Hydrogen energy or hydrogen installation order management device, method, and system

The system optimizes hydrogen energy ordering and delivery by using AI to match charging stations with production bases and providing a backup system, addressing inefficiencies and ensuring continuous supply, thus improving the hydrogen energy supply chain's efficiency and cost-effectiveness.

WO2024205334A1PCT designated stage expired Publication Date: 2024-10-03SLENO CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/KR2024/004105
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-31
Filing Date
2024-03-29
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

The existing hydrogen energy supply chain faces issues with frequent missed orders, increased logistics costs, and decreased efficiency due to inefficient logistics methods, necessitating improved ordering and delivery processes for hydrogen facilities and equipment.

Method used

A system and method for efficiently ordering and delivering hydrogen energy and equipment by matching charging stations with production bases using artificial intelligence to optimize hydrogen energy ordering contracts, allowing for automatic ordering and ensuring continuous supply through spare production bases in case of disruptions.

Benefits of technology

This approach optimizes hydrogen energy ordering, reduces logistics costs, and ensures uninterrupted supply by automating the ordering process and providing a backup system for hydrogen energy delivery, enhancing the efficiency of production and distribution facilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure KR2024004105_03102024_PF_FP_ABST
    Figure KR2024004105_03102024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention relates to a hydrogen energy or hydrogen installation ordering device, method, and system and, more specifically, mediates an order contract relating to supply of hydrogen energy or hydrogen installation components between a demand side and a supply side, and enables automatic ordering of hydrogen energy or hydrogen installation components required by the demand side during a predetermined period, so that the demand side can be efficiently supplied with the hydrogen energy or hydrogen installation components.
Need to check novelty before this filing date? Find Prior Art

Description

Hydrogen energy or hydrogen facility order management device, method and system

[0001] The present invention relates to a device, method and system for ordering hydrogen energy or hydrogen equipment, and more particularly, to a device, method and system for mediating an ordering contract for the supply of hydrogen energy or hydrogen equipment parts between a demand side and a supply side, and for automatically ordering hydrogen energy or hydrogen equipment parts required by the demand side for a certain period of time, thereby enabling efficient supply of hydrogen energy or hydrogen equipment parts.

[0002] Hydrogen, with atomic number 1, is abundant, making up 75% of the universe's mass. It exists infinitely in nature, bound to oxygen and carbon.

[0003] Additionally, hydrogen is environmentally friendly because it does not produce pollutants such as fine dust when generating energy and only emits pure water as a byproduct.

[0004] Furthermore, hydrogen complements the surplus power of renewable energy by storing it inexpensively and efficiently. This can facilitate the energy transition in industries and transportation, which require a stable energy supply.

[0005] Due to these characteristics, hydrogen is considered a leading clean energy source, replacing fossil fuels. Hydrogen is the most abundant and lightest element in the universe, can be made from water, and, after use, reverts to water, drawing attention as a clean energy source.

[0006] Previously, hydrogen energy was produced at power plants, production facilities, etc., and the produced hydrogen energy was charged into a tube trailer, transported through the tube trailer, and delivered to a charging station. Then, a dispenser was connected to the tube trailer, and hydrogen energy could be charged into transportation vehicles through the dispenser at the charging station.

[0007] However, this type of hydrogen energy supply has problems such as frequent missed orders, increased logistics costs due to inefficient logistics methods, and consequently reduced efficiency of production facilities.

[0008] Therefore, it is necessary to order hydrogen facilities related to the production and supply of hydrogen energy and to efficiently deliver the ordered hydrogen facilities.

[0009] Additionally, there is a constant need for replacement of hydrogen facilities, such as production bases that produce hydrogen energy and charging stations that receive hydrogen energy from production bases and then supply it to transportation.

[0010] Therefore, it is necessary to more efficiently order hydrogen energy between the demand side and the supply side and efficiently deliver the ordered hydrogen energy to charging stations.

[0011] The present invention is intended to solve the problems of the prior art as described above, and its purpose is to mediate a contract for the supply of hydrogen energy between the demand side and the supply side.

[0012] Additionally, the purpose is to provide automatic hydrogen energy orders from the demand side for a certain period of time in accordance with the hydrogen energy supply ordering contract concluded between the demand side and the supply side.

[0013] In addition, the purpose is to efficiently supply hydrogen facility parts by mediating order contracts for the supply of hydrogen facility parts between demanders and suppliers and allowing demanders to automatically order the hydrogen facility parts they need for a certain period of time.

[0014] In order to achieve the above object, a hydrogen energy order management method according to the present invention may include the steps of: receiving request information regarding hydrogen energy supply from a charging station terminal; receiving, from at least one production base terminal, proposed price information regarding hydrogen energy supply and operation information of the production base; determining one of the at least one production base as a main production base based on the request information regarding hydrogen energy supply, the proposed price information regarding hydrogen energy supply, and the operation information of the production base, and matching the same with a charging station related to the charging station terminal; transmitting information regarding a hydrogen energy order contract to the main production base terminal and the charging station terminal; and receiving approval information regarding the conclusion of the hydrogen energy order contract from the main production base terminal and the charging station terminal, and concluding the hydrogen energy order contract.

[0015] Here, the method may further include a step of receiving operation information of a charging station from the charging station terminal, inferring a consumption pattern of hydrogen energy of the charging station based on the operation information of the charging station to produce demand prediction information, and, in response to the charging station needing hydrogen energy supply based on the demand prediction information, transmitting order information for ordering hydrogen energy to the main production base terminal based on the order contract.

[0016] In addition, the method of inferring the consumption pattern of hydrogen energy of the charging station and producing demand prediction information is to learn to produce the demand prediction information based on the operation information of the charging station while the artificial intelligence model applies the operation information of the charging station as an input variable and the demand prediction information as an output variable, and based on the demand prediction information, it is possible to determine whether or not there is a need for supply of hydrogen energy.

[0017] In addition, the operation information of the charging station may include at least one of information on the amount of hydrogen energy used or sold daily, weekly, monthly or yearly, information on the remaining amount of fuel in the tube trailer, information on the replacement history cycle of the tube trailer, information on the location of the charging station, and information on the acceptable hydrogen energy supply price.

[0018] In addition, the step of determining one of the at least one production base as a main production base and matching it with a charging station related to the charging station terminal includes a step of learning to match the charging station and the production base based on the request information on the hydrogen energy supply, the proposed price information on the hydrogen energy supply, and the operation information of the production base, while the artificial intelligence model applies the request information on the hydrogen energy supply, the proposed price information on the hydrogen energy supply, and the operation information of the production base as input variables and applies matching of the charging station and the production base as output variables, and when matching the charging station and the production base, the production base that most closely matches the charging station can be matched as the main production base.

[0019] In addition, the operational information of the production base may include at least one of information on the daily, weekly, monthly or yearly supply of hydrogen energy, information on the production operation rate, information on whether a tube trailer charging hydrogen energy is being charged or on standby, information on the charging time of the tube trailer, information on the location of the production base, information on the inventory of hydrogen energy, and information on the supply history of hydrogen energy.

[0020] In addition, the step of determining one of the at least one production base as a main production base and matching it with the charging station may include a step of additionally matching at least one reserve production base excluding the main production base based on the proposed price information for the hydrogen energy supply and the operation information of the production base.

[0021] In addition, when receiving supply unavailability information including unavailability of hydrogen energy supply from the main production base terminal, the supply unavailability information is transmitted to the charging station terminal, and when receiving one-time supply request information from the charging station terminal, the one-time supply request information is transmitted to the production base terminal of at least one reserve production base, so as to notify the at least one reserve production base to transmit proposal price information for hydrogen energy supply for a predetermined period of time, and based on the transmitted proposal price information for hydrogen energy supply, an auction can be conducted to conclude a contract for ordering of the reserve production base and the charging station.

[0022] Meanwhile, a hydrogen energy order management device according to the present invention for achieving the above object may include an information transmission and reception unit that receives request information on hydrogen energy supply from a charging station terminal, receives proposed price information on hydrogen energy supply and operation information of a production base from at least one production base terminal, and transmits information on a hydrogen energy order contract to a main production base terminal and the charging station terminal; and a contract management unit that determines one of the at least one production base as a main production base based on the request information on hydrogen energy supply, the proposed price information on hydrogen energy supply, and the operation information of the production base, matches it with the charging station, and receives approval information on the conclusion of the hydrogen energy order contract from the main production base terminal and the charging station terminal to conclude the hydrogen energy order contract.

[0023] Meanwhile, a hydrogen energy order management system according to the present invention for achieving the above object may include a charging station terminal for transmitting request information regarding hydrogen energy supply; at least one production base terminal for transmitting proposed price information regarding hydrogen energy supply and operation information of a production base; and an order management device for receiving request information regarding hydrogen energy supply from the charging station terminal, receiving proposed price information regarding hydrogen energy supply and operation information of the production base from the at least one production base terminal, and determining one of the at least one production base as a main production base and matching it with the charging station based on the request information regarding hydrogen energy supply, the proposed price information regarding hydrogen energy supply, and the operation information of the production base, transmitting information regarding a hydrogen energy order contract to the main production base terminal and the charging station terminal, and receiving approval information regarding the conclusion of the hydrogen energy order contract from the main production base terminal and the charging station terminal to conclude the hydrogen energy order contract.

[0024] Meanwhile, a hydrogen energy order management method according to the present invention for achieving the above object may include the steps of: receiving request information regarding hydrogen energy supply from a charging station terminal; receiving, from at least one production base terminal, proposed price information regarding hydrogen energy supply and operation information of the production base for a predetermined period of time; conducting an auction for the predetermined period of time based on the proposed price information regarding the hydrogen energy supply transmitted; determining the successful production base as a main production base in response to a successful bid from at least one production base based on the auction and matching the successful production base with a charging station related to the charging station terminal; transmitting information regarding a hydrogen energy order contract to the main production base terminal and the charging station terminal; and receiving approval information regarding the conclusion of the hydrogen energy order contract from the main production base terminal and the charging station terminal and concluding the hydrogen energy order contract.

[0025] Meanwhile, a hydrogen energy order management method according to the present invention for achieving the above object may include the steps of: receiving, from at least one production base terminal, information on proposed price for hydrogen energy supply and information on operation of the production base; posting information on an open market based on the information on proposed price for hydrogen energy supply and information on operation of the production base and providing the information to a charging station terminal; selecting one of the at least one production base posted on the open market from the charging station terminal, and determining one of the at least one production base as a main production base and matching it with a charging station related to the charging station terminal; transmitting information on a hydrogen energy order contract to the main production base terminal and the charging station terminal; and receiving, from the main production base terminal and the charging station terminal, information on the conclusion of the hydrogen energy order contract and concluding the hydrogen energy order contract.

[0026] Meanwhile, a hydrogen facility order management method according to the present invention for achieving the above object may include the steps of: receiving hydrogen facility component information, proposed price information regarding hydrogen facility component supply, and supplier operation information from at least one supplier terminal; posting the hydrogen facility component information, the proposed price information regarding hydrogen facility component supply, and the supplier operation information on an open market and providing the information to a demand terminal; determining a supplier related to the hydrogen facility component as a primary supplier in response to selection information of the hydrogen facility component selected from the open market by the demand terminal, and matching the supplier with a demander related to the demand terminal; transmitting information regarding an order contract for hydrogen facility components to the primary supplier terminal and the demand terminal; and receiving approval information regarding the conclusion of an order contract for hydrogen facility components from the primary supplier terminal and the demand terminal, and concluding an order contract for hydrogen facility components.

[0027] Here, the method may further include a step of receiving user operation information from the user terminal, and based on the user operation information, inferring the user's need for hydrogen facility replacement to produce demand forecast information, and in response to determining that the user needs a supply of hydrogen facility parts based on the demand forecast information, a step of transmitting order information for ordering hydrogen facility parts to the primary supplier terminal based on the order contract may be further included.

[0028] In addition, the process of inferring the user's need for replacement of hydrogen facilities and producing demand prediction information involves learning to produce demand prediction information based on the user's operation information while the artificial intelligence model applies the user's operation information as an input variable and the demand prediction information as an output variable, and based on the demand prediction information, it is possible to determine whether or not there is a need for supply of hydrogen facilities.

[0029] In addition, the above-mentioned user operation information may include at least one of information on the number of times the charging dispenser has been charged, information on the operating time of the charging dispenser, information on the vibration intensity and vibration pattern of the charging dispenser, information on the noise level, noise cycle and noise pattern of the charging dispenser, and the acceptable hydrogen facility supply price.

[0030] In addition, the above-mentioned demand operation information may include at least one of information on the number of times the tube trailer of the hydrogen facility is charged, information on the production time of the hydrogen facility, information on the vibration intensity and vibration pattern of the hydrogen facility, information on the noise level, noise cycle and noise pattern of the hydrogen facility, and information on the acceptable supply price of the hydrogen facility.

[0031] Additionally, the supplier operation information may include at least one of information on daily, weekly, monthly or yearly supply of hydrogen facility components, information on the location of the supplier, information on the inventory of hydrogen facility components, and information on the supply history of hydrogen facility components.

[0032] Meanwhile, a hydrogen facility order management device according to the present invention for achieving the above object may include an information transmission and reception unit that receives hydrogen facility component information, proposed price information on hydrogen facility component supply, and supplier operation information from at least one supplier terminal, and transmits information on an order contract for hydrogen facility components to a primary supplier terminal and a demand terminal; a contract management unit that posts the hydrogen facility component information, the proposed price information on hydrogen facility supply, and the supplier operation information on an open market and provides the information to a demand terminal, and determines a supplier related to the hydrogen facility component as a primary supplier in response to selection information of the hydrogen facility component selected from the open market by the demand terminal, matches the supplier with a demander related to the demand terminal, and receives approval information on the conclusion of an order contract for the hydrogen facility component from the primary supplier terminal and the demand terminal, and concludes an order contract for the hydrogen facility component.

[0033] Meanwhile, a hydrogen facility order management system according to the present invention for achieving the above object may include: a demand terminal transmitting selection information for selecting hydrogen facility components; at least one supplier terminal transmitting hydrogen facility component information, proposed price information for hydrogen facility supply, and supplier operation information; and an order management device receiving the hydrogen facility component information, proposed price information for hydrogen facility supply, and supplier operation information from the at least one supplier terminal, and providing the hydrogen facility component information, the proposed price information for hydrogen facility supply, and the supplier operation information to the demand terminal by posting the information on an open market based on the hydrogen facility component information, the proposed price information for hydrogen facility component supply, and the supplier operation information, and determining a supplier related to the hydrogen facility component as a main supplier in response to the selection information for selecting hydrogen facility components from the demand terminal in the open market, matching the supplier with a demander related to the demand terminal, transmitting information on an order contract for the hydrogen facility component to the main supplier terminal and the demand terminal, and receiving approval information on the conclusion of an order contract for the hydrogen facility component from the main supplier terminal and the demand terminal to conclude an order contract for the hydrogen facility component.

[0034] Meanwhile, a hydrogen facility order management method according to the present invention for achieving the above object may include the steps of: receiving request information regarding the supply of hydrogen facility parts from a demand terminal; receiving hydrogen facility part information, proposed price information regarding the supply of hydrogen facility parts, and supplier operation information from at least one supplier terminal; determining one of at least one supplier as a primary supplier based on the request information regarding the supply of hydrogen facility parts, the hydrogen facility part information, proposed price information regarding the supply of hydrogen facility parts, and the supplier operation information, and matching the selected supplier with a demander associated with the demand terminal; transmitting information regarding an order contract for hydrogen facility parts to a primary supplier terminal and the demand terminal; and receiving approval information regarding the conclusion of an order contract for hydrogen facility parts from the primary supplier terminal and the demand terminal, and concluding an order contract for hydrogen facility parts.

[0035] Here, the step of determining one of the at least one supplier as a primary supplier and matching it with a demander related to the demander terminal includes a step of learning to match the demander and supplier based on the hydrogen facility component information, the request information regarding the hydrogen facility supply, the proposed price information regarding the hydrogen facility supply, and the supplier operation information, while the artificial intelligence model applies the hydrogen facility component information, the request information regarding the hydrogen facility supply, the proposed price information regarding the hydrogen facility supply, and the supplier operation information as input variables and applies matching of the demander and supplier as output variables, and when matching the demander and supplier, the supplier that best matches the demander can be matched as the primary supplier.

[0036] In addition, the step of determining one of the at least one supplier as a primary supplier and matching it with the demander may include a step of additionally matching at least one reserve supplier excluding the primary supplier based on the hydrogen facility component information, the proposed price information for the hydrogen facility component supply, and the supplier operation information.

[0037] In addition, when receiving information on unavailability of supply, including unavailability of supply of hydrogen facility components, from the primary supplier terminal, the unavailability of supply information is transmitted to the demand terminal, and in response to selection information for selecting at least one reserve supplier from the demand terminal, information on an order contract for hydrogen facility components is transmitted to the demand terminal and the reserve supplier terminal, and approval information on the conclusion of an order contract for hydrogen facility components is received from the reserve supplier terminal and the demand terminal, so that the order contract for hydrogen facility components can be concluded.

[0038] Meanwhile, a hydrogen facility order management method according to the present invention for achieving the above object may include the steps of: receiving request information regarding the supply of hydrogen facility parts from a demand terminal; receiving hydrogen facility part information, proposed price information regarding the supply of hydrogen facility parts, and supplier operation information from at least one supplier terminal for a predetermined period of time; conducting an auction for the predetermined period of time based on the transmitted hydrogen facility part information and the proposed price information regarding the supply of hydrogen facility parts; determining the successful bidder as a primary supplier based on the auction, in response to a successful bid from at least one supplier, and matching the successful bidder with a demander associated with the demand terminal; transmitting information regarding an order contract for hydrogen facility parts to a primary supplier terminal and the demand terminal; and receiving approval information regarding the conclusion of an order contract for hydrogen facility parts from the primary supplier terminal and the demand terminal, and concluding an order contract for hydrogen facility parts.

[0039] The hydrogen energy order management device, method and system according to the present invention have the following effects.

[0040] First, it can provide an optimal hydrogen energy ordering contract. The present invention receives operational information on charging stations and production bases, enabling optimal matching between charging stations and production bases. This allows for optimal hydrogen energy ordering contracts to be concluded.

[0041] Second, ordering is easy. The present invention monitors the operational status of charging stations that have signed ordering contracts. If it determines that a charging station requires hydrogen energy supply, the production base can automatically place an order for hydrogen energy to be supplied to that charging station. Accordingly, charging stations can receive hydrogen energy without a separate ordering process.

[0042] Third, hydrogen energy can be supplied to charging stations without interruption. In the present invention, when a charging station and a production base enter into a contract, the contracted production base is designated as the primary production base, and a backup production base can be additionally matched with the charging station. Accordingly, hydrogen energy is typically ordered from the primary production base to the charging station with which the contract was signed. However, if hydrogen energy production at the primary production base is disrupted, the backup production base can be ordered to supply hydrogen energy to the corresponding charging station, ensuring a smooth supply of hydrogen energy to the charging station.

[0043] Meanwhile, the hydrogen facility order management method, device and system according to the present invention have the following effects.

[0044] First, it can provide an optimal hydrogen facility ordering contract. The present invention receives supplier operation information from suppliers and demand operation information from demanders, optimally matching demanders and suppliers, and thereby concludes an ordering contract for hydrogen facility components required for maintenance.

[0045] Second, ordering is easy. The present invention monitors the operational status of a customer who has entered into an ordering contract. If it determines that the customer needs hydrogen equipment parts, the system automatically orders the supplier to supply the hydrogen equipment parts to the relevant charging station. This allows the customer to easily obtain hydrogen equipment parts that require frequent replacement without a separate ordering process.

[0046] Third, hydrogen facility components can be supplied to users without interruption. In the present invention, when a user and a supplier enter into a purchase order agreement, the supplier who signed the contract is designated as the primary supplier, and additional backup suppliers can be matched. Accordingly, while normally the primary supplier supplies hydrogen facility components to the user who signed the purchase order agreement, if the primary supplier experiences a disruption in the supply of hydrogen facility components, the backup supplier can supply the components to the user, ensuring a smooth supply of hydrogen facility components to the user.

[0047] Figure 1 is a block diagram showing a hydrogen energy ordering management system according to an embodiment of the present invention.

[0048] FIG. 2 is a block diagram showing a hydrogen energy ordering management device according to an embodiment of the present invention.

[0049] Figure 3 is a flowchart showing the process of ordering a hydrogen energy contract according to an embodiment of the present invention.

[0050] FIG. 4 is a schematic diagram illustrating learning by a hydrogen energy order management device according to an embodiment of the present invention to match a charging station and a production base.

[0051] FIG. 5 is a drawing exemplarily showing a hydrogen energy order management device according to an embodiment of the present invention that monitors a charging station and automatically orders hydrogen energy to a production base according to an order contract when hydrogen energy supply is required at the charging station.

[0052] FIG. 6 is a diagram showing a hydrogen energy order management device according to an embodiment of the present invention mediating an order contract for the supply of hydrogen energy between a reserve production base and a charging station.

[0053] FIG. 7 is a diagram showing a hydrogen energy order management device according to an embodiment of the present invention mediating an order contract for the supply of hydrogen energy through an open market.

[0054] Figure 8 is a block diagram showing a hydrogen facility order management system according to an embodiment of the present invention.

[0055] Figure 9 is a block diagram showing a hydrogen facility order management device according to an embodiment of the present invention.

[0056] FIG. 10 is a drawing showing a hydrogen facility order management device according to an embodiment of the present invention mediating an order contract for the supply of hydrogen facility parts through an open market.

[0057] FIG. 11 is a drawing exemplarily showing a hydrogen facility order management device according to an embodiment of the present invention that monitors a user and automatically orders hydrogen facility parts from a maintenance company according to an order contract when a user needs to supply hydrogen facility parts.

[0058] FIG. 12 is a drawing exemplarily showing a hydrogen facility order management device according to an embodiment of the present invention that matches a demander and a supplier to order hydrogen facility parts.

[0059] FIG. 13 is a schematic diagram illustrating what a hydrogen facility order management device according to an embodiment of the present invention learns to match a demander and a supplier.

[0060] FIG. 14 is a drawing exemplarily showing a hydrogen facility order management device according to an embodiment of the present invention ordering hydrogen facility parts by matching a demander and a potential supplier.

[0061] <Explanation of symbols>

[0062] 100: Production base terminal

[0063] 200: Charging station terminal

[0064] 300: Order Management Device

[0065] 310: Information Transmitter and Receiver

[0066] 320: Contract Management Department

[0067] 330: Charging Station Management Department

[0068] 340: Transportation Management Department

[0069] 400: Supplier Terminal

[0070] 500: Demand terminal

[0071] 600: Order Management Device

[0072] 610: Information Transmitter and Receiver

[0073] 620: Contract Management Department

[0074] 630: Demand Forecasting Department

[0075] 640: Transportation Management Department

[0076] Specific structural or functional descriptions of embodiments according to the concept of the present invention disclosed in this specification are merely illustrative for the purpose of explaining embodiments according to the concept of the present invention, and embodiments according to the concept of the present invention may be implemented in various forms and are not limited to the embodiments described in this specification.

[0077] Since embodiments according to the concept of the present invention can have various changes and can have various forms, embodiments are illustrated in the drawings and described in detail in the present specification.

[0078] However, this is not intended to limit the embodiments according to the concept of the present invention to specific disclosure forms, but includes all modifications, equivalents, or substitutes included in the spirit and technical scope of the present invention.

[0079] When it is said that a component is "connected" or "connected" to another component, it should be understood that it may be directly connected or connected to that other component, but that there may be other components in between. Conversely, when it is said that a component is "directly connected" or "connected" to another component, it should be understood that there are no other components in between.

[0080] The terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the invention.

[0081] Singular expressions include plural expressions unless the context clearly dictates otherwise. In this specification, the terms "comprises" or "having" should be understood to indicate the presence of a disclosed feature, number, step, operation, component, part, or combination thereof, but not to exclude the possibility of the presence or addition of one or more other features, numbers, steps, operations, components, parts, or combinations thereof.

[0082] Unless otherwise defined, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which the present invention belongs.

[0083] Terms defined in commonly used dictionaries should be interpreted to have a meaning consistent with their meaning in the context of the relevant technology, and will not be interpreted in an idealized or overly formal sense unless expressly defined herein.

[0084] Hereinafter, the specific technical configuration of the present invention will be examined with reference to the attached drawings.

[0085] Hydrogen Energy Order Management System

[0086] Figure 1 is a block diagram showing a hydrogen energy ordering management system according to an embodiment of the present invention.

[0087] As illustrated in FIG. 1, a hydrogen energy order management system according to an embodiment of the present invention may include a production base terminal (100), a charging station terminal (200), and an order management device (300).

[0088] The production base terminal (100) is configured to communicate with the order management device (300) at the production base. Here, the production base refers to a supply side that produces and supplies hydrogen energy, and can be used in the same sense as a power plant or a shipping center. The production base can enter into an order contract for hydrogen energy with a specific charging station via the order management device (300), and based on the concluded order contract, can charge hydrogen energy into a tube trailer and ship it to the charging station.

[0089] The production base terminal (100) is connected to the order management device (300) via a network, and can transmit operation information of the production base related to the production base to the order management device (300).

[0090] For example, the production base terminal (100) may transmit to the order management device (300) operation information of the production base and proposed price information on hydrogen energy supply, including at least one of information on the daily, weekly, monthly or yearly supply amount of hydrogen energy produced at the production base, information on the production operation rate, information on whether a tube trailer charging hydrogen energy is being charged or on standby, information on the charging time of the tube trailer, information on the location of the production base, information on the inventory amount of hydrogen energy, and information on the supply history of hydrogen energy.

[0091] Meanwhile, the hydrogen energy mentioned in the present invention may use hydrogen in any of the following forms: gas, liquid, and LOHC (Liquid Organic Hydrogen Carriers). However, hydrogen is not limited to these forms and various forms may be used.

[0092] Here, the production base terminal (100) includes, but is not limited to, a remote device, a workstation, a computer, a general-purpose computer, an Internet appliance, a handheld device, a wireless device, a portable device, a wearable computer, a cellular or mobile phone, a personal digital assistant (PDA), a smartphone, a tablet, an ultrabook, a netbook, a laptop, a desktop, a multi-processor system, a microprocessor-based or programmable home appliance, a set-top box, a network PC, a minicomputer, and the like.

[0093] The charging station terminal (200) communicates with the order management device (300) at the charging station. Here, the charging station is a location where hydrogen-fueled vehicles visit to recharge hydrogen energy, representing the demand side requiring hydrogen energy. Accordingly, the charging station can supply hydrogen energy according to the demand of the corresponding vehicle. The charging station enters into an order contract with a specific production base via the order management device (300), and based on the concluded order contract, a tube trailer filled with hydrogen energy is transported from the production base, thereby supplying hydrogen energy.

[0094] The charging station terminal (200) is connected to the order management device (300) via a network, and can transmit operation information of the charging station related to the charging station to the order management device (300).

[0095] For example, the charging station terminal (200) can transmit to the order management device (300) operation information of the charging station including at least one of information on the amount of hydrogen energy used or sold daily, weekly, monthly or yearly, information on the remaining amount of fuel in the tube trailer, information on the replacement history cycle of the tube trailer, information on the location of the charging station, and information on the acceptable hydrogen energy supply price.

[0096] Additionally, the charging station terminal (200) can transmit request information regarding hydrogen energy supply to the order management device (300). This request information regarding hydrogen energy supply is information transmitted to the order management device (300) to receive hydrogen energy.

[0097] Here, the charging station terminal (200) includes, but is not limited to, a remote device, a workstation, a computer, a general-purpose computer, an Internet appliance, a handheld device, a wireless device, a portable device, a wearable computer, a cellular or mobile phone, a personal digital assistant (PDA), a smartphone, a tablet, an ultrabook, a netbook, a laptop, a desktop, a multi-processor system, a microprocessor-based or programmable home appliance, a set-top box, a network PC, a minicomputer, and the like.

[0098] The order management device (300) is connected to a production base terminal (100) and a charging station terminal (200) via a network, and is configured to conclude an order contract for hydrogen energy between the production base and the charging station, and automatically order hydrogen energy according to the order contract.

[0099] In the case of hydrogen energy, rather than storing it in transport tanks and then supplying it to the charging station's storage space, as is the case with conventional liquefied natural gas (LNG), the tube trailers themselves used to store and transport hydrogen are being replaced. Thus, to ensure optimal replacement of the tube trailers at charging stations, a pre-filled tube trailer is required.

[0100] Accordingly, the order management device (300) can mediate and conclude an order contract for hydrogen energy between a production base and a charging station, monitor the charging station, and automatically order hydrogen energy to the production base according to the concluded order contract when supply of hydrogen energy is required, thereby managing the transport of hydrogen energy from the production base to the charging station.

[0101] Here, the order management device (300) can be implemented as a computing device, which can be a server-class computer or a terminal. However, it does not necessarily have to be a server-class computer; it can also be implemented as a terminal such as a general-purpose personal computer or laptop. It can also be implemented as a high-capacity server device, but this does not necessarily mean that it must be a high-capacity device.

[0102] Hydrogen Energy Order Management Device

[0103] Below, the hydrogen energy order management device (300) will be described with reference to the drawing.

[0104] Figure 2 is a block diagram showing a hydrogen energy order management device (300) according to an embodiment of the present invention.

[0105] As illustrated in FIG. 2, a hydrogen energy order management device (hereinafter referred to as 'order management device (300)') according to an embodiment of the present invention may include an information transmission and reception unit (310), a contract management unit (320), a charging station management unit (330), and a transportation management unit (340).

[0106] The information transmission and reception unit (310) is configured to receive and transmit multiple pieces of information from the production base terminal (100) and the charging station terminal (200).

[0107] For example, as described above, the information transmitting and receiving unit (310) can receive, from the production base terminal (100), operation information of the production base including at least one of information on the daily, weekly, monthly or yearly supply amount of hydrogen energy produced at the production base, information on the production operation rate, information on whether a tube trailer charging hydrogen energy is being charged or on standby, information on the charging time of the tube trailer, information on the location of the production base, information on the inventory amount of hydrogen energy, and information on the supply history of hydrogen energy, and suggested price information on the supply of hydrogen energy.

[0108] In addition, the information transmitting and receiving unit (310) can receive, from the charging station terminal (200), operating information of the charging station including at least one of information on the amount of hydrogen energy used or sold daily, weekly, monthly or yearly, information on the remaining amount of fuel in the tube trailer, information on the replacement history cycle of the tube trailer, information on the location of the charging station, and information on the acceptable hydrogen energy supply price.

[0109] In addition, the information transmission and reception unit (310) can transmit information regarding an ordering contract to the production base terminal (100) and the charging station terminal (200) so that the production base and the charging station can enter into an ordering contract regarding hydrogen energy.

[0110] That is, the information transmission and reception unit (310) can receive request information regarding hydrogen energy supply from the charging station terminal (200) and transmit information regarding an order contract between the charging station and the production base to the charging station terminal (200) and the production base terminal (100), respectively. In addition, the information transmission and reception unit (310) can transmit order information to the production base terminal (100) according to an order contract concluded between the production base and the charging station.

[0111] The contract management unit (320) manages hydrogen energy procurement contracts between production bases and charging stations. Based on request information regarding procurement contracts received from charging stations, operational information about production bases received from at least one production base terminal (100), and proposed price information, the contract management unit (320) can match procurement contracts with at least one production base to a primary production base and charging station.

[0112] At this time, the contract management department (320) can match the charging station with the main production base based on the proposed price for supplying hydrogen energy from the production base, the daily, weekly, monthly, or yearly supply volume of the production base, the production operation rate of the production base, the history of hydrogen energy supply by the production base, the location of the production base and the charging station, etc. In addition, the production base terminal (100) related to the main production base may be named a main production base terminal.

[0113] In addition, the contract management unit (320) can transmit contract information regarding the ordering contract to the corresponding production base terminal (100) and charging station terminal (200) for the matched main production base and charging station, and can receive approval information or disapproval information regarding the conclusion of the ordering contract from the production base terminal (100) and charging station terminal (200). Accordingly, when approval information is received from both the production base terminal (100) and the charging station terminal (200), it is determined that the ordering contract has been concluded, and information regarding the concluded ordering contract can be transmitted to the production base terminal (100) and the charging station terminal (200).

[0114] Additionally, the contract management department (320) can determine at least one standby production base separate from the main production base that has signed a contract with a charging station. If the main production base is unable to supply hydrogen energy to the charging station that has signed the contract, a standby production base is matched in advance to enable hydrogen energy to be supplied from another production base. Such standby production bases can be matched based on the location of the production base or the proposed price for supplying hydrogen energy.

[0115] The charging station management unit (330) is configured to monitor the charging station based on the operating information of the charging station and to predict the demand for hydrogen energy required at the charging station.

[0116] For example, the charging station management unit (330) may infer a consumption pattern of hydrogen energy at the charging station based on the operation information of the charging station including at least one of information on the daily, weekly, monthly or yearly consumption or sales of hydrogen energy received from the charging station terminal (200), information on the remaining fuel amount in at least one tube trailer received in real time, and information on the replacement history cycle of the tube trailer, and accordingly predict the demand for hydrogen energy at the charging station to produce demand prediction information.

[0117] In addition, the charging station management unit (330) can automatically generate order information on hydrogen energy based on demand forecast information on hydrogen energy of the charging station and transmit it to the production base terminal (100) of the production base that has entered into the ordering contract.

[0118] The transportation management unit (340) manages the transportation of tube trailers shipped from the production base. Based on real-time traffic information, the transportation management unit (340) can transmit information on the movement path of the transportation vehicle, the expected travel time of the transportation vehicle, the return time of the transportation vehicle, and the operational status of the transportation vehicle to the production base terminal (100) and the charging station terminal (200).

[0119] Hydrogen Energy Ordering Contract Process

[0120] Below, the hydrogen energy ordering contract process will be explained with reference to the drawings.

[0121] Figure 3 is a flowchart showing the process of ordering a hydrogen energy contract according to an embodiment of the present invention.

[0122] As illustrated in FIG. 3, a hydrogen energy ordering contract according to an embodiment of the present invention can be implemented by receiving a request for hydrogen energy supply from a charging station terminal (200).

[0123] Specifically, when hydrogen energy supply is required, the charging station terminal (200) can transmit request information regarding hydrogen energy supply to the order management device (300). At this time, the charging station terminal (200) can also transmit operating information of the charging station to the order management device (300). Alternatively, the operating information of the charging station can be transmitted when the charging station terminal (200) is connected to the order management device (300) and the charging station subscribes.

[0124] The operational information of the charging station may include at least one of information on the amount of hydrogen energy used or sold daily, weekly, monthly or yearly, information on the remaining amount of fuel in the tube trailer, information on the replacement history cycle of the tube trailer, information on the location of the charging station, and information on the acceptable hydrogen energy supply price.

[0125] In addition, when the charging station terminal (200) transmits request information regarding hydrogen energy supply to the order management device (300), the order management device (300) can transmit this to at least one subscribed production base terminal (100) to notify that there is a request regarding hydrogen energy supply.

[0126] Thereafter, when each production base receives a request for hydrogen energy supply from the order management device (300) through the production base terminal (100), the proposed price information for hydrogen energy supply proposed by the production base and the operation information of the production base related to the production base can be transmitted to the order management device (300). Alternatively, the operation information of the production base can be transmitted when the production base subscribes by connecting the production base terminal (100) to the order management device (300).

[0127] Such suggested price information may include the production cost of hydrogen energy, order quantity, and period of use.

[0128] Next, the order management device (300) can match at least one production base with a charging station based on request information regarding hydrogen energy supply, proposed price information regarding hydrogen energy supply, and production base operation information. This will be described with reference to FIG. 4.

[0129] FIG. 4 is a schematic diagram showing how a hydrogen energy order management device (300) according to an embodiment of the present invention learns to match a charging station and a production base.

[0130] As illustrated in Figure 4, the order management device (300) can learn to match charging stations with production bases based on request information regarding hydrogen energy supply, proposed price information for hydrogen energy supply, and production base operation information. This learning can be performed based on an artificial intelligence model.

[0131] Specifically, the order management device (300) performs learning based on an artificial intelligence model, and at this time, the input variables include a request for hydrogen energy supply, an acceptable supply price of hydrogen energy, a proposed price for hydrogen energy supply, a daily, weekly, monthly or yearly supply amount of a production base, a production operation rate of a production base, a history of hydrogen energy supply by a production base, and the location of a production base and a charging station, and the output variables include matching a charging station and a production base, thereby performing learning while changing hyper parameters.

[0132] At this time, learning can match the optimal charging station with the production base by considering the minimum number of matching items.

[0133] For example, the order management device (300) can match a charging station and a production base if at least three of a plurality of items match. That is, the order management device (300) can determine that at least three of the following items match the charging station and the production base: whether there is a request for hydrogen energy supply; whether the proposed price for hydrogen energy supply is within the range of acceptable hydrogen energy supply prices; whether the daily, weekly, monthly, or yearly supply amount of the production base is above a certain level; whether the production base's production operation rate is above a certain level; whether the production base has supplied hydrogen energy a certain number of times; and whether the distance according to the location of the production base and the charging station is below a certain range.

[0134] Among these, the order management device (300) can match the demander and supplier by judging the supplier with the largest number of matching items among multiple items as the topmost and matching the supplier with the demander.

[0135] Such artificial intelligence models can utilize deep learning models, including convolutional neural networks (CNNs), recurrent neural networks (RNNs), generative adversarial networks (GANs), and reinforcement learning (RL). However, artificial intelligence models are not limited to these and can be used in a variety of ways.

[0136] Meanwhile, the order management device (300) may not learn, but may use a module learned based on an artificial intelligence model that matches the charging station and production base.

[0137] Here, the production base that is matched with the charging station at the highest level is the main production base, and can proceed with the ordering contract with the charging station first.

[0138] After the order management device (300) matches the charging station and production base, information regarding the hydrogen energy order contract can be transmitted to the production base terminal (100) and the charging station terminal (200).

[0139] Specifically, the order management device (300) can transmit contract information regarding an order contract to the corresponding production base terminal (100) and charging station terminal (200) for the matched production base and charging station, respectively.

[0140] Finally, the order management device (300) can receive information approving the order contract for hydrogen energy from the production base terminal (100) and the charging station terminal (200) and conclude the order contract for hydrogen energy.

[0141] That is, the order management device (300) can receive approval information or disapproval information regarding the conclusion of an order contract from the production base terminal (100) and the charging station terminal (200) in response to the contract information regarding the order contract transmitted to the production base terminal (100) and the charging station terminal (200).

[0142] Therefore, when approval information is received from both the production base terminal (100) and the charging station terminal (200), it is determined that the ordering contract has been concluded, and information regarding the concluded ordering contract can be transmitted to the production base terminal (100) and the charging station terminal (200).

[0143] Automatic ordering under the hydrogen energy ordering contract

[0144] Below, we will explain how to automatically order the supply of hydrogen energy based on a hydrogen energy ordering contract with reference to the drawing.

[0145] FIG. 5 is a drawing exemplarily showing a hydrogen energy order management device (300) according to an embodiment of the present invention that monitors a charging station and automatically orders hydrogen energy to a production base according to an order contract when hydrogen energy supply is required at the charging station.

[0146] As illustrated in FIG. 5, the order management device (300) monitors the charging station based on the operation information of the charging station, and if it is determined that hydrogen energy supply is required at the charging station, it can automatically order hydrogen energy to the production base according to the order contract.

[0147] Specifically, the order management device (300) can receive operating information of a charging station including at least one of information regarding daily, weekly, monthly, or yearly hydrogen energy usage or sales, information regarding the remaining fuel level in a tube trailer, and information regarding the tube trailer replacement history cycle, received from a charging station terminal (200). Such operating information of the charging station can be received in real time.

[0148] Accordingly, the order management device (300) monitors the charging station in real time based on the charging station's operational information, infers hydrogen energy consumption patterns at the charging station, and predicts hydrogen energy demand at the charging station accordingly, thereby producing demand forecast information. This demand forecast information may include factors such as the replacement time of the tube trailer and the remaining hydrogen energy.

[0149] If, based on the generated demand forecast information, the order management device (300) determines that the supply of hydrogen energy is necessary at the charging station, order information regarding hydrogen energy can be automatically generated and transmitted to the production base terminal (100) of the production base that has entered into the order contract.

[0150] Here, the order management device (300) can be implemented through learning to produce demand prediction information based on the operation information of the charging station.

[0151] Specifically, the order management device (300) performs learning based on an artificial intelligence model, and at this time, as input variables, the amount of hydrogen energy used or sold, the amount of fuel remaining in the tube trailer, the replacement history cycle of the tube trailer, etc. are applied, and as output variables, demand prediction information is applied to perform learning while changing hyper parameters.

[0152] At this time, learning can be performed in a way that considers the daily, weekly, monthly or yearly usage or sales of hydrogen energy, the remaining fuel amount in one tube trailer, and the replacement history cycle of the tube trailer to determine whether hydrogen energy supply is required at the charging station and the amount of hydrogen energy required.

[0153] Accordingly, the order management device (300) can infer the consumption pattern of hydrogen energy of a charging station and predict the demand for hydrogen energy of the charging station accordingly to determine whether or not there is a need for supply of hydrogen energy.

[0154] Meanwhile, the order management device (300) may not learn, but may use demand prediction information produced by a module learned based on an artificial intelligence model.

[0155] In addition, the order management device (300) can check whether a tube trailer has been shipped from a production base based on order information regarding hydrogen energy, and if a tube trailer has been shipped, can transmit information regarding the movement route of the transportation means, the expected movement time of the transportation means, the return time of the transportation means, the operational status of the transportation means, etc., based on real-time traffic information to the production base terminal (100) and the charging station terminal (200).

[0156] Here, transportation of the tube trailer can be carried out by the production base itself from the charging station to the charging station, or by requesting transportation of the tube trailer from the production base to a transportation company.

[0157] Hydrogen Energy Orders through Preliminary Production Bases

[0158] Below, we will explain how orders for hydrogen energy are processed through a preliminary production base with reference to the drawings.

[0159] FIG. 6 is a drawing showing a hydrogen energy order management device (300) according to an embodiment of the present invention mediating an order contract for the supply of hydrogen energy between a reserve production base and a charging station.

[0160] As illustrated in FIG. 6, the order management device (300) can have a demander and a reserve production base enter into an order contract through an auction so that when the supply of hydrogen energy to a charging station that has entered into an order contract at a main production base is not smooth, another production base can supply hydrogen energy.

[0161] Specifically, the main production base supplies hydrogen energy to the charging station according to the ordering contract concluded between the charging station and the main production base, but the supply of hydrogen energy may not be smooth due to problems with the equipment producing hydrogen energy at the main production base or problems with the tube trailers owned by the production base.

[0162] Accordingly, the order management device (300) can receive supply unavailability information indicating a disruption in the supply of hydrogen energy from the main production base terminal and transmit it to the charging station terminal (200), and receive one-time supply request information received from the charging station terminal (200).

[0163] Here, when matching charging stations and production bases, the optimal charging station and production base are matched as the primary production base, and the production base determined as the next best option can be matched as the backup production base. At least one backup production base can be matched.

[0164] Thereafter, the order management device (300) can transmit the received one-time supply request information to multiple pre-matched standby production base terminals and guide them to propose the supply of hydrogen energy to the charging station through an auction method.

[0165] This allows the order management device (300) to receive proposed price information regarding hydrogen energy supply from multiple standby production base terminals over a predetermined period of time and transmit the information to the charging station terminal (200) and multiple standby production base terminals. At this time, the multiple standby production bases can freely conduct bids regarding the supply price of hydrogen energy through their respective standby production base terminals over a predetermined period of time.

[0166] Accordingly, the order management device (300) selects a reserve production base that offers the lowest price based on the supply price of hydrogen energy bid for a given period of time, and transmits contract information regarding the order contract to the reserve production base terminal and charging station terminal (200) related to the selected reserve production base so that the order contract can be concluded, and the supply of hydrogen energy can proceed based on the demand forecast information according to the concluded order contract.

[0167] An auction like this may be operated and provided by the order management device (300), or may be provided by a separate server, with the order management device (300) only mediating the order contract.

[0168] Meanwhile, the charging station selects one of at least one standby production base, and accordingly, the order management device (300) can cause the charging station and standby production base to enter into an order contract for hydrogen energy.

[0169] Specifically, the order management device (300) may receive supply failure information indicating a disruption in the supply of hydrogen energy from the main production base terminal, and accordingly transmit supply failure information and information regarding at least one standby production base to the charging station. At this time, information regarding at least one standby production base may be provided by indicating a standby production base that is optimally matched with the charging station, excluding the main production base.

[0170] In addition, the charging station terminal (200) can receive information on at least one reserve production base transmitted by the order management device (300), and transmit selection information for selecting one reserve production base among these and request information for concluding a hydrogen energy ordering contract between the reserve production base and the charging station to the order management device (300).

[0171] Next, as if a hydrogen energy ordering contract had been previously concluded, the ordering management device (300) transmits contract information regarding the ordering contract to the standby production base terminal and the charging station terminal (200), respectively, so that the ordering contract can be concluded, and the supply of hydrogen energy can proceed based on demand forecast information according to the concluded ordering contract.

[0172] Hydrogen Energy Ordering through Auction

[0173] Meanwhile, the present invention also allows charging stations to enter into a contract with a primary production base for hydrogen energy supply through an auction. While the present invention previously described determining a reserve production base through an auction, this approach can also be applied to determining a primary production base.

[0174] Specifically, when the order management device (300) receives request information regarding hydrogen energy supply from the charging station terminal (200), the order management device (300) then transmits the request information regarding hydrogen energy supply from at least one production base terminal (200) so that it can receive proposed price information regarding hydrogen energy supply and operation information of the production base from at least one production base terminal (200) for a predetermined period of time.

[0175] Thereafter, the order management device (300) may conduct an auction for a predetermined period based on the transmitted proposed price information for hydrogen energy supply. For example, the order management device (300) may award the contract to the production base with the lowest proposed price for hydrogen energy supply among at least one production base.

[0176] Through such an auction, the successful production base is determined as the main production base, and by matching it with the production base and charging station as described above, information regarding the hydrogen energy ordering contract can be transmitted to the main production base terminal and charging station terminal (200).

[0177] In addition, the order management device (300) can receive approval information regarding the conclusion of a hydrogen energy order contract from the main production base terminal and the charging station terminal (200) and conclude a hydrogen energy order contract.

[0178] In addition, as described in FIG. 5, according to the ordering contract, the ordering management device (300) monitors the charging station to infer consumption patterns and accordingly calculates demand forecast information, thereby automatically ordering hydrogen energy when hydrogen energy supply is required.

[0179] An auction like this may be operated and provided by the order management device (300), or may be provided by a separate server, with the order management device (300) only mediating the order contract.

[0180] Hydrogen Energy Ordering through Open Markets

[0181] Below, we will explain how production bases and charging stations enter into hydrogen energy ordering contracts through the open market, using drawings as reference.

[0182] FIG. 7 is a drawing showing a hydrogen energy order management device (300) according to an embodiment of the present invention mediating an order contract for the supply of hydrogen energy through an open market.

[0183] As illustrated in Figure 7, the order management device (300) can be provided to an open market, allowing charging stations and production bases to enter into ordering agreements regarding the supply of hydrogen energy. The open market is a marketplace where information on hydrogen energy provided by various production bases is posted and provided, allowing charging stations to verify this information.

[0184] Specifically, at least one production base can transmit proposed price information for hydrogen energy supply to the order management device (300) through the production base terminal (100), and the order management device (300) can post each proposed price and inventory quantity on an open market based on the proposed price information for hydrogen energy supply proposed by the production base and the operation information of the production base so that the charging station can confirm it.

[0185] Here, the proposed price information for hydrogen energy supply may additionally include the production cost of hydrogen energy, order quantity, period of use, etc.

[0186] Additionally, the charging station can check the proposed price for hydrogen energy supply through the charging station terminal (200) and select a specific production base. In this way, the production base can be determined as the main production base based on the selection information selected by the charging station terminal (200).

[0187] Accordingly, the order management device (300) transmits contract information regarding the order contract to the production base terminal (100) that proposed the corresponding proposed price based on the selection information transmitted from the charging station terminal (200), thereby providing for the order contract to be concluded and allowing the supply of hydrogen energy to proceed.

[0188] In addition, as described in FIG. 5, according to the ordering contract, the ordering management device (300) monitors the charging station to infer consumption patterns and accordingly calculates demand forecast information, thereby automatically ordering hydrogen energy when hydrogen energy supply is required.

[0189] An open market like this can be operated and provided by an order management device (300), or the order management device (300) can mediate an order contract by providing it on a separate server.

[0190] Hydrogen Equipment Order Management System

[0191] Figure 8 is a block diagram showing a hydrogen facility order management system according to an embodiment of the present invention.

[0192] As illustrated in FIG. 8, a hydrogen facility order management system according to an embodiment of the present invention may include a supplier terminal (400), a demand terminal (500), and an order management device (600).

[0193] The supplier terminal (400) is configured to allow the supplier to communicate with the order management device (600). Here, the supplier refers to a party that produces and supplies components included in hydrogen facilities for generating hydrogen energy, and may include, for example, maintenance companies and unit facility suppliers. The supplier may enter into an order contract for hydrogen facility components with a specific customer through the order management device (600), and may ship the hydrogen facility components to the customer based on the concluded order contract.

[0194] The supplier terminal (400) is connected to the order management device (600) via a network, and can transmit supplier operation information related to the supply of hydrogen facility parts and suppliers to the order management device (600).

[0195] For example, the supplier terminal (400) may transmit supplier operation information, hydrogen facility component information, and proposed price information for hydrogen facility component supply, including at least one of information on the daily, weekly, monthly, or yearly supply amount of hydrogen facility components produced by the supplier, information on the location of the supplier, information on the inventory of hydrogen facility components, information on the supply history of hydrogen facility components, and information on the hydrogen facility component production technology held, to the order management device (600).

[0196] Here, the provider terminal (400) includes, but is not limited to, a remote device, a workstation, a computer, a general-purpose computer, an Internet appliance, a handheld device, a wireless device, a portable device, a wearable computer, a cellular or mobile phone, a personal digital assistant (PDA), a smartphone, a tablet, an ultrabook, a netbook, a laptop, a desktop, a multi-processor system, a microprocessor-based or programmable home appliance, a set-top box, a network PC, a minicomputer, and the like.

[0197] The demand terminal (500) is configured to allow a demander using hydrogen facility components to communicate with the order management device (600). In this case, the demander refers to a party that produces hydrogen energy using the hydrogen facility or supplies hydrogen energy using the hydrogen facility, and may include a maintenance company, a production base, a charging station, a shipping center, an industrial company, a research institute, etc. In particular, a maintenance company may be included as both a demander and a supplier because it supplies hydrogen facility components if it is a wholesaler, and may receive and resell hydrogen facility components if it is a retailer. Accordingly, a maintenance company may be classified as a demander when it receives hydrogen facility components, and as a supplier when it supplies hydrogen facility components. A demander may enter into an order contract for hydrogen facility components with a specific supplier through the order management device (600) for maintenance of the hydrogen facility, and may receive hydrogen facility components by having the hydrogen facility components transported from the supplier based on the concluded order contract.

[0198] The demand terminal (500) is connected to the order management device (600) via a network, and can transmit demand operation information related to the use of hydrogen facilities to the order management device (600).

[0199] For example, if the user terminal (500) is a supplier of hydrogen energy, such as a charging station, the user terminal can transmit user operation information including at least one of information on the number of times a charging dispenser has been charged, information on the operating time of the charging dispenser, information on the vibration intensity and vibration pattern of the charging dispenser, and information on the noise level, noise cycle, and noise pattern of the charging dispenser to the order management device (600).

[0200] In addition, if the user terminal (500) is a side that produces hydrogen energy, such as a production base, the user terminal can transmit user operation information including at least one of information on the number of times a tube trailer of a hydrogen facility related to power generation has been charged, information on the production time of a hydrogen facility related to power generation, information on the vibration intensity and vibration pattern of a hydrogen facility related to power generation, and information on the noise level, noise cycle, and noise pattern of a hydrogen facility related to power generation to the order management device (600).

[0201] Accordingly, the demand terminal (500) can transmit the status of hydrogen facility components to the order management device (600) through demand operation information.

[0202] In addition, the demand terminal (500) can transmit selection information for selecting hydrogen equipment parts posted in the open market to the order management device (600).

[0203] Here, the user terminal (500) includes, but is not limited to, a remote device, a workstation, a computer, a general-purpose computer, an Internet appliance, a handheld device, a wireless device, a portable device, a wearable computer, a cellular or mobile phone, a personal digital assistant (PDA), a smartphone, a tablet, an ultrabook, a netbook, a laptop, a desktop, a multi-processor system, a microprocessor-based or programmable home appliance, a set-top box, a network PC, a minicomputer, and the like.

[0204] The order management device (600) is connected to a supplier terminal (400) and a demand terminal (500) via a network, and is configured to conclude an order contract for hydrogen facility components between the supplier and demand terminal, and automatically order hydrogen facility components according to the order contract. This order management device (600) can post information on hydrogen facility components received from the supplier terminal (400) through an open market, as well as information on the supply of hydrogen facility components and supplier operation related to the supplier, and transmit this information to the demand terminal (500).

[0205] In addition, the order management device (600) can mediate and conclude an order contract for hydrogen facility parts between a supplier and a demander, monitor the demander, and automatically order hydrogen facility parts from the supplier according to the concluded order contract when an order for hydrogen facility parts is required, and manage the transport of hydrogen facility parts from the supplier to the demander.

[0206] Here, the order management device (600) can be implemented as a computing device, which can be a server-class computer or a terminal. However, it does not necessarily have to be a server-class computer; it can also be implemented as a terminal such as a general-purpose personal computer or laptop. It can also be implemented as a high-capacity server device, but this does not necessarily have to be a high-capacity device.

[0207] Typically, hydrogen facility components require frequent replacement. Examples include tube trailers and dispensers. Therefore, the ordering contract device (300) allows users to enter into ordering contracts only for hydrogen facility components that are frequently replaced, ensuring a continuous supply of hydrogen facility components. This facilitates the smooth production and supply of hydrogen energy.

[0208] Hydrogen Equipment Order Management Device

[0209] Below, the hydrogen facility order management device (600) will be described with reference to the drawing.

[0210] Figure 9 is a block diagram showing a hydrogen facility order management device according to an embodiment of the present invention.

[0211] As illustrated in FIG. 9, the hydrogen facility order management device (hereinafter referred to as 'order management device (600)') according to an embodiment of the present invention may include an information transmission and reception unit (610), a contract management unit (620), a demand prediction unit (630), and a transportation management unit (340).

[0212] The information transmission and reception unit (610) is configured to receive and transmit multiple pieces of information from a supplier terminal (400) and a demand terminal (500).

[0213] For example, as described above, the information transmitting and receiving unit (610) may receive, from the supplier terminal (400), supplier operation information including at least one of information on the daily, weekly, monthly or yearly supply amount of hydrogen facility parts produced by the supplier, information on the location of the supplier, information on the inventory amount of hydrogen facility parts, information on the supply history of hydrogen facility parts, and information on the production technology of the hydrogen facility parts held, hydrogen facility part information and proposed price information on the supply of hydrogen facility parts.

[0214] In addition, if the user is a hydrogen energy supplier, the information transmission and reception unit (610) can receive user operation information including at least one of information on the number of times the charging dispenser has been charged, information on the operating time of the charging dispenser, information on the vibration intensity and vibration pattern of the charging dispenser, information on the noise level, noise cycle and noise pattern of the charging dispenser, and information on the acceptable hydrogen facility supply price from the user terminal.

[0215] In addition, if the user is a hydrogen energy producer, the information transmission and reception unit (610) can receive user operation information from the user terminal, including at least one of information on the number of times a tube trailer of a hydrogen facility related to power generation has been charged, information on the production time of a hydrogen facility related to power generation, information on the vibration intensity and vibration pattern of a hydrogen facility related to power generation, information on the noise level, noise cycle and noise pattern of a hydrogen facility related to power generation, and information on the acceptable supply price of hydrogen facility parts.

[0216] In addition, the information transmission and reception unit (610) can transmit information regarding an ordering contract to the supplier terminal (400) and the demand terminal (500) so that the supplier and demander can enter into an ordering contract for hydrogen facility parts.

[0217] That is, the information transmission and reception unit (610) can receive selection information for selecting hydrogen facility components posted on an open market and transmit information regarding an order contract between a supplier and a demander to the supplier terminal (400) and the demander terminal (500), respectively. In addition, the information transmission and reception unit (610) can transmit order information to the supplier terminal (400) according to the order contract concluded between the supplier and the demander.

[0218] The contract management unit (620) manages ordering contracts for hydrogen facility components between suppliers and buyers. This contract management unit (620) provides an open market to buyers and suppliers, receives selection information from buyers regarding hydrogen facility components posted on the open market, and can then conclude ordering contracts between suppliers and buyers.

[0219] That is, the contract management unit (620) can transmit contract information regarding the ordering contract to the supplier terminal (400) and the demand terminal (500) based on the selection information, and can receive approval information or disapproval information regarding the conclusion of the ordering contract from the supplier terminal (400) and the demand terminal (500). Accordingly, when approval information is received from both the supplier terminal (400) and the demand terminal (500), it is determined that the ordering contract has been concluded, and information regarding the concluded ordering contract can be transmitted to the supplier terminal (400) and the demand terminal (500).

[0220] The demand forecasting unit (630) is configured to monitor demand based on demand operation information and predict demand for hydrogen facility components required by demand.

[0221] For example, if the user is a hydrogen energy supplier, the demand prediction unit (630) can infer the user's hydrogen facility replacement needs based on the user operation information including at least one of information on the number of times the charging dispenser has been charged, information on the operating time of the charging dispenser, information on the vibration intensity and vibration pattern of the charging dispenser, and information on the noise level, noise cycle, and noise pattern of the charging dispenser from the user terminal (500), and accordingly predict the user's demand for hydrogen facility parts to produce demand prediction information.

[0222] In addition, if the user is a hydrogen energy producer, the demand prediction unit (630) can infer the user's need for hydrogen facility replacement based on the user operation information including at least one of information on the number of times a tube trailer of a hydrogen facility related to power generation is charged, information on the production time of a hydrogen facility related to power generation, information on the vibration intensity and vibration pattern of a hydrogen facility related to power generation, and information on the noise level, noise cycle, and noise pattern of a hydrogen facility related to power generation from the user terminal (500), and accordingly predict the user's demand for hydrogen facility parts to produce demand prediction information.

[0223] In addition, the demand forecasting unit (630) can automatically generate order information for hydrogen facility parts based on demand forecast information for hydrogen facility parts of the user and transmit it to the supplier terminal (400) of the supplier who has entered into the ordering contract.

[0224] The transportation management unit (640) manages the transportation of hydrogen equipment components shipped from suppliers. Based on real-time traffic information, the transportation management unit (640) can transmit information on the movement path of transportation vehicles, the expected travel time of transportation vehicles, the return time of transportation vehicles, and the operational status of transportation vehicles to the supplier terminal (400) and the demand terminal (500).

[0225] <Process of ordering contracts for hydrogen equipment components>

[0226] Below, we will explain how suppliers and buyers enter into an ordering contract for hydrogen equipment parts through an open market, using drawings as reference.

[0227] FIG. 10 is a drawing showing a hydrogen facility order management device according to an embodiment of the present invention mediating an order contract for the supply of hydrogen facility parts through an open market.

[0228] As illustrated in Fig. 10, the order management device (600) can be provided to an open market so that demanders and suppliers can enter into an order contract for the supply of hydrogen facility parts.

[0229] Specifically, at least one supplier can transmit hydrogen facility component information, proposed price information for hydrogen facility component supply, and supplier operation information to the order management device (600) through each supplier terminal (400).

[0230] Here, hydrogen equipment component information refers to the type of hydrogen equipment component. In other words, consumers can use this information to determine what types of hydrogen equipment components a supplier produces.

[0231] In addition, the order management device (600) can post each hydrogen facility part, proposed price, and inventory quantity on an open market based on hydrogen facility part information proposed by at least one supplier, proposed price information for hydrogen facility part supply, and supplier operation information so that the demander can check them.

[0232] Here, the proposed price information for hydrogen facility supply may additionally include delivery period.

[0233] Additionally, the user can check the proposed price for the supply of hydrogen facility components through the user terminal (500) and select a specific supplier. Accordingly, the order management device (600) can transmit contract information regarding the order contract to the supplier terminal (400) that proposed the proposed price for the hydrogen facility component and the user terminal (500) based on the selection information regarding the selected hydrogen facility component transmitted from the user terminal (500).

[0234] The order management device (600) can receive information approving an order contract for hydrogen facility parts from a supplier terminal (400) and a demand terminal (500) and conclude an order contract for hydrogen facility parts.

[0235] That is, the order management device (600) can receive approval information or disapproval information regarding the conclusion of an order contract from the supplier terminal (400) and the demand terminal (500) in response to the contract information regarding the order contract transmitted to the demand terminal (100) and the supplier terminal (200).

[0236] Therefore, when approval information is received from both the supplier terminal (400) and the demand terminal (500), it is determined that the ordering contract has been concluded, and information regarding the concluded ordering contract can be transmitted to the supplier terminal (400) and the demand terminal (500).

[0237] Through this process, the user can achieve maintenance of the hydrogen facility by entering into a contract with the supplier to order hydrogen facility parts for maintenance of the hydrogen facility and receiving the hydrogen facility parts during the contract period.

[0238] <Automatic ordering according to the ordering contract for hydrogen equipment parts>

[0239] Below, we will explain how to automatically order the supply of hydrogen facility parts based on a hydrogen facility order contract with reference to the drawing.

[0240] FIG. 11 is a drawing exemplarily showing a hydrogen facility order management device according to an embodiment of the present invention that monitors a user and automatically orders hydrogen facility parts from a maintenance company according to an order contract when a user needs to supply hydrogen facility parts.

[0241] As illustrated in Fig. 11, the order management device (600) monitors the demander based on the demander operation information, and when the demander needs to supply hydrogen facility parts, it can automatically order hydrogen facility parts from the supplier according to the order contract.

[0242] Specifically, the order management device (600) can receive demand operation information from the demand terminal (500).

[0243] For example, if the user terminal (500) is a side that supplies hydrogen energy, the user terminal can transmit user operation information including at least one of information on the number of times the charging dispenser has been charged, information on the operating time of the charging dispenser, information on the vibration intensity and vibration pattern of the charging dispenser, and information on the noise level, noise cycle, and noise pattern of the charging dispenser to the order management device (600).

[0244] In addition, if the user terminal (500) is a hydrogen energy producer, the user terminal can transmit user operation information including at least one of information on the number of times a tube trailer of a hydrogen facility related to power generation has been charged, information on the production time of a hydrogen facility related to power generation, information on the vibration intensity and vibration pattern of a hydrogen facility related to power generation, and information on the noise level, noise cycle, and noise pattern of a hydrogen facility related to power generation to the order management device (600).

[0245] Accordingly, the order management device (600) can monitor users in real time based on user operation information, infer their hydrogen equipment replacement needs, and accordingly predict their demand for hydrogen equipment components, thereby generating demand forecast information. This demand forecast information may include information on hydrogen equipment components required by users, such as the replacement timing of charging dispensers and the vibration patterns of hydrogen equipment.

[0246] If, based on the generated demand forecast information, the order management device (600) determines that the demander needs to supply hydrogen facility parts, it can automatically generate order information regarding hydrogen facility parts and transmit it to the supplier terminal (400) of the supplier who has entered into the order contract.

[0247] Here, the order management device (600) can be implemented through learning to produce demand forecast information based on demander operation information.

[0248] Specifically, the order management device (600) performs learning based on an artificial intelligence model, and at this time, as input variables, information on the number of times a charging dispenser has been charged, information on the operating time of the charging dispenser, information on the vibration intensity and vibration pattern of the charging dispenser, information on the noise level, noise cycle and noise pattern of the charging dispenser, information on the number of times a tube trailer has been charged for a hydrogen facility related to power generation, information on the production time of a hydrogen facility related to power generation, information on the vibration intensity and vibration pattern of a hydrogen facility related to power generation, information on the noise level, noise cycle and noise pattern of a hydrogen facility related to power generation, etc. are applied, and as output variables, demand prediction information is applied to perform learning while changing hyper parameters.

[0249] For example, learning can be performed by considering input variables and producing demand forecast information as an output variable, thereby determining whether the demander needs a supply of hydrogen facility components and the type and number of hydrogen facility components required.

[0250] Accordingly, the order management device (600) can infer the need for replacement of hydrogen equipment parts of the user and predict the demand for hydrogen equipment parts of the user accordingly to determine whether or not there is a need for supply of hydrogen equipment parts.

[0251] In addition, the order management device (600) can check whether the hydrogen facility parts have been shipped from the supplier based on order information about the hydrogen facility parts after ordering the hydrogen facility parts, and if the hydrogen facility parts have been shipped, can transmit information about the movement route of the transportation means, the expected movement time of the transportation means, the return time of the transportation means, the operational status of the transportation means, etc., based on real-time traffic information to the supplier terminal (400) and the demand terminal (500).

[0252] Here, the transportation of hydrogen facility components may be carried out by the supplier itself as a customer, or by the supplier requesting the transportation of hydrogen facility components from a transportation company.

[0253] Of course, the user can directly select a specific supplier from the open market through the user terminal (500), decide on the type and quantity of hydrogen equipment, etc., and order hydrogen equipment parts from the supplier.

[0254] <Ordering Hydrogen Equipment Components Based on Demand and Supplier Matching>

[0255] Below, we will explain the process of concluding a contract to order hydrogen equipment parts by matching demanders and suppliers with reference to the drawings.

[0256] FIG. 12 is a drawing exemplarily showing a hydrogen facility order management device according to an embodiment of the present invention that matches a demander and a supplier to order hydrogen facility parts.

[0257] As illustrated in FIG. 12, an order contract for hydrogen facility components according to an embodiment of the present invention can be implemented by matching a demander and a supplier upon receiving a request for hydrogen facility supply from a demander terminal (500).

[0258] Specifically, when the supply of hydrogen facility components is required, the demand terminal (500) can transmit request information regarding the supply of hydrogen facility components to the order management device (600). At this time, the demand terminal (500) can also transmit demand operation information to the order management device (600). Alternatively, the demand operation information can be transmitted when the demand terminal (500) is connected to the order management device (600) and the demander signs up.

[0259] In addition, when the demand terminal (500) transmits request information regarding the supply of hydrogen facility parts to the order management device (600), the order management device (600) can transmit this to at least one subscribed supplier terminal (400) to notify that there is a request regarding the supply of hydrogen facility parts.

[0260] Thereafter, when a supplier receives a request for supply of hydrogen facility parts from an order management device (600) through a supplier terminal (400), each supplier may transmit proposed price information for supply of hydrogen facility parts and supplier operation information related to the supplier to the order management device (600). Alternatively, the supplier operation information may be transmitted when the supplier terminal (400) is connected to the order management device (600) and the supplier signs up.

[0261] Proposed pricing information for the supply of such hydrogen facility components may include additional delivery times.

[0262] Next, the order management device (600) can match a demander with at least one supplier based on request information regarding the supply of hydrogen facility components, proposed price information regarding the supply of hydrogen facility components, and supplier operation information. This will be described with reference to FIG. 6.

[0263] FIG. 13 is a schematic diagram illustrating what a hydrogen facility order management device according to an embodiment of the present invention learns to match a demander and a supplier.

[0264] As illustrated in Figure 13, the order management device (600) can learn to match demanders and suppliers based on request information regarding the supply of hydrogen facility components, proposed price information regarding the supply of hydrogen facility components, and supplier operation information. This learning can be performed based on an artificial intelligence model.

[0265] Specifically, the order management device (600) performs learning based on an artificial intelligence model, and at this time, the input variables include a request for supply of hydrogen facility parts, an acceptable supply price of hydrogen facility parts, a proposed price for supplying hydrogen facility parts, a supplier's daily, weekly, monthly or yearly supply amount, a supplier's production operation rate, a supplier's history of supplying hydrogen facilities, locations of suppliers and demanders, etc., and the output variables include matching of demanders and suppliers, thereby performing learning while changing hyper parameters.

[0266] At this time, learning can match the optimal supplier with the demander by considering the minimum number of matching items.

[0267] For example, the order management device (600) can match when at least three out of a plurality of items match when matching a demander and a supplier. That is, the optimal matching can be performed when at least three of the following items match the charging station and the supplier: whether there is a request for the supply of hydrogen facility parts; whether the proposed price for the supply of hydrogen facility parts is within the range of the acceptable supply price of hydrogen facility parts; whether the supplier's daily, weekly, monthly, or yearly supply volume is above a certain level; whether the supplier's production operation rate is above a certain range; whether the supplier has supplied hydrogen facility parts a certain number of times; and whether the distance according to the location of the demander and supplier is below a certain range.

[0268] Among these, the order management device (600) can match the demander and supplier by judging the supplier with the largest number of matching items among multiple items as the topmost and matching the supplier with the demander.

[0269] Such artificial intelligence models can utilize deep learning models, including convolutional neural networks (CNNs), recurrent neural networks (RNNs), generative adversarial networks (GANs), and reinforcement learning (RL). However, artificial intelligence models are not limited to these and can be used in a variety of ways.

[0270] Here, the supplier who is matched with the demander at the highest level is the primary supplier and can proceed with the ordering contract with the demander first.

[0271] After the ordering contract is concluded, as described above, the ordering management device (600) can receive demand operation information from the demand terminal (500) and produce demand forecast information.

[0272] In addition, based on the generated demand forecast information, if the order management device (600) determines that the demander needs to supply hydrogen facility components, it can automatically generate order information regarding hydrogen facility components and transmit it to the supplier terminal (400) of the supplier that has entered into the ordering contract. Accordingly, it is possible to ensure that hydrogen facility components are supplied to the demander.

[0273] <Ordering Hydrogen Equipment Parts through Backup Suppliers>

[0274] Meanwhile, the order management device (600) can match a standby supplier in advance so that another supplier can supply hydrogen facility parts when the main supplier has difficulty in supplying hydrogen facility parts to a demander with whom the main supplier has entered into an order contract.

[0275] Specifically, the primary supplier supplies hydrogen equipment components to the customer pursuant to a purchase order agreement concluded between the customer and the primary supplier. However, if the primary supplier encounters issues related to hydrogen equipment production, the supply of hydrogen equipment components may be disrupted. Therefore, the purchase order management device (600) can match the customer with a potential supplier to ensure a smooth supply of hydrogen equipment components.

[0276] When matching demanders and suppliers, the optimal supplier is matched with the demander as the primary supplier, and the second-best supplier is matched with the reserve supplier. At least one reserve supplier can be matched.

[0277] The order management device (600) can enter into an order contract for hydrogen facility parts with one of the demanders and the reserve suppliers when the demanders and the reserve suppliers are matched, and order the hydrogen facility to the reserve supplier.

[0278] Specifically, the order management device (600) receives information about a supply failure from the primary supplier terminal, indicating a disruption in the supply of hydrogen facility components, and transmits this information to the demand terminal (500). Accordingly, the device can instruct the reserve supplier terminal to propose the supply of hydrogen facility components to the demand terminal through an auction. This will be described with reference to the drawings.

[0279] FIG. 14 is a drawing exemplarily showing a hydrogen facility order management device according to an embodiment of the present invention ordering hydrogen facility parts by matching a demander and a potential supplier.

[0280] As illustrated in FIG. 14, the order management device (600) may receive proposed price information regarding the supply of hydrogen facility components from at least one reserve supplier terminal for a predetermined period of time and transmit the information to a demand terminal (500) and at least one reserve supplier terminal. At this time, at least one reserve supplier may freely bid on the supply price of hydrogen facility components through each reserve supplier terminal for a predetermined period of time.

[0281] Accordingly, the order management device (600) selects a prospective supplier who proposes the lowest price based on the supply price of hydrogen facility parts bid for a given period of time, and transmits contract information regarding the order contract to the prospective supplier terminal and the demand terminal (500) related to the successful prospective supplier so that the order contract can be concluded, and the supply of hydrogen facility parts can proceed based on the demand forecast information according to the concluded order contract.

[0282] An auction like this may be operated and provided by the order management device (600), or may be provided by a separate server and the order management device (600) may only mediate the order contract.

[0283] Meanwhile, when a demander and a prospective supplier are matched, a contract for ordering hydrogen equipment parts can be concluded with the prospective supplier by the demander selecting one prospective supplier.

[0284] Specifically, the order management device (600) may receive supply unavailability information from the primary supplier terminal indicating a disruption in the supply of hydrogen facility components, and accordingly transmit the supply unavailability information and information regarding at least one backup supplier to the customer. In this case, information regarding at least one backup supplier may be provided by separately displaying a backup supplier that is optimally matched with the customer, excluding the primary supplier.

[0285] The demand terminal (500) can receive information about at least one reserve supplier transmitted by the order management device (600), and transmit selection information for selecting one reserve supplier among these and request information for concluding an order contract for hydrogen facility parts with the reserve supplier.

[0286] Next, as if a contract for ordering hydrogen facility components had been concluded previously, the ordering management device (600) transmits contract information regarding the ordering contract to the prospective supplier terminal and the demand terminal (500), respectively, so that the ordering contract can be concluded, and the supply of hydrogen facility components can be carried out based on demand forecast information according to the concluded ordering contract.

[0287] <Ordering Hydrogen Facilities through Auction>

[0288] Meanwhile, the present invention also allows a buyer to enter into a contract with a primary supplier for the supply of hydrogen equipment components through an auction. While the present invention previously described the buyer determining a potential supplier through an auction, this approach can also be applied when matching primary suppliers.

[0289] Specifically, when the order management device (600) receives request information regarding the supply of hydrogen facility parts from the demand terminal (500), the order management device (600) then transmits the request information regarding the supply of hydrogen facility parts from at least one supplier terminal (200) so that the order management device can receive proposed price information and supplier operation information regarding the supply of hydrogen facility parts from at least one supplier terminal (200) for a predetermined period of time.

[0290] Thereafter, the order management device (600) may conduct an auction for a predetermined period based on the transmitted proposed price information for the supply of hydrogen facility components. For example, the order management device (600) may award the contract to the supplier with the lowest proposed price for the supply of hydrogen facility components among at least one supplier.

[0291] Through such an auction, the supplier who has won the bid is determined as the main supplier, and by matching the supplier and the demander as described above, information regarding the ordering contract for hydrogen facility parts can be transmitted to the main supplier terminal and the demander terminal (500).

[0292] In addition, the order management device (600) can receive approval information regarding the conclusion of an order contract for hydrogen facility components from the main supplier terminal and the demand terminal (500) and conclude an order contract for hydrogen facility components.

[0293] In addition, as described in FIG. 5, according to the ordering contract, the ordering management device (600) monitors the user to infer the need for replacement of hydrogen equipment, and accordingly produces demand forecast information, thereby automatically ordering hydrogen equipment parts when supply of hydrogen equipment parts is required.

[0294] Such an auction may be operated and provided by the order management device (600), or may be provided by a separate server, with the order management device (600) only mediating the order contract.

[0295] The above preferred embodiments of the present invention are disclosed for the purpose of illustration, and those skilled in the art with ordinary knowledge of the present invention will be able to make various modifications, changes, and additions within the spirit and scope of the present invention, and such modifications, changes, and additions should be considered to fall within the scope of the claims of the present invention.

Claims

1. In the hydrogen energy order management method, A step of receiving request information regarding hydrogen energy supply from a charging station terminal; A step of receiving, from at least one production base terminal, proposed price information on hydrogen energy supply and operation information of the production base; A step of determining at least one of the production bases as a main production base based on the request information regarding the hydrogen energy supply, the proposed price information regarding the hydrogen energy supply, and the operation information of the production base, and matching the charging station with the charging station terminal; A step of transmitting information regarding a hydrogen energy ordering contract to the main production base terminal and the charging station terminal; and A step of receiving approval information regarding the conclusion of a contract for ordering hydrogen energy from the main production base terminal and the charging station terminal and concluding a contract for ordering hydrogen energy, method.

2. In paragraph 1, Further comprising a step of receiving operation information of a charging station from the charging station terminal, Based on the operation information of the above charging station, the consumption pattern of hydrogen energy of the charging station is inferred to produce demand forecast information, In response to the need for hydrogen energy supply at the charging station based on the demand forecast information, the method further includes a step of transmitting order information for ordering hydrogen energy to the main production base terminal based on the order contract. method.

3. In paragraph 2, Inferring the consumption pattern of hydrogen energy of the above charging station and producing demand forecast information is as follows: The artificial intelligence model learns to produce the demand prediction information based on the operation information of the charging station, applying the operation information of the charging station as an input variable and the demand prediction information as an output variable. Based on the above demand forecast information, determining whether there is a need for supply of hydrogen energy, method.

4. In paragraph 3, The operation information of the above charging station includes at least one of information on the amount of hydrogen energy used or sold daily, weekly, monthly or yearly, information on the remaining amount of fuel in the tube trailer, information on the replacement history cycle of the tube trailer, information on the location of the charging station, and information on the acceptable hydrogen energy supply price. method.

5. In paragraph 1, The step of determining one of the above at least one production base as a main production base and matching it with a charging station related to the charging station terminal is as follows: A step of learning to match the charging station and the production base based on the request information on the hydrogen energy supply, the proposed price information on the hydrogen energy supply, and the operation information of the production base, in a state where the artificial intelligence model applies the request information on the hydrogen energy supply, the proposed price information on the hydrogen energy supply, and the operation information of the production base as input variables, and applies matching of the charging station and the production base as output variables, When matching the above charging station and production base, the production base that best matches the above charging station is matched as the main production base. method.

6. In paragraph 5, The operational information of the above production base includes at least one of information on the daily, weekly, monthly or yearly supply of hydrogen energy, information on the production operation rate, information on whether a tube trailer charging hydrogen energy is being charged or on standby, information on the charging time of the tube trailer, information on the location of the production base, information on the inventory of hydrogen energy, and information on the supply history of hydrogen energy. method.

7. In paragraph 1, The step of determining one of the above at least one production base as a main production base and matching it with the charging station is as follows: A step of additionally matching at least one reserve production base, excluding the main production base, based on the proposed price information for the hydrogen energy supply and the operation information of the production base, method.

8. In paragraph 7, When receiving information on unavailability of supply, including unavailability of hydrogen energy supply from the main production base terminal, the information on unavailability of supply is transmitted to the charging station terminal, When receiving one-time supply request information from the charging station terminal, the one-time supply request information is transmitted to the production base terminal of at least one of the reserve production bases, and the at least one reserve production base is notified to transmit the proposed price information for hydrogen energy supply for a predetermined period of time. Based on the proposed price information for the delivered hydrogen energy supply, an auction is conducted to conclude a contract for the above-mentioned preliminary production base and the above-mentioned charging station. method.

9. In the hydrogen energy order management device, An information transmitting and receiving unit that receives request information on hydrogen energy supply from a charging station terminal, receives proposed price information on hydrogen energy supply and operation information of a production base from at least one production base terminal, and transmits information on a hydrogen energy ordering contract to the main production base terminal and the charging station terminal; and Based on the request information on the hydrogen energy supply, the proposed price information on the hydrogen energy supply, and the operation information of the production base, a contract management unit is included that determines at least one of the production bases as a main production base and matches it with the charging station, and receives approval information on the conclusion of the hydrogen energy ordering contract from the main production base terminal and the charging station terminal, and concludes the hydrogen energy ordering contract. device.

10. In the hydrogen energy order management system, A charging station terminal that transmits request information regarding hydrogen energy supply; At least one production base terminal transmitting proposed price information on hydrogen energy supply and operational information of the production base; and An order management device that receives request information on hydrogen energy supply from the charging station terminal, receives proposed price information on hydrogen energy supply and operation information of the production base from the at least one production base terminal, determines one of the at least one production base as a main production base based on the request information on hydrogen energy supply, the proposed price information on hydrogen energy supply and the operation information of the production base, matches it with the charging station, transmits information on a hydrogen energy order contract to the main production base terminal and the charging station terminal, and receives approval information on the conclusion of the hydrogen energy order contract from the main production base terminal and the charging station terminal to conclude the hydrogen energy order contract, System.

11. In the hydrogen energy order management method, A step of receiving request information regarding hydrogen energy supply from a charging station terminal; A step of receiving, from at least one production base terminal, proposed price information on hydrogen energy supply and operation information of the production base for a predetermined period of time; A step of conducting an auction for a predetermined period of time based on the proposed price information for the hydrogen energy supply transmitted; Based on the above auction, in response to winning the bid for at least one production base, a step of determining the winning production base as the main production base and matching it with a charging station associated with the charging station terminal; A step of transmitting information regarding a hydrogen energy ordering contract to the main production base terminal and the charging station terminal; and A step of receiving approval information regarding the conclusion of a contract for ordering hydrogen energy from the main production base terminal and the charging station terminal and concluding a contract for ordering hydrogen energy, method.

12. In the hydrogen energy order management method, A step of receiving, from at least one production base terminal, proposed price information on hydrogen energy supply and operation information of the production base; A step of posting the proposed price information for the hydrogen energy supply and the operation information of the production base on an open market and providing it to a charging station terminal; A step of selecting one of the at least one production bases posted on the open market from the above charging station terminal, in response to selection information, and determining one of the at least one production base as a main production base and matching it with a charging station related to the charging station terminal; A step of transmitting information regarding a hydrogen energy ordering contract to the main production base terminal and the charging station terminal; and A step of receiving approval information regarding the conclusion of a contract for ordering hydrogen energy from the main production base terminal and the charging station terminal and concluding a contract for ordering hydrogen energy, method.

13. In the method of managing hydrogen facility orders, A step of receiving hydrogen facility component information, proposed price information regarding hydrogen facility component supply, and supplier operation information from at least one supplier terminal; A step of posting the hydrogen facility component information, the proposed price information for the hydrogen facility component supply, and the supplier operation information on an open market and providing them to a demand terminal; A step of determining a supplier related to the hydrogen facility component as a main supplier in response to selection information for selecting a hydrogen facility component from the open market from the demand terminal and matching it with a demander related to the demand terminal; A step of transmitting information regarding an order contract for hydrogen facility components to the main supplier terminal and the demand terminal; and A step of receiving approval information regarding the conclusion of an order contract for the hydrogen facility components from the main supplier terminal and the demand terminal and concluding an order contract for the hydrogen facility components, method.

14. In paragraph 13, Further comprising a step of receiving user operation information from the user terminal, Based on the above user operation information, the user's hydrogen facility replacement needs are inferred and demand forecast information is produced. In response to the demand forecast information determining that the demander needs a supply of hydrogen facility parts, the method further includes a step of transmitting order information for ordering hydrogen facility parts to the primary supplier terminal based on the order contract. method.

15. In paragraph 14, Inferring the hydrogen facility replacement needs of the above users and producing demand forecast information is as follows: The artificial intelligence model learns to produce the demand prediction information based on the demand operation information by applying the demand operation information as an input variable and the demand prediction information as an output variable. Based on the above demand forecast information, determining whether there is a need for supply of hydrogen facilities, method.

16. In paragraph 15, The above user operation information includes at least one of information on the number of times the charging dispenser is charged, information on the operating time of the charging dispenser, information on the vibration intensity and vibration pattern of the charging dispenser, information on the noise level, noise cycle and noise pattern of the charging dispenser, and the acceptable hydrogen facility supply price. method.

17. In paragraph 15, The above demand operation information includes at least one of information on the number of times a hydrogen facility tube trailer is charged, information on the production time of the hydrogen facility, information on the vibration intensity and vibration pattern of the hydrogen facility, information on the noise level, noise cycle and noise pattern of the hydrogen facility, and information on the acceptable hydrogen facility supply price. method.

18. In paragraph 13, The above supplier operation information includes at least one of information on daily, weekly, monthly or yearly supply of hydrogen facility parts, information on the location of the supplier, information on the inventory of hydrogen facility parts, and information on the supply history of hydrogen facility parts. method.

19. In the hydrogen facility order management device, An information transmitting and receiving unit that receives hydrogen facility component information, proposed price information on hydrogen facility component supply, and supplier operation information from at least one supplier terminal, and transmits information on a hydrogen facility component ordering contract to a main supplier terminal and a demand terminal; Based on the hydrogen facility component information, the proposed price information for the hydrogen facility supply, and the supplier operation information, the system posts the information on the hydrogen facility component in an open market and provides it to a demand terminal, and in response to the selection information of the hydrogen facility component selected from the demand terminal in the open market, determines a supplier related to the hydrogen facility component as a main supplier and matches it with a demander related to the demand terminal, and includes a contract management unit that receives approval information on the conclusion of an order contract for the hydrogen facility component from the main supplier terminal and the demand terminal and concludes an order contract for the hydrogen facility component. device.

20. In the hydrogen facility order management system, A user terminal that transmits selection information for selecting hydrogen facility components; At least one supplier terminal transmitting hydrogen facility component information, proposed price information on hydrogen facility supply, and supplier operation information; An order management device that receives the hydrogen facility component information, the proposed price information on the hydrogen facility supply, and the supplier operation information from the at least one supplier terminal, posts the hydrogen facility component information, the proposed price information on the hydrogen facility component supply, and the supplier operation information on an open market and provides the information to the demand terminal, and determines a supplier related to the hydrogen facility component as a main supplier in response to selection information of the hydrogen facility component selected from the open market from the demand terminal, matches the supplier with a demander related to the demand terminal, transmits information on an order contract for the hydrogen facility component to the main supplier terminal and the demand terminal, and receives approval information on the conclusion of an order contract for the hydrogen facility component from the main supplier terminal and the demand terminal to conclude an order contract for the hydrogen facility component, System.

21. In the method of managing hydrogen facility orders, A step of receiving request information regarding the supply of hydrogen facility parts from a demand terminal; A step of receiving hydrogen facility component information, proposed price information regarding hydrogen facility component supply, and supplier operation information from at least one supplier terminal; A step of determining one of at least one supplier as a primary supplier based on the request information regarding the supply of hydrogen facility components, the hydrogen facility component information, the proposed price information regarding the supply of hydrogen facility components, and the supplier operation information, and matching the primary supplier with a demander associated with the demander terminal; A step of transmitting information regarding an order contract for hydrogen facility components to the main supplier terminal and the demand terminal; and A step of receiving approval information regarding the conclusion of an order contract for the hydrogen facility components from the main supplier terminal and the demand terminal and concluding an order contract for the hydrogen facility components, method.

22. In paragraph 21, The step of determining one of the above at least one supplier as a primary supplier and matching it with a demander associated with the demander terminal is as follows: An artificial intelligence model applies the hydrogen facility component information, the request information regarding the hydrogen facility supply, the proposed price information regarding the hydrogen facility supply, and the supplier operation information as input variables, and applies matching of the demanders and suppliers as output variables, and includes a step of learning to match the demanders and suppliers based on the hydrogen facility component information, the request information regarding the hydrogen facility supply, the proposed price information regarding the hydrogen facility supply, and the supplier operation information. When matching the above demanders and suppliers, the supplier that best matches the above demander is matched as the main supplier. method.

23. In paragraph 21, The step of determining one of the above at least one supplier as a primary supplier and matching it with the demander is as follows: A step of additionally matching at least one reserve supplier excluding the main supplier based on the hydrogen facility component information, the proposed price information for the hydrogen facility component supply, and the supplier operation information, method.

24. In paragraph 23, When receiving information on unavailability of supply, including information on unavailability of hydrogen equipment parts, from the above-mentioned primary supplier terminal, the information on unavailability of supply is transmitted to the above-mentioned demand terminal, In response to the selection information for selecting at least one reserve supplier from the demand terminal, information regarding an order contract for hydrogen facility parts is transmitted to the demand terminal and reserve supplier terminal, Receive approval information regarding the conclusion of an order contract for the hydrogen facility components from the above-mentioned preliminary supplier terminal and the above-mentioned demand terminal, and conclude an order contract for the hydrogen facility components. method.

25. In the method of managing hydrogen facility orders, A step of receiving request information regarding the supply of hydrogen facility parts from a demand terminal; A step of receiving hydrogen facility component information, proposed price information regarding hydrogen facility component supply, and supplier operation information from at least one supplier terminal for a predetermined period of time; A step of conducting an auction for a predetermined period of time based on the transmitted hydrogen facility component information and the proposed price information for the hydrogen facility supply; Based on the above auction, in response to winning a bid among at least one supplier, a step of determining the winning supplier as a primary supplier and matching it with a demander associated with the demander terminal; A step of transmitting information regarding an order contract for hydrogen facility components to the main supplier terminal and the demand terminal; and A step of receiving approval information regarding the conclusion of an order contract for the hydrogen facility components from the main supplier terminal and the demand terminal and concluding an order contract for the hydrogen facility components, method.

Citation Information

Patent Citations

  • Distribution schedule management system for hydrogen storage cartridge, terminal equipment used for the system and distribution schedule management method

    JP2006146431A

  • Hydrogen sale brokerage method

    JP2008250501A

  • Method and system for data collection, learning, and streaming of machine signals for analysis and maintenance using the industrial internet of things

    JP2021526250A

  • Electronic device including wireless charging antenna and control method for the electronic device

    KR1020230119572A

  • Cable sheath dissecting equipment

    KR102447946B1