Anti-settling foundation of mountainous area airport earth and stone filling area

By using a combined structure of excavation and backfill ramming layer, strong compaction treatment layer and flexible pile composite layer in the earth and rock filling area of ​​the mountainous airport, the problems of difference in bearing capacity and settlement deformation in the earth and rock filling area were solved, and the foundation was realized Improved load capacity and reduced processing costs.

WO2024222764A1PCT designated stage expired Publication Date: 2024-10-31CAAC CENTRAL SOUTHERN AIRPORT DESIGN & RESEARCH INSTITUTE (GUANGZHOU) CO LTD

Patent Information

Application Number
PCT/CN2024/089683
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-25
Filing Date
2024-04-25
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

Because the landfill area of ​​earth and rock material at mountainous airports has not been effectively compacted, there are differences in bearing capacity and compressibility, making settlement deformation difficult to control. In addition, existing treatment technologies are expensive, have limited treatment depth, and pose safety risks.

Method used

A top-to-bottom treatment layer structure is adopted, including excavation and backfill ramming layer, strong compaction treatment layer and flexible pile composite layer. Through ramming and flexible pile bodies, the load is shared to remove large holes and cavities to form a hard shell layer. Reduce settlement and reduce treatment costs.

Benefits of technology

It effectively enhances the load-bearing capacity of the foundation, reduces post-construction settlement, reduces treatment costs, and improves the stability and safety of the earth and stone filling area.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024089683_31102024_PF_FP_ABST
    Figure CN2024089683_31102024_PF_FP_ABST
Patent Text Reader

Abstract

The present utility model provides an anti-settling foundation of a mountainous area airport earth and stone filling area, sequentially comprising, from top to bottom, a treatment layer and a non-treatment layer using earth and stone as a filler. The treatment layer sequentially comprises, from top to bottom, an excavation, backfilling and compaction layer using earth and stone as a filler, a dynamic compaction treatment layer, and a flexible pile composite layer, wherein the thickness of the treatment layer is greater than or equal to 15 m, the thickness of the excavation, backfilling and compaction layer is less than or equal to 5 m, and the thickness of the dynamic compaction treatment layer is less than or equal to 10 m; the particle size of the filler of the excavation, backfilling and compaction layer is not greater than 2 / 3 of the thickness of the excavation, backfilling and compaction layer; the flexible pile composite layer comprises inter-pile soil and a plurality of flexible pile bodies using earth and stone as a filler, and the plurality of flexible pile bodies vertically penetrate into the inter-pile soil and are distributed in an array; and the upper surface of each flexible pile body is flush with the upper surface of the inter-pile soil. According to the anti-settling foundation of the present utility model, the load bearing capacity of the foundation is enhanced, the post-construction settlement amount is effectively reduced, and treatment costs are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

An anti-settlement foundation for soil and rock filling areas at mountain airports Technical Field

[0001] The utility model belongs to the technical field of airport construction, and in particular relates to an anti-settlement foundation in an earth and stone filling area of ​​a mountain airport. Background Art

[0002] In recent years, with the expansion of the scale and increase in the number of airport construction, the strata encountered in airport construction projects have become increasingly complex, and the technical requirements for stratum treatment methods and the requirements for treatable thickness have also become increasingly higher.

[0003] With the rapid development of airport construction, thick layers of earth and rock that were previously filled or dumped in ravines are often encountered during the renovation and expansion of mountain airports. Due to the lack of layered compaction, the engineering properties of the earth and rock filling area are poor. If not treated, it is not suitable to be used as a bearing layer. The main characteristics of earth and stone filling areas are: (1) the granular materials are not uniform, and the particle sizes vary greatly. The maximum diameter of the particles can reach 2m, and there is a lack of cohesion between the particles; (2) the gaps between the particles are of different sizes, and there are holes and cavities; (3) the original landform is undulating, and the thickness of the filling varies greatly, with the thickest reaching hundreds of meters; (4) the filling is randomly piled or dumped without effective compaction, and the stratum is uneven, resulting in large differences in bearing capacity and compressibility in space; (5) the backfill time is inconsistent, resulting in obvious changes in the stratum properties in the vertical space. The deeper the stratum, the greater the upper stress it is subjected to, and the mechanical properties gradually increase; (6) the secondary consolidation settlement is large and the settlement time is long. Under the condition of external load, the filling settles, deforms, forms and creep phenomena, and it is difficult to reach a convergence state; (7) if there are no interception and drainage measures on the surface, the fine particles will be carried away by the infiltration of surface water, forming many funnel-shaped collapses. During the airport renovation and expansion project, if the soil and rock area that has not been effectively compacted is turned into an airfield, it will pose a safety hazard.

[0004] For airports in mountainous areas with undulating terrain, the amount of excavation and filling is enormous, and the thickness of the earth and rock filling area can reach up to 100 meters. This layer of filling bears its own load, fill load, pavement structure load, and the ground load of aircraft and vehicles. It is the main load-bearing body in the airport runway and also the cause of settlement and deformation.

[0005] According to the existing treatment technology and reference materials, the treatment methods available for backfill soil and stone materials include grouting, dynamic compaction, column hammer dynamic compaction and low-strength pile method, but the treatment thickness is limited and the treatment cost is high. The grouting method mainly injects slurry into the backfill soil and stone materials through the grouting pipe to make the original loose body be cemented and solidified to form a combination with good engineering properties. The disadvantage is that the grouting method is only effective for fillers with certain interconnected pores, and for block-shaped gravel particle fills with large holes or voids, the construction quality is difficult to control, and if a good cementation and solidification effect is to be achieved, the construction cost is difficult to control; the dynamic compaction method mainly uses the impact of the rammer to compact and reinforce the filler, but the high-energy dynamic compaction vibration and noise will have an impact on the surrounding buildings and environment, so the treatment depth in the airport is generally No more than 10m; the column hammer dynamic compaction method is a combination of the dynamic compaction method and the column hammer impact expansion method. Compared with the dynamic compaction method, the vibration and noise impact are relatively low, and the treatment depth generally does not exceed 15m, but this process is rarely used in the airport industry; the low-strength pile method is to place bonding material piles with a strength grade of C5-C25 in the foundation. Bonding material piles include cement fly ash gravel piles, low-strength cement sand and gravel piles, fly ash concrete piles, and plain concrete piles. The pile-making process includes spiral drilling and grouting, mechanical rotary drilling, punching and impact drilling, etc. The processing cost is high and it is suitable for use in local areas. Therefore, designing a foundation structure that can be used for large-scale ultra-thick fill stone material at airports is of great significance for the field road foundation treatment project of mountainous airports.

[0006] Summary of the Invention

[0007] The purpose of this utility model is to overcome the shortcomings and deficiencies in the prior art, provide an anti-settlement foundation for the earth and stone filling area of ​​a mountain airport, enhance the foundation's ability to bear loads, effectively reduce post-construction settlement, and reduce processing costs.

[0008] The utility model is realized through the following technical solutions:

[0009] A subsidence prevention foundation for an earth and rock filling area of ​​an airport in a mountainous area comprises, from top to bottom, a treated layer and an untreated layer filled with earth and rock; the treated layer comprises, from top to bottom, an excavated backfill ramming layer filled with earth and rock, a dynamic ramming treated layer and a flexible pile composite layer; the thickness of the treated layer is ≥15m, the thickness of the excavated backfill ramming layer is ≤5m, and the thickness of the dynamic ramming treated layer is ≤10m; the filler particle size of the excavated backfill ramming layer is not greater than 2 / 3 of the thickness of the excavated backfill ramming layer; the flexible pile composite layer comprises soil between piles and a number of flexible pile bodies filled with earth and rock, wherein the several flexible pile bodies vertically penetrate the soil between piles and are distributed in an array; the upper surface of the flexible pile body is flush with the upper surface of the soil between piles.

[0010] The utility model provides an anti-settlement foundation for the earth and stone filling area of ​​a mountain airport. In the earth and stone filling area of ​​the mountain airport, an anti-settlement treatment is carried out to form an anti-settlement structure. The materials in the earth and stone filling area are used to form the excavation backfill ramming layer and the strong ramming treatment layer, which are uniform and dense. Large holes and voids in the original earth and stone are removed, and the hard shell layer is formed by effective compaction treatment, which plays a role in bearing the main load. The flexible pile composite layer is jointly borne by the soil between the piles and the flexible pile body. The flexible pile body is also formed by using the materials of the earth and stone filling area. The soil around the flexible pile body can also play a lateral compaction role. At the same time, the flexible pile body can transfer the remaining load of the excavated backfill ramming layer and the strong compaction treatment layer to the deeper non-treated layer, thereby enhancing the load-bearing capacity of the foundation and effectively reducing the post-construction settlement. Moreover, only by setting the flexible pile body in the flexible pile composite layer and cooperating with the excavated backfill ramming layer and the strong compaction treatment layer, the anti-settlement effect can be achieved. There is no need to set the flexible pile body in the excavated backfill ramming layer and the strong compaction treatment layer, and the materials in the on-site earth and stone filling area can be used according to local conditions, thereby reducing the treatment cost.

[0011] Furthermore, a first tamping area is provided on the surface of the excavated backfill tamping layer. In the excavated backfill tamping layer, excavation is first performed to expose the dynamic tamping layer, which is then treated and then backfilled. Tamping is then performed in the first tamping area to obtain the excavated backfill tamping layer. The first tamping area is used to position the tamping hammer during tamping, thereby treating the loose stratum to form a compacted excavated backfill tamping layer.

[0012] Furthermore, the first tamping area is provided with a plurality of first tamping points, which are used for positioning the tamping hammer. The spacing between the first tamping points is 2-3 times the diameter of the tamping hammer. This is a specific embodiment, using the first tamping points at appropriate spacing for positioning during tamping to provide basic reinforcement.

[0013] Furthermore, the side of the excavated backfill rammed layer is sloped, and the slope ratio is not less than 1:2. The slope of the excavated backfill rammed layer is set to prevent collapse and improve safety.

[0014] Furthermore, the side of the excavated backfill rammed layer is stepped with a plurality of steps, each step being no less than 1m high and having a height-to-width ratio of 1:2. Excavation adjustment is beneficial to the stability of the excavation operation, making the space of the excavated backfill rammed layer more stable.

[0015] Furthermore, a second tamping area is provided on the surface of the dynamic compaction treatment layer, wherein the second tamping area is used for positioning the tamping hammer during tamping, and the dynamic compaction treatment layer is treated in the second tamping area.

[0016] Furthermore, a plurality of second tamping points are provided within the second tamping area, and the second tamping points are used for positioning the second tamping of the tamping hammer. The spacing between the second tamping points is 2-3 times the diameter of the tamping hammer. This is a specific embodiment, using the second tamping points with appropriate spacing for positioning during tamping.

[0017] Furthermore, the diameter of the flexible piles is 100-200 cm, and the lateral and longitudinal spacing between the flexible piles is 2-3.5 times the diameter of the flexible piles. The flexible piles are arranged in an array with appropriate spacing to evenly distribute the load, transferring the residual load of the excavated backfill rammed layer and the dynamic compaction treatment layer to the deeper untreated layer.

[0018] Furthermore, the diameter of the filler of the flexible pile body is not greater than 20 cm. The particle size of the filler of the flexible pile body is limited to form a dense flexible pile body.

[0019] Furthermore, the anti-settlement foundation in the soil and rock fill area of ​​the mountain airport also includes a compacted material layer and a pavement structure layer. The compacted material layer is disposed on the excavated, backfilled, and rammed layer; the pavement structure layer is disposed on the compacted material layer; a road trench influence zone is disposed within the compacted material layer, and the cross-sectional area of ​​the excavated, backfilled, and rammed layer is larger than that of the road trench influence zone. The pavement structure layer directly bears the load from aircraft taking off and landing or vehicles driving over the road surface, while the compacted material layer shares the load and transfers it to the treatment layer.

[0020] In order to better understand and implement the present invention, the present invention is described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] FIG1 is a longitudinal cross-sectional view of an anti-settlement foundation in a soil and rock filling area of ​​a mountain airport according to an embodiment.

[0022] FIG2 is a construction structure diagram of an anti-settlement foundation in an earth and rock filling area of ​​a mountain airport according to an embodiment.

[0023] FIG. 3 is a top view of a flexible pile composite layer according to an embodiment.

[0024] FIG4 is a partial schematic diagram of the excavation and backfilling ramming layer according to the embodiment.

[0025] FIG5 is a transverse cross-sectional view of the excavated backfill ramming layer of the embodiment. DETAILED DESCRIPTION

[0026] The following is a further detailed description of the embodiments of the present invention in conjunction with the accompanying drawings and examples. It should be understood that the specific embodiments described herein are merely for the purpose of explaining the embodiments of the present invention, and are not intended to limit the embodiments of the present invention. It should also be noted that, for ease of description, the accompanying drawings only illustrate portions of the embodiments of the present invention, rather than all structures.

[0027] Furthermore, the terms "first," "second," "third," etc., in the specification and claims are used solely for descriptive purposes to distinguish between identical technical features. They are not to be construed as indicating or implying relative importance, or as implicitly specifying the number of technical features, nor do they necessarily describe a sequential or chronological order. The terms are interchangeable where appropriate. Thus, a feature specified as "first" or "second" may explicitly or implicitly include at least one of those features.

[0028] Similarly, the terms "fixed" and "connected" used in the specification and claims should not be construed as limited to direct connections. Thus, the expression "device A is connected to device B" should not be limited to devices or systems in which device A is directly connected to device B. Rather, it means that a path exists between device A and device B, which may include other devices or tools.

[0029] Example

[0030] The present embodiment provides an anti-settlement foundation for a soil and rock filling area of ​​a mountain airport. FIG1 is a longitudinal cross-sectional view of the anti-settlement foundation for a soil and rock filling area of ​​a mountain airport. As shown in FIG1 , the anti-settlement foundation for a soil and rock filling area of ​​a mountain airport comprises, from top to bottom, a treated layer 1 and an untreated layer 2 filled with soil and rock. The treated layer 1 comprises, from top to bottom, an excavated backfill ramming layer 11 filled with soil and rock, a dynamic compaction treated layer 12, and a flexible pile composite layer 13. The thickness of the treated layer 1 is ≥15 m, the thickness of the excavated backfill ramming layer 11 is ≤5 m, and the thickness of the dynamic compaction treated layer 12 is ≤10 m.

[0031] The filler particle size of the excavated backfill ramming layer 11 is not greater than 2 / 3 of the thickness of the excavated backfill ramming layer 11;

[0032] The flexible pile composite layer 13 includes inter-pile soil 131 and a plurality of flexible pile bodies 132 filled with soil and rock. The plurality of flexible pile bodies 132 are vertically penetrated in the inter-pile soil 131 and distributed in an array. The upper surface of the flexible pile body 132 is flush with the upper surface of the inter-pile soil 131.

[0033] This embodiment provides an anti-settlement foundation for the earth and rock filling area of ​​a mountain airport. In the earth and rock filling area of ​​the mountain airport, an anti-settlement treatment is performed to form an anti-settlement structure. The materials in the earth and rock filling area are used to form a homogeneous and dense excavation backfill ramming layer 11 and a dynamic compaction treatment layer 12. Large holes and voids in the original earth and rock are removed, and the hard shell layer is formed by effective compaction treatment, which plays the role of bearing the main load. The flexible pile composite layer 13 is jointly borne by the soil between the piles 131 and the flexible pile body 132. The flexible pile body 132 is also formed by the materials in the earth and rock filling area. The soil around the flexible pile body 132 can also play a lateral compaction role. At the same time, the flexible pile body 132 can transfer the residual load of the excavation backfill ramming layer 11 and the dynamic compaction treatment layer 12 to the deeper non-treated layer 2, thereby enhancing the foundation's ability to bear load and effectively reducing post-construction settlement. In this embodiment, the flexible pile body 132 is only provided in the flexible pile composite layer 13 and cooperated with the excavation backfill ramming layer 11 and the dynamic compaction treatment layer 12 to achieve the effect of preventing settlement. There is no need to provide the flexible pile body 132 in the excavation backfill ramming layer 11 and the dynamic compaction treatment layer 12, and the materials in the on-site earth and stone filling area are utilized according to local conditions, thereby reducing the treatment cost.

[0034] Treatment layer 1 is located in the earth and rock fill area of ​​a mountain airport. During construction, a flexible pile composite layer 13, a dynamic compaction treatment layer 12, and an excavated backfill ramming layer 11 are sequentially installed in the earth and rock fill area from bottom to top. Based on the load of the earth and rock fill area at the mountain airport, combined with the thickness and mechanical parameters of the earth and rock fill area, and in accordance with the technical indicators for post-construction settlement deformation and post-construction differential settlement deformation required within the airport's design service life as specified in the specifications, a settlement deformation analysis determines the thickness of treatment layer 1 required for anti-settlement treatment. Considering that dynamic compaction treatment layer 12 is formed by dynamic compaction using a rammer, and the maximum impact depth of the dynamic compaction energy level is 10m, when the thickness of treatment layer 1 is ≥15m, the surface layer is excavated. The excavated area serves as the excavated backfill ramming layer 11, and the excavation depth is 5m, exposing the area for dynamic compaction treatment layer 12. Flexible pile bodies 132 are arranged on the surface of the compaction treatment layer 12 , and flexible pile accommodating holes are formed by mechanical rotary drilling and rammer punching and expanding. The flexible pile accommodating holes 133 extend from the surface of the compaction treatment layer 12 to the bottom of the flexible pile composite layer 13 .

[0035] Figure 2 shows the construction structure of the anti-settlement foundation in the earth and rock fill area of ​​a mountain airport. As shown in Figure 2, the diameter of the flexible pile receiving hole 133 is 100-200 cm. The portion of the flexible pile receiving hole 133 within the compaction treatment layer 12 is called an empty pile 1331, and the height of the empty pile 1331 is 10 m. The portion of the flexible pile receiving hole 133 within the flexible pile composite layer 13 is the actual filler. A filler channel is formed within the flexible pile receiving hole 133, and filler is introduced into the flexible pile receiving hole 133. As filler is added, a rammer is used to perform a high-kinetic energy, overpressure, and strong compaction operation. Under the action of high kinetic energy and overpressure, the filler undergoes superdynamic consolidation and strong displacement compaction. The filler is continuously compacted layer by layer within the flexible pile receiving hole 133, and some of the filler is forcefully squeezed into the surrounding inter-pile soil 131, filling the cavities and gaps in the inter-pile soil 131 and making it more compact. In the earth and rock filling area, settlement and deformation are the main considerations for construction treatment. Therefore, the use of flexible piles 132 for large-scale construction can achieve the effect of preventing settlement and the cost is lower than that of rigid piles.

[0036] After the flexible pile body 132 is formed in the flexible pile receiving hole 133, the empty pile 1331 is backfilled with soil and stone materials on site, and then subjected to dynamic compaction treatment to obtain a dynamic compaction treatment layer 12. Backfilling begins 5m on the surface of the dynamic compaction treatment layer 12, and layered compaction is performed to obtain an excavated backfill compaction layer 11.

[0037] In another embodiment, when the thickness of the treated layer 1 is less than 10 m, the treated layer 1 is an excavated backfill ramming layer 11 , and the treated layer 1 only needs to be rammed without excavation.

[0038] In another embodiment, when the thickness of the treated layer 1 is 10-15m, the treated layer 1 includes an excavation backfill ramming layer 11 and a dynamic compaction treated layer 12 from top to bottom, wherein the thickness of the excavation backfill ramming layer 11 is 5m. During construction, refer to the above treatment and treat the dynamic compaction treated layer 12 and the excavation backfill ramming layer 11 from bottom to top.

[0039] Preferably, the diameter of the flexible piles 132 is 100-200 cm, and the lateral and longitudinal spacing between the flexible piles 132 is 2-3.5 times the diameter of the flexible piles 132. FIG3 is a top view of the flexible pile composite layer. As shown in FIG1 and FIG3, the flexible piles 132 are arranged in an array, with appropriate spacing to uniformly distribute the load, transferring the residual load of the excavated backfill rammed layer 11 and the dynamic compaction treatment layer 12 to the deeper untreated layer 2.

[0040] More preferably, the diameter of the filler of the flexible pile body 132 is no greater than 20 cm. The filler of the flexible pile body 132 is the material of the earth and rock landfill, and by limiting the particle size of the filler of the flexible pile body 132, a dense flexible pile body 132 is formed.

[0041] Preferably, a second tamping area is provided on the surface of the compaction-treated layer 12. The second tamping area is used to position the tamping hammer during tamping, and the compaction-treated layer 12 is treated within the second tamping area. This is a specific embodiment, using second tamping points at appropriate intervals for positioning during point tamping.

[0042] More preferably, a number of second tamping positions are provided in the second tamping area, and the second tamping positions are used for positioning the second tamping of the rammer, and the spacing between the second tamping positions is 2-3 times the diameter of the rammer. This is a specific implementation method, which uses second tamping positions with appropriate spacing for positioning during tamping. Specifically, in the second tamping area, a rammer is used to perform two tamping operations according to the second tamping positions, and the tamping energy level range is 10,000 kN·m. The mass of the rammer for tamping is generally 50T to 60T, the diameter of the rammer is generally 2.0m to 3.0m, and the spacing between the second tamping positions is generally 2 to 3 times the diameter of the rammer. After the two tamping processes are completed, full tamping or impact rolling is used for leveling. The full tamping uses a tamping energy of 1,000 kN·m. Impact rolling can also be used to level the ground to obtain a tamping treatment layer 12.

[0043] After the compaction treatment layer 12 is obtained, the excavated backfill rammed layer 11 is backfilled. Preferably, the side of the excavated backfill rammed layer 11 is sloped, and the slope ratio is not less than 1:2. The slope of the excavated backfill rammed layer 11 is set to prevent collapse and improve safety.

[0044] More preferably, FIG4 is a partial schematic diagram of the excavated, backfilled, and rammed layer. As shown in FIG4 , the side of the excavated, backfilled, and rammed layer 11 is stepped, with each step being no less than 1 meter high and having a height-to-width ratio of 1:2. This stepped excavation method improves the stability of the excavation operation and provides a more stable space for the excavated, backfilled, and rammed layer 11.

[0045] The filler of the excavated backfill rammed layer 11 is earth and stone material, the particle size is not greater than 2 / 3 of the thickness of the excavated backfill rammed layer 11, the gradation is good (Cu≥5, Cc=1-3), the compaction degree after compaction is not less than 0.93, and the solid volume ratio is not less than 0.8.

[0046] FIG5 is a transverse cross-sectional view of the excavated backfill ramming layer. As shown in FIG5 , a first ramming area 111 is provided on the surface of the excavated backfill ramming layer 11. In the excavated backfill ramming layer 11, excavation is first performed to expose the dynamic ramming layer 12. The dynamic ramming layer 12 is treated and then backfilled. Then, ramming is performed in the first ramming area 111 to obtain the excavated backfill ramming layer 11. The first ramming area 111 is used to position the rammer during ramming, so as to process the loose stratum into a compacted excavated backfill ramming layer 11.

[0047] More preferably, a plurality of first tamping positions 1111 are provided in the first tamping area 111. The first tamping positions 1111 are used for positioning the tamping of the rammer. The spacing between the first tamping positions 1111 is 2-3 times the diameter of the rammer. This is a specific embodiment, using the first tamping positions 1111 with appropriate spacing for positioning during tamping to perform basic reinforcement. Specifically, in the first tamping area 111, a rammer is used to perform two tamping operations according to the first tamping positions 1111. The tamping energy level ranges from 4000 to 10000 kN·m. The mass of the rammer for tamping is generally preferably 10T to 60T, the diameter of the rammer is generally 2.0m to 3.0m, and the spacing between the first tamping positions 1111 is generally 2 to 3 times the diameter of the rammer. After the second round of spot tamping is completed, full tamping or impact rolling is used for leveling. The tamping energy of full tamping is 1000 kN·m. Impact rolling can also be used to level the ground to obtain the excavated backfill tamping layer 11.

[0048] More preferably, as shown in FIG1 and FIG2 , the anti-settlement foundation in the earth and rock filling area of ​​the mountain airport further includes a fill layer 3 and a pavement structure layer 4. The fill layer 3 is arranged on the excavated backfill ramming layer 11; the pavement structure layer 4 is arranged on the fill layer 3.

[0049] A trench influence zone 31 is provided in the compacted material layer 3 , and the cross-sectional area of ​​the excavated backfill ramming layer 11 is larger than the cross-sectional area of ​​the trench influence zone 31 .

[0050] The pavement structure layer 4 directly bears the load when aircraft take off and land or vehicles drive across the road surface, and the fill layer 3 shares the load and transfers the load to the treated layer 1.

[0051] After excavating and backfilling the rammed layer 11, the backfill construction of the compacted material is carried out. The trench influence zone 31 is divided as follows: each boundary line of the road surface structure layer 4 is expanded 3m outward to obtain the slope boundary line. From the top of the compacted material layer 3 corresponding to the slope boundary line, a slope coefficient of 1:0.6 is applied to the bottom of the compacted material layer 3. This area is the trench influence zone 31.

[0052] The present invention is not limited to the above-mentioned embodiments. If various changes or modifications to the present invention do not depart from the spirit and scope of the present invention, and if these changes and modifications fall within the scope of the claims and equivalent technologies of the present invention, the present invention is also intended to include these changes and modifications.

Claims

1. An anti-settlement foundation for the earth and rock filling area of ​​a mountain airport. Features: It includes a treated layer and a non-treated layer with soil and stone as fillers from top to bottom, wherein the treated layer includes an excavated backfill rammed layer with soil and stone as fillers, a dynamic tamping treated layer and a flexible pile composite layer from top to bottom, wherein the thickness of the treated layer is ≥15m, the thickness of the excavated backfill rammed layer is ≤5m, and the thickness of the dynamic tamping treated layer is ≤10m; The filler particle size of the excavated backfill ramming layer is not greater than 2 / 3 of the thickness of the excavated backfill ramming layer; The flexible pile composite layer includes inter-pile soil and a plurality of flexible pile bodies with soil and rocks as fillers. The plurality of flexible pile bodies vertically penetrate the inter-pile soil and are distributed in an array. The upper surface of the flexible pile body is flush with the upper surface of the inter-pile soil.

2. The anti-settlement foundation for the earth and rock filling area of ​​a mountain airport according to claim 1, Features: The surface of the excavated backfill ramming layer is provided with a first ramming area.

3. The anti-settlement foundation for the earth and rock filling area of ​​a mountain airport according to claim 2, Features: A plurality of first tamping point positions are arranged in the first tamping area, and the first tamping point positions are used for point tamping positioning of the tamping hammer. The spacing between the first tamping point positions is 2-3 times of the diameter of the tamping hammer.

4. The anti-settlement foundation for the earth and rock filling area of ​​a mountain airport according to claim 1, Features: The side of the excavated backfill ramming layer is sloped, and the slope rate is not less than 1:

2.

5. The anti-settlement foundation for the earth and rock filling area of ​​a mountain airport according to claim 4, Features: The side surface of the excavated backfill rammed layer is in a stepped shape consisting of a plurality of steps, the height of each step is not less than 1m, and the aspect ratio is 1:

2.

6. The anti-settlement foundation for the earth and rock filling area of ​​a mountain airport according to claim 1, Features: A second tamping area is provided on the surface of the strong tamping treatment layer.

7. The anti-settlement foundation for the earth and rock filling area of ​​a mountain airport according to claim 6, Features: A plurality of second tamping positions are arranged in the second tamping area, and the second tamping positions are used for second point tamping positioning of the tamping hammer, and the spacing between the second tamping positions is 2-3 times of the diameter of the tamping hammer.

8. The anti-settlement foundation for the earth and rock filling area of ​​a mountain airport according to claim 1, Features: The diameter of the flexible pile body is 100-200 cm, and the transverse spacing and longitudinal spacing between the flexible pile bodies are both 2-3.5 times of the diameter of the flexible pile body.

9. The anti-settlement foundation for earth and rock filling area of ​​mountain airport according to claim 1, Features: The filler diameter of the flexible pile body is not greater than 20 cm.

10. The anti-settlement foundation for the earth and rock filling area of ​​a mountain airport according to claim 1, Features: The anti-settlement foundation of the earth and rock filling area of ​​the mountain airport also includes a landfill layer and a pavement structure layer, wherein the landfill layer is arranged on the excavated backfill ramming layer; and the pavement structure layer is arranged on the landfill layer; A channel influence zone is arranged in the compacted body layer, and the cross-sectional area of ​​the excavated backfill ramming layer is larger than the cross-sectional area of ​​the channel influence zone.

Citation Information

Patent Citations

  • Layered backfill and layered dynamic compaction combined reinforcing method of highfill artificial foundation

    CN106120702A

  • Method for reinforcing gravel soil ultra-high fill foundation

    CN110241695A

  • Construction method for differential settlement control of framed bent structure factory building in excavation and filling area

    CN114753412A

  • Settlement-preventing foundation for earth and stone material filling area of airport in mountainous area

    CN219773024U

  • Equal energy deformation composite foundation using microorganisms to solidify aggregate and the construction method thereof

    US20220315882A1

Cited By

  • Large-thickness collapsible loess foundation reinforcement effect evaluation system

    CN121502232A