.1 and the load-bearing member body 3.1. The second claw 4.2.1 can be extended into the groove of the inner claw boot 5.1.1 to support the support frame 5.

[0091] The first flap assembly 3.3 enables the load-bearing member body 3.1 to support the supporting frame 5 in its upward movement. The first flap assembly 3.3 is mounted on the load-bearing member body 3.1 via a first rotating pin assembly 3.5. The first rotating pin assembly 3.5 includes a first pin 3.5.1, a first flat key 3.5.2, a first hexagonal head 3.5.3, and a first stop plate 3.5.4. The first rotating pin assembly 3.5 enables the first flap 3.3.1 to rotate relative to the load-bearing member body 3.1. Rotating the first hexagonal head 3.5.3 drives the first pin 3.5.1 to rotate.

[0092] Furthermore, a groove is provided within the load-bearing member body 3.1, and the second flap 4.2.1 can be completely accommodated within the groove. The second flap 4.2.1 automatically extends out of the groove under the action of gravity. When the climbing frame 4 climbs, the second flap 4.2.1 is automatically retracted into the groove under the action of the outer frame of the climbing frame 4. When the climbing frame 4 is in place, the second flap 4.2.1 automatically extends out of the groove under the action of gravity.

[0093] Further, referring to Figure 3f, a first top block 3.1.1 and a second top block 3.1.2 are fixed within the groove of the load-bearing member main body 3.1. These first and second top blocks 3.1.1 and 3.1.2 limit the rotation angle of the first flap 3.3.1, keeping it horizontal when not subjected to external forces. The first and second top blocks 3.1.1 and 3.1.2 can be welded with full penetration 42CrMo quenched and tempered material to enhance local load-bearing capacity.

[0094] In addition, a shackle 3.6 is installed on the load-bearing member body 3.1, and the shackle 3.6 cooperates with the lifting mechanism to realize the lifting of the load-bearing member body 3.1.

[0095] Specifically, referring to Figure 5c, the buffer balancing mechanism is a spring box 5.2, which is detachably mounted (via screws) on the top of the support frame 5. The spring box 5.2 comprises a spring box body 5.2.1 and multiple sets of springs 5.2.2. The spring box body 5.2.1 comprises a hollow base 5.2.1.1 and a cover 5.2.1.2 disposed over the base 5.2.1.1. The relative distance between the base 5.2.1.1 and the cover 5.2.1.2 is adjusted by the springs 5.2.2.

[0096] Further, with reference to Figure 5c, the spring box 5.2 also includes a guide shaft 5.2.1.3 fixed to the seat 5.2.1.1 and a limit bolt 5.2.1.4 passing through the sides of the seat 5.2.1.1 and the cover 5.2.1.2. The spring 5.2.2 is sleeved on the outside of the guide shaft 5.2.1.3, and a limit hole for the limit bolt 5.2.1.4 to pass through is opened on the side of the cover 5.2.1.2. When the cover 5.2.1.2 moves relative to the seat 5.2.1.1, the limit bolt 5.2.1.4 limits the maximum displacement of the cover 5.2.1.2. The seat 5.2.1.1 and the cover 5.2.1.2 are hollow inside for the telescopic mechanism 6 to pass through.

[0097] By providing the guide shaft 5.2.1.3, radial deformation of the spring 5.2.2 can be prevented. In addition, the limiting bolt 5.2.1.4 and the limiting hole cooperate to limit the relative movement position between the cover body 5.2.1.2 and the base body 5.2.1.1, so that the spring is always kept in a compressed state to achieve a buffering function.

[0098] The side and bottom of the seat body 5.2.1.1 are provided with threaded holes. The threaded hole at the bottom is used to install the guide shaft 5.2.1.3, and the threaded hole at the side is used for the limit bolt 5.2.1.4 to pass through.

[0099] When installing the spring box 5.2, first, fix the guide shaft 5.2.1.3 inside the hollow chamber of the base 5.2.1.1, then assemble the multiple groups of springs 5.2.2 into the guide shaft 5.2.1.3. Finally, the cover 5.2.1.2 and the base 5.2.1.1 are installed together using the limit bolts 5.2.1.4 on the side. It is necessary to ensure that the springs 5.2.2 in the spring box 5.2 are always in a pre-stressed state.

[0100] 12a and 12b , the multiple groups of springs 5.2.2 in the spring box 5.2 can be in different compression states, thereby balancing and mitigating the eccentric load, displacement deviation and vibration of the construction steel platform 1.

[0101] Further, referring to Figure 9, the support frame 5 can be accommodated in the concave groove formed by the climbing frame 4. At least two rows of outer claw shoe assemblies 3.4 and two rows of first flap claw assemblies 3.3 are arranged in the height direction of the load-bearing member 3 (at least two rows of outer claw shoes 3.4.1 are provided to stably support the climbing frame 4, and at least two rows of first flap claw assemblies 3.3 are provided to stably support the support frame 5. In other words, the climbing frame 4 and the support frame 5 can be hung on the same load-bearing member 3). The climbing frame 4 is provided with a second flap claw assembly 4.2, and the support frame 5 is provided with an inner claw shoe 5.1.1. The flap claws of the second flap claw assembly 4.2 are adapted to the shape of the support arms of the outer claw shoe assembly 3.4, and the slots of the inner claw shoe 5.1.1 are adapted to the shape of the flap claws of the first flap claw assembly 3.3.

[0102] Because in the prior art, the support frame 5 is hung on the upper load-bearing member 3 of the climbing frame 4, that is, the support frame 5 and the climbing frame 4 are not on the same floor. Therefore, the climbing frame 4 and the support frame 5 together need to occupy at least two floors of height (therefore, in the prior art, a multi-layer concrete main structure is usually used to install the existing self-lifting support system. That is, the self-lifting support system can only be installed after the concrete main structure is constructed for at least two floors. In addition, the self-lifting support system occupies multiple floors, which is not convenient for subsequent construction work such as secondary structure and exterior wall painting). In this embodiment, the support frame 5 is accommodated in the concave groove formed by the climbing frame 4, so that the support frame 5 and the climbing frame 4 can be simultaneously hung on the side of the load-bearing member 3 on the same floor. In this way, the support frame 5 and the climbing frame 4 together occupy a single floor of space. The self-lifting support system can be installed after one floor of the concrete main structure is constructed, thereby allowing the construction steel platform 1 to be involved in the construction of the concrete main structure as early as possible. In addition, because the self-lifting support system only occupies one floor of structure, it is convenient for subsequent construction work such as secondary structure and exterior wall painting. That is to say, the mutual climbing self-lifting support system of the same-layer frames realizes the effect of same-layer climbing (same-layer climbing means that the supporting frame 5 and the climbing frame 4 can be hung on the load-bearing member 3 of the same layer at the same time).

[0103] Specifically, referring to Figures 4a to 4e, the climbing frame 4 comprises a climbing frame body 4.1, a second flap assembly 4.2, a second rotation pin assembly 4.3, and a slip limiter structure 4.4. The climbing frame body 4.1 is welded from Q355B and 42CrMo metal materials. A third top block 4.1.2, a fourth top block 4.1.3, and a guide groove 4.1.1 are provided on the climbing frame body 4.1. The third and fourth top blocks 4.1.2 and 4.1.3 cooperate to define the flipping position of the flaps in the second flap assembly 4.2. The third and fourth top blocks 4.1.2 and 4.1.3 can be welded with full penetration 42CrMo quenched and tempered material to enhance local load-bearing capacity. The climbing frame 4 is equipped with two layers of the second flap assembly 4.2. The second flap assembly 4.2 comprises a second flap 4.2.1, a second elastic material layer 4.2.2, and screws. The second pivot pin assembly 4.3 includes a second pin 4.3.1, a second flat key 4.3.2, a second stop plate 4.3.3, and a second hexagonal head 4.3.4. The second pin 4.3.1 and the second flap 4.2.1 are connected by a key. The second flap 4.2.1 can be tilted under its own weight, while the third and fourth support blocks 4.1.2 and 4.1.3 cooperate to keep the second flap 4.2.1 horizontal.

[0104] In this embodiment, the rotating structure is a ball joint structure 6.3. The climbing frame 4 and the supporting frame 5 of this embodiment can be hung on the outside of the same load-bearing member 3, and are specifically implemented by the following structure: the climbing frame 4 includes two side plates and a base connecting the two side plates. The supporting frame 5 is located in the concave space formed by the two side plates and the base and is hung on the outside of the load-bearing member 3. An installation groove 4.4.1 is opened on the base, and the ball joint structure 6.3 is located in the installation groove 4.4.1 and the installation position can be adjusted.

[0105] The mounting groove 4.4.1 and the limiting bolt group 4.4.2 inside it together form the sliding limiting structure 4.4, thereby adjusting and fixing the installation position of the ball joint structure 6.3. The size of the ball joint seat 6.3.3 and the lower flange plate 6.2.2 is larger than the rectangular cavity between the spring box 5.2 and the support frame 5. First, the ball joint seat 6.3.3 is assembled in the concave space at the bottom of the climbing frame 4. On the one hand, the limiting bolt group 4.4.2 and the limiting waist-shaped hole 6.3.4 on the side of the ball joint seat 6.3.3 cooperate to limit the ball joint structure 6.3. On the other hand, when the telescopic mechanism is lifted, the telescopic mechanism 6 is lifted to drive the ball joint structure 6.3, thereby driving the climbing frame 4 to rise.

[0106] Referring further to Figures 5a to 5d, the support frame 5 comprises a support frame body 5.1, a spring box 5.2, and a guide assembly 5.3. Two inner claw shoes 5.1.1 are arranged within the support frame body 5.1. These inner claw shoes 5.1.1 feature various structural features, including inclined, curved, and straight surfaces. These inner claw shoes 5.1.1 are constructed of 42CrMo quenched and tempered material and welded through full penetration to enhance local load-bearing capacity. The spring box 5.2 is screwed to the upper portion of the support frame body 5.1.

[0107] 4a and 5d , the present invention provides a guide structure comprising a guide assembly 5.3 located on the side of a support frame 5 and guide grooves 4.1.1 disposed on the adjacent sides of two side plates of a climbing frame 4. The guide assembly 5.3 is received in the guide grooves 4.1.1 to guide the lifting and lowering of the support frame 5.

[0108] By setting the guide component 5.3 and the guide groove 4.1.1 of the climbing frame 4 to form a guide sliding pair, the mutual guiding effect of the supporting frame 5 and the climbing frame 4 during movement is guaranteed, that is, the mutual climbing of the frames is guided (the mutual climbing of the frames refers to the climbing frame 4 and the supporting frame 5 supporting each other to achieve relative climbing).

[0109] Referring to Figure 5d, this embodiment proposes a specific structure of a guide assembly 5.3: the guide assembly 5.3 includes a guide seat 5.3.1 fixed on the side of the support frame 5 and a wear-resistant plate 5.3.2 detachably mounted on the outer surface of the guide seat 5.3.1. The wear-resistant plate 5.3.2 is made of ZCuSn10P1. The guide assembly 5.3 is connected to the support frame body 5.1 by screws. The wear-resistant performance of the guide assembly 5.3 is improved by providing the wear-resistant plate 5.3.2. The thickness of the wear-resistant plate 5.3.2 of the guide assembly 5.3 is adjustable so as to adjust the spacing of the guide sliding pair between the support frame 5 and the climbing frame 4. The adjustable spacing ensures smooth movement of the two.

[0110] Furthermore, the second claw assembly 4.2 and the first claw assembly 3.3 are both provided with locking mechanisms to lock their rotation. The locking mechanisms are provided to achieve the descending function of the same-layer frame mutual climbing self-lifting support system.

[0111] In the prior art, the construction steel platform 1 is disassembled at high altitude after the main concrete structure is built. High-altitude operations not only have certain safety risks but also have low work efficiency (the existing self-lifting support system only has a lifting function). In order to meet the needs of ground disassembly and expansion of construction operations after the construction steel platform 1 completes the construction of the main concrete structure, the support lifting system is required to have a descending function. However, the top form self-lifting support system in the prior art does not have a descending function. In this application, a locking mechanism is provided to limit the rotation of the flap, thereby realizing the function of the climbing frame 4 being able to descend relative to the load-bearing member 3. On the one hand, it is convenient for the construction steel platform 1 to be disassembled from below, and on the other hand, the lowered construction steel platform 1 can provide a working surface for operations such as secondary structure and exterior wall painting.

[0112] Specifically, referring to Figure 4c , this embodiment proposes a specific structure of a locking mechanism: the locking mechanism includes a stopper plate (the second stopper plate 4.3.3 corresponds to the second flap 4.2.1, and the first stopper plate 3.5.4 corresponds to the first flap 3.3.1). A pin is provided on the flap to enable rotation. The pin has a limit slot defined in the head, which is inserted into the stopper plate to restrict the pin's rotation. The flaps of both the second flap assembly 4.2 and the first flap assembly 3.3 are mounted via the pin to enable rotation.

[0113] Specifically, the limit baffle can be detachably installed on the load-bearing member 3 and the climbing frame 4. For example, two groups of bolt holes can be set on the load-bearing member 3 and the climbing frame 4. When the bolts passing through the limit baffle are installed in the first group of bolt holes, the limit baffle is inserted into the annular positioning groove opened at the end of the pin shaft, thereby limiting the pin shaft and playing the role of axial positioning to prevent the pin shaft from loosening. When the bolts passing through the limit baffle are installed in the second group of bolt holes, the limit baffle is inserted into the special-shaped limit groove inside the annular positioning groove. At this time, the pin shaft cannot rotate, thereby achieving locking of the flap. The limit baffle with this structure is simple in structure and easy to manufacture, and its cost is low. The limit baffle can also be realized by sliding to achieve different installation positions corresponding to the two states.

[0114] Further, referring to Figures 3c, 3e, 4b, and 4c, a limiting protrusion is provided on the outer wall of the pin, and a positioning groove is provided on the inner wall of the through-hole through which the claw passes, in which the claw and the pin are fixedly connected. The limiting protrusion and the positioning groove cooperate to limit the circumferential rotation of the pin, and the installation process of the claw and the pin is very simple.

[0115] 11b, the width of the first claw assembly 3.3 is smaller than the slot width of the inner claw shoe 5.1.1, and referring to FIG8b, the width of the second claw assembly 4.2 is smaller than the width of the upper support arm of the outer claw shoe assembly 3.4.

[0116] The upper support arm, inner claw shoe 5.1.1, and flip claw of the outer claw shoe assembly 3.4 all feature both straight and inclined surfaces. Referring to Figures 11a and 11b, when the spatial distance between the load-bearing member 3 and the support frame 5 deviates, gravity and the self-centering structure of the inclined surface between the two can eliminate positional deviations when the support frame 5 is in place, thereby self-centering the load-bearing member 3 and the support frame 5 in a planar contact state. The outer claw shoe 3.4.1 of the load-bearing member 3 and the flip claw of the climbing frame 4 utilize the same principle, achieving self-centering in a planar contact state upon landing while eliminating positional deviations. Specifically, the contact surface between the second flip claw 4.2.1 and the outer claw shoe 3.4.1 comprises a combination of straight, curved, and inclined surfaces. This combination of three surfaces not only enables vertical and horizontal load bearing, but also ensures that the climbing frame 4 self-centers along the inclined surface under the action of gravity onto the outer claw shoe 3.4.1 of the load-bearing member 3, thus ensuring the centering of the supporting lifting system.

[0117] Furthermore, referring to Figures 3c and 4b, an elastic material layer is attached to the mating contact surfaces of the flaps via fasteners (the first flap 3.3.1 corresponds to the first elastic material layer 3.3.2, and the second flap 4.2.1 corresponds to the second elastic material layer 4.2.2). By providing the elastic material layer, the elastic material layer deforms under external force, thereby ensuring that the flaps and the outer jaw shoe 3.4.1 or the inner jaw shoe 5.1.1 can closely fit together to bear the load.

[0118] Referring to Figure 6 , the telescopic mechanism 6 is provided with an upper flange 6.1 and a lower flange 6.2. The upper flange 6.1 is rigidly connected to the support column 7. The upper flange 6.1 comprises an upper flange plate 6.1.1 and an upper flange plate 6.1.2, which are bolted together. The lower flange 6.2 comprises a lower flange plate 6.2.1 and a lower flange plate 6.2.2, which are bolted together. The bottom of the telescopic mechanism 6 is a ball joint structure 6.3, which comprises a sphere 6.3.1, a ball joint seat 6.3.3, a ball joint cover 6.3.2, and a bolt assembly. The side of the ball joint seat 6.3.3 is provided with a retaining waist-shaped hole 6.3.4.

[0119] Referring to Figure 7 , the load-bearing member 3 initially serves as a formwork for pouring the main concrete structure. Once the main concrete structure reaches the required strength, it can be used for subsequent installation of the climbing frame 4 and support frame 5. The two load-bearing members 3 can be bolted together. If the main structure's construction floor height changes, a floor height adjustment block 3.7 can be added between the upper and lower load-bearing members 3.

[0120] Referring to Figures 12a and 12b, the sizes of the ball joint seat 6.3.3 and the lower flange plate 6.2.2 are both larger than the size of the rectangular cavity between the spring box 5.2 and the support frame 5. As shown in Figure 12a, during the jacking process, when the upper flange 6.1 and the spring box 5.2 are in a disengaged state (there is no contact between the two), at this time, the lower flange 6.2 and the lower end surface of the support frame 5 are in a contact state. Therefore, the cylinder body can drive the support frame 5 to lift. As shown in Figure 12b, when the jacking is completed, when the upper flange 6.1 falls on the spring box 5.2, the spring box 5.2 is in a compressed state due to the external force, and at this time, the lower flange 6.2 and the lower end surface of the support frame 5 are in a disengaged state.

[0121] The installation process of this same-layer frame mutual climbing self-lifting support system is as follows.

[0122] First, referring to Figures 12a and 12b, during installation, install the ball joint seat 6.3.3 into the mounting slot 4.4.1 at the bottom of the climbing frame 4. The ball joint seat 6.3.3 is positioned using the limiting bolt assembly 4.4.2 and the limiting waist-shaped hole 6.3.4 on the side of the ball joint seat 6.3.3. Furthermore, the lower flange plate 6.2.2 needs to be removed. The telescopic mechanism 6 is sequentially inserted through the spring box 5.2 and the rectangular cavity between the support frame 5 until the upper flange plate 6.1.1 of the telescopic mechanism 6 rests on the spring box 5.2. Next, the lower flange plate 6.2.2 is reinstalled onto the lower flange plate 6.2.1. The telescopic mechanism 6 and the climbing frame 4 are connected via the ball joint structure 6.3. The support column 7 and the upper flange plate 6.1.1 of the telescopic mechanism 6 are connected. This completes the installation of the same-level frame inter-climbing self-elevating support system. Subsequently, the support column 7 and the construction steel platform 1 are installed in sequence.

[0123] Referring to Figures 12a and 12b, when the upper flange 6.1.1 is located on the spring box 5.2, the spring box 5.2 is in a compressed state due to the external force. The multiple groups of springs 5.2.2 in the spring box 5.2 can be in different compression states, thereby balancing and reducing the overload, displacement deviation and vibration of the construction steel platform 1. When the upper flange 6.1.1 is located on the spring box 5.2, the ball hinge structure 6.3 at the head of the telescopic mechanism 6 can rotate freely, ensuring that the first flap 3.3.1 of the load-bearing member 3 and the inner claw shoe 5.1.1 of the support frame 5 are fitted on multiple sides, thereby realizing the load transfer of the construction steel platform 1 to the support frame 5.

[0124] Referring to Figures 14a and 14b, the supporting lifting system has a layer of load-bearing members 3 when it is initially installed. The layer of load-bearing members 3 is first used as a template for the pouring construction of the concrete main structure. When the strength of the concrete main structure meets the standard, the supporting lifting system is installed. First, the reusable concrete structure embedded parts 2 and the load-bearing members 3 are installed, and then the climbing frame 4 is dropped on the load-bearing members 3. Subsequently, the supporting frame 5 is dropped on the load-bearing members 3. Then the telescopic mechanism 6 is installed, and its head is movably connected to the climbing frame 4 through a ball joint. Its lower flange plate 6.2.2 can lift the supporting frame 5, and its upper flange plate 6.1.2 can be dropped on the spring box 5.2 of the supporting frame 5. Its upper flange 6.1 is connected to the supporting column 7 to support the construction steel platform 1. The supporting lifting system includes a jacking function and a lowering function. The supporting lifting system has at least two layers of load-bearing members 3 during jacking, lifting and lowering movements.

[0125] The jacking process of this same-layer frame mutual climbing self-lifting support system is as follows (including two major steps of jacking the support frame 5 and the climbing frame 4).

[0126] Referring to Figures 15a to 15c, as the telescopic mechanism 6 extends (the cylinder extends relative to the telescopic rod), its lower flange plate 6.2.2 gradually comes into contact with the bottom of the support frame 5, while its upper flange plate 6.1.1 gradually separates from the spring box 5.2. This allows the lower flange plate 6.2.2 to support the support frame 5 as it continues to rise during extension, allowing for sliding movement between the bottom of the support frame 5 and the lower flange plate 6.2.2 under external forces. During this movement, the load of the construction steel platform 1 is transmitted to the telescopic mechanism 6 via the upper flange plate 6.1.1. A spherical joint structure 6.3 at the head of the telescopic mechanism 6 ensures self-centering during telescopic movement. Once the support frame 5 has risen into position, the telescopic mechanism 6 retracts (i.e., the cylinder moves slightly downward), allowing the inner claw shoe 5.1.1 and the first flap 3.3.1 of the support frame 5 to simultaneously engage and bear the load. At this point, the support frame 5 is suspended on the load-bearing member 3. Of course, during the retraction movement, if the inner claw shoe 5.1.1 of the support frame 5 and the first flap 3.3.1 cannot be aligned on multiple sides due to installation deviation, excessive structural construction deviation, or large deformation under heavy load during construction, the position of the support frame 5 on the lower flange plate 6.2.2 can be adjusted by external force to achieve simultaneous alignment of the inner claw shoe 5.1.1 and the first flap 3.3.1 on multiple sides to jointly bear the load. Continuing the retraction movement gradually aligns the upper flange plate 6.1.1 and the spring box 5.2. After the jacking is completed, the load of the construction steel platform 1 is transmitted sequentially through the support column 7 to the upper flange plate 6.1.1, the support frame 5, the load-bearing member 3, the revolving concrete structure embedded part 2, and finally to the concrete main structure. During the lifting process, the load of the construction steel platform 1 is transmitted through the supporting columns 7 to the upper flange plate 6.1.2 of the telescopic mechanism 6, the spherical joint structure 6.3, the bottom of the climbing frame 4, the second flap 4.2.1, the load-bearing member 3, the revolving concrete structure embedded part 2, and finally to the main concrete structure. (This section describes the lifting of the climbing frame 4 in detail.)

[0127] Referring to Figures 16a to 16c, when the support frame 5 rises to the upper load-bearing member 3, the telescopic mechanism 6 lifts the climbing frame 4 upward. During the ascent of the climbing frame 4, its second flap 4.2.1 contacts the outer claw shoe 3.4.1 of the load-bearing member 3, causing the second flap 4.2.1 to flip within the climbing frame 4. As the climbing frame 4 continues to rise, the second flap 4.2.1 gradually disengages from the outer claw shoe 3.4.1 and flips under its own weight. Simultaneously, the positioning of the top block keeps the second flap 4.2.1 naturally horizontal. The telescopic mechanism 6 then extends (i.e., the telescopic rod moves downward), driving the climbing frame 4 downward. The self-centering structure of the second flap 4.2.1 and the outer claw shoe 3.4.1 of the climbing frame 4 ensures that the climbing frame 4 is self-centered and in contact with the plane when landing, eliminating positional deviation. During the movement, the ball joint structure 6.3 is in a free sliding and rotating state, thus ensuring that after the jacking is completed, the second flap 4.2.1 and the outer claw shoe 3.4.1 are simultaneously in contact with each other and bear the load together. Of course, the jacking can be carried out on a partial floor as needed. The jacking function realizes the central assembly of the climbing frame 4 on the load-bearing member 3. (Jumping of the support frame 5)

[0128] The descending process of this same-layer frame mutual climbing self-lifting support system is as follows.

[0129] 17a to 17d, first, the telescopic mechanism 6 retracts to lift the climbing frame 4 (the telescopic rod moves upward to disengage the second flap claw from the outer claw boot 3.4.1), and then the second hexagonal head 4.3.4 is rotated to drive the second flap claw 4.2.1 to flip inside the climbing frame 4 and lock the second flap claw 4.2.1, and then the telescopic mechanism 6 extends (the telescopic rod moves downward), thereby moving the climbing frame 4 down to the next layer of load-bearing member 3 and restoring the second flap claw 4.2.1 to a horizontal state (i.e., unlocked and in an extended state), so that the second flap claw 4.2.1 and the outer claw boot 3.4.1 fit together on multiple sides to bear the load together, thereby realizing the descent of the climbing frame 4. After the climbing frame 4 is lowered, the telescopic mechanism 6 first extends (the cylinder moves upward), disengaging the support frame 5 from the first flap 3.3.1. The first hexagonal heads 3.5.3 of the upper and lower load-bearing members 3 are then rotated, causing the second flap 4.2.1 to flip inside the load-bearing members 3 and lock. The long-stroke telescopic mechanism 6 then retracts, allowing the support frame 5 to descend to the next load-bearing member 3 and restore the first flap 3.3.1 to its horizontal position. This allows the first flap 3.3.1 and the inner claw shoe 5.1.1 to engage and support the load simultaneously on multiple surfaces, thereby lowering the support frame 5. Of course, the descent can be performed on a partial floor, depending on construction needs. After the descent is complete, the long-stroke telescopic mechanism 6 can also be used to carry the load of the construction steel platform 1, transferring it sequentially to the climbing frame 4, the load-bearing members 3, the revolving concrete structure embedded components 2, and finally to the main concrete structure.

[0130] The same-layer frame mutual climbing self-elevating support system proposed in this embodiment has the following beneficial effects:

[0131] 1. This same-layer frame mutual climbing self-lifting support system adopts a structure that combines three functions: same-layer frame, mutually guided climbing and good centering. Among them, the same-layer frame means that because the climbing frame 4 and the support frame 5 can be hung on the outside of the same load-bearing member, the self-lifting support system can be installed after one layer of concrete main structure construction. In addition, the self-lifting support system can only occupy one layer of structure, and subsequent construction work such as secondary structure and exterior wall painting will be carried out. Mutually guided climbing means that the climbing frame 4 and the support frame 5 guide each other to climb. The specific implementation methods are: one is through the guide structure (guide groove 4.1.1), the second is that the climbing frame is set as an outer frame on the outside of the support frame 5, and the third is to cooperate with the telescopic mechanism 6. When the climbing frame 4 does not climb, the support frame 5 climbs with the climbing frame 4 as the fulcrum. When the support frame 5 does not climb, the climbing frame 4 climbs with the support frame 5 as the fulcrum. Good centering is achieved through two measures. First, by relying on the side plates of the climbing frame 4, it is ensured that the position of the support frame 5 will not deviate too much when climbing or descending. Second, when the centering is poor in a smaller size during installation, the width of the first claw assembly 3.3 is smaller than the slot width of the inner claw shoe 5.1.1, and the width of the second claw assembly 4.2 is smaller than the width of the upper support arm of the outer claw shoe assembly 3.4. At the same time, with the inclined structure of the claw, the climbing frame 4 and the support frame 5 can rely on their gravity and the inclined self-centering structure to eliminate position deviations when they are in place, so that the climbing frame 4 and the support frame 5 are self-centered in a plane contact state. When the centering is not good for larger sizes, the position of the support frame 5 on the lower flange can be adjusted by external force, so that the inner claw shoe 5.1.1 of the support frame 5 and the first flap assembly 3.3 can be matched, so that the matching position of the second flap 4.2.1 and the inner claw shoe 5.1.1 can be adjusted, thereby ensuring the accuracy of the position of the support frame 5 on the load-bearing member 3 when it is raised or lowered;

[0132] 2. The ball joint structure 6.3 and the buffer balance mechanism work together to ensure the effective release of internal forces between the various structural components during the operation of the support and lifting system. Combined with the movable space between the cylinder body and the support frame 5, these two points work together to ensure the accuracy of the lifting and lowering positions of the support frame 5 and the climbing frame 4 on the load-bearing member 3. On the other hand, it also improves the adaptability of the lifting operation under the multiple influences of installation deviation, structural construction deviation and heavy loads during construction.

[0133] 3. This supporting lifting system can realize the descending function. On the one hand, it expands the types of construction operations (it can provide a working surface for secondary structure and exterior wall painting, etc.), and on the other hand, it facilitates the disassembly of the construction steel platform 1 from below (the construction steel platform 1 can follow the supporting frame 5 to descend to the bottom of the building instead of being disassembled at a high level as in the prior art).

[0134] 4. This same-layer frame mutual climbing self-lifting support system has the advantages of simple structure, easy disassembly and stable and reliable operation.

[0135] The present invention further proposes a climbing device for a same-layer frame mutual climbing self-lifting support system.

[0136] In this preferred embodiment, a climbing device of a same-layer frame mutual climbing self-lifting support system includes a load-bearing member 3, a climbing frame 4, a telescopic mechanism 6 and a support frame 5, wherein:

[0137] Both the climbing frame 4 and the supporting frame 5 can be hung on the outside of the load-bearing member 3. A buffer balancing mechanism is arranged above the supporting frame 5. The telescopic mechanism 6 includes a telescopic rod and a cylinder body which is sleeved on the outside of the telescopic rod and is telescopic relative to the telescopic rod. The bottom of the telescopic rod is movably connected to the bottom of the climbing frame 4 through a rotating structure. The cylinder body is passed through the supporting frame 5. An upper flange 6.1 is fixed above the cylinder body to abut against the top surface of the buffer balancing mechanism. A lower flange is fixed to the bottom of the cylinder body to abut against the bottom end surface of the supporting frame 5. The cylinder body and the supporting frame 5 can move horizontally.

[0138] In this embodiment, the buffer balancing mechanism is a spring box 5.2, which includes a hollow base 5.2.1.1, a cover 5.2.1.2 covering the base 5.2.1.1, and a spring 5.2.2 located inside the base 5.2.1.1. The relative distance between the base 5.2.1.1 and the cover 5.2.1.2 is adjusted by the spring 5.2.2.

[0139] Furthermore, the spring box 5.2 also includes a guide shaft 5.2.1.3 fixed to the base 5.2.1.1 and a limit bolt 5.2.1.4 passing through the sides of the base 5.2.1.1 and the cover 5.2.1.2. The spring 5.2.2 is sleeved on the outside of the guide shaft 5.2.1.3, and a limit hole for the limit bolt 5.2.1.4 to pass through is opened on the side of the cover 5.2.1.2. When the cover 5.2.1.2 moves relative to the base 5.2.1.1, the limit bolt 5.2.1.4 moves up and down relative to the limit hole. The base 5.2.1.1 and the cover 5.2.1.2 are hollow inside to allow the telescopic mechanism 6 to pass through.

[0140] The height of the load-bearing member 3 is set to correspond to the height of one floor of the concrete wall. The supporting frame 5 can be accommodated in the concave groove formed by the climbing frame 4. The climbing frame 4 is provided with a second claw assembly 4.2, and the supporting frame 5 is provided with an inner claw boot 5.1.1. At least two rows of outer claw boot assemblies 3.4 and a first claw assembly 3.3 are arranged in the height direction of the load-bearing member 3. The claw of the second claw assembly 4.2 is adapted to the shape of the support arm of the outer claw boot assembly 3.4, and the slot of the inner claw boot 5.1.1 is adapted to the shape of the claw of the first claw assembly 3.3.

[0141] The flaps of the second flap assembly 4.2 and the first flap assembly 3.3 are both provided with locking mechanisms to lock their rotation, and elastic material layers are installed on the mating contact surfaces of the flaps through fasteners.

[0142] In this embodiment, the locking mechanism includes a limit baffle, a pin is passed through the claw to realize its rotation, a limit slot is provided on the head of the pin, and the limit baffle is inserted into the limit slot to limit the rotation of the pin; the width of the claw of the first claw assembly 3.3 is smaller than the slot width of the inner claw boot 5.1.1, and the width of the claw of the second claw assembly 4.2 is smaller than the width of the support arm on the outer claw boot assembly 3.4.

[0143] The rotating structure is a ball-joint structure. In this embodiment, the climbing frame 4 and the supporting frame 5 can be mounted on the outside of the same load-bearing member. This is achieved by the following structure: the climbing frame 4 includes two side panels and a base connecting the two side panels. The supporting frame 5 is located in the concave space formed by the two side panels and the base and is mounted on the outside of the load-bearing member 3. The base is provided with a mounting groove 4.4.1, and the ball-joint structure is located in the mounting groove 4.4.1, and the mounting position is adjustable.

[0144] The climbing device of the same-layer frame mutual climbing self-elevating support system proposed in this embodiment has the following beneficial effects:

[0145] 1. Because the cylinder body and the support frame 5 are movable, the position of the support frame 5 on the lower flange can be adjusted by external force, so that the inner claw shoe 5.1.1 of the support frame 5 and the first flap claw assembly 3.3 can be matched, so that the installation position of the second flap claw 4.2.1 and the inner claw shoe 5.1.1 can be adjusted, thereby ensuring the accuracy of the position of the support frame 5 on the load-bearing member 3 when it is raised or lowered;

[0146] 2. The ball joint structure 6.3 and the buffer balance mechanism are used in conjunction to ensure the effective release of internal forces between the various structural components during the operation of the support and lifting system. Combined with the movable relationship between the cylinder body and the support frame 5, these two points work together to ensure the accuracy of the position of the support frame 5 and the climbing frame 4 on the load-bearing member 3 when they are lifted and lowered. On the other hand, they enhance the adaptability of the lifting operation under the multiple influences of installation deviation, structural construction deviation, and large loads during construction (construction deviation and construction load are external factors for misalignment, and insufficient internal guide centering structure is an internal factor. This application improves these external and internal factors to ensure centering).

[0147] 3. The support frame 5 is accommodated inside the climbing frame 4, and the two can be integrated and installed on one floor, thus solving the problem that the existing self-lifting support system cannot be installed and lifted on the same structural floor. This allows the construction steel platform 1 to be involved in the construction of the concrete main structure as early as possible, improves the adaptability and construction efficiency of the construction steel platform 1, and shortens the construction period of the main structure.

[0148] 4. This climbing device can realize the descending function. On the one hand, it expands the types of construction operations (it can provide a working surface for secondary structure and exterior wall painting, etc.), and on the other hand, it facilitates the disassembly of the construction steel platform 1 from below (the construction steel platform 1 can follow the support frame 5 to descend to the bottom of the building instead of being disassembled at a high level as in the prior art).

[0149] 5. This climbing device has the advantages of simple structure, easy disassembly and stable and reliable operation.

[0150] The present invention further proposes a jacking method for a same-layer frame mutual climbing self-lifting support system.

[0151] In this preferred embodiment, a jacking method based on the above-mentioned same-layer frame mutual climbing self-elevating support system includes the following steps:

[0152] Step S10, controlling the cylinder of the telescopic mechanism 6 to lift upward, so that the lower flange at the bottom of the cylinder abuts against the lower end surface of the support frame 5 to drive the support frame 5 to lift as a whole;

[0153] Step S20, when the support frame 5 is raised to its position, the cylinder body retracts downward and the first claw assembly 3.3 cooperates with the inner claw shoe 5.1.1 to hang the support frame 5 on the outside of the load-bearing member 3;

[0154] Step S30: the telescopic rod of the telescopic mechanism 6 is retracted relative to the cylinder body, thereby driving the climbing frame 4 to be lifted as a whole;

[0155] Step S40, when the climbing frame 4 climbs to its position, the telescopic rod is extended downward so that the claw of the second claw assembly 4.2 falls above the outer claw shoe assembly 3.4 of the load-bearing member 3, and the climbing frame 4 is hung on the outside of the load-bearing member 3.

[0156] The jacking method proposed in the present invention has a convenient operation process. The support frame 5 is accommodated inside the climbing frame 4, and the two can be integrated and installed on one layer, thereby solving the problem that the existing self-lifting support system cannot be installed and lifted on the same structural layer. This allows the construction steel platform 1 to intervene in the construction of the concrete main structure as early as possible, improves the adaptability and construction efficiency of the construction steel platform 1, and shortens the construction period of the main structure.

[0157] The present invention further proposes a method for lowering a same-layer frame mutual climbing self-lifting support system.

[0158] In this preferred embodiment, a descending method based on the above-mentioned same-layer frame mutual climbing self-elevating support system includes the following steps:

[0159] Step S101: Control the telescopic rod of the telescopic mechanism 6 to extend upward to drive the climbing frame 4 to ascend, separate the claw of the second claw assembly 4.2 from the outer claw shoe assembly 3.4, rotate the claw of the second claw assembly 4.2 so that it is stored inside the climbing frame 4 and then locked, and control the telescopic rod to extend downward to drive the climbing frame 4 to descend;

[0160] Step S102: After the climbing frame 4 is lowered into position, the claws of the second claw assembly 4.2 are unlocked so that they naturally extend horizontally (the claws of the second claw assembly 4.2 are naturally in a horizontal position under gravity), and the telescopic rod is controlled to move so that the claws of the second claw assembly 4.2 fall above the outer claw shoe assembly 3.4;

[0161] Step S103: Control the cylinder of the telescopic mechanism 6 to extend upward to separate the flap of the first flap assembly 3.3 from the inner claw shoe 5.1.1, rotate the flap of the first flap assembly 3.3 so that it is housed inside the load-bearing member 3 and then locked, and control the cylinder to move downward to drive the support frame 5 to descend;

[0162] Step S104, when the support frame 5 is lowered into place, the claws of the first claw assembly 3.3 are unlocked so that they are naturally extended to a horizontal state, and the cylinder is controlled to move so that the claws of the first claw assembly 3.3 are matched with the slots of the inner claw shoe 5.1.1, and the climbing frame 4 is hung on the outside of the load-bearing member 3.

[0163] The present invention proposes a method for lowering the same-layer frame inter-climbing self-lifting support system, which drives the construction steel platform 1 to descend through the support frame 5. On the one hand, it expands the types of construction operations (it can provide a working surface for secondary structure and exterior wall painting operations, etc.), and on the other hand, it facilitates the disassembly of the construction steel platform 1 from below (the construction steel platform 1 can follow the support frame 5 to descend to the bottom of the building instead of being disassembled at a high level as in the prior art).

[0164] The above are only preferred embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structural transformations made using the contents of the present invention's description and drawings, or directly or indirectly applied to other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A climbing device for a same-layer frame mutual climbing self-lifting support system, characterized in that: It includes load-bearing parts, climbing frames, telescopic mechanisms and supporting frames, among which: The climbing frame and the supporting frame can be hung on the outside of the same load-bearing member, and a guiding structure is arranged between the climbing frame and the supporting frame to realize mutually guided climbing. A buffer balancing mechanism is arranged above the supporting frame, and the telescopic mechanism includes a cylinder body and a telescopic rod. The bottom of the telescopic rod is movably connected to the bottom of the climbing frame through a rotating structure, and the cylinder body is penetrated through the inner cavity of the supporting frame. An upper flange is fixed above the cylinder body to abut against the top end surface of the buffer balancing mechanism, and a lower flange is fixed below the cylinder body to abut against the bottom end surface of the supporting frame. The cylinder body and the supporting frame can move horizontally.

2. The climbing device of the same-layer frame mutual climbing self-elevating support system according to claim 1 is characterized in that: The buffer balance mechanism is a spring box, which includes a hollow seat body, a cover body arranged above the seat body, and a spring located in the seat body. The relative distance between the seat body and the cover body is adjusted by the spring.

3. The climbing device of the same-layer frame mutual climbing self-elevating support system according to claim 2 is characterized in that: The spring box also includes a guide shaft fixed on the seat body and a limit bolt passing through the sides of the seat body and the cover body. The spring is sleeved outside the guide shaft. A limit hole for the limit bolt to pass through is opened on the side of the cover body. When the cover body moves relative to the seat body, the limit bolt limits the maximum displacement of the cover body. The seat body and the cover body are hollow inside to allow the cylinder body to pass through.

4. The climbing device of the same-layer frame mutual climbing self-elevating support system according to claim 1 is characterized in that: The supporting frame can be accommodated in the concave groove formed by the climbing frame so that the climbing frame and the telescopic mechanism can be simultaneously hung on the outside of the same load-bearing member, and the load-bearing member is provided with an outer claw boot assembly and a first claw assembly, the climbing frame is provided with a second claw assembly cooperating with the support arm of the outer claw boot assembly, and the supporting frame is provided with an inner claw boot cooperating with the first claw assembly.

5. The climbing device of the same-layer frame mutual climbing self-elevating support system according to claim 4 is characterized in that: The height of the load-bearing member corresponds to the height of one layer of the concrete wall. The second claw assembly and the first claw assembly are both provided with locking mechanisms to lock their rotation. An elastic material layer is installed on the mating contact surface of the claw via a fastener.

6. The climbing device of the same-layer frame mutual climbing self-elevating support system according to claim 5, characterized in that: The locking mechanism includes a limit baffle, a pin is passed through the claw to realize its rotation, a limit slot is provided on the head of the pin, and the limit baffle is inserted into the limit slot to limit the rotation of the pin; the claw width of the first claw assembly is smaller than the slot width of the inner claw shoe, and the claw width of the second claw assembly is smaller than the width of the support arm on the outer claw shoe assembly.

7. The climbing device of the same-layer frame mutual climbing self-elevating support system according to any one of claims 1 to 6, characterized in that: The climbing frame includes two side plates and a base connecting the two side plates. The support frame is located in a concave space formed by the two side plates and the base and is hung on the outside of the load-bearing member. A mounting groove is provided on the base. The rotating structure is located in the mounting groove and the mounting position is adjustable. The guide structure includes a guide assembly located on the side of the support frame and a guide groove arranged on the side where the two side plates of the climbing frame are close to each other. The guide assembly is accommodated in the guide groove to guide the lifting and lowering of the support frame.

8. A self-lifting support system with mutual climbing frames on the same floor, characterized in that: It comprises a climbing device as described in any one of claims 1 to 7, and also comprises a supporting column, the bottom end of the supporting column is rigidly connected to the upper flange of the telescopic mechanism cylinder body, and the top end of the supporting column is rigidly connected to the construction steel platform.

9. A jacking method based on the same-layer frame mutual climbing self-lifting support system according to claim 8, characterized in that: The following steps are involved: The cylinder body of the control telescopic mechanism is lifted upward, and the lower flange at the bottom of the cylinder body abuts against the lower end surface of the support frame to drive the support frame to be lifted as a whole; When the support frame rises to the right position, the cylinder body retracts downward and the first claw assembly cooperates with the inner claw shoe to hang the support frame on the outside of the load-bearing member; The telescopic rod of the telescopic mechanism is controlled to retract relative to the cylinder body, thereby driving the climbing frame to rise as a whole; When the climbing frame is climbed to the right position, the telescopic rod is extended downward to make the turning claw of the second turning claw assembly fall on the outer claw shoe assembly of the load-bearing member, and the climbing frame is hung on the outer side of the load-bearing member.

10. A method for descending the same-layer frame mutual climbing self-elevating support system according to claim 8, characterized in that: The following steps are involved: The telescopic rod of the telescopic mechanism is controlled to extend upward to drive the climbing frame to rise, so that the claw of the second claw assembly and the outer claw shoe assembly are separated, the claw of the second claw assembly is rotated to be stored inside the climbing frame and then locked, and the telescopic rod of the telescopic mechanism is controlled to extend downward to drive the climbing frame to descend; When the climbing frame is lowered into place, the claw of the second claw assembly is unlocked to be naturally extended to a horizontal state, and the telescopic rod is controlled to move so that the claw of the second claw assembly falls above the outer claw shoe assembly; The control cylinder body extends upward to separate the flap of the first flap assembly from the inner claw shoe, rotates the flap of the first flap assembly to be stored inside the load-bearing member and then locks it, and the control cylinder body moves downward to drive the support frame to descend; When the support frame is lowered into place, the claw of the first claw assembly is unlocked to naturally extend to a horizontal state, and the cylinder of the telescopic mechanism is controlled to move so that the claw of the first claw assembly cooperates with the slot of the inner claw shoe to hang the climbing frame on the outside of the load-bearing member.

Citation Information

Patent Citations

  • Central jacking system of internal climbing tower crane

    CN107055367A

  • Door-type self-adaptive telescopic hydraulic climbing platform system and climbing method thereof

    CN108222482A

  • Stroke-adjustable intermittent top formwork climbing system and climbing frame and climbing method thereof

    CN113147939A

  • Same-layer frame mutual-climbing type self-lifting supporting system and climbing device and lifting method thereof

    CN116290710A

  • Lift drive for a rail-guided climbing system

    US20210293037A1

Cited By

  • Wind-resistant system for integral steel platform climbing formwork

    CN120946082A