Iron-carbon micro-electrolysis reactor
By designing the circulation gap structure and preset angle aeration circulation in the iron-carbon microelectrolysis reactor, the problems of filler passivation and plate cleavage in traditional reactors are solved, the reaction efficiency and equipment reliability are improved, and fully automatic operation is achieved and low-cost operations.
Patent Information
- Application Number
- PCT/CN2023/095282
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-19
- Publication Date
- 2024-11-28
AI Technical Summary
Traditional iron-carbon microelectrolytic reactors are prone to form passivation film and plate bonds after long-term operation, resulting in a decrease in the contact area of the filler and a decrease in reaction efficiency. The filler is easily bonded into blocks, resulting in equipment blockage and affecting the wastewater treatment effect.
An iron-carbon microelectrolytic reactor was designed, using the circulation gap structure between the outer tank and the inner tank, and a circulation aeration circulation was formed through a preset aerator aerated mechanism to promote full contact between wastewater and filler, control the flow of water, and reduce filler Passivate and cleavage, improve filler utilization, and avoid packer cleavage by rotating aeration riser and sealing overflow structure.
It effectively avoids packing passivation and plate cleavage, improves the internal water circulation of the reactor, enhances the efficiency of wastewater treatment, reduces the difficulty of filling replacement, extends the service life of the equipment, and realizes fully automatic operation, reducing labor costs and risks.
Smart Images

Figure CN2023095282_28112024_PF_FP_ABST
Abstract
Description
An iron-carbon micro-electrolysis reactor Technical Field
[0001] The present application relates to the technical field of wastewater treatment equipment, and in particular to an iron-carbon micro-electrolysis reactor. Background Art
[0002] With the rapid development of chemical engineering, a large amount of difficult-to-degrade wastewater is generated in society. It is difficult to treat it to meet the standards using traditional sewage treatment processes or equipment. For difficult-to-degrade chemical wastewater, the commonly used treatment units include Fenton, iron-carbon micro-electrolysis and other methods. Among them, iron-carbon micro-electrolysis, also known as internal electrolysis, is an ideal method for treating high-concentration organic wastewater. It is mainly used to treat wastewater with high organic concentration, high toxicity, high color, and difficult biodegradation. It can significantly reduce the color and COD of the wastewater, increase the B / C ratio, and improve the biodegradability of the wastewater. It can be widely used in the treatment of various industrial wastewaters such as printing and dyeing, chemicals, electroplating, pulp and paper, pharmaceuticals, wool washing, pesticides, alcohol, and other industries, as well as treated water reuse projects.
[0003] Iron-carbon micro-electrolysis is an electrochemical method that usually uses zero-valent iron and activated carbon as the anode and cathode respectively. In water, when they come into contact with each other, the anode releases electrons and the cathode accepts and transfers electrons, forming countless microscopic primary cells. The micro-electrolysis reaction also accelerates the release of electrons by the iron electrode. Zero-valent iron, as the anode, loses two electrons to form Fe 2+ (i.e. Fe-2e→Fe 2+ ), activated carbon acts as a cathode, accepts electrons and forms [H] and O" (i.e., O 2+ +4H + +4e→2O〃+4[H]), and shows strong redox activity. In addition, the reduced iron powder loses electrons and forms oxygen (such as Fe(OH) 2+ 、Fe(OH)2 + After further oxidation, it forms good ferrous hydroxide (Fe(OH)2) and ferric hydroxide (Fe(OH)3) flocs, which are transformed and removed with the pollutants through a combination of co-precipitation, adsorption and inter-particle bridging.
[0004] Therefore, the electrode reaction of iron-carbon micro-electrolysis produces a strong reducing free hydrogen radical [H], and also produces a by-product Fe 2+ and Fe 3+Industrial wastewater contains a large amount of organic matter, mainly composed of elements such as C, N, P, and S. After long-term operation, the iron-carbon micro-electrolysis reactor will form iron phosphorus oxides, such as Fe3(PO4)2〃8H2O and FePO4〃8H2O, or react with S to form FeS. In addition, there is oxygen dissolved in the water, which will also react with iron to form Fe2O3 and Fe3O4. These compounds cover the surface of the filler and some pores. If they are not washed away in time, a passivation film will form, which will hinder the effective contact area between iron and carbon, affect the effect of the galvanic cell between iron and carbon, weaken the galvanic cell effect between iron and carbon, and reduce the treatment efficiency of the iron-carbon micro-electrolysis reaction for wastewater. As the operating time increases, the passivation film of the iron-carbon filler becomes denser and more severe, which inhibits the generation of [H] until electrolysis cannot proceed at all. Because the activity of iron filings is too strong, if the iron filings cannot be separated, they will stick to each other. Iron compounds will also connect with the iron filings to form lumps, which will lead to compaction and channeling.
[0005] Because traditional iron-carbon micro-electrolysis reactors, such as those described in patent CN212770010U, only provide bottom aeration and result in uneven and turbulent water flow with dead zones, the filler can still easily become passivated and compacted, weakening the micro-electrolysis galvanic cell and significantly impacting wastewater treatment effectiveness. After long-term operation, the filler can become severely compacted and deposited at the bottom of the device, potentially causing blockage during operation.
[0006] Summary of the Invention
[0007] Based on this, it is necessary to provide an iron-carbon micro-electrolysis reactor that can better avoid passivation and agglomeration of fillers.
[0008] An iron-carbon micro-electrolysis reactor, comprising:
[0009] The outer tank is formed with a communicating receiving cavity and a first mounting hole;
[0010] An inner tank is located in the receiving chamber and connected to the outer tank, a circulation gap is formed between the outer wall of the inner tank and the inner wall of the outer tank, a first circulation intervention surface and a second circulation intervention surface are respectively provided at both ends of the inner tank, and a position-avoiding through hole is formed in the inner tank, and the position-avoiding through hole is provided at least through the first circulation intervention surface;
[0011] An aeration device is inserted into the first mounting hole and connected to the outer tank. The aeration device includes a first aeration mechanism and a second aeration mechanism. The aeration side of the first aeration mechanism is arranged toward the first circulation intervention surface. The second aeration mechanism is inserted into the avoidance through hole, and the aeration side of the second aeration mechanism is located inside the inner tank. There is a preset angle between the aeration direction of the first aeration mechanism and the aeration direction of the second aeration mechanism to form an aeration circulation that circulates through the first circulation intervention surface, the inner cavity of the inner tank, the second circulation intervention surface and the circulation gap in sequence.
[0012] The details of one or more embodiments of the present application are set forth in the accompanying drawings and the description below. Other features, objects, and advantages of the present application will become apparent from the description, drawings, and claims. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, without paying any creative work, they can also obtain drawings of other embodiments based on these drawings.
[0014] Figure 1 is a schematic diagram of an iron-carbon micro-electrolysis reactor according to an embodiment; Figure 2 is a schematic diagram of the operation of the iron-carbon micro-electrolysis reactor shown in Figure 1; Figure 3 is a top view of the iron-carbon micro-electrolysis reactor shown in Figure 1; Figure 4 is a schematic diagram of the partial structure of the iron-carbon micro-electrolysis reactor shown in Figure 3; Figure 4a is a schematic diagram of the partial structure of the iron-carbon micro-electrolysis reactor shown in Figure 4; Figure 5 is a cross-sectional view of the mud discharge pipe of the iron-carbon micro-electrolysis reactor shown in Figure 1; Figure 6 is a structural schematic diagram of the first aeration mechanism of the iron-carbon micro-electrolysis reactor shown in Figure 1; Figure 7 is a schematic diagram of the first angle steel reinforcement frame of the iron-carbon micro-electrolysis reactor shown in Figure 1 being connected to the first inner annular angle steel and the first outer annular angle steel respectively; Figure 8 is a cross-sectional view of the connection between the first inner annular angle steel and the inner tank of the iron-carbon micro-electrolysis reactor shown in Figure 7; Figure 8a is a cross-sectional view of the connection between the first inner annular angle steel and the inner tank of the iron-carbon micro-electrolysis reactor shown in Figure 7 7 is a sectional view along line AA of the iron-carbon micro-electrolysis reactor shown in FIG7 ; FIG8b is a sectional view along line BB of the iron-carbon micro-electrolysis reactor shown in FIG7 ; FIG9 is a schematic diagram of the second angle steel reinforcement frame of the iron-carbon micro-electrolysis reactor shown in FIG1 being connected to the second inner ring angle steel and the second outer ring angle steel respectively; FIG10 is a sectional view of the connection between the second inner ring angle steel and the inner tank of the iron-carbon micro-electrolysis reactor shown in FIG9 ; FIG11 is a sectional view of the aeration riser of the second aeration mechanism of the iron-carbon micro-electrolysis reactor shown in FIG1 ; FIG12 is a sectional view of the rotating device of the second aeration mechanism of the iron-carbon micro-electrolysis reactor shown in FIG1 ; FIG13 is a schematic diagram of the local structure of the rotating device shown in FIG12 ; FIG14 is a schematic diagram of the second high-neck ring gasket of the second neck ring sealing flow-through member of the rotating device shown in FIG12 . DETAILED DESCRIPTION
[0015] To facilitate understanding of the present application, a more comprehensive description of the present application will be provided below with reference to the relevant drawings. Preferred embodiments of the present application are shown in the drawings. However, the present application can be implemented in many different forms and is not limited to the embodiments described herein. Rather, the purpose of providing these embodiments is to provide a more thorough and comprehensive understanding of the disclosure of the present application. It should be noted that when an element is referred to as being "fixed to" another element, it can be directly on the other element or there can be an intermediate element. When an element is considered to be "connected to" another element, it can be directly connected to the other element or there can be an intermediate element. The terms "vertical," "horizontal," "left," "right," and similar expressions used herein are for illustrative purposes only and do not represent the only embodiments. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one skilled in the art to which this application belongs. The terms used herein in the specification of this application are for the purpose of describing specific embodiments only and are not intended to limit this application. The term "and / or" used herein includes any and all combinations of one or more of the relevant listed items.
[0016] As shown in Figures 1 and 2, an iron-carbon micro-electrolysis reactor 10 of one embodiment includes an outer tank 100, an inner tank 200, and an aeration device 300. The outer tank 100 is formed with a receiving cavity 102 and a first mounting hole 104 that are interconnected. The inner tank 200 is located in the receiving cavity 102 and is connected to the outer tank 100. A circulation gap 202 is formed between the outer wall of the inner tank 200 and the inner wall of the outer tank 100. A first circulation intervention surface 201 and a second circulation intervention surface 203 are respectively provided at both ends of the inner tank 200. The inner tank 200 is formed with a avoidance through hole 204, and the avoidance through hole 204 is provided at least through the first circulation intervention surface 201.
[0017] Referring to Figures 3 and 4 , the aeration device 300 is further disposed within the first mounting hole 104 and connected to the outer tank 100. The aeration device 300 includes a first aeration mechanism 310 and a second aeration mechanism 320. The aeration side of the first aeration mechanism 310 is positioned toward the first circulation insertion surface 201, allowing it to provide a better aeration effect on the first circulation insertion surface 201. The second aeration mechanism 320 is disposed within the avoidance through-hole 204 and positioned within the inner tank 200, allowing it to aerate the interior of the inner tank 200. Furthermore, the aeration directions of the first aeration mechanism 310 and the second aeration mechanism 320 are arranged at a predetermined angle, thereby forming an aeration circulation that sequentially circulates through the first circulation insertion surface 201, the inner cavity of the inner tank 200, the second circulation insertion surface 203, and the circulation gap 202. In this embodiment, there are two first mounting holes 104. The first aeration mechanism 310 is disposed through one of the first mounting holes 104 and connected to the outer tank, while the second aeration mechanism 320 is disposed through the other first mounting hole 104 and connected to the outer tank. It is understood that in other embodiments, the number of first mounting holes 104 may be one, with either the first aeration mechanism 310 or the second aeration mechanism 320 disposed through the first mounting hole 104, and the first aeration mechanism 310 communicating with the second aeration mechanism 320 within the outer tank.
[0018] In the above-mentioned iron-carbon micro-electrolysis reactor 10, the aeration side of the first aeration mechanism 310 is arranged toward the first circulation intervention surface 201, the second aeration mechanism 320 is penetrated in the avoidance through hole 204, and the aeration side of the second aeration mechanism 320 is located inside the inner tank 200. There is a preset angle between the aeration direction of the first aeration mechanism 310 and the aeration direction of the second aeration mechanism 320 to form an aeration circulation that circulates through the first circulation intervention surface 201, the inner cavity of the inner tank 200, the second circulation intervention surface 203 and the circulation gap 202 in sequence, so that the water body inside the reactor forms a better circulation, thereby making the wastewater more fully contacted with the filler, which can promote the progress of the reaction. The above-mentioned iron-carbon micro-electrolysis reactor 10 controls the mechanics of the water body, that is, cleverly controls the actions of the first aeration mechanism 310 and the second aeration mechanism 320 to form three modes of "vertical aeration", "horizontal aeration", and "vertical and horizontal aeration". Under the action of the upward water flow, the problems of filler passivation and compaction are solved, thereby reducing the difficulty of filler replacement and improving the utilization rate of the iron-carbon filler; the water body inside the reactor forms a good circulation, and the speed of water flow and mixing is faster. Through the linkage control of the online pH meter and the acid supply mechanism, the pH value of the overall water body in the reactor can be stabilized within a relatively precise range, thereby promoting better reaction.
[0019] As shown in Figures 1 and 2, in one embodiment, the preset angle is between 45° and 90°. In this embodiment, the preset angle is 90° to better form an aerated circulation, allowing the aerated circulation to circulate sequentially through the first circulation intervention surface 201, the inner cavity of the inner tank 200, the second circulation intervention surface 203, and the circulation gap 202. Specifically, the first aeration mechanism 310 is a vertical aeration mechanism. The aeration direction of the aeration side of the first aeration mechanism 310 is perpendicular to the first circulation intervention surface 201, allowing the aeration side of the first aeration mechanism 310 to effectively act on the first circulation intervention surface 201. The second aeration mechanism 320 is a horizontal aeration mechanism. The aeration direction of the aeration side of the second aeration mechanism 320 is parallel to the radial direction of the inner tank 200, allowing the aeration side of the second aeration mechanism 320 to effectively act on the packing of the inner tank 200, thereby ensuring more complete contact between the wastewater and the packing and promoting the reaction.
[0020] As shown in Figures 1 and 2, in one embodiment, the outer tank 100 further forms a second mounting hole 101 that communicates with the receiving chamber 102. The iron-carbon micro-electrolysis reactor 10 also includes a water inlet device 400, which is disposed within the second mounting hole 101 and connected to the outer tank 100 to allow water to enter the receiving chamber 102 through the water inlet device 400. In one embodiment, the water inlet device 400 includes an inlet pipe 410 and an inlet pump 420. The inlet pipe 410 is disposed within the second mounting hole 101 and connected to the outer tank 100. The inlet pump 420 is disposed on the inlet pipe 410. By providing the inlet pump 420, water can be reliably supplied to the inlet pipe 410. In one embodiment, the water inlet device 400 also includes a first flow valve 430, which is disposed on the inlet pipe 410 to regulate and control the water flow rate of the inlet pipe 410, so that the water flow rate of the inlet pipe 410 better meets the water inlet requirements. In one embodiment, the water inlet device 400 further includes a first check valve 440 , which is disposed on the water inlet pipe 410 to prevent wastewater from flowing back into the tank body while ensuring that wastewater reliably flows into the receiving chamber 102 through the water inlet pipe 410 .
[0021] As shown in Figures 1 and 2 , in one embodiment, the end of the water inlet pipe 410 within the outer tank 100 is formed with a bell mouth 412 to mitigate the impact of the incoming water, causing the incoming water to flow slowly and downward. This ensures that only fine iron and carbon powders are swept up during the inflow process and re-enter the wastewater circulation for re-reaction. In this embodiment, the bell mouth 412 is positioned toward the bottom of the receiving chamber 102.
[0022] As shown in Figures 1 and 2, in one embodiment, the outer tank 100 further defines a third mounting hole 103 communicating with the receiving chamber 102. The iron-carbon micro-electrolysis reactor 10 further includes a water outlet device 500, which is disposed within the third mounting hole 103 and connected to the outer tank 100 to reliably drain water from the receiving chamber 102. In this embodiment, the third mounting hole 103 is formed on the outer peripheral wall adjacent to the top of the outer tank 100.
[0023] As shown in Figures 1 to 3, in one embodiment, the water outlet device 500 includes a water outlet pipe 510 and a water outlet baffle 520. The water outlet pipe 510 is connected to the outer tank 100 through the third mounting hole 103. The water outlet baffle 520 is located within the receiving chamber 102 and connected to the outer tank 100. The end of the water outlet pipe 510 that communicates with the receiving chamber 102 is positioned toward the water outlet baffle 520. A slow flow channel 522 is formed between the water outlet baffle 520 and the inner wall of the receiving chamber 102. The slow flow channel 522 communicates with the water outlet pipe 510, allowing the water outlet baffle 520 to block scum, that is, to prevent floating impurities from entering the water outlet pipe 510 and thereby clogging it. It also prevents water from flowing directly out of the top of the inner tank 200, causing local short-circuiting. In this embodiment, the middle portion of the water outlet baffle 520 is positioned corresponding to the water outlet pipe 510.
[0024] As shown in Figures 2 and 3 , in one embodiment, the outlet baffle 520 is arranged parallel to the axis of the outer tank 100, and both sides of the outlet baffle 520 are fixedly connected to the inner circumferential wall of the outer tank 100. This ensures that the outlet baffle 520 is securely fixed to the inner circumferential wall of the outer tank 100 and effectively blocks scum. The outlet baffle 520 prevents floating impurities from entering the outlet pipe 510, thereby blocking it. It also prevents water from flowing directly out of the top of the inner tank 200, which could cause local short-circuiting.
[0025] As shown in Figures 1 to 3, in one embodiment, the outer tank 100 further defines a fourth mounting hole 105 communicating with the receiving chamber 102. The iron-carbon micro-electrolysis reactor 10 also includes a sludge discharge device 600, which is disposed within the fourth mounting hole 105 and connected to the outer tank 100. The end of the sludge discharge device 600 located within the receiving chamber 102 is located below the inner tank 200, allowing sludge in the receiving chamber 102 to be discharged through the sludge discharge device 600. In this embodiment, the sludge discharge device 600 is located at the bottom of the receiving chamber 102. In one embodiment, the sludge discharge device 600 includes a sludge discharge pipe 610 and a sludge discharge pump 620. The sludge discharge pipe 610 is disposed within the fourth mounting hole 105 and connected to the outer tank 100. The sludge discharge pump 620 is disposed on the sludge discharge pipe 610. In this embodiment, the end of the sludge discharge pipe 610 located within the receiving chamber 102 is located at the bottom of the receiving chamber 102. In one embodiment, the mud discharge device 600 further includes a second flow valve 630 , which is disposed on the mud discharge pipe 610 , so as to adjust the mud flow passing through the mud discharge pipe 610 through the second flow valve 630 .
[0026] As shown in FIG2 , in one embodiment, the iron-carbon micro-electrolysis reactor 10 further includes a mud hopper 700, which is located on the inner bottom wall of the outer tank 100 and connected to the outer tank 100, so that the bottom of the outer tank 100 can better gather sludge, so that the sludge can be better discharged through the mud discharge hole group 612, while conveniently guiding the aeration circulation to flow upward. In this embodiment, the mud hopper 700 is located below the inner tank 200, and the mud hopper 700 is formed with a mud collecting trough 702 arranged toward the first circulation intervention surface 201. The mud discharge pipe 610 is at least partially located in the mud collecting trough 702. The mud discharge pipe 610 is provided with a mud discharge hole group 612 connected to the mud collecting trough 702, so that the sludge on the inner bottom wall of the outer tank 100 is collected through the mud collecting trough 702, and the sludge in the mud collecting trough 702 is reliably discharged through the mud discharge hole group 612. In this embodiment, heavier impurities in the filler fall into the mud hopper 700 during the aeration and circulation flushing process, and the impurities in the mud hopper 700 are discharged through the mud discharge pipe 610 and the mud discharge pump 620. Furthermore, the mud hopper 700 is located on the inner bottom wall of the outer tank 100 and is fixedly connected to the outer tank 100.
[0027] As shown in FIG2 , in one embodiment, a bell mouth 412 is positioned toward the sludge collecting trough 702 . Wastewater enters the bell mouth 412 via the water inlet pump 420 and the water inlet pipe 410. The bell mouth 412 acts to mitigate the force of the incoming water, so that only the fine iron and carbon powders are swept up by the incoming water, allowing them to re-enter the wastewater circulation to re-react, while the heavier impurities remain in the sludge hopper 700 . In this embodiment, the portion of the water inlet pipe 410 within the outer tank 100 is located between the sludge hopper 700 and the inner tank 200 to facilitate water inflow through the water inlet pipe 410 .
[0028] As shown in FIG2 , in one embodiment, the number of mud discharge hole groups 612 is multiple, and the multiple mud discharge hole groups 612 are arranged at intervals along the axial direction of the mud discharge pipe 610. One end of the mud discharge pipe 610 is located in the mud collecting tank 702, so that the mud discharge hole group 612 has a better mud discharge effect. Referring to FIG5 , in one embodiment, the mud discharge hole group 612 includes at least two mud discharge holes 6122, and two adjacent mud discharge holes are staggered along the circumferential direction, so that the mud discharge hole group 612 has a better mud discharge effect. In one embodiment, the mud hopper 700 is provided with a mounting hole 703, and the mud discharge pipe 610 is respectively inserted into the fourth mounting hole 105 and the mounting hole. One end of the mud discharge pipe 610 is located in the mud collecting tank 702, so that the mud discharge pipe 610 can be better installed in the outer tank 100 and the mud hopper 700.
[0029] As shown in Figures 2 to 4a, in one embodiment, a wing ring 206 with a preset angle of inclination is provided at the periphery of one end of the inner tank 200. This wing ring 206 surrounds the first circulation intrusion surface 201, preventing the aeration head from disturbing the water outside the inner tank during aeration. This creates an overall circulation in which water flows upward inside the inner tank and downward outside the inner tank. This wing ring 206 guides the aerated circulation toward the first circulation intrusion surface 201, thereby ensuring that the aerated circulation is more effectively applied to the first circulation intrusion surface 201. In this embodiment, the wing ring 206 surrounds the aeration side of the first aeration mechanism 310, ensuring that the aeration side of the first aeration mechanism 310 faces the first circulation intrusion surface 201 for reliable aeration. In this embodiment, the preset angle of inclination is between 30° and 60°. Specifically, the preset inclined cone angle is 45°, so that the wing ring 206 guides the aeration circulation to flow toward the first circulation intervention surface 201 , thereby allowing the aeration circulation to better act on the first circulation intervention surface 201 .
[0030] As shown in Figures 2 to 4 , in one embodiment, the first aeration mechanism 310 includes a first aeration main pipe 312 and multiple aeration heads 314. The multiple aeration heads 314 are spaced apart from the first aeration main pipe 312, with the aeration end of each aeration head 314 facing the first circulation intervention surface 201. This allows the aeration side of the first aeration mechanism 310 to effectively interact with the first circulation intervention surface 201. In this embodiment, the first aeration main pipe 312 is inserted through one of the first mounting holes 104 and connected to the outer tank. The multiple aeration heads 314 are spaced apart from the first aeration main pipe 312, forming an aeration disc structure. The aeration positions of the first aeration mechanism 310 are spaced apart from each other, corresponding to the positions on the first circulation intervention surface 201. In one embodiment, the first aeration main pipe 312 and the second aeration mechanism 320 are staggered to avoid interference between the first aeration main pipe 312 and the second aeration mechanism 320 . This allows the aeration device 300 to be better positioned within the outer tank 100 , forming a reliable aeration circulation.
[0031] As shown in Figures 2, 4, and 6 (where the dashed line in Figure 6 represents the outline of the inner tank projection), in one embodiment, a first aeration main pipe 312 includes an aeration pipe body 3122 and multiple aeration branch pipes 3124. Multiple aeration branch pipes 3124 are arranged side by side, each connected to the aeration pipe body 3122 and equipped with at least one aeration head 314. In this embodiment, the aeration heads 314 on the multiple aeration branch pipes 3124 collectively form an aeration disk structure. Each aeration branch pipe 3124 may be equipped with one or two aeration heads 314. In one embodiment, multiple aeration heads 314 are arranged at intervals, and the projections of the multiple aeration heads 314 on the plane where the first circulation intervention surface 201 is located are located on the first circulation intervention surface 201, so that the multiple aeration heads 314 can better aerate the first circulation intervention surface 201, which not only enables the first aeration mechanism 310 to better flush the silt on the grid, but also is more conducive to the formation of an aeration circulation in the iron-carbon micro-electrolysis reactor, and better avoids the problem of disturbing the silt in the mud hopper below, thereby preventing larger impurities from entering the inner tank again with the aeration circulation and causing blockage of the grid or iron-carbon.
[0032] As shown in Figure 1, in one embodiment, the inner tank 200 includes an inner tank body 210 and an iron-carbon core group 220. The inner tank body 210 is formed with an installation cavity 205. The iron-carbon core group 220 is located in the installation cavity 205 and is connected to the inner tank body 210. The first circulation intervention surface 201 and the second circulation intervention surface 203 are respectively arranged on the end surfaces of both ends of the iron-carbon core group 220, and the avoidance through hole 204 is formed in the iron-carbon core group 220.
[0033] As shown in FIG1 , in one embodiment, the iron-carbon core assembly 220 includes an iron-carbon filling tube 222, a first grid member 224, and a second grid member 226. The iron-carbon filling tube 222 is located in the mounting cavity 205, the first grid member 224 is located in the mounting cavity 205 and connected to the inner tank body 210, and the second grid member 226 is located in the mounting cavity 205 and connected to the inner tank body 210. The first grid member 224 and the second grid member 226 respectively abut against both end surfaces of the iron-carbon filling tube 222. The first circulation intervention surface 201 is provided on the side of the first grid member 224 facing away from the iron-carbon filling tube 222, and the second circulation intervention surface 203 is provided on the side of the second grid member 226 facing away from the iron-carbon filling tube 222. The avoidance through hole 204 includes a first connecting hole 2041 formed in the first grid member 224 and a avoidance channel 2043 formed in the iron-carbon filler tube 222. The first connecting hole 2041 is connected to the avoidance channel 2043. In this embodiment, the iron-carbon filler tube 222 is formed with iron-carbon fillers.
[0034] As shown in Figures 1, 7, and 8, in one embodiment, the first grille member 224 is detachably connected to the inner tank body 210. In this embodiment, the inner tank 200 further includes a first locking member 230. A first inner annular angle steel 213 is provided on the inner circumferential wall of the inner tank body 210. A first locking hole 212 is defined in the first inner annular angle steel 213. The first grille member 224 is provided with a first through hole 2242. The first locking member 230 is respectively disposed in the first through hole 2242 and the first locking hole 212, so that the first grille member 224 is detachably connected to the inner tank body 210. In this embodiment, the first locking member 230 includes a first bolt 232 and a first nut 234. The first bolt 232 is respectively inserted into the first through hole 2242 and the first locking hole 212. The first nut 234 is screwed to the first bolt 232, and the first nut 234 abuts against the side of the first grille member 224 facing away from the inner tank body 210, so that the first grille member 224 can be removed to replace the filler in the tank body. The first grille member 224 can be made of fiberglass or metal, but not limited to metal, which improves the applicability of the iron-carbon micro-electrolysis reactor. In particular, the fiberglass grille can better meet the requirements for use under conditions with high corrosion resistance. The inner tank body 210 and the first inner annular angle steel 213 are formed separately, which reduces the manufacturing difficulty of the inner tank 200, and the inner tank body 210 is fixedly connected to the first inner annular angle steel 213.
[0035] As shown in Figures 1, 7, and 8, in one embodiment, the first inner annular angle steel 213 is formed with a first inner annular positioning groove 2132 that communicates with the first locking hole 212. The first grille member 224 is located within the first inner annular positioning groove 2132, allowing the first inner annular angle steel 213 to support and abut against the first grille member 224, thereby ensuring that the first grille member 224 is well positioned and mounted on the first inner annular angle steel 213. In this embodiment, the cross-section of the first inner annular positioning groove 2132 is L-shaped.
[0036] As shown in Figures 1, 7 and 8, in one embodiment, the number of the first locking members 230 is multiple, and the multiple first locking members 230 are arranged at intervals along the circumference of the first inner annular angle steel 213; the number of the first through holes 2242 and the number of the first locking holes 212 are both multiple, and the multiple first locking members 230 are respectively passed through the corresponding first through holes 2242 and the corresponding first locking holes 212, so that the first grille member 224 is reliably positioned and installed on the first inner annular angle steel 213.
[0037] As shown in Figures 1, 7 and 8, in one embodiment, the iron-carbon micro-electrolysis reactor 10 also includes a first angle steel reinforcement frame 800, and a first outer annular angle steel 106 is provided on the inner circumferential wall of the outer tank 100. The first angle steel reinforcement frame 800 is fixedly connected to the first inner annular angle steel 213 and the first outer annular angle steel respectively, so as to realize the relative installation and fixation of the inner tank 200 and the outer tank 100, avoid the relative movement of the inner tank 200 and the outer tank 100, and at the same time play the role of supporting the inner tank, and avoid the problem of large obstruction of the aeration circulation between the inner tank and the outer tank.
[0038] As shown in Figures 1, 7, and 8, in one embodiment, a first angle steel reinforcement frame 800 is fixedly connected to the first inner annular angle steel 213 and the first outer annular angle steel, respectively. The first inner annular angle steel 213, the first outer annular angle steel, and the first angle steel reinforcement frame 800 are disposed on the same plane. The first angle steel reinforcement frame 800 divides the first grille member 224 into a plurality of first grille units within the first inner annular angle steel 213, thereby better securing the first grille member 224 to the outer tank 100. It will be appreciated that in other embodiments, the first inner annular angle steel 213, the first outer annular angle steel, and the first angle steel reinforcement frame 800 are not limited to being disposed on the same plane. For example, the bottom surface of the first angle steel reinforcement frame 800 may be located below the first inner annular angle steel 213 and the first outer annular angle steel, thereby supporting and securing the first angle steel reinforcement frame 800 to the first inner annular angle steel 213 and the first outer annular angle steel.
[0039] As shown in Figures 1, 7, and 8, in one embodiment, the first angle steel reinforcement frame 800 includes a first transverse angle steel group 810 and a first longitudinal angle steel group 820. The first transverse angle steel group 810 includes at least two first transverse angle steels 812 arranged parallel to each other, and the first longitudinal angle steel group 820 includes at least two first longitudinal angle steels 822 arranged parallel to each other. Each first transverse angle steel intersects and is fixed to any first longitudinal angle steel. A first grille unit is provided between adjacent first longitudinal angle steels, between two adjacent first longitudinal angle steels, and between two adjacent first transverse angle steels. A first grille unit is provided at the center of the intersection of the first transverse angle steel group 810 and the first longitudinal angle steel group 820. The first connecting hole 2041 is formed in the first grille unit at the center of the intersection of the first transverse angle steel group 810 and the first longitudinal angle steel group 820. It is understood that each first transverse angle steel intersects and is fixed to any first longitudinal angle steel by welding, gluing, or screwing. Referring to Figures 8a and 8b simultaneously, specifically, at the intersection of the first transverse angle steel 812, the inner tank, and the first inner annular angle steel 213, a first notch 213a is formed in the inner tank and the first inner annular angle steel 213. The first transverse angle steel 812 is inserted through the first notch and is fixedly connected to the inner tank and the first inner annular angle steel, respectively. A second notch 106a is formed in the first outer annular angle steel 106. The first transverse angle steel 812 is located in the second notch and is fixedly connected to the first outer annular angle steel. Similarly, at the intersection of the first longitudinal angle steel 822, the inner tank, and the first inner annular angle steel 213, a third notch 213b is formed in the inner tank and the first inner annular angle steel 213. The first longitudinal angle steel 822 is inserted through the third notch and is fixedly connected to the inner tank and the first inner annular angle steel, respectively. The first outer annular angle steel 106 is formed with a fourth notch 106 b , and the first longitudinal angle steel 822 is located in the fourth notch and is fixedly connected to the first outer annular angle steel.
[0040] As shown in Figures 1, 9, and 10, in one embodiment, the second grille member 226 is detachably connected to the inner tank body 210. In this embodiment, the inner tank 200 further includes a second locking member 250. A second inner annular angle steel is provided on the inner circumferential wall of the inner tank body 210. A second locking hole 214 is defined in the second inner annular angle steel 215. The second grille member 226 is provided with a second through hole 2262. The second locking member 250 is respectively inserted into the second through hole 2262 and the second locking hole 214, thereby allowing the second grille member 226 to be detachably connected to the inner tank body 210. In this embodiment, the second locking member 250 includes a second bolt 252 and a second nut 254. The second bolt 252 is respectively inserted into the second through hole 2262 and the second locking hole 214. The second nut 254 is screwed to the second bolt 252, and the second nut 254 abuts against the side of the second grid member 226 facing away from the inner tank body 210, so that the second grid member 226 can be removed to replace the filler in the tank body. The second grid member 226 can be made of fiberglass or metal, but is not limited to metal, which improves the applicability of the iron-carbon micro-electrolysis reactor. In particular, the fiberglass grid can better meet the requirements for use under conditions with high corrosion resistance. The inner tank body 210 and the second inner annular angle steel 215 are formed separately, which reduces the manufacturing difficulty of the inner tank 200, and the inner tank body 210 is fixedly connected to the second inner annular angle steel 215.
[0041] As shown in Figures 9 and 10, in one embodiment, the second inner annular angle steel 215 is formed with a second inner annular positioning groove 2152 that communicates with the second locking hole 214. The second grille member 226 is located in the second inner annular positioning groove 2152, so that the second inner annular angle steel 215 is supported and abutted against the second grille member 226, and the second grille member 226 is well positioned and mounted on the second inner annular angle steel 215. In this embodiment, the cross-section of the second inner annular positioning groove 2152 is L-shaped.
[0042] As shown in Figures 9 and 10, in one embodiment, the number of the second locking members 250 is multiple, and the multiple second locking members 250 are arranged at intervals along the circumference of the second inner annular angle steel 215; the number of the second through holes 2262 and the number of the second locking holes 214 are both multiple, and the multiple second locking members 250 are respectively passed through the corresponding second through holes 2262 and the corresponding second locking holes 214, so that the second grille member 226 is reliably positioned and installed on the second inner annular angle steel 215.
[0043] As shown in Figures 9 and 10, in one embodiment, the iron-carbon micro-electrolysis reactor 10 also includes a second angle steel reinforcement frame 900, and a second outer annular angle steel 107 is formed on the inner circumferential wall of the outer tank 100. The second angle steel reinforcement frame 900 is fixedly connected to the second inner annular angle steel 215 and the second outer annular angle steel 107, respectively, to achieve relative installation and fixation of the inner tank 200 and the outer tank 100, avoid relative movement of the inner tank 200 and the outer tank 100, and at the same time play the role of supporting the inner tank, and avoid the problem of large obstruction of the aeration circulation between the inner tank and the outer tank.
[0044] As shown in Figures 9 and 10, in one embodiment, the second angle steel reinforcement frame 900 is fixedly connected to the second inner ring angle steel 215 and the second outer ring angle steel 107, respectively. The second outer ring angle steel 107 and the second inner ring angle steel 215 are arranged on the same plane. The bottom surface of the second angle steel reinforcement frame 900 is located below the second outer ring angle steel 107 and the second inner ring angle steel 215, so that the second angle steel reinforcement frame 900 is supported and fixed to the second outer ring angle steel 107 and the second inner ring angle steel 215; the second angle steel reinforcement frame 900 divides the second grille member 226 into a plurality of second grille units in the second inner ring angle steel 215, so that the second grille member 226 can be better installed and fixed to the outer tank 100. It can be understood that in other embodiments, the bottom surface of the second angle steel reinforcement frame 900 is not limited to being located below the second outer ring angle steel 107 and the second angle steel reinforcement frame 900. For example, the second angle steel reinforcement frame 900, the second outer ring angle steel 107 and the second angle steel reinforcement frame 900 can be arranged on the same plane.
[0045] As shown in Figures 9 and 10, in one embodiment, the second angle steel reinforcement frame 900 includes a second transverse angle steel group 910 and a second longitudinal angle steel group 920. The second transverse angle steel group includes at least two second transverse angle steels 912 arranged parallel to each other, and the second longitudinal angle steel group includes at least two second longitudinal angle steels 922 arranged parallel to each other. Each second transverse angle steel intersects and is fixed with any second longitudinal angle steel. A second grille unit is provided between adjacent second longitudinal angle steels and second transverse angle steels, between two adjacent second longitudinal angle steels, and between two adjacent second transverse angle steels. A second grille unit is provided at the center of the intersection of the second transverse angle steel group and the second longitudinal angle steel group. It is understood that each second transverse angle steel intersects and is fixedly connected, glued, or screwed with any second longitudinal angle steel. Referring to Figures 8a and 8b , specifically, at the intersection of the second transverse angle steel 912 with the inner tank and the second inner annular angle steel 215, a first opening 215a is formed on each of the inner tank and the second inner annular angle steel 215. The second transverse angle steel 912 is disposed through the first opening and is fixedly connected to the inner tank and the second inner annular angle steel 215, respectively. The second outer annular angle steel 107 is formed with a second opening 107a. The second transverse angle steel 912 is located at the second opening and is fixedly connected to the second outer annular angle steel 107. Similarly, at the intersection of the second longitudinal angle steel 922 with the inner tank and the second inner annular angle steel 215, a third opening 215b is formed on each of the inner tank and the second inner annular angle steel 215. The second longitudinal angle steel 922 is disposed through the third opening and is fixedly connected to the inner tank and the second inner annular angle steel, respectively. The second outer annular angle steel 107 is formed with a fourth opening 107 b , and the second longitudinal angle steel 922 is located at the fourth opening and fixedly connected to the second outer annular angle steel 107 .
[0046] As shown in Figure 1, in one embodiment, the avoidance through-hole 204 further includes a second connecting through-hole 2042 formed in the second grille member 226, and the second connecting through-hole 2042 is connected to the avoidance channel 2043. In one embodiment, the iron-carbon core group 220 further includes an annular perforated sleeve 328. The second aeration mechanism 320 is disposed through the annular perforated sleeve 328 and is rotatably connected to the inner tank 200, thereby reliably confining the filler between the annular perforated sleeve 328 and the inner tank 200. The annular perforated sleeve 328 is disposed through the first connecting through-hole 2041, the avoidance through-hole 204, and the second connecting through-hole 2042, respectively, thereby reliably confining the filler between the annular perforated sleeve 328 and the inner tank 200. In this embodiment, the second connecting through-hole 2042 is formed in the second grille unit at the center of the intersection of the second transverse angle steel group and the second longitudinal angle steel group.
[0047] As shown in Figure 1, in one embodiment, the second aeration mechanism 320 includes a second aeration main pipe 322, a rotating device 324, and an aeration riser 326. The aeration riser 326 is connected to the second aeration main pipe 322 via the rotating device 324, allowing the aeration riser 326 and the second aeration main pipe 322 to rotate relative to each other. The aeration riser 326 is inserted into and rotatably connected to an annular perforated sleeve 328, allowing the aeration side of the aeration riser 326 to better act on the packing surface through the perforations of the annular perforated sleeve 328, thereby better preventing packing from becoming hardened or degraded. In this embodiment, the second aeration main pipe 322 is inserted into another first mounting hole 104 and connected to the outer tank.
[0048] As shown in FIG1 , in one embodiment, the aeration riser 326 has a transverse aeration hole group 3262 formed within an annular perforated sleeve 328. As shown in FIG1 and FIG11 , in one embodiment, there are multiple transverse aeration hole groups 3262, each of which is spaced axially along the aeration riser 326. In one embodiment, each transverse aeration hole group 3262 includes multiple transverse aeration holes 3263 spaced circumferentially, thereby providing a better aeration effect for the transverse aeration hole groups 3262 of the aeration riser 326. In this embodiment, the outer wall of the annular perforated sleeve 328 is formed with m punching holes, the number of the transverse aeration hole groups 3262 is n1, and each transverse aeration hole group 3262 includes n2 transverse aeration holes arranged at intervals along the circumferential direction. Then, the number of transverse aeration holes is n1*n2, m is greater than n1*n2, and m, n1, and n2 are all positive integers, so that the aeration side of the aeration riser 326 can better act on the filler surface through the punching holes of the annular perforated sleeve 328, that is, through the action of rotation, the entire cross-section of the iron-carbon filler can be flushed 360 degrees, thereby better avoiding the problem of filler compaction or passivation.
[0049] As shown in FIG. 1 , in one embodiment, the diameter of the aeration riser 326 is smaller than the inner diameter of the annular perforated sleeve 328 , so that the aeration riser 326 can rotate relatively to the annular perforated sleeve 328 within the annular perforated sleeve 328 .
[0050] As shown in FIG1 , in one embodiment, the second aeration mechanism 320 further includes a rotating handle 329 . The portion of the aeration riser 326 located outside the inner tank 200 is connected to the rotating handle 329 . The rotating handle 329 drives the aeration riser 326 to rotate relative to the second aeration main pipe 322 to adjust the aeration direction of the second aeration main pipe 322 . The operator can operate from the outside of the outer tank without having to manually enter the outer tank, making the operation safer, more convenient, and simpler.
[0051] As shown in Figures 1 and 3, in one embodiment, the aeration riser 326 is arranged to protrude outside the inner tank 200; a first limit member 208 and a second limit member 207 are respectively provided at positions adjacent to the outer tank 100, and the first limit member 208 and the second limit member 207 are arranged at preset angles along the circumference of the center of the inner tank 200. The rotating handle 329 is located between the first limit member 208 and the second limit member 207 and rotates relative to the outer tank 100, so that the rotating handle 329 rotates between the predetermined angles of the first limit member 208 and the second limit member 207, thereby rotating the aeration riser 326 relative to the annular perforated sleeve 328 within a predetermined angle range. In this embodiment, the rotation angle of the rotary handle 329 is 90°, allowing the aeration standpipe 326 to rotate 90° with the rotary handle 329. Furthermore, the aeration standpipe 326 is provided with multiple transverse aeration hole groups 3262 at axial intervals. Each transverse aeration hole group 3262 includes multiple transverse aeration holes spaced circumferentially. This allows the entire cross-section of the iron-carbon filler to be flushed 360 degrees, effectively preventing filler compaction or passivation. Specifically, the first stopper 208 and the second stopper 207 are both stopper protrusions.
[0052] It is understood that in other embodiments, the rotary handle 329 can be replaced with a drive mechanism, which can be a rotary cylinder or other mechanical transmission mechanism, and the drive mechanism is connected to the portion of the aeration riser 326 located outside the inner tank 200. During operation, the iron-carbon micro-electrolysis reactor 10 can achieve fully automatic operation without the need for human supervision, thereby reducing labor costs and risks.
[0053] As shown in Figure 1, in one embodiment, the outer circumference of the aeration standpipe 326 is respectively fitted with a first bearing 3266 and a second bearing 3265. The outer circumferences of the first bearing 3266 and the second bearing 3265 are both connected to the inner circumference of the annular perforated sleeve 328, enabling the aeration standpipe 326 to rotate relative to the annular perforated sleeve 328. In this embodiment, the ends of the annular perforated sleeve 328 extend to the first connecting hole 2041 and the second connecting hole 2042, respectively. The first grille 224 supports and secures the annular perforated sleeve 328, while the second grille 226 secures the annular perforated sleeve 328. The first bearing 3266 and the second bearing 3265 secure the aeration standpipe 326 and ensure its rotation. The rotation device 324 is designed to rotate only the aeration standpipe 326 during rotation, avoiding interference with the second aeration main pipe 322.
[0054] As shown in Figures 1 and 12, in one embodiment, the rotating device 324 includes a rotating outer tube 3242, a rotating inner tube 3244 and an elastic sealing flow structure 3246. The rotating outer tube 3242 is sleeved on the outside of the rotating inner tube 3244 and is rotatably connected to the rotating inner tube 3244. The rotating outer tube 3242 is connected to the second aeration main pipe 322, and the end of the rotating inner tube 3244 away from the rotating outer tube 3242 is connected to the aeration riser 326; the rotating outer tube 3242 is formed with a communicating receiving groove 303 and a first sealing through hole 307, the rotating inner tube 3244 is formed with a second sealing through hole 305, the elastic sealing flow structure 3246 is located in the receiving groove 303, and the elastic sealing flow structure 3246 is One end is located in the first sealing through hole 307 and is connected to the rotating outer tube 3242, and the other end of the elastic sealing flow-through structure 3246 is located in the second sealing through hole 305 and is connected to the rotating inner tube 3244. The elastic sealing flow-through structure 3246 is formed with a water through hole 309, and the water through hole 309 is respectively connected to the rotating outer tube 3242 and the rotating inner tube 3244. When the rotating outer tube 3242 and the rotating inner tube 3244 rotate relative to each other, the elastic sealing flow-through structure 3246 elastically deforms, so that the elastic sealing flow-through structure 3246 elastically abuts against the relative rotation connection between the rotating outer tube 3242 and the rotating inner tube 3244, thereby making the rotating outer tube 3242 and the rotating inner tube 3244 have better rotational sealing performance.
[0055] As shown in FIG12 , in one embodiment, the elastic sealing flow-through structure 3246 includes a first neck ring sealing flow-through member 324a, an elastic connector 324b, and a second neck ring sealing flow-through member 324c. The first neck ring sealing flow-through member 324a is connected to the second neck ring sealing flow-through member 324c via the elastic connector 324b. The first neck ring sealing flow-through member 324a is located in the second sealing through-hole 305 and is connected to the rotating inner tube 3244. The elastic connector 324b is located in the receiving groove 303. The second neck ring sealing flow-through member 324c is located in the first sealing through-hole 307 and is connected to the rotating outer tube 3242. Thus, the two ends of the elastic sealing flow-through structure 3246 are sealedly connected to the rotating outer tube 3242 and the rotating inner tube 3244, respectively. The water through hole 309 includes a first water through hole 3092 formed in the first neck ring sealing flow member 324a, a second water through hole 3094 formed in the elastic connecting member 324b and a third water through hole 3096 formed in the second neck ring sealing flow member 324c. The first water through hole 3092 is connected to the rotating inner tube 3244, and the second water through hole 3094 is connected to the rotating outer tube 3242.
[0056] As shown in Figure 12, in one embodiment, the elastic connecting member 324b is a coil spring or a silicone sleeve. In this embodiment, the elastic connecting member 324b is a coil spring, so that the elastic connecting member 324b has good elastic strength.
[0057] As shown in Figures 12 to 14, in one embodiment, the first neck ring-shaped sealing flow passage member 324a includes a first high-necked ring gasket 3241 and a first annular gasket 3243 connected to each other. The first water passage 3092 includes a first water passage groove 3091 formed in the first high-necked ring gasket 3241 and a first opening 3093 formed in the first annular gasket 3243. The first water passage groove communicates with the first opening. The first high-necked ring gasket 3241 is located in the first sealing through-hole 307 and connected to the rotating outer tube 3242. In this embodiment, the first annular gasket 3243 is connected to the end of the first high-necked ring gasket 3241 facing away from the rotating outer tube 3242, ensuring a better sealing connection between the first neck ring-shaped sealing flow passage member 324a and the rotating outer tube 3242.
[0058] As shown in FIG12 , in one embodiment, the second neck ring-shaped sealing flow passage member 324c includes a second high-necked ring gasket 3245 and a second annular gasket 3247 connected thereto. The third water passage 3096 includes a second water groove 3095 formed in the second high-necked ring gasket 3245 and a second opening 3097 formed in the second annular gasket 3247. The second water groove communicates with the second opening. The second high-necked ring gasket 3245 is located in the second sealing through-hole 305 and connected to the rotating inner tube 3244. In this embodiment, the second annular gasket 3247 is connected to the end of the second high-necked ring gasket 3245 facing away from the rotating inner tube 3244, ensuring a better sealing connection between the second neck ring-shaped sealing flow passage member 324c and the rotating inner tube 3244.
[0059] Specifically, the first neck ring sealing flow member 324a and the second neck ring sealing flow member 324c are both sealed with annular gaskets with good elasticity, and the first seal is formed by the extrusion of the rotating inner tube 3244 and the rotating outer tube 3242. In addition, the interior of the rotating inner tube 3244 and the interior of the rotating outer tube 3242 are both provided with annular convex grooves to support the first high-neck annular gasket 3241 and the second high-neck annular gasket 3245. In the middle is provided an elastic sealing flow structure 3246 which is fixedly connected by an elastic connecting piece 324b, a first annular gasket 3243 and a second annular gasket 3247. The second seal is formed by the extrusion of the rotating inner tube 3244 and the rotating outer tube 3242 and the rebound action of the elastic connecting piece 324b.
[0060] As shown in Figure 12, in one embodiment, the first high-neck annular gasket 3241 abuts against the first annular gasket 3243, and the second high-neck annular gasket 3245 abuts against the second annular gasket 3247, so that the elastic sealing flow-through structure 3246 elastically abuts against the first annular gasket 3243 and the second annular gasket 3247 respectively, while facilitating the disassembly, maintenance or replacement of the elastic sealing flow-through structure 3246.
[0061] As shown in FIG12 , in one embodiment, the elastic connector 324b is a coil spring, and the two ends of the elastic connector 324b are respectively fixedly connected to the first annular gasket 3243 and the second annular gasket 3247, so that the elastic connector 324b is respectively reliably fixedly connected to the first annular gasket 3243 and the second annular gasket 3247. In this embodiment, the two ends of the elastic connector 324b can be respectively fixedly connected to the first annular gasket 3243 and the second annular gasket 3247.
[0062] As shown in Figures 1 and 2 , in one embodiment, the first aeration mechanism 310 includes a first aeration main pipe 312 and multiple aeration heads 314. The multiple aeration heads 314 are spaced apart from the first aeration main pipe 312, with the aeration end of each aeration head 314 facing the first circulation interface 201. The first aeration main pipe 312 is connected to the second aeration main pipe 322. The first aeration main pipe 312 and the rotating device 324 are staggered, preventing interference between the first aeration main pipe 312 and the aeration device 300. This results in a more compact structure for the aeration device 300 and facilitates the formation of an aerated circulation within the outer tank 100. In this embodiment, the aeration heads 314 are titanium alloy. When aerated by the aeration heads 314, the influent creates an upward thrust on the first circulation interface 201 of the first grille member 224 at the bottom of the inner tank 200, pushing the influent upward and promoting sufficient contact and reaction between the wastewater and the filler within the inner tank 200. Under the joint action of the aeration head 314 and the aeration side of the aeration riser 326, the three modes of "longitudinal aeration", "transverse aeration", and "longitudinal and transverse aeration" and the action of the upward water flow, impurities such as particulate matter on the surface of the iron-carbon filler can be blown out, and light impurities float upward with the water flow to the water surface, while heavier impurities pass through the gaps in the filler and the first grid member 224 supported at the bottom and fall into the mud hopper 700, thereby better avoiding passivation and compaction of the iron-carbon filler.
[0063] As shown in Figures 1 and 2 , the first aeration mechanism 310 is further provided with a first solenoid valve 313, and the second aeration mechanism 320 is provided with a second solenoid valve 323. The iron-carbon micro-electrolysis reactor 10 also includes a controller, with both the first and second solenoid valves electrically connected to the controller. The controller regulates the on / off state or the amount of opening of the first and / or second solenoid valves by controlling the opening and / or closing of the first and / or second solenoid valves. By controlling the on / off state of the first and / or second solenoid valves, i.e., electrically controlling the opening and closing of the first and / or second solenoid valves, three modes of aeration (vertical aeration), horizontal aeration, and vertical and horizontal aeration can be achieved. Furthermore, the upward flow of water can remove impurities such as particulate matter from the surface of the iron-carbon filler. Light impurities float to the surface with the water flow, while heavier impurities pass through the gaps in the filler and the first grille member 224 supported at the bottom and fall into the mud hopper 700, thereby better preventing passivation and compaction of the iron-carbon filler. In this embodiment, the first aeration main pipe 312 is provided with a first solenoid valve, and the second aeration main pipe 322 is provided with a second solenoid valve. The iron-carbon micro-electrolysis reactor 10 can achieve fully automatic operation during operation without manual supervision, thereby reducing labor costs and risks. It is understood that in other embodiments, the controller can be omitted, and the first solenoid valve 313 and the second solenoid valve 323 can be replaced with mechanical valves.
[0064] As shown in Figures 1 and 2 , the aeration device 300 further includes a fan 350, the active end of which is connected to the first aeration main pipe 312. Furthermore, the first aeration main pipe 312 is equipped with a second check valve 3122 to prevent water flowing through the first aeration main pipe 312 from backflowing into the fan. Furthermore, the second aeration main pipe 322 is equipped with a third check valve 3221 to prevent water flowing through the second aeration main pipe 322 from backflowing into the fan.
[0065] As shown in Figures 1 and 2, in one embodiment, a wing ring 206 with a preset tapered angle is provided at the periphery of one end of the inner tank 200. The wing ring 206 surrounds the first circulation intrusion surface 201, directing the aerated circulation toward the first circulation intrusion surface 201. This allows the aerated circulation to better act on the first circulation intrusion surface 201. The water inside the inner tank 200, under the longitudinal aeration of the aeration head 314, forms an upward flow, while the water outside the inner tank 200 flows to the bottom of the inner tank 200 for replenishment. Furthermore, the wing ring 206 prevents the aeration process of the aeration head 314 from disturbing the water outside the inner tank 200, thereby forming an aerated circulation in which the water inside the inner tank 200 flows upward and the water outside the inner tank 200 flows downward.
[0066] As shown in Figures 1 and 3, in one embodiment, the iron-carbon micro-electrolysis reactor 10 further includes a platform guardrail 1200 and a cage 1300. The platform guardrail surrounds the outer wall of the outer tank 100 and is disposed adjacent to the top of the outer tank 100, allowing the user to observe the reaction conditions inside the outer tank 100. The platform guardrail 1200 is formed with an installation opening 802, and the cage is disposed along the outer wall of the outer tank 100 and extends through the installation opening. A ladder 1310 is provided within the cage 1300, allowing the user to access the platform guardrail via the ladder.
[0067] As shown in Figures 1 and 3, in one embodiment, a platform guardrail 1200 is provided with a first retaining wall 804 and a second retaining wall 806. The installation opening is located between the first and second retaining walls. The first retaining wall is provided with a movable door 8042 for access to the platform guardrail. In this embodiment, the first and second retaining walls serve as a barrier to prevent unauthorized access to the platform guardrail by climbing a ladder, which could pose a safety hazard.
[0068] As shown in Figure 1, in one embodiment, iron-carbon micro-electrolysis reactor 10 also includes pH control device 1100, pH control device 1100 includes acid supply mechanism 1110 and online pH meter 1120, acid supply mechanism 1110 is communicated with receiving chamber 102, online pH meter 1120 is located in receiving chamber 102, online pH meter 1120 is used to detect the pH value of the aeration circulation in receiving chamber 102, acid supply mechanism 1110 is used to control the acid addition amount according to pH value, so that the water body in the reactor is stably controlled at a certain pH range. In the present embodiment, acid supply mechanism 1110 includes acid pipe 1112 and acid pump 1114, acid pump is located on acid pipe, and the control end of acid pump and the control end of online pH meter are all electrically connected with controller, to realize pH value automatic regulation. When the pH value measured by online pH meter is higher than preset value, controller control acid pump work, to regulate the pH value in reactor. The online pH meter is linked to the acid pump to stably control the pH of the water in the reactor within a certain range. Furthermore, the acid supply mechanism 1110 also includes a dosing valve 1116 provided on the acid addition pipe, which is used to control and regulate the flow through the acid addition pipe.
[0069] Compared with the prior art, this application has the following advantages, including but not limited to:
[0070] 1. In the iron-carbon micro-electrolysis reactor 10 of the present application, the aeration side of the first aeration mechanism 310 is arranged toward the first circulation intervention surface 201, and the second aeration mechanism 320 is disposed through the avoidance through-hole 204. The aeration side of the second aeration mechanism 320 is located inside the inner tank 200. The aeration direction of the first aeration mechanism 310 and the aeration direction of the second aeration mechanism 320 are at a preset angle to form an aeration circulation that circulates sequentially through the first circulation intervention surface 201, the inner cavity of the inner tank 200, the second circulation intervention surface 203, and the circulation gap 202. This allows for a better circulation of the water inside the reactor, thereby ensuring more complete contact between the wastewater and the filler, thereby promoting the reaction.
[0071] 2. The iron-carbon micro-electrolysis reactor 10 controls water mechanics, that is, cleverly controls the actions of the first aeration mechanism 310 and the second aeration mechanism 320 to form three modes: "vertical aeration", "horizontal aeration", and "vertical and horizontal aeration". This solves the problems of filler passivation and compaction under the action of upward water flow, thus reducing the difficulty of filler replacement and improving the utilization rate of the iron-carbon filler.
[0072] 3. The water inside the reactor forms a good circulation, and the water flows and mixes at a faster speed. Through the linkage control of the online pH meter and the acid supply mechanism, the pH value of the entire water in the reactor can be stabilized within a relatively accurate range, thereby promoting better reaction.
[0073] 4. Since the wing ring 206 is arranged around the first circulation intervention surface 201, the aeration head is prevented from disturbing the water outside the inner tank during the aeration process, thereby forming an overall circulation in which the water inside the inner tank flows upward and the water outside the inner tank flows downward. The wing ring 206 plays the role of guiding the aeration circulation flow toward the first circulation intervention surface 201, thereby making the aeration circulation flow better act on the first circulation intervention surface 201;
[0074] 5. The mud hopper 700 is located on the inner bottom wall of the outer tank 100 and is connected to the outer tank 100, so that the bottom of the outer tank 100 can better collect silt, so that the silt can be better discharged through the mud discharge hole group 612, and at the same time, it is convenient to guide the aeration circulation to flow upward;
[0075] 6. The water outlet baffle 520 is located in the receiving chamber 102 and connected to the outer tank 100. The end of the water outlet pipe 510 communicating with the receiving chamber 102 is arranged toward the water outlet baffle 520. A slow flow channel 522 is formed between the water outlet baffle 520 and the inner wall of the receiving chamber 102. The slow flow channel 522 is communicated with the water outlet pipe 510, so that the water outlet baffle 520 plays the role of blocking scum, that is, preventing floating impurities from entering the water outlet pipe 510, thereby blocking the water outlet pipe 510; at the same time, it also prevents the water flow from the top of the inner tank 200 from directly discharging, causing a local short-circuit phenomenon;
[0076] 7. The aeration riser 326 located outside the inner tank 200 is connected to a rotary handle 329. The rotary handle 329 can be used to drive the aeration riser 326 to rotate relative to the second aeration main pipe 322 to adjust the aeration direction of the second aeration main pipe 322. The operator can operate from the outside of the outer tank without having to enter the outer tank, making the operation safer, more convenient and simple.
[0077] The technical features of the above-described embodiments can be combined arbitrarily. In order to make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification. The above-described embodiments only express several implementation methods of the present application, and their descriptions are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that for ordinary technicians in this field, without departing from the concept of the present application, several variations and improvements can be made, which all fall within the scope of protection of the present application. Therefore, the scope of protection of the patent in this application shall be based on the attached claims.
Claims
1. An iron-carbon micro-electrolysis reactor, characterized in that: include: The outer tank (100) is formed with a communicating receiving cavity (102) and a first mounting hole (104); An inner tank (200) is located in the receiving cavity (102) and connected to the outer tank (100); a circulation gap (202) is formed between the outer wall of the inner tank (200) and the inner wall of the outer tank (100); a first circulation intervention surface (201) and a second circulation intervention surface (203) are respectively provided at two ends of the inner tank (200); a position avoidance through hole (204) is formed in the inner tank (200); and the position avoidance through hole (204) is at least provided through the first circulation intervention surface (201); An aeration device (300) is inserted into the first mounting hole (104) and connected to the outer tank (100). The aeration device (300) comprises a first aeration mechanism (310) and a second aeration mechanism (320). The aeration side of the first aeration mechanism (310) is arranged toward the first circulation intervention surface (201). The second aeration mechanism (320) is inserted into the avoidance through hole (204). The aeration side of the second aeration mechanism (320) is located inside the inner tank (200). There is a preset angle between the aeration direction of the first aeration mechanism (310) and the aeration direction of the second aeration mechanism (320) (320), so as to form an aeration circulation that circulates through the first circulation intervention surface (201), the inner cavity of the inner tank (200), the second circulation intervention surface (203) and the circulation gap (202) in sequence.
2. The iron-carbon micro-electrolysis reactor according to claim 1, characterized in that: The preset angle is 45° to 90°.
3. The iron-carbon micro-electrolysis reactor according to claim 1, characterized in that: The outer tank (100) is also formed with a second mounting hole (101) communicating with the accommodating cavity (102); the iron-carbon micro-electrolysis reactor (10) further comprises a water inlet device (400), the water inlet device (400) is passed through the second mounting hole (101) and is connected to the outer tank (100), the water inlet device (400) comprises a water inlet pipe (410), a water inlet pump (420) and a first flow valve (430), the water inlet pipe (410) is passed through the second mounting hole (101) and is connected to the outer tank (100); the water inlet pump (420) is arranged on the water inlet pipe (410), and the first flow valve (430) is arranged on the water inlet pipe (410); the water inlet device (400) further comprises a first check valve (440), and the first check valve (440) is arranged on the water inlet pipe (410).
4. The iron-carbon micro-electrolysis reactor according to claim 3, characterized in that: The end of the water inlet pipe (410) located inside the outer tank (100) is formed with a bell mouth (412).
5. The iron-carbon micro-electrolysis reactor according to claim 1, characterized in that: The outer tank (100) is further formed with a third mounting hole (103) communicating with the receiving chamber (102); the iron-carbon micro-electrolysis reactor (10) further comprises a water outlet device (500), the water outlet device (500) comprising a water outlet pipe (510) and a water outlet baffle (520), the water outlet pipe (510) being connected to the outer tank (100) via the third mounting hole (103), the water outlet baffle (520) being located in the receiving chamber (102) and connected to the outer tank (100). , and the end of the water outlet pipe (510) communicating with the receiving chamber (102) is arranged toward the water outlet baffle (520), a slow flow channel (522) is formed between the water outlet baffle (520) and the inner wall of the receiving chamber (102), and the slow flow channel (522) is communicated with the water outlet pipe (510); the water outlet baffle (520) is arranged parallel to the axial direction of the outer tank (100), and both sides of the water outlet baffle (520) are fixedly connected to the inner circumferential wall of the outer tank (100).
6. The iron-carbon micro-electrolysis reactor according to claim 4, characterized in that: The outer tank (100) is further formed with a fourth mounting hole (105) communicating with the receiving chamber (102); the iron-carbon micro-electrolysis reactor (10) further comprises a mud discharge device (600) and a mud bucket (700); the mud discharge device (600) comprises a mud discharge pipe (610), a mud discharge pump (620) and a second flow valve (630); the mud discharge pipe (610) is passed through the fourth mounting hole (105) and connected to the outer tank (100); the mud discharge pump (620) is arranged on the mud discharge pipe (610); the end of the mud discharge pipe located in the receiving chamber (102) is located below the inner tank (200); and the second flow valve (630) is arranged on the mud discharge pipe (610); The mud hopper (700) is located on the inner bottom wall of the outer tank (100) and is connected to the outer tank (100). The mud hopper (700) is located below the inner tank (200). The mud hopper (700) is formed with a mud collecting trough (702) arranged toward the first circulation intervention surface (201). The mud discharge pipe (610) is at least partially located in the mud collecting trough (702). The mud discharge pipe (610) is provided with a mud discharge through hole group (612) connected to the mud collecting trough (702). The mud hopper (700) is provided with an installation through hole (703). The mud discharge pipe (610) is respectively penetrated through the fourth installation hole (105) and the installation through hole (703). One end of the mud discharge pipe (610) is located in the mud collecting trough (702).
7. The iron-carbon micro-electrolysis reactor according to claim 6, characterized in that: The bell mouth (412) is arranged toward the mud collecting trough (702); the portion of the water inlet pipe (410) inside the outer tank (100) is located between the mud bucket (700) and the inner tank (200).
8. The iron-carbon micro-electrolysis reactor according to claim 6, characterized in that: The number of the mud discharge hole groups (612) is multiple, and the multiple mud discharge hole groups (612) are arranged at intervals along the axial direction of the mud discharge pipe (610). Each mud discharge hole group (612) includes at least two mud discharge holes (6122), and two adjacent mud discharge holes (6122) are staggered along the circumferential direction.
9. The iron-carbon micro-electrolysis reactor according to claim 1, characterized in that: A wing ring (206) with a preset inclined cone angle is provided at the periphery of one end of the inner tank (200), and the wing ring (206) is arranged around the first circulation intervention surface (201); the preset inclined cone angle is 30° to 60°.
10. The iron-carbon micro-electrolysis reactor according to claim 1, characterized in that: The first aeration mechanism (310) comprises a first aeration main pipe (312) and a plurality of aeration heads (314). The plurality of aeration heads (314) are arranged on the first aeration main pipe (312) at intervals, and the aeration end of each aeration head (314) is arranged toward the first circulation intervention surface (201). The first aeration main pipe (312) and the second aeration mechanism (320) are arranged staggered. The first aeration main pipe (312) comprises an aeration pipe body (3122) and A plurality of aeration branch pipes (3124) are arranged side by side, each of the aeration branch pipes (3124) is connected to the aeration pipe body (3122), and each of the aeration branch pipes (3124) is provided with at least one aeration head (314); the plurality of aeration heads (314) are arranged at intervals, and the projections of the plurality of aeration heads (314) on the plane where the first circulation intervention surface (201) is located are located on the first circulation intervention surface (201).
11. The iron-carbon micro-electrolysis reactor according to claim 1, characterized in that: The inner tank (200) comprises an inner tank body (210) and an iron-carbon core group (220), wherein the inner tank body (210) is formed with an installation cavity (205), wherein the iron-carbon core group (220) is located in the installation cavity (205) and connected to the inner tank body (210), wherein the first circulation intervention surface (201) and the second circulation intervention surface (203) are respectively arranged on the end surfaces at both ends of the iron-carbon core group (220), wherein the avoidance through hole (204) is formed in the iron-carbon core group (220); wherein the iron-carbon core group (220) comprises an iron-carbon filling tube (222), a first grid member (224) and a second grid member (226), wherein the iron-carbon filling tube (222) is located in the installation cavity (205), wherein the iron-carbon filling tube (222) is provided with a first grid member (224) and a second grid member (226). In the installation cavity (205), the first grid member (224) is located in the installation cavity (205) and connected to the inner tank body (210), the second grid member (226) is located in the installation cavity (205) and connected to the inner tank body (210), the first grid member (224) and the second grid member (226) are respectively in contact with the end surfaces of both ends of the iron-carbon filler tube (222), the first circulation intervention surface (201) is provided on the side of the first grid member (224) away from the iron-carbon filler tube (222), and the second circulation intervention surface (203) is provided on the side of the second grid member (226) away from the iron-carbon filler tube (222); The avoidance through hole (204) comprises a first connection through hole (2041) formed in the first grille member (224) and an avoidance channel (2043) formed in the iron-carbon filler tube (222), and the first connection through hole (2041) is connected to the avoidance channel (2043).
12. The iron-carbon micro-electrolysis reactor (10) according to claim 11, characterized in that: The inner tank (200) further comprises a first locking member (230); a first inner annular angle steel (213) is provided on the inner peripheral wall of the inner tank body (210); a first locking hole (212) is provided in the first inner annular angle steel (213); a first through hole (2242) is provided in the first grille member (224); the first locking member (230) is respectively penetrated in the first through hole (2242) and the first locking hole (212); a first inner annular positioning groove (2132) communicating with the first locking hole (212) is formed in the first inner annular angle steel (213); the first grille member (224) is located in the first inner annular positioning groove (2132), so that the first inner annular angle steel (213) is supported and abutted against the first grille member (224); the number of the first locking members (230) is plural, and the plural first locking members (230) are arranged along the first inner annular angle steel (2 13) are arranged at circumferential intervals; the number of the first through holes (2242) and the number of the first locking holes (212) are both multiple, and multiple first locking members (230) are respectively inserted into the corresponding first through holes (2242) and the corresponding first locking holes (212); the iron-carbon micro-electrolysis reactor (10) also includes a first angle steel reinforcement frame (800), a first outer annular angle steel (106) is arranged on the inner circumferential wall of the outer tank (100), and the first angle steel reinforcement frame (800) is fixedly connected to the first inner annular angle steel (213) and the first outer annular angle steel (106) respectively; the first inner annular angle steel (213), the first outer annular angle steel (106) and the first angle steel reinforcement frame (800) are arranged on the same plane; the first angle steel reinforcement frame (800) divides the first grille member (224) into multiple first grille units in the first inner annular angle steel (213); The first angle steel reinforcement frame (800) comprises a first transverse angle steel group (810) and a first longitudinal angle steel group (820), wherein the first transverse angle steel group (810) comprises at least two first transverse angle steels (812) arranged in parallel with each other, and the first longitudinal angle steel group (820) comprises at least two first longitudinal angle steels (822) arranged in parallel with each other, each of the first transverse angle steels (812) and any of the first longitudinal angle steels (822) are intersected and fixed, and a first grille unit is arranged between adjacent first longitudinal angle steels (822) and first transverse angle steels (812), between two adjacent first longitudinal angle steels (822), and between two adjacent first transverse angle steels (812); a first grille unit is arranged at the intersection center position of the first transverse angle steel group (810) and the first longitudinal angle steel group (820), and the first connecting through hole (2041) is formed at the first grille unit at the intersection center position of the first transverse angle steel group (810) and the first longitudinal angle steel group (820).
13. The iron-carbon micro-electrolysis reactor according to claim 11, characterized in that: The inner tank (200) further comprises a second locking member (250); a second inner annular angle steel (215) is provided on the inner peripheral wall of the inner tank body (210); a second locking hole (214) is provided in the second inner annular angle steel (215); the second grille member (226) is provided with a second through hole (2262); the second locking member (250) is respectively passed through the second through hole (2262) and the second locking hole (214); the second inner annular angle steel (215) is formed with a second inner annular positioning groove (2152) communicating with the second locking hole (214); the second grille member (226) is located in the second inner annular positioning groove (2152); 52), so that the second inner annular angle steel (215) is supported and abutted against the second grille member (226); the number of the second locking members (250) is multiple, and the multiple second locking members (250) are arranged at intervals along the circumference of the second inner annular angle steel (215); the number of the second through holes (2262) and the number of the second locking holes (214) are both multiple, and the multiple second locking members (250) are respectively penetrated into the corresponding second through holes (2262) and the corresponding second locking holes (214); the iron-carbon micro-electrolysis reactor (10) also includes a second angle steel reinforcement frame (900), and the inner circumferential wall of the outer tank (100) is formed The second angle steel reinforcement frame (900) is fixedly connected to the second inner annular angle steel (215) and the second outer annular angle steel (107) respectively; the second inner annular angle steel (215), the second outer annular angle steel (107) and the second angle steel reinforcement frame (900) are arranged on the same plane; the second angle steel reinforcement frame (900) divides the second grille member (226) into a plurality of second grille units in the second inner annular angle steel (215); the second angle steel reinforcement frame (900) includes a second transverse angle steel group (910) and a second longitudinal angle steel group (920); the second transverse angle steel group (910) includes at least Two second transverse angle steels (912) are arranged in parallel with each other, the second longitudinal angle steel group (920) includes at least two second longitudinal angle steels (922) arranged in parallel with each other, each second transverse angle steel (912) is intersected and fixed with any second longitudinal angle steel (922), a second grille unit is arranged between adjacent second longitudinal angle steels (922) and second transverse angle steels (912), between two adjacent second longitudinal angle steels (922), and between two adjacent second transverse angle steels (912); a second grille unit is arranged at the intersection center of the second transverse angle steel group (910) and the second longitudinal angle steel group (920).
14. The iron-carbon micro-electrolysis reactor (10) according to claim 13, characterized in that: The avoidance through hole (204) also includes a second connecting through hole (2042) formed on the second grille member (226), and the second connecting through hole (2042) is connected to the avoidance channel (2043); the second connecting through hole (2042) is formed at the second grille unit at the intersection center position of the second transverse angle steel group (910) and the second longitudinal angle steel group (920); the iron-carbon core group (220) also includes an annular punching sleeve (328), and the annular punching sleeve (328) is respectively penetrated through the first connecting through hole (2041), the avoidance through hole (204) and the second connecting through hole (2042).
15. The iron-carbon micro-electrolysis reactor according to claim 14, characterized in that: The second aeration mechanism (320) comprises a second aeration main pipe (322), a rotating device (324) and an aeration riser (326); the aeration riser (326) is connected to the second aeration main pipe (322) via the rotating device (324), so that the aeration riser (326) and the second aeration main pipe (322) are connected to each other in a relatively rotatable manner; the aeration riser (326) is formed with a transverse aeration hole group (3262) in the annular perforated sleeve (328); the transverse aeration hole group (3262) is formed ... transverse aeration hole group (3262); the transverse aeration hole group (3262) is formed in the transverse aeration hole group (326); the transverse aeration hole group (3262) is formed in the transverse aeration hole group (326); the transverse aeration hole group (3262) is formed in the transverse aeration hole group (326); the transverse aeration hole group (326 The number of hole groups (3262) is multiple, and the multiple transverse aeration hole groups (3262) are arranged at intervals along the axial direction of the aeration standpipe (326); each of the transverse aeration hole groups (3262) includes a plurality of transverse aeration holes (3263) arranged at intervals along the circumferential direction; the diameter of the aeration standpipe (326) is smaller than the inner diameter of the annular perforated sleeve (328); the second aeration mechanism (320) further includes a rotating handle (329), and the aeration standpipe (326) is located in the inner tank (20 0) is connected to the rotating handle (329); the aeration riser (326) is arranged protruding from the outside of the inner tank (200); a first limiting member (208) and a second limiting member (207) are respectively provided at a position adjacent to the outer tank (100), the first limiting member (208) and the second limiting member (207) are arranged at a preset angle along the circumferential direction of the center of the inner tank (200), and the rotating handle (329) is located between the first limiting member (208) and the second limiting member (207). The limiting members (207) rotate relative to the outer tank (100); the outer peripheral walls of the aeration riser (326) are respectively sleeved with a first bearing (3266) and a second bearing (3265), and the outer peripheral walls of the first bearing (3266) and the outer peripheral walls of the second bearing (3265) are both connected to the inner peripheral wall of the annular perforated sleeve (328), so that the aeration riser (326) is penetrated by the annular perforated sleeve (328) and is rotatably connected to the annular perforated sleeve (328).
16. The iron-carbon micro-electrolysis reactor according to claim 15, characterized in that:The rotating device (324) comprises a rotating outer tube (3242), a rotating inner tube (3244) and an elastic sealing flow-through structure (3246); the rotating outer tube (3242) is sleeved outside the rotating inner tube (3244) and is rotationally connected to the rotating inner tube (3244); the rotating outer tube (3242) is connected to the second aeration main tube (322); and the end of the rotating inner tube (3244) away from the rotating outer tube (3242) is connected to the aeration riser (326); The rotating outer tube (3242) is formed with a communicating receiving groove (303) and a first sealing through hole (307), the rotating inner tube (3244) is formed with a second sealing through hole (305), the elastic sealing flow-through structure (3246) is located in the receiving groove (303), and the elastic sealing flow-through structure (3246) includes a first neck ring sealing flow-through member (324a), an elastic connecting member (324b) and a second neck ring sealing flow-through member (324c), the first neck ring sealing flow-through member (324a) is connected to the rotating inner tube (3244) by a second sealing through hole (305), and the elastic sealing flow-through structure (3246) is located in the receiving groove (303). The elastic connecting member (324b) is connected to the second neck ring-shaped sealing flow member (324c), the first neck ring-shaped sealing flow member (324a) is located in the second sealing through hole (305) and connected to the rotating inner tube (3244), the elastic connecting member (324b) is located in the receiving groove (303), the second neck ring-shaped sealing flow member (324c) is located in the first sealing through hole (307) and connected to the rotating outer tube (3242); the elastic sealing flow structure (3246) is formed with a water flow The water through hole (309) includes a first water through hole (3092) formed in the first neck ring-shaped sealing flow member (324a), a second water through hole (3094) formed in the elastic connecting member (324b), and a third water through hole (3096) formed in the second neck ring-shaped sealing flow member (324c), wherein the first water through hole (3092) is connected to the rotating inner tube (3244), and the first water through hole (3092) is connected to the second water through hole The first water hole (3094) is connected to the third water hole (3096), and the third water hole (3096) is connected to the rotating outer tube (3242); wherein the first neck ring-shaped sealing flow-through member (324a) comprises a first high-neck ring-shaped gasket (3241) and a first ring-shaped gasket (3243) connected to each other, and the first water hole (3092) comprises a first water groove (3091) formed on the first high-neck ring-shaped gasket (3241) and a first ring-shaped gasket (3243) formed on the first ring-shaped gasket (3243). ), the first water passage groove (3091) is in communication with the first opening (3093); the second neck ring-shaped sealing flow-through member (324c) comprises a second high-neck ring-shaped gasket (3245) and a second ring-shaped gasket (3247) connected to each other, and the third water passage hole (3096) comprises a second water passage groove (3095) formed in the second high-neck ring-shaped gasket (3245) and a second opening (3097) formed in the second ring-shaped gasket (3247) , the second water channel (3095) is connected to the second opening (3097); the first high-necked annular gasket (3241) abuts against the first annular gasket (3243), and the second high-necked annular gasket (3245) abuts against the second annular gasket (3247); the elastic connecting member (324b) is a coil spring, and the two ends of the elastic connecting member (324b) are respectively fixedly connected to the first annular gasket (3243) and the second annular gasket (3247).
17. The iron-carbon micro-electrolysis reactor according to claim 1, characterized in that: The invention also comprises a platform guardrail (1200) and a guard cage (1300), wherein the platform guardrail (1200) is arranged around the outer peripheral wall of the outer tank (100), and the platform guardrail (1200) is arranged adjacent to the top of the outer tank (100); the platform guardrail (1200) is formed with an installation opening (802), the guard cage (1300) is arranged along the outer peripheral wall of the outer tank (100), and the guard cage (1300) is passed through the installation opening (802), and a ladder is arranged in the guard cage (1300); the platform guardrail (1200) is provided with a first retaining wall (804) and a second retaining wall (806), the installation opening (802) is located between the first retaining wall (804) and the second retaining wall (806), and the first retaining wall (804) is provided with a movable door (8042).
18. The iron-carbon micro-electrolysis reactor according to claim 1, characterized in that: The invention also comprises a pH control device (1100), wherein the pH control device (1100) comprises an acid supply mechanism (1110) and an online pH meter (1120), wherein the acid supply mechanism (1110) is connected to the receiving chamber (102), and the online pH meter (1120) is arranged in the receiving chamber (102), and the online pH meter (1120) is used to detect the pH value of the aeration circulation in the receiving chamber (102), and the acid supply mechanism (1110) is used to control the amount of acid addition according to the pH value.
Citation Information
Patent Citations
Three-dimensional three-phase electrocatalytic oxidation system
CN108191006A
Efficient micro-electrolysis reactor
CN212024853U
Iron-carbon micro-electrolysis reactor
CN212770010U
Wastewater treatment micro-electrolysis catalytic tower
CN213141496U
Iron-carbon micro-electrolysis device for treating chemical industrial wastewater
CN218145987U
Cited By
Equipment for comprehensively treating wastewater based on advanced oxidation method
CN119551855A
Pipeline type efficient microelectrolysis materialization system
CN120058062A
Efficient iron-carbon reactor for organic wastewater pretreatment and wastewater treatment equipment
CN120736634A