Communication method and apparatus
By performing resource priority evaluation and preemption check in the NR SL system, the UE resource conflict problem is solved, the performance of the NR SL system is improved, and the reliable transmission of high-priority services is ensured, and the LTE SL UE signal reception power saturation is solved. question.
Patent Information
- Application Number
- PCT/CN2024/082335
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-09-28
- Filing Date
- 2024-03-19
- Publication Date
- 2024-11-21
AI Technical Summary
In the NR SL system, the reserved resources of multiple UEs may conflict, and the prior art lacks an effective preemption check and reevaluation mechanism, resulting in the signal reception power of the LTE SL UE in the subframe, affecting the decoding performance.
By receiving the sideline control information of the second communication device, the priority value of the resource is determined, preemptive inspection and re-evaluation in resource coexistence is realized, resource collision is avoided, high priority level services are transmitted, and high priority level services are ensured. reliability.
It reduces the decoding performance of LTE SL UE due to signal reception power saturation, improves the overall performance of NR SL systems, and ensures reliable transmission of high-priority services.
Smart Images

Figure CN2024082335_21112024_PF_FP_ABST
Abstract
Description
Communication method and device
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This application claims priority to the Chinese patent application filed with the State Intellectual Property Office of China on May 12, 2023, with application number 202310539778.9 and application name “A communication method and device”, the entire contents of which are incorporated by reference into this application; this application claims priority to the Chinese patent application filed with the State Intellectual Property Office of China on September 28, 2023, with application number 202311286248.4 and application name “A communication method and device”, the entire contents of which are incorporated by reference into this application. Technical Field
[0003] The present application relates to the field of communication technology, and in particular to a communication method and device. Background Art
[0004] The application of device-to-device (D2D) technology can reduce the burden on cellular networks, reduce the battery power consumption of user equipment, increase data rates, and well meet the needs of proximity services. D2D technology allows multiple user equipment (UE) that support D2D functions to conduct direct discovery and direct communication with or without network infrastructure. In view of the characteristics and advantages of D2D technology, and under the network of long-term evolution (LTE) technology proposed by the 3rd generation partnership project (3GPP), sidelink communication based on D2D technology was proposed. The sidelink communication includes but is not limited to D2D communication, vehicle to everything (V2X) communication, and SL-U communication. The links of D2D communication, V2X communication, and sidelink on unlicensed spectrum (SL-U) communication can all be called sidelinks (SL).
[0005] LTE SL solves some of the basic needs in the V2X scenario, but it cannot effectively support future application scenarios such as fully intelligent driving and autonomous driving. With the development of new radio (NR) technology in the 3GPP standard organization, NR SL has also been further developed, for example, it can support lower transmission delay, more reliable communication transmission, higher throughput, and better user experience. With the increase in the number of NR SL UEs and business use cases, it is necessary to further expand the spectrum resources of NR SL. For example, on the spectrum originally allocated to LTE SL, NR SL UE uses the resources originally belonging to LTE SL UE, as shown in Figure 1. For another example, on the unlicensed spectrum, NR SL UE1 uses the resources in the channel occupancy time (COT) of NR SL UE2. In the above scenario, the reserved resources of multiple NR SL UEs may conflict, but there is currently no relevant technical solution for how to perform preemption checks and re-evaluations.
[0006] Summary of the Invention
[0007] Embodiments of the present application provide a communication method and apparatus for implementing preemption checking and re-evaluation in resource coexistence.
[0008] In a first aspect, the present application provides a communication method, which is performed by a first communication device, for example, a terminal device, or a component in the terminal device, without limitation.
[0009] In this method, a first communication device receives second sideline control information from a second communication device, where the second sideline control information is used to indicate a second resource and B priority values corresponding to B sideline information, and the second resource fully or partially overlaps with the first resource, wherein the second resource is a reserved resource for B sideline information, and the first resource is a reserved resource for A sideline information of the first communication device. The first resource and the second resource belong to a first subframe in the time domain, the first subframe is a subframe of a first communication standard, the A sideline information and the B sideline information both belong to information of the second communication standard, the second communication standard is different from the first communication standard, and the first subframe includes C time slots of the second communication standard; based on the B priority values and the A priority value corresponding to the A sideline information, it is determined that a third resource is preempted and / or the third resource is re-evaluated, the third resource is the first resource or a resource in the first resource other than the resource in the first time slot, the resource in the first resource other than the resource in the first time slot overlaps with the second resource, and the first time slot is the first time slot of the C time slots.
[0010] Wherein, C is an integer greater than 1, A and B are both positive integers, and A is greater than 1 and / or B is greater than 1. For example, C is 2, A and B are both 2; or, C is 2, A is 2, and B is 1; or, C is 2, A is 1, and B is 2.
[0011] Optionally, the first communication standard is LTE SL and the second communication standard is NR SL, without limitation.
[0012] In the above embodiment, the first communication device can implement preemption checking and re-evaluation in resource coexistence through A priority values and B priority values, which can avoid resource collisions and give priority to transmitting services with higher priority levels, thereby ensuring the transmission reliability of high priority services.
[0013] If the first communication standard is LTE SL and the second communication standard is NR SL, and the first subframe overlaps with multiple time slots of NR SL, there may be multiple NS SL UEs using resources on the first subframe, and the LTE SL UE cannot perform automatic gain control modulation on symbols other than the starting symbol of the first subframe, which means that the signal strength received by the LTE SL UE on other symbols of the first subframe is greater than the signal strength received on the starting symbol, which will cause the receiving power of the LTE SL UE to be saturated, resulting in the LTE SL UE being unable to decode normally when receiving data on the first subframe. In an embodiment of the present application, the first communication device reduces the problem of reduced decoding performance of LTE SL due to changes in the signal strength received on the first subframe through preemptive checking and re-evaluation.
[0014] In addition, the first resource carries A side information, and the second resource carries B side information. If the existing preemption check and / or reassessment mechanism is used, it may cause both the first communication device and the second communication device to transmit in the same first subframe, which may cause the signal strength received by the LTE SL UE on other symbols of the first subframe to be greater than the signal strength received on the starting symbol, resulting in the LTE SL UE being unable to decode normally when receiving data on the first subframe. In order to avoid the impact on LTE SL, the embodiment of the present application designs a method for allowing the second resource of B side information to preempt the first resource of A side information.
[0015] In one possible implementation, the second resource overlaps with the first resource in the first time slot, and the third resource is the first resource; or, the first resource includes the first time slot in the time domain, the second resource does not overlap with the first resource in the first time slot, and the third resource is the resource in the first resource excluding the resource in the first time slot.
[0016] Through the above implementation, the second resource overlaps with the first resource in the first time slot. If the first communication device continues to use the first resource for transmission, and the second communication device continues to use the second resource for transmission, it will cause resource collision, which will reduce the performance of the two communication devices. Therefore, it is necessary to determine which communication device to transmit through preemption checking and / or re-evaluation. In order to improve the overall performance of the NR SL system, the embodiment of the present application is designed to allow side information with a lower level of priority to be transmitted, thereby avoiding the side information with a larger priority value among the A side information affecting the transmission of the side information with a smaller priority value among the B side information.
[0017] In one possible implementation, the first communication device determines that the third resource is preempted and / or determines to re-evaluate the third resource based on the B priority values and the A priority values corresponding to the A side information. Specifically, it may be that: the first priority value among the A priority values is greater than the second priority value among the B priority values, and the first communication device determines that the third resource is preempted and / or determines to re-evaluate the third resource.
[0018] Through the above implementation method, resource collision can be avoided, and side information with a higher priority level can be transmitted, which can reduce the impact of side information with a larger priority value (i.e., a lower priority level) in side information A on the transmission of side information with a smaller priority value (i.e., a higher priority level) in side information B.
[0019] In one possible implementation, both A and B are greater than 1, the first priority value is the minimum or maximum value among the A priority values, and the second priority value is the minimum or maximum value among the B priority values.
[0020] Alternatively, A is greater than 1, B is 1, the first priority value is the minimum or maximum value among the A priority values, and the second priority value corresponds to the priority value of the side information carried by the second resource.
[0021] Alternatively, A is 1, B is greater than 1, the first priority value is the priority value corresponding to the side information carried by the first resource, and the second priority value is the minimum or maximum value among the B priority values.
[0022] Alternatively, the first priority value is the minimum or maximum value among D priority values, and the second priority value corresponds to the third sideline information among the B sideline information, wherein the D priority values correspond to D sideline information, the D sideline information are sideline information carried on the second time slot among the C time slots, the D sideline information include the A sideline information, the reserved resources for the third sideline information are the second time slot in the time domain, and D is an integer greater than 1.
[0023] Alternatively, the first priority value is the minimum or maximum value among the E priority values, and the second priority value corresponds to the third sideline information among the B sideline information, wherein the E priority values correspond to E sideline information, the reserved resources of the E sideline information overlap with the first frequency domain resources on the first subframe in the frequency domain, the E sideline information include part or all of the A sideline information, the reserved resources of the third sideline information are the first frequency domain resources in the frequency domain, and E is an integer greater than 1.
[0024] Alternatively, the first priority value corresponds to the first sideline information among the A sideline information, the second priority value corresponds to the third sideline information among the B sideline information, and the reserved resources for the first sideline information and the reserved resources for the third sideline information are both the first time slot in the time domain.
[0025] Through the above implementation, various solutions can be designed according to different values of the amount of side information transmitted by the first resource and the amount of side information transmitted by the second resource, and the implementation is flexible.
[0026] In a possible implementation, C is 2, and the second resource overlaps with the first resource, which may be:
[0027] The A and the B are both 2, the A side information includes the first side information and the second side information, the B side information includes the third side information and the fourth side information, the reserved resources of the first side information and the reserved resources of the third side information overlap, and the reserved resources of the second side information and the reserved resources of the fourth side information overlap or do not overlap.
[0028] Alternatively, A is 2, B is 1, the A sideline information includes first sideline information and second sideline information, the B sideline information includes third sideline information, and the reserved resources of the first sideline information and the reserved resources of the third sideline information overlap in the first time slot.
[0029] Alternatively, A is 1, B is 2, the A sideline information includes first sideline information, the B sideline information includes third sideline information and fourth sideline information, and the reserved resources of the first sideline information and the reserved resources of the third sideline information overlap in the first time slot.
[0030] In a possible implementation, A and B are both 2, the reserved resources of the second sideline information overlap with the reserved resources of the fourth sideline information, and the third resource is the first resource.
[0031] Alternatively, A and B are both 2, the reserved resources of the first sideline information and the reserved resources of the third sideline information overlap in the second time slot of the C time slots, the reserved resources of the second sideline information and the reserved resources of the fourth sideline information do not overlap, and the third resource is the resource of the first resource in the second time slot.
[0032] Alternatively, A and B are both 2, the reserved resources of the first sideline information and the reserved resources of the third sideline information overlap in the first time slot, the reserved resources of the second sideline information and the reserved resources of the fourth sideline information do not overlap, and the third resource is the first resource.
[0033] Alternatively, A is 2, B is 1, and the third resource is the first resource.
[0034] Alternatively, A is 1, B is 2, and the third resource is the first resource.
[0035] In one possible implementation, C is 2, and the first communication device determines that the third resource is preempted and / or determines to re-evaluate the third resource based on the B priority values and the A priority value corresponding to the A sidelink information. Specifically, it can be:
[0036] Both A and B are 2, the first priority value is greater than the second priority value, and the first communication device determines that the third resource is preempted and / or determines to re-evaluate the third resource, wherein the first priority value is the minimum or maximum value among the A priority values, and the second priority value is the minimum or maximum value among the B priority values.
[0037] Alternatively, A is 2, B is 1, the first priority value among the A priority values is greater than the priority value corresponding to the side information carried by the second resource, and the first communication device determines that the third resource is preempted and / or determines to re-evaluate the third resource.
[0038] Alternatively, A is 1, B is 2, the priority value corresponding to the side information carried by the first resource is greater than the second priority value among the B priority values, and the first communication device determines that the third resource is preempted and / or determines to re-evaluate the third resource.
[0039] In a possible implementation, the second priority value is smaller than a first threshold; and / or the first priority value is larger than the first threshold.
[0040] In one possible implementation, A is greater than 1, the A side information includes first side information, the reserved resources of the first side information are the resources on the first time slot, and the priority value corresponding to the first side information is the minimum value of the A priority values; or, A is greater than 1, the A side information includes first side information and second side information, the reserved resources of the first side information are the resources on the first time slot, the reserved resources of the second side information are the resources on the C time slots other than the first time slot, and the priority value corresponding to the first side information is smaller than the priority value corresponding to the second side information.
[0041] Through the above implementation, the highest priority or higher priority sideline information among the A sideline information is carried in the first time slot of the C time slots, enabling the high-priority service to be transmitted first and more easily win the priority comparison in the first time slot.
[0042] In one possible implementation, the method may further include: the first communication device performs a preemption check and / or re-evaluation on the frequency domain resources of the first resource in the second time slot of the C time slots in the sixth time slot; or, performs a preemption check and / or re-evaluation on the frequency domain resources of the first resource in the C time slots in the third time slot; wherein the identifier of the sixth time slot satisfies (m-T3-1), the identifier of the third time slot satisfies (n-T3), m is the identifier of the first time slot, n is the identifier of the second time slot, and T3 is a preset threshold.
[0043] Through the above implementation, the first communication device can perform timely resource preemption checks and / or reassessments. In other words, the second communication device cannot send a second SCI after the third or sixth time slot to reserve a second resource that overlaps with the first resource. This prevents the first communication device from processing the second SCI from the second communication device in time, potentially leading to a collision between the first and second resources. This design of the preemption check and / or reassessment timing ensures that high-priority services are maintained while avoiding resource collisions.
[0044] In a second aspect, the present application provides a communication method, which is performed by a first communication device. The first communication device is, for example, a terminal device, or a component in the terminal device, without limitation.
[0045] In this method, a first communication device receives second side control information of a second communication device, where the second side control information is used to indicate a second channel occupancy time COT, a second resource in the second COT overlaps with a first resource, and the first resource belongs to the first COT of the first communication device; when a first condition is met, it is determined that a fourth resource is preempted and / or it is determined to re-evaluate the fourth resource, wherein the fourth resource is the first resource, or the first COT, or includes the first resource and the remaining resources in the first COT after the first resource.
[0046] The first condition includes one or more of the following:
[0047] The third priority value corresponding to the side information carried by the second resource is less than the fourth priority value among the A priority values, wherein the A priority values are the priority values corresponding to the A side information carried by the first COT, and A is a positive integer.
[0048] Alternatively, the second COT is an initial COT of the second communication device.
[0049] Alternatively, the device for receiving the sidelink information carried by the first resource is the same as the device for receiving the sidelink information carried by the second resource.
[0050] Alternatively, the first resource is the fourth time slot in the first COT in the time domain, and the remaining duration of the first COT after the fourth time slot is less than or equal to a second threshold.
[0051] In the above embodiment, the first resource of the first communication device overlaps with the second resource in the second COT. The transmission of the first communication device on the first resource may cause a resource collision, affecting the performance of the first communication device and the second communication device. Alternatively, the transmission of the first communication device on the first resource may cause the second communication device to be unable to continue transmitting on subsequent resources, which is equivalent to the second COT terminating before the first resource. For example, the transmission of the first resource will result in the inability to transmit more important services (with a smaller L1 priority value or a smaller CAPC value) in the time slot after the first resource in the second COT. In order to take into account both continuous transmission within the COT and priority transmission of more important services, the embodiment of the present application designs a preemption check / re-evaluation mechanism.
[0052] In a possible implementation, the first COT and the second COT are both first COTs, or the first COT and the second COT are both second COTs.
[0053] In one possible implementation, the fourth priority value is the priority value corresponding to the sideline information carried by the first resource; or, A is greater than 1, and the fourth priority value is the minimum or maximum value among the A priority values.
[0054] In a possible implementation, the third priority value is smaller than a first threshold; and / or the fourth priority value is larger than the first threshold.
[0055] In a third aspect, the present application provides a communication method, which is performed by a first communication device, for example, a terminal device, or a component in the terminal device, without limitation.
[0056] In this method, a first communication device receives second side control information from a second communication device, where the second side control information is used to indicate a second resource, where the second resource overlaps with the first resource, and where the first resource belongs to a first continuous transmission of the first communication device; when a first condition is met, it is determined that a fourth resource is preempted or that the fourth resource is re-evaluated, and the fourth resource includes the first resource.
[0057] The first condition may include one or more of the following:
[0058] The third priority value is less than the fourth priority value, wherein the third priority value is the priority value corresponding to the side information carried by the second resource, or the third priority value is a priority value among the B priority values corresponding to the B side information carried by the second continuous transmission where the second resource is located; the fourth priority value is the priority value corresponding to the side information carried by the first resource, or the fourth priority value is a priority value among the A priority values corresponding to the A side information carried by the first continuous transmission where the first resource is located, and both A and B are positive integers;
[0059] The second resource belongs to a second continuous transmission, or the second resource belongs to a second channel occupancy time COT, wherein the second continuous transmission is used to transmit sidelink information of the second communication device, and the second COT is an initial COT of the second communication device;
[0060] The first resource is the fourth time slot in the first continuous transmission in the time domain, and a remaining duration of the first continuous transmission after the fourth time slot is less than or equal to a second threshold;
[0061] Alternatively, the device for receiving the sidelink information carried by the first resource is the same as the device for receiving the sidelink information carried by the second resource.
[0062] In the above embodiment, the first resource of the first communication device overlaps with the second resource of the second communication device. The transmission of the first communication device on the first resource may cause a resource collision, affecting the performance of the first communication device and the second communication device. Alternatively, the transmission of the first communication device on the first resource may cause the second communication device to be unable to continue transmitting on subsequent resources, which is equivalent to the second continuous transmission belonging to the second resource being terminated before the first resource. For example, the transmission of the first resource will result in the inability to transmit more important services (with smaller L1 priority values or smaller CAPC values) in the time slots after the first and second resources in the second continuous transmission. In order to take into account the priority transmission of more important services in continuous transmission, the embodiment of the present application designs a preemption check / re-evaluation mechanism.
[0063] In one possible implementation, the fourth resource may further include resources of at least one time slot preceding the first resource in the time domain and / or resources of at least one time slot following the first resource in the time domain. Optionally, the resources of at least one time slot preceding the first resource in the time domain may specifically be: resources of Q time slots preceding the first resource in the time domain, where Q is a positive integer; or, all resources preceding the first resource in the time domain in the first continuous transmission. Optionally, the resources of at least one time slot following the first resource in the time domain may specifically be: resources of P time slots following the first resource in the time domain, where P is a positive integer; or, all resources following the first resource in the time domain in the first continuous transmission.
[0064] With the above implementation, if the first communication device occupies the first Q resources of the first resource, the second communication device will receive a "channel occupied" error when performing LBT on the second resource, preventing it from successfully performing LBT on the second resource. Consequently, the second communication device will be unable to access the channel on the second resource and will be unable to transmit on the second resource. Therefore, the first communication device should exclude the first Q consecutive resources of the first resource, giving the second communication device a chance to complete LBT within this timeframe and successfully transmit on the second resource.
[0065] For example, in a continuous transmission, the first time slot of the continuous transmission is accessed via a Type 1 LBT channel, while non-first time slots of the continuous transmission are accessed via a Type 2 LBT channel. If the first resource of the first communication device is preempted, the first communication device cannot access the channel using Type 2 LBT on resources following the first resource. Therefore, when the first resource is preempted, all resources following the first resource are considered preempted. Similarly, when the first resource is re-evaluated, all resources following the first resource are considered re-evaluated as well.
[0066] For another example, if the second communication device preempts the second resource, the first communication device will receive a "channel occupied" error when performing LBT on the first resource, preventing it from successfully performing LBT within P resources after the second resource. Consequently, the first communication device will be unable to access the channel within P resources after the first resource. Therefore, the first communication device should exclude P consecutive resources after the first resource, giving it a chance to complete LBT within that time and successfully transmit on the subsequent resource (e.g., the first time slot after P resources after the first resource).
[0067] In one possible implementation, when the fourth condition is met, the fourth resource includes a resource that is Q time slots before the first resource in the time domain, or includes a resource that is P time slots after the first resource in the time domain, or includes a resource that is Q time slots before the first resource in the time domain and a resource that is P time slots after the first resource in the time domain. The fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, and the first COT is the initial COT of the first communication device.
[0068] Through the above implementation, for the first communication device, if the first communication device is required not to transmit side information on the fourth resource. Then when comparing priorities, the priorities corresponding to the side information carried on these fourth resources can be included in the priority comparison. If the side information carried on the resources after the first resource and / or before the first resource corresponds to a larger priority value, the fourth resource is preempted; if the side information carried on the resources after the first resource and / or before the first resource corresponds to a smaller priority value, the fourth resource is preempted. Similarly, if the second communication device does not transmit side information on the sixth resource, the priorities corresponding to the side information carried on these sixth resources can also be included in the priority comparison. This balances the need for continuous transmission and the need to prioritize high-priority services, ensuring the reliability of higher-priority services in continuous transmission.
[0069] In one possible implementation, the A side information may be part or all of all the side information carried by the first continuous transmission, wherein the A side information includes the side information carried by the first resource, and the A priority values include the priority value corresponding to the side information carried by the first resource.
[0070] Illustratively, the A priority values may further include one or more of the following:
[0071] a priority value corresponding to sideline information carried by all resources except the first resource in the first continuous transmission, wherein the A sideline information also includes sideline information carried by all resources except the first resource in the first continuous transmission;
[0072] a priority value corresponding to side traffic information carried by all resources in the first COT except the first resource, wherein the A side traffic information also includes side traffic information carried by all resources in the first COT except the first resource;
[0073] a priority value corresponding to sidelink information carried by all resources located after the first resource in the time domain in the first continuous transmission, wherein the A sidelink information also includes sidelink information carried by all resources located after the first resource in the time domain in the first continuous transmission;
[0074] a priority value corresponding to sidelink information carried by all resources located after the first resource in the time domain in the first COT, wherein the A sidelink information also includes sidelink information carried by all resources located after the first resource in the time domain in the first COT;
[0075] a priority value corresponding to sidelink information carried by all resources located before the first resource in the time domain in the first continuous transmission, wherein the A sidelink information also includes sidelink information carried by all resources located before the first resource in the time domain in the first continuous transmission;
[0076] a priority value corresponding to sidelink information carried by all resources in the first COT that are located before the first resource in the time domain, wherein the A sidelink information also includes sidelink information carried by all resources in the first COT that are located before the first resource in the time domain;
[0077] a priority value corresponding to sidelink information carried by a resource located Q time slots before the first resource in the time domain, wherein the A sidelink information also includes sidelink information carried by a resource located Q time slots before the first resource in the time domain;
[0078] Alternatively, the priority value corresponding to the side information carried by the resources located in P time slots after the first resource in the time domain, wherein the A side information also includes the side information carried by the resources located in P time slots after the first resource in the time domain.
[0079] In one possible implementation, the B side information may be part or all of all the side information carried by the second continuous transmission, wherein the B side information may include the side information carried by the second resource, and the B priority values include the priority value corresponding to the side information carried by the second resource.
[0080] Illustratively, the B priority values may further include one or more of the following:
[0081] a priority value corresponding to the sideline information carried by all resources except the second resource in the second continuous transmission, wherein the B sideline information also includes the sideline information carried by all resources except the second resource in the second continuous transmission;
[0082] a priority value corresponding to the side traffic information carried by all resources in the second COT except the second resource, wherein the B side traffic information also includes the side traffic information carried by all resources in the second COT except the second resource;
[0083] a priority value corresponding to sidelink information carried by all resources located after the second resource in the time domain in the second continuous transmission, wherein the B sidelink information also includes sidelink information carried by all resources located after the second resource in the time domain in the second continuous transmission;
[0084] a priority value corresponding to sidelink information carried by all resources located after the second resource in the time domain in the second COT, wherein the B sidelink information also includes sidelink information carried by all resources located after the second resource in the time domain in the second COT;
[0085] a priority value corresponding to sidelink information carried by all resources located before the second resource in the time domain in the second continuous transmission, wherein the B sidelink information also includes sidelink information carried by all resources located before the second resource in the time domain in the second continuous transmission;
[0086] a priority value corresponding to sidelink information carried by all resources located before the second resource in the time domain in the second COT, wherein the B sidelink information also includes sidelink information carried by all resources located before the second resource in the time domain in the second COT;
[0087] a priority value corresponding to sidelink information carried by a resource located Q time slots before the second resource in the time domain, wherein the B sidelink information also includes sidelink information carried by a resource located Q time slots before the second resource in the time domain;
[0088] Or, the priority value corresponding to the sidelink information carried by the resources located in P time slots after the second resource in the time domain, wherein the B sidelink information also includes the sidelink information carried by the resources located in P time slots after the second resource in the time domain.
[0089] In one possible implementation, if A is 1, the fourth priority value may be the priority value corresponding to the side information carried by the first resource; or, if A is greater than 1, the fourth priority value may be the minimum or maximum value among the A priority values.
[0090] In one possible implementation, if B is 1, the third priority value may be the priority value corresponding to the side information carried by the second resource; or, if B is greater than 1, the third priority value may be the minimum or maximum value among the B priority values.
[0091] For example, the fourth priority value may be the minimum value among A priority values, and the third priority value may be the minimum value among B priority values. For another example, the fourth priority value may be the minimum value among A priority values, and the third priority value may be the maximum value among B priority values. For another example, the fourth priority value may be the maximum value among A priority values, and the third priority value may be the minimum value among B priority values. For another example, the fourth priority value may be the maximum value among A priority values, and the third priority value may be the maximum value among B priority values.
[0092] In one possible implementation, the third priority value is the priority value corresponding to the side information carried by the second resource, and the fourth priority value is the priority value corresponding to the side information carried by the first resource; the first resource and the second resource can overlap in K time slots, and in each of the K overlapping time slots, the third priority value corresponding to the side information carried by the second resource is less than the fourth priority value corresponding to the side information carried by the first resource, where K is a positive integer.
[0093] In a possible implementation, the first resource and the second resource may both be one time slot in the time domain.
[0094] In a possible implementation, the third priority value is smaller than the first threshold; and / or the fourth priority value is larger than the first threshold.
[0095] In a possible implementation, the first continuous transmission may be a first COT, and / or the second continuous transmission may be a second COT.
[0096] In a possible implementation manner, the first terminal device may further determine not to send the sidelink information on an eighth resource or determine to reselect an eighth resource, where the eighth resource may include the first resource.
[0097] In one possible implementation, the eighth resource may further include resources of at least one time slot preceding the first resource in the time domain and / or resources of at least one time slot following the first resource in the time domain. Optionally, the resources of at least one time slot preceding the first resource in the time domain may specifically be: resources of Q time slots preceding the first resource in the time domain, where Q is a positive integer; or, all resources preceding the first resource in the time domain in the first continuous transmission. Optionally, the resources of at least one time slot following the first resource in the time domain may specifically be: resources of P time slots following the first resource in the time domain, where P is a positive integer; or, all resources following the first resource in the time domain in the first continuous transmission.
[0098] In one possible implementation, when the fourth condition is met, the eighth resource includes a resource that is Q time slots before the first resource in the time domain, or includes a resource that is P time slots after the first resource in the time domain, or includes a resource that is Q time slots before the first resource in the time domain and a resource that is P time slots after the first resource in the time domain. The fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, and the first COT is the initial COT of the first communication device.
[0099] In a possible implementation, Q time slots located before the first resource in the time domain belong to the first resource, and / or P time slots located after the first resource in the time domain belong to the first resource.
[0100] In a fourth aspect, the present application provides a communication method, which is performed by a first communication device, for example, a terminal device, or a component in the terminal device, without limitation.
[0101] In this method, a first communication device receives second sideline control information from a second communication device, where the second sideline control information is used to indicate a second resource, where the second resource overlaps with the first resource in K time slots, and the first resource is used to transmit the sideline information of the first communication device, where K is a positive integer; when a first condition is met, it is determined that a fourth resource is preempted or that the fourth resource is re-evaluated, and the fourth resource includes the first resource.
[0102] The first condition may be: in each overlapping time slot among the K time slots, the priority value corresponding to the sidelink information carried by the second resource is smaller than the priority value corresponding to the sidelink information carried by the first resource.
[0103] In the above embodiment, the first resource of the first communication device and the second resource of the second communication device overlap in K time slots. The transmission of the first communication device on the first resource may cause resource collision, affecting the performance of the first communication device and the second communication device. Alternatively, the transmission of the first communication device on the first resource may cause the second communication device to be unable to continue transmitting on subsequent resources, which is equivalent to the second continuous transmission belonging to the second resource being terminated before the first resource. For example, the transmission of the first resource will result in the inability to transmit more important (smaller L1 priority value or smaller CAPC value) services in the time slot after the first resource in the second continuous transmission. In order to take into account the priority transmission of more important services in continuous transmission, the embodiment of the present application designs a preemption check / re-evaluation mechanism.
[0104] Furthermore, the second communication device's preemption of the sixth resource will prevent the first communication device from transmitting sidelink information on the fourth resource. If, in each overlapping time slot, the priority value corresponding to the sidelink information carried by the second resource is lower than the priority value corresponding to the sidelink information carried by the first resource, it can be considered that the multiple sidelink information carried on the sixth resource are important. To ensure this set of important sidelink transmissions on the sixth resource, the second terminal device can preempt or not re-evaluate the sixth resource. Accordingly, the first terminal's fourth resource is preempted or re-evaluated.
[0105] In one possible implementation, the fourth resource may further include resources of at least one time slot preceding the first resource in the time domain and / or resources of at least one time slot following the first resource in the time domain. Optionally, the resources of at least one time slot preceding the first resource in the time domain may specifically be: resources of Q time slots preceding the first resource in the time domain, where Q is a positive integer; or, all resources preceding the first resource in the time domain in the first continuous transmission. Optionally, the resources of at least one time slot following the first resource in the time domain may specifically be: resources of P time slots following the first resource in the time domain, where P is a positive integer; or, all resources following the first resource in the time domain in the first continuous transmission.
[0106] In one possible implementation, when the fourth condition is met, the fourth resource includes a resource that is Q time slots before the first resource in the time domain, or includes a resource that is P time slots after the first resource in the time domain, or includes a resource that is Q time slots before the first resource in the time domain and a resource that is P time slots after the first resource in the time domain. The fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, and the first COT is the initial COT of the first communication device.
[0107] In a possible implementation, the first continuous transmission may be a first COT, and / or the second continuous transmission may be a second COT.
[0108] In a possible implementation manner, the first terminal device may further determine not to send the sidelink information on an eighth resource or determine to reselect an eighth resource, where the eighth resource may include the first resource.
[0109] In one possible implementation, the eighth resource may further include resources of at least one time slot preceding the first resource in the time domain and / or resources of at least one time slot following the first resource in the time domain. Optionally, the resources of at least one time slot preceding the first resource in the time domain may specifically be: resources of Q time slots preceding the first resource in the time domain, where Q is a positive integer; or, all resources preceding the first resource in the time domain in the first continuous transmission. Optionally, the resources of at least one time slot following the first resource in the time domain may specifically be: resources of P time slots following the first resource in the time domain, where P is a positive integer; or, all resources following the first resource in the time domain in the first continuous transmission.
[0110] In one possible implementation, when the fourth condition is met, the eighth resource includes a resource that is Q time slots before the first resource in the time domain, or includes a resource that is P time slots after the first resource in the time domain, or includes a resource that is Q time slots before the first resource in the time domain and a resource that is P time slots after the first resource in the time domain. The fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, and the first COT is the initial COT of the first communication device.
[0111] In a possible implementation, Q time slots located before the first resource in the time domain belong to the first resource, and / or P time slots located after the first resource in the time domain belong to the first resource.
[0112] In a fifth aspect, the present application provides a communication method, which is performed by a second communication device, which is, for example, a terminal device or a component in a terminal device, without limitation.
[0113] In this method, a second communication device receives one or more sideline control information, wherein the one or more sideline control information is used to indicate a fifth resource and M priority values corresponding to M sideline information, wherein the fifth resource fully or partially overlaps with the second resource, wherein the fifth resource is a reserved resource for the M sideline information, and the second resource is a reserved resource for B sideline information of the second communication device; based on the M priority values and the B priority values corresponding to the B sideline information, the second resource is preempted and / or it is determined not to re-evaluate the second resource. The fifth resource and the second resource belong to a first subframe in the time domain, the first subframe is a subframe of a first communication standard, the M sideline information and the B sideline information are both information of a second communication standard, the second communication standard is different from the first communication standard, and the first subframe includes C time slots of the second communication standard.
[0114] Wherein, C is an integer greater than 1, A and B are both positive integers, and A is greater than 1 and / or B is greater than 1. For example, C is 2, A and B are both 2; or, C is 2, A is 2, and B is 1; or, C is 2, A is 1, and B is 2.
[0115] Optionally, the first communication standard is LTE SL and the second communication standard is NR SL, without limitation.
[0116] In one possible implementation, the second communication device preempts the second resource and / or determines not to re-evaluate the second resource based on the M priority values and the B priority values corresponding to the B side information. Specifically, it may be that: the fifth priority value among the M priority values is greater than the second priority value among the B priority values, and the second resource is preempted and / or determined not to re-evaluate the second resource.
[0117] In one possible implementation, both M and B are greater than 1, the fifth priority value is the minimum or maximum value among the M priority values, and the second priority value is the minimum or maximum value among the B priority values.
[0118] Alternatively, the M is greater than 1, the B is 1, the fifth priority value is the minimum or maximum value among the M priority values, and the second priority value corresponds to the priority value corresponding to the sidelink information carried by the second resource.
[0119] Alternatively, M is 1, B is greater than 1, the fifth priority value is the priority value corresponding to the sideline information carried by the fifth resource, and the second priority value is the minimum or maximum value among the B priority values.
[0120] Alternatively, M is greater than 1, the fifth priority value is the minimum or maximum value among the F priority values, the second priority value corresponds to the third sideline information among the B sideline information, wherein the F priority values correspond to F sideline information, the F sideline information are sideline information carried on the second time slot among the C time slots, the F sideline information include the M sideline information, the reserved resources of the third sideline information are the second time slot in the time domain, and F is an integer greater than 1.
[0121] Alternatively, the fifth priority value is the minimum or maximum value among the G priority values, and the second priority value corresponds to the third sideline information among the B sideline information, wherein the G priority values correspond to G sideline information, the reserved resources of the G sideline information overlap with the second frequency domain resources on the first subframe in the frequency domain, the G sideline information include part or all of the M sideline information, the reserved resources of the third sideline information are the second frequency domain resources in the frequency domain, and G is an integer greater than 1.
[0122] Alternatively, the fifth priority value corresponds to the fifth sideline information among the M sideline information, the second priority value corresponds to the third sideline information among the B sideline information, and the reserved resources of the fifth sideline information and the reserved resources of the third sideline information are both the first time slot among the C time slots in the time domain.
[0123] In a possible implementation, C is 2, and the fifth resource overlaps with the second resource, which may be:
[0124] When M is 2 and B is 2, the M side information includes fifth side information and sixth side information, the B side information includes third side information and fourth side information, the reserved resources of the fifth side information overlap with the reserved resources of the third side information, and the reserved resources of the sixth side information overlap or do not overlap with the reserved resources of the fourth side information.
[0125] Alternatively, when M is 2 and B is 1, the M sideline information include fifth sideline information and sixth sideline information, the B sideline information include third sideline information, and the reserved resources of the fifth sideline information and the reserved resources of the third sideline information overlap in the first time slot of the C time slots.
[0126] Alternatively, when M is 1 and B is 2, the M sideline information include fifth sideline information, the B sideline information include third sideline information and fourth sideline information, and the reserved resources of the fifth sideline information and the reserved resources of the third sideline information overlap in the first time slot of the C time slots.
[0127] In one possible implementation, C is 2, and the second communication device preempts the second resource and / or determines not to re-evaluate the second resource based on the M priority values and the B priority values corresponding to the B sidelink information. Specifically, it may be:
[0128] The M and the B are both 2, the fifth priority value is greater than the second priority value, the second communication device preempts the second resource and / or determines not to re-evaluate the second resource, wherein the fifth priority value is the minimum or maximum value among the M priority values, and the second priority value is the minimum or maximum value among the B priority values.
[0129] Alternatively, M is 2, B is 1, the fifth priority value among the M priority values is greater than the priority value corresponding to the sidelink information carried by the second resource, and the second communication device preempts the second resource and / or determines not to re-evaluate the second resource.
[0130] Alternatively, when M is 1 and B is 2, and the priority value corresponding to the sidelink information carried by the fifth resource is greater than the second priority value among the B priority values, the second communication device preempts the second resource and / or determines not to re-evaluate the second resource.
[0131] In one possible implementation, the B is greater than 1, the B side information includes third side information, the reserved resources of the third side information are the resources on the first time slot among the C time slots, and the priority value corresponding to the third side information is the minimum value of the B priority values; or, the B is greater than 1, the B side information includes third side information and fourth side information, the reserved resources of the third side information are the resources on the first time slot among the C time slots, the reserved resources of the fourth side information are the resources on the time slots among the C time slots except the first time slot, and the priority value corresponding to the third side information is smaller than the priority value corresponding to the fourth side information.
[0132] The technical effects that can be achieved by the above-mentioned fifth aspect and any possible implementation method thereof may refer to the technical effects that can be achieved by the above-mentioned first aspect and any possible implementation method thereof, and no further details will be given.
[0133] In a sixth aspect, the present application provides a communication method, which is performed by a second communication device, such as a terminal device or a component in the terminal device, without limitation.
[0134] In this method, the second communication device receives first side control information of the first communication device, where the first side control information is used to indicate a first channel occupancy time COT, a first resource in the first COT overlaps with a second resource, and the second resource belongs to a second COT of the second communication device; when a first condition is met, the sixth resource is seized and / or it is determined not to re-evaluate the sixth resource, wherein the sixth resource is the second resource, or the second COT, or includes the second resource and the remaining resources in the second COT after the second resource.
[0135] The first condition includes one or more of the following:
[0136] The third priority value corresponding to the sideline information carried by the second resource is less than the fourth priority value among the A priority values, wherein the A priority values are the priority values corresponding to the A sideline information carried by the first COT, and A is a positive integer;
[0137] Alternatively, the second COT is an initial COT of the second communication device;
[0138] Alternatively, the device for receiving the side information carried by the first resource is the same as the device for receiving the side information carried by the second resource;
[0139] Alternatively, the first resource is the fourth time slot in the first COT in the time domain, and the remaining duration of the first COT after the fourth time slot is less than or equal to a second threshold.
[0140] In a possible implementation, the first COT and the second COT are both first COTs, or the first COT and the second COT are both second COTs.
[0141] In one possible implementation, the fourth priority value is the priority value corresponding to the side information carried by the first resource; or, when A is greater than 1, the fourth priority value is the minimum or maximum value among the A priority values.
[0142] In a possible implementation, the third priority value is smaller than a first threshold; and / or the fourth priority value is larger than the first threshold.
[0143] The technical effects that can be achieved by the above-mentioned sixth aspect and any possible implementation method thereof may refer to the technical effects that can be achieved by the above-mentioned second aspect and any possible implementation method thereof, and no further details will be given.
[0144] In a seventh aspect, the present application provides a communication method, which is performed by a second communication device, such as a terminal device or a component in the terminal device, without limitation.
[0145] In the method, a second communication device receives first side control information from a first communication device, where the first side control information is used to indicate a first resource, the first resource overlaps with a second resource, and the second resource is used to transmit the side information of the second communication device; and when a first condition is met, a sixth resource is seized or determined not to be re-evaluated, where the sixth resource includes the second resource.
[0146] The first condition may include one or more of the following:
[0147] The third priority value is less than the fourth priority value, wherein the third priority value is the priority value corresponding to the side information carried by the second resource, or the third priority value is a priority value among the B priority values corresponding to the B side information carried by the second continuous transmission where the second resource is located; the fourth priority value is the priority value corresponding to the side information carried by the first resource, or the fourth priority value is a priority value among the A priority values corresponding to the A side information carried by the first continuous transmission where the first resource is located, and both A and B are positive integers;
[0148] The second resource belongs to a second continuous transmission, or the second resource belongs to a second channel occupancy time COT, wherein the second continuous transmission is used to transmit sidelink information of the second communication device, and the second COT is an initial COT of the second communication device;
[0149] The first resource is the fourth time slot in the first continuous transmission in the time domain, and a remaining duration of the first continuous transmission after the fourth time slot is less than or equal to a second threshold;
[0150] Alternatively, the device for receiving the sidelink information carried by the first resource is the same as the device for receiving the sidelink information carried by the second resource.
[0151] In one possible implementation, the sixth resource may further include resources of at least one time slot preceding the second resource in the time domain and / or resources of at least one time slot following the second resource in the time domain. Optionally, the resources of at least one time slot preceding the second resource in the time domain may be: resources of Q time slots preceding the second resource in the time domain, where Q is a positive integer; or, all resources preceding the second resource in the time domain in the second continuous transmission. Optionally, the resources of at least one time slot following the second resource in the time domain may specifically be: resources of P time slots following the second resource in the time domain, where P is a positive integer; or, all resources following the second resource in the time domain in the second continuous transmission.
[0152] In one possible implementation, when the fourth condition is met, the sixth resource includes a resource of Q time slots that is located before the second resource in the time domain and / or a resource of P time slots that is located after the second resource in the time domain, wherein the fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, wherein the first COT is the initial COT of the first communication device.
[0153] In one possible implementation, the A side information may be part or all of all the side information carried by the first continuous transmission, wherein the A side information includes the side information carried by the first resource, and the A priority values include the priority value corresponding to the side information carried by the first resource.
[0154] Illustratively, the A priority values may further include one or more of the following:
[0155] a priority value corresponding to sideline information carried by all resources except the first resource in the first continuous transmission, wherein the A sideline information also includes sideline information carried by all resources except the first resource in the first continuous transmission;
[0156] a priority value corresponding to side traffic information carried by all resources in the first COT except the first resource, wherein the A side traffic information also includes side traffic information carried by all resources in the first COT except the first resource;
[0157] a priority value corresponding to sidelink information carried by all resources located after the first resource in the time domain in the first continuous transmission, wherein the A sidelink information also includes sidelink information carried by all resources located after the first resource in the time domain in the first continuous transmission;
[0158] a priority value corresponding to sidelink information carried by all resources located after the first resource in the time domain in the first COT, wherein the A sidelink information also includes sidelink information carried by all resources located after the first resource in the time domain in the first COT;
[0159] a priority value corresponding to sidelink information carried by all resources located before the first resource in the time domain in the first continuous transmission, wherein the A sidelink information also includes sidelink information carried by all resources located before the first resource in the time domain in the first continuous transmission;
[0160] a priority value corresponding to sidelink information carried by all resources in the first COT that are located before the first resource in the time domain, wherein the A sidelink information also includes sidelink information carried by all resources in the first COT that are located before the first resource in the time domain;
[0161] a priority value corresponding to sidelink information carried by a resource located Q time slots before the first resource in the time domain, wherein the A sidelink information also includes sidelink information carried by a resource located Q time slots before the first resource in the time domain;
[0162] Alternatively, the priority value corresponding to the side information carried by the resources located in P time slots after the first resource in the time domain, wherein the A side information also includes the side information carried by the resources located in P time slots after the first resource in the time domain.
[0163] In one possible implementation, the B side information may be part or all of all the side information carried by the second continuous transmission, wherein the B side information includes the side information carried by the second resource, and the B priority values include the priority value corresponding to the side information carried by the second resource.
[0164] Illustratively, the B priority values may further include one or more of the following:
[0165] a priority value corresponding to the sideline information carried by all resources except the second resource in the second continuous transmission, wherein the B sideline information also includes the sideline information carried by all resources except the second resource in the second continuous transmission;
[0166] a priority value corresponding to the side traffic information carried by all resources in the second COT except the second resource, wherein the B side traffic information also includes the side traffic information carried by all resources in the second COT except the second resource;
[0167] a priority value corresponding to sidelink information carried by all resources located after the second resource in the time domain in the second continuous transmission, wherein the B sidelink information also includes sidelink information carried by all resources located after the second resource in the time domain in the second continuous transmission;
[0168] a priority value corresponding to sidelink information carried by all resources located after the second resource in the time domain in the second COT, wherein the B sidelink information also includes sidelink information carried by all resources located after the second resource in the time domain in the second COT;
[0169] a priority value corresponding to sidelink information carried by all resources located before the second resource in the time domain in the second continuous transmission, wherein the B sidelink information also includes sidelink information carried by all resources located before the second resource in the time domain in the second continuous transmission;
[0170] a priority value corresponding to sidelink information carried by all resources located before the second resource in the time domain in the second COT, wherein the B sidelink information also includes sidelink information carried by all resources located before the second resource in the time domain in the second COT;
[0171] a priority value corresponding to sidelink information carried by a resource located Q time slots before the second resource in the time domain, wherein the B sidelink information also includes sidelink information carried by a resource located Q time slots before the second resource in the time domain;
[0172] Or, the priority value corresponding to the sidelink information carried by the resources located in P time slots after the second resource in the time domain, wherein the B sidelink information also includes the sidelink information carried by the resources located in P time slots after the second resource in the time domain.
[0173] In one possible implementation, if A is 1, the fourth priority value may be the priority value corresponding to the side information carried by the first resource; or, if A is greater than 1, the fourth priority value may be the minimum or maximum value among the A priority values.
[0174] In one possible implementation, if B is 1, the third priority value may be the priority value corresponding to the side information carried by the second resource; or, if B is greater than 1, the third priority value may be the minimum or maximum value among the B priority values.
[0175] In one possible implementation, the third priority value is the priority value corresponding to the side information carried by the second resource, and the fourth priority value is the priority value corresponding to the side information carried by the first resource; the first resource and the second resource overlap in K time slots, and in each of the K overlapping time slots, the third priority value corresponding to the side information carried by the second resource is less than the fourth priority value corresponding to the side information carried by the first resource, where K is a positive integer.
[0176] In a possible implementation, the first resource and the second resource may both be one time slot in the time domain.
[0177] In a possible implementation, the third priority value is smaller than the first threshold; and / or the fourth priority value is larger than the first threshold.
[0178] In a possible implementation manner, the first continuous transmission is a first COT, and / or the second continuous transmission is a second COT.
[0179] In a possible implementation manner, the second communication device may further determine to send the sidelink information on a ninth resource or determine to select a ninth resource, where the ninth resource includes the second resource.
[0180] In one possible implementation, the ninth resource may further include resources of at least one time slot preceding the second resource in the time domain and / or resources of at least one time slot following the second resource in the time domain. Optionally, the resources of at least one time slot preceding the second resource in the time domain may be: resources of Q time slots preceding the second resource in the time domain, where Q is a positive integer; or, all resources preceding the second resource in the time domain in the second continuous transmission. Optionally, the resources of at least one time slot following the second resource in the time domain may specifically be: resources of P time slots following the second resource in the time domain, where P is a positive integer; or, all resources following the second resource in the time domain in the second continuous transmission.
[0181] In one possible implementation, when the fourth condition is met, the ninth resource includes resources of Q time slots that are located before the second resource in the time domain and / or resources of P time slots that are located after the second resource in the time domain, wherein the fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, wherein the first COT is the initial COT of the first communication device.
[0182] For the technical effects that can be achieved by the above-mentioned seventh aspect and any possible implementation method thereof, please refer to the technical effects that can be achieved by the above-mentioned third aspect and any possible implementation method thereof, and no further details will be given.
[0183] In an eighth aspect, the present application provides a communication method, which is performed by a second communication device, such as a terminal device or a component in the terminal device, without limitation.
[0184] In the method, a second communication device receives first side control information from a first communication device, where the first side control information is used to indicate a first resource, the first resource overlaps with a second resource in K time slots, and the second resource is used to transmit the side information of the second communication device, where K is a positive integer; and when a first condition is met, a sixth resource is seized or determined not to be re-evaluated, where the sixth resource includes the second resource.
[0185] The first condition may be: in each overlapping time slot among the K time slots, the priority value corresponding to the sidelink information carried by the second resource is smaller than the priority value corresponding to the sidelink information carried by the first resource.
[0186] In one possible implementation, the sixth resource may further include resources of at least one time slot preceding the second resource in the time domain and / or resources of at least one time slot following the second resource in the time domain. Optionally, the resources of at least one time slot preceding the second resource in the time domain may be: resources of Q time slots preceding the second resource in the time domain, where Q is a positive integer; or, all resources preceding the second resource in the time domain in the second continuous transmission. Optionally, the resources of at least one time slot following the second resource in the time domain may specifically be: resources of P time slots following the second resource in the time domain, where P is a positive integer; or, all resources following the second resource in the time domain in the second continuous transmission.
[0187] In one possible implementation, when the fourth condition is met, the sixth resource includes a resource of Q time slots that is located before the second resource in the time domain and / or a resource of P time slots that is located after the second resource in the time domain, wherein the fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, wherein the first COT is the initial COT of the first communication device.
[0188] In a possible implementation manner, the first continuous transmission is a first COT, and / or the second continuous transmission is a second COT.
[0189] In a possible implementation manner, the second communication device may further determine to send the sidelink information on a ninth resource or determine to select a ninth resource, where the ninth resource includes the second resource.
[0190] In one possible implementation, the ninth resource may further include resources of at least one time slot preceding the second resource in the time domain and / or resources of at least one time slot following the second resource in the time domain. Optionally, the resources of at least one time slot preceding the second resource in the time domain may be: resources of Q time slots preceding the second resource in the time domain, where Q is a positive integer; or, all resources preceding the second resource in the time domain in the second continuous transmission. Optionally, the resources of at least one time slot following the second resource in the time domain may specifically be: resources of P time slots following the second resource in the time domain, where P is a positive integer; or, all resources following the second resource in the time domain in the second continuous transmission.
[0191] In one possible implementation, when the fourth condition is met, the ninth resource includes resources of Q time slots that are located before the second resource in the time domain and / or resources of P time slots that are located after the second resource in the time domain, wherein the fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, wherein the first COT is the initial COT of the first communication device.
[0192] For the technical effects that can be achieved by the above-mentioned eighth aspect and any possible implementation method thereof, please refer to the technical effects that can be achieved by the above-mentioned fourth aspect and any possible implementation method thereof, and no repetition will be given.
[0193] In a ninth aspect, an embodiment of the present application provides a communication device. The communication device is configured to perform the method described in any one of the first to fourth aspects above and any possible implementation thereof. The communication device is, for example, a first communication device, or a functional module in the first communication device, such as a baseband device or a chip system.
[0194] In one possible design, the communication device includes a baseband device and a radio frequency device.
[0195] In another possible design, the communication device includes a processing module (sometimes also referred to as a processing unit) and a transceiver module (sometimes also referred to as a transceiver unit). The transceiver module can implement both sending and receiving functions. When the transceiver module implements the sending function, it can be referred to as a sending module (sometimes also referred to as a sending unit); when the transceiver module implements the receiving function, it can be referred to as a receiving module (sometimes also referred to as a receiving unit). The sending module and the receiving module can be the same functional module, which is referred to as a transceiver module and can implement both sending and receiving functions; alternatively, the sending module and the receiving module can be different functional modules, with the transceiver module being a general term for these functional modules.
[0196] In a tenth aspect, an embodiment of the present application provides a communication device. The communication device is configured to perform the method described in any one of aspects 5 to 8 above and any possible implementation thereof. The communication device is, for example, a second communication device, or a functional module in the second communication device, such as a baseband device or a chip system.
[0197] In one possible design, the communication device includes a baseband device and a radio frequency device.
[0198] In another possible design, the communication device includes a processing module (sometimes also referred to as a processing unit) and a transceiver module (sometimes also referred to as a transceiver unit). The transceiver module can implement both sending and receiving functions. When the transceiver module implements the sending function, it can be referred to as a sending module (sometimes also referred to as a sending unit); when the transceiver module implements the receiving function, it can be referred to as a receiving module (sometimes also referred to as a receiving unit). The sending module and the receiving module can be the same functional module, which is referred to as a transceiver module and can implement both sending and receiving functions; alternatively, the sending module and the receiving module can be different functional modules, with the transceiver module being a general term for these functional modules.
[0199] In the eleventh aspect, an embodiment of the present application further provides a communication device. The communication device may include one or more processors. Optionally, the communication device may further include a memory. The memory is used to store one or more computer programs or instructions. The one or more processors are used to execute the one or more computer programs or instructions stored in the memory, so that the communication device performs the method described in the first aspect and any possible implementation thereof, or performs the method described in the second aspect and any possible implementation thereof, or performs the method described in the third aspect and any possible implementation thereof, or performs the method described in the fourth aspect and any possible implementation thereof, or performs the method described in the fifth aspect and any possible implementation thereof, or performs the method described in the sixth aspect and any possible implementation thereof, or performs the method described in the seventh aspect and any possible implementation thereof, or performs the method described in the eighth aspect and any possible implementation thereof.
[0200] In a twelfth aspect, embodiments of the present application further provide a communication system, which includes one or more of the following: the communication device described in the fifth aspect, or the communication device described in the sixth aspect.
[0201] In aspect 13, an embodiment of the present application provides a computer-readable storage medium, which is used to store computer programs or instructions. When the computer-readable storage medium is executed, the method described in the first aspect and any possible implementation thereof is implemented, or the method described in the second aspect and any possible implementation thereof is implemented, or the method described in the third aspect and any possible implementation thereof is implemented, or the method described in the fourth aspect and any possible implementation thereof is implemented, or the method described in the fifth aspect and any possible implementation thereof is implemented, or the method described in the sixth aspect and any possible implementation thereof is implemented, or the method described in the seventh aspect and any possible implementation thereof is implemented, or the method described in the eighth aspect and any possible implementation thereof is implemented.
[0202] In the fourteenth aspect, the embodiments of the present application also provide a computer program product comprising instructions, which, when run on a computer, enables the method described in the first aspect and any possible implementation thereof to be implemented, or enables the method described in the second aspect and any possible implementation thereof to be implemented, or enables the method described in the third aspect and any possible implementation thereof to be implemented, or enables the method described in the fourth aspect and any possible implementation thereof to be implemented, or enables the method described in the fifth aspect and any possible implementation thereof to be implemented, or enables the method described in the sixth aspect and any possible implementation thereof to be implemented, or enables the method described in the seventh aspect and any possible implementation thereof to be implemented, or enables the method described in the eighth aspect and any possible implementation thereof to be implemented.
[0203] In the fifteenth aspect, an embodiment of the present application also provides a chip, which is coupled to a memory and is used to read and execute program instructions in the memory, so that the device where the chip is located implements the method described in the first aspect and any possible implementation thereof, or implements the method described in the second aspect and any possible implementation thereof, or implements the method described in the third aspect and any possible implementation thereof, or implements the method described in the fourth aspect and any possible implementation thereof, or implements the method described in the fifth aspect and any possible implementation thereof, or implements the method described in the sixth aspect and any possible implementation thereof, or implements the method described in the seventh aspect and any possible implementation thereof, or implements the method described in the eighth aspect and any possible implementation thereof.
[0204] For the technical effects that can be achieved in the above-mentioned ninth to fifteenth aspects and any possible implementation methods, please refer to the technical effects that can be achieved in any of the above-mentioned first to eighth aspects and any possible implementation methods, and no repetition will be given. BRIEF DESCRIPTION OF THE DRAWINGS
[0205] FIG1 is a schematic diagram of the dynamic coexistence of LTE SL resources and NR SL resources;
[0206] FIG2 is a schematic diagram of V2X;
[0207] FIG3 is a schematic diagram of retransmission reserved resources and periodic reserved resources;
[0208] Figure 4(a), Figure 4(b) and Figure 4(c) are schematic diagrams of the coexistence of multiple resources;
[0209] Figures 5(a), 5(b), 5(c) and 5(d) are schematic diagrams of the architectures of various communication systems applicable to embodiments of the present application;
[0210] FIG6 is a flow chart of a communication method provided in an embodiment of the present application;
[0211] FIG7 is a schematic diagram of the overlap of a first resource and a second resource provided in an embodiment of the present application;
[0212] FIG8 is a schematic diagram of a third resource provided in an embodiment of the present application;
[0213] FIG9 is a schematic diagram of various preemption checks provided in an embodiment of the present application;
[0214] FIG10 is a schematic diagram of various preemption checks provided in an embodiment of the present application;
[0215] FIG11 is a flow chart of another communication method provided in an embodiment of the present application;
[0216] FIG12 is a schematic diagram of a fourth resource provided in an embodiment of the present application;
[0217] FIG13 is a schematic structural diagram of a communication device provided in an embodiment of the present application;
[0218] FIG14 is a schematic structural diagram of another communication device provided in an embodiment of the present application;
[0219] FIG15 is a schematic structural diagram of another communication device provided in an embodiment of the present application;
[0220] FIG16 is a schematic structural diagram of another communication device provided in an embodiment of the present application;
[0221] FIG17 is a flow chart of another communication method provided in an embodiment of the present application;
[0222] FIG18 is a schematic diagram of a fourth resource provided in an embodiment of the present application;
[0223] FIG19 is a schematic diagram of a first resource and a second resource overlapping over K time slots provided in an embodiment of the present application;
[0224] Figure 20 is a flow chart of another communication method provided in an embodiment of the present application. DETAILED DESCRIPTION
[0225] The present application will be described in further detail below with reference to the accompanying drawings.
[0226] The embodiments of the present application provide a communication method and apparatus for implementing preemption checking and re-evaluation in resource coexistence, which can reduce the problem that the LTE SL UE cannot decode normally due to the saturation of the signal receiving power on some time domain resources in a subframe of the LTE SL. The communication method and apparatus can also be used to implement preemption checking and re-evaluation in unlicensed spectrum, ensuring the reliability of high-priority services as much as possible on the basis of ensuring continuous transmission. Among them, the method and apparatus described in the present application are based on the same technical concept. Since the principles of solving the problems by the method and apparatus are similar, the implementation of the apparatus and the method can refer to each other, and the repeated parts will not be repeated.
[0227] The embodiments of the present application will be presented around a system including multiple devices, components, modules, etc. It should be understood that the system may include other devices, components, modules, etc. not mentioned, or may only include some of the devices, components, or modules, etc. mentioned in the embodiments.
[0228] Below, some terms in the embodiments of the present application are explained to facilitate understanding by those skilled in the art.
[0229] 1) Sidelink (SL)
[0230] SL may refer to a communication link between terminal devices. For example, the SL may include, but is not limited to, one or more of the following: a D2D communication link, a V2X communication link, or a SL-U communication link.
[0231] It should be understood that V2X can include direct communications between vehicles (V2V), vehicles and roadside infrastructure (V2I), vehicles and pedestrians (V2P), as well as vehicle-to-network (V2N) or vehicle-to-any-entity V2X links, as shown in Figure 2. V2V refers to vehicle-to-vehicle communications; V2P refers to vehicle-to-human (including pedestrians, cyclists, drivers, or passengers); and V2I refers to vehicle-to-infrastructure communications, such as roadside units (RSUs) or network equipment.
[0232] 2) Side information
[0233] In the present application, the sidelink information may be information transmitted between terminal devices, or refers to information transmitted through SL. Exemplarily, the sidelink information may include but is not limited to one or more of the following: physical sidelink control channel (PSCCH), physical sidelink shared channel (PSSCH), physical sidelink feedback channel (PSFCH), demodulation reference signal (DMRS), or channel state information reference signal (CSI RS), etc.
[0234] PSCCH can also be called sidelink control information. Sidelink control information includes but is not limited to one or more of the following: PSCCH, SCI, first-order SCI, second-order SCI, media access control element (MAC CE), PC5 radio resource control (RRC).
[0235] In addition, within a time slot, the first OFDM symbol copies the information sent on the second symbol for automatic gain control (AGC).
[0236] 3) Resources
[0237] Resources may include time domain resources and / or frequency domain resources. In an embodiment of the present application, resources include time domain resources and frequency domain resources. According to the Rel-16 / Rel-17NR protocol, the scheduling granularity of PSCCH / PSSCH is a time slot in the time domain and one or more consecutive subchannels in the frequency domain. The transmitting end may send side information on the resource; accordingly, the receiving end may receive the side information on the resource. Among them, time domain resources may include symbols, slots, mini-slots, partial slots, sub-frames, radio frames, or sensing slots, etc., without limitation. Frequency domain resources may include resource elements (RE), resource blocks (RB), RB sets, subchannels, resource pools, bandwidth parts (BWP), carriers, channels, or interlaces, etc., without limitation.
[0238] Exemplarily, resources may be reserved for initial transmission, reserved for retransmission, or periodically reserved. Initial transmission reserved resources refer to resources reserved for initial transmission, or resources actually (or currently) transmitting sidelink information. Retransmission reserved resources refer to resources reserved for retransmission. Periodically reserved resources refer to periodically reserved resources.
[0239] For example, in NR, the frequency resource assignment, time resource assignment, and resource reservation period fields in the SCI can indicate retransmission reserved resources and / or periodic reserved resources. For example, the frequency domain indication field indicates the number and frequency domain location of the subchannels for initial transmission and retransmission. The time domain indication field indicates the time interval between retransmission resources and initial transmission resources. The resource reservation period field indicates the resource reservation period.
[0240] For example, see Figure 3, which illustrates a schematic diagram of retransmission reserved resources and periodic reserved resources in NR. In Figure 3, R1 is the initial transmission resource or the resource for actually sending the SCI (illustrated by a solid line), and R2 and R3 are retransmission reserved resources (illustrated by a dotted line). R4, R5, and R6 are periodic reserved resources (illustrated by a dotted line). The SCI sent on the initial transmission resource (i.e., R1) can indicate the retransmission reserved resources. The time domain resource indication field and frequency domain resource indication field in the SCI are used to indicate R1, R2, and R3. The resource reservation period field in the SCI indicates the resource reservation period, such as the time interval between R1 and R4 in Figure 3. Since the frequency domain resources reserved for the period are the same, they are integer multiples of the period in the time domain. This is equivalent to R2 periodically reserving R5 and R3 periodically reserving R6. Although R4 has not yet been used for sideline transmission, it can also be considered that R4 reserves R5 and R6.
[0241] 4) Subframe, time slot, first communication standard and second communication standard
[0242] A subframe refers to a subframe of a first communication standard. A time slot refers to a time slot of a second communication standard. The second communication standard is different from the first communication standard. For example, the second communication standard is an evolution of the first communication standard. For example, the second communication standard is NR SL and the first communication standard is LTE SL, without limitation. LTE SL may also be referred to as E-UTRA radio access, and NR SL may also be referred to as NR radio access. For ease of understanding, the following example uses a subframe of LTE SL and a time slot of NR SL as an example.
[0243] It should be noted that in the embodiments of the present application, LTE SL can be replaced by LTE V2X, or LTE sidelink, etc., without limitation. Similarly, NR SL in the embodiments of the present application can be replaced by NR V2X, or LTE sidelink, etc., without limitation.
[0244] Given that NR SL supports subcarrier spacing (SCS) of 15 kHz, 30 kHz, 60 kHz, or 120 kHz, while LTE SL only supports an SCS of 15 kHz, this means that one subframe of LTE SL includes one or more time slots of NR SL, or one subframe of LTE SL coincides (or overlaps) with one or more time slots of NR SL, or one or more time slots of NR SL belong to one subframe of LTE SL. For example, if the SCS of NR SL is 30 kHz, then one subframe of LTE SL includes two time slots of NR SL, or one subframe of LTE SL overlaps with two time slots of NR SL, or two time slots of NR SL belong to one subframe of LTE SL, as shown in Figure 4(a). For another example, if the SCS of NR SL is 60kHz, then one subframe of LTE SL includes four time slots of NR SL, or one subframe of LTE SL overlaps with the four time slots of NR SL, or the four time slots of NR SL belong to one subframe of LTE SL, as shown in Figure 4(b).
[0245] It should be noted that the time slots in the embodiments of the present application can be replaced by time units, that is, the time domain granularity in the embodiments of the present application is not limited. A time unit can be one or more symbols, or one or more time slots, or one or more mini-slots, or one or more subframes, or one or more frames, etc. Among them, multiple time units can be continuous or discrete in time.
[0246] 5) Channel occupancy (CO) and channel occupancy time (COT)
[0247] Channel occupancy refers to the transmission of a terminal device on one or more channels after performing the channel access process. After the terminal device performs type 1 (type 1) channel access, the period of time during which the terminal device occupies the channel for transmission is called channel occupancy time (COT). The frequency domain unit of COT is a channel, and the time domain unit is milliseconds (ms) or time slots. In the embodiment of the present application, CO can be a time concept, that is, the time of SL transmission; it can also be a resource concept, that is, the time-frequency resources occupied by SL transmission. COT can be a time concept, that is, the time of SL transmission; it can also be a resource concept, that is, the time-frequency resources occupied by SL transmission. The terminal device can transmit on multiple adjacent or non-adjacent channels. The transmission of the terminal device on multiple channels can be understood as: the terminal device's transmission occupies 1 COT, and the COT occupies multiple channels in the frequency domain; or, the terminal device's transmission occupies multiple COTs, and each COT occupies 1 channel in the frequency domain. In the embodiment of the present application, if no further distinction is made, COT and CO can be the same concept, that is, COT and CO can be used interchangeably.
[0248] In an embodiment of the present application, when COT is a time concept, the COT can be used for transmission over N consecutive time slots, where N is a positive integer or an integer greater than 1. Alternatively, when COT is a resource concept, the COT can include N consecutive time slots in the time domain and can include M1 RB sets, M2 subchannels, or M3 interlaces in the frequency domain. In the frequency domain, the COT can include M3 interlaces in the M1 RB set or M2 subchannels in the M1 RB set. Where M1, M2, and M3 are positive integers.
[0249] After the terminal device successfully accesses the channel based on type 1 listen-before-talk (LBT), it transmits within the COT. This COT can be called the initial COT of the terminal device. The first type of LBT is performed based on different channel access priority classes (CAPC). This COT can also be called the COT initialized based on CAPC=p. Here, initial means initiated, initial, initialization, or initiate. The initial COT can also be called the initial COT, or the created COT, etc., without limitation.
[0250] 6) Continuous transmission
[0251] Continuous transmission can be multi-consecutive slots transmission (MCSt), a transmission burst (also known as a transmission burst), or transmission on a candidate multi-slot resource. Continuous transmission is the transmission of multiple sidelink messages from a terminal device within a continuous time unit. For example, multi-slot continuous transmission can be transmission on a candidate multi-slot resource.
[0252] There can be no time interval between two adjacent side messages in a transmission burst, or a time interval of less than 25 μs. In contrast, there can be no time interval between two adjacent side messages in multi-slot continuous transmission, or a time interval between them. In other words, there can be a time interval of more than 25 μs between two adjacent side messages in multi-slot continuous transmission.
[0253] In the embodiment of the present application, continuous transmission can be a time concept, that is, the time of SL transmission. For example, continuous transmission includes transmission on N consecutive time slots, N is a positive integer, or N is an integer greater than 1. Alternatively, continuous transmission can also be a resource concept, that is, the time-frequency resource occupied by SL transmission. For example, the time-frequency resource may include N consecutive time slots in the time domain, and the time-frequency resource may include M1 RB sets, M2 subchannels, or M3 interlaces in the frequency domain. The time-frequency resource may include M3 interlaces in M1 RB sets, or M2 subchannels in M1 RB sets in the frequency domain. Wherein, M1, M2 and M3 are positive integers.
[0254] Alternatively, continuous transmission can be understood as COT. In other words, continuous transmission and COT can be the same concept, or they can be different concepts. For example, continuous transmission can include A1 COTs, or COT can include A2 continuous transmissions, or COT can include A3 continuous transmissions and A4 single-slot transmissions. Where A1, A2, A3, and A4 are all positive integers.
[0255] Optionally, the continuous transmission can be understood as a multi-slot candidate resource. In other words, continuous transmission and multi-slot candidate resources can be the same concept, or continuous transmission and multi-slot candidate resources can be different concepts. For example, continuous transmission can include B1 multi-slot candidate resources, or multi-slot candidate resources can include B2 continuous transmissions, or multi-slot candidate resources can include B3 continuous transmissions and B4 single-slot transmissions. Where B1, B2, B3, and B4 are all positive integers.
[0256] Alternatively, the COT can be understood as a multi-slot candidate resource. In other words, the COT and the multi-slot candidate resource can be the same concept, or they can be different concepts. For example, the COT can include C1 multi-slot candidate resources, or the multi-slot candidate resources can include C2 COTs, or the COT can include C3 multi-slot candidate resources and C4 single-slot transmissions. C1, C2, C3, and C4 are all positive integers.
[0257] 7) Resource coexistence or resource sharing
[0258] Resource coexistence and resource sharing can be used interchangeably. In the embodiment of the present application, resource coexistence may include resource coexistence of NR SL and LTE SL, as well as COT coexistence (or COT sharing).
[0259] Resource coexistence of NR SL and LTE SL means that the NR SL terminal device (which can be recorded as NR SL UE) uses the resources originally belonging to the LTE SL terminal device (which can be recorded as LTE SL UE), as shown in Figure 4(a) or Figure 4(b).
[0260] COT sharing means that a terminal device shares the resources in its own COT with other terminal devices, that is, for SL transmission of other terminal devices, as shown in Figure 4(c). In Figure 4(c), UE1 shares the resources in its own COT with UE2, which is used for SL transmission between UE2 and UE3. For example, the terminal device of the initial COT and the terminal device of the shared COT occupy the channel for transmission within a continuous period of time. COT sharing needs to meet corresponding conditions. For example, the terminal device of the initial COT is the receiving device or the transmitting device of the terminal device of the shared COT. For another example, the terminal device of the initial COT and the terminal device of the shared COT are members of the same group and are not restricted.
[0261] Continuous transmission sharing means that a terminal device shares its own continuous transmission resources with other terminal devices, that is, it is used for SL transmission of other terminal devices. For details, please refer to Figure 4(c).
[0262] 8) Unlicensed spectrum
[0263] Unlicensed frequency bands can also be called shared spectrum. In wireless communication systems, frequency bands can be divided into licensed frequency bands and unlicensed frequency bands according to their use. In licensed frequency bands, users use spectrum resources based on the scheduling of the central node. In unlicensed frequency bands, the transmitter needs to use spectrum resources in a competitive manner. For example, the transmitter competes for channels through LBT. SL communication in unlicensed frequency bands is an important evolution direction, and SL communication on unlicensed spectrum is called SL-U. UEs working through SL-U need to coexist with nearby Wi-Fi and other devices based on the LBT mechanism. There can also be communication between one or more terminal devices such as Wi-Fi terminal devices, Bluetooth terminal devices, and Zigbee terminal devices on the unlicensed spectrum.
[0264] 9) Priority and priority value
[0265] The importance of priority-associated side information may also be referred to as service priority, transmission priority, L1 priority, physical layer priority, CAPC, priority in SCI, priority corresponding to PSSCH associated with SCI, transmission priority, priority for sending PSSCH, priority for resource selection, priority of logical channel, or the highest level priority of logical channel, etc., without restriction.
[0266] In one example, the priority value is positively correlated with the priority level, meaning that a larger priority value corresponds to a lower priority level, and a smaller priority value corresponds to a higher priority level. For example, if the priority value ranges from 1 to 8, then in this example, a priority value of 1 corresponds to the highest priority level, while a priority value of 8 corresponds to the lowest priority level. For another example, if the CAPC priority value ranges from 1 to 4, then in this example, a priority value of 1 corresponds to the highest priority level, while a priority value of 4 corresponds to the lowest priority level.
[0267] In another example, the priority value is inversely correlated (or negatively correlated) with the priority level, meaning that a larger priority value corresponds to a higher priority level, and a smaller priority value corresponds to a lower priority level. For example, if the priority value ranges from 0 to 7, then in this example, a priority value of 0 corresponds to the lowest priority level, while a priority value of 7 corresponds to the highest priority level.
[0268] It should be noted that the embodiment of the present application does not limit the value range of the priority value.
[0269] 10) Automatic gain control (AGC) symbol
[0270] This AGC symbol is located at the beginning of the transmission, for example, symbol 0 for PSCCH / PSSCH transmissions, or symbol 11 for PSFCH transmissions. Since AGC adjustments cannot be performed while simultaneously receiving and decoding data, the signal on the AGC symbol is a replica of the signal content on the next symbol. Since SL transmission maintains equal power across all symbols, the content of the remaining symbols can be received based on the automatic gain control results of the AGC symbol.
[0271] It should be noted that the embodiments of the present application do not limit the position and number of AGC symbols in SL-U.
[0272] 11) Terminal equipment
[0273] A terminal device, also known as a terminal apparatus, can be abbreviated as a terminal or UE, and refers to a device that provides data connectivity to a user. For example, the terminal device may include a handheld device with wireless connectivity, or a processing device connected to a wireless modem. The terminal device may communicate with the core network via a radio access network (RAN), exchange data with the RAN, or interact with the RAN. The terminal device may include user equipment (UE), a wireless terminal device, a mobile terminal device, a device-to-device communication (D2D) terminal device, a V2X terminal device, a machine-to-machine / machine-type communication (M2M / MTC) terminal device, or an Internet of Things (IoT) terminal device. The terminal device may also be a vehicle or terminal-type roadside unit, or a communication module or chip built into a vehicle or roadside unit. For example, an LTE SL terminal device (which may be denoted as an LTE SL UE) may refer to an LTE SL module, and an NR SL terminal device (which may be denoted as an NR SL UE) may refer to an NR SL module.
[0274] In the embodiment of the present application, direct communication (PC5) interface communication is supported between terminal devices, that is, transmission through a side link is supported.
[0275] As an example and not a limitation, in the embodiments of the present application, the terminal device may also be a wearable device. Wearable devices may also be referred to as wearable smart devices or smart wearable devices, etc., which are a general term for wearable devices that are intelligently designed and developed using wearable technology for daily wear, such as glasses, gloves, watches, clothing, and shoes. A wearable device is a portable device that is worn directly on the body or integrated into the user's clothes or accessories. Wearable devices are not only hardware devices, but also achieve powerful functions through software support, data interaction, and cloud interaction. Broadly speaking, wearable smart devices include those that are fully functional, large in size, and can achieve complete or partial functions without relying on smartphones, such as smart watches or smart glasses, etc., as well as those that only focus on a certain type of application function and need to be used in conjunction with other devices such as smartphones, such as various smart bracelets, smart helmets, and smart jewelry for vital sign monitoring.
[0276] The various terminal devices introduced above, if located on a vehicle (eg, placed in or installed in a vehicle), can be considered as vehicle-mounted terminal devices, which are also called on-board units (OBUs).
[0277] In the embodiment of the present application, the terminal device may further include a relay. Alternatively, it can be understood that anything that can communicate data with a base station can be considered a terminal device.
[0278] In the embodiments of the present application, the device for implementing the function of the terminal device can be the terminal device; it can also be a device that can support the terminal device to implement the function, such as a chip system. The device can be installed in the terminal device or used in conjunction with the terminal device. In the embodiments of the present application, the chip system can be composed of a chip or include a chip and other discrete devices.
[0279] It should be understood that the information sending end in the communication system of the present application can be a network device or a terminal device, and the information receiving end can be a network device or a terminal device, and the present application does not limit this.
[0280] Unless otherwise specified, the first communication device, second communication device, third communication device, terminal equipment, or UE in the following text may be understood as NR SL UE.
[0281] 12) Network equipment
[0282] Network equipment, which can also be called network devices, includes, for example, access network (AN) equipment, such as a base station (e.g., access point), which can refer to a device in the access network that communicates with a terminal device through one or more cells at an air interface, or, for example, a network device in a V2X technology is a road side unit (RSU). RSU can be a fixed infrastructure entity that supports V2X applications and can exchange messages with other entities that support V2X applications. The network equipment may include a next generation node B (gNB) in the fifth generation mobile communication technology (5G) new radio (NR) system (also referred to as the NR system), or may also include a centralized unit (CU) and a distributed unit (DU) in a cloud radio access network (Cloud RAN) system, which is not limited in the embodiments of the present application.
[0283] Network devices may also include core network devices, such as access and mobility management functions (AMFs). Since the embodiments of this application primarily involve access networks, the network devices described herein refer to access network devices unless otherwise specified. Hereinafter, a base station may be used to represent a network device and / or an access network device.
[0284] In the embodiments of the present application, the apparatus for implementing the function of the network device may be the network device, or may be a device capable of supporting the network device in implementing the function, such as a chip system, which may be installed in the network device. In the technical solutions provided in the embodiments of the present application, the technical solutions provided in the embodiments of the present application are described by taking the network device as an example.
[0285] 13) "And / or" describes the relationship between associated objects, indicating that three possible relationships exist. For example, A and / or B can represent: A exists alone, A and B exist simultaneously, and B exists alone. The character " / " generally indicates that the associated objects are in an "or" relationship.
[0286] In the embodiments of the present application, "at least one" refers to one or more, and "more" refers to two or more. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single items or plural items. For example, at least one of a, b or c can represent: a, b, c, a and b, a and c, b and c, or a, b and c, where a, b, c can be single or multiple. In addition, the character " / ", unless otherwise specified, generally indicates that the objects associated before and after are in an "or" relationship. The terms "system" and "network" in the embodiments of the present application can be used interchangeably, and "according to" and "based on" can be used interchangeably.
[0287] In the embodiments of this application, ordinal numbers such as "first" and "second" are generally used to distinguish different objects and are not used to define the order, timing, priority, or importance of multiple objects. For example, in the embodiments of this application, the first communication device, the second communication device, and the third communication device are used to distinguish three communication devices and do not define the priority or importance of these three communication devices.
[0288] The definitions (explanations) of concepts, terms, etc. in the embodiments of this application are applicable throughout the text, not only to the locations where the definitions are made.
[0289] Next, a communication system to which the embodiments of the present application are applicable will be introduced.
[0290] The network architecture and application scenarios described in the embodiments of the present application are intended to more clearly illustrate the technical solutions of the embodiments of the present application, and do not constitute a limitation on the technical solutions provided in the embodiments of the present application. Ordinary technicians in this field can know that with the evolution of network architecture and the emergence of new application scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.
[0291] The embodiments of the present application can be applied to side communication scenarios, such as D2D, V2X, or SL-U scenarios. In the embodiments of the present application, the terminal device can be located within the coverage of the network device or outside the coverage of the network device, and the terminal device within the coverage can also communicate directly with the terminal device outside the coverage. For example, Figures 5(a) to 5(d) show schematic diagrams of the architectures of various communication systems applicable to the embodiments of the present application. It should be understood that the V2X shown in Figure 2 is also a communication system applicable to the embodiments of the present application.
[0292] Figure 5(a) shows the architecture of a communication system including cellular communication and direct communication between terminal devices. The communication system shown in Figure 5(a) may include at least one network device and at least two terminal devices. Figure 5(a) only shows one network device and two terminal devices (terminal device 1 and terminal device 2 as shown in Figure 5(a)). The network device can send information to terminal device 1 via a downlink, and terminal device 1 can send information to the network device via an uplink. Terminal devices 1 and 2 can communicate directly via a sidelink.
[0293] In FIG5(a), both terminal device 1 and terminal device 2 are shown within the coverage of the network device. Optionally, terminal device 1 may be within the coverage of the network device and terminal device 2 may be outside the coverage of the network device without restriction.
[0294] FIG5(b) shows an architecture of a communication system including cellular communication and vehicle network communication. The communication system shown in FIG5(b) may include at least one network device and at least two terminal devices. For example, FIG5(b) shows one network device and three terminal devices, and the terminal devices in FIG5(b) are shown as vehicles, such as vehicle 1, vehicle 2, and vehicle 3 in FIG5(b). The network device can send information to vehicle 1 via a downlink, and vehicle 1 can send information to the network device via an uplink. Vehicles 1 and 2 can communicate directly via a side link, and vehicles 1 and 3 can also communicate directly via a side link.
[0295] In Figure 5(b), vehicle 1 and vehicle 2 are within the coverage of the network device, and vehicle 3 is shown outside the coverage of the network device. Optionally, vehicle 1 may be within the coverage of the network device, and vehicle 2 and vehicle 3 may be outside the coverage of the network device, or vehicle 1 and vehicle 3 may be within the coverage of the network device, and vehicle 2 may be outside the coverage of the network device, without pre-restriction.
[0296] The above-mentioned cellular communication may include one or more of the following: LTE communication, 5G NR communication, or future mobile communication, etc., without limitation.
[0297] Figure 5(c) illustrates the architecture of a communication system for direct communication between terminal devices. This communication system can include two terminal devices. The two terminal devices can communicate with each other via a sidelink. Figure 5(c) illustrates an example in which one terminal device is an AR, VR, or MR device, and the other terminal device is a processing device or display device.
[0298] Figure 5(d) shows the architecture of a communication system that includes WiFi communication and direct communication. The communication system shown in Figure 5(d) may include at least one network device and at least two terminal devices. For example, Figure 5(d) shows a network device and three terminal devices (such as terminal device 1, terminal device 2, and terminal device 3 in Figure 5(d). In Figure 5(d), the network device is shown as a router. The router can send information to terminal device 1 via a downlink, and terminal device 1 can send information to the router via an uplink. Terminal device 1 and terminal device 2 can communicate directly via a side link, and terminal device 1 and terminal device 3 can also communicate directly via a side link.
[0299] It should be understood that the above communication system is only an example and is not intended to limit the communication system of the present application.
[0300] Next, the technical features involved in the embodiments of this application are introduced.
[0301] LTE SL addresses some basic requirements in V2X scenarios, but it cannot effectively support future applications such as fully intelligent driving and autonomous driving. With the development of new radio (NR) technology within the 3GPP standards organization, NR SL has also been further developed, for example, to support lower transmission latency, more reliable communication transmission, higher throughput, and a better user experience. However, as the number of NR SL UEs increases, NR SL faces the problem of resource shortage.
[0302] Resource coexistence can effectively solve the problem of NR SL resource shortage. For example, on the spectrum originally allocated to LTE SL, NR SL UE uses the resources originally belonging to LTE SL UE, as shown in Figure 1, Figure 4(a) or Figure 4(b). For another example, on the unlicensed spectrum, NR SL UE2 uses the resources in the COT of NR SL UE2, as shown in Figure 4(c). In the above scenario, the reserved resources of multiple NR SL UEs may conflict or overlap, but there is currently no relevant technical solution for how to perform pre-emption checking and re-evaluation.
[0303] As an example, in Figure 4(a), NR SL UE1 uses the resources on the first time slot, and NR SL UE2 uses the resources on the second time slot. Then when the LTE SL UE receives the data transmission of NR SL UE1 and NR SL UE2 on the LTE SL subframe, due to geographical location, communication quality, and transmission power, the channel strength on the first time slot will be less than the signal strength on the second time slot, and the LTE SL UE cannot perform AGC adjustment on symbols other than the starting symbol in the LTE SL subframe, which leads to saturation of the signal receiving power on the second time slot, making it impossible for the LTE SL UE to decode normally. There is currently no relevant technical solution for how to perform preemption checks and / or re-evaluations when LTE SL and NR SL resources coexist to reduce the impact on the LTE SL UE, such as causing the LTE SL UE to be unable to decode normally.
[0304] As another example, in FIG4(c), there is currently no relevant technical solution for how UE2 preempts resources in UE1's COT, or how UE1 reclaims resources in its own COT after sharing them with UE2.
[0305] Based on this, an embodiment of the present application proposes a communication method for implementing preemption check and re-evaluation in resource coexistence, which can reduce the problem of LTE SL UE being unable to decode normally due to signal reception power saturation on some time domain resources in a subframe of LTE SL.
[0306] The embodiments of the present application can be applied to the communication system shown in any one of Figures 2 and 5(a)-5(d).
[0307] In an embodiment of the present application, the first communication device is the party whose resources are seized. The first communication device can be a terminal device, or a processor, chip, or a functional module in the terminal device, etc., without limitation. The second communication device is the party who seizes resources. The second communication device can be a terminal device, or a processor, chip, or a functional module in the terminal device, etc., without limitation. It should be understood that the first communication device can also seize the resources of the second communication device, that is, the roles of the first communication device and the second communication device can be interchangeable. Optionally, the method provided in an embodiment of the present application may also involve a third communication device. The third communication device is the party whose resources are seized. It can be a terminal device, or a processor, chip, or a functional module in the terminal device, etc., without limitation.
[0308] The following description will be made by taking the first communication device as UE1, the second communication device as UE2, and the third communication device as UE3 as an example, which is not limited in the embodiments of the present application.
[0309] Figure 6 shows a flow chart of a communication method provided in an embodiment of the present application. In this embodiment, the first communication standard is LTE SL and the second communication standard is NR SL as an example for description.
[0310] In the embodiment shown in FIG6 , the reserved resources of UE1 (denoted as the first resources) and the reserved resources of UE2 (denoted as the second resources) partially or completely overlap, and the first resources and the second resources belong to the same subframe (denoted as the first subframe) in the LTE SL in the time domain. The first subframe includes C time slots of the NR SL; or, the first subframe overlaps with the C time slots of the NR SL; or, the C time slots of the NR SL belong to the first subframe. In other words, the C time slots of the NR SL can be understood as time domain resources that overlap with the first subframe and include the first resources, that is, the first resources belong to the C time slots of the NR SL in the time domain, and the C time slots of the NR SL overlap with the first subframe; or as time domain resources that overlap with the first subframe and include the second resources, that is, the second resources belong to the C time slots of the NR SL in the time domain, and the C time slots of the NR SL overlap with the first subframe.
[0311] C is an integer greater than 1. For example, if the SCS of the NR SL is 30kHz, C is 2, as shown in Figure 4(a). For another example, if the SCS of the NR SL is 60kHz, C is 4, as shown in Figure 4(b). For another example, if the SCS of the NR SL is 120kHz, C is 8. In this embodiment of the present application, the first subframe and C time slots can be used interchangeably. In this embodiment of the present application, C NR SL time slots can be simply referred to as C time slots.
[0312] Given that resources include time domain resources and frequency domain resources, the overlap involved in the embodiments of the present application can be understood as overlap in the time domain and partial overlap in the frequency domain; or overlap in both the time domain and the frequency domain; or overlap in the time domain and the frequency domain; or overlap in both the time domain and the frequency domain; or overlap only in the time domain; or overlap only in the time domain; or overlap only in the frequency domain; or overlap only in the frequency domain, or overlap only in the frequency domain, without limitation. For ease of understanding, the following text takes overlap in the time domain and partial overlap in the frequency domain, or overlap in both the time domain and the frequency domain as an example.
[0313] The first resource and the second resource belong to the first subframe in the time domain, and can be replaced by the first subframe including the time domain resources of the first resource and the time domain resources of the second resource; or can be replaced by the first resource and the second resource being located in the first subframe; or can be replaced by the number of time slots included in the first resource in the time domain and the number of time slots included in the second resource in the time domain being less than or equal to C, etc., without restriction.
[0314] The first resource includes one or more time slots in the time domain and one or more subchannels in the frequency domain. If the first resource includes multiple time slots in the time domain, the number of subchannels in each of the multiple time slots can be the same, different, or partially the same, without limitation.
[0315] In one example, the first resource includes multiple time slots in the time domain, and the frequency domain resources in each of the multiple time slots may be the same, that is, the positions and numbers of subchannels of the first resource in the multiple time slots are the same. Alternatively, the first resource includes multiple time slots in the time domain, and the starting frequency domain value or the ending frequency domain value in each of the multiple time slots is the same, that is, the starting subchannel or the ending subchannel of the first resource in the multiple time slots is the same. Alternatively, the first resource includes adjacent time slot 1 and time slot 2 in the time domain, and the frequency domain resources of the first resource in time slot 1 partially overlap with the frequency domain resources in time slot 2, for example, the subchannels in time slot 1 are subchannel 1, subchannel 2, and subchannel 3, and the subchannels in time slot 2 are subchannel 3 and subchannel 4.
[0316] The second resource includes one or more time slots in the time domain and one or more subchannels in the frequency domain. If the second resource includes multiple time slots in the time domain, the number of subchannels in each of the multiple time slots can be the same, different, or partially the same, without limitation.
[0317] In one example, the second resource includes multiple time slots in the time domain, and the frequency domain resources in each of the multiple time slots can be the same, that is, the positions and numbers of subchannels of the second resource in the multiple time slots are the same. Alternatively, the second resource includes multiple time slots in the time domain, and the starting frequency domain value or the ending frequency domain value in each of the multiple time slots is the same, that is, the starting subchannel or the ending subchannel of the second resource in the multiple time slots is the same. Alternatively, the second resource includes adjacent time slot 3 and time slot 4 in the time domain, and the frequency domain resources of the first resource in time slot 3 partially overlap with the frequency domain resources in time slot 4. For details, please refer to the description of the first resource and will not be repeated here.
[0318] The first time slot is the first time slot among the C time slots. It is worth noting that, given that the LTE SL UE cannot perform AGC adjustment on symbols other than the starting symbol of the first subframe, in order to avoid affecting the LTE SL UE, the first resource and the second resource both include the first time slot in the time domain, that is, both include the first time slot among the C time slots. The fifth time slot is the second time slot among the C time slots. The second time slot is any time slot among the C time slots, without restriction. For example, the second time slot is the first time slot among the C time slots, that is, the first time slot. For another example, the second time slot is the second time slot among the C time slots, that is, the fifth time slot.
[0319] As shown in FIG6 , the method may include the following contents.
[0320] S601: The second communication device sends a second SCI; correspondingly, the first communication device receives the second SCI of the second communication device.
[0321] S601 may also be expressed as: UE2 sends the second SCI; correspondingly, UE1 receives the second SCI of UE2.
[0322] For example, UE2 needs to transmit B sidelink information and selects resources in the first subframe for the B sidelink information, such as the second resource. That is, UE2 selects a second resource for the B sidelink information. The second resource belongs to the first subframe in the time domain and is a reserved resource for the B sidelink information, i.e., it is used to transmit the B sidelink information. Furthermore, UE2 may send a second SCI. The second SCI may be used to indicate the second resource used to carry the B sidelink information and the B priority values corresponding to the B sidelink information.
[0323] It should be noted that the number of second SCIs can be one or more and is not limited. For example, if B is greater than 1, UE2 can indicate the second resource and B priority values through one SCI; or it can indicate the second resource and B priority values through multiple SCIs (e.g., B), where one SCI is used to indicate the reserved resource for one sidelink information and the priority value corresponding to the sidelink information.
[0324] Exemplarily, the second SCI may indicate the second resource in the following two ways.
[0325] In mode 2-1, the number of second SCIs is 1, and the second SCIs respectively indicate the frequency domain resources of the second resource in different time slots. For example, the second SCI indicates the frequency domain resource of the second resource in the first time slot and the frequency domain resource of the second resource in the fifth time slot through the time domain resource indication field and / or the frequency domain resource indication field. For another example, field 1 in the second SCI indicates the frequency domain resource of the second resource in the first time slot, and field 2 in the second SCI indicates the frequency domain resource of the second resource in the fifth time slot.
[0326] In mode 2-2, there are multiple second SCIs, and the multiple SCIs respectively indicate resources of the second resource in different time slots. For example, one SCI in the multiple SCIs indicates the frequency domain resource of the second resource in the first time slot through the time domain resource indication field and / or the frequency domain resource indication field, and another SCI in the multiple SCIs indicates the frequency domain resource of the second resource in the fifth time slot through the time domain resource indication field and / or the frequency domain resource indication field.
[0327] It should be noted that the terms such as resources, time slots, subframes, side information, and priority values involved in the embodiments of the present application can all be referred to in the previous term explanation section and will not be repeated here.
[0328] In the embodiments of the present application, the reserved resources for side information may also be referred to as the resources for the side information. For example, the reserved resources for B side information may be referred to as the resources for B side information. The same applies to other cases and will not be described in detail. The priority value corresponding to the side information may also be referred to as the priority value of the side information.
[0329] The B priority values are used to measure (or determine) the priority levels of the B side information. For example, the priority value is positively correlated with the priority level of the side information, or the priority value is negatively correlated with the priority level of the side information. For details, please refer to the term explanation section and will not be repeated here. Wherein, B is a positive integer. When B is greater than 1, the B priority values can be different, the same, or partially the same, without limitation.
[0330] The B side information correspond to the B priority values in a one-to-one manner, that is, one side information among the B side information corresponds to one priority value among the B priority values, and one priority value among the B priority values corresponds to one side information among the B side information. For example, the B side information includes side information 1, side information 2, side information 3, and side information 4, and the B priority values include priority value 1, priority value 2, priority value 3, and priority value 4, side information 1 corresponds to priority value 1, side information 2 corresponds to priority value 2, side information 3 corresponds to priority value 3, and side information 4 corresponds to priority value 4.
[0331] As an example, B is greater than 1, and the B side information may include third side information. The reserved resources for the third side information are the resources on the first time slot, that is, the resources of the second resource on the first time slot. If the priority value is negatively correlated with the priority level, the priority value corresponding to the third side information may be the minimum value among the B priority values. For example, the B priority values include 2, 3, 4, and 5, and the priority value corresponding to the third side information is 2. Or if the priority value is positively correlated with the priority level, the priority value corresponding to the third side information may be the maximum value among the B priority values. In this example, UE2 can use the resources of the second resource on the first time slot to carry the side information with the highest priority level among the B side information.
[0332] As another example, B is greater than 1, and the B sidelink information includes third sidelink information and fourth sidelink information. The reserved resources for the third sidelink information are resources in the first time slot, that is, the resources of the second resource in the first time slot. The reserved resources for the fourth sidelink information are resources in the C time slots other than the first time slot, that is, the resources of the second resource in the C time slots other than the first time slot. Optionally, the reserved resources for the fourth sidelink information may be resources in the fifth time slot of the second resource. If the priority value is negatively correlated with the priority level, the priority value corresponding to the third sidelink information is lower than the priority value corresponding to the fourth sidelink information. For example, if the B priority values include 2, 3, 4, and 5, the priority value corresponding to the third sidelink information may be 2, 3, or 4. Alternatively, if the priority value is positively correlated with the priority level, the priority value corresponding to the third sidelink information is higher than the priority value corresponding to the fourth sidelink information. In this example, UE2 does not use the resources of the second resource in the first time slot to carry the sidelink information with the lowest priority level among the B sidelink information.
[0333] In one possible implementation, UE2 may implement any of the above two examples through a resource selection process, where the resource selection process is performed at the physical layer or MAC layer of UE2. The following uses the example of UE2 selecting resources for B sidelink information (e.g., the third sidelink information and the fourth sidelink information) as an example to illustrate possible resource selection methods:
[0334] Resource selection mode 2-1: UE2 selects resources for transmitting the third sidelink information in the first time slot, or preferentially selects resources for transmitting the third sidelink information in the first time slot. The priority value corresponding to the third sidelink information is the minimum value among A priority values, or the priority value corresponding to the third sidelink information is less than the priority value corresponding to the fourth sidelink information.
[0335] Resource selection mode 2-2: UE2 selects resources for transmitting the third sidelink information in the first time slot. If the priority value corresponding to the fourth sidelink information is greater than or equal to the priority value corresponding to the third sidelink information, UE2 may select resources for transmitting the fourth sidelink information in the fifth time slot.
[0336] For example, UE2 selects resources for the third sidelink information and the fourth sidelink information, where the priority value corresponding to the third sidelink information is 1 and the priority value corresponding to the fourth sidelink information is 2. UE2 then selects resources for transmitting the third sidelink information in the first time slot and / or selects resources for transmitting the fourth sidelink information in the fifth time slot.
[0337] In an embodiment of the present application, the second resource completely or partially overlaps with the first resource. For example, after receiving the second SCI, UE1 can determine that the second resource of UE2 belongs to the resource on the first frame according to the second SCI, and completely or partially overlaps with its own resource on the first subframe (recorded as the first resource). The first resource is a reserved resource for A side information, that is, it is used to transmit A side information. The A side information corresponds to A priority values. The embodiment of the present application does not limit the specific implementation form of the A side information. The A priority values are used to measure (or determine) the priority level of the A side information. For example, the priority value is positively correlated with the priority level of the side information, or the priority value is negatively correlated with the priority level of the side information. For details, please refer to the term explanation section and will not be repeated. Wherein, A is a positive integer. When A is greater than 1, the A priority values can be different, the same, or partially the same, without limitation.
[0338] The A side information pieces correspond one-to-one to the A priority values, i.e., one side information piece among the A side information pieces corresponds to one priority value among the A priority values, and one priority value among the A priority values corresponds to one side information piece among the A side information pieces. For example, the A side information pieces include side information 1 and side information 2, the A priority values include priority value 1 and priority value 2, side information 1 corresponds to priority value 2, and side information 2 corresponds to priority value 1.
[0339] As an example, A is greater than 1, and the A side information may include first side information, and the reserved resources of the first side information are resources on the first time slot, that is, the resources of the first resource on the first time slot. If the priority value is negatively correlated with the priority level, the priority value corresponding to the first side information may be the minimum value among the A priority values. Alternatively, if the priority value is positively correlated with the priority level, the priority value corresponding to the first side information may be the maximum value among the A priority values. In this example, UE1 can use resources on the first time slot to carry the side information with the highest priority level among the A side information.
[0340] As another example, A is greater than 1, and the A side information includes first side information and second side information. The reserved resources for the first side information are the resources on the first time slot, that is, the resources of the first resource on the first time slot. The reserved resources for the second side information are the resources on the time slots other than the first time slot in the C time slots, that is, the resources of the first resource on the time slots other than the first time slot in the C time slots. Optionally, the reserved resources for the second side information are the resources of the first resource on the fifth time slot. If the priority value is negatively correlated with the priority level, the priority value corresponding to the first side information is less than the priority value corresponding to the second side information. Alternatively, if the priority value is positively correlated with the priority level, the priority value corresponding to the first side information is greater than the priority value corresponding to the second side information. In this example, UE1 does not use the resources of the first resource on the first time slot to carry the side information with a low priority level among the A side information.
[0341] In a possible implementation, UE1 can implement any of the above two examples through a resource selection process, where the resource selection process is performed at the physical layer or MAC layer of UE1. The following uses the example of UE1 selecting resources for A sidelink information (e.g., first sidelink information and second sidelink information) as an example to illustrate possible resource selection methods:
[0342] Resource selection mode 1-1: UE1 selects resources for transmitting the first sidelink information in the first time slot, or preferentially selects resources for transmitting the first sidelink information in the first time slot. The priority value corresponding to the first sidelink information is the minimum value among A priority values, or the priority value corresponding to the first sidelink information is less than the priority value corresponding to the second sidelink information.
[0343] Resource selection mode 1-2: UE1 selects resources for transmitting the first sidelink information in the first time slot. If the priority value corresponding to the second sidelink information is greater than or equal to the priority value corresponding to the first sidelink information, UE1 may select resources for transmitting the second sidelink information in the fifth time slot.
[0344] For example, UE1 selects resources for the first sidelink information and the second sidelink information, the priority value corresponding to the first sidelink information is 1, and the priority value corresponding to the second sidelink information is 2. UE1 then selects resources for transmitting the first sidelink information in the first time slot and / or selects resources for transmitting the second sidelink information in the fifth time slot.
[0345] It should be noted that a piece of sidelink information occupies one time slot in the time domain and one or more subchannels in the frequency domain, without restriction. When B is greater than 1, the number of subchannels occupied by each of the B sidelink information pieces can be the same or different, without restriction. Similarly, when A is greater than 1, the number of subchannels occupied by each of the A sidelink information pieces can be the same or different.
[0346] Among them, the partial or full overlap of the first resource and the second resource can be understood as: part of the first resource overlaps with part of the second resource; or it can be understood as part of the first resource overlaps with the full overlap of the second resource, that is, the second resource includes the first resource; or it can be understood as the full overlap of the first resource with part of the second resource, which is equivalent to the first resource including the second resource; or it can be understood as the full overlap of the first resource with the full overlap of the second resource, which is equivalent to the first resource and the second resource being the same resource; or it can be understood as the first resource and the second resource partially or partially overlap in the time domain, and partially or fully overlap in the frequency domain resources in this overlapping time domain.
[0347] Different NR SL SCSs result in different numbers of time slots overlapping with the first subframe. That is, there are multiple values for C, and therefore multiple implementations of partial or full overlap of the first and second resources. The following describes partial or full overlap of the first and second resources, taking a case where C is 2, that is, an NR SL SCS of 30 kHz, and a first subframe consisting of two time slots, as an example.
[0348] In one example, A is 2, B is 2, and A side information includes first side information and second side information, that is, the first resource is the reserved resource for the first side information and the second side information. B side information includes third side information and fourth side information, that is, the second resource is the reserved resource for the third side information and the fourth side information. In this example, the reserved resources for the first side information and the third side information overlap, and the reserved resources for the second side information and the fourth side information overlap, as shown in (a) in Figure 7. Alternatively, the reserved resources for the first side information and the third side information overlap, and the reserved resources for the second side information and the fourth side information do not overlap, as shown in (b) and (c) in Figure 7. In FIG7(b), the reserved resources for the first sideline information and the reserved resources for the third sideline information overlap in the second time slot (denoted as the fifth time slot) of the C time slots. The reserved resources for the second sideline information and the reserved resources for the fourth sideline information are both in the first time slot in the time domain and do not overlap in the frequency domain. In FIG7(c), the reserved resources for the first sideline information and the reserved resources for the third sideline information overlap in the first time slot. The reserved resources for the second sideline information and the reserved resources for the fourth sideline information are both in the fifth time slot in the time domain and do not overlap in the frequency domain.
[0349] In this example, the reserved resources of the first side information correspond to resource 1 in Figure 7, the reserved resources of the second side information correspond to resource 2 in Figure 7, the reserved resources of the third side information correspond to resource 3 in Figure 7, and the reserved resources of the fourth side information correspond to resource 4 in Figure 7.
[0350] In another example, A is 2 and B is 1. The A sideline information includes first and second sideline information, meaning the first resource is reserved for the first and second sideline information. The B sideline information includes third sideline information, meaning the second resource is reserved for the third sideline information. In this example, the reserved resources for the first and third sideline information overlap in the first time slot, as shown in (d) of Figure 7 .
[0351] It should be understood that the reserved resources for the first sidelink information and the reserved resources for the third sidelink information overlap in the first time slot, which means that the reserved resources for the first sidelink information and the reserved resources for the third sidelink information are both in the first time slot and partially or completely overlap in the frequency domain. The phrase "the reserved resources for the first sidelink information and the reserved resources for the third sidelink information are both in the first time slot" can be replaced by "the reserved resources for the first sidelink information and the reserved resources for the third sidelink information are both in the first time slot."
[0352] In another example, A is 1 and B is 2. The A sideline information includes the first sideline information, meaning the first resource is reserved for the first sideline information. The B sideline information includes the third sideline information and the fourth sideline information, meaning the second resource is reserved for the third and fourth sideline information. In this example, the reserved resources for the first sideline information and the third sideline information overlap in the first time slot, as shown in (e) of Figure 7 .
[0353] It should be noted that the reserved resources for the first sidelink information and the reserved resources for the second sidelink information can be the same, different, or partially the same in the frequency domain, without limitation. Similarly, the reserved resources for the third sidelink information and the reserved resources for the fourth sidelink information can be the same, different, or partially the same in the frequency domain.
[0354] As mentioned above, after UE1 receives the second SCI, it can determine the second resources, that is, which resources on the first subframe are reserved resources for UE2 based on the second SCI. As an example, UE1 can determine that resource 3 on C time slots is a reserved resource for UE2 through the third frequency domain information. The third frequency domain information may include one or more of the following: resources with the same position and number of subchannels on each time slot in the C time slots are reserved resources for UE2; or, resources with the same starting subchannel on each time slot in the C time slots are reserved resources for UE2; or, resources with the same ending subchannel on each time slot in the C time slots are reserved resources for UE2; or, resources with partially overlapping frequency domain resources on each time slot in the C time slots are reserved resources for UE2. For example, resource 3 and resource 4 have the same position and number of subchannels on each time slot in the C time slots, and UE1 determines that resource 3 and resource 4 are both reserved resources for UE2.
[0355] In another example, UE1 determines that resource 3 in one of the C time slots is a reserved resource for UE2, and determines, based on resource 3 and the fourth frequency domain information, that resource 4 in the C time slots is a reserved resource for UE2. Resource 4 is the resource in the C time slots other than resource 3. The fourth frequency domain resource information may include one or more of the following: resources with the same subchannel position and number as resource 3 in the C time slots are also reserved resources for UE2; or resources with the same starting subchannel in the frequency domain as resource 3 in the C time slots are also reserved resources for UE2; or resources with the same ending subchannel in the frequency domain as resource 3 in the C time slots are also reserved resources for UE2; or resources that partially overlap with the frequency domain resources of resource 3 in the C time slots are also reserved resources for UE2. For example, if resource 3 is a reserved resource for UE2, and resource 3 and resource 4 have the same subchannel position and number in each of the C time slots, UE1 determines that resource 4 is also a reserved resource for UE2.
[0356] In one possible implementation, UE2 may implement either of the two examples above through a resource selection process, where the resource selection process is performed at the physical layer or the MAC layer of UE2. The following uses the example of UE2 selecting resources for B sidelink information (e.g., the third sidelink information and the fourth sidelink information) as an example to illustrate possible resource selection methods:
[0357] Resource selection method 2-3: UE2 determines that the subchannel numbers of the resources for transmitting the third sideline information and the resources for transmitting the fourth sideline information are both Lsch, and selects resources for transmitting the third sideline information and the fourth sideline information at the same frequency domain positions in the first time slot and the fifth time slot respectively.
[0358] Resource Selection Mode 2-4: UE2 determines that the number of subchannels for the resource transmitting the third sidelink information is Lsch, and selects resource 3 in the first time slot as the resource for transmitting the third sidelink information. If the number of subchannels for the resource transmitting the fourth sidelink information is Lsch, UE2 selects a resource in the fifth time slot that has the same frequency domain location as resource 3 for transmitting the fourth sidelink information. Optionally, if the above conditions are not met, UE2 does not transmit the fourth sidelink information in the fifth time slot.
[0359] Resource selection mode 2-5: UE2 determines that the subchannel numbers of the resources for transmitting the third sidelink information and the resources for transmitting the fourth sidelink information are both Lsch, and selects resources for transmitting the third sidelink information and the fourth sidelink information in the first time slot and the fifth time slot respectively.
[0360] Resource Selection Mode 2-6: UE2 selects resource 3 in the first time slot for transmitting the third sidelink information. Resource 3 includes Lsch subchannels in the frequency domain. If the number of subchannels in the resource for the fourth sidelink information is Lsch, UE2 selects a resource in the fifth time slot for transmitting the fourth sidelink information. Optionally, if the above conditions are not met, UE2 does not transmit the fourth sidelink information in the fifth time slot.
[0361] Resource selection mode 2-7: UE2 selects resources for transmitting the third sidelink information and the fourth sidelink information at the same frequency domain position of the starting subchannels of the first time slot and the fifth time slot, respectively.
[0362] Resource Selection Mode 2-8: UE2 selects Resource 3 in the first time slot as the resource for transmitting the third sidelink information. If Resource 4 in the fifth time slot has the same starting subchannel as Resource 3, UE2 transmits the fourth sidelink information on Resource 4 in the fifth time slot. Alternatively, if the above conditions are not met, UE2 does not transmit the fourth sidelink information in the fifth time slot.
[0363] Resource selection mode 2-9: UE2 selects resources for transmitting the third sidelink information and the fourth sidelink information at the same frequency domain position of the end subchannels of the first time slot and the fifth time slot, respectively.
[0364] Resource Selection Mode 2-10: UE2 selects Resource 3 in the first time slot as the resource for transmitting the third sidelink information. If Resource 4 in the fifth time slot has the same end subchannel as Resource 3, UE2 transmits the fourth sidelink information on Resource 4 in the fifth time slot. Alternatively, if the above conditions are not met, UE2 does not transmit the fourth sidelink information in the fifth time slot.
[0365] Resource selection mode 2-11: UE2 selects resources for transmitting the third sidelink information and the fourth sidelink information on the sub-channels where the frequency domain resources overlap in the first time slot and the fifth time slot, respectively.
[0366] Resource Selection Mode 2-12: UE2 selects Resource 3 in the first time slot as the resource for transmitting the third sidelink information. If Resource 4 in the fifth time slot overlaps with Resource 3 in the frequency domain, UE2 transmits the fourth sidelink information on Resource 4 in the fifth time slot. Optionally, if the above conditions are not met, UE2 does not transmit the fourth sidelink information in the fifth time slot.
[0367] It should be noted that after UE1 determines that the second resource used by UE2 to transmit B sidelink information completely or partially overlaps with its first resource used to transmit A sidelink information, it can execute S604 to resolve the resource conflict between the first and second resources. Therefore, S602 and S603 are optional steps, indicated by dashed lines in Figure 6.
[0368] S602: The first communication device sends a first SCI; correspondingly, the second communication device receives the first SCI of the first communication device.
[0369] S602 can also be expressed as: UE1 sends a first SCI; correspondingly, UE2 receives the first SCI.
[0370] Exemplarily, UE1 needs to transmit A side information and selects resources on the first subframe, i.e., the first resource, for the A side information. That is, UE1 selects the first resource for the A side information, and the first resource belongs to the first subframe in the time domain and is a reserved resource for the A side information, i.e., used to transmit the A side information. Furthermore, UE1 can send a first SCI. The first SCI can be used to indicate the first resource used to carry the A side information and the A priority values corresponding to the A side information. It should be understood that UE2 can determine the first resource and the A priority values corresponding to the A side information by other means, which is not limited in this application. For the description of the first resource and the A priority values, please refer to the relevant content in S601 and will not be repeated here.
[0371] It should be noted that the number of first SCIs can be one or more and is not limited. For example, if A is greater than 1, UE1 can indicate the first resource and A priority values through one SCI; or it can indicate the first resource and A priority values through multiple SCIs (e.g., A), where one SCI is used to indicate the reserved resource for one sidelink information and the priority value corresponding to the sidelink information.
[0372] Exemplarily, the first SCI may indicate the first resource in the following two ways.
[0373] In mode 1-1, the number of first SCIs is 1, and the first SCIs respectively indicate the frequency domain resources of the first resource in different time slots. For example, the first SCI indicates the frequency domain resources of the first resource in the first time slot and the frequency domain resources of the first resource in the fifth time slot through the time domain resource indication field and / or the frequency domain resource indication field. For another example, field 1 in the first SCI indicates the frequency domain resources of the first resource in the first time slot, and field 2 in the first SCI indicates the frequency domain resources of the first resource in the fifth time slot.
[0374] In mode 1-2, there are multiple first SCIs, and the multiple SCIs respectively indicate resources of the first resource in different time slots. For example, one SCI in the multiple SCIs indicates the frequency domain resource of the first resource in the first time slot through the time domain resource indication field and / or the frequency domain resource indication field, and another SCI in the multiple SCIs indicates the frequency domain resource of the first resource in the fifth time slot through the time domain resource indication field and / or the frequency domain resource indication field.
[0375] After receiving the first SCI, UE2 can determine that the first resource of UE1 belongs to the first subframe in the time domain, and overlaps with its own resource (i.e., the second resource) in the first subframe in whole or in part. In one example, UE2 can determine that resource 1 in C time slots is a reserved resource for UE1 through the first frequency domain information. The first frequency domain information may include one or more of the following: resources with the same position and number of subchannels in each time slot in the C time slots are reserved resources for UE1; or, resources with the same starting subchannel in each time slot in the C time slots are reserved resources for UE1; or, resources with the same ending subchannel in each time slot in the C time slots are reserved resources for UE1; or, resources with partially overlapping frequency domain resources in each time slot in the C time slots are reserved resources for UE1. For example, resource 1 and resource 2 have the same position and number of subchannels in each time slot in the C time slots, and UE2 determines that resource 1 and resource 2 are both reserved resources for UE1.
[0376] In another example, UE2 determines that resource 1 in one of the C time slots is a reserved resource for UE1, and determines that resource 2 in the C time slots is a reserved resource for UE1 based on resource 1 and the second frequency domain information. Resource 4 is the resource in the C time slots other than resource 3. The second frequency domain resource information may include one or more of the following: resources with the same subchannel position and number as resource 1 in the C time slots are also reserved resources for UE1; or, resources with the same starting subchannel in the frequency domain as resource 1 in the C time slots are also reserved resources for UE1; or, resources with the same ending subchannel in the frequency domain as resource 1 in the C time slots are also reserved resources for UE1; or, resources that partially overlap with the frequency domain resources of resource 1 in the C time slots are also reserved resources for UE1. For example, resource 1 is a reserved resource for UE1, and resource 1 and resource 2 have the same subchannel position and number in each of the C time slots. UE2 determines that resource 2 is also a reserved resource for UE1.
[0377] In a possible implementation, UE1 may implement any of the above two examples through a resource selection process, which is performed at the physical layer or MAC layer of UE1. The following uses the example of UE1 selecting resources for A sidelink information (e.g., first sidelink information and second sidelink information) as an example to illustrate possible resource selection methods:
[0378] Resource selection method 1-3: UE1 determines that the subchannel numbers of the resources for transmitting the first sidelink information and the resources for transmitting the second sidelink information are both Lsch, and selects the resources for transmitting the first sidelink information and the second sidelink information at the same frequency domain positions in the first time slot and the fifth time slot respectively.
[0379] Resource Selection Method 1-4: UE1 determines that the number of subchannels in the resource for transmitting the first sidelink information is Lsch, and selects Resource 1 in the first time slot as the resource for transmitting the first sidelink information. If the number of subchannels in the resource for transmitting the second sidelink information is Lsch, UE1 selects a resource in the fifth time slot that has the same frequency domain location as Resource 1 for transmitting the second sidelink information. Optionally, if the above conditions are not met, UE1 does not transmit the second sidelink information in the fifth time slot.
[0380] Resource selection mode 1-5: UE1 determines that the subchannel numbers of the resource for transmitting the first sidelink information and the resource for transmitting the second sidelink information are both Lsch, and selects resources for transmitting the first sidelink information and the second sidelink information in the first time slot and the fifth time slot respectively.
[0381] Resource Selection Method 1-6: UE1 selects resource 1 in the first time slot for transmitting the first sidelink information. Resource 1 includes Lsch subchannels in the frequency domain. If the number of subchannels in the resource for the second sidelink information is Lsch, UE1 selects the resource in the fifth time slot for transmitting the second sidelink information. Optionally, if the above conditions are not met, UE1 does not transmit the second sidelink information in the fifth time slot.
[0382] Resource selection mode 1-7: UE1 selects resources for transmitting the first sidelink information and the second sidelink information at the same frequency domain position of the starting subchannels of the first time slot and the fifth time slot, respectively.
[0383] Resource Selection Mode 1-8: UE1 selects Resource 1 in the first time slot as the resource for transmitting the first sidelink information. If Resource 2 in the fifth time slot has the same starting subchannel as Resource 1, UE1 transmits the second sidelink information on Resource 2 in the fifth time slot. Alternatively, if the above conditions are not met, UE1 does not transmit the second sidelink information in the fifth time slot.
[0384] Resource selection mode 1-9: UE1 selects resources for transmitting the first sidelink information and the second sidelink information at the same frequency domain position of the end subchannel of the first time slot and the fifth time slot, respectively.
[0385] Resource Selection Mode 1-10: UE1 selects Resource 1 in the first time slot as the resource for transmitting the first sidelink information. If Resource 2 in the fifth time slot has the same end subchannel as Resource 1, UE1 transmits the second sidelink information on Resource 2 in the fifth time slot. Alternatively, if the above conditions are not met, UE1 does not transmit the second sidelink information in the fifth time slot.
[0386] Resource selection mode 1-11: UE1 selects resources for transmitting the first sidelink information and the second sidelink information respectively on the sub-channels where the frequency domain resources overlap in the first time slot and the fifth time slot.
[0387] Resource Selection Mode 1-12: UE1 selects Resource 1 in the first time slot as the resource for transmitting the first sidelink information. If Resource 2 in the fifth time slot overlaps with Resource 1 in the frequency domain, UE1 transmits the second sidelink information on Resource 2 in the fifth time slot. Optionally, if the above conditions are not met, UE1 does not transmit the second sidelink information in the fifth time slot.
[0388] It should be noted that after UE2 determines that the first resource used by UE1 to transmit A sidelink information completely or partially overlaps with its own second resource used to transmit B sidelink information, it can execute S605 to resolve the resource conflict between the first and second resources. Therefore, S603 is an optional step, indicated by a dotted line in Figure 6.
[0389] S603: The third communication device sends a third SCI; correspondingly, the second communication device receives the third SCI from the third communication device.
[0390] S603 can also be expressed as: UE3 sends the third SCI; correspondingly, UE2 receives the third SCI of UE3.
[0391] Exemplarily, UE3 needs to transmit H side information and select resources on the first subframe for the H side information, such as those recorded as the seventh resource. That is, UE3 pre-configures the seventh resource for the H side information, and the seventh resource belongs to the first subframe in the time domain and is a reserved resource for the H side information, i.e., it is used to transmit the H side information. Furthermore, UE3 can send a third SCI. The third SCI can be used to indicate the seventh resource used to carry the H side information and the H priority values corresponding to the H side information. It should be understood that UE2 can determine the seventh resource and the H priority values corresponding to the A side information by other means, which is not limited in this application. The specific contents of the third SCI, the seventh resource, the H side information, and the H priority values can be respectively referred to the relevant contents of the aforementioned first SCI, the first resource, the A side information, and the A priority values, and will not be repeated here.
[0392] It should be noted that UE1 and / or UE2 may or may not receive the third SCI. Therefore, in this embodiment, for UE2, UE2 may receive at least one SCI. This at least one SCI includes the first SCI. Optionally, this at least one SCI may also include the third SCI, i.e., UE2 receives the third SCI. It should be understood that this at least one SCI may also include SCIs of other UEs besides UE1 and UE3, without limitation.
[0393] The at least one SCI is used to indicate the fifth resource and the M priority values corresponding to the M side information. Among them, the fifth resource is a reserved resource for the M side information. The M priority values are used to measure (or determine) the priority levels of the M side information. Among them, M is a positive integer. When M is greater than 1, the M priority values can be different, the same, or partially the same, without restriction. The M side information corresponds to the M priority values one-to-one, that is, one side information among the M side information corresponds to one priority value among the M priority values, and one priority value among the M priority values corresponds to one side information among the M side information. Please refer to the aforementioned related content for details and will not be repeated here.
[0394] The fifth resource includes the first resource, the M sideline information includes A sideline information, and the M priority values include A priority values. For example, if UE2 does not receive the third SCI, the fifth resource is the first resource, and M is A. For another example, if UE2 receives the third SCI, the fifth resource includes the first resource and the seventh resource, and M is (A+H), that is, the M sideline information includes A sideline information and H sideline information, and the M priority values include A priority values and H priority values.
[0395] Among them, the partial or full overlap of the fifth resource and the second resource can be understood as: part of the fifth resource overlaps with part of the second resource; or it can be understood as part of the fifth resource overlaps with the full overlap of the second resource, that is, the second resource includes the fifth resource; or it can be understood as the full overlap of the fifth resource with part of the second resource, which is equivalent to the fifth resource including the second resource; or it can be understood as the full overlap of the fifth resource with the full overlap of the second resource, which is equivalent to the fifth resource and the second resource being the same resource; or it can be understood as the fifth resource and the second resource partially or partially overlap in the time domain, and partially or fully overlap in the frequency domain resources in this overlapping time domain.
[0396] Different NR SL SCSs result in different numbers of time slots overlapping with the first subframe. That is, there are multiple values for C, and therefore multiple implementations of partial or full overlap of the fifth resource and the second resource. The following describes partial or full overlap of the fifth resource and the second resource, taking C as 2, i.e., an NR SL SCS of 30 kHz, and a first subframe consisting of two time slots, as an example.
[0397] In one example, M is 2, B is 2, and the M side information includes the fifth side information and the sixth side information, that is, the fifth resource is the reserved resource for the fifth side information and the sixth side information. The B side information includes the third side information and the fourth side information, that is, the second resource is the reserved resource for the third side information and the fourth side information. In this example, the reserved resources for the fifth side information overlap with the reserved resources for the third side information, and the reserved resources for the sixth side information overlap with the reserved resources for the fourth side information, as shown in (a) in Figure 7 (resource 1 in Figure 7 corresponds to the reserved resources for the fifth side information, and resource 2 corresponds to the reserved resources for the sixth side information). Alternatively, the reserved resources for the fifth side information overlap with the reserved resources for the third side information, and the reserved resources for the sixth side information do not overlap with the reserved resources for the fourth side information, as shown in (b) and (c) in Figure 7. In FIG7(b), the reserved resources for the fifth sideline information and the reserved resources for the third sideline information overlap in the fifth time slot, while the reserved resources for the sixth sideline information and the reserved resources for the fourth sideline information are both in the first time slot in the time domain and do not overlap in the frequency domain. In FIG7(c), the reserved resources for the fifth sideline information and the reserved resources for the third sideline information overlap in the first time slot, while the reserved resources for the sixth sideline information and the reserved resources for the fourth sideline information are both in the fifth time slot in the time domain and do not overlap in the frequency domain.
[0398] In this example, the reserved resources of the fifth side information correspond to resource 1 in Figure 7, the reserved resources of the sixth side information correspond to resource 2 in Figure 7, the reserved resources of the third side information correspond to resource 3 in Figure 7, and the reserved resources of the fourth side information correspond to resource 4 in Figure 7.
[0399] In another example, M is 2 and B is 1. The M sideline information includes fifth and sixth sideline information, meaning the fifth resource is reserved for the fifth and sixth sideline information. The B sideline information includes third sideline information, meaning the second resource is reserved for the third sideline information. In this example, the reserved resources for the fifth and third sideline information overlap in the first time slot, as shown in (d) of Figure 7 .
[0400] It should be understood that the reserved resources for the fifth sideline information and the reserved resources for the third sideline information overlap in the first time slot, which means that the reserved resources for the fifth sideline information and the reserved resources for the third sideline information are both in the first time slot and partially or completely overlap in the frequency domain. The phrase "the reserved resources for the fifth sideline information and the reserved resources for the third sideline information are both in the first time slot" can be replaced by "the reserved resources for the fifth sideline information and the reserved resources for the third sideline information are both in the first time slot."
[0401] In another example, M is 1 and B is 2. The M sideline information includes fifth sideline information, meaning the fifth resource is a reserved resource for the fifth sideline information. The B sideline information includes third sideline information and fourth sideline information, meaning the second resource is a reserved resource for the third and fourth sideline information. In this example, the reserved resources for the fifth sideline information and the third sideline information overlap in the first time slot, as shown in (e) of Figure 7 .
[0402] It should be noted that the reserved resources for the fifth sideline information and the reserved resources for the sixth sideline information can be the same, different, or partially the same in the frequency domain, without limitation. Similarly, the reserved resources for the third sideline information and the reserved resources for the fourth sideline information can be the same, different, or partially the same in the frequency domain.
[0403] It should be noted that, if the M pieces of side information are A pieces of side information, the fifth side information is the aforementioned first side information, and the sixth side information is the aforementioned second side information.
[0404] S604: The first communication device determines, according to the second SCI, that the third resource is preempted, or determines to re-evaluate the third resource, or determines that the third resource is preempted and re-evaluates the third resource.
[0405] S604 may also be expressed as: UE1 determines, according to the second SCI, that the third resource is preempted, or determines to re-evaluate the third resource, or determines that the third resource is preempted and re-evaluates the third resource.
[0406] For example, if UE1 determines based on the second SCI that the third resource is preempted, UE1 does not use the third resource. And / or, if UE1 determines based on the second SCI to re-evaluate the third resource, UE1 may evaluate the third resource to determine whether the third resource overlaps with reserved resources of other UEs.
[0407] Optionally, UE1's determination that the third resource is preempted and / or determination to re-evaluate the third resource may be replaced by UE1's determination not to use the third resource; or by UE1's determination not to transmit sidelink information on the third resource, etc., without limitation. For ease of understanding, the following description uses determination that the third resource is preempted as an example. It should be understood that "determining that the third resource is preempted" may be replaced by "determining to re-evaluate the third resource"; or by "determining not to use the third resource"; or by "determining not to transmit sidelink information on the third resource"; or by multiple combinations of the foregoing.
[0408] The third resource may be the first resource, or may be a resource in the first resource excluding the resource on the first time slot. The resources in the first resource excluding the resource on the first time slot overlap with the second resource. For example, the first resource includes time slot 1 and time slot 2 in the time domain, and overlaps with the second resource on time slot 2, time slot 1 is the first time slot, and the resources in the first resource excluding the resource on the first time slot are the resources of the first resource on time slot 2, as shown in (a) in Figure 8. For another example, the first resource includes time slot 1, time slot 2, time slot 3 and time slot 4 in the time domain, and overlaps with the second resource on time slot 2 and time slot 3, time slot 1 is the first time slot, and the resources in the first resource excluding the resource on the first time slot include the resources of the first resource on time slot 2 and the resources of the first resource on time slot 3, as shown in (b) in Figure 8.
[0409] In one example, the second resource overlaps with the first resource in the first time slot, and the third resource may be the first resource. In this example, the second resource overlaps with the first resource in the first time slot. If the first resource in the time slot is preempted by UE2, UE1 cannot transmit in the first time slot, which means that the LTE SL UE performs AGC adjustment on the data transmitted by UE2 (instead of the data transmitted by UE1) in the first subframe. If UE1 transmits in the time slot after the first time slot, the LTE SL UE may use the previous AGC adjustment result, which may cause the receiving power of the LTE SL UE to be saturated. Therefore, even if the first resource does not overlap with the second resource in the time slot after the first time slot, UE1 does not use the resource that does not overlap with the second resource, thereby reducing the problem that the LTE SL UE cannot decode normally.
[0410] In another example, the first resource includes the first time slot in the time domain, the second resource does not overlap with the first resource in the first time slot, and the third resource can be a resource in the first resource other than the resource in the first time slot. In this example, the second resource does not overlap with the first resource in the first time slot, and UE1 can perform power control in the first time slot, which means that the LTE SL UE can perform AGC adjustment on the data transmitted by UE1 in the first subframe. Even if the first resource overlaps with the second resource in the time slot after the first time slot and is preempted by UE2, UE1 can also use the resources of the first resource in the first time slot, or use the resources of the first resource in the first time slot and the resources after the first time slot that do not overlap with the second resource, such as the resources in time slot 1 and time slot 4 as shown in (b) in Figure 8, which can improve resource utilization.
[0411] It should be understood that the second resource and the first resource overlap in the first time slot, which means that the second resource and the first resource both include the first time slot in the time domain and partially or completely overlap in the frequency domain of the first time slot. The second resource and the first resource do not overlap in the first time domain, which means that the second resource and the first resource both include the first time slot in the time domain and do not overlap in the frequency domain of the first time slot.
[0412] The SCS of the NR SL varies, and the number of time slots overlapping with the first subframe also varies. This means that there are multiple values for C and multiple implementations of the third resource. The following describes the third resource using an example where C is 2, that is, an NR SL SCS of 30 kHz, and a first subframe consisting of two time slots.
[0413] As an example, taking (a) in Figure 7 as an example, that is, A is 2, B is 2, the reserved resources of the first side information overlap with the reserved resources of the third side information, and the reserved resources of the second side information overlap with the reserved resources of the fourth side information. In this case, the third resource can be the first resource.
[0414] As another example, taking (b) in Figure 7 as an example, that is, A is 2, B is 2, the reserved resources for the first sideline information and the reserved resources for the third sideline information overlap in the fifth time slot, and the reserved resources for the second sideline information and the reserved resources for the fourth sideline information do not overlap. In this case, the third resource can be the resource of the first resource excluding the resource in the first time slot, that is, the resource of the first resource in the fifth time slot. In other words, the third resource can be the reserved resource for the first sideline information.
[0415] Another example, taking (c) in Figure 7 as an example, that is, A is 2, B is 2, the reserved resources of the first sideline information and the reserved resources of the third sideline information overlap in the first time slot, and the reserved resources of the second sideline information and the reserved resources of the fourth sideline information do not overlap. In this case, the third resource can be the first resource.
[0416] As another example, taking (d) in FIG7 as an example, that is, A is 2, B is 1, and the reserved resources of the first side information and the reserved resources of the third side information overlap in the first time slot. In this case, the third resource can be the first resource.
[0417] As another example, taking (e) in FIG7 as an example, that is, A is 1, B is 2, and the reserved resources of the first side information and the reserved resources of the third side information overlap in the first time slot. In this case, the third resource can be the first resource.
[0418] In one possible implementation, UE1 may determine that the third resource is preempted and / or determine to re-evaluate the third resource based on the priority levels of the A side information and the priority levels of the B side information, so as to ensure the transmission reliability of the high-priority service. For example, UE1 may determine that the third resource is preempted and / or determine to re-evaluate the third resource based on the A priority values corresponding to the A side information and the B priority value corresponding to the B side information. FIG6 takes the case where UE1 determines that the third resource is preempted and / or determines to re-evaluate the third resource based on the B priority values and the A priority value as an example.
[0419] Optionally, if the priority value is negatively correlated with the priority level, and the first priority value among the A priority values is greater than the second priority value among the B priority values, UE1 can determine that the third resource is preempted. Alternatively, if the priority value is positively correlated with the priority level, and the first priority value among the A priority values is less than the second priority value among the B priority values, UE1 can determine that the third resource is preempted and / or determine to re-evaluate the third resource. For the negative correlation between the priority value and the priority level and the positive correlation between the priority value and the priority level, please refer to the content of the term explanation section and will not be repeated here. Unless otherwise specified, the following description will take the negative correlation between the priority value and the priority level as an example.
[0420] Here, if A is 1, the first priority value may be the priority value corresponding to the sideline information carried by the first resource, that is, the A priority values only include the first priority value; or, if A is greater than 1, the first priority value may be any priority value among the A priority values. If B is 1, the second priority value may be the priority value corresponding to the sideline information carried by the second resource, that is, the B priority values only include the second priority value; or, if B is greater than 1, the second priority value may be any priority value among the B priority values.
[0421] There are multiple possible implementations of the first priority value and the second priority value, which will be introduced one by one below.
[0422] Case 1-1: Both A and B are greater than 1. The first priority value can be the minimum or maximum of the priority values A, and the second priority value can be the minimum or maximum of the priority values B. That is, if the priority value is negatively correlated with the priority level, then: the minimum of the priority values A is greater than the minimum of the priority values B; or the minimum of the priority values A is greater than the maximum of the priority values B; or the maximum of the priority values A is greater than the minimum of the priority values B; or the maximum of the priority values A is greater than the maximum of the priority values B.
[0423] For ease of understanding, the following text takes the negative correlation between priority value and priority level as an example unless otherwise specified. It should be understood that by replacing "greater than" with "less than" in the scheme where priority value and priority level are negatively correlated, a scheme where priority value and priority level are positively correlated can be obtained. For example, if the priority value is negatively correlated with priority level, the minimum value among A priority values is greater than the minimum value among B priority values; correspondingly, if the priority value is positively correlated with priority level, the minimum value among A priority values is less than the minimum value among B priority values. For another example, if the priority value is negatively correlated with priority level, the minimum value among A priority values is greater than the maximum value among B priority values; correspondingly, if the priority value is positively correlated with priority level, the minimum value among A priority values is less than the maximum value among B priority values.
[0424] It should be understood that if the minimum value among the A priority values is greater than the minimum or maximum value among the B priority values, the maximum value among the A priority values is also greater than the minimum or maximum value among the B priority values. Alternatively, if the maximum value among the A priority values is less than the minimum or maximum value among the B priority values, the minimum value among the A priority values is also less than the minimum or maximum value among the B priority values.
[0425] Taking C as 2, A as 2, and B as 2 as an example, the priority values of A include 4 and 5, the priority values of B include 1 and 3, and the minimum value of the priority values of A is greater than the minimum or maximum value of the priority values of B. UE1 determines that the third resource is preempted, wherein the first priority value is 4 and the second priority value is 1 or 3. Alternatively, the priority values of A include 1 and 5, the priority values of B include 2 and 3, and the maximum value of the priority values of A is greater than the minimum or maximum value of the priority values of B. UE1 determines that the third resource is preempted, wherein the first priority value is 5 and the second priority value is 2 or 3. Alternatively, the priority values of A include 1 and 3, the priority values of B include 2 and 4, and the maximum value of the priority values of A is greater than the minimum value of the priority values of B. UE1 determines that the third resource is preempted, wherein the first priority value is 3 and the second priority value is 2. That is, if A is 2, B is 2, and the first priority value is greater than the second priority value, UE1 can determine that the third resource is preempted, the first priority value is the maximum or minimum value among the priority values A, and the second priority value is the maximum or minimum value among the priority values B. Furthermore, the third resource can be the first resource, or a resource in the first resource other than the resource in the first time slot. For details, please refer to the above description and will not be repeated here.
[0426] Case 1-2: A is greater than 1, and B is 1. The first priority value can be the minimum or maximum of the A priority values, and the second priority value is the priority value corresponding to the sideline information carried by the second resource. In other words, the minimum of the A priority values is greater than the priority value corresponding to the sideline information carried by the second resource; or the maximum of the A priority values is greater than the priority value corresponding to the sideline information carried by the second resource.
[0427] Taking C as 2, A as 2, and B as 1 as an example, the priority values of A include 2 and 5, the priority value corresponding to the side information carried by the second resource is 4, the maximum value of the priority values of A is greater than the priority value corresponding to the side information carried by the second resource, and UE1 determines that the third resource is preempted, wherein the first priority value is 5. Alternatively, the priority values of A include 4 and 5, the priority values of B include 2, the maximum value or the minimum value of the priority values of A is greater than the priority value corresponding to the side information carried by the second resource, and UE1 determines that the third resource is preempted, wherein the first priority value is 4 or 5, and the second priority value is 2. That is, if A is 2 and B is 1, any priority value of the priority values of A is greater than the priority value corresponding to the side information carried by the second resource, and UE1 can determine that the third resource is preempted. Furthermore, the third resource can be the first resource, and the details can be referred to the above description, which will not be repeated here.
[0428] Case 1-3: A is 1 and B is greater than 1. The first priority value is the priority value corresponding to the sidelink information carried by the first resource, and the second priority value can be the minimum or maximum value among the B priority values. In other words, the priority value corresponding to the sidelink information carried by the first resource is greater than the minimum value among the B priority values; or the priority value corresponding to the sidelink information carried by the first resource is greater than the maximum value among the B priority values.
[0429] Taking C as 2, A as 1, and B as 2 as an example, the priority value corresponding to the side information carried by the first resource is 3, the B priority values include 2 and 4, and the priority value corresponding to the side information carried by the first resource is greater than the minimum value of the B priority values, wherein the second priority value is 2. Alternatively, the priority value corresponding to the side information carried by the first resource is 6, the B priority values include 2 and 4, and the priority value corresponding to the side information carried by the first resource is greater than the minimum value or the maximum value of the B priority values, wherein the second priority value is 2. That is, if A is 1 and B is 2, and the priority value corresponding to the side information carried by the first resource is greater than any of the B priority values, UE1 can determine that the third resource is preempted. Furthermore, the third resource can be the first resource, and the details can be referred to the above description, which will not be repeated here.
[0430] Case 1-4: The first priority value can be the minimum or maximum value among the D priority values, and the second priority value corresponds to the third sideline information among the B sideline information. In other words, the minimum value among the D priority values is greater than the priority value corresponding to the third sideline information; or the maximum value among the D priority values is greater than the priority value corresponding to the third sideline information.
[0431] Among them, the D priority values correspond to D side information, and one priority value among them corresponds to one side information among the D side information. For details, please refer to the description of B side information corresponding to B priority values, which will not be repeated here. The D side information is all or part of the side information carried on the second time slot among the C time slots. In cases 1-4, the reserved resources for the third side information are the second time slot in the time domain, or the reserved resources for the third side information are in the second time slot. Among them, the D side information include part or all of the A side information, that is, the reserved resources for the D side information include part or all of the first resources. In other words, the D priority values include part or all of the A priority values. Optionally, the D priority values are the priority values corresponding to all side information carried on the second time slot except the third side information, that is, all side information except the third side information among all side information carried by the D side information on the second time slot. Optionally, the D sidelink information may also include sidelink information of other UEs (such as UE3) in addition to UE 1 and UE 2. The second time slot is any time slot among the C time slots. D is a positive integer greater than 1.
[0432] In case 1-4, the first priority value is greater than the second priority value, and UE1 may determine that the third resource is preempted. The first priority value is the minimum value or the maximum value among the D priority values.
[0433] Assume that the D side information includes side information 1 of UE1 and side information 5 of UE3, and the third side information is side information 3 of UE2. The reserved resources for side information 1 are recorded as resource 1, the reserved resources for side information 3 are recorded as resource 3, and the reserved resources for side information 5 are recorded as resource 5. The D priority values include the priority value corresponding to side information 1 and the priority value corresponding to side information 5. If A is 2, the A side information includes side information 1 and side information 2. The reserved resources for side information 2 are recorded as resource 2. If B is 2, the B side information includes side information 3 and side information 4. The reserved resources for side information 4 are recorded as resource 4.
[0434] Based on an example of the above assumptions, the priority value corresponding to side information 1 is 7, the priority value corresponding to side information 3 is 3, and the priority value corresponding to side information 5 is 5. The minimum value of the D priority values is greater than the priority value corresponding to side information 3. UE1 can determine that the third resource is preempted. Alternatively, the priority value corresponding to side information 1 is 4, the priority value corresponding to side information 3 is 3, and the priority value corresponding to side information 5 is 5. The minimum value or the maximum value of the D priority values is greater than the priority value corresponding to side information 3. UE1 can determine that the third resource is preempted.
[0435] For example, if C is 2, A is 2, and B is 2, the first resource overlaps with the second resource, and the second time slot can be the first time slot, that is, resources 1, 3, and 5 are in the first time slot, as shown in Figure 9 (a); or the second time slot can be the fifth time slot, that is, resources 1, 3, and 5 are in the fifth time slot, as shown in Figure 9 (b). In this case, the third resource is the first resource.
[0436] Alternatively, if C is 2, A is 2, and B is 2, the first resource and the second resource do not overlap in the first time slot but overlap in the fifth time slot. The second time slot can be the first time slot, that is, resources 1, 3, and 5 are in the first time slot, as shown in Figure 9 (c); or the second time slot can be the fifth time slot, that is, resources 1, 3, and 5 are in the fifth time slot, as shown in Figure 9 (d). In this case, the third resource is the resource of the first resource in the fifth time slot.
[0437] Alternatively, if C is 2, A is 2, and B is 2, the first resource and the second resource overlap in the first time slot but do not overlap in the fifth time slot. The second time slot can be the first time slot, that is, resources 1, 3, and 5 are in the first time slot, as shown in Figure 9(e); or the second time slot can be the fifth time slot, that is, resources 1, 3, and 5 are in the fifth time slot, as shown in Figure 9(f). In this case, the third resource is the first resource.
[0438] Alternatively, if C is 2, A is 2, and B is 1, the first resource and the second resource overlap in the first time slot, and the second time slot is the first time slot, that is, resource 1, resource 3, and resource 5 are in the first time slot, as shown in (g) in Figure 9.
[0439] Alternatively, if C is 2, A is 1, and B is 2, the first resource and the second resource overlap in the first time slot, and the second time slot is the first time slot, that is, resource 1, resource 3, and resource 5 are in the first time slot, as shown in (h) in Figure 9.
[0440] In the above situations 1-4, the priority value corresponding to the third sidelink information is less than the priority values corresponding to all sidelink information except the third sidelink information in the time slot where the reserved resource for the third sidelink information is located. UE1 may determine that the third resource is preempted. The D priority values are the priority values corresponding to all sidelink information except the third sidelink information in the time slot where the reserved resource for the third sidelink information is located.
[0441] Optionally, B is greater than 1, the B sideline information include the third sideline information and the fourth sideline information, the first priority value is the minimum or maximum value among the D priority values, and the second priority value is the minimum value among the priority values corresponding to the third sideline information and the priority values corresponding to the fourth sideline information. Furthermore, the second priority value is less than the priority values corresponding to all sideline information other than the third sideline information and the fourth sideline information in the time slot where the reserved resources for the third sideline information and the fourth sideline information are located, and UE1 can determine that the third resource is preempted. Among them, the D priority values are the priority values of all sideline information other than the third sideline information and the fourth sideline information in the time slot where the reserved resources for the third sideline information and the fourth sideline information are located.
[0442] Alternatively, if the priority value corresponding to the fourth sidelink information is less than the priority values corresponding to all sidelink information other than the fourth sidelink information in the time slot where the reserved resource for the fourth sidelink information is located, UE1 may determine that the third resource is preempted. The D priority values are the priority values corresponding to all sidelink information other than the fourth sidelink information in the time slot where the reserved resource for the fourth sidelink information is located.
[0443] Case 1-5: The first priority value is the minimum or maximum of the E priority values, and the second priority value corresponds to the third sideline information among the B sideline information. In other words, the minimum of the E priority values is greater than the priority value corresponding to the third sideline information; or the maximum of the E priority values is greater than the priority value corresponding to the third sideline information.
[0444] Among them, the E priority values correspond to E sideline information, and one priority value thereof corresponds to one sideline information among the E sideline information. For details, please refer to the description of B sideline information corresponding to B priority values, which will not be repeated here. The reserved resources of the E sideline information overlap with the first frequency domain resources on the first subframe in the frequency domain. In case 1-5, the reserved resources of the third sideline information are the first frequency domain resources in the frequency domain, or in other words, the reserved resources of the third sideline information are in the first frequency domain resources. Among them, the E sideline information include part or all of the A sideline information, that is, the reserved resources of the E sideline information include part or all of the first resources. In other words, the E priority values include part or all of the A priority values. Optionally, the E sideline information may also include sideline information of other UEs (such as UE3) in addition to UE 1 and UE2. E is an integer greater than 1. Optionally, the E sideline information does not include the third sideline information, and the E priority values do not include the priority value corresponding to the third sideline information.
[0445] In case 1-5, the first priority value is greater than the second priority value, and UE1 may determine that the third resource is preempted. The first priority value is the minimum value or the maximum value among the E priority values.
[0446] Assume that the E side information includes side information 1 of UE1 and side information 5 of UE3, and the third side information is side information 3 of UE2. The reserved resources for side information 1 are recorded as resource 1, the reserved resources for side information 3 are recorded as resource 3, and the reserved resources for side information 5 are recorded as resource 5. The E priority values include the priority value corresponding to side information 1 and the priority value corresponding to side information 5. If A is 2, the A side information includes side information 1 and side information 2. The reserved resources for side information 2 are recorded as resource 2. If B is 2, the B side information includes side information 3 and side information 4. The reserved resources for side information 4 are recorded as resource 4.
[0447] Based on an example of the above assumptions, the priority value corresponding to side information 1 is 2, the priority value corresponding to side information 3 is 3, and the priority value corresponding to side information 5 is 5. The minimum value of the E priority values is greater than the priority value corresponding to side information 3. UE1 can determine that the third resource is preempted. Alternatively, the priority value corresponding to side information 1 is 4, the priority value corresponding to side information 3 is 3, and the priority value corresponding to side information 5 is 5. The minimum value or the maximum value of the E priority values is greater than the priority value corresponding to side information 3. UE1 can determine that the third resource is preempted.
[0448] For example, if C is 2, A is 2, and B is 2, the first resource overlaps with the second resource. The frequency domain resources of resource 1 and resource 5 in the first time slot overlap with the frequency domain resources of resource 3 (i.e., the first frequency domain resource), as shown in Figure 10 (a); or the frequency domain resources of resource 1 and resource 5 in the fifth time slot overlap with the first frequency domain resource, as shown in Figure 10 (b). In this case, the third resource is the first resource. The first frequency domain resource is represented by a thick black box in Figure 10.
[0449] Alternatively, if C is 2, A is 2, and B is 2, the first resource and the second resource do not overlap in the first time slot but overlap in the fifth time slot. The frequency domain resource of resource 5 in the first time slot overlaps with the first frequency domain resource, and the frequency domain resource of resource 1 in the fifth time slot overlaps with the first frequency domain resource, as shown in Figure 10(c); or the frequency domain resources of resource 1 and resource 5 in the fifth time slot both overlap with the first frequency domain resource, as shown in Figure 10(d). In this case, the third resource is the resource of the first resource in the fifth time slot.
[0450] Alternatively, if C is 2, A is 2, and B is 2, the first resource and the second resource overlap in the first time slot but do not overlap in the fifth time slot. The frequency domain resources of resource 1 and resource 5 in the first time slot both overlap with the first frequency domain resource, as shown in (e) of Figure 10. Alternatively, the frequency domain resource of resource 1 in the first time slot overlaps with the first frequency domain resource, and the frequency domain resource of resource 5 in the fifth time slot overlaps with the first frequency domain resource, as shown in (f) of Figure 10. In this case, the third resource is the first resource.
[0451] Alternatively, if C is 2, A is 2, and B is 1, the first resource and the second resource overlap in the first time slot, and the frequency domain resources of resource 1 and resource 5 in the first time slot both overlap with the first frequency domain resource, as shown in (g) in Figure 10.
[0452] Alternatively, if C is 2, A is 1, and B is 2, the first resource and the second resource overlap in the first time slot, and the frequency domain resources of resource 1 and resource 5 in the first time slot both overlap with the first frequency domain resource, as shown in (h) in Figure 10.
[0453] In the above situations 1-5, the priority value corresponding to the third sideline information is less than the priority value corresponding to all sideline information on the resources overlapping with the first frequency domain resources in C time slots, and UE1 can determine that the third resource is preempted. It can be understood that the priority value corresponding to all sideline information on the resources overlapping with the first frequency domain resources in C time slots does not include the priority value corresponding to the third sideline information. In other words, the priority value corresponding to the third sideline information is less than the priority value corresponding to all sideline information on the resources overlapping with the first frequency domain resources in C time slots except the third sideline information, and UE1 can determine that the third resource is preempted. The first frequency domain resource is a resource in the frequency domain that is reserved for the third sideline information.
[0454] Optionally, B is greater than 1, the B side information includes third side information and fourth side information, the first priority value may be the minimum or maximum value among the E priority values, and the second priority value is the minimum value between the priority value corresponding to the third side information and the priority value corresponding to the fourth side information. Optionally, the E priority values do not include the priority value corresponding to the third side information and the priority value corresponding to the fourth side information.
[0455] Furthermore, if the second priority value is less than the priority values corresponding to all sidelink information on resources overlapping with the first frequency domain resource, UE1 may determine that the third resource is preempted. Alternatively, if the priority value corresponding to the fourth sidelink information is less than the priority values corresponding to all sidelink information on all resources overlapping with the first frequency domain resource, UE1 may determine that the third resource is preempted.
[0456] The E priority values are priority values corresponding to all sidelink information on resources overlapping with the first frequency domain resource. Optionally, the E priority values do not include the priority value corresponding to the fourth sidelink information.
[0457] Case 1-6: The first priority value corresponds to the first sideline information among the A sideline information, the second priority value corresponds to the third sideline information among the B sideline information, and the reserved resources for the first sideline information and the reserved resources for the third sideline information are both the first time slot in the time domain. In case 1-6, the reserved resources for the first sideline information and the reserved resources for the third sideline information may not overlap in the frequency domain, as shown in (b) in Figure 7 (it should be noted that the reserved resources for the first sideline information in case 1-6 correspond to resource 2 in (b) in Figure 7, and the reserved resources for the third sideline information correspond to resource 4 in (b) in Figure 7); or they may overlap, as shown in (c) in Figure 7. Through case 1-6, UE1 can determine that the third resource is preempted through the priority value relationship on the first time slot. The implementation method is simple and can reduce the complexity of preemption checking and re-evaluation.
[0458] In another possible implementation, when the second condition is met, UE1 determines that the third resource is preempted and / or determines to re-evaluate the third resource.
[0459] For example, if the priority value is negatively correlated with the priority level, the second condition may include one or more of the following:
[0460] A is greater than 1, B is greater than 1, the first priority value is greater than the second priority value, the first priority value is the minimum or maximum value among the A priority values, and the second priority value is the minimum or maximum value among the B priority values.
[0461] Alternatively, A is greater than 1, B is 1, the first priority value is greater than the priority value corresponding to the sideline information carried by the second resource, and the first priority value is the minimum or maximum value among the A priority values.
[0462] Alternatively, A is 1, B is greater than 1, the priority value corresponding to the sideline information carried by the first resource is greater than the second priority value, and the second priority value is the minimum or maximum value among the B priority values.
[0463] Alternatively, the first priority value is greater than the priority value corresponding to the third side information among the B side information, and the first priority value is the minimum or maximum value among the D priority values, and the D side information and the third side information corresponding to the D priority values are both side information carried on the second time slot.
[0464] Alternatively, the first priority value is greater than the priority value corresponding to the third sideline information among the B sideline information, the first priority value is the minimum or maximum value among the E priority values, the reserved resources of the E sideline information corresponding to the E priority values overlap with the first frequency domain resources on the first subframe in the frequency domain, and the reserved resources of the third sideline information are the first frequency domain resources in the frequency domain.
[0465] Alternatively, the first priority value is greater than the second priority value, the first priority value corresponds to the first sideline information among the A sideline information, the second priority value corresponds to the third sideline information among the B sideline information, and the reserved resources of the first sideline information and the reserved resources of the third sideline information are both the first time slot in the time domain.
[0466] It should be pointed out that the relevant content of the second condition can be referred to the above content and will not be repeated here.
[0467] In one possible implementation, UE1 may perform a preemption check and / or re-evaluation on the frequency domain resources of the first resource in the second time slot of C time slots in the sixth time slot. Alternatively, UE2 may perform a preemption check and / or re-evaluation on the frequency domain resources of the first resource in the C time slots in the third time slot. The identifier of the sixth time slot satisfies (m-T3-1), the identifier of the third time slot satisfies (n-T3), m is the identifier of the first time slot, and n is the identifier of the second time slot. The T3 is a preset threshold, for example, it can be 3, 5, 9, or 17 time slots. For example, when the SCS of the NR SL is 15kHz, T3 is 3 time slots; when the SCS of the NR SL is 30kHz, T3 is 5 time slots. For another example, when the SCS of the NR SL is 60kHz, T3 is 9 time slots; when the SCS of the NR SL is 120kHz, T3 is 17 time slots.
[0468] In one possible implementation, the first priority value is greater than a first threshold, and / or the second priority value is less than the first threshold. It should be understood that the threshold corresponding to the first priority value and the threshold corresponding to the second priority value may be the same or different, without limitation. The first threshold may be predefined, configured by the network for UE1 and / or UE2, or preconfigured for UE1 and / or UE2, without limitation.
[0469] S605: The second communication device seizes the second resource according to the at least one SCI, or determines not to re-evaluate the second resource, or seizes the second resource and determines not to re-evaluate the second resource.
[0470] S605 may also be expressed as: UE2 preempts the second resource according to at least one SCI, or determines not to re-evaluate the second resource, or preempts the second resource and determines not to re-evaluate the second resource.
[0471] The at least one SCI includes a first SCI. Optionally, the at least one SCI may further include a third SCI.
[0472] Exemplarily, UE2 preempts the second resource based on at least one SCI; further, UE2 may use the second resource to transmit sidelink information. And / or, UE2 determines not to re-evaluate the second resource based on at least one SCI, meaning that the second resource does not overlap with reserved resources of other UEs; further, UE2 may use the second resource to transmit sidelink information.
[0473] Optionally, UE2's seizing of the second resource and / or determining not to re-evaluate the second resource may be replaced by UE2 determining to use the second resource; or by UE2 transmitting sidelink information on the second resource, etc., without limitation. For ease of understanding, the following description uses seizing the second resource as an example. It should be understood that "seizing the second resource" may be replaced by "determining not to re-evaluate the second resource"; or by "determining to use the second resource"; or by "transmitting sidelink information on the second resource"; or by any combination of the foregoing.
[0474] In one possible implementation, UE2 may preempt the second resource and / or determine not to re-evaluate the second resource based on the priority levels of the M sideline information and the priority value levels of the B sideline information, so as to ensure the transmission reliability of high-priority services. For example, UE2 may preempt the second resource and / or determine not to re-evaluate the second resource based on the M priority values corresponding to the M sideline information and the B priority values corresponding to the B sideline information. FIG6 takes the case where UE2 preempts the second resource and / or determines not to re-evaluate the second resource based on the B priority values and the M priority values as an example.
[0475] Optionally, if the priority value is negatively correlated with the priority level, and the fifth priority value among the M priority values is greater than the second priority value among the B priority values, UE2 preempts the second resource. Alternatively, if the priority value is positively correlated with the priority level, and the fifth priority value among the M priority values is less than the second priority value among the B priority values, UE2 preempts the second resource.
[0476] If M is 1, the fifth priority value may be the priority value corresponding to the sideline information carried by the fifth resource, i.e., the M priority values include only the fifth priority value; or, if M is greater than 1, the fifth priority value may be any one of the M priority values. If B is 1, the second priority value may be the priority value corresponding to the sideline information carried by the second resource, i.e., the B priority values include only the second priority value; or, if B is greater than 1, the second priority value may be any one of the B priority values.
[0477] There are multiple possible implementations of the fifth priority value and the second priority value, which will be introduced one by one below.
[0478] Case 2-1: Both M and B are greater than 1. The fifth priority value can be the minimum or maximum of the M priority values, and the second priority value can be the minimum or maximum of the B priority values. In other words, the minimum of the M priority values is greater than the minimum of the B priority values; or the minimum of the M priority values is greater than the maximum of the B priority values; or the maximum of the M priority values is greater than the minimum of the B priority values; or the maximum of the M priority values is greater than the maximum of the B priority values.
[0479] Taking C as 2, M as 2, and B as 2 as an example, the M priority values include 4 and 5, the B priority values include 1 and 3, the minimum value of the M priority values is greater than the minimum or maximum value of the B priority values, and UE2 preempts the second resource, wherein the fifth priority value is 4, and the second priority value is 1 or 3. Alternatively, the M priority values include 1 and 5, the B priority values include 2 and 3, the maximum value of the M priority values is greater than the minimum or maximum value of the B priority values, and UE2 preempts the second resource, wherein the fifth priority value is 5, and the second priority value is 2 or 3. Alternatively, the M priority values include 1 and 3, the B priority values include 2 and 4, the maximum value of the M priority values is greater than the minimum value of the B priority values, and UE2 preempts the second resource, wherein the fifth priority value is 3, and the second priority value is 2. That is, if M is 2, B is 2, the fifth priority value is greater than the second priority value, UE2 preempts the second resource, the fifth priority value is the maximum or minimum value among the M priority values, and the second priority value is the maximum or minimum value among the B priority values.
[0480] Case 2-2: M is greater than 1, B is 1, and the fifth priority value can be the minimum or maximum of the M priority values. The second priority value is the priority value corresponding to the sidelink information carried by the second resource. In other words, the minimum of the M priority values is greater than the priority value corresponding to the sidelink information carried by the second resource; or the maximum of the M priority values is greater than the priority value corresponding to the sidelink information carried by the second resource.
[0481] Taking C as 2, M as 2, and B as 1 as an example, the M priority values include 2 and 5, the priority value corresponding to the sidelink information carried by the second resource is 4, the maximum value of the M priority values is greater than the priority value corresponding to the sidelink information carried by the second resource, UE2 preempts the second resource, wherein the fifth priority value is 5. Alternatively, the M priority values include 4 and 5, the B priority values include 2, the maximum or minimum value of the M priority values is greater than the priority value corresponding to the sidelink information carried by the second resource, UE2 preempts the second resource, wherein the fifth priority value is 4 or 5, and the second priority value is 2. That is, if M is 2 and B is 1, any priority value of the M priority values is greater than the priority value corresponding to the sidelink information carried by the second resource, UE2 preempts the second resource.
[0482] Case 2-3: M is 1, B is greater than 1, the fifth priority value is the priority value corresponding to the sidelink information carried by the fifth resource, and the second priority value can be the minimum or maximum value among the B priority values. In other words, the priority value corresponding to the sidelink information carried by the fifth resource is greater than the minimum value among the B priority values; alternatively, the priority value corresponding to the sidelink information carried by the fifth resource is greater than the maximum value among the B priority values.
[0483] Taking C as 2, M as 1, and B as 2 as an example, the priority value corresponding to the side information carried by the fifth resource is 3, the B priority values include 2 and 4, the priority value corresponding to the side information carried by the fifth resource is greater than the minimum value of the B priority values, and UE2 preempts the second resource. In this case, the second priority value is 2. Alternatively, the priority value corresponding to the side information carried by the fifth resource is 6, the B priority values include 2 and 4, the priority value corresponding to the side information carried by the fifth resource is greater than the minimum value or the maximum value of the B priority values, and UE2 preempts the second resource. In this case, the second priority value is 2. That is, if M is 1 and B is 2, the priority value corresponding to the side information carried by the fifth resource is greater than any of the B priority values, and UE2 preempts the second resource.
[0484] Case 2-4: The fifth priority value may be the minimum or maximum value among the F priority values, and the second priority value corresponds to the third sideline information among the B sideline information. That is, the minimum value among the F priority values is greater than the priority value corresponding to the third sideline information; or the maximum value among the F priority values is greater than the priority value corresponding to the third sideline information.
[0485] Among them, the F priority values correspond to F side information, and one priority value thereof corresponds to one side information among the F side information. For details, please refer to the description of B side information corresponding to B priority values, which will not be repeated here. The F side information is all or part of the side information carried on the second time slot among the C time slots. In case 2-4, the reserved resources for the third side information are the second time slot in the time domain, or the reserved resources for the third side information are in the second time slot. Among them, the F side information include part or all of the M side information, that is, the reserved resources for the F side information include part or all of the fifth resources. In other words, the F priority values include part or all of the M priority values. Optionally, the F side information can also include side information of other UEs besides UE1, UE2 and UE3. F is a positive integer greater than 1.
[0486] In case 2-4, the fifth priority value is greater than the second priority value, and UE2 can preempt the second resource. The fifth priority value is the maximum value or the minimum value among the F priority values.
[0487] It should be pointed out that the specific implementation process of situations 2-4 can refer to the content of situations 1-4 mentioned above and will not be repeated here.
[0488] In the above situations 2-4, the priority value corresponding to the third sidelink information is less than the priority values corresponding to all sidelink information other than the third sidelink information in the time slot where the reserved resource for the third sidelink information is located, and UE2 can preempt the second resource. The F priority values are the priority values corresponding to all sidelink information other than the third sidelink information in the time slot where the reserved resource for the third sidelink information is located.
[0489] Optionally, B is greater than 1, and the B sidelink information includes the third sidelink information and the fourth sidelink information. The fifth priority value can be the minimum or maximum value among the F priority values, and the second priority value is the minimum value among the priority values corresponding to the third sidelink information and the priority values corresponding to the fourth sidelink information. Furthermore, the second priority value is less than the priority values of all sidelink information other than the third sidelink information and the fourth sidelink information in the time slot where the reserved resources for the third sidelink information and the fourth sidelink information are located, and UE2 can preempt the second resource. Among them, the F priority values are the priority values corresponding to all sidelink information other than the third sidelink information and the fourth sidelink information in the time slot where the reserved resources for the third sidelink information and the fourth sidelink information are located. Alternatively, the priority value corresponding to the fourth sidelink information is less than the priority value corresponding to all sidelink information other than the fourth sidelink information in the time slot where the reserved resources for the fourth sidelink information are located, and UE2 can preempt the second resource. Among them, the F priority values are the priority values corresponding to all sidelink information other than the fourth sidelink information in the time slot where the reserved resources for the fourth sidelink information are located.
[0490] Case 2-5: The fifth priority value is the minimum or maximum of the G priority values, and the second priority value corresponds to the third sideline information among the B sideline information. That is, the minimum of the G priority values is greater than the priority value corresponding to the third sideline information; or the maximum of the G priority values is greater than the priority value corresponding to the third sideline information.
[0491] Among them, the G priority values correspond to G sideline information, and one priority value corresponds to one sideline information among the G sideline information. For details, please refer to the description of B sideline information corresponding to B priority values, which will not be repeated here. The G sideline information is all or part of the sideline information carried in the second frequency domain resources on the first subframe. In case 2-5, the reserved resources for the third sideline information are the second frequency domain resources in the frequency domain, or in other words, the reserved resources for the third sideline information are in the second frequency domain resources. Among them, the G sideline information include part or all of the M sideline information, that is, the reserved resources for the G sideline information include part or all of the fifth resources. In other words, the G priority values include part or all of the M priority values. Optionally, the G sideline information can also include sideline information of other UEs besides UE1, UE2 and UE3. G is an integer greater than 1. It can be understood that the priority values corresponding to all sideline information on resources overlapping with the second frequency domain resources in C time slots do not include the priority value corresponding to the third sideline information. That is, the priority value corresponding to the third sidelink information is smaller than the priority values corresponding to all sidelink information except the third sidelink information on the resources overlapping with the second frequency domain resources in C time slots, and UE2 can preempt the second resource.
[0492] In case 2-5, the fifth priority value is greater than the second priority value, and UE2 can preempt the second resource. The fifth priority value is the maximum value or the minimum value among the G priority values.
[0493] It should be pointed out that the specific implementation process of situations 2-5 can refer to the content of the aforementioned situations 1-5 and will not be repeated here.
[0494] In the above situation 2-5, the priority value corresponding to the third sidelink information is lower than the priority value corresponding to all sidelink information on the resources overlapping with the second frequency domain resource, and UE2 can preempt the second resource. The second frequency domain resource is the frequency domain resource reserved for the third sidelink information.
[0495] Optionally, B is greater than 1, the B side information includes third side information and fourth side information, the fifth priority value may be the minimum or maximum value among the G priority values, and the second priority value is the minimum value between the priority value corresponding to the third side information and the priority value corresponding to the fourth side information. Optionally, the G priority values do not include the priority value corresponding to the third side information and the priority value corresponding to the fourth side information.
[0496] Furthermore, if the second priority value is less than the priority value corresponding to all sidelink information on resources overlapping with the second frequency domain resource, UE2 may preempt the second resource. Alternatively, if the priority value corresponding to the fourth sidelink information is less than the priority value corresponding to all sidelink information on resources overlapping with the second frequency domain resource, UE2 may preempt the second resource. The G priority values are priority values corresponding to all sidelink information on resources overlapping with the second frequency domain resource. Optionally, the G priority values do not include the priority value corresponding to the fourth sidelink information.
[0497] Case 2-6: The fifth priority value corresponds to the fifth sideline information among the M sideline information, the second priority value corresponds to the third sideline information among the B sideline information, and the reserved resources for the fifth sideline information and the reserved resources for the third sideline information are both the first time slot in the time domain. In case 2-6, the reserved resources for the fifth sideline information and the reserved resources for the third sideline information may not overlap in the frequency domain, as shown in (b) of Figure 7 (it should be pointed out that the reserved resources for the fifth sideline information in case 2-6 correspond to resource 2 in Figure 7, and the reserved resources for the third sideline information correspond to resource 4 in Figure 7); or they may overlap, as shown in (c) of Figure 7. Through case 2-6, UE2 can preempt the second resource through the priority value relationship on the first time slot. The implementation method is simple and can reduce the complexity of preemption checking and re-evaluation.
[0498] In another possible implementation, when the third condition is met, UE2 preempts the second resource and / or determines not to re-evaluate the second resource.
[0499] For example, if the priority value is negatively correlated with the priority level, the third condition may include one or more of the following:
[0500] M is greater than 1, B is greater than 1, the fifth priority value is greater than the second priority value, the fifth priority value is the minimum or maximum value among the M priority values, and the second priority value is the minimum or maximum value among the B priority values.
[0501] Alternatively, M is greater than 1, B is 1, the fifth priority value is greater than the priority value corresponding to the sidelink information carried by the second resource, and the fifth priority value is the minimum value or the maximum value among the M priority values.
[0502] Alternatively, M is 1, B is greater than 1, the priority value corresponding to the sideline information carried by the fifth resource is greater than the second priority value, and the second priority value is the minimum value or the maximum value among the B priority values.
[0503] Alternatively, the fifth priority value is greater than the priority value corresponding to the third side information among the B side information, and the fifth priority value is the minimum or maximum value among the F priority values, and the F side information and the third side information corresponding to the F priority values are both side information carried on the second time slot.
[0504] Alternatively, the fifth priority value is greater than the priority value corresponding to the third side information among the B side information, and the fifth priority value is the minimum or maximum value among the G priority values. The G side information corresponding to the G priority values overlap with the second frequency domain resources in the frequency domain, and the third side information is the second frequency domain resource in the frequency domain.
[0505] Alternatively, the fifth priority value is greater than the second priority value, the fifth priority value corresponds to the fifth sideline information among the M sideline information, the second priority value corresponds to the third sideline information among the B sideline information, and the reserved resources of the fifth sideline information and the reserved resources of the third sideline information are both the first time slot in the time domain.
[0506] It should be pointed out that the relevant contents of the third condition can be referred to the above content and will not be repeated here.
[0507] In one possible implementation, the fifth priority value is greater than the first threshold, and / or the second priority value is less than the first threshold. It should be understood that the threshold corresponding to the fifth priority value and the threshold corresponding to the second priority value may be the same or different, without limitation. The first threshold may be predefined, network-configured, or user-set, and is not pre-restricted.
[0508] It should be noted that the execution order of the various steps in FIG6 is provided as an example, and the embodiments of the present application are not limited thereto. For example, S604 may be executed before S605, or after S605, or simultaneously with S605. For another example, S601 may be executed before S602, or after S602, or simultaneously with S602.
[0509] In the embodiment shown in Figure 6 above, UE1 performs preemption check and re-evaluation based on priority values A and B, realizing preemption check and re-evaluation in resource coexistence, avoiding resource collisions, and giving priority to transmitting services with higher priority levels, thereby ensuring the transmission reliability of high-priority services.
[0510] Figure 11 shows a flow chart of another communication method provided by an embodiment of the present application. The embodiment shown in Figure 11 can be applied to a COT sharing scenario.
[0511] In the embodiment shown in Figure 11, the COT of UE1 is recorded as the first COT, and the COT of UE2 is recorded as the second COT. The first resource in the first COT overlaps with the second resource in the second COT. For a description of COT, please refer to the term explanation section and will not be repeated here.
[0512] Optionally, the first COT is the same as the second COT. For example, after UE2 shares the first resource in the second COT with UE1, UE2 intends to take back the first resource.
[0513] The first resource belongs to the first COT and is used to transmit the sidelink information of UE1. The first resource includes one or more time slots in the time domain, one or more subchannels and / or one or more RB sets in the frequency domain. The first COT includes one or more time slots in the time domain, one or more subchannels and / or one or more RB sets in the frequency domain. Among them, the first resource belongs to the first COT, which can be understood as the first COT including the first resource; or it can be understood as the first resource being located in the first COT, without limitation. For the sake of ease of description, unless otherwise specified, this embodiment is introduced by taking the example of the first resource including one time slot in the time domain and one or more subchannels in the frequency domain.
[0514] The second resource belongs to the second COT and is used to transmit the sidelink information of UE2. The second resource includes one or more time slots in the time domain, one or more subchannels and / or one or more RB sets in the frequency domain. The second COT includes one or more time slots in the time domain, one or more subchannels and / or one or more RB sets in the frequency domain. Among them, the second resource belongs to the second COT, which can be understood as the second COT including the second resource; or it can be understood as the second resource being located in the second COT, without limitation. For the sake of ease of description, unless otherwise specified, this embodiment is introduced by taking the example of the second resource including one time slot in the time domain and one or more subchannels in the frequency domain.
[0515] In this embodiment, the first resource and the second resource overlap, which means that the first resource and the second resource overlap in both the time domain and the frequency domain; or that the first resource and the second resource overlap in the time domain and fully or partially overlap in the frequency domain; or that the first resource and the second resource overlap in the time domain, and the RB set where the first resource is located and the RB set where the second resource is located overlap in the frequency domain, without restriction.
[0516] As shown in FIG11 , the method may include the following contents.
[0517] S1101: The second communication device sends a second SCI; accordingly, the first communication device receives the second SCI of the second communication device.
[0518] S1101 can also be expressed as: UE2 sends the second SCI, and UE1 receives the second SCI.
[0519] The second SCI may be used to indicate (or determine) a second COT. Second resources in the second COT overlap with the first resources. The first resources belong to the first COT of UE1.
[0520] In the embodiment of the present application, the second COT may also be understood as a reserved resource for UE2 to transmit sidelink information.
[0521] The second SCI may be a first-order SCI or a second-order SCI. The COT indication field in the second SCI indicates the time-frequency information of the second COT. The embodiment of the present application does not limit the name of the COT indication field; for example, it may also be a COT structure field, a COT information field, or a COT sharing field. The COT indication field may include a field indicating the second COT time domain resource and / or a field indicating the second COT frequency domain resource.
[0522] In one example, the B side information is side information carried by the second COT, including at least any one of the following: the B side information is side information carried by the second resource; or, the B side information is all side information carried by the second COT; or, the B side information is all side information in the second resource and after the second resource in the second COT; or, the B side information is all side information transmitted by UE2 in the second COT; or, the B side information is all side information transmitted by UE2 in the second COT after the second resource and the second resource, without limitation.
[0523] Optionally, UE2 may determine that multiple side messages are all sent by the same UE according to any of the following methods. For example, it is determined that B side messages are all sent by UE2. The side control information of the multiple side messages includes the same ID information. For example, the ID information may be at least one of source ID information, destination ID information, or additional ID information. Alternatively, the side control information of the multiple side messages includes different ID information, but UE1 receives a preemption confirmation message. Alternatively, UE1 receives a first message indicating that B side messages are all sent by UE2.
[0524] In one example, the second SCI may also be used to indicate (or determine) a priority value (i.e., an L1 priority value) corresponding to the sidelink information carried by the second resource and / or a priority value (i.e., a CAPC priority value) of the access channel, such as a third priority value. After accessing the channel, UE2 transmits the sidelink information on the second resource.
[0525] In another example, UE1 may receive a fourth SCI. The fourth SCI may be used to indicate the third priority value. UE2 may send the fourth SCI, i.e., UE2 sends the fourth SCI. Alternatively, the fourth SCI may be sent by a UE other than UE1 and UE2, such as when UE2 shares the second resource with UE3, and UE3 sends the fourth SCI.
[0526] S1102: The first communication device sends a first SCI; correspondingly, the second communication device receives the first SCI of the first communication device.
[0527] S1102 can also be expressed as: UE1 sends a first SCI; correspondingly, UE2 receives the first SCI of UE1.
[0528] S1102 is an optional step. UE1 may only execute S1101 (without executing S1102), or UE1 may execute both S1101 and S1102, without limitation.
[0529] The first SCI may be used to indicate (or determine) a first COT. The first resource and the second resource in the first COT overlap. The second resource belongs to the second COT of UE2. Optionally, UE2 may also determine the first COT and / or the first resource in other ways, which are not limited in this embodiment of the present application.
[0530] In the embodiment of the present application, the first COT may also be understood as a reserved resource for UE1 to transmit sidelink information.
[0531] The first SCI may be a first-order SCI or a second-order SCI. The COT indication field in the first SCI indicates the time-frequency information of the first COT. The embodiment of the present application does not limit the name of the COT indication field; for example, it may also be a COT structure field, a COT information field, or a COT shared field. The COT indication field may include a field indicating the first COT time domain resource and / or a field indicating the first COT frequency domain resource.
[0532] In one example, the A side information is side information carried by the first COT, including at least any one of the following: the A side information is side information carried by the first resource; or, the A side information is all side information carried by the first COT; or, the A side information is all side information in the first resource and after the first resource in the first COT; or, the A side information is all side information transmitted by UE1 in the first COT; or, the A side information is all side information transmitted by UE1 in the first resource and after the first resource in the first COT.
[0533] Optionally, UE1 may determine that multiple sideline messages are all sent by the same UE according to any of the following methods. For example, it is determined that A sideline messages are all sent by UE1. The sideline control information of the multiple sideline messages includes the same ID information. For example, the ID information may be at least one of source ID information, destination ID information, or additional ID information. Alternatively, the sideline control information of the multiple sideline messages includes different ID information, but UE2 receives preemption confirmation information. Alternatively, UE2 receives first information indicating that A sideline messages are all sent by UE1.
[0534] In one example, the first SCI may also be used to indicate (or determine) A priority values corresponding to A side information. The A side information is side information carried by the first COT. The A priority values corresponding to the A side information may be indicated by one first SCI or by multiple first SCIs.
[0535] The A side information messages correspond one-to-one to the A priority values. That is, one side information message among the A side information messages corresponds to one priority value among the A priority values, and one priority value among the A priority values corresponds to one side information message among the A side information messages. A is a positive integer. If A is greater than 1, the A priority values may be different, the same, or partially the same.
[0536] It should be noted that, in view of the COT sharing mechanism, the transmission of part or all of the A sidetrack information may have nothing to do with UE1, that is, the sending and receiving of part or all of the sidetrack information is not done by UE1.
[0537] In another example, UE2 may receive a fifth SCI. The fifth SCI may be used to indicate A priority values. The number of the fifth SCIs may be one or more. For example, if the number of the fifth SCIs is one, the fifth SCI may be sent by UE1, i.e., UE1 sends the fifth SCI. For another example, if the number of the fifth SCIs is multiple, the sending of the multiple SCIs may be performed by multiple UEs, which may include UE1 and / or other UEs that share resources in the first COT, without limitation.
[0538] S1103: When the first condition is met, the first communication device determines that the fourth resource is preempted and / or determines to re-evaluate the fourth resource.
[0539] S1103 may also be expressed as: when the first condition is met, UE1 determines that the fourth resource is preempted and / or determines to re-evaluate the fourth resource.
[0540] For example, when the first condition is met, UE1 determines that the fourth resource is preempted, and UE1 does not use the fourth resource. And / or, when the first condition is met, UE1 determines to re-evaluate the fourth resource, and UE1 may evaluate the fourth resource to determine whether the fourth resource overlaps with reserved resources of other UEs.
[0541] Optionally, UE1's determination that the fourth resource is preempted and / or determination to re-evaluate the fourth resource may be replaced by UE1's determination not to use the fourth resource; or by UE1's determination not to transmit sidelink information on the fourth resource, etc., without limitation. For ease of understanding, the following description uses the example of determining that the fourth resource is preempted. It should be understood that "determining that the fourth resource is preempted" may be replaced by "determining to re-evaluate the fourth resource"; or by "determining not to use the fourth resource"; or by "determining not to transmit sidelink information on the fourth resource"; or by multiple combinations of the foregoing.
[0542] The fourth resource may be the first resource, as shown in FIG12(a); or the first COT, as shown in FIG12(b); or may include the first resource and the remaining resources of the first COT after the first resource, as shown in FIG12(c). In FIG12, the first COT includes five time slots in the time domain, and the first resource is located in the fourth time slot of the first COT.
[0543] S1104: When the first condition is met, the second communication apparatus preempts the sixth resource and / or determines not to re-evaluate the sixth resource.
[0544] S1104 may also be expressed as: when the first condition is met, the second communication device preempts the sixth resource and / or determines not to re-evaluate the sixth resource.
[0545] Exemplarily, when the first condition is met, UE2 preempts the sixth resource; further, UE2 may use the sixth resource to transmit sidelink information. And / or, when the first condition is met, UE2 determines not to re-evaluate the sixth resource, meaning that the sixth resource does not overlap with reserved resources of other UEs; further, UE2 may use the sixth resource to transmit sidelink information.
[0546] Optionally, UE2's seizing the sixth resource and / or determining not to re-evaluate the sixth resource may be replaced by UE2 determining to use the sixth resource; or by UE2 transmitting sidelink information on the sixth resource, etc., without limitation. For ease of understanding, the following description uses seizing the sixth resource as an example. It should be understood that "seizing the sixth resource" may be replaced by "determining not to re-evaluate the sixth resource"; or by "determining to use the sixth resource"; or by "transmitting sidelink information on the sixth resource"; or by any combination of the foregoing.
[0547] The sixth resource may be the second resource; or may be the second COT; or may include the second resource and the remaining resources of the second COT after the second resource. For details, please refer to the content shown in FIG. 12 .
[0548] Exemplarily, the first condition may include one or more of the following: the third priority value is less than the fourth priority value; the second COT is the initial COT of UE2; the receiving device of the side information carried by the first resource is the same as the receiving device of the side information carried by the second resource; or, the first resource is the fourth time slot in the first COT in the time domain, and the remaining duration of the first COT after the fourth time slot is less than or equal to the second threshold.
[0549] In one example, the fourth priority value may be any one of A priority values. That is, if the priority level of the sidelink information carried by the second resource is higher than the priority level of one of the A sidelink information, UE1 may determine that the fourth resource is preempted, and / or UE2 may preempt the sixth resource.
[0550] In another example, the fourth priority value is the priority value corresponding to the sidelink information carried by the first resource. That is, the priority level of the sidelink information carried by the second resource is higher than the priority level of the sidelink information carried by the first resource. UE1 can determine that the fourth resource is preempted, and / or UE2 can preempt the sixth resource.
[0551] As another example, A is greater than 1, and the fourth priority value can also be the minimum or maximum value among the A priority values. That is, the priority level of the side information carried by the second resource is higher than the highest priority level or the lowest priority level among the A side information. UE1 can determine that the fourth resource is preempted, and / or UE2 can preempt the sixth resource. For example, A is 4, and the A priority values include 3, 4, 5, and 6. The third priority value is 2, and the third priority value is less than the maximum or minimum value among the A priority values. UE1 can determine that the fourth resource is preempted, and / or UE2 can preempt the sixth resource. For another example, A is 4, and the A priority values include 3, 4, 5, and 6. The third priority value is 5, and the third priority value is less than the maximum value among the A priority values. UE1 can determine that the fourth resource is preempted, and / or UE2 can preempt the sixth resource.
[0552] In another example, if the third priority value is less than the fourth priority value, UE1 may determine that the fourth resource is preempted, and / or UE2 may preempt the sixth resource. If both B and A are greater than 1, the third priority value is the minimum or maximum of the B priority values, and the fourth priority value is the minimum or maximum of the A priority values. Alternatively, if B is greater than 1 and A is 1, the third priority value is the minimum or maximum of the B priority values, and the fourth priority value is the priority value corresponding to the sidelink information carried by the first resource. Alternatively, if B is 1 and A is greater than 1, the third priority value is the priority value corresponding to the sidelink information carried by the second resource, and the fourth priority value is the minimum or maximum of the A priority values.
[0553] In another example, the second COT is UE2's initial COT. Optionally, the first COT and the second COT are the same. That is, after UE2 shares the first resource in the second COT with UE1, it intends to reclaim the first resource. If the second COT is UE2's initial COT, UE1 can determine that the fourth resource has been preempted and / or that UE2 can preempt the sixth resource. Alternatively, if the second COT is UE2's initial COT and the third priority value is less than the fourth priority value, UE1 can determine that the fourth resource has been preempted and / or that UE2 can preempt the sixth resource. In other words, when the preempting UE is the UE in the initial COT, the preempting UE can preempt the resource. UE2 can update the COT sharing information to indicate which UEs use which resources in the COT. For example, if UE1 was originally instructed to share resource 1 in the COT, the updated COT sharing information indicates that UE2 should use resource 2, which overlaps with resource 1. UE1 can determine whether it has been preempted based on the updated COT sharing information. For example, this COT sharing information is carried in the second SCI.
[0554] In another example, the receiving device for the side information carried by the first resource is the same as the receiving device for the side information carried by the second resource. That is, the overlapping first resource and the second resource are both used to send side information to the same receiving device. UE1 can determine that the fourth resource is preempted, and / or UE2 can preempt the sixth resource. Alternatively, the overlapping first resource and the second resource are both used to send side information to the same receiving device, and the third priority value is less than the fourth priority value. UE1 can determine that the fourth resource is preempted, and / or UE2 can preempt the sixth resource. This ensures the reliability of high-priority services.
[0555] Optionally, the UE of the initial COT indicates preemption confirmation information. The preemption confirmation information indicates that the first resource can be preempted, or indicates that the second resource can be preempted. For example, if the first resource in the first COT is preempted, the UE1 of the initial first COT sends the preemption confirmation information.
[0556] Optionally, a UE receiving the sidelink information carried by the first resource indicates preemption confirmation information, or a UE receiving the sidelink information carried by the second resource indicates preemption confirmation information. The preemption confirmation information indicates that the first resource can be preempted, or indicates that the second resource can be preempted. For example, if the first resource in the first COT is preempted, UE1 that initially controls the first COT sends preemption confirmation information.
[0557] In another example, the remaining duration of the first COT after the fourth time slot is less than or equal to the second threshold. That is, if the remaining resources of the first COT after the first resource are less than or equal to the second threshold in the time domain, UE1 can determine that the fourth resource is preempted and / or UE2 can preempt the sixth resource. Alternatively, if the remaining resources of the first COT after the first resource are less than or equal to the second threshold in the time domain, and the third priority value is less than the fourth priority value, UE1 can determine that the fourth resource is preempted and / or UE2 can preempt the sixth resource. This provides more resources for high-priority services to ensure the transmission reliability of these services. The remaining duration can be the number of time slots remaining in the COT, or the absolute remaining transmission time. The second threshold time slot number, or the absolute time. For example, the second threshold is any value from {1, 2, 3, 4, 5} time slots. For another example, the second threshold is any value from {1, 2, 3, 4, 5} milliseconds (ms).
[0558] For the remaining situations of the first condition, please refer to the above content and will not be listed one by one.
[0559] In one possible implementation, the third priority value may be less than the first threshold; and / or the fourth priority value may be greater than the first threshold. It should be understood that the threshold corresponding to the third priority value and the threshold corresponding to the fourth priority value may be the same, such as both being the first threshold, or may be different, without limitation. The first threshold may be the L1 priority threshold or the CAPC threshold.
[0560] It should be noted that the first threshold value may be predefined, or configured by the network for UE 1 and / or UE2, or preconfigured for UE 1 and / or UE2, without limitation. The second threshold value may be predefined, or configured by the network for UE 1 and / or UE2, or preconfigured for UE 1 and / or UE2, without limitation.
[0561] It should be noted that the execution order of each step in Figure 11 is an example, and the embodiments of the present application are not limited thereto. For example, S1103 can be executed before S1104, or after S1104, or simultaneously with S1104. For another example, S1101 can be executed before S1102, or after S1102, or simultaneously with S1102.
[0562] In the embodiment shown in Figure 11 above, UE1 performs preemption checks and reassessments based on the second condition, implementing preemption checks and reassessments in unlicensed spectrum. Furthermore, the second condition can be implemented in a variety of flexible ways. Furthermore, UE1 performs preemption checks based on the third and fourth priority values, thereby ensuring the transmission reliability of high-priority services.
[0563] FIG17 shows a flow chart of another communication method provided in an embodiment of the present application.
[0564] Exemplarily, the embodiment shown in FIG17 may be applied to a scenario of continuous transmission sharing.
[0565] In the embodiment shown in FIG17 , the first resource is a resource used for sideline transmission of UE1, and the second resource is a resource used for sideline transmission of UE2.
[0566] In the embodiment shown in Figure 17, the continuous transmission of UE1 is recorded as the first continuous transmission, and the continuous transmission of UE2 is recorded as the second continuous transmission. The first resource may belong to the first continuous transmission of UE1. The second resource may belong to the second continuous transmission of UE1. In other words, resource overlap includes any one of the following situations: the first resource overlaps with the second resource; or the first resource overlaps with the second resource in the second continuous transmission; or the first resource in the first continuous transmission overlaps with the second resource in the second continuous transmission. For the relevant description of continuous transmission, please refer to the term explanation section and will not be repeated here.
[0567] Optionally, the first continuous transmission is the same as the second continuous transmission. For example, after UE2 shares the first resource in the second continuous transmission with UE1, UE2 intends to take back the first resource.
[0568] Optionally, the first resource may also belong to the first COT of UE1. For the description of COT, please refer to the above content and will not be repeated here. In one implementation, the first continuous transmission may be understood as the first COT, that is, the first continuous transmission is the same as the first COT. In another implementation, the first continuous transmission is different from the first COT. For example, the first COT belongs to the first continuous transmission (that is, the first continuous transmission includes the first COT). For another example, the first continuous transmission belongs to the first COT (that is, the first COT includes the first continuous transmission). For another example, the first COT partially overlaps with the first continuous transmission, and the overlapping portion includes the first resource.
[0569] Optionally, the second resource may also belong to the second COT of UE2. For the description of COT, please refer to the above content and will not be repeated here. In one implementation, the second continuous transmission may be understood as the second COT, that is, the second continuous transmission is the same as the second COT. In another implementation, the second continuous transmission is different from the second COT. For example, the second COT belongs to the second continuous transmission (that is, the second continuous transmission includes the second COT). For another example, the second continuous transmission belongs to the second COT (that is, the second COT includes the second continuous transmission). For another example, the second COT partially overlaps with the second continuous transmission, and the overlapping part includes the second resource.
[0570] It should be understood that when the first continuous transmission is the first COT and the second continuous transmission is the second COT, the method provided in the embodiment of the present application can refer to the content of Figure 11 and will not be repeated here.
[0571] In the scheme shown in FIG17 , the first continuous transmission and the second continuous transmission are used as examples. The first continuous transmission can be replaced by the first COT, and the second continuous transmission can be replaced by the second COT. The first continuous transmission can also be referred to as the first multi-slot continuous transmission or the first transmission train, without limitation. The second continuous transmission can also be referred to as the second multi-slot continuous transmission or the second transmission train, without limitation.
[0572] The first resource belongs to the first continuous transmission and is used to transmit the side information of UE1. The first resource includes one or more time slots in the time domain and may include one or more of the following in the frequency domain: one or more sub-channels, one or more RB sets, or one or more interlaces. The first continuous transmission includes one or more time slots in the time domain and may include one or more of the following in the frequency domain: one or more sub-channels, one or more RB sets, or one or more interlaces. Among them, the first resource belongs to the first continuous transmission, which can be understood as the first continuous transmission including the first resource; or it can be understood as the first resource being located in the first continuous transmission, without limitation. Unless otherwise specified, the following description will take the example of the first continuous transmission including multiple time slots in the time domain. Multiple time slots can, for example, be multiple continuous time slots. Among them, each time slot in the multiple time slots can carry a side information of UE1, and the side information carried by each time slot corresponds to a priority value.
[0573] The second resource belongs to the second continuous transmission and is used to transmit the side information of UE2. The second resource includes one or more time slots in the time domain and may include one or more of the following in the frequency domain: one or more sub-channels, one or more RB sets, or one or more interlaces. The second continuous transmission includes one or more time slots in the time domain and may include one or more of the following in the frequency domain: one or more sub-channels, one or more RB sets, or one or more interlaces. Among them, the second resource belongs to the second continuous transmission, which can be understood as the second continuous transmission including the second resource; or it can be understood as the second resource being located in the second continuous transmission, without limitation. Unless otherwise specified, the following description will take the example of the second continuous transmission including multiple time slots in the time domain. Multiple time slots can, for example, be multiple continuous time slots. Among them, each time slot in the multiple time slots can carry a side information of UE2, and each time slot carrying a side information corresponds to a priority value.
[0574] In this embodiment, the first resource and the second resource overlap, which means that the first resource and the second resource overlap in both the time domain and the frequency domain; or that the first resource and the second resource overlap in the time domain and fully or partially overlap in the frequency domain; or that the first resource and the second resource overlap in the time domain, and the RB set where the first resource is located and the RB set where the second resource is located overlap in the frequency domain, without restriction.
[0575] As shown in FIG. 17 , the method may include the following contents.
[0576] S1701: The second communication device sends a second SCI; accordingly, the first communication device receives the second SCI from the second communication device.
[0577] S1701 can also be expressed as: UE2 sends the second SCI, and UE1 receives the second SCI.
[0578] The second SCI may be used to indicate (or determine) a second resource. The second resource overlaps with the first resource. The first resource belongs to a first continuous transmission of UE1. Optionally, the second resource belongs to a second continuous transmission of UE2. The second continuous transmission may be indicated by the second SCI. Alternatively, the second continuous transmission may be indicated by other indication information, without limitation.
[0579] In the embodiment of the present application, the second continuous transmission (and / or the second resource) may also be understood as a reserved resource for UE2 to transmit sidelink information.
[0580] The second SCI can be a first-order SCI or a second-order SCI. As an example, the resource indication field in the first SCI indicates the time-frequency information of the first resource. The embodiment of the present application does not limit the name of the resource indication field. For example, it can also be a resource structure field, a resource information field, or a resource sharing field. The resource indication field may include a field indicating the time domain resources of the first resource and / or a field indicating the frequency domain resources of the first resource. As another example, the continuous transmission indication field in the second SCI indicates the time domain information of the second continuous transmission and / or the frequency domain information of the second continuous transmission. The embodiment of the present application does not limit the name of the continuous transmission indication field. For example, it can also be a continuous transmission structure field, a continuous transmission information field, or a continuous transmission sharing field. The continuous transmission indication field may include a field indicating the time domain resources of the second continuous transmission and / or a field indicating the frequency domain resources of the second continuous transmission.
[0581] S1702: The first communication device sends a first SCI; correspondingly, the second communication device receives the first SCI from the first communication device.
[0582] S1702 can also be expressed as: UE1 sends a first SCI; correspondingly, UE2 receives the first SCI from UE1.
[0583] S1702 is an optional step, indicated by a dotted line in FIG17 . UE1 may execute only S1701 (without S1702), or may execute both S1701 and S1702 without limitation. For example, UE1 may not execute S1702 when determining a re-evaluated resource, but may execute S1702 when determining a preempted resource.
[0584] The first SCI may be used to indicate (or determine) a first resource. The first resource overlaps with the second resource. The second resource belongs to the second continuous transmission of UE2. Optionally, the first resource belongs to the first continuous transmission of UE1. The first continuous transmission may be indicated by the first SCI, or the first resource may be indicated by other indication information, without limitation. Optionally, UE2 may also determine the first continuous transmission and / or the first resource by other means, which is not limited in the embodiments of the present application.
[0585] In the embodiment of the present application, the first continuous transmission (and / or the first resource) may also be understood as a reserved resource for UE1 to transmit sidelink information.
[0586] The first SCI can be a first-order SCI or a second-order SCI. As an example, the resource indication field in the first SCI indicates the time-frequency information of the first resource. The embodiment of the present application does not limit the name of the resource indication field. For example, it can also be a resource structure field, a resource information field, or a resource sharing field. The resource indication field may include a field indicating the time domain resources of the first resource and / or a field indicating the frequency domain resources of the first resource. As another example, the continuous transmission indication field in the first SCI indicates the time domain information of the first continuous transmission and / or the frequency domain information of the first continuous transmission. The embodiment of the present application does not limit the name of the continuous transmission indication field. For example, it can also be a continuous transmission structure field, a continuous transmission information field, or a continuous transmission sharing field. The continuous transmission indication field may include a field indicating the time domain resources of the first continuous transmission and / or a field indicating the frequency domain resources of the first continuous transmission.
[0587] S1703: When the first condition is met, the first communication device determines that the fourth resource is preempted or determines to re-evaluate the fourth resource.
[0588] S1703 may also be expressed as: when the first condition is met, UE1 determines that the fourth resource is preempted or determines to re-evaluate the fourth resource.
[0589] The fourth resource includes the first resource. Exemplarily, when the first condition is met, UE1 determines that the fourth resource is preempted, then UE1 does not use the fourth resource. For example, UE1 may reselect other resources for transmitting UE1's side information. And / or, when the first condition is met, UE1 determines to re-evaluate the fourth resource, then UE1 may evaluate the fourth resource, that is, not use the fourth resource, to determine whether the fourth resource overlaps with the reserved resources of other UEs. For example, for the preempted fourth resource (or the re-evaluated fourth resource), UE1 may reselect other resources for transmitting UE1's side information. Exemplarily, when the first condition is not met, the first communication device preempts the fourth resource or determines not to re-evaluate the fourth resource. The embodiment of the present application is described by taking the satisfaction of the first condition as an example.
[0590] In one embodiment, the fourth resource may also include resources of at least one time slot that is located before the first resource in the time domain; or the fourth resource may also include resources of at least one time slot that is located after the first resource in the time domain; or, the fourth resource may also include resources of at least one time slot that is located before the first resource in the time domain and resources of at least one time slot that is located after the first resource in the time domain.
[0591] Among them, the resource of at least one time slot that is located before the first resource in the time domain can be: the resource of Q time slots that are located before the first resource in the time domain, where Q is a positive integer; or, at least one multi-slot candidate resource of the Q time slots that are located before the first resource in the time domain; or, the resource of at least one time slot that is located before the first resource in the time domain can also be: all resources that are located before the first resource in the time domain.
[0592] Among them, the resource of at least one time slot located after the first resource in the time domain can be: the resource of P time slots located after the first resource in the time domain, P is a positive integer; or, at least one multi-slot candidate resource of P time slots located after the first resource in the time domain; or, the resource of at least one time slot located after the first resource in the time domain can also be: all resources located after the first resource in the time domain.
[0593] Exemplarily, the fourth resource may also include all resources in the first continuous transmission except the first resource, that is, the fourth resource is the first continuous transmission. If the UE selects resources based on continuous transmission, assuming that the resources in one time slot are preempted, the UE can reselect resources based on the granularity of continuous transmission. Therefore, when the first resource is preempted, it can be considered that all continuous transmissions where the first resource is located have been preempted. Similarly, when the first resource is re-evaluated, it can be considered that the continuous transmission where the first resource is located is re-evaluated.
[0594] Alternatively, the fourth resource may include all resources in the first COT except the first resource, that is, the fourth resource is the first COT. If the UE selects resources based on the COT, assuming that resources in one time slot are preempted, the UE can reselect resources based on the COT granularity. Therefore, when the first resource is preempted, it can be considered that all COTs containing the first resource are preempted. Similarly, when the first resource is re-evaluated, it can be considered that the COT containing the first resource is re-evaluated.
[0595] Alternatively, the fourth resource may also include all resources in the first continuous transmission that are located after the first resource in the time domain, that is, the fourth resource is all resources in the first continuous transmission that are located in the time domain from the start time of the first resource to the end time of the first continuous transmission. For example, the first resource is located in time slot m, and the first continuous transmission is located in the time slot interval [n1, n2], then the fourth resource includes resources located in the time slot interval [m, n2]. In continuous transmission, the first time slot of the continuous transmission is based on the Type1 LBT access channel, and the non-first time slot of the continuous transmission is based on the Type2 LBT access channel. If the first resource of UE1 is preempted, UE1 cannot access the channel on the resource after the first resource through Type2 LBT. Therefore, when the first resource is preempted, it can be regarded as all resources after the first resource are also preempted. Similarly, when the first resource is re-evaluated, it can be regarded as all resources after the first resource are also re-evaluated. Further, for the situation where "the fourth resource may also include resources that are located P time slots after the first resource in the time domain", if the P time slots after the first resource exceed the first continuous transmission, then this situation is equivalent to "the fourth resource may also include all resources that are located after the first resource in the time domain in the first continuous transmission".
[0596] Alternatively, the fourth resource may also include all resources in the first COT that are located after the first resource in the time domain, that is, the fourth resource is all resources in the first COT that are located in the time domain from the start time of the first resource to the end time of the first COT. For example, if the first resource is located in time slot m and the first COT is located in the time slot interval [n3, n4], then the fourth resource includes resources located in the time slot interval [m, n4]. In the COT, the first time slot of the COT is based on the Type 1 LBT access channel, while the non-first time slots of the COT are based on the Type 2 LBT access channel. If UE1's first resource is preempted, UE1 cannot access the channel on the resources after the first resource through Type 2 LBT. Therefore, when the first resource is preempted, it can be considered that all resources after the first resource are also preempted. Similarly, when the first resource is re-evaluated, it can be considered that all resources after the first resource are also re-evaluated. Further, for the situation where "the fourth resource may also include resources that are P time slots behind the first resource in the time domain", if the P time slots behind the first resource exceed the first COT, then this situation is equivalent to "the fourth resource may also include all resources in the first COT that are behind the first resource in the time domain".
[0597] Alternatively, the fourth resource may also include resources of Q time slots that are located before the first resource in the time domain. That is, the resources of the Q time slots are before the first resource, adjacent to the first resource, and the resources of the Q time slots are continuous in the time domain. This means that the fourth resource is all resources in the time domain from the start time of the first time slot of the Q time slots to the end time of the first resource. Alternatively, it means that the fourth resource is the first resource and the resources of Q consecutive time slots that are before the first resource and adjacent to the first resource. For example, if the first resource is located in time slot m, the fourth resource includes resources located in the time slot interval [mQ, m]. The Q time slots may belong to the first continuous transmission, as shown in (1) in Figure 18; or, the Q time slots may not belong to the first continuous transmission, as shown in (2) in Figure 18. The first continuous transmission in Figure 18 may also be replaced by the first COT, and the Q time slots may belong to the first COT; or, the Q time slots may not belong to the first COT. Figure 18 takes Q as 3 and the first resource as one time slot in the time domain as an example. If UE1 occupies the first Q resources of the first resource, UE2 will receive a "channel occupied" error when performing LBT on the second resource, preventing LBT from succeeding. Consequently, UE2 will be unable to access the channel on the second resource and will be unable to transmit on the second resource. Therefore, UE1 should exclude the first Q consecutive resources of the first resource, giving UE2 a chance to complete LBT within the specified timeframe and successfully transmit on the second resource.
[0598] Alternatively, the fourth resource may also include resources of P time slots that are located after the first resource in the time domain, that is, the fourth resource is all resources in the time domain from the start time of the first resource to the end time of the Pth time slot among the P time slots. For example, if the first resource is located in time slot m, the fourth resource includes resources located in the time slot interval [m, m+P]. The P time slots may belong to the first continuous transmission, as shown in (3) in Figure 18; or, the P time slots may not belong to the first continuous transmission, as shown in (4) in Figure 18. The first continuous transmission in Figure 18 may also be replaced by the first COT, and the P time slots may belong to the first COT; or, the P time slots may not belong to the first COT. Figure 18 takes P as 2 as an example. If UE2 seizes the second resource, UE1 will get the result of "channel occupied" when performing LBT at the first resource, and will not be able to successfully perform LBT within the P resources after the second resource. Then UE1 cannot access the channel within the P resources after the first resource. Therefore, UE1 should exclude P consecutive resources after the first resource so that UE1 has a chance to pass LBT within the time and thus successfully transmit on subsequent resources (eg, the first time slot after P resources after the first resource).
[0599] Alternatively, the fourth resource may also include all resources that are located before the first resource in the time domain in the first continuous transmission, that is, the fourth resource is all resources in the time domain from the start time of the first continuous transmission to the end time of the first resource in the first continuous transmission. For example, the first resource is located in time slot m, and the first continuous transmission is located in the time slot interval [n1, n2], then the fourth resource includes the resources located in the time slot interval [n1, m]. For the situation where "the fourth resource may also include resources that are Q time slots before the first resource in the time domain", if the Q time slots before the first resource exceed the first continuous transmission, then this situation is equivalent to "the fourth resource may also include all resources that are located before the first resource in the time domain in the first continuous transmission".
[0600] Alternatively, the fourth resource may also include all resources in the first COT that are located before the first resource in the time domain, that is, the fourth resource is all resources in the first COT that are located in the time domain from the start time of the first COT to the end time of the first resource. For example, if the first resource is located in time slot m and the first COT is located in the time slot interval [n3, n4], then the fourth resource includes resources located in the time slot interval [n3, m]. For the scenario where "the fourth resource may also include resources that are Q time slots before the first resource in the time domain", if the Q time slots before the first resource exceed the first COT, then this scenario is equivalent to "the fourth resource may also include all resources in the first COT that are located before the first resource in the time domain".
[0601] Alternatively, the fourth resource may also include all resources in the first multi-slot candidate resource except the first resource, that is, the fourth resource is the first multi-slot candidate resource. Among them, the first multi-slot candidate resource is the multi-slot candidate resource where the first resource is located. The first multi-slot candidate resource is a resource used to carry the sidelink information of UE1. That is, the UE is a resource selected based on the multi-slot candidate resource. If the resources on one of the time slots are preempted, the UE can reselect resources based on the granularity of the multi-slot candidate resource. Therefore, when the first resource is preempted, it can be regarded as all the multi-slot candidate resources where the first resource is located being preempted. Similarly, therefore, when re-evaluating the first resource, it can be regarded as re-evaluating the multi-slot candidate resource where the first resource is located.
[0602] Alternatively, the fourth resource may also include a combination of the above items.
[0603] For example, the fourth resource may also include resources of Q time slots that are located before the first resource in the time domain and resources of P time slots that are located after the first resource in the time domain. The resources of the Q time slots are before the first resource, adjacent to the first resource, and the resources of the Q time slots are continuous in the time domain; the resources of the P time slots are after the first resource, adjacent to the first resource, and the resources of the P time slots are continuous in the time domain. That is, the resources of the Q time slots, the first resource, and the resources of the P time slots constitute resources that are continuous in the time domain. That is, the fourth resource is all resources in the time domain from the start time of the first time slot in the Q time slots to the end time of the Pth time slot in the P time slots. For example, if the first resource is located in time slot m, then the fourth resource includes resources located in the time slot interval [mQ, m+P]. The fourth resource may belong to the first continuous transmission, as shown in (5) in Figure 18; or, the fourth resource may not belong to the first continuous transmission, as shown in (6) in Figure 18. If UE2 seizes the second resource, UE1 will get the result of "channel occupied" when performing LBT at the first resource, and will not be able to successfully perform LBT within P resources after the second resource. UE1 will then be unable to access the channel within P resources after the first resource. Therefore, UE1 should exclude P consecutive resources after the first resource, so that UE1 has a chance to pass LBT within this time, and thus successfully transmit on subsequent resources (e.g., the first time slot after P resources after the first resource). Furthermore, if UE1 occupies the first Q resources before the first resource, UE2 will get the result of "channel occupied" when performing LBT before the second resource, and will not be able to successfully perform LBT before the second resource. UE2 will then be unable to access the channel on the second resource, and will not be able to transmit on the second resource. Therefore, UE1 should exclude Q consecutive resources before the first resource, so that UE2 has a chance to pass LBT within this time, and thus successfully transmit on the second resource.
[0604] For example, the fourth resource may also include at least one multi-slot candidate resource that overlaps with a resource of Q time slots that is located before the first resource in the time domain and a resource of P time slots that is located after the first resource in the time domain. The resource of the Q time slots is before the first resource, adjacent to the first resource, and the resource of the Q time slots is continuous in the time domain; the resource of the P time slots is after the first resource, adjacent to the first resource, and the resource of the P time slots is continuous in the time domain. In other words, the resource of the Q time slots, the first resource, and the resource of the P time slots constitute resources that are continuous in the time domain. That is, the fourth resource is all multi-slot candidate resources that overlap in the time domain from the start time of the first time slot of the Q time slots to the end time of the P time slot of the P time slots. For example, if the first resource is located in time slot m, then the fourth resource includes multi-slot candidate resources that overlap with the time slot interval [mQ, m+P]. If UE2 seizes the second resource, UE1 will get the result of "channel occupied" when performing LBT at the first resource, and will not be able to successfully perform LBT within P resources after the second resource. Then UE1 will not be able to access the channel within P resources after the first resource. Therefore, UE1 should exclude P consecutive resources after the first resource, so that UE1 has a chance to pass LBT within this time, and thus successfully send on subsequent resources (e.g. the first time slot after P resources after the first resource). If UE1 occupies the first Q resources before the first resource, UE2 will get the result of "channel occupied" when performing LBT before the second resource, and will not be able to successfully perform LBT before the second resource. Then UE2 will not be able to access the channel on the second resource, nor will it be able to send on the second resource. Therefore, UE1 should exclude Q consecutive resources before the first resource, so that UE2 has a chance to pass LBT within this time, and thus successfully send on the second resource.
[0605] Furthermore, if the UE selects a resource based on multi-slot candidate resources and one of the resources is preempted, the UE can reselect a resource based on the granularity of the multi-slot candidate resources. Therefore, when a first resource is preempted, it can be considered that all multi-slot candidate resources containing the first res...
Claims
1. A communication method, applied to a first communication device, characterized in that: include: Receive second sideline control information of a second communication device, where the second sideline control information is used to indicate B priority values corresponding to a second resource and B sideline information, where the second resource fully or partially overlaps with the first resource, where the second resource is a reserved resource for the B sideline information, and the first resource is a reserved resource for A sideline information of the first communication device, where the first resource and the second resource belong to a first subframe in the time domain, where the first subframe is a subframe of a first communication standard, where the A sideline information and the B sideline information are both information of a second communication standard, where the second communication standard is different from the first communication standard, and where the first subframe includes C time slots of the second communication standard, where C is an integer greater than 1, where A and B are both positive integers, and where A is greater than 1 and / or where B is greater than 1; Based on the B priority values and the A priority values corresponding to the A sideline information, it is determined that a third resource is preempted and / or it is determined to re-evaluate the third resource, the third resource is the first resource or is a resource of the first resource excluding the resource on the first time slot, the resources of the first resource excluding the resource on the first time slot overlap with the second resource, and the first time slot is the first time slot of the C time slots.
2. The method according to claim 1, characterized in that The second resource overlaps with the first resource in the first time slot, and the third resource is the first resource; or, The first resource includes the first time slot in the time domain, the second resource does not overlap with the first resource in the first time slot, and the third resource is a resource in the first resource except the resource in the first time slot.
3. The method according to claim 1 or 2, characterized in that: The determining that the third resource is preempted and / or determining to re-evaluate the third resource according to the B priority values and the A priority values corresponding to the A side information includes: A first priority value among the A priority values is greater than a second priority value among the B priority values, and it is determined that the third resource is preempted and / or it is determined to re-evaluate the third resource.
4. The method according to claim 3, characterized in that A and B are both greater than 1, the first priority value is the minimum or maximum value among the A priority values, and the second priority value is the minimum or maximum value among the B priority values; or A is greater than 1, B is 1, the first priority value is the minimum or maximum value among the A priority values, and the second priority value is the priority value corresponding to the sideline information carried by the second resource; or A is 1, B is greater than 1, the first priority value is the priority value corresponding to the sideline information carried by the first resource, and the second priority value is the minimum value or the maximum value of the B priority values; or The first priority value is the minimum or maximum value among the D priority values, the second priority value corresponds to the third sideline information among the B sideline information, wherein the D priority values correspond to the D sideline information, the D sideline information is the sideline information carried on the second time slot among the C time slots, the D sideline information includes the A sideline information, the reserved resource of the third sideline information is the second time slot in the time domain, and D is an integer greater than 1; or, The first priority value is the minimum or maximum value among the E priority values, the second priority value corresponds to the third sideline information among the B sideline information, wherein the E priority values correspond to the E sideline information, the reserved resources of the E sideline information overlap with the first frequency domain resources on the first subframe in the frequency domain, the E sideline information include part or all of the A sideline information, the reserved resources of the third sideline information are the first frequency domain resources in the frequency domain, and E is an integer greater than 1; or The first priority value corresponds to the first sideline information among the A sideline information, the second priority value corresponds to the third sideline information among the B sideline information, and the reserved resources of the first sideline information and the reserved resources of the third sideline information are both the first time slot in the time domain.
5. The method according to any one of claims 1 to 4, characterized in that The C is 2, and the second resource overlaps with the first resource, including: The A and the B are both 2, the A side information includes the first side information and the second side information, the B side information includes the third side information and the fourth side information, the reserved resources of the first side information overlap with the reserved resources of the third side information, and the reserved resources of the second side information overlap or do not overlap with the reserved resources of the fourth side information; or A is 2, B is 1, the A side information includes first side information and second side information, the B side information includes third side information, and the reserved resources of the first side information and the reserved resources of the third side information overlap in the first time slot; or, A is 1, B is 2, the A sideline information includes first sideline information, the B sideline information includes third sideline information and fourth sideline information, and the reserved resources of the first sideline information and the reserved resources of the third sideline information overlap in the first time slot.
6. The method according to claim 5, characterized in that A and B are both 2, the reserved resources of the second sideline information overlap with the reserved resources of the fourth sideline information, and the third resource is the first resource; or A and B are both 2, the reserved resources of the first side information and the reserved resources of the third side information overlap in the second time slot of the C time slots, the reserved resources of the second side information and the reserved resources of the fourth side information do not overlap, and the third resource is the resource of the first resource in the second time slot; or A and B are both 2, the reserved resources of the first sideline information and the reserved resources of the third sideline information overlap in the first time slot, the reserved resources of the second sideline information and the reserved resources of the fourth sideline information do not overlap, and the third resource is the first resource; or A is 2, B is 1, and the third resource is the first resource; or, The A is 1, the B is 2, and the third resource is the first resource.
7. The method according to any one of claims 1 to 6, characterized in that The C is 2, and the determining that the third resource is preempted and / or determining to re-evaluate the third resource according to the B priority values and the A priority values corresponding to the A side information includes: A and B are both 2, the first priority value is greater than the second priority value, it is determined that the third resource is preempted and / or it is determined to re-evaluate the third resource, wherein the first priority value is the minimum or maximum value of the A priority values, and the second priority value is the minimum or maximum value of the B priority values; or, A is 2, B is 1, a first priority value among the A priority values is greater than a priority value corresponding to the sideline information carried by the second resource, and it is determined that the third resource is preempted and / or it is determined to re-evaluate the third resource; or A is 1, B is 2, and the priority value corresponding to the side information carried by the first resource is greater than the second priority value among the B priority values, determining that the third resource is preempted and / or determining to re-evaluate the third resource.
8. The method according to any one of claims 3, 4, or 7, characterized in that: The second priority value is less than a first threshold; and / or the first priority value is greater than a first threshold.
9. The method according to any one of claims 1 to 8, characterized in that A is greater than 1, the A sideline information includes first sideline information, the reserved resources of the first sideline information are the resources on the first time slot, and the priority value corresponding to the first sideline information is the minimum value among the A priority values; or The A is greater than 1, and the A sideline information include first sideline information and second sideline information. The reserved resources of the first sideline information are resources on the first time slot, and the reserved resources of the second sideline information are resources on the time slots of the C time slots except the first time slot. The priority value corresponding to the first sideline information is less than the priority value corresponding to the second sideline information.
10. The method according to any one of claims 1 to 9, characterized in that The method further comprises: Performing a preemption check and / or re-evaluation on the frequency domain resource of the first resource in the second time slot of the C time slots in the sixth time slot; or, Performing a preemption check and / or re-evaluation on the frequency domain resources of the first resource in the C time slots in a third time slot; Among them, the identifier of the sixth time slot satisfies (m-T3-1), the identifier of the third time slot satisfies (n-T3), m is the identifier of the first time slot, n is the identifier of the second time slot, and T3 is a preset threshold.
11. The method according to any one of claims 1 to 10, characterized in that The first communication standard is a Long Term Evolution Sidelink (LTE SL), and the second communication standard is a New Radio Sidelink (NR SL).
12. A communication method, applied to a first communication device, characterized in that: include: receiving second sideline control information of a second communication device, where the second sideline control information is used to indicate a second channel occupation time COT, where a second resource in the second COT overlaps with a first resource, and the first resource belongs to a first COT of the first communication device; When the first condition is met, determining that a fourth resource is preempted and / or determining to re-evaluate the fourth resource, wherein the fourth resource is the first resource, or the first COT, or includes the first resource and remaining resources after the first resource in the first COT; The first condition includes one or more of the following: The third priority value corresponding to the side information carried by the second resource is less than the fourth priority value among the A priority values, wherein the A priority values are the priority values corresponding to the A side information carried by the first COT, and A is a positive integer; or The second COT is an initial COT of the second communication device; or, The device for receiving the side information carried by the first resource is the same as the device for receiving the side information carried by the second resource; or, The first resource is the fourth time slot in the first COT in the time domain, and the remaining duration of the first COT after the fourth time slot is less than or equal to a second threshold.
13. The method according to claim 12, characterized in that The fourth priority value is the priority value corresponding to the sideline information carried by the first resource; or A is greater than 1, and the fourth priority value is the minimum or maximum value among the A priority values.
14. The method according to claim 12 or 13, characterized in that The third priority value is less than the first threshold; and / or the fourth priority value is greater than the first threshold.
15. A communication method, applied to a second communication device, characterized in that: include: Receive one or more sideline control information, where the one or more sideline control information is used to indicate a fifth resource and M priority values corresponding to the M sideline information, where the fifth resource overlaps with the second resource in whole or in part, where the fifth resource is a reserved resource for the M sideline information, and the second resource is a reserved resource for B sideline information of the second communication device, where both M and B are positive integers, and M is greater than 1 and / or B is greater than 1; Preempting the second resource and / or determining not to re-evaluate the second resource according to the M priority values and B priority values corresponding to the B sidelink information; Among them, the fifth resource and the second resource belong to the first subframe in the time domain, the first subframe is a subframe of the first communication standard, the M sideline information and the B sideline information are both information of the second communication standard, the second communication standard is different from the first communication standard, and the first subframe includes C time slots of the second communication standard, and C is an integer greater than 1.
16. The method according to claim 15, characterized in that The preempting the second resource and / or determining not to re-evaluate the second resource according to the M priority values and the B priority values corresponding to the B sidelink information includes: A fifth priority value among the M priority values is greater than a second priority value among the B priority values, and the second resource is preempted and / or it is determined not to re-evaluate the second resource.
17. The method according to claim 16, characterized in that The M and the B are both greater than 1, the fifth priority value is the minimum value or the maximum value among the M priority values, and the second priority value is the minimum value or the maximum value among the B priority values; or M is greater than 1, B is 1, the fifth priority value is the minimum value or the maximum value of the M priority values, and the second priority value is the priority value corresponding to the sideline information carried by the second resource; or, The M is 1, the B is greater than 1, the fifth priority value is the priority value corresponding to the sideline information carried by the fifth resource, and the second priority value is the B the minimum or maximum of the priority values; or, The M is greater than 1, the fifth priority value is the minimum or maximum value among the F priority values, the second priority value corresponds to the third sideline information among the B sideline information, wherein the F priority values correspond to F sideline information, the F sideline information is the sideline information carried on the second time slot among the C time slots, the F sideline information includes the M sideline information, the reserved resource of the third sideline information is the second time slot in the time domain, and F is an integer greater than 1; or, The fifth priority value is the minimum or maximum value among the G priority values, the second priority value corresponds to the third sideline information among the B sideline information, wherein the G priority values correspond to the G sideline information, the reserved resources of the G sideline information overlap with the second frequency domain resources on the first subframe in the frequency domain, the G sideline information include part or all of the M sideline information, the reserved resources of the third sideline information are the second frequency domain resources in the frequency domain, and G is an integer greater than 1; or The fifth priority value corresponds to the fifth sideline information among the M sideline information, the second priority value corresponds to the third sideline information among the B sideline information, and the reserved resources of the fifth sideline information and the reserved resources of the third sideline information are both the first time slot among the C time slots in the time domain.
18. The method according to any one of claims 15 to 17, characterized in that The C is 2, and the fifth resource overlaps with the second resource, including: When M is 2 and B is 2, the M side information includes fifth side information and sixth side information, the B side information includes third side information and fourth side information, the reserved resources of the fifth side information overlap with the reserved resources of the third side information, and the reserved resources of the sixth side information overlap or do not overlap with the reserved resources of the fourth side information; or When M is 2 and B is 1, the M side information includes fifth side information and sixth side information, the B side information includes third side information, and the reserved resources of the fifth side information and the reserved resources of the third side information overlap in the first time slot of the C time slots; or, When M is 1 and B is 2, the M side information include fifth side information, the B side information include third side information and fourth side information, and the reserved resources of the fifth side information and the reserved resources of the third side information overlap in the first time slot of the C time slots.
19. The method according to any one of claims 17 to 18, characterized in that The C is 2, and the preempting the second resource and / or determining not to re-evaluate the second resource according to the M priority values and the B priority values corresponding to the B sidelink information includes: The M and the B are both 2, the fifth priority value is greater than the second priority value, the second resource is preempted and / or it is determined not to re-evaluate the second resource, wherein the fifth priority value is the minimum or maximum value of the M priority values, and the second priority value is the minimum or maximum value of the B priority values; or, The M is 2, the B is 1, the fifth priority value among the M priority values is greater than the priority value corresponding to the sideline information carried by the second resource, the second resource is preempted and / or it is determined not to re-evaluate the second resource; or When M is 1 and B is 2, and the priority value corresponding to the side information carried by the fifth resource is greater than the second priority value among the B priority values, the second resource is preempted and / or it is determined not to re-evaluate the second resource.
20. The method according to any one of claims 17 to 19, characterized in that B is greater than 1, the B side information includes third side information, the reserved resources of the third side information are resources on the first time slot of the C time slots, and the priority value corresponding to the third side information is the minimum value of the B priority values; or The B is greater than 1, the B side information include third side information and fourth side information, the reserved resources of the third side information are resources on the first time slot among the C time slots, the reserved resources of the fourth side information are resources on the time slots among the C time slots except the first time slot, and the priority value corresponding to the third side information is less than the priority value corresponding to the fourth side information.
21. The method according to any one of claims 15 to 20, characterized in that The first communication standard is a Long Term Evolution Sidelink (LTE SL), and the second communication standard is a New Radio Sidelink (NR SL).
22. A communication method, applied to a second communication device, characterized in that: include: receiving first sideline control information of a first communication device, where the first sideline control information is used to indicate a first channel occupancy time COT, where a first resource and a second resource in the first COT overlap, and the second resource belongs to a second COT of the second communication device; When the first condition is met, preempt the sixth resource and / or determine not to re-evaluate the sixth resource, wherein the sixth resource is the second resource, or the second COT, or includes the second resource and the remaining resources after the second resource in the second COT; The first condition includes one or more of the following: The third priority value corresponding to the side information carried by the second resource is less than the fourth priority value among the A priority values, wherein the A priority values are the priority values corresponding to the A side information carried by the first COT, and A is a positive integer; or The second COT is an initial COT of the second communication device; or, The device for receiving the side information carried by the first resource is the same as the device for receiving the side information carried by the second resource; or, The first resource is the fourth time slot in the first COT in the time domain, and the remaining duration of the first COT after the fourth time slot is less than or equal to a second threshold.
23. The method according to claim 22, characterized in that The fourth priority value is the priority value corresponding to the sideline information carried by the first resource; or When A is greater than 1, the fourth priority value is the minimum or maximum value among the A priority values.
24. The method according to claim 22 or 23, characterized in that The third priority value is less than the first threshold; and / or the fourth priority value is greater than the first threshold.
25. A communication method, applied to a first communication device, characterized in that: include: receiving second sideline control information from a second communication device, the second sideline control information being used to indicate a second resource, the second resource overlapping with a first resource, the first resource belonging to a first continuous transmission of the first communication device; When the first condition is met, determining that a fourth resource is preempted or determining to re-evaluate a fourth resource, the fourth resource including the first resource; The first condition includes one or more of the following: The third priority value is less than the fourth priority value, wherein the third priority value is the priority value corresponding to the sideline information carried by the second resource, or the third priority value is a priority value among B priority values corresponding to B sideline information carried by the second continuous transmission where the second resource is located; the fourth priority value is the priority value corresponding to the sideline information carried by the first resource, or the fourth priority value is a priority value among A priority values corresponding to A sideline information carried by the first continuous transmission where the first resource is located, and A and B are both positive integers; The second resource belongs to a second continuous transmission, or the second resource belongs to a second channel occupation time COT, wherein the second continuous transmission is used to transmit the side information of the second communication device, and the second COT is an initial COT of the second communication device; or, The first resource is the fourth time slot in the first continuous transmission in the time domain, and the remaining duration of the first continuous transmission after the fourth time slot is less than or equal to a second threshold.
26. The method according to claim 25, characterized in that The fourth resources further include resources of at least one time slot before the first resources in the time domain and / or resources of at least one time slot after the first resources in the time domain.
27. The method according to claim 26, characterized in that The resource of at least one time slot located before the first resource in the time domain includes: A resource that is Q time slots before the first resource in the time domain, where Q is a positive integer; or All resources in the first continuous transmission that are located before the first resource in the time domain.
28. The method according to claim 27, characterized in that When the fourth condition is met, the fourth resource includes the resources of Q time slots that are located before the first resource in the time domain, wherein the fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, wherein the first COT is the initial COT of the first communication device.
29. The method according to any one of claims 26 to 28, characterized in that The resource of at least one time slot located after the first resource in the time domain includes: A resource that is located P time slots after the first resource in the time domain, where P is a positive integer; or All resources in the first continuous transmission that are located after the first resource in the time domain.
30. The method according to claim 29, characterized in that When the fourth condition is met, the fourth resource includes the resources of P time slots that are located after the first resource in the time domain, wherein the fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, wherein the first COT is the initial COT of the first communication device.
31. The method according to any one of claims 25 to 30, characterized in that The A side information are part or all of the side information carried by the first continuous transmission, wherein the A side information include the side information carried by the first resource, and the A priority values include the priority value corresponding to the side information carried by the first resource.
32. The method according to claim 31, characterized in that The A priority values also include one or more of the following: a priority value corresponding to the side information carried by all resources located after the first resource in the time domain in the first continuous transmission, wherein the A side information also includes the side information carried by all resources located after the first resource in the time domain in the first continuous transmission; or, The priority value corresponding to the side information carried by all resources that are located before the first resource in the time domain in the first continuous transmission, wherein the A side information also includes the side information carried by all resources that are located before the first resource in the time domain in the first continuous transmission.
33. The method according to claim 31, characterized in that The A priority values also include one or more of the following: a priority value corresponding to the side information carried by resources in the first continuous transmission that are Q time slots before the first resource in the time domain, wherein the A side information also includes the side information carried by resources in the first continuous transmission that are Q time slots before the first resource in the time domain; or, The priority value corresponding to the side information carried by the resources in the first continuous transmission and located in the time domain for P time slots after the first resource, wherein the A side information also includes the side information carried by the resources in the first continuous transmission and located in the time domain for P time slots after the first resource.
34. The method according to any one of claims 25 to 33, characterized in that The B side information are part or all of all the side information carried by the second continuous transmission, wherein the B side information include the side information carried by the second resource, and the B priority values include the priority value corresponding to the side information carried by the second resource.
35. The method according to claim 34, characterized in that The B priority values also include one or more of the following: a priority value corresponding to the side information carried by all resources located after the second resource in the time domain in the second continuous transmission, wherein the B side information also includes the side information carried by all resources located after the second resource in the time domain in the second continuous transmission; The priority value corresponding to the side information carried by all resources that are located before the second resource in the time domain in the second continuous transmission, wherein the B side information also includes the side information carried by all resources that are located before the second resource in the time domain in the second continuous transmission.
36. The method according to claim 34, characterized in that The B priority values also include one or more of the following: a priority value corresponding to the side information carried by resources in the second continuous transmission that are Q time slots before the second resource in the time domain, wherein the B side information also includes the side information carried by resources in the second continuous transmission that are Q time slots before the second resource in the time domain; or, The priority value corresponding to the side information carried by the resources of P time slots located after the second resource in the time domain in the second continuous transmission, wherein the B side information also includes the side information carried by the resources of P time slots located after the second resource in the time domain in the second continuous transmission.
37. The method according to any one of claims 25 to 36, characterized in that A is 1, and the fourth priority value is the priority value corresponding to the sideline information carried by the first resource; or A is greater than 1, and the fourth priority value is the minimum or maximum value among the A priority values.
38. The method according to any one of claims 25 to 37, characterized in that The B is 1, and the third priority value is the priority value corresponding to the sideline information carried by the second resource; or B is greater than 1, and the third priority value is the minimum or maximum value among the B priority values.
39. The method according to any one of claims 25 to 38, characterized in that The third priority value is a priority value corresponding to the sideline information carried by the second resource, and the fourth priority value is a priority value corresponding to the sideline information carried by the first resource; The first resource and the second resource overlap in K time slots, and in each of the K overlapping time slots, the third priority value corresponding to the side information carried by the second resource is less than the fourth priority value corresponding to the side information carried by the first resource, and K is a positive integer.
40. The method according to any one of claims 25 to 39, characterized in that The first resource and the second resource are both one time slot in the time domain.
41. The method according to any one of claims 25 to 40, characterized in that The third priority value is less than the first threshold; and / or the fourth priority value is greater than the first threshold.
42. The method according to any one of claims 25 to 41, characterized in that The first continuous transmission is a first COT, and / or the second continuous transmission is a second COT.
43. A communication method, applied to a second communication device, characterized in that: include: receiving first sideline control information from a first communication device, where the first sideline control information is used to indicate a first resource, where the first resource overlaps with a second resource, and where the second resource is used to transmit sideline information of the second communication device; When the first condition is met, preempting a sixth resource or determining not to re-evaluate the sixth resource, wherein the sixth resource includes the second resource; The first condition includes one or more of the following: The third priority value is less than the fourth priority value, wherein the third priority value is the priority value corresponding to the sideline information carried by the second resource, or the third priority value is a priority value among B priority values corresponding to B sideline information carried by the second continuous transmission where the second resource is located; the fourth priority value is the priority value corresponding to the sideline information carried by the first resource, or the fourth priority value is a priority value among A priority values corresponding to A sideline information carried by the first continuous transmission where the first resource is located, and A and B are both positive integers; The second resource belongs to a second continuous transmission, or the second resource belongs to a second channel occupation time COT, wherein the second continuous transmission is used to transmit the side information of the second communication device, and the second COT is an initial COT of the second communication device; or, The first resource is the fourth time slot in the first continuous transmission in the time domain, and the first continuous transmission is the remaining time slot after the fourth time slot. The remaining time is less than or equal to the second threshold.
44. The method according to claim 43, characterized in that The sixth resources further include resources of at least one time slot located before the second resources in the time domain and / or resources of at least one time slot located after the second resources in the time domain.
45. The method according to claim 44, characterized in that The resource of at least one time slot located before the second resource in the time domain comprises: A resource that is Q time slots before the second resource in the time domain, where Q is a positive integer; or all resources in the second continuous transmission that are located before the second resource in the time domain.
46. The method according to claim 45, characterized in that When the fourth condition is met, the sixth resource includes the resource of Q time slots that are located before the second resource in the time domain, wherein the fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, wherein the first COT is the initial COT of the first communication device.
47. The method according to any one of claims 44 to 46, characterized in that The resource of at least one time slot located after the second resource in the time domain comprises: A resource that is located P time slots after the second resource in the time domain, where P is a positive integer; or All resources in the second continuous transmission that are located after the second resource in the time domain.
48. The method according to claim 47, characterized in that When the fourth condition is met, the sixth resource includes the resources of P time slots located after the second resource in the time domain, wherein the fourth condition includes that the second communication device cannot share the first COT, or the fourth condition includes that the first communication device cannot share the second COT, wherein the first COT is the initial COT of the first communication device.
49. The method according to any one of claims 43 to 48, characterized in that The A side information are part or all of the side information carried by the first continuous transmission, wherein the A side information include the side information carried by the first resource, and the A priority values include the priority value corresponding to the side information carried by the first resource.
50. The method according to claim 49, characterized in that The A priority values also include one or more of the following: a priority value corresponding to the side information carried by all resources located after the first resource in the time domain in the first continuous transmission, wherein the A side information also includes the side information carried by all resources located after the first resource in the time domain in the first continuous transmission; or, The priority value corresponding to the side information carried by all resources that are located before the first resource in the time domain in the first continuous transmission, wherein the A side information also includes the side information carried by all resources that are located before the first resource in the time domain in the first continuous transmission.
51. The method according to claim 49, characterized in that The A priority values also include one or more of the following: a priority value corresponding to the side information carried by resources in the first continuous transmission that are Q time slots before the first resource in the time domain, wherein the A side information also includes the side information carried by resources in the first continuous transmission that are Q time slots before the first resource in the time domain; or, The priority value corresponding to the side information carried by the resources in the first continuous transmission and located in the time domain for P time slots after the first resource, wherein the A side information also includes the side information carried by the resources in the first continuous transmission and located in the time domain for P time slots after the first resource.
52. The method according to any one of claims 43 to 51, characterized in that The B side information are part or all of all the side information carried by the second continuous transmission, wherein the B side information include the side information carried by the second resource, and the B priority values include the priority value corresponding to the side information carried by the second resource.
53. The method according to claim 52, characterized in that The B priority values also include one or more of the following: a priority value corresponding to the side information carried by all resources located after the second resource in the time domain in the second continuous transmission, wherein the B side information also includes the side information carried by all resources located after the second resource in the time domain in the second continuous transmission; or, The priority value corresponding to the side information carried by all resources located before the second resource in the time domain in the second continuous transmission, wherein the B side information also includes the side information carried by all resources located before the second resource in the time domain in the second continuous transmission.
54. The method according to claim 52, characterized in that The B priority values also include one or more of the following: The priority of the side information carried by the resource located Q time slots before the second resource in the time domain in the second continuous transmission corresponds to Priority value, wherein the B side information also includes side information carried by resources of Q time slots preceding the second resource in the time domain in the second continuous transmission; or, The priority value corresponding to the side information carried by the resources of P time slots located after the second resource in the time domain in the second continuous transmission, wherein the B side information also includes the side information carried by the resources of P time slots located after the second resource in the time domain in the second continuous transmission.
55. The method according to any one of claims 43 to 54, characterized in that A is 1, and the fourth priority value is the priority value corresponding to the sideline information carried by the first resource; or A is greater than 1, and the fourth priority value is the minimum or maximum value among the A priority values.
56. The method according to any one of claims 43 to 55, characterized in that The B is 1, and the third priority value is the priority value corresponding to the sideline information carried by the second resource; or B is greater than 1, and the third priority value is the minimum or maximum value among the B priority values.
57. The method according to any one of claims 43 to 48, characterized in that The third priority value is a priority value corresponding to the sideline information carried by the second resource, and the fourth priority value is a priority value corresponding to the sideline information carried by the first resource; The first resource and the second resource overlap in K time slots, and in each of the K overlapping time slots, the third priority value corresponding to the sideline information carried by the second resource is smaller than the fourth priority value corresponding to the sideline information carried by the first resource.
58. The method according to any one of claims 43 to 57, characterized in that The first resource and the second resource are both one time slot in the time domain.
59. The method according to any one of claims 43 to 58, characterized in that The third priority value is less than the first threshold; and / or the fourth priority value is greater than the first threshold.
60. The method according to any one of claims 43 to 59, characterized in that The first continuous transmission is a first COT, and / or the second continuous transmission is a second COT.
61. A communication method, applied to a first communication device, characterized in that: include: receiving second sideline control information from a second communication device, where the second sideline control information is used to indicate a second resource, where the second resource overlaps with a first resource in K time slots, where the first resource is used to transmit the sideline information of the first communication device, and K is an integer greater than 1; When the first condition is met, determining that a fourth resource is preempted or determining to re-evaluate a fourth resource, the fourth resource including the first resource; The first condition is that, in each overlapping time slot among the K time slots, the priority value corresponding to the sideline information carried by the second resource is smaller than the priority value corresponding to the sideline information carried by the first resource.
62. A communication method, applied to a second communication device, characterized in that: include: receiving first sideline control information from a first communication device, where the first sideline control information is used to indicate a first resource, where the first resource overlaps with a second resource in K time slots, and where the second resource is used to transmit sideline information of the second communication device, where K is an integer greater than 1; When the first condition is met, preempting a sixth resource or determining not to re-evaluate the sixth resource, wherein the sixth resource includes the second resource; The first condition is that, in each overlapping time slot among the K time slots, the priority value corresponding to the sideline information carried by the second resource is smaller than the priority value corresponding to the sideline information carried by the first resource.
63. A communication device, characterized in that: A module comprising executing the method as described in any one of claims 1 to 14, 25 to 42, and 61, or a module comprising executing the method as described in any one of claims 15 to 24, 43 to 60, and 62.
64. A communication device, characterized in that: including a processor and a memory; The memory is used to store one or more computer programs or instructions, and the processor is used to execute the one or more computer programs or instructions stored in the memory, so that the communication device performs the method as described in any one of claims 1 to 14, 25 to 42, 61, or the method as described in any one of claims 15 to 24, 43 to 60, 62.
65. A communication system, characterized in that: It comprises a first communication device and / or a second communication device, wherein the first communication device is used to execute the method as described in any one of claims 1 to 14, 25 to 42, and 61, and the second communication device is used to execute the method as described in any one of claims 15 to 24, 43 to 60, and 62.
66. A computer-readable storage medium, characterized in that A computer program or instructions is stored, the computer program or instructions being used to implement the method according to any one of claims 1 to 14, 25 to 42, 61, or the method according to any one of claims 15 to 24, 43 to 60, 62.
67. A computer program product, characterized in that The computer program product comprises a computer program, which, when executed on a computer, causes the computer to perform the method according to any one of claims 1 to 14, 25 to 42, 61, or the method according to any one of claims 15 to 24, 43 to 60, 62.
Citation Information
Patent Citations
Resource preemption sidelink communication
CN114557087A
Resource reselection in sidelink
US20210153167A1
Communication method and apparatus, device, and storage medium
WO2023056822A1
New radio (NR) vehicle to vehicle (V2X) – methods for scheduling sidelink in unlicensed spectrum
WO2023069517A1
