Molten iron temperature control method, molten iron temperature control device, molten iron temperature control system, and terminal device

The hot metal temperature control method and system address the issue of excessive actions and transparency in blast furnaces by using a physical model to calculate and present optimal pulverized coal ratio and flow rate manipulations, resulting in stable and efficient operation with reduced reducing agent ratios.

WO2024204465A1PCT designated stage expired Publication Date: 2024-10-03JFE STEEL CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/012503
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-30
Filing Date
2024-03-27
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Existing hot metal temperature control methods in blast furnaces are prone to excessive actions and lack transparency in the basis for calculations, leading to inefficient operation and increased reducing agent ratios due to fluctuations in raw material quality and operator skill shortages.

Method used

A method and system that calculates and prioritizes pulverized coal ratio and flow rate manipulations based on a physical model to maintain hot metal temperature within target ranges, with a determination step that explains the basis for actions and presents them to operators for approval, reducing excessive actions and improving control stability.

Benefits of technology

The system effectively suppresses excessive actions, stabilizes hot metal temperature control, and reduces the reducing agent ratio by prioritizing optimal control actions and providing transparent operational decisions, enhancing blast furnace efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024012503_03102024_PF_FP_ABST
    Figure JP2024012503_03102024_PF_FP_ABST
Patent Text Reader

Abstract

This molten iron temperature control method comprises: calculation steps (S11-S19) for calculating a pulverized coal ratio operation amount by molten iron temperature control, calculating a pulverized coal flow rate operation amount by pulverized coal ratio follow-up control in order to compensate for deviation between a target value of the pulverized coal ratio, which takes into account the pulverized coal ratio operation amount, and the actual value of the current pulverized coal ratio, and prioritizing the molten iron temperature control or the pulverized coal ratio follow-up control as an optimum action; a determination step for determining a basis of calculation relating to the optimum action, and adding wording to a basis wording indicating the basis; and a presentation step for presenting operation information including the basis wording and at least one of the pulverized coal ratio operation amount and the pulverized coal flow rate operation amount calculated as the optimal action.
Need to check novelty before this filing date? Find Prior Art

Description

Molten iron temperature control method, molten iron temperature control device, molten iron temperature control system, and terminal device

[0001] The present disclosure relates to a molten iron temperature control method, a molten iron temperature control device, a molten iron temperature control system, and a terminal device.

[0002] The labor force is expected to decrease due to the declining birthrate and aging population, and the steel industry is also expected to see a decrease in skilled operators with knowledge and experience. Therefore, there is a need for highly efficient and stable operations through process automation.

[0003] In a blast furnace, raw materials such as coke and iron ore are charged from the top of the furnace, and hot air and pulverized coal are blown in through the tuyere at the bottom of the furnace to melt and reduce the iron ore, and molten iron is obtained from the tap hole. 2 The aim is to lower the reducing agent rate and coke rate to reduce CO2 and hot metal costs. However, as high-quality raw materials are becoming scarce, fluctuations in raw material quality are expected to increase. Therefore, it is expected that control of the blast furnace process will become even more difficult.

[0004] Controlling the hot metal temperature (HMT) is important for achieving highly efficient and stable blast furnace operation. If the hot metal temperature drops too low, the temperature of the by-product slag drops and its viscosity increases, making it difficult to discharge from the furnace. Furthermore, if the hot metal or slag in the lower part of the furnace solidifies due to insufficient heat, a furnace cooling accident may occur, leading to a shutdown of operations. Setting a higher target temperature to avoid a drop in the hot metal temperature consumes more fuel, leading to an increase in the reducing agent rate. By suppressing the variation in the hot metal temperature, it becomes possible to lower the target value while still satisfying the lower limit of the hot metal temperature, leading to a reduction in the reducing agent rate.

[0005] The hot metal temperature is controlled by manipulating, for example, the coke rate, blast moisture, blast temperature, pulverized coal rate, and pulverized coal flow rate. Because the blast furnace is a process with a large heat capacity, there is a time delay of about 2 to 8 hours before the hot metal temperature changes when an operational variable is changed. Therefore, it is necessary to predict the hot metal temperature taking into account the time delay until the effect of the action appears, and to control it based on the prediction.

[0006] In light of this background, various molten iron temperature control methods have been proposed. For example, Patent Document 1 discloses a method of calculating a target value of the pulverized coal ratio by executing a dual control loop consisting of a first control (molten iron temperature control) and a second control (pulverized coal ratio tracking control). In the first control, a target value of the pulverized coal ratio is calculated so that the molten iron temperature falls within a preset target range. In the second control, a pulverized coal flow rate manipulated variable is calculated to compensate for (reduce) the deviation between the target value of the pulverized coal ratio and the current actual value of the pulverized coal ratio.

[0007] Patent No. 7107444

[0008] The method described in Patent Document 1 enables control of the molten iron temperature that is less affected by fluctuations in unloading. However, there is a risk of excessive action being taken when the molten iron temperature deviates from the target value and there is a large discrepancy between the target value of the pulverized coal ratio and the actual value of the pulverized coal ratio. Here, excessive action refers to the execution of an additional operation that is not essential. The method described in Patent Document 1 may further manipulate the pulverized coal ratio (operation based on the first control) even though only manipulating the pulverized coal flow rate (second control) to compensate for the deviation in the pulverized coal ratio is sufficient. Furthermore, although Patent Document 1 achieves automatic control, automatic control generally tends to rarely explain the reasons for the actions taken. For example, by presenting the basis for calculating the manipulated variable, the operator can be convinced.

[0009] In view of the above circumstances, the purpose of the present disclosure is to provide a molten iron temperature control method, a molten iron temperature control device, a molten iron temperature control system, and a terminal device that are capable of suppressing excessive actions and showing optimal actions and the basis for calculations.

[0010] (1) A molten iron temperature control method according to one embodiment of the present disclosure includes: a calculation step of calculating a pulverized coal ratio manipulated variable by molten iron temperature control so that a molten iron temperature predicted by a physical model capable of calculating a state inside a blast furnace falls within a preset target range; calculating a pulverized coal flow rate manipulated variable by pulverized coal ratio tracking control to compensate for a deviation between a target value of the pulverized coal ratio taking into account the pulverized coal ratio manipulated variable and a current actual value of the pulverized coal ratio; and prioritizing the molten iron temperature control or the pulverized coal ratio tracking control as an optimal action based on the magnitude of discrepancy between the target value and the actual value of the pulverized coal ratio; a determination step of determining a basis for calculation of the optimal action and adding a statement to a statement indicating the basis; and a presentation step of presenting operation information including at least one of the pulverized coal ratio manipulated variable and the pulverized coal flow rate manipulated variable calculated as the optimal action and the statement of the basis.

[0011] (2) As one embodiment of the present disclosure, in (1), when the absolute value of the pulverized coal flow rate manipulation amount is larger than the manipulation range of the pulverized coal flow rate that can be changed per time, the calculation step prioritizes the pulverized coal ratio tracking control and does not take the pulverized coal manipulation amount calculated by the molten iron temperature control into account in the target value of the pulverized coal ratio.

[0012] (3) As an embodiment of the present disclosure, in (1) or (2), when the predicted molten iron temperature value calculated taking into account the pulverized coal flow rate control amount falls outside the target range of the molten iron temperature, the calculation step prioritizes the molten iron temperature control and takes into account the pulverized coal control amount calculated by the molten iron temperature control in the target value of the pulverized coal ratio.

[0013] (4) As an embodiment of the present disclosure, in any of (1) to (3), the determination step adds a plurality of terms to the basis term, and the plurality of terms include a plurality of change contents arranged in order of proximity to the current time or in order of the largest amount of change.

[0014] (5) As an embodiment of the present disclosure, in any of (1) to (4), the operation information is an operation quantity presentation screen having wording expressing the intention of the optimal action, a basis for calculating the optimal action, an accept button, and a reject button, the accept button is used when the operator accepts the optimal action shown on the operation quantity presentation screen, and the reject button is used when the operator rejects the optimal action shown on the operation quantity presentation screen.

[0015] (6) As an embodiment of the present disclosure, in (5), the presentation step has, as control modes, a semi-automatic mode in which the optimal action is executed with the operator's approval and an automatic mode in which the optimal action is executed without the operator's approval, and the operation information is an operation amount presentation screen that further has a timer when the control mode is the automatic mode, and the timer displays the time from the time the display regarding the optimal action is updated to a predetermined specified time, and if the non-adopted button is not selected before the specified time arrives, the optimal action is executed.

[0016] (7) A molten iron temperature control device according to an embodiment of the present disclosure includes: a calculation unit that calculates a pulverized coal ratio manipulated variable by molten iron temperature control so that a molten iron temperature predicted by a physical model capable of calculating a state inside a blast furnace falls within a predetermined target range; calculates a pulverized coal flow rate manipulated variable by pulverized coal ratio tracking control to compensate for a deviation between a target value of the pulverized coal ratio taking into account the pulverized coal ratio manipulated variable and a current actual value of the pulverized coal ratio; and prioritizes the molten iron temperature control or the pulverized coal ratio tracking control as an optimal action based on the magnitude of discrepancy between the target value and the actual value of the pulverized coal ratio; a determination unit that determines a basis for calculation of the optimal action and adds a statement to a statement indicating the basis; and a presentation unit that presents operation information including at least one of the pulverized coal ratio manipulated variable and the pulverized coal flow rate manipulated variable calculated as the optimal action and the statement of the basis.

[0017] (8) As one embodiment of the present disclosure, in (7), when the absolute value of the pulverized coal flow rate manipulation amount is larger than the manipulation range of the pulverized coal flow rate that can be changed per time, the calculation unit prioritizes the pulverized coal ratio tracking control and does not take the pulverized coal manipulation amount calculated by the molten iron temperature control into account in the target value of the pulverized coal ratio.

[0018] (9) As an embodiment of the present disclosure, in (7) or (8), when the predicted molten iron temperature value calculated taking into account the pulverized coal flow rate control amount falls outside the target range of the molten iron temperature, the calculation unit prioritizes the molten iron temperature control and takes into account the pulverized coal control amount calculated by the molten iron temperature control in the target value of the pulverized coal ratio.

[0019] (10) As an embodiment of the present disclosure, in any of (7) to (9), the determination unit adds multiple sentences to the basis sentence, and the multiple sentences include multiple change contents arranged in order of proximity to the current time or in order of the largest amount of change.

[0020] (11) As an embodiment of the present disclosure, in any of (7) to (10), the operation information is an operation quantity presentation screen having wording expressing the intention of the optimal action, a basis for calculating the optimal action, an accept button, and a reject button, the accept button is used when the operator accepts the optimal action shown on the operation quantity presentation screen, and the reject button is used when the operator rejects the optimal action shown on the operation quantity presentation screen.

[0021] (12) As an embodiment of the present disclosure, in (11), the presentation unit has, as control modes, a semi-automatic mode in which the optimal action is executed with the operator's approval and an automatic mode in which the optimal action is executed without the operator's approval, and the operation information is an operation amount presentation screen that further has a timer when the control mode is the automatic mode, and the timer displays the time from the time the display regarding the optimal action is updated to a predetermined specified time, and if the non-adopted button is not selected before the specified time arrives, the optimal action is executed.

[0022] (13) A molten iron temperature control system according to an embodiment of the present disclosure is a molten iron temperature control system including a molten iron temperature control device and a terminal device, comprising: a calculation unit that calculates a pulverized coal ratio manipulated variable by molten iron temperature control so that a molten iron temperature predicted by a physical model capable of calculating a state inside a blast furnace falls within a preset target range, calculates a pulverized coal flow rate manipulated variable by pulverized coal ratio tracking control to compensate for a deviation between a target value of the pulverized coal ratio taking the pulverized coal ratio manipulated variable into account and a current actual value of the pulverized coal ratio, and prioritizes the molten iron temperature control or the pulverized coal ratio tracking control as an optimal action based on the magnitude of discrepancy between the target value and the actual value of the pulverized coal ratio; a determination unit that determines a basis for calculation of the optimal action and adds a statement to a statement of basis indicating the basis; and an output unit that outputs operation information including at least one of the pulverized coal ratio manipulated variable and the pulverized coal flow rate manipulated variable calculated as the optimal action and the statement of basis. The device comprises: a communication unit that transmits and receives the operation information; an acquisition unit that acquires the optimum action and the operation information related to the optimum action, including the rationale statement; a display unit that displays the acquired optimum action and the operation information, including the rationale statement; and an interface unit that receives instructions regarding the displayed operation information and outputs the setting value of the operation variable in accordance with the instructions or based on the passage of a predetermined time.

[0023] (14) A terminal device according to an embodiment of the present disclosure is a terminal device constituting a molten iron temperature control system together with a molten iron temperature control device that outputs operation information including at least one of a pulverized coal ratio manipulated variable and a pulverized coal flow rate manipulated variable calculated as an optimal action based on the magnitude of discrepancy between a target value of the pulverized coal ratio and an actual value of the pulverized coal ratio for controlling the molten iron temperature, and a reason statement indicating the reason for the calculation of the optimal action, the terminal device comprising: an acquisition unit that acquires the optimal action and the operation information related to the optimal action including the reason statement; a display unit that displays the acquired optimal action and the operation information so that the reason statement is included; and an interface unit that receives instructions for the displayed operation information and outputs a setting value of an operation variable in accordance with the instruction or based on the passage of a predetermined time.

[0024] (15) As an embodiment of the present disclosure, in (14), the operation information includes a plurality of operation conditions, and is displayed together with a priority order.

[0025] According to the present disclosure, it is possible to provide a molten iron temperature control method, a molten iron temperature control device, a molten iron temperature control system, and a terminal device that are capable of suppressing excessive actions and showing optimal actions and the basis for calculations.

[0026] FIG. 1 is a block diagram showing an example configuration of a molten pig iron temperature control device according to an embodiment of the present disclosure. FIG. 2 is a flowchart illustrating processing by a calculation unit. FIG. 3 is a flowchart illustrating processing by a determination unit. FIG. 4 is a flowchart illustrating processing by a presentation unit. FIG. 5 is a diagram illustrating an example of an operation variable presentation screen when the control mode is the auto mode. FIG. 6 is a diagram illustrating an example of an operation variable presentation screen when the control mode is the semi-auto mode. FIG. 7 is a diagram illustrating another operation variable presentation screen when the control mode is the auto mode. FIG. 8 is a diagram illustrating an example of changes in the molten pig iron temperature, the target value of the pulverized coal ratio, and the set value of the pulverized coal flow rate over the past 8 hours and the future 10 hours, with the current time set to 0. FIG. 9 is a diagram illustrating another example of changes in the molten pig iron temperature, the target value of the pulverized coal ratio, and the set value of the pulverized coal flow rate over the past 8 hours and the future 10 hours, with the current time set to 0. Figure 10 is a diagram showing an example of changes in molten iron temperature, coke rate, pulverized coal ratio manipulated variable, pulverized coal ratio, pulverized coal flow rate manipulated variable, pulverized coal flow rate, blast flow rate, and iron-making speed over 60 hours. Figure 11 is a diagram showing an example of changes in molten iron temperature, coke rate, pulverized coal ratio, pulverized coal flow rate, blast flow rate, iron-making speed, and inferior raw material charging ratio over 60 hours. Figure 12 is a block diagram showing an example of the configuration of a molten iron temperature control system equipped with a molten iron temperature control device.

[0027] Hereinafter, a molten iron temperature control method, a molten iron temperature control device, a molten iron temperature control system, and a terminal device according to an embodiment of the present disclosure will be described with reference to the drawings. In each drawing, identical or corresponding parts are designated by the same reference numerals. In the description of this embodiment, the description of identical or corresponding parts will be omitted or simplified as appropriate.

[0028] [Configuration of Molten Iron Temperature Control Device] Fig. 1 is a block diagram showing the configuration of a molten iron temperature control device 1 according to an embodiment of the present disclosure. As shown in Fig. 1, the molten iron temperature control device 1 according to this embodiment can be configured by an information processing device such as a computer. Specifically, an internal arithmetic processing device such as a CPU (Central Processing Unit) executes a program, causing the computer or the like to function as the molten iron temperature control device 1.

[0029] An operation database 2 is connected to the molten iron temperature control device 1 in a data-readable form. In this embodiment, the operation database 2 stores operation factors, calculated values ​​of process variables, actual values ​​of process variables, and historical data of temperatures or pressures measured at the furnace body, furnace top, or furnace bottom. The operation factors include, for example, the furnace top coke rate, blast flow rate, amount of enriched oxygen, blast temperature, blast moisture, pulverized coal rate, and pulverized coal flow rate. The calculated values ​​of the process variables include, for example, the gas utilization rate, solution loss carbon, molten iron temperature, and ironmaking speed output by the physical model. The actual values ​​of the process variables include, for example, the CO or CO2 content of the discharged furnace top gas. 2 The process variables include the ironmaking rate, hot metal temperature, solution loss carbon, and gas utilization rate. The operational database 2 sequentially stores measurement data required for operation and operational factors required for hot metal temperature control, and this information is read out and used as needed. The calculated values ​​of the process variables output by the physical model are sequentially stored in the operational database 2 each time a calculation is performed by the hot metal temperature control device 1.

[0030] The physical model used in the present disclosure is the same as the model described in the reference document (Hanano Michiharu et al.: "Study on Blow-in Operation Using a Blast Furnace Unsteady State Model," Tetsu-to-Haganen, Vol. 68, p. 2369). That is, the physical model is composed of a group of partial differential equations that take into account multiple physical phenomena such as the reduction of iron ore, heat exchange between iron ore and coke, and melting of iron ore, and is a physical model that can calculate variables (output variables) that indicate the state inside the blast furnace in an unsteady state.

[0031] The molten iron temperature control device 1 according to this embodiment includes a calculation unit 11, a determination unit 12, and a presentation unit 13. The molten iron temperature control device 1 can control the molten iron temperature by the calculation unit 11, the determination unit 12, and the presentation unit 13 performing the processes described below. The molten iron temperature control device 1 may also include a storage device, and in this case, the storage device may store a physical model. When performing the processes described below, the molten iron temperature control device 1 may read the physical model from the storage device and use it for calculation.

[0032] [Operation of Calculation Unit] The operation of the calculation unit 11 will be described with reference to Fig. 2. At least a part of the process shown in Fig. 2 corresponds to the calculation steps executed by the calculation unit 11.

[0033] Fig. 2 is a flowchart showing the flow of processing in the calculation unit 11. The flowchart shown in Fig. 2 starts when an execution command is input to the calculation unit 11, and proceeds to processing in step S11.

[0034] In the process of step S11, the calculation unit 11 calculates the pulverized coal ratio manipulated variable ΔPCR so that the molten iron temperature predicted by the physical model falls within a preset target range. 0 In this embodiment, the calculation method in step S11 is the same as the molten iron temperature control method described in Patent Document 1. That is, ΔPCR is calculated by controlling the molten iron temperature. 0 and the following ΔPCI 0 is calculated.

[0035] In calculating the pulverized coal ratio manipulated variable (ΔPCR), which is the manipulated variable of the pulverized coal ratio (PCR), a so-called speed-type method is used in which the change is increased or decreased from the manipulated variable. Therefore, the pulverized coal ratio after adjustment is calculated based on the current target value of the pulverized coal ratio (PCR ref (0)) plus ΔPCR.

[0036] Next, the current ironmaking speed Prod(0), the relaxation coefficient α 0 (0 < α 0 ≦1), the pulverized coal ratio control amount ΔPCR 0 Pulverized coal flow rate control amount ΔPCI corresponding to 0 is calculated by equation (1). The pulverized coal flow rate manipulated variable (ΔPCI) is the manipulated variable of the pulverized coal flow rate (PCI). The subscript 0 indicates the ΔPCR 0 Regarding the pulverized coal flow rate, the pulverized coal flow rate control amount ΔPCI 0 is calculated as an increase or decrease from the current PCI value. The process of the calculation unit 11 proceeds to step S12.

[0037]

[0038] In the process of step S12, the calculation unit 11 calculates the pulverized coal flow rate manipulated variable to compensate for the deviation between the target value of the pulverized coal ratio and the current value (the current actual value of the pulverized coal ratio). In this embodiment, the calculation method of step S12 is the same as the method of the pulverized coal ratio tracking control described in the above-mentioned Patent Document 1. In other words, the following ΔPCR is calculated by the pulverized coal ratio tracking control. 1 First, the current pulverized coal flow rate is set to PCI(0), and the target value of the pulverized coal ratio is set to PCR(0). ref (0), the deviation δPCR between the target value and the actual value of the pulverized coal ratio is calculated by the formula (2).

[0039]

[0040] Next, the relaxation coefficient α 1 (0 < α 1 ≦1), the pulverized coal flow rate manipulated variable ΔPCI for compensating for the deviation δPCR between the target value and the actual value of the pulverized coal ratio 1 is calculated by the formula (3). The process of the calculation unit 11 proceeds to step S13.

[0041]

[0042] In the process of step S13, the calculation unit 11 calculates the absolute value |ΔPCI of the pulverized coal flow rate manipulated variable for compensating for the deviation δPCR between the target value and the actual value of the pulverized coal ratio. 1 It is determined whether |ΔPCI is greater than the operation range A of the pulverized coal flow rate that can be changed at one time. 1| is greater than the operation range A, which means that there is a large discrepancy between the actual value of the pulverized coal ratio and the current target value of the pulverized coal ratio. Here, in the method described in Patent Document 1, excessive action may be taken when the molten iron temperature deviates from the target value and there is a large discrepancy between the target value of the pulverized coal ratio and the current actual value of the pulverized coal ratio. In this embodiment, when this discrepancy is large, the optimal action is, in principle, to not consider the increase or decrease in the pulverized coal ratio manipulated variable based on the molten iron temperature control, i.e., not to add it to the target value of the pulverized coal ratio, and to manipulate only the pulverized coal flow rate with the sole aim of tracking the target value of the pulverized coal ratio at that time. When this discrepancy is large, excessive action can be suppressed by not taking (reflecting) the pulverized coal manipulated variable calculated by the molten iron temperature control into account in the target value of the pulverized coal ratio. That is, in this embodiment, when dissociation is large, priority is given to pulverized coal ratio tracking control in principle, and only the pulverized coal flow rate is controlled to compensate for the deviation of the pulverized coal ratio, thereby preventing a decrease in accuracy of molten iron temperature control due to excessive control of the pulverized coal ratio. 1 If | is greater than the operation width A (Yes in step S13), the calculation unit 11 proceeds to the process of step S14. 1 If | is equal to or smaller than the operation width A (No in step S13), the calculation unit 11 proceeds to the process in step S19.

[0043] In the process of step S14, the calculation unit 11 calculates the pulverized coal flow rate manipulated variable ΔPCI 1 The predicted value of the molten iron temperature is calculated taking into account the current time t 0 Step response S of the hot metal temperature after k hours when the pulverized coal flow rate is changed by a unit amount PCI (k|t 0 ) and the free response y of the hot metal temperature assuming that the current input variables are maintained in the future. free (t 0 +k) is calculated using a physical model. Pulverized coal flow rate manipulated variable ΔPCI for compensating for the deviation δPCR between the target value and the actual value of the pulverized coal ratio. 1 The predicted value of the hot metal temperature y pre (t 0 +k) can be obtained by equation (4). The calculation unit 11 proceeds to the process of step S15.

[0044]

[0045] In the process of step S15, the calculation unit 11 calculates the predicted molten iron temperature value y pre (t 0 +k) is determined to be within the target range of the hot metal temperature. When the process of step S15 is performed, there is a large discrepancy between the target value and the actual value of the pulverized coal ratio. If the pulverized coal ratio tracking control is prioritized, the hot metal temperature may remain lower or higher than the target (i.e., it may fall outside the target range of the hot metal temperature). In this case, the hot metal temperature control may be prioritized and the pulverized coal ratio may also be manipulated. pre (t 0 +k) is within the target range of the molten iron temperature (Yes in step S15), the calculation unit 11 proceeds to the processing in step S16. pre (t 0 +k) is not within the target range of the molten iron temperature (No in step S15), the calculation unit 11 proceeds to the process of step S18. The calculation unit 11 prioritizes the molten iron temperature control or the pulverized coal ratio tracking control as the optimal action based on the magnitude of the discrepancy between the target value and the actual value of the pulverized coal ratio.

[0046] In the process of step S16, the calculation unit 11 sets the "pulverized coal ratio tracking control priority flag." The calculation unit 11 then proceeds to the process of step S17.

[0047] In the process of step S17, the calculation unit 11 adds ΔPCI to the pulverized coal ratio manipulated variable ΔPCR to be finally presented. 0 Without taking into account the above, the final pulverized coal flow rate operation amount ΔPCI is 1 Then, the series of processes is completed.

[0048] In the process of step S18, the calculation unit 11 sets the “molten iron temperature control priority flag.” The calculation unit 11 then proceeds to the process of step S19.

[0049] In the process of step S19, the calculation unit 11 calculates the pulverized coal ratio manipulated variable ΔPCR to be finally presented as ΔPCR 0 The final pulverized coal flow rate operation amount ΔPCI is set as ΔPCI 0 and ΔPCI 1Sum of (ΔPCI 0 ΔPCI 1 The process then ends.

[0050] [Operation of Determination Unit] The operation of the determination unit 12 will be described with reference to Fig. 3. At least a part of the process shown in Fig. 3 corresponds to the determination step executed by the determination unit 12. The determination unit 12 determines the basis for the calculation of the optimal action and adds a statement to the basis statement indicating the basis. Specific examples of the statement to be added will be described later.

[0051] Fig. 3 is a flowchart showing the flow of processing by the determination unit 12. The flowchart shown in Fig. 3 starts when an execution command is input to the determination unit 12, and proceeds to the determination in step S21.

[0052] In the process of step S21, the determination unit 12 determines whether or not the pulverized coal ratio tracking control priority flag is set in the calculation unit 11. If the pulverized coal ratio tracking control priority flag is set, the determination unit 12 proceeds to the process of step S22. If the pulverized coal ratio tracking control priority flag is not set, the determination unit 12 proceeds to the process of step S23.

[0053] In the process of step S22, the determination unit 12 adds "pulverized coal ratio tracking control is prioritized" to the reason statement. The reason statement indicates the reason for the operation (action) and is the content displayed in the "basis 32 for presenting optimal action" described later. The reason statement may be stored in a storage device provided in the molten iron temperature control device 1. As a result, the determination unit 12 proceeds to the process of step S25.

[0054] In the process of step S23, the determination unit 12 determines whether or not the molten iron temperature control priority flag is set in the calculation unit 11. If the molten iron temperature control priority flag is set, the determination unit 12 proceeds to the process of step S24. If the molten iron temperature control priority flag is not set, the determination unit 12 proceeds to the process of step S25.

[0055] In the process of step S24, the determining unit 12 adds "molten iron temperature control is prioritized" to the reason statement. As a result, the determining unit 12 proceeds to the process of step S25.

[0056] In the process of step S25, the determination unit 12 determines whether or not the pulverized coal ratio or the pulverized coal flow rate conflicts with an operational constraint that requires postponing the implementation of an action.

[0057] For example, an excessive pulverized coal ratio may lead to a deterioration in permeability. Therefore, an operational constraint such as an upper limit of the pulverized coal ratio may exist. When the current target value of the pulverized coal ratio exceeds the upper limit, the determination unit 12 adds "upper limit of pulverized coal ratio" to the reasoning statement. Furthermore, for example, when the reducing agent ratio is extremely low, a sudden drop in the molten iron temperature and a deterioration in permeability may occur. Therefore, an operational constraint such as a lower limit of the reducing agent ratio may exist. When the current reducing agent ratio is below the lower limit, the determination unit 12 adds "lower limit of reducing agent ratio" to the reasoning statement. Furthermore, when the top gas temperature is low, for example, soot may be generated at the furnace top or moisture in the blast furnace gas may condense, potentially damaging the blast furnace equipment. Therefore, an operational constraint such as a lower limit of the top gas temperature may exist. When the current top gas temperature is below the lower limit, the determination unit 12 adds "lower limit of top gas temperature" to the reasoning statement. Furthermore, for example, if the theoretical combustion temperature at the tip of the tuyere is too low, the pulverized coal may not burn in the tuyere. On the other hand, if the theoretical combustion temperature is too high, the tuyere may be damaged. Therefore, there may be operational constraints such as upper and lower limits of the theoretical combustion temperature. If the current theoretical combustion temperature is not within the range of the upper and lower limits, the determination unit 12 adds "upper limit of theoretical combustion temperature" or "lower limit of theoretical combustion temperature" to the reason statement.

[0058] If the operational constraints are violated as described above, the determination unit 12 proceeds to the process of step S26. If the operational constraints are not violated, the determination unit 12 proceeds to the process of step S27.

[0059] In the process of step S26, the determination unit 12 adds, for example, "upper limit of pulverized coal ratio," "lower limit of reducing agent ratio," "lower limit of furnace top gas temperature," "upper limit of theoretical combustion temperature," or "lower limit of theoretical combustion temperature," to the reason statement as described above. Thereby, the determination unit 12 proceeds to the process of step S27.

[0060] In the process of step S27, the determination unit 12 determines whether or not there has been a change in the manipulated variables or indicators based on the trends of the manipulated variables related to molten iron temperature control and the indicators highly correlated with the molten iron temperature. Examples of manipulated variables include the coke rate, pulverized coal rate, blast temperature, and blast humidity. Examples of indicators highly correlated with the molten iron temperature include the tuyere embedding temperature, silicon and sulfur components in the molten iron, the theoretical combustion temperature, and solution loss carbon. The determination unit 12 can determine whether or not there has been a change by calculating the difference from the current value and determining whether the absolute value of the difference exceeds a threshold. The determination unit 12 may also determine whether or not there has been a change in the indicators using a machine learning model that inputs a graph of the trends. If multiple items have changed, the determination unit 12 may sort the corresponding multiple statements in order of proximity to the current time or the largest amount of change. If there has been a change in the manipulated variables or indicators, the determination unit 12 proceeds to the process of step S28. If there has been no change in the manipulated variables or indicators, the determination unit 12 terminates the series of processes.

[0061] In the process of step S28, the determination unit 12 adds, to the basis statement, for example, the manipulated variable or index that has changed, the time when the change occurred (for example, how many hours ago from the current time), and the direction of the change (for example, increase or decrease), in association with each other. This completes the series of processes performed by the determination unit 12. In this way, the determination unit 12 adds a statement to the basis statement indicating the basis for the calculation of the above-mentioned optimal action.

[0062] As described above, the rationale statement may include multiple operational constraints and changes. However, to avoid excessive information, it is preferable to limit the number of operational constraints and changes included in the rationale statement to one to four.

[0063] [Operation of Presentation Unit] The operation of the presentation unit 13 will be described with reference to Fig. 4. The presentation unit 13 presents operation information to the operator. At least a part of the process shown in Fig. 4 corresponds to a presentation step executed by the presentation unit 13.

[0064] Fig. 4 is a flowchart showing the flow of processing by the presentation unit 13. The flowchart shown in Fig. 4 starts when an execution command is input to the presentation unit 13, and proceeds to processing in step S31.

[0065] In the process of step S31, the presentation unit 13 determines whether or not an action is necessary by determining whether the absolute value of the manipulated variable of the optimal action obtained by the calculation unit 11 exceeds the smallest unit that can be changed. For example, when the target value of the pulverized coal ratio is changed in increments of at least 2 kg / t, even if the calculation unit 11 calculates a pulverized coal ratio manipulated variable of +1 kg / t, it is determined that no action is necessary. The process of step S31 makes it possible to suppress the presentation of excessive frequencies. Furthermore, suppressing the presentation of excessive frequencies leads to the prevention of hunting in the molten iron temperature. If it is determined that an action is necessary in step S31, the process of the presentation unit 13 proceeds to the process of step S32. If it is determined that an action is unnecessary in step S31, the process of the presentation unit 13 ends the series of processes.

[0066] In the process of step S32, the presenting unit 13 performs a process for determining whether the time τ 1 Determine whether τ minutes have passed. 1 is non-zero, but not limited to any particular value. 1 If τ minutes have passed, the process of the presentation unit 13 proceeds to step S33. 1 If no more than 10 minutes have passed, the process of the presentation unit 13 ends the series of processes. Since the blast furnace is a process with a long time constant, it takes time for the effect of an action to appear. Therefore, if a similar action is performed shortly after the most recent operation, there is a possibility that an excessive action will occur. The process of step S32 is important to prevent excessive action. Here, τ 1 It is preferable that τ is selected to include multiple values. 1 It is preferable that different values ​​be set for when emergency operation is required, such as when the blast flow rate, oxygen enrichment amount, or coke ratio has recently been significantly changed, and for normal operation.

[0067] In the process of step S33, the presentation unit 13 determines whether the difference between the set value of the operating variable (e.g., blast flow rate, oxygen enrichment amount, or coke ratio) used in the process of step S32 and the set value of the currently set operating variable is within a threshold value. If it is within the threshold value, the process of the presentation unit 13 proceeds to the process of step S34. If it is greater than the threshold value, the process of the presentation unit 13 ends the series of processes. If the operator significantly changes the set value during the series of processes for some reason, such as equipment trouble or poor furnace condition, the operating variable obtained by the process of the calculation unit 11 is not a recommended action, and executing it may deteriorate the controllability of the molten iron temperature. The process of step S33 makes it possible to prevent the molten iron temperature control device 1 from running out of control due to external disturbances.

[0068] In the process of step S34, the presenting unit 13 determines the set control mode. In this embodiment, the presenting unit 13 has two control modes. That is, the presenting unit 13 can use a semi-automatic mode in which the optimal action is executed with the operator's approval, or an automatic mode in which the optimal action is executed without the operator's approval. If the control mode is the automatic mode, the process of the presenting unit 13 proceeds to the process of step S35. If the control mode is the semi-automatic mode, the process of the presenting unit 13 proceeds to the process of step S36.

[0069] In the process of step S35, information based on the optimum action shown in FIG. 5 is displayed as a pop-up on the operator's operating terminal, and an alarm is issued. When the control mode is the auto mode, a timer 36 is provided on the screen to count down until the action is executed. The moment the pop-up is displayed, that is, when the display relating to the optimum action is updated, the timer 36 starts counting down. 2 The seconds are set and a countdown starts. If the operator presses the reject button 35 before the timer 36 reaches 0 seconds, the pop-up disappears and the process of the presentation unit 13 ends the series of processes. If the operator does not press (does not select) the reject button 35 before the timer 36 reaches 0 seconds or if the operator presses (selects) the accept button 34, the process of the presentation unit 13 proceeds to the process of step S37. That is, τ2 If the operator does not reject the request within τ seconds, the optimal action is executed. 3 ≦τ 2 τ that satisfies 3 The alarm may be issued at the timing of τ 2 and τ 3 is a non-zero value, but is not limited to a specific value. Here, "0 seconds" is an example of a predetermined time, and another value may be used. The timer 36 is not limited to a down timer, and may be any timer that displays the time remaining until the predetermined time.

[0070] In the process of step S36, information based on the optimum action shown in FIG. 6 is displayed as a pop-up on the operator's operating terminal, and an alarm is issued. When the control mode is semi-automatic mode, the timer 36 until the action is executed is not provided on the screen. The execution of the action requires the operator's approval. When the operator presses the approve button 44, the process of the presentation unit 13 proceeds to the process of step S37. When the operator presses the reject button 45, the pop-up is cleared, and the process of the presentation unit 13 ends the series of processes. To prevent the operator from leaving the pop-up displayed, if neither the approve button 44 nor the reject button 45 is pressed from the moment the pop-up is displayed, the process of the presentation unit 13 is terminated. 4 An alarm may be sounded every τ minutes. 4 is non-zero, but is not limited to any particular value.

[0071] In the process of step S37, the pop-up displayed in step S35 or step S36 disappears, and the set values ​​of the manipulated variables are overwritten (updated) with the values ​​calculated in accordance with the optimal action. This completes the process of step S37, and the presentation unit 13 ends the series of processes. The overwritten (updated) set values ​​of the manipulated variables are output to, for example, a computer that controls the operating equipment 4 (see FIG. 12 ), and are reflected in the operating equipment 4.

[0072] [Operation Quantity Presentation Screen] FIG. 5 is a diagram showing an operation quantity presentation screen when the control mode of the molten iron temperature control device 1 is the auto mode.

[0073] The manipulated variable presentation screen displays a statement 31 expressing the intention of the optimal action (for example, increasing the molten iron temperature, decreasing the molten iron temperature, or controlling the pulverized coal ratio), and a presentation basis 32 for the optimal action determined by the determination unit 12. The manipulated variable presentation screen also displays an optimal manipulated variable 33, an accept button 34, a reject button 35, and a timer 36. The optimal manipulated variable 33 displays at least one of the pulverized coal ratio manipulated variable and the pulverized coal flow rate manipulated variable calculated as the optimal action.

[0074] FIG. 6 is a diagram showing an operation amount presentation screen when the control mode of the molten iron temperature control device 1 is the semi-automatic mode.

[0075] The manipulated variable presentation screen displays a statement 41 indicating the direction of the optimal action (for example, increasing the molten iron temperature, decreasing the molten iron temperature, or controlling the pulverized coal ratio), and a presentation basis 42 for the optimal action determined by the determination unit 12. The manipulated variable presentation screen also displays an optimal manipulated variable 43, an accept button 44, and a reject button 45. The optimal manipulated variable 43 displays at least one of the pulverized coal ratio manipulated variable and the pulverized coal flow rate manipulated variable calculated as the optimal action.

[0076] FIG. 7 is a diagram showing another manipulated variable presentation screen when the control mode of the hot metal temperature control device 1 is in the auto mode. In FIG. 7 , the pulverized coal ratio manipulated variable and the pulverized coal flow rate manipulated variable calculated as the optimal action are presented, and two cases are presented in which another manipulated variable (blast moisture in the example of FIG. 7 ) calculated by hot metal temperature control based on a physical model is used as another action. In the example of FIG. 7 , the operation information includes multiple operation conditions and is displayed in order of priority (1 to 3 in FIG. 7 ). There is a possibility that some manipulated variables cannot be controlled due to operational constraints. Therefore, as in the example of FIG. 7 , it is preferable to present multiple recommended actions and allow the operator to select an action. To prevent button pressing errors, a specification may be adopted in which the operator must press the “Execute” button after pressing the “Accept” or “Reject” button.

[0077] Example 1 In this example, Figure 8 shows a case in which the hot metal temperature control priority flag is set by the processing of the calculation unit 11. Figure 8 shows changes in the hot metal temperature (HMT), the target value of the pulverized coal ratio (PCR), and the set value of the pulverized coal flow rate (PCI) for the past 8 hours and the future 10 hours, with the current time set to 0. The dashed lines for the hot metal temperature represent the upper and lower limits of the target value. The thick solid lines for the past 8 hours represent actual values. The thin solid lines represent calculated values ​​using a physical model including future predictions. The dotted lines represent predicted values ​​of the hot metal temperature when the calculated action is implemented. The triangular plot for the pulverized coal ratio represents the actual value of the pulverized coal ratio at the current time. The arrows for the pulverized coal ratio and pulverized coal flow rate indicate the action calculated by the calculation unit 11. In this example, there is a large discrepancy between the target value and the actual value of the pulverized coal ratio, while prioritizing pulverized coal ratio tracking control fails to suppress the rise in the hot metal temperature. Therefore, the priority was given to hot metal temperature control, and actions on the pulverized coal ratio and pulverized coal flow rate were proposed.

[0078] [Example 2] In this example, a case in which the pulverized coal ratio tracking control priority flag was set by the processing of the calculation unit 11 is shown in Figure 9. Figure 9 is a diagram showing changes in the molten iron temperature, the target value of the pulverized coal ratio, and the set value of the pulverized coal flow rate over the past 8 hours and the future 10 hours, with the current time set to 0, at a time different from that in Figure 8. In this example, while there was a large discrepancy between the target value and the actual value of the pulverized coal ratio, the molten iron temperature was predicted to be unchanged. Therefore, pulverized coal ratio tracking control was given priority, and only the action for the pulverized coal flow rate was presented.

[0079] [Example 3] In this example, the semi-automatic mode was used as the control mode in the hot metal temperature control device 1, and operation was carried out by manipulating the pulverized coal ratio and the pulverized coal flow rate. 1 is 40 minutes.

[0080] FIG. 10 is a diagram showing the changes in the hot metal temperature, coke rate, pulverized coal rate manipulated variable, pulverized coal rate, pulverized coal flow rate manipulated variable, pulverized coal flow rate, blast flow rate, and ironmaking speed over 60 hours.

[0081] In Figure 10 , the solid lines represent actual values ​​for the hot metal temperature and pulverized coal ratio. The dashed lines represent target values. The circles in Figure 10 represent actual values ​​for the pulverized coal ratio manipulated variable and pulverized coal flow rate manipulated variable. The triangles represent optimal actions calculated by the hot metal temperature control device 1. The operator accepted all of the optimal actions presented by the hot metal temperature control device 1. Therefore, for the pulverized coal ratio manipulated variable and pulverized coal flow rate manipulated variable in Figure 10 , the optimal actions and actual operations (results) all matched. As shown by the pulverized coal ratio and pulverized coal flow rate in Figure 10 , by appropriately adjusting the pulverized coal flow rate, the actual value of the pulverized coal ratio tracked the target value. Furthermore, the coke rate in Figure 10 gradually decreased due to manual operation by the operator. However, as shown by the pulverized coal ratio in Figure 10 , the effect of the decrease in coke rate on the hot metal temperature was offset by the pulverized coal ratio target value increased by the hot metal temperature control device 1. In other words, the hot metal temperature was controlled to be close to the target value.

[0082] [Example 4] In this example, an operation was carried out during a period different from that of Example 3 by using the auto mode as the control mode of the molten iron temperature control device 1 and manipulating the pulverized coal ratio and the pulverized coal flow rate. 1 is 40 minutes.

[0083] FIG. 11 is a graph showing the changes in the hot metal temperature, coke rate, pulverized coal rate, pulverized coal flow rate, blast flow rate, iron-making speed, and inferior raw material charging ratio over 11 days.

[0084] The molten iron temperature in Figure 11 shows the difference from the target molten iron temperature at time zero. The graphs in Figure 11 other than the molten iron temperature graph show the period average value as zero. Automatically controlling the pulverized coal ratio and pulverized coal flow rate using the molten iron temperature control device 1 for all periods in the figure resulted in the molten iron temperature fluctuating within the range of -25 to 35°C, making automatic control of the molten iron temperature possible. Furthermore, on the ninth day, the blast flow rate was reduced due to poor permeability, resulting in a drop in the molten iron temperature. However, increasing the pulverized coal ratio allowed the molten iron temperature to be controlled near the target value. Furthermore, although yard sintering and yard coke were used throughout the entire period in the figure, fluctuations in the molten iron temperature were suppressed. Thus, the control performance of the molten iron temperature control device 1 was confirmed to be excellent even under severe operating conditions, such as reduced airflow due to poor permeability or the use of poor-quality raw materials.

[0085] (Molt metal temperature control system) FIG. 12 is a block diagram showing a configuration example of a molten iron temperature control system including a molten iron temperature control device 1. The molten iron temperature control system includes the molten iron temperature control device 1 and a terminal device 3. The molten iron temperature control system may further include an operation database 2. In the molten iron temperature control system, the molten iron temperature control device 1 may include a communication unit 14 that transmits and receives operation information, in addition to the calculation unit 11, the determination unit 12, and the presentation unit 13. The communication unit 14 transmits the optimal action, operation information, etc., particularly to the terminal device 3. In the molten iron temperature control system, the molten iron temperature control device 1 can present the optimal action, operation information, etc., via the terminal device 3 instead of directly presenting the information. Therefore, the presentation unit 13 functions as an output unit that outputs the optimal action, operation information, etc., to the communication unit 14. The terminal device 3 is, for example, a device used by an operator. The terminal device 3 may be a mobile terminal such as a smartphone or a tablet. The operating equipment 4 is equipment used in blast furnace operation. The molten iron temperature control system is configured to be able to communicate with the operating equipment 4 via a network, and outputs set values ​​of the operating variables that have been updated in accordance with, for example, the optimal action to the operating equipment 4. In the molten iron temperature control system, the molten iron temperature control device 1 executes the above-mentioned processing, and screens such as those shown in FIGS. 5 to 7 are displayed on the terminal device 3. For example, when an operator operates the device (gives instructions), set values ​​of the operating variables are output to the operating equipment 4 in accordance with the instructions. The molten iron temperature control device 1 can also receive instructions regarding operation information from the operator via the communication unit 14.

[0086] (Terminal Device) The terminal device 3 includes an acquisition unit 131, a display unit 132, and an interface unit 133. The acquisition unit 131 acquires an optimal action and operation information related to the optimal action, including a rationale statement. The display unit 132 displays the acquired optimal action and operation information, including the rationale statement. For example, the display unit 132 may display operation information (see FIG. 7 ) including the rationale statement and multiple operation conditions, with the operation conditions displayed in order of priority. The interface unit 133 accepts instructions regarding the displayed operation information and outputs set values ​​of the operation variables in accordance with the instructions or based on the passage of a predetermined time. Here, the set values ​​of the operation variables may be output to the operating equipment 4 directly by the interface unit 133 or via the molten iron temperature control device 1.

[0087] The molten iron temperature control device 1, the operation database 2, the terminal device 3, and the operation equipment 4 are configured to be able to communicate with each other via a network such as a local area network (LAN) or the Internet. The configuration in FIG. 12 is an example. The molten iron temperature control device 1 and the terminal device 3 do not need to include all of the components shown in FIG. 12 . Furthermore, the molten iron temperature control device 1 and the terminal device 3 may include components other than those shown in FIG. 12 . Furthermore, the components included in the molten iron temperature control device 1 and the terminal device 3 are not limited to those shown in FIG. 12 . For example, the determination unit 12 and the display unit 132 may be included in the same device. Furthermore, for example, some of the components included in the molten iron temperature control device 1 in FIG. 12 may be included in the terminal device 3. Furthermore, for example, some of the components included in the terminal device 3 in FIG. 12 may be included in the molten iron temperature control device 1. Therefore, a molten iron temperature control system comprising a molten iron temperature control device 1 and a terminal device 3 may be configured as a whole to comprise a calculation unit 11, a judgment unit 12, a presentation unit 13 (output unit), a communication unit 14, an acquisition unit 131, a display unit 132, and an interface unit 133.

[0088] As described above, the molten iron temperature control method, molten iron temperature control device 1, molten iron temperature control system, and terminal device 3 according to this embodiment are able to suppress excessive actions and present optimal actions and the basis for calculations through the above-described processes and configurations. In this embodiment, even in automatic control (auto mode), the basis for calculations is presented to the operator, allowing the operator to feel convinced. Furthermore, the manipulated variable presentation screen having an accept button and a reject button is suitable for allowing the operator to quickly indicate acceptance or rejection, and is preferable as an interface for operations such as blast furnace operations, where decisions may need to be made every few minutes.

[0089] Although the embodiments have been described above, the present disclosure is not limited by the descriptions and drawings that form a part of the present disclosure according to the present embodiments. For example, changing the manipulated variables for controlling the molten iron temperature leads to fluctuations in the tuyere gas temperature. From the viewpoint of maintaining equipment such as tuyere refractory and preventing deterioration of permeability due to unburned pulverized coal, it is preferable to keep the tuyere gas temperature within a predetermined range. Therefore, the manipulated variable presentation screen may visualize how the tuyere gas temperature changes when the optimal action calculated by the molten iron temperature control device 1 is implemented. In other words, other embodiments, examples, operational techniques, etc., made by those skilled in the art based on the present embodiments are all included in the scope of the technology of the present disclosure.

[0090] REFERENCE SIGNS LIST 1 Molten iron temperature control device 2 Operation database 3 Terminal device 4 Operation equipment 11 Calculation unit 12 Determination unit 13 Presentation unit (output unit) 14 Communication unit 31 Statement expressing the intention of the optimal action 32 Basis for presenting the optimal action 33 Optimal operation amount 34 Accept button 35 Reject button 36 Timer 41 Statement expressing the intention of the optimal action 42 Basis for presenting the optimal action 43 Optimal operation amount 44 Accept button 45 Reject button 131 Acquisition unit 132 Display unit 133 Interface unit

Claims

1. A molten iron temperature control method comprising: a calculation step of calculating a pulverized coal ratio manipulation amount by molten iron temperature control so that a molten iron temperature predicted by a physical model capable of calculating conditions inside a blast furnace falls within a preset target range, calculating a pulverized coal flow rate manipulation amount by pulverized coal ratio tracking control to compensate for a deviation between a target value of the pulverized coal ratio taking into account the pulverized coal ratio manipulation amount and a current actual value of the pulverized coal ratio, and prioritizing the molten iron temperature control or the pulverized coal ratio tracking control as an optimal action based on the magnitude of discrepancy between the target value and the actual value of the pulverized coal ratio; a determination step of determining a basis for calculation of the optimal action and adding a statement to a statement of basis indicating the basis; and a presentation step of presenting operation information including at least one of the pulverized coal ratio manipulation amount and the pulverized coal flow rate manipulation amount calculated as the optimal action and the statement of basis.

2. A molten iron temperature control method as described in claim 1, wherein, in the calculation step, when the absolute value of the pulverized coal flow rate manipulation amount is greater than the manipulation range of the pulverized coal flow rate that can be changed per time, the pulverized coal ratio tracking control is prioritized, and the pulverized coal manipulation amount calculated by the molten iron temperature control is not taken into account in the target value of the pulverized coal ratio.

3. A molten iron temperature control method as described in claim 1 or 2, wherein, when a molten iron temperature predicted value calculated taking into account the pulverized coal flow rate operation amount falls outside the target range of the molten iron temperature, the calculation step gives priority to the molten iron temperature control and takes into account the pulverized coal operation amount calculated by the molten iron temperature control in the target value of the pulverized coal ratio.

4. A molten iron temperature control method as described in any one of claims 1 to 3, wherein the determination step adds a plurality of statements to the reason statement, and the plurality of statements includes a plurality of change contents arranged in order of proximity to the current time or in order of the largest amount of change.

5. A molten iron temperature control method as described in any one of claims 1 to 4, wherein the operation information is an operation quantity presentation screen having wording expressing the intention of the optimal action, a basis for calculating the optimal action, an accept button, and a reject button, the accept button being used when the operator accepts the optimal action shown on the operation quantity presentation screen, and the reject button being used when the operator rejects the optimal action shown on the operation quantity presentation screen.

6. The molten iron temperature control method of claim 5, wherein the presentation step has, as control modes, a semi-automatic mode in which the optimal action is executed with the approval of the operator and an automatic mode in which the optimal action is executed without the approval of the operator, and the operation information is an operation amount presentation screen further having a timer when the control mode is the automatic mode, and the timer displays the time from the time when the display regarding the optimal action is updated to a predetermined specified time, and if the non-adopted button is not selected before the specified time is reached, the optimal action is executed.

7. A molten iron temperature control device comprising: a calculation unit that calculates a pulverized coal ratio manipulation amount by molten coal temperature control so that a molten coal temperature predicted by a physical model capable of calculating conditions inside a blast furnace falls within a predetermined target range, calculates a pulverized coal flow rate manipulation amount by pulverized coal ratio tracking control to compensate for a deviation between a target value of the pulverized coal ratio taking into account the pulverized coal ratio manipulation amount and a current actual value of the pulverized coal ratio, and prioritizes the molten coal temperature control or the pulverized coal ratio tracking control as an optimal action based on the magnitude of discrepancy between the target value and the actual value of the pulverized coal ratio; a determination unit that determines a basis for calculation of the optimal action and adds a statement to a statement of basis indicating the basis; and a presentation unit that presents operation information including at least one of the pulverized coal ratio manipulation amount and the pulverized coal flow rate manipulation amount calculated as the optimal action and the statement of basis.

8. A molten iron temperature control device as described in claim 7, wherein when the absolute value of the pulverized coal flow rate manipulation amount is greater than the manipulation range of the pulverized coal flow rate that can be changed per time, the calculation unit prioritizes the pulverized coal ratio tracking control and does not take the pulverized coal manipulation amount calculated by the molten iron temperature control into account in the target value of the pulverized coal ratio.

9. A molten iron temperature control device as described in claim 7 or 8, wherein when a molten iron temperature prediction value calculated taking into account the pulverized coal flow rate operation amount falls outside the target range of the molten iron temperature, the calculation unit prioritizes the molten iron temperature control and takes the pulverized coal operation amount calculated by the molten iron temperature control into account in the target value of the pulverized coal ratio.

10. A molten iron temperature control device as described in any one of claims 7 to 9, wherein the judgment unit adds multiple statements to the reason statement, and the multiple statements include multiple changes arranged in order of closest to the current time or in order of largest amount of change.

11. A molten iron temperature control device as described in any one of claims 7 to 10, wherein the operation information is an operation quantity presentation screen having wording expressing the intention of the optimal action, a basis for calculating the optimal action, an accept button, and a reject button, the accept button being used when the operator accepts the optimal action shown on the operation quantity presentation screen, and the reject button being used when the operator rejects the optimal action shown on the operation quantity presentation screen.

12. A molten iron temperature control device as described in claim 11, wherein the presentation unit has, as control modes, a semi-automatic mode in which the optimal action is executed with the approval of the operator and an automatic mode in which the optimal action is executed without the approval of the operator, and the operation information is an operation amount presentation screen further having a timer when the control mode is the automatic mode, and the timer displays the time from the time when the display regarding the optimal action is updated to a predetermined specified time, and if the non-adopted button is not selected before the specified time is reached, the optimal action is executed.

13. A molten iron temperature control system comprising a molten iron temperature control device and a terminal device, comprising: a calculation unit which calculates a pulverized coal ratio manipulation amount by molten iron temperature control so that a molten iron temperature predicted by a physical model capable of calculating the state inside a blast furnace falls within a preset target range, calculates a pulverized coal flow rate manipulation amount by pulverized coal ratio tracking control to compensate for a deviation between a target value of the pulverized coal ratio taking into account the pulverized coal ratio manipulation amount and a current actual value of the pulverized coal ratio, and prioritizes the molten iron temperature control or the pulverized coal ratio tracking control as an optimal action based on the degree of discrepancy between the target value of the pulverized coal ratio and the actual value; a determination unit which determines a basis for calculation of the optimal action and adds a statement to a statement of basis indicating the basis; an output unit which outputs operation information including at least one of the pulverized coal ratio manipulation amount and the pulverized coal flow rate manipulation amount calculated as the optimal action and the statement of basis; and a communication unit which transmits and receives the operation information. A molten iron temperature control system comprising: an acquisition unit that acquires the optimal action and the operation information related to the optimal action, including the rationale statement; a display unit that displays the acquired optimal action and the operation information so that the rationale statement is included; and an interface unit that receives instructions for the displayed operation information and outputs a setting value of an operation variable in accordance with the instruction or based on the passage of a predetermined time.

14. A terminal device constituting a molten iron temperature control system together with a molten iron temperature control device that outputs operation information including at least one of a pulverized coal ratio manipulation amount and a pulverized coal flow rate manipulation amount calculated as an optimal action based on the magnitude of discrepancy between a target pulverized coal ratio value and an actual pulverized coal ratio value for control of molten iron temperature, and a reason statement indicating the reason for the calculation of the optimal action, the terminal device comprising: an acquisition unit that acquires the optimal action and the operation information related to the optimal action including the reason statement; a display unit that displays the acquired optimal action and the operation information so that the reason statement is included; and an interface unit that accepts instructions for the displayed operation information and outputs a setting value of an operation variable in accordance with the instruction or based on the passage of a predetermined time.

15. The terminal device according to claim 14, wherein the operation information includes a plurality of operation conditions and is displayed together with an order of priority.

Citation Information

Patent Citations

  • Method for identifying predicting model of molten iron temperature in blast furnace and its program, and method for predicting molten iron temperature in blast furnace and its program

    JP2005320588A

  • Operation guidance method, blast furnace operation method, production method of hot metal, and operation guidance device

    JP2022014169A

  • Molten iron temperature control method, operation guidance method, blast furnace operation method, molten iron manufacturing method, molten iron temperature control device, and operation guidance device

    JP7107444B2

  • Method for controlling process, operation guidance method, method for operating blast furnace, method for manufacturing molten iron, and device for controlling process

    WO2021014923A1