Charge management device, refrigeration cycle system, and program of charge management method

The rate management device calculates carbon dioxide emissions and associated fees for refrigeration cycle devices by tracking electricity usage, addressing the lack of clear fee management in existing technologies and promoting sustainable operation by enabling accurate emissions tracking and fee management.

WO2024241485A1PCT designated stage expired Publication Date: 2024-11-28MITSUBISHI ELECTRIC CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2023/019134
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-23
Publication Date
2024-11-28

AI Technical Summary

Technical Problem

Current technologies recognize carbon dioxide emissions from refrigeration cycle devices but fail to clearly manage the associated emissions fees, lacking a systematic approach to calculate and manage emissions and fees based on electricity consumption.

Method used

A rate management device and method that calculates carbon dioxide emissions and associated fees by tracking electricity usage over specific periods, using emission and fee coefficients to determine emissions amounts and charges, integrated with refrigeration cycle systems and management software.

Benefits of technology

Enables accurate calculation and management of carbon dioxide emissions and related fees, allowing for effective fee management and compliance with emissions targets, promoting sustainable operation of refrigeration cycle devices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023019134_28112024_PF_FP_ABST
    Figure JP2023019134_28112024_PF_FP_ABST
Patent Text Reader

Abstract

This charge management device that performs charge management based on a power amount related to a refrigeration cycle device, the charge management device comprising: a power amount calculation unit that calculates a specific period power amount that is a power amount related to the refrigeration cycle device in a specific period; a carbon dioxide emission amount calculation unit that calculates, from the specific period power amount, a specific period emission amount related to the refrigeration cycle device in the specific period; and a charge calculation unit that calculates an emission amount charge based on the specific period emission amount.
Need to check novelty before this filing date? Find Prior Art

Description

Fee management device, refrigeration cycle system, and fee management method program

[0001] This technology relates to a fee management device, a refrigeration cycle system, and a fee management method program, and in particular to managing the amount of carbon dioxide emitted in a refrigeration cycle device and fees based on the amount of carbon dioxide emitted.

[0002] A refrigeration cycle device having a refrigerant circuit uses electric power to circulate a refrigerant to cool or heat an object, or to air-condition an object, etc. Here, an air conditioning controller has been proposed that can clearly display the amount of carbon dioxide emissions based on the amount of electric power consumed by the air conditioning device and encourage operation to reduce emissions (see, for example, Patent Document 1).

[0003] JP 2011-145008 A

[0004] Here, carbon dioxide (CO 2 Efforts to reduce carbon dioxide emissions are underway in countries around the world. As part of these efforts, a system is being established in which companies and organizations can buy and sell carbon dioxide emission rights. Companies that use this system can sell the rights to reduce their carbon dioxide emissions by reaching their carbon dioxide emission targets. On the other hand, companies that exceed their carbon dioxide emission targets can purchase the carbon dioxide emission rights that are on sale to cover the excess.

[0005] When this system is applied to office buildings, etc., it is assumed that carbon dioxide emissions in office buildings, etc. are mainly due to electricity consumption. The technology in Patent Document 1 can recognize carbon dioxide emissions, but it is unclear how this relates to emission fees.

[0006] Therefore, in order to solve the above problem, the object is to provide a fee management device, a refrigeration cycle system, and a program for a fee management method that can grasp fees based on carbon dioxide emissions from refrigeration cycle devices.

[0007] In order to solve this problem, the disclosed fee management device is a fee management device that manages fees based on the amount of electricity related to the refrigeration cycle device, and is equipped with an electricity amount calculation unit that calculates a specific period electricity amount, which is the amount of electricity related to the refrigeration cycle device during a specific period, a carbon dioxide emission calculation unit that calculates the specific period emissions related to the refrigeration cycle device during the specific period from the specific period electricity amount, and a fee calculation unit that calculates an emission fee based on the specific period emissions.

[0008] The disclosed refrigeration cycle system includes one or more refrigeration cycle devices and the fee management device.

[0009] The disclosed fee management method program is a fee management method program that manages fees based on the amount of electricity related to a refrigeration cycle device, and causes a computer to perform an electricity amount calculation process that calculates a specific period electricity amount, which is the amount of electricity related to the refrigeration cycle device during a specific period, a carbon dioxide emission amount calculation process that calculates the specific period emissions related to the refrigeration cycle device during the specific period from the specific period electricity amount, and a fee calculation process that calculates an emission fee based on the specific period emissions.

[0010] The disclosed fee management device calculates the amount of carbon dioxide emissions based on the amount of electricity consumed in a specific period in the refrigeration cycle device, and calculates the fee based on the amount of carbon dioxide emissions. This makes it possible to grasp the fee based on the amount of carbon dioxide emissions related to the refrigeration cycle device.

[0011] 1 is a diagram showing the configuration of an air conditioning system centered on a fee management device 100 according to embodiment 1. FIG. 2 is a diagram showing the flow of processing related to power amount collection performed by the fee management device 100 according to embodiment 1. FIG. 3 is a diagram showing the flow of processing related to calculation of emission fees performed by the fee management device 100 according to embodiment 1. FIG. 4 is a diagram showing an example of a result in a management processing unit 110 according to embodiment 1. FIG. 5 is a diagram showing the configuration of an air conditioning system centered on a fee management device 100 according to embodiment 2. FIG. 6 is a diagram showing the flow of processing related to calculation of emission fees performed by the fee management device 100 according to embodiment 2. FIG. 7 is a diagram explaining an example of processing in a management processing unit 110 according to embodiment 2.

[0012] Below, a fee management device and a refrigeration cycle system according to embodiments will be described with reference to the drawings. In the following drawings, components with the same reference numerals are identical or equivalent and will be common throughout the embodiments described below. Furthermore, the size relationships between components in the drawings may differ from those in reality. Furthermore, the configurations of components shown throughout the specification are merely examples and are not limited to the configurations described in the specification. In particular, the combinations of components are not limited to the combinations in each embodiment, and components described in other embodiments may be applied to other embodiments. Furthermore, when multiple similar devices are distinguished by subscripts, the subscripts may be omitted if there is no need to distinguish or identify them.

[0013] Embodiment 1. Fig. 1 is a diagram showing the configuration of an air conditioning system centered around a fee management device 100 according to embodiment 1. In embodiment 1, the refrigeration cycle device is an air conditioning device 200, and the air conditioning system will be described as an example of a refrigeration cycle system. The air conditioning system in embodiment 1 has the fee management device 100 and the air conditioning device 200.

[0014] Air conditioner 200 in embodiment 1 has one outdoor unit 210 and one indoor unit 220. Air conditioner 200 is a device that conditions the air of a space to be air-conditioned by configuring a refrigerant circuit by connecting, via piping, devices such as a compressor and an outdoor heat exchanger (not shown) of outdoor unit 210 and devices such as an indoor heat exchanger (not shown) of indoor unit 220.

[0015] The air conditioning apparatus 200 requires power to control and operate the equipment that makes up the refrigerant circuit. The fee management device 100 in embodiment 1 manages the amount of power and other information related to the air conditioning apparatus 200 (outdoor unit 210 and indoor unit 220) based on various data in the air conditioning apparatus 200, and calculates the amount of carbon dioxide emissions and fees related to the operation of the air conditioning apparatus 200. The fee management device 100 in embodiment 1 has a management processing unit 110, a memory unit 120, a timing unit 130, a communication unit 140, an input unit 150, and an output unit 160.

[0016] The timekeeping unit 130 includes a timer and measures the date and time used by the management processing unit 110 for processing such as judgment. The communication unit 140 is an interface device that converts signals when the management processing unit 110 communicates signals containing various data with each air conditioning unit 200. Unless otherwise specified, communication between the management processing unit 110 and the air conditioning unit 200 is assumed to occur via the communication unit 140. The input unit 150 transmits signals, such as signals sent from an external device (not shown) or signals containing instructions entered by an administrator, to the management processing unit 110. In the first embodiment, the input unit 150 is particularly used when the administrator sets carbon dioxide emission targets and coefficients. The output unit 160 outputs signals including results of calculations performed by the management processing unit 110, such as the amount of power consumed by the air conditioning unit 200, the amount of carbon dioxide emissions due to operation, and fees. The output unit 160 may send signals to an external device (not shown), but here it is assumed to have a display device (not shown) that displays the results.

[0017] The storage unit 120 serves as a database for storing data used by the management processing unit 110 when it performs processing, and data obtained by the management processing unit 110 through calculations and other processes. Here, "storage" includes "recording," etc. The storage unit 120 particularly includes an emission coefficient storage unit 121, a fee data storage unit 122, and an equipment data storage unit 123.

[0018] The emission coefficient storage unit 121 stores the relationship between the amount of electricity consumed and the amount of carbon dioxide emissions as emission coefficient data that converts the amount of electricity consumed into the amount of carbon dioxide emissions. The emission coefficient is a coefficient determined for each electric utility based on the carbon dioxide emissions composition (e.g., the ratio of petroleum-based to renewable energy-based) of the utility, targeting businesses that emit a certain amount of carbon dioxide or more, by a country or other organization. The emission coefficient is updated, for example, annually. For example, electricity generated using fossil fuels may have a large emission coefficient. On the other hand, electricity generated by a manager using renewable energy may have a small emission coefficient. As such, emission coefficients are not uniform and often vary depending on the terms of the contract between the electric utility or manager and the user of the air conditioning device 200. Therefore, although not particularly limited, the emission coefficient storage unit 121 also accumulates and stores past emission coefficients in association with the application period for which the emission coefficient is applied.

[0019] The fee data storage unit 122 also stores data related to fees. In particular, the fee data storage unit 122 in the first embodiment stores, as a fee coefficient, the relationship between the amount of carbon dioxide emissions and the emission fee paid in accordance with the carbon dioxide emissions. For example, the price of rights related to carbon dioxide emissions fluctuates depending on the relationship between supply and demand. The fee data storage unit 122 also accumulates and stores fee coefficients in association with past fee coefficients and application periods. The fee data storage unit 122 may also store data on electricity fees indicating the relationship between the amount of power and fees.

[0020] The device data storage unit 123 then stores and records data related to the air conditioning device 200 as device data. Here, the device data includes not only preset value data such as data related to the capacity of the outdoor unit 210 and the indoor unit 220, but also data obtained by actual operation of the air conditioning device 200, such as the amount of power consumed and operating time, thermo-ON time, and refrigerant flow rate.

[0021] The storage unit 120 has a volatile storage device (not shown) such as random access memory (RAM) that can temporarily store data, and a non-volatile auxiliary storage device (not shown) such as flash memory that can store data for the long term. Although not particularly limited, here, the storage unit 120 stores and records data related to carbon dioxide emissions for the long term. The storage unit 120 also stores programs, and the management processing unit 110 executes processes based on the programs to realize the processes performed by each unit of the management processing unit 110.

[0022] The management processing unit 110 has a data collection unit 111, an electric energy calculation unit 112, a carbon dioxide emission calculation unit 113, a fee calculation unit 114, and an emission target value setting unit 115. The data collection unit 111 performs a collection processing step of collecting device data contained in signals sent from the air conditioning device 200 and storing the data in the memory unit 120. The data collection unit 111 also stores data contained in signals from the input unit 150 in the memory unit 120.

[0023] The power amount calculation unit 112 performs a power amount calculation step to calculate the amount of power consumed by the air conditioning device 200 for a set time or period based on the amount of power stored as device data. The power amount calculation unit 112 includes a unit power amount calculation unit 112A and a specific period power amount calculation unit 112B to accommodate minor changes in operating conditions and electricity rates. The unit power amount calculation unit 112A calculates the unit power amount, which is the amount of power consumed per set unit time, by integrating the amount of power sent from the air conditioning device 200 as device data, and stores the calculated amount in the storage unit 120. Furthermore, upon reaching a preset date and time or upon receiving an instruction from the administrator via the input unit 150, the specific period power amount calculation unit 112B calculates the specific period power amount for the specific period based on the unit power amount and stores the calculated amount in the storage unit 120. The specific period may be a preset period. For example, if instructed by the administrator, the specific period may be the period from the date and time when the specific period power amount was last calculated. Here, it is assumed that the specific period power amount calculation unit 112B calculates the specific period power amount for a specific period based on a set date and time, such as one month.

[0024] The carbon dioxide emission amount calculation unit 113 performs a carbon dioxide emission amount calculation process to calculate a specific period emission amount, which is the carbon dioxide emission amount during a specific period, based on the specific period electricity amount calculated by the specific period electricity amount calculation unit 112B and the emission coefficient stored in the emission coefficient memory unit 121.

[0025] The fee calculation unit 114 performs a fee calculation step of calculating an emission fee based on the specific-period emission amount calculated by the carbon dioxide emission calculation unit 113 and the fee coefficient stored in the fee data storage unit 122. Here, the fee calculation unit 114 in the first embodiment calculates the emission fee by multiplying the specific-period emission amount calculated by the carbon dioxide emission calculation unit 113 by the fee coefficient. However, this is not limited to this. For example, a carbon dioxide emission trading system involves trading an excess or surplus amount relative to a carbon dioxide emission target. Therefore, the fee calculation unit 114 calculates the emission fee by, for example, calculating the difference between the emission target value set by the emission target value setting unit 115 (described later) and the specific-period emission amount calculated by the carbon dioxide emission calculation unit 113.

[0026] Here, regarding transactions, for example, the administrator may be able to freely sell the surplus amount at an auction or the like. Also, if the excess amount is not purchased by the transaction deadline, penalties such as fines may be imposed. Therefore, the administrator only needs to be able to display the surplus amount, the excess amount, the purchase / sale deadline, the current auction price range, and the like. Furthermore, by being able to compare the surplus carbon dioxide emissions of multiple air conditioning devices 200, it is possible to make proposals such as replacing the air conditioning devices 200. In the first embodiment, a transaction based on the difference between the emission target value set by the emission target value setting unit 115 and the specific-period emission amount calculated by the carbon dioxide emission calculation unit 113 is described. However, in a transaction, when an increase in carbon dioxide emissions is expected, it is possible to suggest purchasing the excess amount at the time the emission target value is set, when it is cheaper than purchasing the rights after the actual carbon dioxide emissions exceed the target value.

[0027] The emission target value setting unit 115 performs a target value setting step of setting emission target values ​​based on the settings sent from the input unit 150. The emission target values ​​can be set, for example, as follows: (1) Fixed (2) Individual setting (3) Long-term target allocation (equal or proportional)

[0028] For the fixed setting (1), the emission target value setting unit 115 sets a fixed emission target value in advance. On the other hand, for the individual setting (2), the emission target value setting unit 115 sets an emission target value for each specific period. Furthermore, for the period allocation of the long-term target (3), when a long-term emission target, for example, on an annual basis, is input, the emission target value setting unit 115 sets a value obtained by equally dividing and distributing the long-term target over the specific period as the emission target value. Furthermore, the emission target value setting unit 115 may calculate an emission performance ratio from past actual carbon dioxide emissions, and set a value obtained by distributing the long-term target over the specific period based on the emission performance ratio as the emission target value.

[0029] Here, the management processing unit 110 is assumed to be configured, for example, by a microcomputer having a control processing unit such as a CPU (Central Processing Unit). The processing performed by each unit of the management processing unit 110 is realized by the control processing unit executing processing based on program data stored in the storage unit 120. However, this is not limited to this. Each unit of the management processing unit 110 may also be configured by an independent dedicated device (hardware).

[0030] 2 is a diagram showing the flow of processing related to power amount collection performed by the fee management device 100 according to the first embodiment. This processing is mainly performed by the management processing unit 110. The data collection unit 111 of the management processing unit 110 causes the communication unit 140 to send a request signal to request device data from the air conditioning device 200 (step S1). When the communication unit 140 receives a signal from the air conditioning device 200 (step S2), the data collection unit 111 stores the device data in the device data storage unit 123 of the storage unit 120 (step S3). The unit power amount calculation unit 112A determines whether a unit time has elapsed based on the timekeeping of the timer unit 130 (step S4). If it is determined that the unit time has not elapsed, the processing ends.

[0031] On the other hand, when the unit power amount calculation unit 112A determines that the unit time has elapsed, it accumulates the amount of power based on the device data and calculates the unit power amount of the air conditioning device 200 (outdoor unit 210 and indoor unit 220) (step S5).The unit power amount calculation unit 112A then stores the calculated unit power amount as data in the storage unit 120 (step S6).The above processing is performed for each unit time.

[0032] 3 is a diagram showing the flow of processing related to the calculation of the emission fee performed by the fee management device 100 according to the first embodiment. This processing is also mainly performed by the management processing unit 110. The specific period power amount calculation unit 112B determines whether the set date and time has arrived based on the timekeeping of the timing unit 130 (step S11). If the specific period power amount calculation unit 112B determines that the set date and time has not arrived, it ends the processing.

[0033] On the other hand, when the specific period power amount calculation unit 112B determines that the set date and time has arrived, it calculates the specific period power amount based on the unit power amount data stored in the storage unit 120 (step S12). Here, the specific period power amount is the amount of power obtained by accumulating the unit time power amounts of the air conditioning apparatus 200 from the previous calculation of the specific period power amount by the specific period power amount calculation unit 112B to the current calculation of the specific period power amount. The specific period power amount calculation unit 112B stores the calculated specific period power amount as data in the storage unit 120 (step S13).

[0034] Then, the carbon dioxide emission calculation unit 113 of the management processing unit 110 calculates the specific period emissions based on the emission coefficient stored in the emission coefficient storage unit 121 of the storage unit 120 (step S14). The carbon dioxide emission calculation unit 113 calculates the specific period emissions, for example, by multiplying the emission coefficient by the specific period electricity amount. The carbon dioxide emission calculation unit 113 stores the calculated specific period emissions as data in the storage unit 120 (step S15).

[0035] The fee calculation unit 114 of the management processing unit 110 calculates the emissions fee for the specific period based on the fee coefficient stored in the fee data storage unit 122 of the storage unit 120 (step S16). Here, the fee calculation unit 114 may calculate the electricity fee for the amount of electricity consumed by the air conditioning device 200 during the specific period, and calculate a fee that is the sum of the electricity fee and the emissions fee. The fee calculation unit 114 stores the calculated fee as data in the storage unit 120 (step S17).

[0036] FIG. 4 is a diagram showing an example of the results from the management processing unit 110 according to the first embodiment. The management processing unit 110 outputs a result signal including the data on the specific-period power amount, specific-period emissions, and fees stored in the storage unit 120 (step S18). For example, a display device (not shown) included in the output unit 160 displays the processing results based on the result signal. The results shown in FIG. 4 are obtained by calculating the fees and the like for each month, assuming that the specific period is one month. Here, a is the emission coefficient, and b is the fee coefficient.

[0037] As described above, according to the fee management device 100 in the refrigeration cycle system of Embodiment 1, in the management processing unit 110, the carbon dioxide emission amount calculation unit 113 calculates the specific period emissions from the specific period power consumption of the air conditioning device 200. Then, the fee calculation unit 114 calculates the emission fee based on the specific period emissions. Therefore, it is possible to grasp the fee based on the carbon dioxide emissions related to the air conditioning device 200.

[0038] Furthermore, according to the fee management device 100 of the first embodiment, the carbon dioxide emission calculation unit 113 calculates the specific period emissions based on the emission coefficient. Therefore, if there is a change in the relationship between the amount of electricity and the amount of carbon dioxide emissions, this can be addressed by changing the emission coefficient stored in the emission coefficient storage unit 121 of the storage unit 120. Here, by storing past emission coefficients in the emission coefficient storage unit 121, it is possible to calculate the specific period emissions retroactively. Similarly, the fee calculation unit 114 calculates the emission fee based on the fee coefficient. Therefore, if there is a change in the relationship between the amount of carbon dioxide emissions and the fee, this can be addressed by changing the fee coefficient stored in the fee data storage unit 122 of the storage unit 120. Furthermore, by storing past fee coefficients in the fee data storage unit 122, it is possible to calculate the emission fee retroactively.

[0039] According to the fee management device 100 of the first embodiment, the management processing unit 110 has a target emission value setting unit 115, which sets the target emission value. The target emission value setting unit 115 sets the target emission value based on a flat rate or actual emission rate, based on a long-term goal. This allows the fee management device 100 to automatically set the target emission value in accordance with a long-term goal, such as an annual unit.

[0040] Embodiment 2 In the air conditioning system of Embodiment 1, the air conditioning unit 200 has one outdoor unit 210 and one indoor unit 220. In the air conditioning system of Embodiment 2, multiple air conditioning units 200 are included, and the fee management device 100 manages the amount of electricity used by the multiple air conditioning units 200. The fee management device 100 in Embodiment 2 then calculates the specific period emissions and emission fees for each indoor unit 220 or a set group. For this reason, the fee management device 100 apportions the amount of electricity used by the outdoor unit 210 to each indoor unit 220.

[0041] Fig. 5 is a diagram showing the configuration of an air conditioning system centered around a fee management device 100 according to embodiment 2. In Fig. 5, devices and the like that are given the same reference numerals as in Fig. 1 basically perform the same operations as in embodiment 1.

[0042] The air conditioning system in Embodiment 2 has multiple air conditioning apparatuses 200 (air conditioning apparatus 200A and air conditioning apparatus 200B). Air conditioning apparatus 200A has one outdoor unit 210A and three indoor units 220A, 220B, and 220C. Air conditioning apparatus 200B has one outdoor unit 210B and three indoor units 220D, 220E, and 220F.

[0043] Here, the air conditioning system in embodiment 2 is installed within a facility. Indoor unit 220A is installed as a group for tenant A. Indoor unit 220B is installed as a group for tenant B. Indoor unit 220D and indoor unit 220E are installed as a group in the common area. Indoor unit 220C and indoor unit 220F are installed as a group in the office.

[0044] The air conditioning system in embodiment 2 also has a power management device 300. The power management device 300 manages the amount of power consumed by each outdoor unit 210 and each indoor unit 220 in the multiple air conditioning devices 200. In embodiment 1, there was only one air conditioning device 200, so the fee management device 100 collected power amount data directly from the air conditioning device 200. In the air conditioning system of embodiment 2, the fee management device 100 obtains power-related data for each outdoor unit 210 and each indoor unit 220 in the multiple air conditioning devices 200 from the power management device 300. The power amount data obtained from the power management device 300 is stored in the device data storage unit 123 of the storage unit 120 as part of the device data, as in embodiment 1.

[0045] In the fee management device 100 in Embodiment 2, the management processing unit 110 has an operation ratio calculation unit 116. The operation ratio calculation unit 116 performs an operation ratio calculation step of calculating, as an operation ratio R, the operation ratio of each indoor unit 220 in the operation of the outdoor unit 210, based on the device data stored in the device data storage unit 123 of the storage unit 120. Here, the operation ratio calculation unit 116 calculates the operation ratio R based on the device data that indicates the degree of use in the operation of each indoor unit 220, such as the capacity or operating time, thermo-ON time, and refrigerant flow rate of each indoor unit 220, which are stored as device data in the device data storage unit 123.

[0046] In the fee management device 100 of the second embodiment, the processing up to the collection of power amounts and the calculation of unit power amounts performed by the management processing unit 110 is the same as that described with reference to Fig. 2 in the first embodiment. In the second embodiment, the unit power amount calculation unit 112A calculates the unit power amount for each outdoor unit 210 and each indoor unit 220.

[0047] 6 is a diagram showing the flow of processing related to the calculation of emission fees performed by the fee management device 100 according to the second embodiment. As in the first embodiment, this processing is also mainly performed by the management processing unit 110. The specific period power amount calculation unit 112B determines whether the set date and time has arrived based on the timekeeping of the timing unit 130 (step S21). If the specific period power amount calculation unit 112B determines that the set date and time has not arrived, it ends the processing.

[0048] When the specific period power amount calculation unit 112B determines that the set date and time has arrived, it performs calculation processing of the specific period power amount. At this time, the operation ratio calculation unit 116 calculates the operation ratio R based on the device data stored in the device data storage unit 123 of the storage unit 120 (step S22).

[0049] The specific period power amount calculation unit 112B allocates the unit power amount of the outdoor unit 210 to each indoor unit 220 based on the operation ratio R calculated by the operation ratio calculation unit 116 (step S23). Furthermore, the specific period power amount calculation unit 112B adds the allocated unit power amount P of the outdoor unit 210 to the unit power amount of the corresponding indoor unit 220 (step S24). The specific period power amount calculation unit 112B then calculates the specific period power amount for each indoor unit 220 (step S25). The specific period power amount calculation unit 112B stores the calculated specific period power amount as data in the storage unit 120 (step S26). The specific period power amount calculation unit 112B may also calculate the specific period power amount for each group based on the specific period power amount calculated for each indoor unit 220.

[0050] Then, the carbon dioxide emission calculation unit 113 of the management processing unit 110 calculates the specific-period emissions for each specific-period energy based on the emission coefficients stored in the emission coefficient storage unit 121 of the storage unit 120 (step S27). The calculation method performed by the carbon dioxide emission calculation unit 113 is the same as in embodiment 1. Here, in the fee management device 100 of embodiment 2, the emission coefficients stored in the emission coefficient storage unit 121 may be set for each indoor unit 220 or for each group in accordance with, for example, a contract between an administrator and a user. The carbon dioxide emission calculation unit 113 stores the calculated specific-period emissions as data in the storage unit 120 (step S28).

[0051] The fee calculation unit 114 of the management processing unit 110 calculates the emissions fee for each indoor unit 220 or each group for the specific period based on the fee coefficient stored in the fee data storage unit 122 of the storage unit 120 (step S29). To calculate the emissions fee, the fee calculation unit 114, for example, calculates the difference between the emissions for the specific period and the target emissions value. The fee calculation unit 114 then multiplies the calculated difference by the fee coefficient to calculate the emissions fee. The fee calculation unit 114 may also calculate the electricity fee for the amount of electricity consumed by the air conditioning device 200 during the specific period, and calculate a fee that combines the electricity fee and the emissions fee.

[0052] Here, the fee coefficients stored in the fee data storage unit 122 may differ for each indoor unit 220 and each group due to contracts between users and administrators, etc. When the fee calculation unit 114 calculates the emissions fee, it uses the fee coefficients corresponding to each indoor unit 220 or each group.

[0053] Furthermore, with regard to the relationship between the emission target value and the actual specific period emission amount, for example, there are cases where the specific period emission amount exceeds the emission target value and cases where the specific period emission amount is less than the emission target value, resulting in a surplus. When the specific period emission amount is in surplus with respect to the emission target value, the emission fee becomes negative. If the emission fee is negative, the fee calculation unit 114 may calculate a fee by deducting the negative emission fee the next time it calculates the emission fee. Also, if the emission fee is negative, the fee calculation unit 114 may set the emission fee to 0. For example, the administrator may be able to set, via the input unit 150, how the fee calculation unit 114 will handle negative emission fees. The fee calculation unit 114 stores the calculated fee as data in the storage unit 120 (step S30).

[0054] Fig. 7 is a diagram illustrating an example of processing in the management processing unit 110 according to the second embodiment. The management processing unit 110 outputs a result signal including the data on the specific-period power amount, specific-period emission amount, and fee stored in the storage unit 120 (step S31). For example, a display device (not shown) included in the output unit 160 displays the processing result based on the result signal. Here, Fig. 7 shows an example in which the power amount of the outdoor units 210 is allocated to each group.

[0055] For example, while administrators previously only had to pay electricity bills to electric utilities, the application of the emission credit system means that if carbon dioxide emissions exceed the target amount, administrators may incur costs for the excess. Therefore, administrators need a system that reasonably requires users to cover the excess. On the other hand, if there is excess carbon dioxide emissions, administrators can reduce the user's burden. For example, by showing users the processing results, such as the current carbon dioxide emissions and a forecast of whether they exceed or exceed the target amount, users can be motivated by the fact that their contribution to carbon dioxide reduction will lead to cost reductions and global warming prevention. To avoid unfairness, administrators should set a reasonable target emission quota based on factors such as the previous year's usage record, the number of users, floor area, and the number of indoor units 220 installed.

[0056] As described above, according to the fee management device 100 of embodiment 2, the operation ratio calculation unit 116 of the management processing unit 110 calculates the operation ratio R, which represents the operation ratio of the indoor units 220. The specific period power amount calculation unit 112B then apportions the unit power amount of the outdoor unit 210 based on the operation ratio R, adds this to the unit power amount of each indoor unit 220, and calculates the specific period power amount. The carbon dioxide emission calculation unit 113 then calculates the specific period emissions for each indoor unit 220 or for each group, and the fee calculation unit 114 calculates the emission fee based on the specific period emissions. Therefore, for the carbon dioxide emissions generated by the operation of the air conditioning apparatus 200, the administrator can charge users an emission fee apportioned for each indoor unit 220 or for each group.

[0057] Furthermore, in the fee management device 100 of the second embodiment, the emission coefficient and / or fee coefficient can be set for each indoor unit 220 or for each group of the air conditioning device 200. This allows the administrator to make settings that match the contract with the user of the air conditioning device 200, for example.

[0058] The fee calculation unit 114 then calculates the emission fee from the difference between the specific period emission amount and the target emission amount set by the target emission amount setting unit 115. This makes it possible to calculate an emission fee that is in line with the system.

[0059] Embodiment 3 The emission coefficients and fee coefficients described in Embodiments 1 and 2 are coefficients related to the calculation of fees. Therefore, when changing past emission coefficients or fee coefficients stored in the emission coefficient storage unit 121 or fee data storage unit 122, a function may be provided to protect the change history or by requiring a password when a change is made.

[0060] Although the fee management device 100 described above is an independent device, this is not limiting. For example, the fee management device 100 may be integrated with the power management device 300 described in the second embodiment or an air conditioning device management device (not shown) that manages the operation of the air conditioning devices 200. Furthermore, the functions performed by the fee management device 100 can be performed as a single function by a device such as a system controller or cloud server that controls multiple air conditioning devices 200 serving as the fee management device 100.

[0061] For example, the long-term target may be changed during the period for which the long-term target was set. In such a case, the emission target value for the specific period for which the emission fee has already been calculated should not be changed. For this reason, the emission target value setting unit 115 may set the emission target value by allocating the emission target value for the calculated period from the changed long-term target in advance.

[0062] In addition, in the charge management device 100 of the first and second embodiments, the power amount calculation unit 112 is configured with a unit power amount calculation unit 112A and a specific period power amount calculation unit 112B to calculate the unit power amount and the specific period power amount. However, this is not limited to this, and for example, the specific period power amount may be calculated from the power amount in the device data.

[0063] In the first embodiment and other examples, an air conditioning system in which the refrigeration cycle device is the air conditioner 200 has been described as an example, but the present invention is not limited to this. The present invention can also be applied to refrigeration cycle systems having other refrigeration cycle devices, such as cooling devices, refrigeration devices, heat pump devices, and hot water supply devices. The present invention can also be applied to other devices or systems that use electric power, such as lighting.

[0064] 100 Charge management device, 110 Management processing unit, 111 Data collection unit, 112 Power amount calculation unit, 112A Unit power amount calculation unit, 112B Specific period power amount calculation unit, 113 Carbon dioxide emission amount calculation unit, 114 Charge calculation unit, 115 Emission target value setting unit, 116 Operation ratio calculation unit, 120 Memory unit, 121 Emission coefficient memory unit, 122 Charge data memory unit, 123 Device data memory unit, 130 Timekeeping unit, 140 Communication unit, 150 Input unit, 160 Output unit, 200, 200A, 200B Air conditioning device, 210, 210A, 210B Outdoor unit, 220, 220A, 220B, 220C, 220D, 220E, 220F Indoor unit, 300 Power management device.

Claims

1. A fee management device that performs fee management based on the amount of electricity related to a refrigeration cycle device, comprising: an electricity amount calculation unit that calculates a specific period electricity amount, which is the amount of electricity related to the refrigeration cycle device in a specific period; a carbon dioxide emission calculation unit that calculates a specific period emission amount related to the refrigeration cycle device in the specific period from the specific period electricity amount; and a fee calculation unit that calculates an emission fee based on the specific period emission amount.

2. The fee management device according to claim 1, wherein the carbon dioxide emission calculation unit calculates the specific period emission amount based on an emission coefficient indicating the relationship between the specific period electric energy and the carbon dioxide emission amount.

3. A fee management device as described in claim 1 or claim 2, further comprising an emission target value setting unit that sets a target value for the specific period emission amount, and wherein the fee calculation unit calculates the emission fee from the difference between the target value and the specific period emission amount.

4. The fee management device of claim 3, wherein the emission target value setting unit sets the target value based on an annual target for carbon dioxide emissions, using a flat rate corresponding to the specific period or a past emission performance ratio.

5. A fee management device as described in any one of claims 1 to 4, wherein the fee calculation unit calculates the emission fee based on a fee coefficient indicating the relationship between the specific period emission amount and the emission fee.

6. A fee management device as described in any one of claims 1 to 5, wherein the fee calculation unit calculates an electricity fee for the refrigeration cycle device based on the amount of electricity of the refrigeration cycle device, and adds up the electricity fee and the emission fee.

7. A fee management device as described in any one of claims 1 to 6, further comprising an operation ratio calculation unit which calculates an operation ratio representing the operation ratio of each of the indoor units based on equipment data for each of the indoor units of the refrigeration cycle device constructed by connecting an outdoor unit and a plurality of indoor units through piping, wherein the power amount calculation unit allocates the power amount of the outdoor unit to each of the indoor units based on the operation ratio, and adds the allocated amount to the power amount of each of the indoor units to calculate the power amount.

8. A fee management device as described in claim 7, wherein the carbon dioxide emission calculation unit calculates the specific period emission amount based on an emission coefficient that indicates the relationship between the amount of electricity and carbon dioxide emission and is set for each indoor unit.

9. A fee management device as described in claim 7 or claim 8, wherein the fee calculation unit calculates the emission fee based on a fee coefficient set for each indoor unit and indicating the relationship between the specific period emission amount and the emission fee.

10. A fee management device as described in claim 7, wherein the indoor units are divided into a plurality of groups, the carbon dioxide emission calculation unit calculates the specific period emission amount for each of the groups, and the fee calculation unit calculates the emission fee for each of the groups.

11. The fee management device of claim 10, wherein the carbon dioxide emission calculation unit calculates the specific period emission amount based on an emission coefficient that indicates the relationship between the amount of electricity and carbon dioxide emission and is set for each group.

12. A fee management device as described in claim 10 or claim 11, wherein the fee calculation unit calculates the emission fee based on a fee coefficient set for each group that indicates the relationship between the specific period emission amount and the emission fee.

13. A refrigeration cycle system comprising one or more refrigeration cycle devices and a fee management device according to any one of claims 1 to 12.

14. A program for a fee management method that manages fees based on the amount of electricity related to a refrigeration cycle device, the program causing a computer to perform the following steps: an electricity amount calculation step of calculating a specific period electricity amount, which is the amount of electricity related to the refrigeration cycle device in a specific period; a carbon dioxide emission calculation step of calculating a specific period emission amount related to the refrigeration cycle device in the specific period from the specific period electricity amount; and a fee calculation step of calculating an emission fee based on the specific period emission amount.

Citation Information

Patent Citations

  • System and method for optimizing reduction in greenhouse effect gas, management server, program, and recording medium

    JP2003331088A

  • Greenhouse gas emission amount calculation system, calculation method, greenhouse gas emission trading system and trading method

    JP2009129229A

  • Air conditioning system and method of controlling air conditioning system

    JP2010169348A

  • Air conditioner group controller

    JP2012007834A

  • Air conditioning system, air conditioning method and control device

    JP2017048962A