Method for supplying raw material gas, device for supplying raw material gas, and device for forming film on substrate
By controlling the power supplied to the heater in the raw material container based on temperature and carrier gas amount, the method addresses the inefficiencies in film formation rate due to depleting raw material, ensuring stable and consistent film deposition in film formation processes.
Patent Information
- Application Number
- PCT/JP2024/017161
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-22
- Filing Date
- 2024-05-08
- Publication Date
- 2024-11-28
AI Technical Summary
Existing methods for supplying raw material gas in film formation processes, such as CVD, face challenges in maintaining a consistent film formation rate due to variations in the remaining amount of solid raw material, leading to inefficiencies and decreased deposition rates as the material depletes.
The method involves controlling the power supplied to the heater in the raw material container based on the correlation between the temperature of the raw material and the amount of carrier gas, adjusting the electric power to maintain a desired film formation rate by sublimating the solid raw material and mixing it with carrier gas, and continuously supplying the gas mixture to the substrate.
This approach ensures a stable and consistent film formation rate by compensating for the decreasing amount of solid raw material, prolonging the replacement cycle of the raw material and maintaining the set film formation rate throughout the process.
Smart Images

Figure JP2024017161_28112024_PF_FP_ABST
Abstract
Description
Method for supplying source gas, device for supplying source gas, and device for forming film on substrate
[0001] The present disclosure relates to a method for supplying a source gas, an apparatus for supplying a source gas, and an apparatus for forming a film on a substrate.
[0002] For example, when depositing a metal film or the like on a substrate by CVD, a source gas obtained from a solid source may be used. Specifically, a solid source stored in a source container is heated and sublimated, and the source gas is mixed with a carrier gas supplied from a carrier gas source to obtain a source gas, which is then supplied to a processing container containing a substrate, thereby forming a film.
[0003] Patent Document 1 describes a method of calculating the flow rate of a source gas by measuring the gas pressure in a process gas supply line with a pressure gauge, and then describes a control method of adjusting the temperature of a source container by a temperature control program to adjust the flow rate of the source gas to achieve a desired film thickness when the calculated source gas flow rate differs from a set flow rate according to a recipe.
[0004] Japanese Patent Application Laid-Open No. 2008-240119
[0005] The present disclosure provides a technology for supplying a source gas so as to obtain a desired film formation rate by controlling the power supplied to the heater based on the correlation between the temperature at which the source material is heated and the amount of carrier gas supplied.
[0006] The method for supplying a raw material gas of the present disclosure includes the steps of: supplying power to a heater provided in a raw material container containing a solid raw material, and heating the inside of the raw material container to sublimate the solid raw material; supplying a carrier gas into the raw material container heated by the heater, mixing the carrier gas with the sublimated raw material, and supplying the resulting raw material to a consumption area in which a substrate is placed as a raw material gas; and determining an index value corresponding to the remaining amount of the solid raw material, wherein, when performing the step of sublimating the solid raw material, power corresponding to the index value at the time of performing the step is supplied to the heater based on the correspondence between the preset index value and the power supplied to the heater.
[0007] According to the present disclosure, by controlling the power supplied to the heater based on the correlation between the temperature at which the raw material is heated and the amount of carrier gas supplied, the raw material gas can be supplied so as to obtain a desired film formation rate.
[0008] FIG. 1 is a plan view showing a substrate processing system according to an embodiment of the present disclosure; FIG. 2 is a longitudinal side view showing a Ru film formation processing module of the substrate processing system; FIG. 3 is a longitudinal side view showing a source gas supply device attached to the Ru film formation processing module; FIG. 4 is a block diagram showing the source gas supply device in a comparative embodiment; FIG. 5 is a graph showing a change in film formation rate by a source gas supply method of the comparative embodiment; FIG. 6 is a graph showing a change in power supplied to each heater by the source gas supply method; FIG. 7 is a block diagram showing the electrical configuration of the source gas supply device in the embodiment; FIG. 8 is an action diagram showing the operation of the source gas supply device; FIG. 9 is a graph showing a change in power supplied to a side heater by a source gas supply method in the embodiment; FIG. 10 is a graph showing a change in power supplied to a bottom heater by the source gas supply method; FIG. 11 is a graph showing a change in power supplied to an upper heater by the source gas supply method; FIG. 12 is a graph showing a change in film formation rate by the source gas supply method.
[0009] The substrate processing system 1 shown in FIG. 1 is configured to perform a film formation process for forming a TiN (titanium nitride) film and a Ru (ruthenium) film as barrier metals on a wafer W. The substrate processing system 1 is configured as a multi-chamber system including multiple process modules 101, 102, 103, and 104 that perform an oxide film removal process, which is a pre-processing step for the film formation, and a TiN film and a Ru film formation process. Of the two process modules 101 and 102 that perform the oxide film removal process, the COR process module 101 performs a COR (Chemical Oxide Removal) process to transform an oxide film formed on the surface of a metal base (e.g., a Si layer, as described below) into a reaction product. The PHT process module 102 performs a PHT (Post Heat Treatment) process to sublimate the reaction product. The TiN film formation process module 103 performs the TiN film formation process, and the Ru film formation process module 104 performs the Ru film formation process.
[0010] In addition, when a Ru film is formed directly on a metal substrate without forming a barrier metal such as a TiN film, instead of performing the COR process and the PHT process, Ar (argon) gas plasma or H 2 The oxide film may be removed by gas plasma. In this case, the substrate processing system 1 is provided with a plasma processing module for removing the oxide film instead of the COR processing module 101 and the PHT processing module 102.
[0011] Returning to the explanation of FIG. 1, in addition to the process modules 101 to 104 , the substrate processing system 1 also includes a loader module 61 , a load lock module 62 , first and second vacuum transfer modules 63 and 64 , and a connection module 65 .
[0012] 1, the loader module 61, the load lock module 62, the first vacuum transfer module 63, the connection module 65, and the second vacuum transfer module 64 are arranged linearly in the front-to-rear direction in this order. In the following description of the substrate processing system 1, the side where the loader module 61 is located will be referred to as the front side, and the side where the second vacuum transfer module 64 is located will be referred to as the rear side.
[0013] The loader module 61 includes a housing whose interior is at atmospheric pressure, a transfer mechanism 61a for wafers W provided within the housing, and load ports 68. In this example, four load ports 68 are provided side by side on the front side of the housing. A transfer container C called a FOUP (Front Opening Unified Pod) for storing wafers W is placed on each load port 68. The transfer mechanism 61a is formed of, for example, an articulated arm that can move left and right, and is capable of transferring wafers W between the transfer container C on each load port 68 and each load lock module 62.
[0014] In this example, three load lock modules 62 are provided side by side as viewed from the front. Each load lock module 62 has a housing, and the housing is connected to the loader module 61 and the first vacuum transfer module 63 via gate valves (not shown) provided on the front and rear sides of the housing. The pressure inside the housing can be freely changed between atmospheric pressure and vacuum pressure when the gate valves on the front and rear sides of the housing are closed. A stage on which the wafer W is placed is provided inside the housing, and the stage is configured to be able to transfer the wafer W to and from the transfer mechanism 61a and a vacuum transfer mechanism 69 (described later) that access the load lock module 62.
[0015] The first and second vacuum transfer modules 63, 64 are similarly configured and each include a housing 63a, 64a and a vacuum transfer mechanism 69 provided within the housing 63a, 64a. One end of an exhaust pipe is connected to the housing 63a, 64a, and a vacuum atmosphere is maintained within the housing 63a, 64a by an exhaust mechanism connected via the exhaust pipe. The exhaust mechanism is, for example, a turbomolecular pump.
[0016] In this example, two connection modules 65 are provided side by side. Each connection module 65 has a housing, which is connected to the housings 63 a, 64 a of the vacuum transfer modules 63, 64. The inside of the housing of the connection module 65 is evacuated to a vacuum atmosphere of the same pressure as the inside of the housings 63 a, 64 a by the exhaust mechanism described above. A wafer W is placed inside the housing of the connection module 65, and a stage configured to be able to transfer the wafer W to and from a vacuum transfer mechanism 69, which will be described later, is provided inside the housing of the connection module 65.
[0017] As viewed from the front side, a COR processing module 101 and a PHT processing module 102 are connected via gate valves G1 to both the left and right sides of the front side of the housing 63a of the first vacuum transfer module 63. The COR processing module 101 is located on the left side, and the PHT processing module 102 is located on the right side. In this way, one COR processing module 101 and one PHT processing module 102 are provided around the first vacuum transfer module 63.
[0018] As viewed from the front, TiN film forming process modules 103 are connected to both the left and right sides of the rear side of the housing 63a of the first vacuum transfer module 63 via gate valves G1. In this manner, two TiN film forming process modules 103 are provided around the first vacuum transfer module 63. Wafers W are transferred between these process modules 101 to 103 and the load lock module 62 by a vacuum transfer mechanism 69 formed, for example, by an articulated arm that can move back and forth and left and right. The vacuum transfer mechanism 69 also transfers wafers W between these process modules 101 to 103 and the connection module 65, and between these process modules 101 to 103.
[0019] Two Ru film formation processing modules 104 arranged side by side in the front and rear are connected to the left and right sides of the housing 64a of the second vacuum transfer module 64 as viewed from the front side via gate valves G1. The wafer W is transferred between the Ru film formation processing modules 104 and the connection module 65 by, for example, a vacuum transfer mechanism 69 of the second vacuum transfer module 64. In this way, four Ru film formation processing modules 104 are provided around the second vacuum transfer module 64.
[0020] As shown in FIG. 2 as a representative example of the above-described processing modules 101 to 104, each of the processing modules 101 to 104 includes a processing vessel 41 that is evacuated to create a vacuum atmosphere inside, and a substrate mounting table 42 that is provided within the processing vessel 41 and on which a wafer W is placed, and each processing step is performed within the processing vessel 41.
[0021] The substrate processing system 1 includes a control unit 200, which is a computer, and the control unit 200 includes a program. The program includes instructions (steps) for carrying out the above-described wafer W processing process and wafer W transfer process. The program is stored in a storage medium, such as a compact disc, a hard disk, a DVD, or a nonvolatile memory, and is read from the storage medium and installed in the control unit 200.
[0022] The control unit 200 outputs control signals to each unit of the substrate processing system 1 according to the program, and controls the operation of each unit. Specifically, the control unit 200 controls the operation of the processing modules 101 to 104, opening and closing of the gate valve G1 and the like, the operation of the transfer mechanism 61a and the vacuum transfer mechanism 69, the operation of the exhaust mechanism, and switching of the pressure in the load lock module 62. Specific examples of the control of the operation of the processing modules 101 to 104 include temperature control of the wafer W by supplying power to heaters and the like, which will be described later, and control of the supply and cut-off of each gas into the processing vessel 41.
[0023] Here, we will explain the transfer path of the wafer W in the substrate processing system 1. The wafer W is first transferred in the following order: transfer container C → loader module 61 → load lock module 62 → first vacuum transfer module 63 → COR processing module 101. Then, the wafer W that has undergone the COR process in the COR processing module 101 is transferred in the following order: COR processing module 101 → first vacuum transfer module 63 → PHT processing module 102.
[0024] Then, the wafer W that has undergone the PHT process in the PHT process module 102 is transferred in the order of the PHT process module 102, the first vacuum transfer module 63, and the TiN film formation process module 103. The wafer W that has undergone the TiN film formation process in the TiN film formation process module 103 is transferred in the order of the TiN film formation process module 103, the first vacuum transfer module 63, the connection module 65, the second vacuum transfer module 64, and the Ru film formation process module 104. The wafer W that has undergone the Ru film formation process in the Ru film formation process module 104 is transferred in the order of the Ru film formation process module 104, the second vacuum transfer module 64, the connection module 65, the first vacuum transfer module 63, the load lock module 62, and the loader module 61, and is then returned to the transfer container C.
[0025] Although individual illustrations are omitted, we will first briefly describe the COR processing module 101, the PHT processing module 102, and the TiN film formation processing module 103. Each of these processing modules 101 to 103 includes a processing vessel, a substrate mounting table disposed within the processing vessel, a substrate heater provided on the substrate mounting table, and various gas supply mechanisms.
[0026] The substrate heater of the COR processing module 101 is configured to heat the wafer W placed on the mounting table to a heating temperature of 60° C. or higher by, for example, circulating a temperature control fluid through a pipe formed in the substrate mounting portion. The COR processing module 101 also has a gas supply mechanism that supplies HF (hydrogen fluoride) gas, NH 3 The processing chamber includes a mixed gas supply mechanism configured to supply a mixed gas of (ammonia) gas and an inert gas. The mixed gas supply mechanism is configured to supply various gases to a shower head provided in the processing chamber.
[0027] The substrate heater of the PHT processing module 102 uses, for example, resistance heat and is configured to heat the wafer W to a temperature higher than that of the wafer W in the COR processing. The inert gas supply unit, which is a gas supply mechanism of the PHT processing module 102, supplies inert gas N 2 directly to the processing chamber without using, for example, a shower head. 2The inert gas supply allows for rapid purging of reaction products sublimated in the processing vessel and for adjusting the pressure in the processing vessel.
[0028] The TiN film forming module 103 forms a TiN film by, for example, thermal atomic layer deposition (ALD). A substrate heater in the TiN film forming module 103 heats the wafer W to, for example, 700°C to 1000°C. The gas supply mechanism is configured to alternately supply a source gas containing a source material for the TiN film and a reactive gas that reacts with the source gas to the processing chamber via, for example, supplying a purge gas. For example, the source gas is TiCl 4 (titanium tetrachloride) gas, and the reaction gas is NH 3 (ammonia) gas.
[0029] The configuration of the Ru film forming module 104 will be described below with reference to Fig. 2. Fig. 2 is a vertical cross-sectional side view showing the Ru film forming module 104. The Ru film forming module 104 forms Ru on the surface of the wafer W. 3 (CO) 12 A source gas containing a gas (hereinafter sometimes referred to as DCR gas) is continuously supplied to form a Ru film by thermal CVD. The processing vessel 41 described above is a substantially cylindrical vessel with openings on the top and bottom. A substrate mounting table 42 for holding a wafer W substantially horizontally is provided within the processing vessel 41. The processing vessel 41 is filled with N gas (not shown). 2 A gas supply unit is connected to the processing vessel 41 to supply N 2 It is configured to supply gas appropriately.
[0030] A bottom lid 41a is provided at the opening on the lower surface of the processing vessel 41, and a vacuum exhaust line 43 is connected to the bottom lid 41a via an exhaust port. A vacuum exhaust unit 44, such as a vacuum pump, is provided downstream of the vacuum exhaust line 43 and configured to evacuate the gas inside the processing vessel 41. A pressure control valve, such as an APC valve (not shown), is provided between the processing vessel 41 and the vacuum exhaust unit 44 on the vacuum exhaust line 43. The opening and closing operation of the APC valve is controlled based on the result of measuring the pressure inside the processing vessel 41 by a pressure measurement unit P2 connected to the processing vessel 41.
[0031] A loading / unloading port is formed on the side of the processing vessel 41 for loading / unloading the wafer W between the processing vessel 41 and the second vacuum transfer module 64, and this loading / unloading port is configured to be freely opened and closed by a gate valve G1. The substrate mounting table 42 described above is made of, for example, aluminum nitride or quartz, and has a substrate heater made of a resistance heating element embedded therein for heating the wafer W. The substrate heater generates heat when supplied with power from a power supply unit (not shown), and heats the wafer W mounted on the substrate mounting table 42 to a temperature in the range of, for example, 100°C to 250°C.
[0032] A support portion 45 extending downward is connected to the center of the underside of the substrate mounting table 42. The support portion 45 is disposed so as to penetrate the bottom cover portion 41 a. The substrate mounting table 42 has, for example, three transfer pins (not shown) formed on the upper surface thereof so as to penetrate the substrate mounting table 42 and be able to freely protrude and retract. The transfer pins thus provided on the substrate mounting table 42 transfer the wafer W between the substrate mounting table 42 and the vacuum transfer mechanism 69, and mount the wafer W on the substrate mounting table 42.
[0033] A shower head 50 is airtightly attached to an opening on the upper surface of the processing vessel 41 via, for example, a heat-resistant insulating member. The shower head 50 is disposed in a position facing the wafer W placed on the substrate mounting table 42. The shower head 50 includes, for example, a cylindrical housing 51 and a diffusion chamber 52 provided inside the housing 51 for diffusing a source gas. The upper surface of the housing 51 is formed with gas supply holes 53 to which a gas supply mechanism 58 (described later) is connected and through which a source gas is supplied. The lower surface of the housing 51 is formed with a number of discharge holes 54 for discharging the supplied source gas toward the wafer W.
[0034] The diffusion chamber 52 is provided with diffuser plates 55, 56 spaced apart from each other so as to divide the diffusion chamber 52 into three spaces in the vertical direction. The diffuser plates 55, 56 each have a plurality of through holes 55 a, 56 a formed therein that form a flow path for the source gas. The through holes 56 a of the diffuser plate 56 are offset from each other so as not to face the outlet holes 54 formed in the lower surface of the housing 51. The through holes 55 a of the diffuser plate 55 are also offset from each other so as not to face the through holes 56 a of the diffuser plate 56. By arranging the through holes 55 a, 56 a in the diffuser plates 55, 56 as described above, the source gas is prevented from passing through the through holes 55 a, 56 a and the outlet holes 54 in a straight line. This prevents the source gas from being sufficiently dispersed within the housing 51 that constitutes the showerhead 50, allowing the source gas to be uniformly released from each outlet hole 54.
[0035] The gas supply mechanism 58 includes a gas supply line 59 and a source gas supply source 10 provided upstream of the gas supply line 59 for supplying a source gas. A downstream end of the gas supply line 59 is connected to gas supply holes 53 provided on the upper surface of the shower head 50. Valves V1 and V2 are provided downstream of the source gas supply source 10 on the gas supply line 59. Of the valves V1 and V2, the valve V1 provided downstream is, for example, a shutoff valve, and performs an operation of supplying and cutting off the source gas to and from the processing vessel 41.
[0036] On the other hand, the valve V2 is used to discharge the source gas in the source gas supply source 10 to the outside. A pressure measurement unit P1 is connected between the valves V1 and V2 in the gas supply line 59, measuring the pressure of the source gas flowing therethrough. Furthermore, an exhaust line 60 provided with a valve V6 is connected between the valves V1 and V2 in the gas supply line 59. The downstream end of the exhaust line 60 is connected to the vacuum exhaust unit 44, so that the source gas can be discharged directly toward the vacuum exhaust unit 44 without passing through the processing vessel 41. The gas supply line 59 and the exhaust line 60 are provided with heating units (not shown), which heat the entire gas supply line 59 and the exhaust line 60, including the valves V1, V2, and V6. This prevents the source gas from re-solidifying and adhering to the gas supply line 59 and the exhaust line 60, including the valves V1, V2, and V6.
[0037] The control unit 200 described above also has a function of controlling the Ru film formation process in the Ru film formation module 104. The control unit 200 includes a storage unit 201 and programs for executing each film formation process, and operates each component within the Ru film formation module 104. Specifically, the control unit 200 includes a program for executing a source gas supply process, which will be described later, and operates each component of the gas supply mechanism 58.
[0038] The source gas supply source 10 of the Ru film formation processing module 104 according to the present disclosure will be described in detail below with reference to FIG. 3. FIG. 3 is a vertical cross-sectional side view showing the source gas supply source 10, and temperature sensors TCa, TCb, and TCc and power supply units 21a, 21b, and 21c, which will be described later, are not shown. The source gas supply source 10 includes a source container 11 that stores a solid source material S for generating DCR gas contained in the source gas, a plurality of heaters 12 provided in the source container 11 for heating the solid source material S, and a carrier gas supply unit 13. The solid source material S may be, for example, solid Ru formed in a granular form. 3 (CO) 12 is.
[0039] The carrier gas supply unit 13 is configured to supply, as a carrier gas, for example, CO (carbon monoxide) gas to the source container 11. CO gas is used to dissolve solid Ru.3 (CO) 12 The carrier gas supply unit 13 includes a CO gas source 13 a, an inlet path 13 b connecting the CO gas source 13 a to the source container 11, and a flow rate control unit 13 c provided in the inlet path 13 b.
[0040] The flow rate control unit 13c is equipped with a CO gas flow meter and corresponds to a measuring unit that measures the supply amount of CO gas. The introduction path 13b branches into two paths downstream of the flow rate control unit 13c, for example, one downstream end of which is connected to the source material container 11 via a valve V3, and the other downstream end of which is connected to the gas supply path 59 downstream of the valve V2 via a valve V4. With this configuration, the carrier gas supply unit 13 is configured to be able to switch between a path that supplies the carrier gas to the source material container 11 and a path that supplies the carrier gas directly to the gas supply path 59, bypassing the source material container 11.
[0041] The source material container 11 has a substantially cylindrical shape and includes a main body 14 that is open at the top end, and a top lid 15 that is detachably and airtightly attached to the top end of the main body 14. The top lid 15 forms the upper surface of the source material container 11 and has a substantially disk shape. A source material gas outlet 15a is formed in the center of the top lid 15, through which the source material gas generated in the source material container 11 is discharged to the gas supply path 59. A carrier gas supply port 15b is formed in the side end of the top lid 15, through which CO gas is supplied to the source material container 11. The flow path cross-sectional area of the carrier gas supply port 15b is smaller than the flow path cross-sectional area of the source material gas outlet 15a.
[0042] The main body 14 includes a bottom 14a that forms the bottom surface of the raw material container 11 and a side 14b that forms the side surface of the raw material container 11. The bottom 14a is disk-shaped and has a diameter that expands outward more than the lower end of the side 14b. The upper end of the side 14b expands outward to form a flange, to which a top lid 15 of the same diameter can be detachably attached. The raw material container 11 is configured so that the internal space of the main body 14 can be opened upward when the top lid 15 is removed.
[0043] A raw material mounting section 16 for holding granular solid raw material S is disposed in the internal space of the raw material container 11. The raw material mounting section 16 is formed to protrude downward from the underside of the top lid 15. The up-down direction relative to the raw material gas supply source 10 is the same as the vertical direction, and the dimensions in the up-down direction are sometimes referred to as height or depth. The height of the raw material mounting section 16 is approximately the same as the depth of the internal space of the main body 14. The raw material mounting section 16 is accommodated in the raw material container 11 by attaching the top lid 15 to the main body 14. In this case, the lower surface of the raw material mounting section 16 is positioned so as to contact the bottom 14a of the main body 14. The raw material mounting section 16 is removed from the internal space of the main body 14 by removing the main body 14 from the top lid 15 and pulling it upward, allowing the raw material mounting section 16 to be removed from the internal space of the main body 14 and replenished with solid raw material as needed.
[0044] The raw material loading section 16 is configured in a substantially cylindrical shape with a diameter smaller than the internal space of the raw material container 11. The raw material loading section 16 is configured with multiple stages, for example, six tray sections 17, arranged at intervals from each other, for example, in the vertical direction. The tray sections 17 correspond to the raw material holding trays in this embodiment. These tray sections 17 are configured in substantially the same annular shape and are each arranged around a cylindrical central flow passage 18 extending in the vertical direction. The central flow passage 18 is located directly below the raw material gas discharge port 15a of the upper lid 15 and has substantially the same flow passage cross-sectional area as the raw material gas discharge port 15a.
[0045] Specifically, the tray section 17 is composed of a horizontally disposed annular bottom section 17a, an inner protrusion 17b provided inside the bottom section 17a, and a cylindrical outer wall section 17c formed to extend downward from the underside of the top cover 15 and support the outer periphery of the bottom section 17a. The inner protrusion 17b is provided to protrude upward from the bottom section 17a. The bottom section 17a, inner protrusion 17b, and outer wall section 17c form an annular recess that opens upward in each tray section 17. This annular recess can stably hold a large number of granular solid source material S while preventing it from falling from the tray section 17. The space above each tray section 17, which is spaced apart vertically, forms a source gas generation space SP where the solid source material S is sublimated to generate DCR gas and mixed with CO gas to obtain a source gas. Each source gas generation space SP has approximately the same volume.
[0046] Furthermore, the inner protrusion 17b formed on the inner periphery of each tray portion 17 forms an annular gap 17d between the upper tray portion 17 and the top lid 15. Each raw material gas generation space SP is connected to the central flow passage 18 via these gaps 17d. Meanwhile, the upper end of the cylindrical outer wall portion 17c of the topmost tray portion 17c is connected to the underside of the top lid 15. That is, each tray portion 17 is suspended from the top lid 15 via the outer wall portion 17c. The outer wall portion 17c surrounding the topmost tray portion 17 is disposed inside the outer wall portion 17c in the region below it. A plurality of carrier gas inlet holes 17e penetrating from the inside to the outside are formed in the outer wall portion 17c in regions corresponding to each raw material gas generation space SP. The plurality of carrier gas inlet holes 17e are uniformly formed in the annular outer wall portion 17c at equal angular intervals, for example, 30° intervals.
[0047] As described above, the raw material loading section 16 is disposed so that its bottom 17a, which is its lower surface, contacts the bottom 14a of the main body 14. A cylindrical carrier gas flow path 19 is formed between the outer surface of the cylindrical outer wall 17c and the inner surface of the main body 14. The upper end of the carrier gas flow path 19 communicates with the carrier gas supply port 15b. The radial width of the carrier gas flow path 19 is configured to be larger at the outer wall 17c of the uppermost tray 17, which is its upper end, than at the region below it.
[0048] As described above, the source container 11 is provided with a plurality of heaters 12, each of which includes a bottom heater 12a attached to the bottom 14a, a side heater 12b attached to the side 14b, and an upper heater 12c attached to the top lid 15. Each of the heaters 12a to 12c is supplied with power from power supply units 21a to 21c, which will be described later. The bottom heater 12a is, for example, a linear resistance heating element, and is embedded radially in the bottom 14a.
[0049] The side heater 12b and the upper heater 12c are each composed of, for example, a sheet-like resistance heating element. The side heater 12b is arranged to cover the entire outer surface of the side portion 14b, and the upper heater 12c is arranged to cover the entire upper surface of the top lid 15. A joint constituting the upstream end of a gas supply path 59 is airtightly attached to the center of the top lid 15, and the gas supply path 59 is connected to the central flow path 18 via a source gas outlet 15a. A joint constituting the downstream end of an introduction path 13b is airtightly attached to the side edge of the top lid 15, and the introduction path 13b is connected to the carrier gas flow path 19 via a carrier gas supply port 15b. The upper heater 12c has openings corresponding to the source gas outlet 15a and the carrier gas supply port 15b.
[0050] These heaters 12 (12a to 12c) heat the source container 11 to a predetermined temperature, thereby sublimating the solid source S contained in the source container 11 and generating DCR gas. To indirectly control the temperature of the solid source S in this manner, power supply units 21a to 21c that supply power are connected to the heaters 12a to 12c, and temperature sensors TCa, TCb, and TCc as shown in FIG. 7 are provided corresponding to the heaters 12a to 12c of the source container 11. The temperature sensors TCa, TCb, and TCc are attached to measure the temperatures of the bottom 14a, side 14b, and top lid 15, respectively.
[0051] The power supply units 21a, 21b, and 21c are configured to supply adjusted power to the heaters 12a, 12b, and 12c, respectively. The power supply units 21a to 21c and the temperature sensors TCa to TCc are connected to the control unit 200. The control unit 200 operates the power supply units 21a to 21c to adjust the temperatures of the bottom portion 14a, the side portion 14b, and the top lid 15 to their respective set temperatures. The control unit 200 also performs various controls in the source gas supply process. The control unit 200 also operates the flow rate control unit 13c to supply a predetermined CO gas flow rate.
[0052] The raw material gas supply source 10 having the configuration described above corresponds to the "apparatus for supplying raw material gas" in this embodiment, and the Ru film formation processing module 104 having the raw material gas supply source 10 corresponds to the "apparatus for forming a film on a substrate" in this embodiment.
[0053] Before describing the source gas supply method of the present disclosure, a comparative source gas supply method employing general feedback control will be described.
[0054] The source gas supply process of the comparative embodiment will be described with reference to Figures 4 to 6. Figure 4 is a block diagram showing the source gas supply source of the comparative embodiment, with the branched downstream end of the introduction path 13b partially omitted. Figure 5 is a graph showing the change in the Ru film formation rate (Ru film thickness formed per unit time) relative to the remaining amount of solid source material in the source gas supply process of the comparative embodiment, and Figure 6 is a graph showing the change in the power Wa, Wb, and Wc supplied to each heater 12a, 12b, and 12c relative to the remaining amount of solid source material in the same process.
[0055] In the comparative source gas supply method, the control unit 200 performs feedback control to increase or decrease the power supplied from the power supply units 21a to 21c to each heater 12 based on the measured values of the temperature sensors TCa, TCb, and TCc so that the temperatures of the bottom 14a, side 14b, and top lid 15 approach their respective set temperatures. In this source gas supply method, the solid source S is heated via the source container 11 (bottom 14a, side 14b, and top lid 15) to sublimate the solid source S and generate DCR gas. The set temperatures of the bottom 14a, side 14b, and top lid 15 are set, for example, through preliminary experiments, so that the Ru film formation rate is constant under a predetermined CO gas supply flow rate.
[0056] However, when the source gas is supplied under the above-mentioned conditions while performing feedback control, it has been found that as the film formation process progresses and the remaining amount of solid source S in the source container 11 decreases, the Ru film formation rate may decrease, as shown in Fig. 5. When the power supplied to each of the heaters 12a to 12c is checked as the Ru film formation rate decreases, it has been found that the supplied power also tends to decrease in accordance with the decrease in the Ru film formation rate, even though the temperature setting value has not been changed.
[0057] The reason for the above-described phenomenon is believed to be that as the solid source material S sublimes and the remaining amount decreases, the total heat capacity of the source material container 11 and the solid source material S decreases. Therefore, the amount of heat required to maintain the temperatures of the bottom 14a, side 14b, and top lid 15 of the source material container 11 at the aforementioned temperature settings also decreases, and the power supplied to each heater 12a-12c also decreases. However, when the power supplied to each heater 12a-12c decreases, even if the temperatures of the bottom 14a, side 14b, and top lid 15 are maintained at the temperature settings, it is thought that the temperature drop on the surface of the solid source material S held in the tray unit 17 is greater than the detected values by the temperature sensors TCa, TCb, and TCc. As a result, the decrease in the amount of sublimation from the solid source material S is thought to decrease the DCR gas concentration, causing a decrease in the film formation rate. In consideration of these phenomena, the source gas supply method disclosed herein adjusts the film formation rate by upwardly correcting the power supplied to each heater 12, which decreases as the remaining amount of source gas decreases.
[0058] The operation of the source gas supply process of the present disclosure will be described in detail below with reference to FIGS. 7 to 10. FIG. 7 is a block diagram showing the source gas supply source of the present disclosure. FIG. 8 is an operational diagram of the source gas supply process of the present disclosure. In FIG. 8, the flow of CO gas is indicated by a solid line, and the flow of the source gas, which is a mixed gas of CO gas and DCR gas produced by sublimation of the solid source S, is indicated by a dashed line. FIGS. 7 and 8 omit the illustration of the branched downstream end of the introduction path 13b. FIGS. 9A to 9C are graphs showing the change in power of each heater relative to the remaining amount of solid source in the same process, and FIG. 10 is a graph showing the change in Ru film formation rate relative to the remaining amount of solid source in the same process.
[0059] Prior to the source gas supply process, a power supply recipe for each heater 12 in the source gas supply process is created through a preliminary test. Specifically, a power supply recipe for the heater 12 necessary to maintain a film formation rate R1 at each remaining amount is created in response to changes in the remaining amount of solid source material S. For example, at the start of Ru film formation when the source gas supply to the wafer W begins, the source container 11 initially contains an initial remaining amount M1 of 2500 g of solid source material S. The pressure within the source container 11 and the amount of CO gas supplied per unit time may be constant or may be varied in response to changes in the remaining amount of solid source material S. The pressure may be, for example, approximately 40 mTorr to 150 mTorr. Meanwhile, the source container 11 does not have a fixed set temperature, but rather varies depending on the power supply. Therefore, the temperature sensors TCa, TCb, and TCc are used to monitor the temperatures of the bottom 14a, side 14b, and top lid 15. The target film formation rate R1 may also be referred to as the set film formation rate R1.
[0060] 7 , for example, after the wafer W is loaded into the processing vessel 41, the supply of power to the heater 12 is started, the valves V1 and V4 are closed, and the valves V2, V3, and V6 are opened. The flow rate control unit 13c of the carrier gas supply unit 13 starts supplying CO gas heated to a predetermined temperature (e.g., 80°C) at a preset flow rate. Next, the vacuum exhaust unit 44 performs a vacuum exhaust operation, and causes the carrier gas to flow into, for example, the source vessel 11 via the gas supply path 59. Then, power adjusted by the power supply units 21a to 21c is supplied to each of the heaters 12a to 12c, thereby heating the source vessel 11 and the solid source S.
[0061] Then, when the temperature of the source container 11 becomes constant, the valve V6 is closed, while the valve V1 is opened to start supplying the source gas from the source gas supply source 10 to the processing container 41. The carrier gas supply unit 13 continues to supply gas into the source container 11 at a constant flow rate during the Ru film formation process, that is, from the time valve V1 is opened until it is closed. During the Ru film formation process, the source container 11, the gas supply line 59, the exhaust line 60, and the processing container 41 are constantly heated by the heating unit described above so that the temperatures of the source gas are kept constant at the above-mentioned predetermined temperature, at least to prevent re-solidification of the source gas.
[0062] The process of generating the raw material gas will be described below. As shown by the solid line in Figure 8, CO gas supplied from the introduction passage 13b first flows into the carrier gas flow passage 19 via the carrier gas supply port 15b. The cylindrical carrier gas flow passage 19 has a narrower radial width in a region below the upper end. Therefore, the CO gas that flows into the upper end is prevented from proceeding straight downward and flows circumferentially, flowing downward from the entire circumference of the upper end. The CO gas flowing downward around the entire circumference of the carrier gas flow passage 19 then flows into multiple carrier gas inlet holes 17e that open on the outer surface of the raw material loading section 16.
[0063] The CO gas flowing into each carrier gas inlet 17e is supplied to the raw material gas generation space SP of each tray section 17 arranged vertically from all directions at intervals of 30°C. The CO gas is then diffused radially toward the center and circumferential directions in the raw material gas generation space SP, and flows over the annularly arranged solid raw material S. As a result, the DCR gas and CO gas obtained by sublimation of the solid raw material S heated in the raw material container 11 are mixed in the raw material gas generation space SP, and a raw material gas with a uniform concentration is obtained. The "DCR gas" corresponds to the "raw material in the raw material gas" in the claims.
[0064] The generated source gas flows toward each gap 17d in each annular source gas generation space SP and then flows from each gap 17d into the central flow passage 18. The DCR gas that flows into the central flow passage 18 flows upward through the central flow passage 18 and then flows through the source gas outlet 15a and the gas supply path 59 toward the shower head 50. The CO gas that flows into the shower head 50 is then released into the processing vessel 41 so as to be uniform on the surface of the wafer W. A Ru film is then formed on the wafer W uniformly at approximately the set film formation rate R1. From this perspective, the processing vessel 41 of the Ru film formation processing module 104 corresponds to a source gas consumption area in this embodiment. In this disclosure, in order to maintain this set film formation rate R1 even when the solid source material is reduced, the power supplied to each heater 12, which decreases as the remaining amount of solid source material decreases, is controlled to supply a constant amount of source gas.
[0065] In the preliminary test described above, when the solid source S is initially stored with an initial remaining amount M1, power capable of realizing a set film formation rate R1 is supplied to each heater 12. As described with reference to Figures 5 and 6, the powers Wa1, Wb1, and Wc1 supplied to each heater 12a, 12b, and 12c capable of realizing the set film formation rate R1 when the initial remaining amount M1 is reached are determined in advance. If film formation on wafers W in the preliminary test is continued in this manner, the film formation rate R will change. For example, if film formation is continued without changing the powers Wa1, Wb1, and Wc1 supplied to each heater 12, the film formation rate R will be greater than the set film formation rate R1.
[0066] Therefore, film formation is performed while sequentially decreasing the power supplied to each heater 12, and the powers Wa2, Wb2, and Wc2 supplied to each heater 12 that currently achieve the set film formation rate R1 are identified. After the supplied powers Wa2, Wb2, and Wc2 are identified, the remaining amount M2 of the solid source material S at that time is measured. Thereafter, by repeating the above-described operation, a correspondence relationship between the remaining amount M of the solid source material S in the source material container 11 and the powers Wa', Wb', and Wc' supplied to each heater 12 to achieve the set film formation rate R1 is obtained, as shown in Figures 9A to 9C.
[0067] 9A to 9C, the dashed lines indicate the changes in the supply powers Wa, Wb, and Wc in the comparative example, as described with reference to Fig. 6. Comparing the supply powers indicated by the dashed lines (comparative example) and the solid lines (present disclosure) in these figures, it can be said that an offset correction is performed to increase the supply power to each heater 12 in response to a decrease in the solid source material S in the source container 11.
[0068] On the other hand, in an actual film formation process, it may not be possible to measure the remaining amount M of the solid source material S over time. However, if the set film formation rate R1 is steadily maintained, the consumption rate of the solid source material S and the concentration of DCR gas in the source gas are constant. Therefore, the consumption amount N of the solid source material S can be determined by determining the cumulative supply amount X [L (standard condition)] of the carrier gas supplied to the source container 11 from the flow rate control unit 13c of the carrier gas supply unit 13. The remaining amount M at that time can be determined by subtracting the consumption amount N from the initial remaining amount M1 of the solid source material S. Therefore, the correspondence relationship between the remaining amount M of the solid source material S and the powers Wa', Wb', and Wc' supplied to each heater 12 in FIGS. 9A to 9C can be rewritten as a correspondence relationship with the cumulative supply amount X of the carrier gas.
[0069] 9A to 9C and the powers Wa', Wb', and Wc' supplied to each heater 12. Based on the cumulative carrier gas supply amount X that increases with film formation on the wafer W, the supply powers Wa', Wb', and Wc' corresponding to the cumulative carrier gas supply amount X are supplied to each heater 12.
[0070] 1 and 2, the operation of the substrate processing system 1 that performs a series of processes including the source gas supply process described above will be described. Before starting a series of processes in the substrate processing system 1, a plurality of recesses are formed on the surface of the wafer W in a previous etching process to form a wiring layer. The recesses are formed so as to reach, for example, a Si (silicon) layer, and a silicon oxide film is formed at the bottom of the recesses due to natural oxidation of the Si layer caused by contact with the atmosphere during transport of the wafer W.
[0071] When the vacuum transfer mechanism 69 in the first vacuum transfer module 63 receives such a wafer W from the load lock module 62 shown in FIG. 1, the wafer W is transferred toward the COR processing module 101 .
[0072] In the COR processing module 101, the pressure inside the processing vessel is adjusted in advance by the vacuum exhaust unit so that a vacuum atmosphere is created inside the processing vessel. The gate valve G1 of the COR processing module 101 is opened, and the wafer W is introduced into the processing vessel from the loading port by the vacuum transfer mechanism 69. The wafer W is then transferred to the substrate mounting table, and the vacuum transfer mechanism 69 is then removed from the processing vessel, and the gate valve G1 is closed. The pressure and temperature inside the processing vessel are adjusted according to the recipe settings for the COR process. Next, HF gas and NH 3 The mixed gas containing the gas is supplied to the processing vessel 41. This can change the properties of the silicon oxide film and form a reaction product.
[0073] After the COR process is completed, the wafer W on which the reaction products have been formed is unloaded from the COR process module 101 in the reverse order of the loading procedure. The wafer W is then transferred to the PHT process module 102. Thereafter, the wafer W is loaded into the PHT process module 102 in the same order as the loading procedure into the COR process module 101, and the PHT process is performed. The pressure and temperature within the process chamber are adjusted in accordance with the recipe for the PHT process, and an inert gas is supplied to heat-treat the wafer W. The reaction products from the heat-treated wafer W are sublimated, removing the silicon oxide film and exposing the unoxidized Si layer at the bottom of the recess.
[0074] After the PHT process is completed, the wafer W from which the silicon oxide film has been removed is unloaded from the PHT process module 102 and similarly loaded into the TiN film formation process module 103, where the TiN film formation process is performed. The pressure and temperature within the process chamber are adjusted according to the recipe for the TiN film formation process, and a source gas and a reactive gas are alternately supplied to form a TiN film within the recess. When the wafer W is transferred from the PHT process module 102 to the TiN film formation process module 103, it is transferred via the first vacuum transfer module 63, which is a transfer path in a vacuum atmosphere, so the wafer W is not exposed to the atmosphere. This prevents the surface of the Si layer exposed within the recess from being re-oxidized by the atmosphere.
[0075] After the TiN film formation process is completed, the wafer W with the TiN film formed in the recess is transferred out of the TiN film formation module 103 and similarly transferred into the Ru film formation module 104. When the wafer W is transferred from the TiN film formation module 103 to the Ru film formation module 104, it is transferred via the first vacuum transfer module 63, the second vacuum transfer module 64, and the connection module 65, which are transfer paths in a vacuum atmosphere, so that the wafer W with the TiN film formed thereon can be transferred without being exposed to the air atmosphere.
[0076] The Ru film forming process is performed on the wafer W loaded into the Ru film forming module 104. Before the wafer W is loaded into the Ru film forming module 104, the valve V1 is closed and a N 2 N is introduced into the processing vessel 41 from the gas supply unit. 2 The gas is directly supplied, and the opening of the APC valve provided in the vacuum exhaust line 43 is adjusted based on the measurement result at the pressure measurement unit P2, thereby creating a vacuum atmosphere at a predetermined pressure (e.g., 7 to 10 Torr) inside the processing vessel 41.
[0077] In this state, the gate valve G1 provided at the wafer W transfer port of the processing vessel 41 is opened, and the vacuum transfer mechanism 69 holding the wafer W is inserted into the processing vessel 41 from the second vacuum transfer module 64 through the transfer port. The wafer W is then transferred to above the substrate mounting table 42 located at the standby position. The wafer W is then transferred onto the raised support pins (not shown), after which the vacuum transfer mechanism 69 is removed from the processing vessel 41, and the gate valve G1 is closed. At the same time, the support pins are lowered, and the wafer W is placed on the substrate mounting table 42.
[0078] Next, the wafer W is heated to a predetermined temperature (e.g., 120 to 250° C.) by a heater provided on the substrate mounting table 42. When the temperature of the wafer W reaches the predetermined temperature, the aperture of the APC valve of the vacuum exhaust path 43 is adjusted, and the interior of the processing vessel 41 is depressurized to a predetermined pressure (e.g., 5 to 100 mTorr). When the depressurization of the interior of the processing vessel 41 is completed, a source gas supply step is performed by the source gas supply source 10 so that the gas supply mechanism 58 starts supplying the source gas into the processing vessel 41.
[0079] Meanwhile, the control unit 200 sequentially processes wafers W over a period from the start of use of the source container 11 containing the solid source S with a specified initial remaining amount M1 until the remaining amount of the solid source S reaches a preset lower limit. As a result, the control unit 200 grasps the cumulative supply amount X of the carrier gas supplied to the source container 11 (a process of calculating the cumulative supply amount). Based on the correspondence relationships shown in FIGS. 9A to 9C , each heater 12 is supplied with the supply powers Wa', Wb', and Wc' corresponding to the current cumulative supply amount X of the carrier gas. As a result, the heated solid source S in the source container 11 sublimes (a process of sublimating the solid source), and the resulting mixture of the DCR gas as the source and the CO gas as the carrier gas flows out of the source container 11 as a source gas (a process of supplying the source gas). At the same time, when the valve V1 on the gas supply path 59 side is opened and the opening of the valve V2 is adjusted, the raw material gas is supplied into the processing vessel 41 via the shower head 50, and formation of a Ru film on the wafer W by CVD (Chemical Vapor Deposition) begins.
[0080] As described above, the powers Wa', Wb', and Wc' supplied to the heaters 12 are adjusted to maintain the set deposition rate R1 even if the remaining amount of solid source material S in the source container 11 changes. Therefore, a source gas with a uniform DCR gas concentration is supplied to each wafer W sequentially subjected to deposition processing in the Ru film deposition module 104, enabling stable deposition of Ru films between wafers under the set deposition rate R1. During film deposition processing of each wafer W, the powers Wa', Wb', and Wc' supplied to the heaters 12 may be adjusted as needed in accordance with an increase in the cumulative carrier gas supply rate X. Alternatively, the powers Wa', Wb', and Wc' supplied to the heaters 12 may be set based on the cumulative carrier gas supply rate X up to that point before film deposition on the next wafer W is started, and the powers may be fixed during the processing of the wafer W, thereby performing intermittent power adjustment.
[0081] When the Ru film formation is completed, valve V1 is closed, and the wafer W is unloaded from the processing vessel 41, loaded into the load lock module 62, and returned to the transfer vessel C via the loader module 61 in the reverse order of the above.
[0082] As described above, according to the present disclosure, the source gas can be supplied so as to obtain a desired film formation rate. Specifically, the power supplied to each heater 12 is determined through preliminary experiments or the like so that the set film formation rate R1 is maintained even if the remaining amount M of the solid source S in the source container 11 changes. The above-described supply power is then correlated with the integrated supply amount X of the carrier gas, which serves as an index for estimating the remaining amount M of the solid source S in the source container 11. During film formation processing on the wafer W, power is supplied to each heater 12a-12c based on this correspondence. This reduces the influence of changes in heat capacity due to changes in the remaining amount M of the solid source S, thereby achieving stable film formation at the set film formation rate R1. Furthermore, by adjusting the supply power using the correspondence of the present disclosure, the source gas can be continuously supplied while maintaining the set film formation rate R1 (specifically, within an allowable range including the set film formation rate R1) until the remaining amount of the solid source S reaches approximately zero. This allows for a longer replacement cycle for replenishing or replacing the solid source S.
[0083] In this operation, in the present disclosure, the carrier gas is continuously supplied at a constant flow rate, but this is not a necessary requirement. For example, the carrier gas may be supplied intermittently during the film formation process, as in ALD (Atomic Layer Deposition), or the carrier gas flow rate may be varied during the film formation process. Even in this case, the cumulative supply amount can be appropriately determined using the flow rate control unit 13c of the carrier gas supply unit 13 or a flow meter newly installed in the inlet path 13b, for example. However, when the carrier gas flow rate is varied, the correspondence relationships shown in Figures 9A to 9C must be changed to correspond to the carrier gas flow rate, as described below, to avoid changes in the concentration of DCR gas in the source gas.
[0084] In this operation, the integrated supply amount referenced when supplying power does not necessarily need to be measured during the source gas supply process, as in the present disclosure. For example, if the carrier gas supply amount is preset, such as a constant amount per unit time, as in the present disclosure, the integrated supply amount can be predicted in advance without being acquired sequentially during the source gas supply process. Therefore, the power supplied to each heater 12 may be adjusted based on, for example, a predicted integrated supply amount without measuring the integrated carrier gas supply amount.
[0085] Furthermore, when the same film formation process is repeatedly performed on multiple wafers W, power adjustment is possible in the same way without prior prediction or measuring and understanding the cumulative carrier gas supply amount for each wafer W. Specifically, even without understanding the cumulative supply amount for each wafer W, power may be supplied in the same way as for the wafer W on which a film was previously formed. Furthermore, it is not essential to measure the cumulative supply amount and adjust the supplied power periodically at regular intervals, as in the present disclosure. Measurement may be performed intermittently, or, in the case of a carrier gas supply pattern in which supply and interruption are repeated, measurement may be performed at the end of the previous carrier gas supply. Furthermore, it is not essential that the measurement and adjustment of the supplied power be performed in a one-to-one correspondence, as in the present disclosure. Measurement or adjustment of the supplied power may be performed frequently.
[0086] The correspondence relationship between the integrated supply flow rate of the carrier gas and the supplied power changes, for example, if the supply flow rate per unit time of the carrier gas changes. Therefore, when the supply flow rate of the carrier gas is changed, a correspondence relationship corresponding to each supply flow rate is acquired. Then, it is preferable to store multiple correspondence relationships (tables) acquired for these multiple different flow rates in the memory unit 201 of the control unit 200. As a result, when the flow rate of the carrier gas is changed, the control unit 200 can switch the correspondence relationship used to adjust the supply power to the heater 12 and execute appropriate supply power.
[0087] Furthermore, the correspondence relationship may be obtained for various conditions, such as the initial remaining amount M1 of the solid source material S, the form of the solid source material S, the type of carrier gas, the set deposition rate R1, the recipe, and other set values. For example, taking the set deposition rate R1 as an example, if the correspondence relationship for different set deposition rates Rx (x = 1, 2, 3, ...) is obtained, the deposition rate can be adjusted appropriately in the deposition process. Furthermore, if multiple different correspondence relationships can be obtained, these correspondence relationships can be appropriately interpolated and used by, for example, interpolating or extrapolating them using numerical processing.
[0088] Furthermore, in the above-described embodiment, the adjustment of the supply power is performed based on the correspondence between the integrated supply amount of the carrier gas and the power supplied to the heater 12, using the integrated supply amount of the carrier gas as an index value indicating the remaining amount of the solid source material S. However, examples of the index value are not limited to this. For example, the weight of the source material container 11 containing the solid source material S may be used as the index value indicating the remaining amount of the solid source material S. In this case, the supply power is adjusted based on the correspondence between the weight of the source material container 11 containing the solid source material S and the supply power, which has been obtained in advance.
[0089] The actual deposition rate adjusted to the set deposition rate R1 by adjusting the supply power as described above is not necessarily limited to a constant value, but may be controlled within an acceptable range, for example, so long as the film thickness after the deposition process is within a control value. Furthermore, the adjustment of the supply power is preferably adjusted within a range of, for example, ±10% of the corresponding supply powers Wa'-Wc'. Furthermore, the adjustment of the supply power is not limited to continuously changing the power value as shown in Figures 9A-9C, but may also be changed in a stepwise manner by a constant value. Furthermore, the adjustment of the supply power may be adjusted by appropriately turning the power supply on and off, so that the amount of heat supplied to the source container 11 is changed in the same way as changing the power value.
[0090] The adjustment of the supply power using the above correspondence is preferably performed for all heaters 12a to 12c as in the present disclosure, but may not be performed for some heaters 12, such as the upper heater 12c. The heaters 12 do not have to be provided in each of the bottom 14a, side 14b, and top lid 15 as in the present disclosure. For example, a single heater 12 may be provided on the lower side of the source material container 11. Temperature sensors TCa to TCc do not have to be provided corresponding to each heater 12. For example, a temperature sensor may be provided corresponding to any one of the heaters 12 to monitor the temperature of the source material container 11. Furthermore, in adjusting the supply power, the pressure inside the source material container 11 is reduced by the vacuum exhaust unit 44 via the exhaust path 60. However, this reduced pressure is not essential; for example, positive pressure may be used.
[0091] The source gas is not limited to a mixed gas of DCR gas and CO gas, but may be a mixed gas of a gas containing a source material of a film to be formed on the wafer W and a carrier gas selected in accordance with the gas. Specifically, as a gas produced by sublimation of a solid source material, AlCl containing a source material of an AlN (aluminum nitride) film may be used. 3 (aluminum chloride) gas and WCl containing raw material for W (tungsten) film 5 In this case, the reaction gas is supplied to the processing vessel 41. The carrier gas may be CO gas or N 2 The gas may be an inert gas such as a gas.
[0092] It should be noted that the embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects, and various omissions, substitutions, modifications, and combinations may be made to the above-described embodiments without departing from the scope and spirit of the appended claims.
[0093] S: solid source material; W: wafer; Wa': power supply amount; Wb': power supply amount; Wc': power supply amount; X: integrated supply amount; 11: source material container; 12: heater; 41: processing container;
Claims
1. A method for supplying a source gas, comprising: a step of supplying power to a heater provided in a source container containing a solid source, and heating the inside of the source container to sublimate the solid source; a step of supplying a carrier gas into the source container heated by the heater, mixing the carrier gas with the sublimated source, and supplying the resultant as a source gas to a consumption area in which a substrate is placed; and a step of determining an index value corresponding to a remaining amount of the solid source, wherein, when performing the step of sublimating the solid source, power corresponding to the index value at the time of performing the step is supplied to the heater based on the correspondence between the preset index value and the power supplied to the heater.
2. The method according to claim 1, wherein the index value is an integrated supply amount obtained by integrating the amount of carrier gas supplied into the raw material container.
3. The method according to claim 2, wherein in the step of calculating the cumulative supply amount, the supply amount of the carrier gas is accumulated over a period from the start of use of a raw material container containing a specified amount of the solid raw material to the time when the remaining amount of the solid raw material reaches a preset lower limit value.
4. The method described in claim 2, wherein the correspondence between the cumulative supply amount of the carrier gas and the power supplied to the heater is set so that the supply amount per unit time of the raw material in the raw material gas supplied to the consumption area is a predetermined value.
5. The method according to claim 1, wherein the raw material container has multiple stages of raw material holding trays spaced apart from each other in the vertical direction, each raw material holding tray holds the solid raw material, and the carrier gas supplied into the raw material container passes over these raw material holding trays to mix with the sublimated raw material.
6. The method according to claim 1, wherein a plurality of the heaters are provided at different positions on the raw material container, and a correspondence between the index value and the power supplied to each heater is set for each heater.
7. An apparatus for supplying a raw material gas, comprising: a raw material container containing a solid raw material and equipped with a heater for heating the solid raw material; a power supply unit for supplying power to the heater; a carrier gas inlet path for supplying a carrier gas to the raw material container; an index value calculation unit for calculating an index value having a correspondence relationship with a remaining amount of the solid raw material; a raw material gas flow path for supplying the raw material gas obtained in the raw material container to a consumption zone in which a substrate is placed; and a control unit, wherein the control unit is configured to output control signals for executing a process step of supplying power to the heater to heat the inside of the raw material container to sublimate the solid raw material, a process step of supplying the carrier gas into the raw material container heated by the heater, mixing the carrier gas with the sublimated raw material, and supplying the carrier gas to the consumption zone as a raw material gas, and a process step of calculating the index value, and the apparatus supplies to the heater power corresponding to the index value at the time of carrying out the process step of sublimating the solid raw material, based on the correspondence relationship between the preset index value and the power supplied to the heater.
8. The apparatus according to claim 7, wherein the index value calculation unit is a supply amount integrating unit that obtains an integrated supply amount by integrating the supply amount of carrier gas supplied from the carrier gas supply unit as the index value.
9. The apparatus described in claim 8, wherein the processing step of calculating the accumulated supply amount integrates the supply amount of the carrier gas over a period from the start of use of a raw material container containing a specified amount of solid raw material to the time when the remaining amount of the solid raw material reaches a preset lower limit value.
10. The apparatus described in claim 8, wherein the correspondence between the cumulative supply amount of the carrier gas and the power supplied to the heater is set so that the supply amount per unit time of the raw material in the raw material gas supplied to the consumption area is a predetermined value.
11. The apparatus described in claim 7, wherein the raw material container has multiple stages of raw material holding trays spaced apart from each other in the vertical direction, each raw material holding tray holds the solid raw material, and the carrier gas supplied into the raw material container passes over these raw material holding trays to mix with the sublimated raw material.
12. The apparatus according to claim 7, wherein a plurality of the heaters are provided at different positions on the raw material container, and a correspondence between the index value and the power supplied to each heater is set for each heater.
13. An apparatus for forming a film on a substrate, comprising: a raw material gas supply device according to any one of claims 7 to 12; and a processing vessel which is the consumption area and has a mounting stage for placing the substrate, wherein the control unit is configured to place the substrate on the mounting stage and output a control signal for executing a processing step of forming a film on the substrate using the raw material gas supplied from the raw material gas supply device to the processing vessel.
Citation Information
Patent Citations
Method of supplying solid material gas
JP2013256709A
Raw material feeding apparatus, substrate processing system, and residual quantity estimation method
JP2023039835A
Precursor supply system and precursor supply method
WO2017187866A1