AI Technical Summary
The existing component mounting systems face productivity decreases due to delays in replenishing component supply elements, especially when the number of supply devices is less than the number of supply unit groups, leading to interruptions in component supply.
A component mounting system with a management device that determines the earliest scheduled part-out time for each supply unit group and allocates replenishment devices accordingly, ensuring timely replenishment by assigning them to supply unit groups based on their scheduled out-of-time order, and allowing these devices to move along specific routes to collect and replenish components.
This approach prevents productivity drops by ensuring that component supply units are replenished in time, even when the number of replenishment devices is fewer than the supply unit groups, maintaining continuous production.
Smart Images

Figure JP2023018207_21112024_PF_FP_ABST
Abstract
Description
Component Mounting System
[0001] The present invention relates to a component mounting system equipped with a production line for producing mounted boards.
[0002] The component mounting system includes a production line in which a plurality of component mounters are arranged in the transport direction of a board such as a printed circuit board, and each component mounter mounts components onto the board to produce mounted boards. Each component mounter in the production line is equipped with a component supply unit equipped with a plurality of component supply elements, such as feeders, that supply components. The production line, in which a plurality of component mounters are arranged in the board transport direction, has a supply unit group in which a plurality of component supply units are arranged in the board transport direction. In the production line, each component supply unit belonging to the supply unit group collects a component supply element to be collected that has run out of components, and replenishes a component supply element to be replenished in response to the collection.
[0003] Patent Literature 1 discloses a component mounting system equipped with a supply device that supplies component supply elements to each component supply unit of multiple component mounters arranged in a board transport direction. The supply device includes a traveling body that can travel between a component storage facility and each component mounter, a mobile platform that is movably mounted on the traveling body, and a supply unit mounted on the mobile platform. When the supply device is positioned facing the component storage facility by the traveling body, the component supply elements are transferred from the component storage facility to the supply unit. Then, when the supply device is positioned facing each component supply unit of each component mounter by the traveling body, the component supply elements are supplied from the supply unit to each component supply unit as the mobile platform moves.
[0004] The component mounting system disclosed in Patent Document 1 is a system that assumes that one or more supply devices are provided for a single production line in which multiple component mounters are arranged. In other words, the number of supply devices is equal to or greater than the number of supply unit groups. If the number of supply devices is less than the number of supply unit groups, a situation may arise in which the supply devices are unable to replenish component supply elements in time before the component supply elements attached to each component supply unit belonging to a supply unit group run out of components. In this case, a delay in the supply of component supply elements by the supply devices may cause a stoppage of component supply from the component supply units, potentially reducing the productivity of mounted boards on the production line.
[0005] International Publication No. 2014 / 010084
[0006] The object of the present invention is to provide a component mounting system that can suppress a decrease in productivity of mounted boards on a production line due to delays in the supply of component supply elements by a supply device, regardless of the number of supply devices for a group of supply units on the production line.
[0007] A component mounting system according to one aspect of the present invention comprises a supply unit group consisting of a plurality of component supply units arranged along the transport direction of a substrate, a plurality of production lines which produce mounted substrates by mounting components supplied from component supply elements attached to each of the component supply units belonging to the supply unit group onto the substrate, one or more supply devices which are movable along each of a plurality of movement paths which pass through any of the supply unit groups of each of the production lines and which are capable of performing a supply operation for each of the component supply units belonging to the supply unit group to replenish component supply elements to be replenished in response to the recovery of component supply elements to be recovered that are out of components, and a management device which manages the supply devices. The management device performs a part out-of-stock setting process that sets the earliest of the expected part out-of-stock times of each of the part supply elements attached to each of the part supply units belonging to that supply unit group as the expected part out-of-stock time for that group, an assignment process that determines a replenishment movement route among the multiple movement routes when the replenishment device performs the replenishment operation by assigning the replenishment devices to each of the supply unit groups of each of the production lines in order of the earliest expected part out-of-stock times for that group, and a replenishment process that moves the replenishment device along the replenishment movement route and has the replenishment device perform the replenishment operation while the replenishment device is positioned at the position of each of the part supply units belonging to the supply unit group on the replenishment movement route.
[0008] The objects, features and advantages of the present invention will become more apparent from the following detailed description and the accompanying drawings.
[0009] 1 is a diagram illustrating an outline of the configuration of a component mounting system according to an embodiment of the present invention; FIG. 2 is a plan view illustrating the configuration of a component mounter provided in the component mounting system; FIG. 3 is a flowchart illustrating the processing flow of a management device provided in the component mounting system; FIG. 4 is a diagram illustrating the out-of-stock setting processing, supply status recognition processing, and allocation processing performed by the management device; FIG. 5 is a flowchart illustrating a modified example of the processing flow of the management device; FIG. 6 is a diagram illustrating first setting processing, second setting processing, and third setting processing for the production priority setting processing performed by the management device; FIG. 7 is a diagram illustrating fourth setting processing, fifth setting processing, and sixth setting processing for the production priority setting processing performed by the management device; FIG. 8 is a diagram illustrating the out-of-stock setting processing, supply status recognition processing, and allocation processing when the management device performs the production priority setting processing; FIG. 9 is a diagram illustrating the out-of-stock setting processing, supply status recognition processing, and allocation processing when the management device performs the production priority setting processing.
[0010] A component mounting system according to an embodiment of the present invention will be described below with reference to the drawings. Note that directional relationships will be described below using X and Y orthogonal coordinate axes that are orthogonal to each other on a horizontal plane.
[0011] 1 is a system for producing mounted boards in which components such as electronic components are mounted on a substrate such as a printed circuit board. Component mounting system 100 includes multiple production lines 1A, 1B, and 1C for producing mounted boards, a storage device 7, one or more supply devices 8A to 8E, and a management device 9.
[0012] Each of the multiple production lines 1A, 1B, and 1C is installed in a predetermined production area AR1 and includes at least multiple component mounters 2 arranged in the board transport direction F1 along the X-axis direction. Each of the production lines 1A, 1B, and 1C can produce mounted boards by using the component mounters 2 to mount components on boards. FIG. 1 illustrates an example in which a total of three production lines, a first production line 1A, a second production line 1B, and a third production line 1C, are installed in the production area AR1. Each of the production lines 1A, 1B, and 1C may include a printing device 3 that prints solder paste on the board upstream of the multiple component mounters 2 in the transport direction F1, and a reflow device 5 that performs reflow processing downstream of the multiple component mounters 2 in the transport direction F1. Furthermore, a first inspection device 4 may be installed between the component mounters 2 and the reflow device 5 in the board transport direction F1, and a second inspection device 6 may be installed downstream of the reflow device 5.
[0013] As will be described in detail later, in each of the production lines 1A, 1B, and 1C, each mounter 2 is provided with a component supply unit 24 equipped with a plurality of component supply elements, such as feeders, for supplying components. In the example of FIG. 1 , each mounter 2 is provided with a component supply unit 24 at each of one end and the other end in the Y-axis direction. In this case, the first production line 1A, in which a plurality of mounters 2 are arranged in the board transport direction F1, has a supply unit group 1AU1 in which a plurality of component supply units 24 are arranged at one end in the Y-axis direction of each mounter 2, and a supply unit group 1AU2 in which a plurality of component supply units 24 are arranged at the other end in the Y-axis direction of each mounter 2. In other words, the first production line 1A has two rows of supply unit groups 1AU1 and 1AU2 spaced apart in the Y-axis direction and extending in the board transport direction F1. Similarly, the second production line 1B, in which multiple mounters 2 are arranged in the board transport direction F1, has a supply unit group 1BU1 in which multiple component supply units 24 are arranged at one end of each mounter 2 in the Y-axis direction, and a supply unit group 1BU2 in which multiple component supply units 24 are arranged at the other end of each mounter 2 in the Y-axis direction. In other words, the second production line 1B has two rows of supply unit groups 1BU1 and 1BU2 spaced apart in the Y-axis direction and extending in the board transport direction F1. The third production line 1C, in which multiple mounters 2 are arranged in the board transport direction F1, has a supply unit group 1CU1 in which multiple component supply units 24 are arranged at one end of each mounter 2 in the Y-axis direction, and a supply unit group 1CU2 in which multiple component supply units 24 are arranged at the other end of each mounter 2 in the Y-axis direction. That is, the third production line 1C has two rows of supply unit groups 1CU1 and 1CU2 that are spaced apart in the Y-axis direction and extend in the substrate transport direction F1.
[0014] As described above, in this embodiment, the component mounting system 100 is provided with six rows of supply unit groups 1AU1, 1AU2, 1BU1, 1BU2, 1CU1, and 1CU2 extending in the substrate transport direction F1, corresponding to the three production lines: the first production line 1A, the second production line 1B, and the third production line 1C. In the following description, the supply unit groups 1AU1, 1AU2, 1BU1, 1BU2, 1CU1, and 1CU2 of the production lines 1A, 1B, and 1C may be collectively referred to as "supply unit groups U."
[0015] Each mounter 2 in each production line 1A, 1B, 1C will be described with reference to Figure 2. Each mounter 2 includes a main body frame 21, a conveyor 23, a component supply unit 24, a head unit 25, and a board support unit 28.
[0016] The main frame 21 is a structure in which the various components of the component mounter 2 are arranged, and is formed in a substantially rectangular shape in a plan view seen from a direction (vertical direction) perpendicular to both the X-axis direction and the Y-axis direction. The conveyor 23 extends in the X-axis direction and is arranged on the main frame 21. The conveyor 23 transports the board PB in a transport direction F1 along the X-axis direction. The board PB transported on the conveyor 23 is positioned by a board support unit 28 at a predetermined work position (a component mounting position where components are mounted on the board PB). The board support unit 28 positions the board PB on the conveyor 23 by supporting the board PB from below.
[0017] The component supply units 24 are disposed at one end and the other end of the main frame 21 in the Y-axis direction, with the conveyor 23 sandwiched between them. The component supply unit 24 is an area in the main frame 21 where a plurality of feeders 24F are mounted side by side, and a set position for each feeder 24F is defined for each component to be sucked and held by a mounting head 251 provided in the head unit 25 (described later). The feeders 24F are detachably mounted to the component supply unit 24. The feeders 24F are component supply elements that supply components. The component supply method of the feeders 24F is not particularly limited as long as they are configured to supply components. Examples of the feeders 24F that can be used include tape feeders that supply components using tape as a carrier, tray feeders that supply components by moving a tray on which components are placed, and stick feeders that supply components stored in a cylindrical stick by pushing the components out of the stick. In the case of a tape feeder, the reel on which the tape is wound can be treated as the component supply element, in the case of a tray feeder, the tray can be treated as the component supply element, and in the case of a stick feeder, the stick can be treated as the component supply element.
[0018] The head unit 25 is held by a moving frame 27. A fixed rail 261 extending in the Y-axis direction and a ball screw shaft 262 rotated by a Y-axis servo motor 263 are arranged on the main body frame 21. The moving frame 27 is placed on the fixed rail 261, and a nut portion 271 provided on the moving frame 27 is threadedly engaged with the ball screw shaft 262. The moving frame 27 also has a guide member 272 extending in the X-axis direction and a ball screw shaft 273 driven by an X-axis servo motor 274. The head unit 25 is movably held by the guide member 272, and a nut portion provided on the head unit 25 is threadedly engaged with the ball screw shaft 273. The moving frame 27 moves in the Y-axis direction due to operation of the Y-axis servo motor 263, and the head unit 25 moves in the X-axis direction relative to the moving frame 27 due to operation of the X-axis servo motor 274. That is, the head unit 25 is movable in the Y-axis direction in conjunction with the movement of the movable frame 27, and is movable in the X-axis direction along the movable frame 27. The head unit 25 is movable between the component supply unit 24 and the board PB supported by the board support unit 28. By moving between the component supply unit 24 and the board PB, the head unit 25 sucks and holds components and performs a component suction and placement operation of placing the sucked and held components onto the board PB.
[0019] The head unit 25 includes a plurality of mounting heads 251. Each mounting head 251 picks up components supplied by the feeder 24F and performs a component suction and mounting operation to mount the picked-up components onto the board PB. The component suction and mounting operation of the mounting heads 251 produces mounted boards in the component mounter 2. The mounting heads 251 are capable of communicating with a negative pressure generator, a positive pressure generator, or the atmosphere via an electric switching valve. That is, supplying negative pressure to the mounting head 251 enables the mounting head 251 to pick up and hold a component, and then supplying positive pressure releases the suction and holding of the component. The mounting head 251 performs a component mounting process to mount the picked-up components onto the board PB at each of a plurality of target mounting positions set on the board PB.
[0020] As shown in Figure 1, the storage device 7 is installed in a preparation area AR2 located in the production area AR1 and adjacent to a waiting area AR3 (described below). In the preparation area AR2, workers and work robots prepare feeders 24F to be replenished to each component supply unit 24 belonging to each supply unit group U of each production line 1A, 1B, 1C. The workers and work robots then replenish the prepared feeders 24F to be replenished in the storage device 7. The storage device 7 is equipped with a storage unit 71 capable of storing multiple feeders 24F to be replenished.
[0021] As shown in FIG. 1, the component mounting system 100 includes one or more supply devices 8A-8E. The number of supply devices 8A-8E is smaller than the number of supply unit groups U on each of the production lines 1A, 1B, and 1C. In this embodiment, there are six rows of supply unit groups U corresponding to the three production lines 1A, 1B, and 1C, while there are a total of five supply devices: a first supply device 8A, a second supply device 8B, a third supply device 8C, a fourth supply device 8D, and a fifth supply device 8E. In the following description, the supply devices 8A-8E may be collectively referred to as "supply devices 8."
[0022] Each supply device 8 is a robot capable of moving within the production area AR1. Each supply device 8 comprises a running body 81, a holding unit 82 mounted on the running body 81, and an operating unit 83. The running body 81 is an unmanned vehicle that automatically travels within the production area AR1. The holding unit 82 is a unit that can hold multiple feeders 24F to be replenished. The operating unit 83 is a unit that performs an operation to move the feeders 24F relative to the holding unit 82.
[0023] Each supply device 8 can move along a plurality of movement routes R1 to R6, passing through the storage unit 71 of the storage device 7 and one of the supply unit groups U of each production line 1A, 1B, and 1C, depending on the movement of the traveling body 81. The first movement route R1 is a movement route that starts from a predetermined waiting area AR3 in the production area AR1 as a starting point RS and ends at a terminal RE, passes through the storage unit 71, and passes through the supply unit group 1AU1 of the first production line 1A. The second movement route R2 is a movement route that starts from the waiting area AR3 as a starting point RS and ends at a terminal RE, passes through the storage unit 71, and passes through the supply unit group 1AU2 of the first production line 1A. The third movement route R3 is a movement route that starts from the waiting area AR3 as a starting point RS and ends at a terminal RE, passes through the storage unit 71, and passes through the supply unit group 1BU1 of the second production line 1B. The fourth movement route R4 is a movement route that starts from the standby area AR3 as a starting point RS and ends at the end point RE, passes through the storage unit 71, and passes through the supply unit group 1BU2 of the second production line 1B. The fifth movement route R5 is a movement route that starts from the standby area AR3 as a starting point RS and ends at the end point RE, passes through the storage unit 71, and passes through the supply unit group 1CU1 of the third production line 1C. The sixth movement route R6 is a movement route that starts from the standby area AR3 as a starting point RS and ends at the end point RE, passes through the storage unit 71, and passes through the supply unit group 1CU2 of the third production line 1C.
[0024] Each supply device 8, when positioned at position P1 of the storage unit 71 on each of the movement routes R1 to R6, can perform a transfer operation by using the operation unit 83 to transfer the feeder 24F to be replenished stored in the storage unit 71 to the holding unit 82. Furthermore, each supply device 8, when positioned at position P2 of each component supply unit 24 belonging to each supply unit group U on each of the movement routes R1 to R6, can perform a supply operation by using the operation unit 83 to retrieve the feeder 24F to be retrieved from each component supply unit 24 to the holding unit 82, and in response to the retrieval, replenish the feeder 24F to be replenished from the holding unit 82 to each component supply unit 24.
[0025] 1 , the component mounting system 100 includes a management device 9 that manages each supply device 8. The management device 9 is configured, for example, by a personal computer. The management device 9 includes a communication unit 91, an operation unit 92, and a processing unit 93.
[0026] The communication unit 91 is an interface circuit for performing data communication with each of the component mounters 2 on each of the production lines 1A, 1B, and 1C and each of the supply devices 8. The operation unit 92 is composed of a touch panel, keyboard, etc., and receives input operations from an operator to input various types of information. The processing unit 93 acquires various types of information via the communication unit 91 and the operation unit 92, and performs supply management processing for managing each of the supply devices 8A to 8E based on the acquired information.
[0027] [Regarding the supply management processing of the management device] As shown in Figures 3 and 4, the processing unit 93 repeatedly performs the supply management processing, including the out-of-stock setting processing a1, the supply status recognition processing a2, the allocation processing a3, and the supply processing a4, until the production of the target number of mounting boards on each production line 1A, 1B, and 1C is completed.
[0028] In the out-of-stock setting process a1, the processing unit 93 acquires production status information D1 from each mounter 2 on each production line 1A, 1B, and 1C via the communication unit 91 (step a11). The production status information D1 indicates the current production status of mounted boards by each mounter 2. The production status information D1 includes, for example, the type and production quantity of boards currently being produced by each mounter 2, the type of feeder 24F attached to the component supply unit 24 of each mounter 2, and the type and remaining number of components supplied by the feeder 24F. Based on the production status information D1 of each mounter 2, the processing unit 93 calculates, for each supply unit group U on each production line 1A, 1B, and 1C, an estimated out-of-stock time T1 indicating the estimated time of out-of-stock for each feeder 24F attached to each component supply unit 24 belonging to the supply unit group U (step a12). Then, the processing unit 93 sets the earliest of the estimated component shortage times T1 of the feeders 24F attached to each component supply unit 24 belonging to each supply unit group U as the estimated component shortage time T2 for each group of the supply unit group U (step a13).
[0029] In the allocation process a3, the processing unit 93 assigns one of the supply devices 8 to each of the supply unit groups U of each production line 1A, 1B, and 1C in order of the earliest expected group out-of-stock time T2 (step a31). Accordingly, the processing unit 93 determines a replenishment movement route from among the multiple movement routes R1 to R6 for each supply device 8 when performing a replenishment operation (step a32). In this case, the replenishment movement route for the supply device 8 assigned to the supply unit group 1AU1 is determined to be the first movement route R1, and the replenishment movement route for the supply device 8 assigned to the supply unit group 1AU2 is determined to be the second movement route R2. Similarly, the replenishment movement route for the supply device 8 assigned to the supply unit group 1BU1 is determined to be the third movement route R3, and the replenishment movement route for the supply device 8 assigned to the supply unit group 1BU2 is determined to be the fourth movement route R4. Furthermore, the movement route during replenishment of the replenishment device 8 assigned to the supply unit group 1CU1 is determined to be the fifth movement route R5, and the movement route during replenishment of the replenishment device 8 assigned to the supply unit group 1CU2 is determined to be the sixth movement route R6. Note that in the following description, the movement routes during replenishment of the replenishment devices 8 assigned to each supply unit group U may be collectively referred to as the "movement route during replenishment R."
[0030] In the supply process a4 after the allocation process a3, the processing unit 93 moves the supply device 8 along a supply movement route R having the standby area AR3 as the start point RS and end point RE (step a41). The processing unit 93 stops the supply device 8 at position P1 of the storage unit 71 on the supply movement route R. With the supply device 8 positioned at position P1 of the storage unit 71 on the supply movement route R, the processing unit 93 causes the supply device 8 to perform a transfer operation to transfer the feeder 24F to be supplied stored in the storage unit 71 to the holding unit 82 (step a42). This allows the supply device 8 to hold, in the holding unit 82, the feeder 24F to be supplied for each component supply unit 24 belonging to each of the supply unit groups U of each production line 1A, 1B, and 1C.
[0031] When the transfer operation of the supplying device 8 to the storage unit 71 is completed, the processing unit 93 resumes the movement of the supplying device 8 along the supplying movement path R. Then, the processing unit 93 stops the supplying device 8 at position P2 of each component supply unit 24 belonging to the supply unit group U on the supplying movement path R. With the supplying device 8 positioned at position P2 of each component supply unit 24 on the supplying movement path R, the processing unit 93 causes each component supply unit 24 to perform a supplying operation to collect the feeder 24F that is out of components and to replenish the feeder 24F to be replenished in response to the collection (step a43). This allows the supplying device 8 to replenish the feeder 24F to be replenished to each component supply unit 24 on the supplying movement path R. When the supplying operation of the supplying device 8 to each component supply unit 24 on the supplying movement path R is completed, the processing unit 93 moves the supplying device 8 along the supplying movement path R until it returns to the end point RE in the waiting area AR3.
[0032] As described above, the processing unit 93 sets the estimated group component shortage time T2 for each of the supply unit groups U of the multiple production lines 1A, 1B, and 1C, and determines the replenishment movement route R for the supply device 8 by assigning one of the supply devices 8 to each of the supply unit groups U in order of the earliest estimated group component shortage time T2. The processing unit 93 then moves the supply device 8 along the replenishment movement route R and causes the supply device 8 to perform a replenishment operation for each of the component supply units 24 belonging to the supply unit group U on the replenishment movement route R. This allows the replenishment operation of the supply device 8 corresponding to the supply unit group U to be performed in order of the earliest estimated group component shortage time T2 for the supply unit group U, regardless of the number of supply devices 8 for the supply unit groups U of the respective production lines 1A, 1B, and 1C, even if, for example, the number of supply devices 8 is fewer than the number of supply unit groups U. This prevents a situation in which the supply device 8 is unable to replenish the feeders 24F attached to each component supply unit 24 belonging to the supply unit group U in time for the feeders 24F to run out of components. This makes it possible to prevent a decrease in productivity of mounting boards in each of the production lines 1A, 1B, and 1C due to a delay in the supply of the feeder 24F by the supply device 8.
[0033] The state of the supply device 8 transitions from standby, replenishment, to replenishment completion, depending on the progress of the replenishment operation corresponding to each supply unit group U of each production line 1A, 1B, and 1C. A supply device 8 in the standby state is a supply device located in the standby area AR3. A supply device 8 in the replenishment state is a supply device in the middle of a replenishment operation corresponding to a supply unit group U on the replenishment movement path R. In other words, a supply device 8 in the replenishment state is located on the replenishment movement path R in the middle of a replenishment operation corresponding to the replenishment process a4. The supply device 8 in the replenishment state includes a supply device 8 in a specific replenishment state whose scheduled return time to the end point RE in the standby area AR3 is earlier than the scheduled group out-of-stock time T2. A supply device 8 in the replenishment completion state is a supply device located on the replenishment movement path R but has completed a replenishment operation corresponding to a supply unit group U. In other words, a supply device 8 in the replenishment completion state has completed a replenishment operation corresponding to the replenishment process a4 and is located on the replenishment movement path R. When the replenishment device 8 in the replenishment completed state returns to the end point RE in the waiting area AR3, the state transitions to the waiting state.
[0034] 3 and 4 , the processing unit 93 performs a supply status recognition process a2 to recognize the status of each supply device 8. In the supply status recognition process a2, the processing unit 93 acquires supply status information D2 indicating the status of each supply device 8 from each supply device 8 via the communication unit 91 (step a21). The supply status information D2 indicates whether each supply device 8 is in a standby state, a replenishment state, or a replenishment completion state. The supply status information D2 includes information regarding an estimated return time T3 indicating the estimated time when a supply device 8 in the replenishment state will return to the end point RE within the waiting area AR3. Based on the supply status information D2, the processing unit 93 recognizes whether each supply device 8 is in a standby state, a replenishment state, or a replenishment completion state (step a22), and recognizes the estimated return time T3 for a supply device 8 in the replenishment state (step a23).
[0035] In the allocation process a3, when the processing unit 93 allocates the supply devices 8 in order of earliest expected group component outage times T2, the allocation candidates are, in this order, the supply device 8 in the standby state, the supply device 8 in the resupply complete state, and the supply device 8 in the specific resupply state, which is in the resupplying state and whose expected return time T3 is earlier than the expected group component outage time T2. At the current time when the processing unit 93 is performing the allocation process a3, the supply device 8 in the standby state is not assigned a supply unit group U to perform a resupply operation and is located in the standby area AR3. The supply device 8 in the resupply complete state is located on the resupply movement route R, but has completed the resupply operation corresponding to the supply unit group U, so at the current time, it returns to the end point RE in the standby area AR3 earlier than the supply device 8 in the resupplying state. The supply device 8 in the specific resupply state is currently in the resupplying state, but its expected return time T3 is earlier than the expected group component outage time T2. In consideration of these circumstances, the processing unit 93 selects as candidates for allocation, in the order of standby supply devices 8, supply devices 8 in a replenishment complete state, and supply devices 8 in a specific replenishment state. In this way, by selecting as candidates for allocation not only standby supply devices 8 but also supply devices 8 in a replenishment complete state and a specific replenishment state, it is possible to accurately assign supply devices 8 to supply unit groups U in accordance with the expected group out-of-stock time T2, even if, for example, the number of supply devices 8 is smaller than the number of supply unit groups U.
[0036] The allocation process a3 of the processing unit 93 based on the estimated group component shortage time T2 of each supply unit group U and the state of each replenishing device 8 will be described in more detail with reference to FIG.
[0037] Before the supply process a4 is performed by the processing unit 93, the expected group component shortage time T2 for each of the six supply unit groups U is earliest for supply unit group 1BU1, followed by supply unit group 1BU2, supply unit group 1AU1, supply unit group 1AU2, supply unit group 1CU2, and supply unit group 1CU1. Under these conditions of expected group component shortage times T2, the five supply devices 8, namely, the first supply device 8A, the second supply device 8B, the third supply device 8C, the fourth supply device 8D, and the fifth supply device 8E, are each in a standby state. In this case, the processing unit 93 assigns the first supply device 8A to the supply unit group 1BU1, the second supply device 8B to the supply unit group 1BU2, the third supply device 8C to the supply unit group 1AU1, the fourth supply device 8D to the supply unit group 1AU2, and the fifth supply device 8E to the supply unit group 1CU2 in order of earliest expected group component shortage time T2. When the assignment of all five supply devices 8 is completed, the processing unit 93 temporarily terminates the assignment process a3. In this case, no supply device 8 is assigned to the supply unit group 1CU1 with the latest expected group component shortage time T2.
[0038] When each supply device 8 performs a supply operation for the supply unit group U on the supply movement path R in accordance with the supply process a4 performed by the processing unit 93 after the assignment process a3, the state of each supply device 8 transitions from a standby state to a supplying state and a supply completion state. In the example of FIG. 4 , the first supply device 8A, whose third movement path R3 is the supply movement path R, is in the middle of a supply operation for the supply unit group 1BU1 on the third movement path R3, but is in a specific supplying state in which the estimated return time T3 is earlier than the estimated group component shortage time T2 of the supply unit group 1CU1 to which the supply device 8 is not currently assigned. The second supply device 8B, whose fourth movement path R4 is the supply movement path R, is in a supply completion state in which the second supply device 8B has completed a supply operation for the supply unit group 1BU2 on the fourth movement path R4. The third supply device 8C, which has the first movement path R1 as its supply movement path R, is in the middle of a supply operation to the supply unit group 1AU1 on the first movement path R1, and is in a supplying state in which its expected return time T3 is later than the expected group component shortage time T2 of the supply unit group 1CU1. Similarly, the fourth supply device 8D, which has the second movement path R2 as its supply movement path R, and the fifth supply device 8E, which has the sixth movement path R6 as its supply movement path R, are also in a supplying state.
[0039] Each component supply unit 24 belonging to the supply unit group U is equipped with a plurality of feeders 24F with different estimated component shortage times T1. As described above, the processing unit 93 sets the earliest of the estimated component shortage times T1 of the feeders 24F equipped in each component supply unit 24 belonging to the supply unit group U as the group estimated component shortage time T2. In this case, the earliest of the estimated component shortage times T1 of the feeders 24F equipped in the component supply unit 24 changes each time a supplying device 8 corresponding to a feeder 24F to be replenished completes a replenishment operation. Therefore, in the component shortage setting process a1, the processing unit 93 updates the group estimated component shortage time T2 each time a replenishment device 8 in the replenishment state completes a replenishment operation corresponding to a feeder 24F to be replenished (step a14).
[0040] In a situation where there is no standby supply device 8 in response to the supply process a4, the processing unit 93 selects the second supply device 8B, which is in a replenishment complete state and located on the fourth movement route R4, and the first supply device 8A, which is in a specific replenishment state and located on the third movement route R3, as candidates for allocation to the supply unit group 1CU1. At the time when the processing unit 93 performs the allocation process a3 for the supply unit group 1CU1, the second supply device 8B, which is in a replenishment complete state, is located on the fourth movement route R4 but has completed a replenishment operation for the supply unit group 1BU2. Therefore, the second supply device 8B, which is in a replenishment complete state, returns to the end point RE within the standby area AR3 earlier than the first supply device 8A, which is in a specific replenishment state. Therefore, the processing unit 93 assigns the second supply device 8B, which is in a replenishment complete state, to the supply unit group 1CU1. Note that if there is no standby or replenishment complete state supply device 8, the processing unit 93 assigns the first supply device 8A, which is in a specific replenishment state, to the supply unit group 1CU1.
[0041] The processing unit 93 repeatedly performs the out-of-component setting process a1, the supply status recognition process a2, the allocation process a3, and the supply process a4 as supply management processes until the production of the target number of mounting boards on each production line 1A, 1B, 1C is completed. This makes it possible to prevent a situation in which the supply device 8 is unable to supply the feeder 24F in time before the feeder 24F attached to each component supply unit 24 belonging to the supply unit group U runs out of components. This makes it possible to prevent a decrease in productivity of mounting boards on each production line 1A, 1B, 1C due to a delay in the supply of the feeder 24F by the supply device 8.
[0042] [Regarding a Modified Example of the Supply Management Process of the Management Device] As shown in FIG. 5 , the processing unit 93 may perform a production priority setting process a0 in addition to the out-of-stock setting process a1, the supply status recognition process a2, the allocation process a3, and the supply process a4. In the production priority setting process a0, the processing unit 93 sets a production priority PP indicating the production priority of the mounting boards on each production line 1A, 1B, and 1C for each supply unit group U on each production line 1A, 1B, and 1C. Specifically, the processing unit 93 acquires input information D3 related to the setting of the production priority PP via the operation unit 92 (step a01). Furthermore, the processing unit 93 recognizes a scheduled production completion time T4 (step a02) and a production delay time T5 related to the production progress status based on production status information D1 acquired via the communication unit 91 (step a03). The scheduled production completion time T4 indicates the scheduled time when the production of the target number of mounting boards on each production line 1A, 1B, and 1C will be completed. The production delay time T5 indicates the production delay time relating to the progress of the production of mounting boards on each of the production lines 1A, 1B, and 1C.
[0043] The processing unit 93 then sets a production priority order PP for each of the supply unit groups U of each production line 1A, 1B, 1C based on the input information D3, the scheduled production completion time T4, and the production delay time T5 (step a04). At this time, the processing unit 93 sets the production priority order PP by any of the first, second, and third setting processes shown in Fig. 6 and the fourth, fifth, and sixth setting processes shown in Fig. 7.
[0044] In the first setting process, the processing unit 93 sets a production priority order PP for each of the supply unit groups U of each of the production lines 1A, 1B, and 1C based on input information D3 input by the operator via the operation unit 92. In this case, the production priority order PP can be set as desired by the operator.
[0045] In the second setting process, the processing unit 93 sets a production priority order PP for each of the supply unit groups U of each of the production lines 1A, 1B, and 1C based on the scheduled production completion time T4 of each of the production lines 1A, 1B, and 1C. At this time, the processing unit 93 can set the production priority order PP for each of the supply unit groups U of each of the production lines 1A, 1B, and 1C so that the production priority order PP is higher in descending order of the scheduled production completion time T4 of the production line.
[0046] In the third setting process, the processing unit 93 sets a production priority order PP for each of the supply unit groups U of each of the production lines 1A, 1B, and 1C based on the production delay time T5 of each of the production lines 1A, 1B, and 1C. At this time, the processing unit 93 can set the production priority order PP for each of the supply unit groups U of each of the production lines 1A, 1B, and 1C so that the production priority order PP is higher in descending order of the production delay time T5 as a production progress status.
[0047] In the fourth setting process, the processing unit 93 sets a production priority order PP for each of the supply unit groups U of each of the production lines 1A, 1B, and 1C based on the input information D3 input via the operation unit 92 and the scheduled production completion time T4 of each of the production lines 1A, 1B, and 1C. In this case, the processing unit 93 prioritizes the input information D3 over the scheduled production completion time T4 when setting the production priority order PP.
[0048] In the fifth setting process, the processing unit 93 sets a production priority order PP for each of the supply unit groups U of each of the production lines 1A, 1B, and 1C based on the input information D3 input via the operation unit 92 and the production delay time T5 of each of the production lines 1A, 1B, and 1C. At this time, the processing unit 93 places more importance on the input information D3 than on the production delay time T5 when setting the production priority order PP.
[0049] In the sixth setting process, the processing unit 93 sets a production priority order PP for each of the supply unit groups U of each production line 1A, 1B, 1C based on the input information D3 input via the operation unit 92, the scheduled production completion time T4 for each production line 1A, 1B, 1C, and the production delay time T5 for each production line 1A, 1B, 1C. In this case, the processing unit 93 prioritizes the input information D3 over the scheduled production completion time T4 and the production delay time T5 when setting the production priority order PP. Furthermore, when both the scheduled production completion time T4 and the production delay time T5 are used, the processing unit 93 can prioritize either the scheduled production completion time T4 or the production delay time T5 in accordance with the input operation via the operation unit 92 when setting the production priority order PP.
[0050] Furthermore, the scheduled production completion time T4 of each production line 1A, 1B, 1C may change due to a problem such as a delay in the replenishment of the feeders 24F by the replenishment device 8 to the supply unit groups U of each production line 1A, 1B, 1C. In this case, the processing unit 93 updates the production priority order PP for each supply unit group U of each production line 1A, 1B, 1C based on the change in the scheduled production completion time T4 (step a05). Figure 7 shows an example in which the production priority order PP for each supply unit group U of each production line 1A, 1B, 1C is set as follows: supply unit group 1AU1 is set to first, supply unit group 1CU2 is set to second, supply unit group 1AU2 is set to third, supply unit group 1CU1 is set to fourth, supply unit group 1BU1 is set to fifth, and supply unit group 1BU2 is set to sixth. With the production priority order PP set in this way, it is assumed that the scheduled production completion time T4 of the supply unit group 1BU2 changes to be later than the scheduled production completion time T4 of the supply unit group 1BU1. In this case, the processing unit 93 updates the production priority order PP of the supply unit group 1BU1 from fifth place to sixth place, and updates the production priority order PP of the supply unit group 1BU2 from sixth place to fifth place.
[0051] After the production priority setting process a0 is performed, the processing unit 93 performs the allocation process a3 and the replenishment process a4 while referring to the production priority order PP of each of the supply unit groups U on each of the production lines 1A, 1B, and 1C. In this case, the processing unit 93 sets a production priority order PP for each of the supply unit groups U on each of the production lines 1A, 1B, and 1C, and assigns the replenishment devices 8 in order of the earliest estimated group component shortage time T2 while referring to the production priority order PP. Then, the processing unit 93 causes the replenishment devices 8 to replenish each component supply unit 24 belonging to the supply unit group U in accordance with the allocation of the replenishment devices 8 to the supply unit groups U. This makes it possible to cause the replenishment devices 8 to perform replenishment operations for each of the supply unit groups U on each of the production lines 1A, 1B, and 1C, while taking into consideration the production priority order PP as well as the estimated group component shortage time T2. This makes it possible to prevent a situation in which the replenishing device 8 is unable to replenishing the feeders 24F in time for the supply unit groups U with high production priority levels PP for the production of mounting boards on each of the production lines 1A, 1B, and 1C. This makes it possible to prevent a decrease in productivity of mounting boards on production lines with high production priority levels PP due to delays in the replenishing device 8 with the feeders 24F.
[0052] In a situation where there are no standby supply devices 8 but there are supply devices 8 in the supply-completed state and in the supplying state, it is necessary to accurately assign the supply devices 8 in the supply-completed state and in the supplying state to each of the supply unit groups U of each production line 1A, 1B, 1C. Assume that, at this point in time under such a situation, supply devices 8 are assigned to the first target supply unit group U, which has the earliest expected group component shortage time T2, and the second target supply unit group U, which has a higher production priority PP than the first target supply unit group U. The assignment of supply devices 8 in this assumed case will be described with reference to FIGS. 8 and 9 .
[0053] In the examples of FIGS. 8 and 9 , the production priority PP for each supply unit group U on each production line 1A, 1B, and 1C is set as follows: supply unit group 1AU1 is set to first, supply unit group 1CU2 is set to second, supply unit group 1AU2 is set to third, supply unit group 1CU1 is set to fourth, supply unit group 1BU1 is set to fifth, and supply unit group 1BU2 is set to sixth. Furthermore, there are no standby supply devices 8. The first supply device 8A is in a supplying state, currently supplying the supply unit group 1BU1 on the third movement path R3. The second supply device 8B is in a supply-completed state, having completed supplying the supply unit group 1BU2 on the fourth movement path R4. The third supply device 8C is in a supplying state, currently supplying the supply unit group 1CU1 on the fifth movement path R5. The fourth supply device 8D is in a supplying state, in the middle of a supplying operation to the supply unit group 1AU2 on the second movement path R2. The fifth supply device 8E is in a supplying state, in the middle of a supplying operation to the supply unit group 1CU2 on the sixth movement path R6.
[0054] Assume that, under the above-described circumstances, a replenishment device 8 is currently assigned to the supply unit group 1BU2 and the supply unit group 1AU1. The supply unit group 1BU2 has the sixth highest production priority PP, but is the first target supply unit group U with the earliest expected group component shortage time T2. On the other hand, the supply unit group 1AU1 has a later expected group component shortage time T2 than the supply unit group 1BU2, but has the first highest production priority PP than the supply unit group 1BU2.
[0055] The second supply device 8B in the replenishment complete state is located on the fourth movement route R4 as the replenishment movement route R, but has completed the replenishment operation corresponding to the supply unit group 1BU2. Therefore, at this time, the second supply device 8B in the replenishment complete state returns to the end point RE in the standby area AR3 earlier than the first supply device 8A, the third supply device 8C, the fourth supply device 8D, and the fifth supply device 8E, which are currently replenishing. Therefore, the processing unit 93 assigns the second supply device 8B in the replenishment complete state to the first target supply unit group 1BU2, which currently has the earliest estimated group component shortage time T2. This prevents the supply device 8 from being late in replenishing the feeder 24F for the first target supply unit group 1BU2.
[0056] 8, if there is no supply device 8 in the specific supplying state whose estimated return time T3 is earlier than the estimated group out-of-stock time T2 of the second target supply unit group 1AU1, the processing unit 93 assigns the second supply device 8B in the supply-completed state to the second target supply unit group 1AU1 in common with the first target supply unit group 1BU2. On the other hand, as shown in FIG. 9, if there is a fifth supply device 8E in the specific supplying state whose estimated return time T3 is earlier than the estimated group out-of-stock time T2 of the second target supply unit group 1AU1, the processing unit 93 assigns the fifth supply device 8E in the specific supplying state to the second target supply unit group 1AU1. This prevents a situation in which the supply device 8 is unable to replenish the feeder 24F in time for the second target supply unit group 1AU1, which has a higher production priority PP than the first target supply unit group 1BU2.
[0057] 8, assume that the second supply device 8B, which has completed supply, is assigned to the second target supply unit group 1AU1 in common with the first target supply unit group 1BU2. The second supply device 8B, which has completed supply, moves along the fourth movement path R4 and returns to the end point RE in the waiting area AR3, and then performs a supply operation on the first target supply unit group 1BU2, which currently has the earliest estimated group component shortage time T2. If the second supply device 8B performs all required supply operations on the first target supply unit group 1BU2, a situation may arise in which the supply operation for the second target supply unit group 1AU1 is not completed in time for the estimated group component shortage time T2. Therefore, the processing unit 93 adjusts the number of times the second supply device 8B performs supply operations for the first target supply unit group 1BU2 in the supply process a4 corresponding to the first target supply unit group 1BU2 so that the supply operation for the second target supply unit group 1AU1 can be completed in time for the group component shortage scheduled time T2. This more reliably prevents the second supply device 8B from being unable to replenish the feeders 24F for the second target supply unit group 1AU1 in time.
[0058] As shown in FIG. 9 , assume that the fifth supply device 8E in the specific supplying state is assigned to the second target supply unit group 1AU1. If the fifth supply device 8E in the specific supplying state performs all required supply operations for the supply unit group 1CU2 on the sixth movement path R6, which is the current supplying movement path R, a situation may arise in which the supply operation for the second target supply unit group 1AU1 is not completed in time for the scheduled group component shortage time T2. Therefore, the processing unit 93 adjusts the number of supply operations performed by the fifth supply device 8E for the supply unit group 1CU2 currently on the sixth movement path R6 so that the supply operation for the second target supply unit group 1AU1 is completed in time for the scheduled group component shortage time T2. This more reliably prevents the fifth supply device 8E from being late in supplying the feeder 24F for the second target supply unit group 1AU1.
[0059] The above-described specific embodiments mainly include inventions having the following configurations.
[0060] A component mounting system according to one aspect of the present invention comprises a supply unit group consisting of a plurality of component supply units arranged along the transport direction of a substrate, a plurality of production lines which produce mounted substrates by mounting components supplied from component supply elements attached to each of the component supply units belonging to the supply unit group onto the substrate, one or more supply devices which are movable along each of a plurality of movement paths which pass through any of the supply unit groups of each of the production lines and which are capable of performing a supply operation for each of the component supply units belonging to the supply unit group to replenish component supply elements to be replenished in response to the recovery of component supply elements to be recovered that are out of components, and a management device which manages the supply devices. The management device performs a part out-of-stock setting process that sets the earliest of the expected part out-of-stock times of each of the part supply elements attached to each of the part supply units belonging to that supply unit group as the expected part out-of-stock time for that group, an assignment process that determines a replenishment movement route among the multiple movement routes when the replenishment device performs the replenishment operation by assigning the replenishment devices to each of the supply unit groups of each of the production lines in order of the earliest expected part out-of-stock times for that group, and a replenishment process that moves the replenishment device along the replenishment movement route and has the replenishment device perform the replenishment operation while the replenishment device is positioned at the position of each of the part supply units belonging to the supply unit group on the replenishment movement route.
[0061] According to this component mounting system, the management device sets a group component outage expected time for each of the supply unit groups on multiple production lines and determines the replenishment movement path for the replenishment device by assigning replenishment devices in order of the earliest group component outage expected time. The management device then moves the replenishment device along the replenishment movement path and causes the replenishment device to perform a replenishment operation for each component supply unit belonging to the supply unit group on the replenishment movement path. This allows the replenishment operation of the replenishment device corresponding to the supply unit group to be performed in order of the earliest group component outage expected time for the supply unit group, regardless of the number of replenishment devices for the supply unit group on each production line. Even if the number of replenishment devices is less than the number of supply unit groups, for example, the replenishment operation of the replenishment device corresponding to the supply unit group can be performed in order of the earliest group component outage expected time for the supply unit group. This prevents a situation in which the replenishment device is unable to replenish the component supply elements in time before the component supply elements attached to each component supply unit belonging to the supply unit group run out of components. This prevents a decrease in the productivity of mounted boards on each production line due to delays in the replenishment of component supply elements by the replenishment device.
[0062] In the component mounting system described above, each of the multiple movement paths has a start point and an end point at a predetermined standby area in a production area where each of the production lines is installed, and passes through one of the supply unit groups of each of the production lines. In this case, the management device performs a supply state recognition process to recognize the state of each replenishment device: a standby state in which the replenishment device is located in the standby area; a replenishment completion state in which the replenishment operation corresponding to the replenishment process has been completed and the replenishment device is located on the replenishment movement path; or a replenishment in progress state in which the replenishment operation corresponding to the replenishment process is in the middle of the replenishment process and the replenishment device is located on the replenishment movement path. In the allocation process, when allocating the replenishment devices in order of the earliest expected group component shortage time, the management device selects as candidates for allocation, in this order: a replenishment device in a standby state, a replenishment completion state, and a replenishment device in a specific replenishment in progress state in which the expected time for returning to the end point in the standby area in the replenishment state is earlier than the expected group component shortage time.
[0063] The state of a supply device transitions between standby, replenishment, and replenishment complete states in accordance with the progress of the replenishment operation corresponding to the allocation to each supply unit group of each production line. A supply device in standby state is a supply device that is located in the standby area. A supply device in replenishment state is a supply device that is in the middle of a replenishment operation corresponding to a supply unit group on the replenishment movement path. Supply devices in replenishment state include a supply device in a specific replenishment state whose scheduled time of return to the end point in the standby area is earlier than the scheduled time of group component shortage. A supply device in replenishment complete state is a supply device that is located on the replenishment movement path but has completed a replenishment operation corresponding to a supply unit group. A supply device in replenishment complete state transitions to standby when it returns to the end point in the standby area.
[0064] When allocating supply devices in order of earliest expected group component out-of-stock time, the management device selects as allocation candidates, in this order, supply devices in a standby state, supply devices in a supply complete state, and supply devices in a specific supplying state. In this way, by selecting as allocation candidates not only supply devices in a standby state but also supply devices in a supply complete state and a specific supplying state, it is possible to accurately allocate supply devices to supply unit groups according to the expected group component out-of-stock time, even if, for example, the number of supply devices is smaller than the number of supply unit groups.
[0065] In the above-mentioned component mounting system, in the component outage setting process, the management device updates the expected group component outage time each time the supply device in the supplying state completes the supply operation corresponding to one of the component supply elements to be supplied.
[0066] Each component supply unit belonging to a supply unit group is equipped with multiple component supply elements with different expected component shortage times. The management device sets the earliest expected component shortage time of each component supply element attached to each component supply unit belonging to the supply unit group as the expected component shortage time for the group. In this case, the earliest expected component shortage time of each component supply element attached to the component supply unit changes each time a replenishment operation by a replenishment device corresponding to a component supply element to be replenished is completed. Therefore, the management device updates the expected component shortage time for the group each time a replenishment operation by a replenishment device corresponding to a component supply element to be replenished is completed.
[0067] The component mounting system further includes a storage unit installed in a preparation area adjacent to the standby area and storing the component supply elements to be replenished. In this case, the supply device has a holding unit capable of holding the component supply elements to be replenished, is movable along a path that passes through the storage unit as one of the multiple movement paths, and is capable of performing a transfer operation to transfer the component supply elements to be replenished stored in the storage unit to the holding unit. Then, during the replenishment process, the management device causes the supply device to perform the transfer operation while the supply device is positioned at the position of the storage unit on the replenishment movement path.
[0068] In this aspect, the management device causes the supply device to perform a transfer operation to transfer the component supply elements to be supplied stored in the storage unit to the holding unit while the supply device is positioned at the position of the storage unit on the movement path during supply, thereby allowing the supply device to hold, in the holding unit, the component supply elements to be supplied to each component supply unit belonging to each of the supply unit groups of each production line.
[0069] In the component mounting system, the management device performs a production priority setting process for each of the supply unit groups on each of the production lines to set a production priority for the production of the mounted boards on each of the production lines, and performs the allocation process and the replenishment process while referring to the production priority.
[0070] In this aspect, the management device sets a production priority for each supply unit group on each production line and assigns a replenishment device to each component supply unit belonging to the supply unit group in order of earliest expected group component outage time, while referring to the production priority. The management device then causes the replenishment device to perform a replenishment operation for each component supply unit belonging to the supply unit group, depending on the assignment of the replenishment device to the supply unit group. This makes it possible to cause the replenishment device to perform a replenishment operation for each supply unit group on each production line, taking into account not only the expected group component outage time but also the production priority. This prevents a situation in which the replenishment device is unable to replenish component supply elements in time for a supply unit group with a high production priority for the production of mounted boards on each production line. This prevents a decrease in productivity of mounted boards on production lines with a high production priority due to delays in the replenishment of component supply elements by the replenishment device.
[0071] In the component mounting system described above, it is assumed that the allocation process is performed for a first target supply unit group having the earliest expected out-of-group time and a second target supply unit group having a higher production priority than the first target supply unit group, under the condition that there are no supply devices in the standby state and there are supply devices in the supply complete state and the supplying in progress state. In this case, the management device allocates the supply device in the supply complete state to the first target supply unit group. Furthermore, for the second target supply unit group, if there is a supply device in the specific supplying state in the supplying state, the management device allocates the supply device in the specific supplying state to the second target supply unit group. On the other hand, if there is no supply device in the specific supplying state, the management device allocates the supply device in the supply complete state to be shared with the first target supply unit group.
[0072] In a situation where there are no standby supply devices but there are supply devices in the supply complete state and in the supply in progress state, it is necessary to accurately assign supply devices in the supply complete state and in the supply in progress state to each supply unit group of each production line. In such a situation, it is assumed that supply devices are currently assigned to the first target supply unit group, which has the earliest expected group component shortage time, and the second target supply unit group, which has a higher production priority than the first target supply unit group.
[0073] A supply device that has completed supplying is located on the supplying movement path, but has completed the supplying operation for the supply unit group, so it will return to the end point in the waiting area earlier than a supply device that is currently in the supplying state. Therefore, the management device assigns a supply device that has completed supplying to the first target supply unit group, which currently has the earliest expected group component out-of-stock time. This prevents a situation in which a supply device is unable to supply component supply elements to the first target supply unit group in time.
[0074] Then, if there is a supply device in a specific supplying state in the supplying state, the management device assigns the specific supplying state to the second target supply unit group. A supplying device in a specific supplying state is a supplying device that is in the middle of a supply operation corresponding to the supply unit group, but whose scheduled time of returning to the end point in the waiting area is earlier than the scheduled time of component shortage for the group. On the other hand, if there is no supplying device in the specific supplying state, the management device assigns a supplying device in a replenishment completed state to the second target supply unit group in common with the first target supply unit group. This prevents a situation in which a supply device is unable to replenish component supply elements in time, even for the second target supply unit group, which has a higher production priority than the first target supply unit group.
[0075] In the above-mentioned component mounting system, when the management device assigns the supply device in the specific supplying state to the second target supply unit group in the allocation process, it adjusts the number of supply operations for the supply unit group on the supply movement path where the supply device in the specific supplying state is located in the current supply process so that the supply operation for the second target supply unit group is completed in time for the scheduled time of component shortage for the group.
[0076] Assume that a supply device in a specific replenishment state is assigned to a second target supply unit group. If the supply device in the specific replenishment state performs all required replenishment operations for the supply unit group on the current replenishment movement path, a situation may arise in which the replenishment operation for the second target supply unit group is not completed in time for the scheduled group component outage time. Therefore, the management device adjusts the number of replenishment operations performed by the supply device in the specific replenishment state for the supply unit group on the current replenishment movement path so that the replenishment operation for the second target supply unit group is completed in time for the scheduled group component outage time. This more reliably prevents the replenishment device from being unable to replenish the second target supply unit group with component supply elements in time.
[0077] In the above-mentioned component mounting system, when the management device assigns the supply device in the replenishment completed state to the second target supply unit group in the allocation process in common with the first target supply unit group, the management device adjusts the number of replenishment operations for the first target supply unit group in the replenishment process corresponding to the first target supply unit group so that the replenishment operation for the second target supply unit group is completed in time for the scheduled time for the group to run out of components.
[0078] Assume that a supply device in a replenishment-completed state is assigned to a second target supply unit group in common with a first target supply unit group. After returning to the end point within the waiting area, the replenishment device in a replenishment-completed state will perform a replenishment operation on the first target supply unit group, which currently has the earliest expected group component outage time. If the replenishment device performs all required replenishment operations on the first target supply unit group, a situation may arise in which the replenishment operation on the second target supply unit group is not completed in time for the expected group component outage time. Therefore, the management device adjusts the number of replenishment operations for the first target supply unit group so that the replenishment operation on the second target supply unit group is completed in time for the expected group component outage time. This more reliably prevents the replenishment device from being unable to replenish the second target supply unit group with component supply elements in time.
[0079] In the component mounting system, the management device sets the production priority order based on input information input via an operation unit in the production priority order setting process.
[0080] In this aspect, the management device can set production priorities for each of the supply unit groups on each production line based on input information input via the operation unit in response to input operations by an operator.
[0081] In the component mounting system, the management device sets the production priority order in the production priority setting process based on a scheduled production completion time for the production of the mounting boards on each of the production lines.
[0082] In this aspect, the management device can set a production priority for each of the supply unit groups on each production line based on the estimated production completion time indicating the estimated time when production of the target number of mounting boards will be completed on each production line. At this time, the management device can set a production priority for each of the supply unit groups on each production line so that the production priority is higher in descending order of the estimated production completion time.
[0083] In the component mounting system, the management device sets the production priority order in the production priority setting process based on the production progress status regarding the production of the mounting boards on each of the production lines.
[0084] In this aspect, the management device can set a production priority for each of the supply unit groups on each production line based on the progress of production of mounted boards on each production line. At this time, the management device can set a production priority for each of the supply unit groups on each production line so that the production priority is assigned to each of the supply unit groups on each production line in descending order of production delay time as a production progress status.
[0085] In the component mounting system, the management device may set the production priority order in the production priority setting process based on input information input via an operation unit and at least one of a scheduled production completion time and a production progress status, which is information related to the production of the mounting boards on each of the production lines.
[0086] In the component mounting system, the management device may set the production priority order by prioritizing the input information over the estimated production completion time and the production progress status.
[0087] In the above-described component mounting system, when the management device uses both the scheduled production completion time and the production progress status, the management device may prioritize either the scheduled production completion time or the production progress status in response to an input operation via an operation unit, and set the production priority order.
[0088] As described above, according to the present invention, it is possible to provide a component mounting system that can suppress a decrease in productivity of mounted boards on a production line due to delays in the supply of component supply elements by a supply device, regardless of the number of supply devices for a group of supply units on the production line.
Claims
1. A system comprising: a plurality of production lines having supply unit groups each including a plurality of component supply units arranged along a transport direction of a board, the production lines comprising: one or more supply devices each capable of moving along each of a plurality of movement paths passing through any of the supply unit groups of each of the production lines, and capable of performing a supply operation for each of the component supply units belonging to the supply unit group to supply a component supply element to be replenished in response to the recovery of a component supply element to be recovered due to lack of components; and a management device for managing the supply devices; wherein the management device performs a component out-of-stock setting process for setting, for each of the supply unit groups of each of the production lines, the earliest of the component out-of-stock scheduled times of each of the component supply elements attached to each of the component supply units belonging to the supply unit group as a group component out-of-stock scheduled time; and an allocation process for determining a replenishment movement path from among the plurality of movement paths when the replenishment device performs the replenishment operation by allocating a replenishment device to each of the supply unit groups of each of the production lines in order of the earliest group component out-of-stock scheduled time. a supply process in which the supply device is moved along the supply movement path, and the supply device is caused to perform the supply operation while the supply device is positioned at the position of each of the component supply units belonging to the supply unit group on the supply movement path.
2. The component mounting system of claim 1, wherein each of the multiple movement paths has a start and end point in a designated waiting area within the production area in which each of the production lines is installed, and passes through one of the groups of supply units of each of the production lines; and the management device performs a supply state recognition process to recognize whether the state of the supply device is a waiting state in which it is located in the waiting area, a supply completion state in which it has completed the supply operation in accordance with the supply process and is located on the supply movement path, or a supplying state in which it is located on the supply movement path in the middle of the supply operation in accordance with the supply process; and when allocating the supply devices in the allocation process in order of the earliest scheduled time of component outage in the group, the candidates for allocation in this order are the supply device in the waiting state, the supply device in the supply completion state, and the supply device in a specific supplying state in which the scheduled time of returning to the end point in the waiting area in the supplying state is earlier than the scheduled time of component outage in the group.
3. A component mounting system as described in claim 2, wherein the management device updates the group scheduled out-of-stock time each time the supply device in the in-supply state completes a supply operation corresponding to one of the component supply elements to be supplied during the component out-of-stock setting process.
4. A component mounting system as described in claim 2, further comprising a storage unit installed in a preparation area adjacent to the waiting area and storing the part supply elements to be replenished, wherein the replenishment device has a holding unit capable of holding the part supply elements to be replenished, is movable along a path that passes through the storage unit as one of the multiple movement paths, and is capable of performing a transfer operation of transferring the part supply elements to be replenished stored in the storage unit to the holding unit, and wherein the management device, during the replenishment process, causes the replenishment device to perform the transfer operation while the replenishment device is positioned at the position of the storage unit on the movement path during replenishment.
5. The component mounting system of claim 2, wherein the management device performs a production priority setting process for setting a production priority order for the production of mounted boards on each of the production lines for each of the supply unit groups on each of the production lines, and performs the allocation process and the replenishment process while referring to the production priority order.
6. The component mounting system described in claim 5, wherein when the management device performs the allocation process on a first target supply unit group having the earliest expected group out-of-stock time and a second target supply unit group having a higher production priority than the first target supply unit group in a situation where there is no supply device in the standby state and there are supply devices in the resupply completed state and the resupplying state, the management device allocates the supply device in the resupply completed state to the first target supply unit group, and allocates the supply device in the specific resupplying state to the second target supply unit group if there is a supply device in the specific resupplying state in the resupplying state, while if there is no supply device in the specific resupplying state, it allocates the supply device in the resupply completed state to be shared with the first target supply unit group.
7. A component mounting system as described in claim 6, wherein when the management device assigns the supply device in the specific supply state to the second target supply unit group in the allocation process, the management device adjusts the number of supply operations for the supply unit group on the supply movement path on which the supply device in the specific supply state is located in the current supply process so that the supply operation for the second target supply unit group is completed in time for the scheduled group component out-of-stock time.
8. The component mounting system of claim 6, wherein when the management device assigns the supply device in the supply complete state to the second target supply unit group in common with the first target supply unit group in the allocation process, the management device adjusts the number of supply operations for the first target supply unit group in the supply process corresponding to the first target supply unit group so that the supply operation for the second target supply unit group is completed in time for the scheduled group component out-of-stock time.
9. The component mounting system according to claim 5, wherein the management device sets the production priority order based on input information input via an operation unit in the production priority setting process.
10. A component mounting system as described in claim 5, wherein said management device, in said production priority setting process, sets said production priority order based on a scheduled production completion time for the production of said mounted boards on each of said production lines.
11. A component mounting system as described in claim 5, wherein said management device, in said production priority setting process, sets said production priority order based on a production progress status regarding the production of said mounted boards in each of said production lines.
12. A component mounting system as described in claim 5, wherein the management device, in the production priority setting process, sets the production priority order based on input information input via an operation unit and at least one of the scheduled production completion time and the production progress status, which are information relating to the production of the mounted boards on each of the production lines.
13. The component mounting system according to claim 12, wherein the management device prioritizes the input information over the scheduled production completion time and the production progress status to set the production priority order.
14. A component mounting system as described in claim 13, wherein when both the scheduled production completion time and the production progress status are used, the management device places emphasis on either the scheduled production completion time or the production progress status in response to an input operation via an operation unit, and sets the production priority order.
Citation Information
Patent Citations
Mounting machine, and component managing device and component management method thereof
JP2008066404A
Component mounting method and component mounting system
JP2023038260A
Component management system, component mounting device, and component managing method
WO2018011941A1
Component refill management system and component mounting system
WO2018135446A1
Component mounting system
WO2019187036A1