Analysis area identification device and analysis area identification method
The analysis area specification device addresses the inefficiency of conventional human flow simulations by focusing analysis on specific traffic areas within large buildings, reducing calculation time and improving simulation efficiency.
Patent Information
- Application Number
- PCT/JP2023/012816
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-29
- Publication Date
- 2024-10-03
AI Technical Summary
Conventional human flow simulations in large buildings require extensive calculation time due to the need to analyze all areas on a floor, making it inefficient to determine passage times and evaluate conditions such as elevator installations or automatic door widths, especially when multiple simulations are needed to assess different conditions.
An analysis area specification device that identifies a traffic area where objects pass and generates a target layout excluding non-traffic areas, reducing the analysis area to only relevant zones, thereby reducing calculation time by focusing analysis on specific areas where object movement occurs.
This approach significantly reduces the time required for human flow simulations and analysis, allowing for faster evaluation of various conditions and passage times without the need for extensive calculations across the entire floor area.
Smart Images

Figure JP2023012816_03102024_PF_FP_ABST
Abstract
Description
Analysis area specifying device and analysis area specifying method
[0001] The present invention relates to an analytical region specifying device and an analytical region specifying method.
[0002] In recent years, building designs using architectural model data, such as Building Information Modeling (BIM) data, have been promoted with the aim of reducing the man-hours required for building design. Buildings consist of multiple floors, and the floor configuration varies depending on the tenants occupying the building. For example, even if the pillars supporting the floors are the same on each floor, the office layout and the location of walls and doors vary from floor to floor. Furthermore, when a departure point and a destination are set for each floor, people using the building must be able to travel from the departure point to the destination without delay. Therefore, simulation processing using architectural model data has been carried out to examine whether a person departing from the departure point can arrive at the destination within the time determined during the building's design phase.
[0003] A technique for planning a path for a robot as a moving body when a starting position and a goal position are given is described in Patent Document 1. Patent Document 1 describes a "global motion path planning method for a robot that performs a two-stage path search so that the robot does not interfere with obstacles."
[0004] Japanese Patent Application Laid-Open No. 2002-73130
[0005] In large buildings, the floor area per floor increases, and there can be dozens of floors. Performing people flow simulations for each floor poses the problem of requiring enormous amounts of calculation time. The reason for this is that conventional people flow simulations treat all areas of a floor as areas where people may stop by, and therefore process all areas of the floor.
[0006] For example, in conventional people flow simulations, to verify the conditions for installing an elevator on a floor, an evaluation method is used, such as changing the timing of people entering the building and running the simulation dozens of times to calculate the average waiting time. Furthermore, if one wants to know the impact of changing the width of automatic doors installed on a floor or the number of security gates, dozens of simulation processes are required for each condition with different values. As a result, the total number of simulations can reach several hundred. Furthermore, the issue of the time required for people flow simulation could not be resolved with the technology disclosed in Patent Document 1, even if robots were replaced with people.
[0007] The present invention has been made in view of the above circumstances, and has as its object to reduce the time required to analyze the passage of an object.
[0008] The analysis area identification device of the present invention identifies an analysis area for analyzing the movement of an object, and includes a passage area acquisition unit that acquires the passage area through which the object passes from a temporary layout, and a target layout generation unit that sets the analysis area as an area from the temporary layout in which at least a portion of the parts other than the passage area are excluded from the analysis target.
[0009] According to the present invention, the analysis area is an area in which at least a portion of the area other than the passage area is excluded from the analysis target, so that the passage of objects can be analyzed using the analysis area, thereby reducing the time required to analyze the flow of objects.
[0010] FIG. 1 is a block diagram showing an example of the functional configuration of an analytical area identification device according to an embodiment of the present invention. FIG. 2 is a block diagram showing an example of the hardware configuration of a computer according to an embodiment of the present invention. FIG. 3 is a diagram showing an example of a temporary layout according to an embodiment of the present invention. FIG. 4 is a diagram showing an example of a pedestrian traffic area according to an embodiment of the present invention. FIG. 5 is a diagram showing an example of a cutout area according to an embodiment of the present invention. FIG. 6 is a diagram showing an example of a target layout according to an embodiment of the present invention. A flowchart showing an example of an analytical area identification process according to an embodiment of the present invention. A flowchart showing an example of a cutout area generation process according to an embodiment of the present invention. A flowchart showing an example of a target layout generation process according to an embodiment of the present invention. A diagram showing an example of a cutout area enlargement confirmation screen according to an embodiment of the present invention. A diagram showing an example of an analysis result screen for heat map analysis according to an embodiment of the present invention.
[0011] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. In this specification and drawings, components having substantially the same functions or configurations are designated by the same reference numerals, and redundant description will be omitted.
[0012] 1 is a block diagram showing an example of the functional configuration of an analytical area specifying device 100 according to an embodiment of the present invention. The analytical area specifying device 100 is an example of an analytical area specifying device having a function of specifying an analytical area for analyzing the movement of an object (for example, a person), and is operated by an operator who designs the layout of a floor.
[0013] The analytical region identifying device 100 includes a storage unit 110 , a calculation unit 120 , and an input / output unit 130 , which are interconnected via a bus 140 .
[0014] The storage unit 110 has a set of temporary layout data 111, pedestrian traffic area data 112, cutout area data 113, and target layout data 114 for each of floors 1 to N of a building.
[0015] The temporary layout data 111 is data indicating an analysis area where people flow analysis is performed, and indicates a passable area. The temporary layout data 111 is generated, for example, from BIM data, and is data that is temporarily used to create target layout data 114, which will be described later. Furthermore, for example, in a cellular automaton model people flow simulator, the temporary layout data 111 is configured as layout data on cells.
[0016] In a cellular automaton model people flow simulator, the distance to the exit (or some cost value proportional to the distance) is calculated for each cell that divides a space, and the distance is stored in the cell. The human model then references the cells surrounding itself and updates its position in a direction that shortens the distance to the exit, simulating the movement of people toward the exit. Because a cellular automaton model people flow simulator must calculate the distance to the exit for each cell, the calculation time increases in proportion to the size of the layout. Similarly, in a model in which the direction of travel to a destination is directly calculated and stored in a cell, rather than the distance, the calculation time also increases in proportion to the size of the layout. Therefore, the analytical area identification device 100 according to this embodiment reduces the analysis processing time by generating each piece of data by processing the temporary layout data 111 as follows, and then performing analysis using the target layout data 114 (described below).
[0017] The temporary layout data 111 may be data indicating a heat map calculation range. The data indicating the heat map calculation range is data used to calculate a heat map of people flow, which is obtained from the results of measuring actual people positions.
[0018] The human traffic area data 112 is data indicating human traffic areas on the temporary layout data 111. In the case of a cellular automaton model people flow simulator, the human traffic area data 112 corresponds to a list of cells through which people passed during a certain time period as a result of a people flow simulation.
[0019] The cutout area data 113 is data representing a cutout area created by enlarging by a predetermined amount the passage area represented by the pedestrian passage area data 112. The cutout area data 113 may be configured in the form of a cell list, for example.
[0020] The target layout data 114 is data that specifies that the range outside the cutout region is to be excluded from the analysis target by the analysis unit 125. Therefore, the target layout data 114 is a portion of the temporary layout data 111. For example, when a people flow simulation is performed, the target layout data 114 is data that narrows the route search range from the departure point to the destination. Note that the target layout data 114 may be data in which each cell has been deleted. Alternatively, the target layout data 114 may be created by applying search restriction settings to cells for each destination.
[0021] The calculation unit 120 includes a temporary layout generation unit 121 , a pedestrian traffic area acquisition unit 122 , a cutout area generation unit 123 , a target layout generation unit 124 , and an analysis unit 125 .
[0022] The temporary layout generator 121 generates a temporary layout using, for example, floor objects and space objects in the BIM data. This temporary layout is stored in the storage unit 110 as temporary layout data 111.
[0023] The pedestrian traffic area acquisition unit 122 acquires pedestrian traffic area data 112 representing pedestrian traffic areas from the temporary layout data 111 by having the later-described analysis unit 125 perform a pedestrian flow simulation or by acquiring information measured by sensors attached to the building. The number of people moving during the pedestrian traffic simulation may be set by estimating the number of people in the building from the area of the spatial data of the BIM data, for example, using the method disclosed in Japanese Patent Application Laid-Open No. 2020-194318.
[0024] The clipping area generation unit 123 sets the clipping area to an area that is the same as the pedestrian passage area or an area that is an enlargement of the pedestrian passage area. For example, the clipping area generation unit 123 sets the clipping area to an area that is enlarged by a certain number of cells in eight directions around a cell in the pedestrian passage area. The clipping area generation unit 123 then generates clipping area data 113 based on the clipping area. If the pedestrian passage area is in the form of a list of cells, the clipping area generation unit 123 stores the cells surrounding each cell in the passage area in a list so that there are no overlaps, thereby generating a list of cells that indicate the clipping area as the clipping area. This clipping area is saved in the storage unit 110 as clipping area data 113.
[0025] The target layout generation unit 124 generates target layout data 114 set to exclude data outside the cutout area from analysis of the temporary layout data 111. The target layout generation unit 124 then checks whether each cell in the temporary layout data 111 is included in the cell list of the cutout area. If the target layout generation unit 124 determines that each cell in the temporary layout data 111 is not included in the cell list of the cutout area, it either deletes the cell from the list in the temporary layout data 111 or generates data as the target layout in which route search to the destination has been disabled. This target layout is saved in the storage unit 110 as target layout data 114.
[0026] The analysis unit 125 has a function of performing various analyses using the target layout data 114 generated based on the temporary layout data 111. When the temporary layout data 111 is first generated, the analysis unit 125 also performs a process of analyzing pedestrian passage using the temporary layout of the temporary layout data 111 and passing the analysis results to the pedestrian passage area acquisition unit 122.
[0027] For example, a people flow simulation process is assumed as an analysis process performed by the analysis unit 125. The analysis unit 125 can also perform a heat map analysis to analyze areas where many people pass through, based on information acquired from various sensors installed on the floors of an existing building.
[0028] Furthermore, the analysis unit 125 can also output a warning when it determines that a person to be analyzed has entered the vicinity of the boundary 41 (see FIG. 6 described later) of the cutout area 30 included in the target layout 40. As this warning, for example, a cutout area enlargement confirmation screen 50 shown in FIG. 10 described later is displayed.
[0029] The input / output unit 130 includes an input unit 131 and an output unit 132. The input unit 131 receives data or instructions input by the operator from an input device 206 (see FIG. 2 described later), and passes the received data or instructions to the calculation unit 120.
[0030] The output unit 132 outputs a screen or the like to the display device 205 (see FIG. 2 described later). For example, the output unit 132 outputs a temporary layout, a pedestrian traffic area, a cutout area, and a target layout, or outputs the analysis results of the analysis unit 125, an enlarged confirmation screen 50 for the cutout area (see FIG. 10 described later), and an analysis result screen 60 of the heat map analysis (see FIG. 11 described later). Note that the output unit 132 may output the above-mentioned data, analysis results, and screens to a mobile terminal, a cloud server, or a printing device connected to the analysis area identification device 100.
[0031] <Example of Hardware Configuration of Computer> Next, a description will be given of the hardware configuration of the computer 200 constituting the analytical area identifying device 100. Fig. 2 is a block diagram showing an example of the hardware configuration of the computer 200. The computer 200 is an example of hardware used as a computer that can operate as the analytical area identifying device 100 according to this embodiment. The analytical area identifying device 100 according to this embodiment realizes an analytical area identifying method performed by the respective functional blocks shown in Fig. 1 in cooperation with each other, by the computer 200 (computer) executing a program.
[0032] The computer 200 includes a CPU (Central Processing Unit) 201, a ROM (Read Only Memory) 202, and a RAM (Random Access Memory) 203, each connected to a bus 204. The computer 200 further includes a display device 205, an input device 206, a non-volatile storage 207, and a network interface 208.
[0033] The CPU 201 reads out and executes program code of software that realizes each functional unit of the calculation unit 120 according to this embodiment from the ROM 202. Variables, parameters, etc. are temporarily written into the RAM 203 by the CPU 201 and are read out as appropriate.
[0034] The display device 205 displays to the operator the results of the processing performed by the computer 200. The input device 206 allows the operator to input predetermined operations and give instructions.
[0035] The nonvolatile storage 207 may be, for example, a hard disk drive (HDD), a solid state drive (SSD), an optical disk, or a nonvolatile memory. The ROM 202 and the nonvolatile storage 207 are used as examples of a computer-readable, non-transitory storage medium that stores a program executed by the computer 200. The storage unit 110 shown in FIG. 1 is configured in the nonvolatile storage 207.
[0036] The network interface 208 may be, for example, a network interface card (NIC), and may transmit and receive various data to and from other analytical region identifying devices 100 .
[0037] <Specific Examples of Layouts and Areas> Next, specific examples of temporary layouts, pedestrian traffic areas, cutout areas, and target layouts will be described with reference to FIGS.
[0038] FIG. 3 is a diagram showing an example of a temporary layout 10. As shown in FIG.
[0039] The temporary layout generation unit 121 generates a temporary layout 10 based on the arrangement of floor objects, wall objects, etc. of the input BIM data.
[0040] As shown in Figure 1, a temporary layout 10 is generated for each floor of a building. The temporary layout 10 is composed of a plurality of cells that form the shape of the floor. Based on the BIM data, passable cells 11 are generated, with the entire floor surface being the subject of calculation. Information about the temporary layout 10 is then stored in list form in the storage unit 110 as temporary layout data 111 shown in Figure 1.
[0041] In the temporary layout 10, cells through which people can pass are called passable cells 11. The passable cells 11 are, for example, the floor surface of a floor. An entrance cell 12 is provided in the lower left of the temporary layout 10 as an example of a departure point. Furthermore, an exit cell 13 is provided in the upper right of the temporary layout 10 as an example of a destination.
[0042] The temporary layout 10 also shows impassable areas 14 that are impassable to people. The impassable areas 14 represent areas where people cannot enter because, for example, walls, shelves, etc. are installed. Therefore, all passable cells 11 excluding the impassable areas 14 are passable areas that people can pass through and are the subject of calculation.
[0043] The temporary layout 10 excludes impassable areas (not shown), such as the exterior walls of buildings, located on the periphery of the passable cells 11. However, the temporary layout data 111 may include impassable areas (not shown), such as the exterior walls of buildings.
[0044] FIG. 4 is a diagram showing an example of a pedestrian traffic area 20 .
[0045] The human traffic area acquisition unit 122 acquires a human traffic area 20 (an example of a traffic area) through which a person (an example of an object) passes from the temporary layout 10 of the temporary layout data 111. For example, the human traffic area acquisition unit 122 acquires the analysis results of a people flow simulation performed by the analysis unit 125, or acquires information measured by a human presence sensor attached to the building, thereby acquiring the human traffic area 20 through which a person passes from the temporary layout 10. The human traffic area 20 is an area through which a person has passed at least once and is acquired for each floor, and is represented by hatched cells in FIG. 4. Information on the human traffic area 20 is then stored in the human traffic area data 112 shown in FIG. 1.
[0046] Typically, people enter a floor through an entrance cell 12, walk toward an exit cell 13, and exit the floor through the exit cell 13. For this reason, people do not enter all of the passable cells 11. Therefore, the pedestrian traffic area acquisition unit 122 uses the results of the pedestrian flow analyzed by the analysis unit 125 through a simple pedestrian flow simulation to acquire, from the temporary layout 10, cells among the passable cells 11 through which people have passed at a certain time, as pedestrian traffic areas 20.
[0047] Furthermore, in the human traffic area 20, a human model 21 is placed, which represents the direction of a person passing through the human traffic area 20 at a certain time. The human model 21 is an image icon that combines a round icon representing a head and a triangular icon representing a nose, and the orientation of the triangular icon indicates the direction the person is facing. The human model 21 makes it easier to understand in which direction a person in the human traffic area 20 is facing as they pass through. The human model 21 can also be acquired by the human traffic area acquisition unit 122 from the results of the people flow analyzed by the analysis unit 125 through a simple people flow simulation.
[0048] FIG. 5 is a diagram showing an example of the cutout area 30. As shown in FIG.
[0049] The cutout area generation unit 123 generates a cutout area 30 that is expanded by a predetermined amount from the pedestrian passage area 20 shown in Fig. 5 (described later). However, if the predetermined amount is set to zero, the cutout area generation unit 123 may set the same area as the pedestrian passage area 20 as the cutout area 30. Information about the cutout area 30 is stored in the cutout area data 113 shown in Fig. 1.
[0050] Figure 5 shows a human passage area 31, which is a thick line tracing the outside of the human passage area 20 shown in Figure 4. The area inside the human passage area 31 represents the area where people pass. Figure 5 also shows a cutout area 30, which is an area obtained by expanding the outside of the human passage area 31 by one cell. The cutout area 30 also extends into a part of the impassable area 14 shown in the temporary layout 10 in Figure 3. For example, cell 32 in Figure 5 is part of the impassable area 14 in the temporary layout 10. Therefore, when the cutout area generation unit 123 generates the cutout area 30, if there is an impassable area 14 made up of an impassable object such as a wall or space within a certain distance from the human passage area 20, the cutout area 30 is cut out to include the impassable area 14.
[0051] FIG. 6 is a diagram showing an example of a target layout 40 .
[0052] The target layout generation unit 124 determines, as the analysis area, an area obtained by excluding from the analysis target at least a portion of the temporary layout 10 other than the pedestrian passage area 31. At this time, the target layout generation unit 124 generates, as the analysis area, a target layout 40 obtained by excluding from the analysis target the portion of the temporary layout 10 other than the cutout area 30. Information on the target layout 40 is stored in the target layout data 114 shown in FIG. 1.
[0053] In addition, the temporary layout 10 may have an impassable area 14, which people cannot pass through, within a certain range from the pedestrian passage area 20. Therefore, the target layout generation unit 124 generates the target layout 40 by excluding the impassable area 14 from the temporary layout 10.
[0054] The shape of the target layout 40 shown in Fig. 6 is approximately the same as the shape of the cutout region 30. In the target layout 40, an entrance cell 42 and an exit cell 43 are set at positions corresponding to the entrance cell 12 and the exit cell 13 shown in Fig. 3, respectively. In the target layout 40, the area near the area indicated by hatching with respect to one cell inside the cutout region 30 in Fig. 6 is defined as the boundary vicinity 41.
[0055] In this way, the calculation unit 120 calculates people flow based on the temporary layout data 111, and generates the target layout 40 by excluding from the calculation area any area that is a certain distance or more away from the point where people have passed. Note that the boundary vicinity 41 may be multiple cells inside the cutout area 30 depending on the size of the cells. Furthermore, the boundary vicinity 41 does not have to be composed of connected cells.
[0056] The analysis unit 125 performs a process of simulating the passage of people using the target layout 40. It is assumed that people move only within the target layout 40. Therefore, the analysis unit 125 does not need to perform calculations to analyze areas other than the target layout 40.
[0057] The destination layout generator 124 may generate the destination layout 40 by applying a search restriction setting to each cell for each destination. In a people flow simulation, the distance to each exit must be calculated for each cell for each type of destination (each exit). Search restriction refers to omitting the process of calculating distance and storing it in the cell. Instead of erasing the passable area, the destination layout generator 124 sets a cell to "no need to store the distance to the exit." Then, when the analyzer 125 actually performs a people flow simulation, the calculation load of the people flow simulation can be reduced by omitting the distance calculation process for the set cell. In this embodiment, the destination layout 40 is described as being separate data from the temporary layout 10. However, if the destination layout 40 is generated by adding settings to the temporary layout 10 as described above, the destination layout 40 may be substantially the same data as the temporary layout 10.
[0058] <Examples of Processing by the Calculation Unit and Examples of Screen Display> Next, examples of processing by the calculation unit 120 and examples of screen display will be described with reference to FIGS. 7 to 11. FIG.
[0059] 7 is a flowchart showing an example of the analytical region specifying process. This process is an example of the analytical region specifying method performed by the analytical region specifying device 100.
[0060] First, the temporary layout generator 121 generates a temporary layout 10 based on BIM data input from an external device (S1). The temporary layout 10 is stored in the storage unit 110 as temporary layout data 111.
[0061] Next, the analysis unit 125 performs a simulation based on the temporary layout 10 (S2). The results of the simulation are passed to the pedestrian traffic area acquisition unit 122.
[0062] Next, the human traffic area acquisition unit 122 acquires a human traffic area 20 from the temporary layout 10 based on the results of the simulation (S3). The human traffic area 20 is stored in the storage unit 110 as human traffic area data 112.
[0063] Next, the clipping area generation unit 123 performs a clipping area generation process shown in Fig. 8 (described later) to generate a clipping area 30 (S4). The clipping area 30 is stored in the storage unit 110 as clipping area data 113.
[0064] 9, which will be described later, to generate a target layout 40 (S5). The target layout 40 is stored in the storage unit 110 as target layout data 114.
[0065] Next, the analysis unit 125 analyzes the flow of people based on the target layout 40 (S6). Then, the analysis unit 125 determines whether or not people are entering the vicinity 41 of the boundary of the cutout region 30 (S7).
[0066] If a person has entered the vicinity 41 of the boundary of the cutout area 30 (YES in S7), the analysis unit 125 displays a cutout area enlargement confirmation screen 50 shown in Fig. 10 (described later) via the output unit 132 to warn the operator (S8). Then, the analysis unit 125 determines whether an instruction to enlarge the cutout area has been given via the input unit 131 (S9).
[0067] If the analysis unit 125 outputs a warning and an instruction to enlarge the cutout area is issued (YES in S9), the process returns to step S4. The cutout area generation unit 123 then enlarges the cutout area 30. In step S5, the target layout generation unit 124 regenerates a target layout 40 (an example of a second target layout) based on the enlarged cutout area 30. In step S6, the analysis unit 125 analyzes pedestrian traffic using the regenerated target layout 40.
[0068] On the other hand, if in step S7 no person has entered the vicinity 41 of the boundary of the cutout area 30 (NO in S7), or if in step S9 there is no instruction to enlarge the cutout area (NO in S9), the analysis unit 125 outputs the analysis result through the output unit 132 (S10), and ends this process.
[0069] Note that steps S8 and S9 may be omitted from this process. In this case, if it is determined in step S7 that a person has entered the vicinity 41 of the boundary of the cutout area 30, the process automatically returns to step S4, and the processes from step S4 onward are performed again. The process of enlarging the cutout area 30 is performed automatically without the operator having to decide whether to enlarge the cutout area 30, which saves the operator the trouble of checking.
[0070] <Cutout Area Generation Processing> Fig. 8 is a flowchart showing an example of the cutout area generation processing. This processing is performed by the cutout area generation unit 123. Here, each cell of the pedestrian passage area 20 shown in Fig. 4 is referred to as a cell c.
[0071] In the cutout area generation process, the cutout area generation unit 123 takes a cell from the pedestrian traffic area and stores the coordinate values of that cell and the eight surrounding cells in a list of cells in the cutout area. Once this storage is complete, the next cell is taken from the pedestrian traffic area and the same process is performed. Also, when storing in the list, if there is a cell with exactly the same coordinate values in an existing list, the storage process is omitted. The details of the cutout area generation process are explained below.
[0072] First, the cutout area generation unit 123 starts a process (S11) of repeating this process for each cell c in the pedestrian traffic area 20 acquired by the pedestrian traffic area acquisition unit 122. This process is performed for each cell c in the pedestrian traffic area 20, for all cells c.
[0073] Next, the clipping region generation unit 123 sets the cell c of interest and cells c' in eight directions around cell c as set C (S12). Next, the clipping region generation unit 123 sets the cells in eight directions around cell c included in set C as cells c', and repeats the process for each cell c' (S13).
[0074] Here, the clipping area generation unit 123 determines whether or not a cell with the same coordinates as the cell c' focused on in the processing of step S13 is included in the cell list of the clipping area 30 (S14). If a cell with the same coordinates as the cell c' is not included in the cell list of the clipping area 30 (NO in S14), the clipping area generation unit 123 returns to step S13, selects another cell c', and repeats the determination of step S14.
[0075] On the other hand, if a cell with the same coordinates as cell c' is included in the cell list of the clipping area 30 (YES in S14), the clipping area generation unit 123 stores cell c' in the cell list of the clipping area (S15). The process of storing cell c' in the cell list of the clipping area is, for example, a process of storing the coordinate values of cells within the range of the clipping area as an array in memory. For example, the coordinate values of cells represented by (-1,0), (0,0), (1,1), (2,1), ... are stored in memory. However, cell c' may be stored in the cell list of the clipping area using a process other than the process of storing cell coordinate values as an array in memory.
[0076] Then, the cutout area generation unit 123 returns to step S13, selects another cell c', and repeats the determination in step S14. After the processes in step S14 and subsequent steps have been performed on all cells c' in set C, the repeated process in step S13 ends. Furthermore, after the processes in step S12 and subsequent steps have been performed on all cells c in the pedestrian traffic area 20, the repeated process in step S11 ends.
[0077] By the cutout area generation process shown in FIG. 8, all cells c included in the pedestrian traffic area are stored in the cutout area cell list.
[0078] 9 is a flowchart showing an example of the target layout generation process. This process is performed by the target layout generation unit 124.
[0079] First, the target layout generating unit 124 copies all information of the temporary layout 10 shown in FIG. 3 (S21).
[0080] Next, the target layout generating unit 124 repeats the following process for each cell c in the copied temporary layout 10 (S22).
[0081] Here, the target layout generation unit 124 determines whether or not cell c of the temporary layout 10 is included in the cutout area cell list (S23). If cell c of the temporary layout 10 is not included in the cutout area cell list (NO in S23), the target layout generation unit 124 deletes cell c from the temporary layout 10 (S24). Then, the target layout generation unit 124 returns to step S22, selects another cell c, and repeats the determination in step S23.
[0082] On the other hand, if cell c of the temporary layout 10 is included in the cutout area cell list (YES in S23), the target layout generation unit 124 returns to step S22, selects another cell c, and repeats the determination in step S23. After the processes from step S23 onwards have been performed on all cells c of the copied temporary layout 10, the repeated process of step S22 ends.
[0083] By the target layout generation process shown in FIG. 9, only the cells of the target layout 40 shown in FIG. 6 are selected.
[0084] <Example of Screen Display During Analysis Processing> After the target layout data 114 is generated, the analysis unit 125 reads the target layout data 114 from the storage unit 110 and performs analysis. Here, examples of screens that are displayed when the analysis unit 125 performs a people flow simulation using the target layout data 114 and when the analysis unit 125 performs a heat map analysis using information obtained from sensors attached to a building will be described.
[0085] (People Flow Simulation) Even after the target layout data 114 has been generated, the analysis unit 125 performs a people flow simulation by changing the layout of equipment on the floor or the time when people flow in. For example, if the operator changes the timing of people flow in, the width of automatic doors, the number of gates, etc., the movement of people will change, and it is possible that people will intrude into the vicinity 41 of the boundary of the target layout 40. For this reason, a screen is displayed to the operator to confirm that the cutout area should be enlarged.
[0086] 10 is a diagram showing a display example of a cutout area enlargement confirmation screen 50. The cutout area enlargement confirmation screen 50 is an example of a screen output by the output unit 132 shown in FIG. 1 and displayed on the display device 205 shown in FIG. 2.
[0087] If a person enters the boundary vicinity 41 while the analysis unit 125 is performing the analysis process, the cutout region generation process shown in Figure 8 may have affected the calculation results of the analysis process. For this reason, the analysis unit 125 outputs a warning via the output unit 132. The analysis unit 125 then displays a cutout region enlargement confirmation screen 50 to confirm whether or not to enlarge the cutout region 30.
[0088] The target layout 40 shown in FIG. 6 is displayed on the cutout area enlargement confirmation screen 50. A message is then displayed to the operator informing them that a person has entered the vicinity 41 of the boundary of the cutout area 30 and prompting them to decide whether to enlarge the cutout area 30. When the operator presses the OK button at the bottom of the cutout area enlargement confirmation screen 50, the cutout area generation unit 123 generates cutout area data 113 in which the cutout area 30 is enlarged. Then, the target layout generation unit 124 regenerates target layout data 114 in which a portion of the target layout 40 is enlarged in accordance with the enlargement of the cutout area 30. When the operator presses the CANCEL button at the bottom of the cutout area enlargement confirmation screen 50, the cutout area 30 is not enlarged.
[0089] As shown in Fig. 1, temporary layout data 111, foot traffic area data 112, cutout area data 113, and target layout data 114 are stored in the storage unit 110 as a set for each floor. Therefore, when the cutout area generation unit 123 enlarges the cutout area 30, the cutout area generation unit 123 overwrites and updates the cutout area data 113. Furthermore, the target layout generation unit 124 reads the temporary layout data 111 stored in the storage unit 110 and regenerates the target layout 40 by the target layout generation process shown in Fig. 9. Then, the target layout generation unit 124 overwrites and updates the original target layout data 114 stored in the storage unit 110 with the target layout data 114 of the regenerated target layout 40.
[0090] The enlargement process of the cutout region 30 and the analysis process may be repeated until the warning message from the analysis unit 125 stops.
[0091] (Heat Map Analysis) Using the target layout 40, the analysis unit 125 can perform heat map analysis based on sensor information acquired from sensors installed in the building that is the target of the target layout 40. For example, when changing the layout of an existing building, the analysis unit 125 analyzes when and how people move between floors based on sensor information acquired by installing motion sensors or the like in the existing building. Then, areas that many people pass through are displayed in red, and areas that few people pass through are displayed in blue, for example.
[0092] 11 is a diagram showing a display example of an analysis result screen 60 of the heat map analysis. The analysis result screen 60 of the heat map analysis is an example of a screen output by the output unit 132 shown in FIG. 1 and displayed on a display device (not shown).
[0093] The analysis result screen 60 of the heat map analysis shows the movement of people in the same manner as the pedestrian traffic area 20 shown in FIG. 4. In the heat map analysis, the number of people who have passed through each cell is visually represented by the type of hatching of each cell. As described above, the number of people who have passed through each cell may be visually represented by changing the color of each cell. By visually representing the number of people who have passed through each cell at a certain time, the operator can grasp the flow of people at a glance.
[0094] In the analysis area identification device 100 according to the embodiment described above, the analysis unit 125 identifies an analysis area (target layout 40) for which analysis processing is performed, focusing on areas where people pass through. To this end, the calculation unit 120 performs processing to acquire people passage area data 112 using the temporary layout data 111 only once, and then generates cutout area data 113 and target layout data 114. The analysis unit 125 then performs people flow analysis processing using the target layout data 114. To this end, a target layout 40 is generated by omitting extra cells where people do not pass through from the temporary layout 10 generated based on architectural drawing data or BIM data. Then, people flow analysis is performed using the target layout data 114 of this target layout 40.
[0095] Cells where no pedestrians pass have been deleted in advance from the target layout data 114. This eliminates the need for the analysis unit 125 to analyze cells where no pedestrians pass, as in the conventional method, and thus allows for a significant reduction in analysis time.
[0096] Furthermore, the analysis time for each analysis process performed by the analysis unit 125 is shorter than the analysis time for each analysis performed using conventional temporary layout data. This reduces the analysis time required for hundreds of simulation processes performed by the analysis unit 125 while changing various conditions, and enables results to be obtained faster than before.
[0097] Furthermore, the analysis of people flow by the analysis unit 125 may include, for example, people flow simulation or heat map analysis. Since the analysis time by the analysis unit 125 is reduced and the amount of data of the analysis results is also reduced, the analysis results can be more easily shared between the analysis unit 125 and other analysis area identification devices 100.
[0098] [Modifications] Note that, in the above-described embodiment, attention is paid to the flow of people, but if the floor is used as a warehouse or the like, the target layout may be generated by paying attention to the flow of various items (an example of an object) such as merchandise and equipment. Furthermore, if a robot or the like is used on a floor where people are present, the target layout may be generated by paying attention to the movement of the robot (an example of an object).
[0099] Furthermore, if the building to be analyzed by the analytical area identification device 100 is large, the analytical area identification process shown in FIG. 7 may be automatically performed on many floors. After the target layout 40 is generated for all floors, people flow is analyzed and a cutout area enlargement confirmation screen 50 is displayed. The operator can instruct the expansion of the cutout area for floors for which it is determined that the cutout area needs to be enlarged. Therefore, the operator can efficiently instruct the expansion of the cutout area only for the necessary floors, without having to input an instruction to execute the analytical area identification process for each floor.
[0100] Furthermore, the present invention is not limited to the above-described embodiments, and various other applications and modifications are possible without departing from the spirit of the present invention as set forth in the claims. For example, the above-described embodiments provide a detailed and specific description of the configuration of the analytical domain identification device in order to clearly explain the present invention, and are not necessarily limited to devices that include all of the described configurations. Furthermore, it is possible to add, delete, or replace part of the configuration of this embodiment with other configurations. Furthermore, the control lines and information lines shown are those considered necessary for explanation, and do not necessarily represent all control lines and information lines in the product. In reality, it can be assumed that almost all configurations are interconnected.
[0101] 10...temporary layout, 11...passable cell, 20...person passage area, 30...cutout area, 31...person passage area, 40...target layout, 50...enlarged confirmation screen, 60...analysis result screen, 100...analysis area identification device, 110...storage unit, 111...temporary layout data, 112...person passage area data, 113...cutout area data, 114...target layout data, 120...calculation unit, 121...temporary layout generation unit, 122...person passage area acquisition unit, 123...cutout area generation unit, 124...target layout generation unit, 125...analysis unit, 130...input / output unit, 131...input unit, 132...output unit
Claims
1. An analysis area identification device that identifies an analysis area in which to analyze the movement of an object, comprising: a passage area acquisition unit that acquires a passage area through which the object passes from a temporary layout; and a target layout generation unit that sets the analysis area to an area from the temporary layout in which at least a portion of the area other than the passage area is excluded from the analysis target.
2. The analysis area identification device according to claim 1, further comprising a cutout area generation unit that generates a cutout area expanded by a predetermined amount from the passage area, and the target layout generation unit generates a target layout as the analysis area by excluding from the temporary layout a portion other than the cutout area as an analysis target.
3. The analysis area identification device according to claim 2, wherein, when an impassable area through which the object cannot pass exists within a certain range from the passable area, the target layout generation unit generates the target layout by excluding the impassable area from the temporary layout.
4. The analysis area identification device according to claim 3, further comprising an analysis unit that analyzes the passage of the object using the temporary layout or the target layout, and the passage area acquisition unit acquires the passage area based on an analysis result obtained by the analysis unit analyzing the passage of the object using the temporary layout.
5. The analysis area identification device according to claim 4, wherein the analysis unit outputs a warning when it determines that the object to be analyzed has entered the vicinity of the boundary of the cutout area included in the target layout.
6. The analysis area identification device according to claim 5, wherein the cutout area generation unit enlarges the cutout area when the warning is output, the target layout generation unit generates a second target layout based on the enlarged cutout area, and the analysis unit analyzes the passage of the object using the second target layout.
7. The analysis area identification device according to claim 3, further comprising a temporary layout generation unit that generates a temporary layout based on the arrangement of floor objects of the input BIM data.
8. The analysis area specifying device according to claim 4, wherein the analysis unit performs a process of simulating the passage of the object using the target layout.
9. The analysis area identification device according to claim 4, wherein the analysis unit uses the target layout to perform a heat map analysis based on sensor information obtained from sensors installed in a building that is the subject of the target layout.
10. A method for identifying an analysis area in which to analyze the movement of an object, the method comprising the steps of: acquiring a passage area through which the object passes from a temporary layout; and determining, as the analysis area, an area from the temporary layout in which at least a portion of the area other than the passage area is excluded from the analysis target.
Citation Information
Patent Citations
Information processing unit, information processing method and program
JP2020095365A
Movement demand estimation system, movement demand estimation method, people flow estimation system, and people flow estimation method
WO2020240932A1
Facility layout abnormality determination device and facility layout abnormality determination method
WO2022054285A1