Power system stabilizing system and power system stabilizing method
The power system stabilization system addresses the challenge of increasing calculation time by using a processing unit to screen constraints, resulting in real-time stabilization of large power systems through the generation of a screened constraint list, which reduces the matrix size and enhances computational efficiency.
Patent Information
- Application Number
- PCT/JP2024/002884
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-17
- Filing Date
- 2024-01-30
- Publication Date
- 2024-11-21
AI Technical Summary
Existing power system stabilization techniques face challenges in reducing calculation time as the scale of the power system increases, making it difficult to perform preventive control in real-time, especially when identifying and screening unnecessary constraints is complex and time-consuming.
A power system stabilization system that includes a processing unit capable of generating a constraint list and screening parameters to determine which constraints to omit, reducing the matrix size and thereby shortening calculation time through the use of a screened constraint list for preventive control.
This approach allows for real-time implementation of preventive control regardless of the power system's scale, significantly reducing calculation time and enabling online stabilization of large power systems.
Smart Images

Figure JP2024002884_21112024_PF_FP_ABST
Abstract
Description
Power system stabilization system and power system stabilization method
[0001] The present disclosure relates to a power system stabilization system and the like.
[0002] In recent years, renewable energy power generation facilities such as solar power generation and wind power generation have been increasing. In renewable energy power generation facilities, the generated power fluctuates with changes in weather and wind conditions, which makes it easy for overloads to occur on the transmission lines of power systems. Special Protection Schemes (SPS) have been proposed as a technology to eliminate such overloads on transmission lines.
[0003] Furthermore, preventive control and security constrained optimal power flow (SCOPF) are known as technologies for preventing a chain reaction of malfunctions in a power system. For example, in preventive control, the greater the number of combinations of monitored objects such as power transmission lines and the number of expected fault cases, the greater the number of constraints, resulting in a huge calculation time. Therefore, technologies for shortening the calculation time for preventive control and the like have been proposed, for example, as described in Patent Documents 1 to 3 and Non-Patent Documents 1 and 2.
[0004] That is, Patent Document 1 describes defining SCOPF as a convex optimization problem and using an optimization solver (ADMM: Alternating Direction Method of Multipliers) that utilizes sparse matrices. Patent Document 2 describes performing convex relaxation in OPF (optimal power flow) including switching, and then performing partial differentiation to speed up calculations. Patent Document 3 describes speeding up SCOPF by convex relaxation and problem decomposition.
[0005] Non-Patent Document 1 describes a method for reducing the problem scale by identifying umbrella constraints in SCOPF and screening out other constraints. Non-Patent Document 2 describes a method for quickly identifying umbrella constraints in a unit commitment problem (UCP) using SCOPF.
[0006] US Patent Application Publication No. 2015 / 0378384 US Patent No. 8,775,136 International Publication No. 2011 / 112365
[0007] A.J.Ardakani and F.Bouffard, “Identification of Umbrella Constraints in DC-Based Security-Constrained Optimal Power Flow”, IEEE Transactions on Power Systems, Nov.2013, vol.28, no.4, pp.3924-3934A.J.Ardakani and F.Bouffard, “Acceleration of Umbrella Constraint Discovery in generation Scheduling Problems”, IEEE Transactions on Power Systems, July 2015, vol.30, no.4, pp.2100-2109
[0008] The techniques described in Patent Documents 1 to 3 aim to speed up calculations by devising preventive control calculation methods, but because the problem scale is not reduced, the calculation time increases as the scale of the power system increases. Therefore, with the techniques described in Patent Documents 1 to 3, it becomes difficult to, for example, utilize the processing results of the power system stabilization system online (reflect them in the power system in real time).
[0009] Furthermore, the techniques described in Non-Patent Documents 1 and 2 aim to speed up calculations by identifying and screening out unnecessary constraints, but the process of identifying unnecessary constraints is complicated, and there is also room for improvement in reducing calculation time. Generally, the larger the scale of a power system, the longer the calculation time required for preventive control, so further improvement is required.
[0010] Therefore, an object of the present disclosure is to provide a power system stabilization system and the like that can stabilize a power system even when the scale of the power system is large.
[0011] In order to solve the above-mentioned problems, the power system stabilization system according to the present disclosure includes a processing unit that generates a constraint list, which is a list of constraints for performing preventive control in the power system, based on a power system model that is a model of the power system, a power system state that indicates the state of the power system, and an event list that is a list of events that are expected in the power system, and the processing unit displays, on a display device, information including constraint screening parameters that are criteria for determining whether or not to screen the constraints, and a screened constraint list that is a list of the constraints that have been screened.
[0012] According to the present disclosure, it is possible to provide a power system stabilization system and the like that can stabilize a power system even when the scale of the power system is large.
[0013] FIG. 1 is a configuration diagram showing an example of a power system that is a target of the power system stabilization system according to the first embodiment. FIG. 2 is an explanatory diagram showing an example of a power system event in the power system stabilization system according to the first embodiment, illustrating a case where the output of a generator increases or decreases. FIG. 3 is an explanatory diagram showing another example of a power system event in the power system stabilization system according to the first embodiment, illustrating a case where a circuit breaker on a transmission line is opened. FIG. 4 is an explanatory diagram showing another example of a power system event in the power system stabilization system according to the first embodiment, illustrating a case where power consumption of a load increases or decreases. FIG. 5 is a diagram showing a hardware configuration of the power system stabilization system according to the first embodiment. FIG. 6 is a functional block diagram of a power system stabilization device included in the power system stabilization system according to the first embodiment. FIG. 7 is an explanatory diagram showing an example of an event case DB of the power system stabilization system according to the first embodiment. FIG. 8 is an explanatory diagram showing an example of a constraint list DB of the power system stabilization system according to the first embodiment. FIG. 9 is an explanatory diagram showing an example of a preventive control DB of the power system stabilization system according to the first embodiment. FIG. 10 is an explanatory diagram showing an example of a preventive control evaluation result DB of the power system stabilization system according to the first embodiment. FIG. 11 is a flowchart showing processing executed by a processing unit of the power system stabilization device according to the first embodiment. FIG. 12 is a flowchart related to constraint screening in the power system stabilization system according to the first embodiment. FIG. 1 is an explanatory diagram showing an example of a screened constraint list DB of the power system stabilization system according to the first embodiment. FIG. 2 is a simulation result showing an example of the effect of reducing calculation time by screening in the power system stabilization system according to the first embodiment. FIG. 3 is a simulation result of a comparative example in the case of no screening. FIG. 4 is a simulation result in the case of screening based on the control of the first embodiment. FIG. 5 is a display example of the results of processing related to preventive control in the power system stabilization system according to the first embodiment. FIG. 6 is a functional block diagram of a power system stabilization device provided in the power system stabilization system according to the second embodiment. FIG. 7 is an explanatory diagram showing an example of a constraint screening parameter evaluation result DB of the power system stabilization system according to the second embodiment. FIG. 8 is a diagram showing an example of the processing result of the constraint screening parameter management unit of the power system stabilization system according to the second embodiment.
[0014] First Embodiment In the following, first, the configuration of the power system GR1 (see FIG. 1 ) and examples of malfunctions of the power system GR1 (see FIGS. 2A, 2B, and 2C ) will be briefly described, and then the power system stabilization system 100 (see FIGS. 3 and 4 ) will be described in detail.
[0015] <Configuration of Power System> Fig. 1 is a configuration diagram showing an example of a power system GR1 that is the target of the power system stabilization system according to the first embodiment. Note that Fig. 1 shows a simplified configuration of the power system GR1. The power system GR1 is a system that supplies power generated by generators G1 to G3 to loads D1 to D3 via buses B1 to B8 and transmission lines L1 to L9. In the example of Fig. 1, the power system GR1 is configured to include generators G1 to G3, buses B1 to B8, and transmission lines L1 to L9.
[0016] The generators G1 to G3 are facilities that generate electricity. Examples of such generators G1 to G3 include facilities that generate solar power or wind power using renewable energy. The generators G1 to G3 may also include generators of facilities that generate thermal power or nuclear power using non-renewable energy. The bus bars B1 to B8 are conductors that form the main circuits of substations and distribution stations. For example, copper strips, steel strips, or aluminum alloy pipes are used for such bus bars B1 to B8. The transmission lines L1 to L9 are electric wires used for transmitting power from the generators G1 to G3 to the loads D1 to D3. The distribution lines used to distribute power to the loads D1 to D3 are also considered to be "power transmission lines." The loads D1 to D3 are devices on the power demand side.
[0017] In the power system GR1, predetermined events may occur due to various factors. Here, "events" refer to malfunctions that may occur in the power system GR1. Examples of such events will be described using Figures 2A to 2C.
[0018] FIG. 2A is an explanatory diagram showing an example of an event in the power grid GR1, in which the output of the generator G1 increases or decreases. For example, if the generator G1 shown in FIG. 2A is a renewable energy power generation facility, the output (generated power) of the generator G1 may increase or decrease significantly due to changes in weather or wind conditions. In the example of FIG. 2A, the range of change when the output of the generator G1 increases or decreases is + / - 5 MW. When the output of the generator G1 changes significantly in this way, the power flow of the transmission lines L1 to L9 and the voltage of the buses B1 to B8 change, and this may have a chain reaction effect.
[0019] 2B is an explanatory diagram showing another example of an event in the power grid GR1, in which a circuit breaker for the power line L3 is opened. For example, if a circuit breaker (not shown) for the power line L3 is opened due to a lightning strike, the connections of the power grid GR1 may change, and the resulting effects may have a chain reaction.
[0020] 2C is an explanatory diagram showing another example of an event in the power grid GR1, in which the power consumption of the load D1 increases or decreases. For example, the power consumption of the load D1 may increase significantly due to an increase in the power consumption of an air conditioner on a cold winter day or a hot summer day. In the example of FIG. 2C, the power consumption of the load D1 increases or decreases by a range of + / - 5 MW.
[0021] Each piece of equipment, including the transmission lines L1 to L9 of the power system GR1, is designed on the assumption that voltage and power flow will be maintained within a specified range. If the voltage or other factors exceed the specified range, protective devices such as circuit breakers will operate to prevent damage to the equipment, causing changes in the power flow, which could have a chain reaction.
[0022] Therefore, in the first embodiment, the power system stabilization system 100 (see FIG. 3) is configured to formulate predetermined measures based on preventive control. Examples of such preventive control include changing the output of the generators G1 to G3, demand response to each consumer, and changing the connection configuration of the power system GR1. This prevents the transmission power of the transmission lines L1 to L9 from exceeding a predetermined threshold based on the transmission capacity. Below, as an example of preventive control, a case where the power system stabilization system 100 (see FIG. 3) changes the output of the generators G1 to G3 will be described.
[0023] Fig. 3 is a diagram showing the hardware configuration of the power system stabilization system 100. The power system stabilization system 100 is a system for stabilizing the power system GR1. As shown in Fig. 3, the power system stabilization system 100 includes a power system stabilization device 10, a communication network N1, a measuring instrument 20, and a control terminal 30.
[0024] The power system stabilization device 10 may be configured with one computer, or may be configured with multiple computers (servers, etc.) that can communicate with each other. The functions of the power system stabilization device 10 may be realized on the cloud. The power system stabilization device 10 performs a predetermined calculation based on the measured values of the measuring instruments 20, etc., and transmits a predetermined control signal to the control terminal 30 based on the calculation result.
[0025] 3, the power system stabilizing device 10 includes, as its hardware configuration, a program database 11, a database 12, a memory 13, an input unit 14, a processing unit 15, a display unit 16 (display device), a communication unit 17, and a bus 18 connecting these components. The program database 11 stores programs for performing predetermined arithmetic processing. Another database 12 stores data used in executing the programs and predetermined arithmetic results.
[0026] The memory 13 stores programs and calculation results as appropriate when various programs are executed. Examples of such memory 13 include flash memory and RAM (Random Access Memory). The input unit 14 inputs predetermined data based on user operations. Examples of such input unit 14 include a keyboard, mouse, stylus, and microphone.
[0027] The processing unit 15 executes predetermined arithmetic processing based on the programs stored in the program database 11. Examples of the processing unit 15 include a central processing unit (CPU), a graphics processing unit (GPU), a field programmable gate array (FPGA), and a tensor processing unit (TPU). The processing unit 15 loads the programs in the program database 11 into the memory 13 and performs predetermined processing.
[0028] The display unit 16 displays data input via the input unit 14, calculation results of the processing unit 15, etc. in a predetermined manner. For example, a display is used as the display unit 16. Note that a mobile terminal (not shown) such as a tablet or smartphone may also function as the input unit 14 and the display unit 16.
[0029] The communication unit 17 has a function of receiving predetermined measurement value data from the measuring instruments 20 via the communication network N1 and transmitting predetermined control command values to the control terminal 30 via the communication network N1. The measuring instruments 20 measure physical quantities at predetermined locations in the power system GR1. For example, an SV / TM or a PMU (Phasor Measurement Unit) is used as such measuring instruments 20. Examples of the physical quantities include voltage, current, voltage phase, current phase, and frequency. The voltage and current in the power system GR1 may be measured as effective values, or may be measured in phasor form or instantaneous values.
[0030] The control terminal 30 is a device that is controlled in a predetermined manner based on a control signal transmitted from the power system stabilization device 10 via the communication network N1. For example, a relay is used as this control terminal 30. The above-mentioned relay is used, for example, when changing the output of the generators G1 to G3 (see FIG. 1). In addition, a relay (i.e., the control terminal 30) is also used when changing the transformation ratio of a transformer (not shown) installed in a substation or when opening and closing circuit breakers (not shown) of the transmission lines L1 to L9 (see FIG. 1). While FIG. 3 illustrates one measuring instrument 20 and one control terminal 30, in reality, many measuring instruments 20 and control terminals 30 are installed in the power system GR1.
[0031] Fig. 4 is a functional block diagram of the power system stabilizing device 10. The power system stabilizing device 10 shown in Fig. 4 includes databases (hereinafter referred to as "DBs") for storing predetermined input data, including a power system model DB 41, a power system state DB 42, an event list DB 43, a constraint screening parameter DB 44, and a cost function DB 45. The input data may be input by an operation via the input unit 14 (see Fig. 3), or may be acquired from an external server or the like (not shown) via a communication network N1 (see Fig. 3).
[0032] The power system stabilizing device 10 also includes, as functional components of the processing unit 15 (see FIG. 3), a constraint condition constructing unit 46, a constraint screening unit 47, a preventive control calculating unit 48, and a preventive control executing unit 49. The display unit 16 shown in FIG. 4 corresponds to the display unit 16 described with reference to FIG. 3. The power system stabilizing device 10 also includes, as databases for storing predetermined output data, a constraint condition list DB 51, a screened constraint list DB 52, a preventive control DB 53, and a preventive control evaluation result DB 54.
[0033] Data on a power system model that is a model of power system GR1 (see FIG. 1) is stored in power system model DB 41. The power system model includes data indicating the components and connection relationships of power system GR1, as well as data on the impedance and transmission capacity of transmission lines L1 to L9 (see FIG. 1), the connection positions of loads D1 to D3 (see FIG. 1), and upper and lower limit values of the output of generators G1 to G3 (see FIG. 1).
[0034] The power system status DB 42 stores power system status data indicating the state of the power system GR1 (see FIG. 1). For example, the power system status data stored in the power system status DB 42 includes the voltage and voltage phase at the buses B1 to B8 (see FIG. 1), as well as the active and reactive power at the transmission lines L1 to L9 and transformers (not shown), and the open / close state of power transmission equipment (circuit breakers; not shown). Note that the power system status changes from moment to moment as the state of the power system GR1 (see FIG. 1) changes. For example, measurement values from the measuring instrument 20 (see FIG. 3) may be used as such power system status data, or virtual data for simulation may be used.
[0035] The event list DB 43 stores a list of events that are expected to occur in the power system GR1. As described above, examples of such events include an increase or decrease in the amount of generated power (see FIG. 2A ), a change in the connection relationship of the power system GR1 (see FIG. 2B ), and an increase or decrease in the amount of power demand (see FIG. 2C ). Other events may also include, for example, a failure of a power transmission line or a communication line included in the power system GR1.
[0036] 5 is an explanatory diagram showing an example of the event list DB 43. In the example of FIG. 5, the event list DB 43 associates an event ID, an event name, an event type, and event details. As a specific example, an event with an event ID of AAA1 identifies a power transmission line fault that occurs when a circuit breaker is opened due to a fault in the power transmission line L1 (see FIG. 1). In the first embodiment, preventive control assuming a power transmission line fault will be described as an example, but the type of event is not limited to this.
[0037] The constraint screening parameter DB 44 shown in FIG. 4 is a database in which values of constraint screening parameters are stored. Here, the "constraint screening parameter" is a value that serves as a criterion for determining whether or not to perform screening of a predetermined constraint condition. Furthermore, "screening" refers to omitting unnecessary constraint conditions in preventive control. In the first embodiment, a case will be described in which the predetermined constraint screening parameter is set by a user through an operation via the input unit 14 (see FIG. 3). Note that the constraint screening parameter may be a fixed value, or may be changed as appropriate at predetermined time intervals.
[0038] The cost function DB 45 shown in Fig. 4 is a database that stores predetermined cost functions used in preventive control. The "cost function" may be, for example, a function that minimizes the absolute value of the output change amount of the generators G1 to G3 (see Fig. 1), or a function that reduces monetary costs. Note that in preventive control, weighting coefficients, etc., used when weighting multiple control variables may be included in the cost function.
[0039] The constraint condition constructing unit 46 constructs the constraint condition list DB 51 based on the data in the power system model DB 41, the power system state DB 42, and the event list DB 43. For example, the constraint condition constructing unit 46 generates a list of constraint conditions for each event so that the power system state of each device in the power system model (e.g., the transmission power of each of the power transmission lines L1 to L9) does not exceed a predetermined threshold.
[0040] The constraint list DB51 is a database that stores a list of constraints constructed by the constraint constructor 46. Hereinafter, the list of constraints when preventive control is performed in the power system GR1 (see FIG. 1 ) will be referred to as the "constraint list." The constraints are expressed in the form of mathematical optimization, for example, as shown in the following equation (1).
[0041]
[0042] Note that "st" at the beginning of equation (1) is an abbreviation for "subject to" and means "subject to the condition that...". A included in equation (1) is an M x N matrix used as a constraint. Also, x is a vector including N decision variables as elements. For example, when the outputs of generators G1 to G3 (see FIG. 1) are changed in preventive control of power system GR1 (see FIG. 1), vector x is set to include multiple elements corresponding to the outputs of generators G1 to G3.
[0043] The b included in equation (1) is M constraint vectors. The constraint vector b represents a constraint condition, for example, that the transmission power of each of the power transmission lines L1 to L9 (see FIG. 1) be kept below a predetermined value. The inequality sign included in equation (1) represents that each element of the vector resulting from the calculation of Ax is less than or equal to the value of the element of the constraint vector b. Note that although the constraint condition is expressed in the form of an equality constraint in equation (1), this is not limiting. For example, the constraint condition may be expressed in the form of an inequality constraint, or may be expressed in the form of a nonlinear or non-convex constraint.
[0044] Fig. 6 is an explanatory diagram showing an example of the constraint list DB 51. In the example of Fig. 6, constraint IDs, constraint names, and constraint expressions are associated with each other in the constraint list DB 51. For example, a constraint with a constraint ID of BBB1 is set so that the transmission power of the transmission line L2 (see Fig. 1) does not exceed a predetermined value (a threshold value based on the transmission capacity) even if a failure occurs in the transmission line L1 (see Fig. 1).
[0045] Generally, the greater the number of transmission lines, the greater the value of M (the number of constraints, the number of rows in matrix A). Depending on the configuration of the power system, the value of M may reach tens of thousands or hundreds of thousands. Therefore, calculating equation (1) as is may take an enormous amount of time. Therefore, in the first embodiment, the constraint screening unit 47 shown in FIG. 4 reduces the size of matrix A by omitting unnecessary constraints from among the multiple constraints included in matrix A (i.e., performing screening). This significantly reduces the calculation time required for preventive control, making it possible to perform preventive control online (i.e., in real time) regardless of the scale of the power system.
[0046] The constraint screening unit 47 shown in FIG. 4 generates a screened constraint list DB 52 based on the data in the constraint screening parameter DB 44 and the constraint list DB 51. The screened constraint list DB 52 is a database that stores a screened constraint list, which is a list of constraints that have been screened. In other words, the screened constraint list is a list of constraints obtained by omitting those with the least influence from among the multiple constraints included in matrix A in equation (1). The screened constraint list is expressed in the form of mathematical optimization, for example, as shown in equation (2) below.
[0047]
[0048] A' included in equation (2) is an M'×N matrix used for constraints. Note that matrix A' is obtained by removing unnecessary constraints from matrix A included in equation (1), and therefore the value of M' described above is smaller than the value of M (M'<M). x included in equation (2) is a vector including N decision variables as its elements. b' included in equation (2) is a vector for M' constraints. By using the screened constraint list expressed by equation (2), the calculation time for performing preventive control is significantly reduced compared to when equation (1) is used directly, and therefore calculation speed can be increased.
[0049] The preventive control calculation unit 48 (processing unit 15: see FIG. 3) shown in FIG. 4 calculates control variables for performing preventive control based on the power system model, the power system state, the event list, the screened constraint list, and a predetermined cost function. That is, the preventive control calculation unit 48 calculates control variables and post-control state variables of the devices in the power system GR1 (see FIG. 1), and stores the calculation results in the preventive control DB 53. The preventive control calculation unit 48 also evaluates the calculation results of the preventive control, and stores the evaluation results in the preventive control evaluation result DB 54.
[0050] As described above, the screened matrix A' has a smaller size than the unscreened matrix A, so that preventive control calculations can be performed in a short time. Therefore, it becomes possible to repeat preventive control of the power system GR1 online (i.e., in real time) at short intervals of several seconds, several tens of seconds, or several minutes.
[0051] FIG. 7 is an explanatory diagram showing an example of the preventive control DB 53. As described above, the preventive control DB 53 stores data such as the control variables of the devices in the power system GR1 (see FIG. 1) and state variables after control. In the example of FIG. 7, the preventive control DB 53 associates a control ID, a control target, and a control variable. For example, in preventive control with a control ID of CCC1, the control target is the generator G1 (see FIG. 1), and the control variable is +10 MW. In other words, it is shown that the preventive control is to increase the output of the generator G1 by 10 MW from the current output.
[0052] Fig. 8 is an explanatory diagram showing an example of the preventive control evaluation result DB 54. As described above, data on evaluation results related to preventive control is stored in the preventive control evaluation result DB 54. In the example of Fig. 8, the preventive control evaluation result DB 54 associates an evaluation result ID, an event name, a most severe overload rate before control, and a most severe overload rate after control.
[0053] Note that the "most severe overload rate" in Figure 8 is the load rate of the transmission line L1 to L9 (see Figure 1) that has the highest ratio of transmitted power to its transmission capacity. The "most severe overload rate before control" is the most severe overload rate before preventive control is performed. The "most severe overload rate after control" is the most severe overload rate after preventive control is performed. For example, in the case of an evaluation result ID of DDD1, when transmission line L1 fails (i.e., becomes overloaded), the most severe overload rate before control is 125%, and the most severe overload rate after control is 90%. In other words, by performing preventive control, the transmitted power of transmission lines L1 to L9 (see Figure 1) is kept below the transmission capacity.
[0054] The preventive control execution unit 49 shown in FIG. 4 executes preventive control of the power system GR1 (see FIG. 1) based on the data in the preventive control DB 53. That is, the preventive control execution unit 49 transmits a predetermined control signal to the control terminal 30 (see FIG. 3) via the communication network N1 (see FIG. 3). This causes preventive control, such as changing the output of the generators G1 to G3, to be executed as appropriate. Note that preventive control may also be performed by outputting a control signal to a virtual control terminal (not shown) in a digital simulator (not shown).
[0055] Furthermore, preventive control may be started by a user who has confirmed the preventive control evaluation results, etc., pressing an execute button (not shown) on the screen of the display unit 16 (see FIG. 4). Data from each database, such as the constraint condition list DB 51, the screened constraint list DB 52, the preventive control DB 53, and the preventive control evaluation result DB 54, is displayed in a predetermined manner on the display unit 16. This allows the user to confirm the results of processing by the processing unit 15 (see FIG. 3).
[0056] 9 is a flowchart showing the processing executed by the processing unit of the power system stabilization device (see also FIG. 4 as appropriate). In step S101, the processing unit 15 reads each piece of data on the power system model, the power system state, and the event list using the constraint condition construction unit 46. That is, the processing unit 15 reads each piece of data from the power system model DB 41, the power system state DB 42, and the event list DB 43.
[0057] In step S102, the processing unit 15 constructs constraints using the constraint constructing unit 46. For example, the processing unit 15 generates a constraint list expressed in a mathematical optimization format (see equation (1)) and stores this constraint list in the constraint list DB 51. In this way, the processing unit 15 generates the constraint list based on the power system model, the power system state, and the event list (constraint list generation process).
[0058] In step S103, the processing unit 15 reads constraint screening parameters and the like using the constraint screening unit 47. As described above, the constraint screening parameters are thresholds that serve as criteria for determining whether or not to screen constraint conditions, and are stored in the constraint screening parameter DB 44.
[0059] In step S104, the processing unit 15 screens the constraints using the constraint screening unit 47. That is, the processing unit 15 generates a small-sized matrix A′ (see equation (2)) by omitting constraints with little impact from among the multiple constraints included in matrix A (see equation (1)). The screened constraints are stored in the screened constraint list DB 52.
[0060] The processing unit 15 may reactivate a predetermined constraint specified by the user through operation of the input unit 14 (see FIG. 3 ) among one or more constraints screened from the constraint list when creating the screened constraint list. This allows constraints that the user wants to keep to remain as they are (or to be restored after screening), thereby increasing the degree of freedom in settings during screening.
[0061] In step S105, the processing unit 15 reads the cost function using the preventive control calculation unit 48. As described above, the cost function is a predetermined function that includes the control cost when performing preventive control, and is stored in the cost function DB 45. In step S106, the processing unit 15 calculates the control amount of preventive control and the like using the preventive control calculation unit 48.
[0062] In step S107, the processing unit 15 executes preventive control using the preventive control execution unit 49. By executing preventive control in this manner, the state of the power system GR1 (see FIG. 1) changes to a predetermined state. As a result, when a fault occurs in a predetermined transmission line, it is possible to prevent other transmission lines from becoming overloaded. After performing the process of step S107, the processing unit 15 ends the series of processes (END). Note that the series of processes shown in FIG. 9 may be repeated in a predetermined manner. Furthermore, the results of each process of steps S101 to S107 shown in FIG. 9 are respectively displayed in a predetermined manner on the display unit 16 (see FIG. 3).
[0063] Next, the process of step S102 in Fig. 9 (construction of constraint conditions) will be described in detail. The processing unit 15 (see Fig. 3) performs preventive control so that each state quantity of the power system GR1 is kept below a predetermined upper limit value even when a predetermined event occurs. Mathematically, the relationship shown in the following equation (3) is maintained in the power system GR1 (see Fig. 1).
[0064]
[0065] G(x, y_0) included in equation (3) is a prediction function that represents the state after the occurrence of an event when a predetermined preventive control x is performed on the state y_0 (most recent state) of the power system GR1 (see FIG. 1). Furthermore, vector g includes upper limits of predetermined state quantities in the power system GR1 (see FIG. 1) and is generated based on data in the power system model DB41 (see FIG. 4). For example, the upper limits of the transmission power of the power transmission lines L1 to L9 (see FIG. 1) may be used as this vector g. For example, the following function is used as a prediction function when the occurrence of a predetermined event is assumed.
[0066]
[0067] In addition, P included in formula (4) k ^line ("^" indicates a superscript) is the power flow in the base cross section of transmission line k (i.e., one of the transmission lines L1 to L9 in Figure 1), and represents the most recent state of transmission line k. k,mis a 1×N (N is the number of decision variables) vector, which represents the sensitivity of the power flow of transmission line k to the occurrence of a predetermined event after preventive control has been performed. g is the output change amount of the generator g (i.e., one of the generators G1 to G3 in FIG. 1). For example, ΔP 1 represents the output change amount of the generator G1 (see FIG. 1). k ^line,rating represents the power flow constraint on transmission line k.
[0068] The correspondence between equation (4) and equation (3) will be explained. First, P k ^line corresponds to y_0 in equation (3). In equation (4), A represents the sensitivity of the power flow when an event occurs. k,m corresponds to G(x, y_0) in equation (3). In equation (4), ΔP g corresponds to the preventive control x in equation (3). P k ^line, rating correspond to the vector g in equation (3).
[0069] In short, equation (4) is k ^line) to preventive control (ΔP g ) is performed, if a certain transmission line fails, the transmission power of another transmission line k is limited by a certain power flow constraint (P k In this way, the constraint list includes a constraint condition indicating that, assuming that a predetermined event occurs in power system GR1 (see FIG. 1), the transmission power of each of transmission lines L1 to L9 (see FIG. 1) of power system GR1 will be equal to or less than a predetermined power flow constraint value.
[0070] As described above, A included in formula (4) k,m is a 1 × N vector (N is the number of decision variables). The number of combinations of transmission line faults due to overload is the total number of events (= L 2: L is the number of transmission lines) and also equals the number of constraints (M). 2 Vector A of k,m There exists such a vector A k,m is expressed by the following equation (5).
[0071]
[0072] The subscript k of a in equation (5) corresponds to a specific transmission line among the L transmission lines (1≦k≦L). m corresponds to a specific event among the M events (1≦m≦M). n corresponds to N decision variables (1≦n≦N). Also, the M vectors A k,m The matrix A in equation (1) is the matrix representation of vector A. k,m a is an element of k,m,n is called a "coefficient". Vector A k,m is calculated by a known method based on the power transfer distribution factor (PTDF) and the line outage distribution factor (LODF) of the power system model.
[0073] In addition to the above-described formula (4), the constraint condition for preventive control may be, for example, the one shown in the following formula (6).
[0074]
[0075] ΔP included in equation (6) g is the output change amount of generator g. Furthermore, N is the number of decision variables (i.e., the number of controlled objects). In other words, equation (6) indicates that the sum of the change amounts when changing the control amounts in the controlled objects is set to 0. For example, if the output of generator G1 (see FIG. 1) is reduced from a state in which power is normally supplied, control is performed to increase the sum of the outputs of the remaining generators G2 and G3 (see FIG. 1) to compensate for this output reduction. Furthermore, another constraint condition, for example, is shown in the following equation (7).
[0076]
[0077] In addition, P included in formula (7) min ^g is the lower limit of the output change amount of the generator g. max ^g is the upper limit of the output change amount of generator g. In other words, equation (7) expresses that the control amount of preventive control is within a predetermined range. The constraint conditions of equations (4), (6), and (7) are stored in the constraint condition list DB 51 (see FIG. 4). Next, the process of step S104 in FIG. 9 (screening of constraint conditions) will be described in detail with reference to FIG. 10.
[0078] 10 is a flowchart relating to the screening of constraint conditions. It is assumed that, prior to the processing of step S1041 in FIG. 9, predetermined constraint conditions are established (S102 in FIG. 9), and further, data such as constraint screening parameters are read (S103 in FIG. 9). In step S1041, the processing unit 15 calculates the vector A k,m Coefficient a, which is an element of k,m,n (see also formula (5)) that satisfies a predetermined condition. Specifically, the processing unit 15 identifies a coefficient a whose absolute value is equal to or less than the constraint screening parameter ε, as shown in the following formula (8). k,m,n Identify.
[0079]
[0080] For example, vector A k,m Coefficient a, which is an element of k,m,n In the above, a k,m,n ≒0, this a k,m,n The impact on the corresponding transmission line is likely to be small, and therefore is not as important for preventative control.
[0081] Next, in step S1042, the processing unit 15 calculates a coefficient a that satisfies a predetermined condition. k,m,n That is, the processing unit 15 selects a constraint condition including a coefficient a whose absolute value is equal to or less than the constraint screening parameter ε. k,m,n (i.e., M vectors A k,m Select one of the following:
[0082] Next, in step S1043, the processing unit 15 determines whether all the constraint conditions have been checked. k,m If there is a constraint condition that has not been confirmed in step S1043 (S1043: No), the processing unit 15 proceeds to the process in step S1044.
[0083] In step S1044, the processing unit 15 calculates all the coefficients a related to the constraints. k,m,n That is, the processing unit 15 determines whether or not the predetermined vector A k,m In this case, all the coefficients a k,m,n In step S1044, it is determined whether all the coefficients a related to the constraints are equal to or smaller than the constraint screening parameter ε. k,m,n If satisfies the predetermined condition (S1044: Yes), the processing of the processing unit 15 proceeds to step S1045.
[0084] In step S1045, the processing unit 15 screens the constraints. That is, the processing unit 15 selects the vector A corresponding to the constraint selected in step S1042. k,m All coefficients a k,m,n In other words, when each of the plurality of constraints is expressed by a polynomial, the processing unit 15 changes the coefficient a k,m,n For all of the coefficients a k,m,n The absolute value of (or coefficient a k,m,n If the square value of ε is equal to or less than the constraint screening parameter ε, the constraint condition expressed by this polynomial is screened.
[0085] This results in M constraints (vector A k,m ), constraints that are not particularly important in the preventive control of the power system GR1 (see FIG. 1) are omitted. Even if a predetermined event m occurs, the screened coefficient a k,m,nSince the transmission line k corresponding to is likely to be hardly affected, there is no particular problem even if unimportant constraints are omitted.
[0086] In this way, the constraints are screened (predetermined vector A k,m By omitting k,m The number of rows of matrix A (see equation (1)) obtained by matrixing can be reduced to obtain matrix A' (see equation (2)). In other words, the number of constraint equations when performing preventive control can be reduced, thereby reducing the problem scale. As a result, the calculation time when performing preventive control can be significantly reduced, and preventive control can be performed online. After performing the process of step S1045 in FIG. 10, the process of the processing unit 15 returns to step S1042.
[0087] In step S1044, the coefficient a related to the constraint k,m,n If there is any coefficient a that does not satisfy the predetermined condition (S1044: No), the processing unit 15 returns to step S1042. k,m,n Another constraint (vector A k,m ) is selected.
[0088] If all constraint conditions have been checked in step S1043 (S1043: Yes), the processing of the processing unit 15 proceeds to step S1046. In step S1046, the processing unit 15 outputs the screened constraint conditions, etc. That is, the processing unit 15 generates a screened constraint list DB 52 (see FIG. 4) and displays it on the display unit 16 (see FIG. 4). The screened constraint list is a list of constraint equations that satisfy the condition of the following equation (9). That is, a coefficient a whose absolute value is greater than the screening parameter ε k,m,n A list of constraints including the above is generated as a screened constraint list.
[0089]
[0090] Alternatively, for example, the value of the constraint screening parameter ε may be displayed on the display unit 16 (see FIG. 4). That is, the processing unit 15 displays information including the constraint screening parameter ε and the screened constraint list on the display unit 16 (display device) (display processing). This allows the user to check the constraint screening parameter ε and the screened constraint list, making it easier to set up preventive control. After performing the processing of step S1046, the processing unit 15 ends the series of processes related to the screening of constraint conditions (S104 in FIG. 9) (END).
[0091] 11 is an explanatory diagram showing an example of the screened constraint list DB 52. In the example of FIG. 11, the screened constraint list DB 52 associates constraint IDs, constraint conditions, and states. For example, for a constraint ID of EEE1, a predetermined constraint condition is applied (Enabled) to the effect that a change in the control amount of "Cont1" has on the power transmission line L1 (see FIG. 1). For a constraint ID of EEE2, the effect that a change in the control amount of "Cont2" has on the power transmission line L1 is screened, and the constraint condition is no longer applied (Disabled).
[0092] Next, the process of step S105 in Fig. 9 (reading of cost function) will be described. The cost function is expressed, for example, by the following equation (10). Note that ΔP included in equation (10) represents the control amount of equipment such as generators G1 to G3 (see Fig. 1) included in power system GR1 (see Fig. 1). In other words, the cost function is set so as to minimize the absolute value of the control amount of equipment included in power system GR1.
[0093]
[0094] Next, the process of step S106 in Fig. 9 (calculation of the control amount, etc., of preventive control) will be described in detail. The processing unit 15 (see Fig. 4) calculates the control amount, etc., of preventive control by generating an optimization model based on the data in the cost function DB 45 and the screened constraint list DB 52. For example, the optimization model may be generated based on the cost function of equation (10), the above-mentioned equations (6) and (7), or the constraint equation of the following equation (11).
[0095]
[0096] In addition, equation (11) is |a k,m,n Coefficient a such that |>ε k,m,n This expression represents that optimization is performed in a format similar to the above-described formula (4) using screened constraints including the above. Alternatively, a constraint list may be created in a format in which a predetermined penalty is assigned if the constraints are not observed. In this way, when so-called solution satisfaction is prioritized, constraints such as the following formulas (12), (13), and (14) are used in addition to the above-described formulas (6) and (7).
[0097]
[0098] ΔP included in equation (12) n ^g is the output change amount of the generator g. Also, λ is a penalty coefficient that indicates the weighting of the penalty when the constraint condition is not observed. g(...) included in equation (12) is a function whose value becomes zero when the constraint condition (equation (14) described later) with the variable in the parentheses is satisfied. Also, ΔP is a predetermined control amount. P included in equation (12) slack ^line,rating represents a predetermined change in the power flow constraint of the transmission line so that the value of g(...) approaches zero. In short, equation (12) represents minimizing the cost function of the first term while imposing a predetermined penalty if the constraint is not observed.
[0099]
[0100] The other constraint equation, equation (13), is used when changing the power flow constraint of the transmission line (ΔP slack,j ^line, rating), and multiplying the upper and lower limit values by a predetermined relaxation coefficient γ. For example, the magnitude of the relaxation coefficient γ is adjusted appropriately when the transmitted power is to be kept within a predetermined range based on the transmission capacity of the transmission line, or when the user allows the transmitted power to be slightly exceeded. The value of the relaxation coefficient γ may be incorporated into the power system model.
[0101] Another constraint equation, equation (14), indicates that when the output of at least one of the generators G1 to G3 (see FIG. 1) is changed, if the state of each transmission line after a fault occurs in a specific transmission line is within an allowable range, the value of the function g is set to zero. Note that the power transfer distribution factor (PTDF) included in equation (14) is a numerical value that represents the amount of change in power flow in another transmission line when the transmission power of a certain transmission line is changed by 1 [MW]. Also, the line outage distribution factor (LODF) is a numerical value that represents the amount of change in power flow that goes around to another transmission line when a certain transmission line is cut. P included in equation (14) i ^line represents the current state of the power grid.
[0102] Although not shown in the flowchart of FIG. 9 , the processing unit 15 may evaluate preventive control based on the calculation time required to calculate the control amount of preventive control and the constraint compliance rate. The "constraint compliance rate" mentioned above is the ratio of the constraint conditions that are complied with to the total number of constraint conditions. Furthermore, "compliance" with a constraint condition means that when a predetermined event occurs after preventive control is performed, a predetermined state quantity (e.g., transmission power of each transmission line) falls within an allowable range. Evaluation result data, including the calculation time and constraint compliance rate, are stored in the preventive control evaluation result DB 54 (see FIG. 4 ).
[0103] Fig. 12 shows simulation results illustrating an example of the effect of reducing calculation time by screening. The horizontal axis of the graph in Fig. 12 represents the number of buses in the power system, and the vertical axis represents the calculation time required to calculate the control variables of preventive control, etc. The multiple asterisks plotted in Fig. 12 represent the simulation results of the first embodiment (with screening). The multiple circles plotted in Fig. 12 represent a comparative example in which screening was not performed.
[0104] In the comparative example (without screening) indicated by a circle, the amount of calculation increases rapidly as the number of buses in the power system increases, and the calculation time also increases accordingly. In contrast, in the first embodiment (with cleaning), unnecessary constraints are screened out, thereby reducing the amount of calculation, and therefore the calculation time is significantly reduced compared to the comparative example. Note that the effect of screening in reducing calculation time tends to become more pronounced as the scale of the power system increases.
[0105] FIG. 13A shows the simulation results of a comparative example without screening. The horizontal axis of FIG. 13A represents the event number assigned to each event. The vertical axis of FIG. 13A represents the most severe overload rate. As described above, the "most severe overload rate" refers to the load rate of the transmission line with the highest ratio of transmitted power to transmission capacity among multiple transmission lines. In FIG. 13A, the simulation results when preventive control was performed are indicated by circles. The simulation results when preventive control was not performed are indicated by crosses.
[0106] In FIG. 13A , the area indicated by symbol W1 appears as a thick line, but in reality, circles (data obtained when preventive control is performed) are plotted at very short intervals in the horizontal direction. Similarly, the area indicated by symbol W2 appears as a thick line, but in reality, crosses (data obtained when preventive control is not performed) are plotted at very short intervals in the horizontal direction (the same applies to symbols W1a and W2a in FIG. 13B ). The dashed line T1 at which the most severe overload rate is 120% in FIG. 13A is a preset threshold value that serves as a criterion for determining whether the most severe overload rate is within an acceptable range. If the most severe overload rate data is above dashed line T1, it is considered that the constraint condition has not been complied with.
[0107] As shown in Figure 13A, for most events, preventive control suppresses the most severe overload rate to 120% or less. However, even with preventive control, the most severe overload rate exceeds 120% for a specific event (the event corresponding to data Q1). Furthermore, although calculation time is not shown in Figure 13A, if screening is not performed, the calculation time becomes long, making online (i.e., real-time) preventive control difficult.
[0108] 13B shows the simulation results for the case where screening based on the control of the first embodiment is performed. In the example of FIG. 13B, unlike the comparative example (see FIG. 13A), the most severe overload rate is suppressed to 120% or less for all events by performing preventive control. In this way, it was found that the results of preventive control can be improved by screening out unnecessary constraints that have little impact on the power grid.
[0109] 14 shows an example of a display of the results of processing related to preventive control. In the example of Fig. 14, in addition to the power system model 41a, the screened constraint list 52a, and the preventive control 53a, the constraint screening parameters 44a and the preventive control evaluation results 54a are displayed on the display unit 16 (see Fig. 4).
[0110] The processing unit 15 may also display at least one of the calculation time when performing preventive control and the constraint compliance rate, which is the compliance rate of the constraint conditions, on the display unit 16 (display device). In the example of Fig. 14, the calculation time is 20 seconds and the constraint compliance rate is 99%. This allows the user to grasp at a glance how much calculation time was required and to what extent the constraint conditions were complied with.
[0111] The processing unit 15 may also display the number of constraints included in the pre-screening constraint list and the number of constraints included in the screened constraint list on the display unit 16 (display device). By displaying the comparison result 61a of the number of constraints, the user can understand to what extent the number of constraints has been reduced by screening.
[0112] 14 may be displayed on the display unit 16 (see FIG. 4). Also, other data, such as the state quantities of a predetermined power transmission line in the power system model 41a, may be displayed. It is not necessary to display all the content on one screen, and the displayed content may be switched by selecting a predetermined tab (not shown) on the display screen.
[0113] <Effects> According to the first embodiment, the processing unit 15 mathematically identifies and screens out unnecessary constraints from among the many constraints included in the constraint list. This significantly reduces the calculation time required for preventive control. As a result, it becomes possible to perform preventive control online (i.e., in real time) regardless of the scale of the power system. Therefore, it is possible to stabilize the power system even if the power system is large.
[0114] Second Embodiment The second embodiment differs from the first embodiment in that the power system stabilizing device 10A (see FIG. 15 ) includes a screening parameter determination preference DB 55 (see FIG. 15 ), as well as a constraint screening parameter management unit 56 (see FIG. 15 ) and a constraint screening parameter evaluation result DB 57 (see FIG. 15 ). Note that the rest is the same as in the first embodiment. Therefore, only the parts that are different from the first embodiment will be described, and a description of the overlapping parts will be omitted.
[0115] Fig. 15 is a functional block diagram of a power system stabilizing device 10A included in the power system stabilizing system according to the second embodiment. In addition to the components described in the first embodiment, the power system stabilizing device 10A includes a screening parameter determination preference DB 55, a constraint screening parameter management unit 56, and a constraint screening parameter evaluation result DB 57 shown in Fig. 15.
[0116] The screening parameter determination preference DB 55 stores data on screening parameter determination preferences. Here, the "screening parameter determination preferences" are data indicating user policies regarding the calculation time and constraint compliance rate when performing preventive control. For example, policies such as limiting the calculation time required for preventive control to a predetermined time or setting the constraint compliance rate to a predetermined value or more, as well as policies such as prioritizing calculation time over constraint compliance rate, are set as screening parameter determination preferences.
[0117] The constraint screening parameter management unit 56 evaluates the constraint screening parameter ε based on the screening parameter determination preference. That is, the constraint screening parameter management unit 56 calculates the calculation time and constraint compliance rate when a predetermined constraint screening parameter ε is used when performing preventive control of the power system GR1 (see FIG. 1 ).
[0118] For example, the constraint screening parameter management unit 56 calculates the calculation time and constraint compliance rate for each of a plurality of constraint screening parameters ε having different magnitudes, and identifies the relationship between them. The relationship between the constraint screening parameter ε and the calculation time and the relationship between the constraint screening parameter ε and the constraint compliance rate are expressed by predetermined mathematical expressions or data tables. Data indicating these relationships are stored in the constraint screening parameter evaluation result DB 57.
[0119] 16 is an explanatory diagram showing an example of the constraint screening parameter evaluation result DB 57. In the example of FIG. 16, the constraint screening parameter evaluation result DB 57 associates the constraint screening parameter with the calculation time and the constraint compliance rate. For example, when the constraint screening parameter is set to 1 [%], the calculation time is 100 [s] and the constraint compliance rate is 100 [%]. In this way, the calculation time and the constraint compliance rate are calculated for each of a plurality of constraint screening parameters having different magnitudes.
[0120] Fig. 17 is a diagram showing an example of the processing results of the constraint screening parameter management unit. The horizontal axis of each graph in Fig. 17 represents the value of the constraint screening parameter ε. The vertical axis of the graph in the upper part of Fig. 17 represents the calculation time when performing preventive control. The vertical axis of the graph in the lower part of Fig. 17 represents the constraint compliance rate. It is assumed that the configuration of the target power system is the same in each piece of data plotted in Fig. 17.
[0121] The processing unit 15 (see FIG. 3) displays, for each of a plurality of constraint screening parameters ε having different magnitudes, at least one of the calculation time when preventive control is performed using the constraint screening parameter ε and the constraint compliance rate, which is the compliance rate with the constraint conditions, on the display unit 16 (display device: see FIG. 3). This allows the user to understand how the calculation time and the constraint compliance rate change depending on the magnitude of the constraint screening parameter ε.
[0122] The "user-set value" shown in Fig. 17 is the value of the constraint screening parameter ε set by the user through the input unit 14 (see Fig. 3). The "system-proposed value" is the value of the constraint screening parameter ε proposed by the constraint screening parameter management unit 56 based on the screening parameter determination preference. The constraint screening parameter management unit 56 calculates the system-proposed value of the constraint screening parameter ε based on the screening parameter determination preference as well as the relationships shown in the graphs in Fig. 17.
[0123] In this way, the processing unit 15 (see FIG. 3) calculates the proposed values of the constraint screening parameters based on the screening parameter determination preferences that indicate the user's policy regarding the calculation time for performing preventive control and the constraint compliance rate, which is the compliance rate of the constraint conditions. Then, the processing unit 15 displays the proposed values on the display unit 16 (display device: see FIG. 3).
[0124] This allows the user to understand the system-proposed value of the constraint screening parameter ε that reflects policies such as shortening the calculation time and prioritizing ensuring the constraint compliance rate. Note that, during actual preventive control, the system-proposed value or a user-set value may be used as the screening parameter ε. Alternatively, the user may set a new constraint screening parameter ε by operating the input unit 14 while referring to the system-proposed value.
[0125] According to the second embodiment, the system-proposed value of the constraint screening parameter ε is displayed based on a predetermined screening parameter determination preference. Since the constraint screening parameter ε is an important parameter that influences the screening of constraint conditions, the system-proposed value can be presented as a reference for the user when determining the constraint screening parameter ε.
[0126] <<Modifications>> The power system stabilization system 100 and the power system stabilization method according to the present disclosure have been described above in the various embodiments, but they are not limited to these descriptions and various modifications can be made. For example, in the first embodiment, a case where all of the processes in steps S101 to S107 in FIG. 9 are performed has been described, but this is not limiting. That is, the process may be terminated at a predetermined step based on a user's operation of the input unit 14 (see FIG. 3). For example, the series of processes may be terminated when the constraint conditions are screened in step S104. Even in this case, for example, the screened constraint list DB 52 may be provided to an external device. The same applies to the second embodiment.
[0127] In the first embodiment, in step S1042 of FIG. 10, the coefficient a whose absolute value is equal to or less than the constraint screening parameter ε is k,m,n In the above description, the processing unit 15 selects a constraint condition including the coefficient a k,m,n Instead of the absolute value of k,m,n In other words, when each of the constraints is expressed by a polynomial, the coefficient a k,m,n For all of the coefficients a k,m,n When the square value of is equal to or less than the constraint screening parameter ε, the processing unit 15 may screen the constraint condition expressed by this polynomial.
[0128] The processing (power system stabilization method) of the power system stabilization system 100 may be executed as a predetermined program on a computer. The program may be provided via a communication line or may be written to a recording medium such as a CD-ROM and distributed.
[0129] Furthermore, the present disclosure is not limited to each embodiment and includes various modifications. For example, each embodiment has been described in detail to clearly explain the present disclosure, and is not necessarily limited to those including all of the described configurations. Furthermore, it is possible to replace part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another example to the configuration of one embodiment. Furthermore, it is possible to add, delete, or replace part of the configuration of each embodiment with other configurations.
[0130] Furthermore, the above-mentioned components, functions, processing units, processing means, etc. may be partially or entirely implemented in hardware, for example, by designing them as integrated circuits. The above-mentioned components, functions, etc. may also be implemented in software, with a processor interpreting and executing a program that implements each function. Information such as programs, tables, and files that implement each function can be stored in memory, a recording device such as a hard disk or SSD (Solid State Drive), or a recording medium such as an IC card, SD card, or DVD. Furthermore, the control lines and information lines shown are those considered necessary for explanation, and do not necessarily represent all control lines and information lines in the product. In reality, it can be assumed that almost all components are interconnected.
[0131] 10, 10A Power system stabilization device 11 Program database 12 Database 13 Memory 14 Input unit 15 Processing unit 16 Display unit (display device) 17 Communication unit 18 Bus 20 Measuring instrument 30 Control terminal 41 Power system model DB 42 Power system state DB 43 Event list DB 44 Constraint screening parameter DB 45 Cost function DB 46 Constraint condition construction unit (processing unit) 47 Constraint screening unit (processing unit) 48 Preventive control calculation unit (processing unit) 49 Preventive control execution unit (processing unit) 51 Constraint condition list DB 52 Screened constraint list DB 53 Preventive control DB 54 Preventive control evaluation result DB 55 Screening parameter determination preference DB 56 Constraint screening parameter management unit 57 Constraint screening parameter evaluation result DB 100 Power system stabilization system B1, B2, B3, B4, B5, B6, B7, B8 Bus bar D1, D2, D3 Load G1, G2, G3 Generator (equipment) GR1 Power system L1, L2, L3, L4, L5, L6, L7, L8, L9 Transmission line N1 Communication network
Claims
1. A power system stabilization system comprising: a processing unit that generates a constraint list that is a list of constraint conditions when performing preventive control in the power system based on a power system model that is a model of the power system, a power system state that indicates the state of the power system, and an event list that is a list of events expected in the power system, and the processing unit displays on a display device information including constraint screening parameters that are criteria for whether or not to screen the constraint conditions, and a screened constraint list that is a list of the constraint conditions that have been screened.
2. The power system stabilization system according to claim 1, characterized in that the list of constraint conditions includes a constraint condition indicating that, assuming that a predetermined event occurs in the power system, the transmission power of each transmission line of the power system will be equal to or less than a predetermined power flow constraint value.
3. The power system stabilization system according to claim 1, characterized in that, when each of the plurality of constraint conditions is expressed by a polynomial, the processing unit screens the constraint conditions expressed by the polynomial when, for all of the coefficients included in a given polynomial, the absolute value of the coefficient or the square value of the coefficient is equal to or less than the constraint screening parameter.
4. The power system stabilization system according to claim 1, characterized in that the processing unit re-enables a predetermined constraint condition designated by a user through operation of an input unit from among one or more constraint conditions screened from the constraint condition list when creating the screened constraint list.
5. The power system stabilization system according to claim 1, characterized in that the processing unit calculates a control amount for performing the preventive control based on the power system model, the power system state, the event list, the screened constraint list, and a predetermined cost function, and the cost function is set so as to minimize an absolute value of the control amount of the equipment included in the power system.
6. The power system stabilization system according to claim 1, characterized in that the list of constraint conditions is created in a format in which a predetermined penalty is given if the constraint conditions are not observed.
7. The power system stabilization system according to claim 1, characterized in that the processing unit causes the display device to display at least one of the calculation time when performing the preventive control and the constraint compliance rate, which is the compliance rate of the constraint condition.
8. The power system stabilization system according to claim 1, characterized in that the processing unit causes the display device to display the number of constraint conditions included in the constraint condition list and the number of constraint conditions included in the screened constraint list.
9. The power system stabilization system according to claim 1, characterized in that the processing unit causes the display device to display at least one of the calculation time when performing the preventive control when using each of the plurality of constraint screening parameters having different magnitudes, and the constraint compliance rate, which is the compliance rate of the constraint condition.
10. The power system stabilization system according to claim 1, characterized in that the processing unit calculates a proposed value of the constraint screening parameter based on a screening parameter determination preference indicating a user's policy regarding a calculation time for performing the preventive control and a constraint compliance rate, which is a compliance rate of the constraint condition, and causes the display device to display the proposed value.
11. A method for stabilizing a power system, comprising: a constraint condition list generation process for generating a constraint condition list that is a list of constraint conditions when performing preventive control in the power system based on a power system model that is a model of the power system, a power system state that indicates the state of the power system, and an event list that is a list of events expected in the power system; and a display process for displaying on a display device information including constraint screening parameters that are criteria for whether or not to screen the constraint conditions, and a screened constraint list that is a list of the constraint conditions that have been screened.
Citation Information
Patent Citations
Reducing corrective actions in security-constrained optimal power flow via sparsity regularization
US20150378384A1
Primal-dual interior point methods for solving discrete optimal power flow problems implementing a chain rule technique for improved efficiency
US8775136B2
Efficient security-constrained optimal power flow (SC OPF) analysis using convexification of continuos variable constraints within a BI-level decomposition scheme
WO2011112365A2
Power system monitoring device
WO2019150738A1