Lifting device and lifting method for steel pile shoe of large-diameter pipe pile
Through the slide rail, gear and roller system combined with the pipe pile support system, the problem of existing equipment that cannot meet the welding accuracy and convenient movement is solved, and the stability, fine hoisting and position adjustment of the steel pile shoe are achieved, which is suitable for pipe piles in different positions. Hoisting.
Patent Information
- Application Number
- PCT/CN2024/086924
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-18
- Filing Date
- 2024-04-10
- Publication Date
- 2024-10-24
AI Technical Summary
The existing lifting steel pile shoe equipment cannot meet the welding accuracy requirements, is large in size, inconvenient to move, and difficult to use in different locations.
A hoisting device for steel pile shoes for large-diameter pipe piles is designed. It uses slide rails, gears and roller systems, combined with pipe piles as the support system, and calculates the height of the roller cap to achieve precise lifting and position adjustment of the steel pile shoes.
It achieves stable and refined hoisting of steel pile boots, avoids errors when moving equipment, is simple and quick to operate, and is suitable for pipe pile hoisting needs in different locations.
Smart Images

Figure CN2024086924_24102024_PF_FP_ABST
Abstract
Description
A large diameter pipe pile steel pile shoe lifting device and lifting method Technical Field
[0001] The invention relates to the technical field of pipe pile construction, in particular to a large-diameter pipe pile steel pile shoe hoisting device and a hoisting method. Background Art
[0002] During the pipe pile manufacturing process, steel pile shoes need to be welded to the pile end plates. Since the piles are placed on wooden skids, the steel shoes must be hoisted for welding. The welding of the steel shoes must be performed according to the design drawings, maintaining a certain distance from the end plates during welding—typically 10mm. Therefore, the device for hoisting the steel shoes needs to be stable and capable of finely adjusting their position to meet welding requirements.
[0003] The existing equipment for lifting steel pile shoes mainly includes: cantilever cranes, overhead cranes, cranes, etc. However, the placement and movement accuracy of these equipments are difficult to meet the welding accuracy of steel pile shoes, and it is difficult to make fine position adjustments to the lifted steel pile shoes. In addition, these equipments are large in size, need to be connected to a power supply, are inconvenient to move, and are difficult to use in situations where steel pile shoes need to be lifted for pipe piles in different positions. Therefore, there is a need for a device and method that has a simple and lightweight structure, is easy to move, and can stably lift steel pile shoes. The focus of this lifting method and device is to use pipe piles as the support system, calculate the height of the roller base according to the outer diameter of the pipe piles where the steel pile shoes are to be installed, and thus accurately control the height of the lifted steel pile shoes. Using pipe piles as the support system avoids errors caused by lifting devices such as cantilever cranes, overhead cranes, and cranes during movement and placement.
[0004] Summary of the Invention
[0005] The purpose of the present invention is to overcome the existing defects and provide a large-diameter pipe pile steel pile shoe lifting device and lifting method, so as to solve the problem that the existing lifting methods and devices cannot simply and accurately lift the steel pile shoe.
[0006] The technical solution to achieve the above purpose is:
[0007] The present invention provides a large diameter pipe pile steel shoe lifting device, comprising: two connecting belts,
[0008] The connecting belt is sleeved on the outer side of one end of the pipe pile to be welded with the steel pile shoe;
[0009] The first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the gear guide rail are fixed on the outside of the connecting belt;
[0010] The first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the outer side of the gear guide rail are slidably connected to the steel ring and the roller bearing platform;
[0011] A lifting arm is welded on the steel ring;
[0012] A pulley is provided at the end of the lifting arm away from the steel ring;
[0013] The roller support is provided at the lower end of the inner side of the steel ring;
[0014] The roller support platform is provided with a first roller;
[0015] A second roller and a third roller are respectively provided on the roller supports on both sides of the first roller;
[0016] A gear is provided at the uppermost end of the inner side of the steel ring;
[0017] The steel rings on both sides of the gear are respectively provided with a fourth roller and a fifth roller;
[0018] The fourth roller and the fifth roller are respectively provided with a locking device;
[0019] The first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the gear guide rail correspond to the first roller, the second roller, the third roller, the fourth roller, the fifth roller and the gear respectively.
[0020] Preferably, the intersection of the radial plane where the center of mass of the steel pile shoe is located and the outer surface of the steel pile shoe is located on the symmetry axis and a circular iron sheet with a circular hole is welded thereon.
[0021] Preferably, a level is provided on the end of the first slide rail.
[0022] Preferably, the tangent plane on the steel ring where the welding point of the lifting arm is located is perpendicular to the lifting arm.
[0023] Preferably, the first slide rail, the second slide rail and the third slide rail are located in the lower half of the connecting belt; the fourth slide rail, the fifth slide rail and the gear guide rail are located in the upper half of the connecting belt.
[0024] The second aspect of the present invention is a hoisting method based on the above-mentioned large-diameter pipe pile steel shoe hoisting device, comprising:
[0025] Step S1, calculating the height h of the roller cap according to the outer diameter of the pile of the steel pile shoe and the length of the lifting rope;
[0026] Step S2, installing a hoisting device;
[0027] Step S3: hoisting and welding the steel pile shoe.
[0028] Preferably, in step S1, the roller platform height h is determined by the following formula:
[0029] Among them, the outer diameter of the pipe pile is R1, the length of the lifting arm is l1, the length of the rope is l2, and the initial value of the diameter of the circle formed by the first roller, the second roller, the third roller, the fourth roller and the fifth roller inside the steel ring is R2.
[0030] Preferably, the step S2 includes:
[0031] Step S21: Install the first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail, and the gear guide rail, and adjust the connecting belt;
[0032] Step S22, adjusting the position and angle of the first slide rail so that the bubble of the spirit level on the first slide rail is located in the middle;
[0033] Step S23, placing the steel ring outside the first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the gear guide rail, and adjusting the first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the gear guide rail so that the first roller, the second roller, the third roller, the fourth roller and the fifth roller and the gear on the steel ring correspond to the first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the gear guide rail respectively;
[0034] Step S24: Install the pulley on the lifting arm.
[0035] Preferably, step S3 includes:
[0036] Step S31, cleaning the rust, water and oil stains on the joint surface between the end plate and the steel pile shoe;
[0037] Step S32: Install the hook on the iron chain in the round hole welded to the iron sheet with the round hole, pull the iron chain on the pulley, lift the steel pile shoe, and align the steel pile shoe with the pipe pile end plate;
[0038] Step S33, preliminarily adjusting the hanging arm to a horizontal position by adjusting the first slide rail, the second slide rail, the third slide rail, the fourth slide rail, and the fifth slide rail;
[0039] Step S34, rotating the gear to finely adjust the position of the steel pile shoe horizontally so that the distance between the welding surface of the steel pile shoe and the end plate surface of the pipe pile is d;
[0040] Step S35: Install the locking device, fix the lifting device, and weld the steel pile shoe.
[0041] Preferably, the distance d2 between the steel pile shoe and the pipe pile end plate is ≤1.5d.
[0042] The beneficial effects of the present invention are as follows: the present invention can roughly adjust the distance between the steel pile shoe and the pipe pile horizontally by arranging the first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail, the first roller, the second roller, the third roller, the fourth roller and the fifth roller; by arranging the gear and the gear guide rail, the gear can be rotated to fine-tune the position of the steel pile shoe; by arranging the lifting arm, the pulley and the round hole iron sheet, the hook on the iron chain is installed in the round hole welded with the round hole iron sheet, and the iron chain on the pulley is pulled to stably lift the pile. Lift the steel pile shoe, align the steel pile shoe with the end plate, and fix it with a locking device. The narrower lower part of the locking device is in the groove of the fourth and fifth slide rails after placement, and the upper part will be close to the surface of the fourth and fifth slide rails after installation, which not only ensures that the pulley can be fixed without displacement, but also ensures that it will not shake left and right after being thrust by the pulley, and welding can be performed. The present invention uses pipe piles as the support system, and the operation is simple and fast. The lifting device can finely and stably adjust the position of the steel pile shoe, and accurately connect the pipe piles and the steel pile shoe. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] FIG1 is a structural diagram of a large-diameter pipe pile steel pile shoe lifting device of the present invention;
[0044] FIG2 is a partial structural diagram of a large-diameter pipe pile steel shoe lifting device of the present invention;
[0045] FIG3 is a partial structural diagram of a large-diameter pipe pile steel pile shoe lifting device of the present invention;
[0046] FIG4 is a structural diagram of the locking device of the present invention;
[0047] FIG5 is a cross-sectional view of the locking device of the present invention;
[0048] 6 is a flow chart of a method for hoisting a large-diameter pipe pile steel shoe hoisting device according to the present invention;
[0049] 7 is a specific flow chart of installing the hoisting device in the present invention;
[0050] FIG8 is a specific flow chart of hoisting and welding in the present invention. DETAILED DESCRIPTION
[0051] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0052] The present invention will be further described below with reference to the accompanying drawings.
[0053] Example 1
[0054] As shown in Figure 1-4, a large-diameter pipe pile steel pile shoe lifting device comprises: two connecting belts 3, the connecting belt 3 is sleeved on one end of the pipe pile steel pile shoe 1 to be welded; a first slide rail 31, a second slide rail 32, a third slide rail 33, a fourth slide rail 34, a fifth slide rail 35 and a gear guide rail 36 are fixed on the outside of the connecting belt 3, the first slide rail 31, the second slide rail 32, and the third slide rail 33 are located in the lower half of the connecting belt 3; the fourth slide rail 34, the fifth slide rail 35 and the gear guide rail 36 are located in the upper half of the connecting belt 3; the first slide rail 31, the second slide rail 32, the third slide rail 33, the fourth slide rail 34, the fifth slide rail 35 and the gear guide rail 36 are slidably connected to the steel ring 2 and the roller base 27 on the outside; a lifting arm 4 is welded on the steel ring 2, and the tangent plane of the position of the welding point of the lifting arm 4 on the steel ring 2 is perpendicular to the lifting arm 4; a pulley 5 is provided at the end of the lifting arm 4 away from the steel ring 2; the lower inner side of the steel ring 2 A roller base 27 is provided at the end, and a first roller 21 is provided on the roller base 27; a second roller 22 and a third roller 23 are respectively provided on the roller base 27 on both sides of the first roller 21; a gear 26 is provided at the uppermost end of the inner side of the steel ring 2; a fourth roller 24 and a fifth roller 25 are respectively provided on the steel ring 2 on both sides of the gear 26; a locking device 6 is respectively provided on the fourth roller 24 and the fifth roller 25, and the narrower lower section of the locking device 6 is respectively located in the groove of the fourth slide rail 34 and the fifth slide rail 35 after placement, and the upper part will be close to the upper surface of the fourth slide rail 34 and the fifth slide rail 35 after installation; among them, the first slide rail 31, the second slide rail 32, the third slide rail 33, the fourth slide rail 34, the fifth slide rail 35 and the gear guide rail 36 correspond to the first roller 21, the second roller 22, the third roller 23, the fourth roller 24, the fifth roller 25 and the gear 26 respectively.
[0055] In this embodiment, the intersection of the radial plane where the center of mass of the steel pile shoe 1 is located and the outer surface of the steel pile shoe 1 is located on the symmetry axis and a circular iron sheet with a circular hole is welded to ensure that the steel pile shoe 1 is always in a stable state when it is lifted.
[0056] In this embodiment, a level is provided on the end of the first slide rail 31 , which can detect whether the plane of the first slide rail 31 is horizontal, and then adjust the position and angle of the first slide rail 31 .
[0057] Example 2
[0058] As shown in Figure 1-8, a method for hoisting a large-diameter pipe pile steel shoe hoisting device includes:
[0059] Step S1, calculating the height h of the roller cap 27 according to the outer diameter of the pile of the steel pile shoe 1 and the length of the lifting rope.
[0060] The height h of the roller bearing platform 27 is determined by the following formula:
[0061] Among them, the outer diameter of the pile of the steel pile shoe 1 is R1, the length of the lifting arm 4 is l1, the length of the rope is l2, and the initial value of the diameter of the circle formed by the first roller 21, the second roller 22, the third roller 23, the fourth roller 24 and the fifth roller 25 on the inner side of the steel ring 2 is R2, which is the diameter of the steel ring 2.
[0062] In this embodiment, the installed steel pile shoe 1 has an outer diameter R1 of 800 mm, a diameter R2 of 1000 mm for the steel ring 2, a length l1 of 1200 mm for the lifting arm 4, and a length l2 of 849 mm for the lifting rope (not shown). Based on the outer diameter of the pile and the length of the lifting rope, the design height h of the roller cap 27 is calculated. The roller cap height is determined by the following formula:
[0063] That is, the height h of the roller support 27 is adjusted to 172 mm.
[0064] Step S2: Install the lifting device.
[0065] Step S21 , installing the first slide rail 31 , the second slide rail 32 , the third slide rail 33 , the fourth slide rail 34 , the fifth slide rail 35 and the gear guide rail 36 , and adjusting the connecting belt 3 .
[0066] Step S22: Adjust the position and angle of the first slide rail 31 so that the bubble of the level (not shown) on the first slide rail 31 is located in the center.
[0067] Step S23, place the steel ring 2 on the outside of the first slide rail 31, the second slide rail 32, the third slide rail 33, the fourth slide rail 34, the fifth slide rail 35 and the gear guide rail 36, and mobilize the first slide rail 31, the second slide rail 32, the third slide rail 33, the fourth slide rail 34, the fifth slide rail 35 and the gear guide rail 36 so that the first roller 21, the second roller 22, the third roller 23, the fourth roller 24 and the fifth roller 25 and the gear 26 on the steel ring 2 correspond one by one to the first slide rail 31, the second slide rail 32, the third slide rail 33, the fourth slide rail 34, the fifth slide rail 35 and the gear guide rail 36 respectively.
[0068] Step S24 , installing the pulley 5 on the hanging arm 4 .
[0069] Step S3: hoisting and welding the steel pile shoe 1.
[0070] Step S31, cleaning the rust, water and oil stains on the joint surface between the end plate and the steel pile shoe 1.
[0071] Step S32: Install the hook on the iron chain (not shown) in the round hole welded on the iron sheet with a round hole (not shown), pull the iron chain on the pulley 5, lift the steel pile shoe 1, and align the steel pile shoe 1 with the pipe pile end plate.
[0072] Step S33, by adjusting the first slide rail 31, the second slide rail 32, the third slide rail 33, the fourth slide rail 34 and the fifth slide rail 35, the lifting arm 4 is preliminarily adjusted horizontally, and the distance d2 between the steel pile shoe 1 and the pipe pile end plate is 1.5d. In this embodiment, the distance d between the welding surface of the steel pile shoe 1 and the pipe pile end plate is 10mm; the distance d2 between the welding surface of the steel pile shoe 1 and the pipe pile end plate is 1.5d, that is, d2≤15mm.
[0073] Step S34, rotating the gear 26, and finely adjusting the position of the steel pile shoe 1 horizontally so that the distance between the welding surface of the steel pile shoe 1 and the end plate surface of the pipe pile is 10 mm.
[0074] Step S35 , installing the locking device 6 , fixing the lifting device, and welding the steel pile shoe 1 .
[0075] The present invention uses pipe piles as a support system, and the operation is simple and quick; and the lifting device can finely and stably adjust the position of the steel pile shoe 1, and accurately connect the pipe pile and the steel pile shoe 1.
[0076] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the above embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A large diameter pipe pile steel shoe lifting device, It is characterized in that include: Two connecting straps, The connecting belt is sleeved on the outer side of one end of the pipe pile to be welded with the steel pile shoe; The first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the gear guide rail are fixed on the outer side of the connecting belt; The first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the outer side of the gear guide rail are slidably connected to the steel ring and the roller bearing platform; A lifting arm is welded on the steel ring; A pulley is provided at the end of the hoisting arm away from the steel ring; The roller support is provided at the lower end of the inner side of the steel ring; The roller support platform is provided with a first roller; The roller supports on both sides of the first roller are respectively provided with a second roller and a third roller; A gear is arranged at the uppermost end of the inner side of the steel ring; The steel rings on both sides of the gear are respectively provided with a fourth roller and a fifth roller; The fourth roller and the fifth roller are respectively provided with a locking device; Among them, the first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the gear guide rail correspond to the first roller, the second roller, the third roller, the fourth roller, the fifth roller and the gear respectively.
2. A large diameter pipe pile steel shoe lifting device according to claim 1, It is characterized in that The intersection of the radial surface where the center of mass of the steel pile shoe is located and the outer surface of the steel pile shoe is located on the symmetry axis and a round hole iron sheet with a round hole is welded.
3. A large diameter pipe pile steel shoe lifting device according to claim 1, It is characterized in that A level is arranged on the end of the first slide rail.
4. A large diameter pipe pile steel shoe lifting device according to claim 1, It is characterized in that The tangent plane on the steel ring where the welding point of the lifting arm is located is perpendicular to the lifting arm.
5. A large diameter pipe pile steel shoe lifting device according to claim 1, It is characterized in that The first slide rail, the second slide rail and the third slide rail are located at the lower half of the connecting belt; the fourth slide rail, the fifth slide rail and the gear guide rail are located at the upper half of the connecting belt.
6. A method for hoisting a large diameter pipe pile steel shoe hoisting device according to claim 1, It is characterized in that include: Step S1, calculating the height h of the roller cap according to the outer diameter of the pile of the steel pile shoe and the length of the lifting rope; Step S2, installing a lifting device; Step S3, hoisting and welding the steel pile shoe.
7. The hoisting method according to claim 6, It is characterized in that In step S1, the roller platform height h is determined by the following formula: Among them, the outer diameter of the pile is R 1 , lifting arm length l 1 , rope length l 2 The initial diameter of the circle formed by the first roller, the second roller, the third roller, the fourth roller and the fifth roller inside the steel ring is R 2 .
8. The hoisting method according to claim 6, It is characterized in that The step S2 comprises: Step S21, installing the first slide rail, the second slide rail, the third slide rail, the fourth slide rail, The fifth slide rail and the gear guide rail are used to adjust the connecting belt; Step S22, adjusting the position and angle of the first slide rail so that the bubble of the level on the first slide rail is located in the middle; Step S23, placing the steel ring outside the first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the gear guide rail, and adjusting the first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the gear guide rail so that the first roller, the second roller, the third roller, the fourth roller and the fifth roller and the gear on the steel ring correspond to the first slide rail, the second slide rail, the third slide rail, the fourth slide rail, the fifth slide rail and the gear guide rail respectively; Step S24, installing the pulley on the hanging arm.
9. The hoisting method according to claim 8, It is characterized in that The step S3 comprises: Step S31, cleaning the floating rust, water and oil stains on the joint surface between the end plate and the steel pile shoe; Step S32, installing the hook on the iron chain in the round hole welded with the round hole iron sheet, pulling the iron chain on the pulley, lifting the steel pile shoe, and aligning the steel pile shoe with the pipe pile end plate; Step S33, preliminarily horizontally adjusting the suspension arm by adjusting the first slide rail, the second slide rail, the third slide rail, the fourth slide rail and the fifth slide rail; Step S34, rotating the gear to finely adjust the position of the steel pile shoe horizontally so that the distance between the welding surface of the steel pile shoe and the end plate surface of the pipe pile is d; Step S35, installing a locking device, fixing the lifting device, and welding the steel pile shoe.
10. The hoisting method according to claim 9, It is characterized in that The distance d between the steel pile shoe and the pipe pile end plate 2 ≤1.5d.
Citation Information
Patent Citations
lifting device for joining heavy pipes together when assembling pipelines
AT213343B
Method for welding pile leg and pile shoe of drill platform
CN101745748A
Pile shoe assembly method of offshore wind power booster station foundation
CN115156814A
Hoisting device and hoisting method for steel pile shoe of large-diameter tubular pile
CN116462086A
Hoisting tool for hoisting high-voltage motor rotor
CN213141152U
