Conveyance system, conveyance method, and program

The conveyance system with an automatically movable body and coordinated supply device allows for flexible pallet transportation and stacking, addressing the inflexibility of existing systems by adapting to equipment layouts and optimizing pallet management.

WO2024247395A1PCT designated stage expired Publication Date: 2024-12-05MITSUBISHI HEAVY IND LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/005954
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-31
Filing Date
2024-02-20
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Existing conveyance systems are inflexible in adapting to equipment layouts, as they require predetermined conveyor positions, limiting the ability to perform stowage work according to individual equipment arrangements.

Method used

A conveyance system comprising an automatically movable body and a supply device that transports and loads pallets, allowing for flexible movement and loading of pallets between different devices based on equipment layout, with a management device coordinating the operations to ensure efficient pallet distribution and stacking.

Benefits of technology

Enables flexible stowage work according to equipment layout, ensuring efficient transportation and stacking of pallets regardless of device positions, and optimizes pallet management by adjusting operations based on remaining pallet counts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024005954_05122024_PF_FP_ABST
    Figure JP2024005954_05122024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention flexibly performs loading work according to a facility layout. This conveyance system comprises at least one movable body that can move automatically, and a supply device. The movable body conveys a plurality of pallets on which no article is mounted toward the supply device, and supplies the plurality of pallets to the supply device. The supply device mounts the supplied pallets on the movable body, and the movable body on which the pallets are mounted conveys the pallets toward a loading device that mounts articles on the pallets.
Need to check novelty before this filing date? Find Prior Art

Description

Transport system, transport method, and program

[0001] The present disclosure relates to a transport system, a transport method, and a program.

[0002] A method for shipping goods by stacking goods on trays such as pallets is known. For example, Patent Document 1 describes an automatic shipping device that transports goods trays on a belt conveyor, stacks goods on the goods trays on the belt conveyor, and ships the stacked goods.

[0003] JP 2019-85208 A

[0004] However, in the technology disclosed in Patent Document 1, stacking and other operations can only be performed on a belt conveyor at a fixed position, making it impossible to perform operations flexibly according to the layout of individual facilities. Therefore, there is a demand for flexible stacking operations that can be performed according to the layout of facilities.

[0005] The present disclosure aims to provide a conveying system, a conveying method, and a program that enable flexible stacking operations according to facility layout.

[0006] The conveying system according to the present disclosure is a conveying system having at least one automatically movable mobile body and a supply device, wherein the mobile body transports a plurality of pallets without any items loaded thereon toward the supply device and supplies the plurality of pallets to the supply device, the supply device loads the loaded pallets onto the mobile body, and the mobile body with the pallets loaded transports the pallets toward a loading device that loads items onto the pallets.

[0007] The conveying method disclosed herein is a method for conveying pallets using at least one automatically movable mobile body and a supply device, and includes the steps of: using the mobile body to convey a plurality of pallets without items loaded toward the supply device and supplying the plurality of pallets to the supply device; loading the supplied pallets onto the mobile body by the supply device; and using the mobile body with the pallets loaded thereon to convey the pallets toward a loading device that loads items onto the pallets.

[0008] The program disclosed herein is a program that causes a computer to execute a transport method for transporting pallets using at least one automatically movable mobile body and a supply device, and causes the computer to execute the steps of transporting multiple pallets without items loaded onto them toward the supply device using the mobile body and supplying the multiple pallets to the supply device, loading the supplied pallets onto the mobile body using the supply device, and transporting the pallets using the mobile body with the pallets loaded onto it toward a loading device that loads items onto the pallets.

[0009] According to the present disclosure, loading operations can be performed flexibly according to the facility layout.

[0010] FIG. 1 is a schematic diagram of a conveyance system according to this embodiment. FIG. 2 is a schematic diagram of a mobile body. FIG. 3 is a schematic block diagram of a management device. FIG. 4 is a schematic block diagram of a mobile body management device. FIG. 5 is a schematic block diagram of a control device of a mobile body. FIG. 6 is a schematic block diagram of a control device of a supply device. FIG. 7 is a schematic block diagram of a control device of a stowage device. FIG. 8 is a schematic diagram illustrating a series of operations performed by a mobile body, a supply device, and a stowage device. FIG. 9 is a schematic diagram illustrating a series of operations performed by a mobile body, a supply device, and a stowage device. FIG. 10 is a schematic diagram illustrating a series of operations performed by a mobile body, a supply device, and a stowage device. FIG. 11 is a schematic diagram illustrating a series of operations performed by a mobile body, a supply device, and a stowage device. FIG. 12 is a schematic diagram illustrating a series of operations performed by a mobile body, a supply device, and a stowage device. FIG. 13 is a flowchart illustrating a processing flow of the management device when the number of remaining pallets is less than a predetermined number. Fig. 14 is a schematic diagram illustrating a series of operations performed by a mobile body, a supply device, and a stowage device. Fig. 15 is a schematic diagram illustrating a series of operations performed by a mobile body, a supply device, and a stowage device. Fig. 16 is a schematic diagram illustrating a series of operations performed by a mobile body, a supply device, and a stowage device. Fig. 17 is a flowchart illustrating the processing flow of the management device when the number of remaining pallets is equal to or greater than a predetermined number.

[0011] Preferred embodiments of the present disclosure will be described in detail below with reference to the accompanying drawings. Note that the present disclosure is not limited to these embodiments, and when there are multiple embodiments, the present disclosure also includes configurations in which the respective embodiments are combined.

[0012] (Conveying System) FIG. 1 is a schematic diagram of a conveying system according to the present embodiment. The conveying system 1 according to the present embodiment is a system for transporting pallets P within a facility W, and more preferably, a system for loading goods R onto the transported pallets P. The facility W is, for example, a facility managed by logistics, such as a warehouse, but may be any facility to which pallets P are transported. The Japan Pallet Association defines a pallet P as "a surface on which cargo can be placed as a single unit, with a structure that allows for loading, transporting, and storing cargo by hand or by dedicated vehicles such as forklifts. This includes those with superstructures." In this embodiment, the pallet P refers to a container or platform on which goods R are loaded. In other words, the pallet referred to here is not limited to a so-called flat platform, but may also include a cart or the like and may be of any shape. The goods R are loaded onto the pallet P, such as merchandise to be shipped. The type and number of goods R loaded onto the pallet P may be determined appropriately depending on the order, etc. In the following description, unless otherwise specified, pallet P refers to an empty pallet that does not have any items R loaded on it.

[0013] As shown in FIG. 1 , the conveyance system 1 includes at least one mobile body 10, a supply device 20, a stowage device 30, a management device 40, and a mobile body management device 50. The mobile body 10 is a mobile body that moves within an area AR of a facility W and transports a pallet P. The supply device 20 is a device that supplies the pallet P to the mobile body 10. The stowage device 30 is a device that stows items R on the pallet P. The management device 40 is a device that manages the transportation of the pallet P and outputs commands to the mobile body 10, the supply device 20, and the stowage device 30, as will be described in detail later. The mobile body management device 50 is a device that manages the movement of the mobile body 10. When multiple mobile bodies 10 are deployed in the conveyance system 1, the mobile body management device 50 manages the movement of the multiple mobile bodies 10. Note that the conveyance system 1 may include multiple mobile bodies 10, supply devices 20, and / or stowage devices 30.

[0014] Hereinafter, one direction along the region AR will be referred to as the X direction, and a direction along the region AR that intersects with the X direction will be referred to as the Y direction. In this embodiment, the Y direction is a direction perpendicular to the X direction. The X and Y directions may also be said to be directions along a horizontal plane. In this embodiment, unless otherwise specified, "position" refers to a position (coordinate) in a coordinate system on a two-dimensional surface on the region AR (the coordinate system of the region AR).

[0015] (Facility) A waypoint WP is set for each position (coordinate) in the facility W. The route along which the moving body 10 travels is set to connect the waypoints WP. In other words, the route connecting the waypoints WP that the moving body 10 plans to pass through becomes the route of the moving body 10. The waypoints WP are set according to the layout of the facility W. For example, the waypoints WP may be set in a matrix pattern within the area AR.

[0016] The facility W includes an area AR1 (pallet installation location) where pallets P are placed, an area AR2 (supply device installation location) where the supply device 20 is placed, and an area AR3 (stowage device installation location) where the stowage device 30 is placed. A plurality of pallets P are placed in the area AR1. In this embodiment, a plurality of pallets P are placed in a stacked state in the area AR1. Hereinafter, a group of pallets P where a plurality of pallets P are stacked will be appropriately referred to as a pallet group Pa. The number of pallets P included in the pallet group Pa may be any number. The area AR1 is located at a position corresponding to one of the plurality of waypoints WP. A plurality of areas AR1 may be provided, and a pallet group Pa is placed in each area AR1. Note that, although the example of FIG. 1 shows three areas AR1, the number is not limited to three.

[0017] A supply device 20 is located in area AR2. Area AR2 is provided at a position corresponding to one of the plurality of waypoints WP. A stowage device 30 is located in area AR3. Area AR3 is provided at a position corresponding to one of the plurality of waypoints WP. The positions of areas AR1, AR2, and AR3 may be set as appropriate depending on the layout of the facility W, etc.

[0018] (Work within the facility) In this embodiment, the mobile body 10 acquires a pallet group Pa (plurality of pallets P) arranged in area AR1, transports the acquired pallet group Pa to area AR2, and supplies the pallet group Pa to the supply device 20. The mobile body 10 also receives a supply of pallets P held by the supply device 20 from the supply device 20, and transports the supplied pallets P to area AR3. The stowage device 30 stows items R onto the pallets P transported to area AR3. The mobile body 10 transports the pallets P on which items R have been stacked in area AR3 to another area. Note that the mobile body 10 performing each of the above tasks may be the same mobile body 10 or different mobile bodies 10.

[0019] (Pallet Group) In this embodiment, the pallet group Pa is placed on a tray Q. The tray Q may have any shape on which the pallet group Pa is placed, but in this embodiment, as shown in FIG. 1 , the tray Q has a base Q1 and feet Q2. The base Q1 is a platform on which the pallet group Pa is placed. The feet Q2 are members extending from the underside of the base Q1 and hold the base Q1 above the floor surface of the equipment W. The movable body 10 enters the space below the base Q1, holds the underside of the base Q1, and moves to hold and transport the tray Q on which the pallet group Pa is loaded (i.e., multiple pallets P). Note that the structure of the tray Q is not limited to this, and the tray Q may have any structure on which the pallet group Pa can be placed and which can be transported by the movable body 10.

[0020] However, the pallet group Pa is not limited to being placed on the tray Q, and may be placed directly on the floor of the equipment W, for example. In this case, for example, in the area AR1, the pallet group Pa may be loaded onto the movable body 10 by a worker, or the pallet group Pa may be loaded onto the movable body 10 by a device for loading the pallet group Pa onto the movable body 10. Furthermore, for example, if the movable body 10 is an AGF (Automated Guided Forklift), the pallet group Pa placed on the floor of the area AR1 may be picked up by forks provided on the movable body 10.

[0021] (Configuration of Each Device) Next, the configuration of each device included in the transport system 1 will be described.

[0022] (Mobile body) FIG. 2 is a schematic diagram of a mobile body. The mobile body 10 is a device capable of moving automatically. That is, the mobile body 10 is capable of carrying a pallet P and is capable of autonomous movement. In this embodiment, the mobile body 10 is a so-called AGV (Automated Guided Vehicle) and does not have the function of a forklift. That is, the mobile body 10 in this embodiment does not have forks capable of lifting the pallet P, like an AGF. However, this is not limited thereto, and at least one of the mobile bodies 10 deployed in the facility W may be an AGF.

[0023] As shown in Fig. 2, the mobile body 10 has a vehicle body 12, wheels 14, a sensor 16, and a control device 60. A pallet P can be mounted on the vehicle body 12, in other words, the vehicle body 12 is provided with a mounting portion on which the pallet P can be mounted. In the example of Fig. 2, the top surface of the vehicle body 12 serves as the mounting portion on which the pallet P can be mounted. The wheels 14 are wheels attached to the vehicle body 12.

[0024] The sensor 16 detects objects present in the vicinity of the mobile body 10. The position and number of sensors 16 may be arbitrary. The sensor 16 is, for example, a sensor that emits laser light. The sensor 16 emits laser light while scanning in one direction (here, the horizontal direction) and detects objects from the reflected light of the emitted laser light. In other words, the sensor 16 can also be said to be a so-called two-dimensional (2D) LiDAR (Light Detection and Ranging). However, the sensor 16 is not limited to the above and may be a sensor that detects objects by any method, such as a so-called three-dimensional (3D) LiDAR that scans in multiple directions, a so-called one-dimensional (1D) LiDAR that does not scan, or a camera.

[0025] The control device 60 is a device that controls the movement of the moving body 10. The configuration of the control device 60 will be described later.

[0026] (Supply Device) The supply device 20 is a device that holds a pallet P and supplies (loads) the held pallet P to the mobile body 10. The supply device 20 may have any configuration, but as shown in FIG. 1 , in this embodiment, the supply device 20 has a base unit 22, a holding unit 24, and a control device 70. The base unit 22 is a mechanism that stores the pallet P, and a storage space 22a that stores the pallet P is formed therein. The storage space 22a is connected to an external space, allowing the mobile body 10 to enter from the outside. The waypoint WP of the area AR2 in which the supply device 20 is located is preferably set within the storage space 22a. The holding unit 24 is a mechanism that holds the pallet P. The holding unit 24 is provided in the storage space 22a of the base unit 22, and holds the pallet P within the storage space 22a. The holding unit 24 retrieves and holds the pallet P that the mobile body 10 has carried into the storage space 22a. The shape of the holding portion 24 may be any shape, for example, it may be a claw shape that can be inserted into an opening formed in the pallet P. Furthermore, the holding portion 24 is movable up and down (vertically) within the storage space 22a. However, the structure of the supply device 20 is not limited to this, and the supply device 20 may have any structure that can collect and hold the pallet P carried in by the movable body 10. The control device 70 is a device that controls the operation of the supply device 20. The configuration of the control device 70 will be described later.

[0027] (Stacking Device) The stowage device 30 is a device (robot) that stacks items R on a pallet P, and is a so-called palletizer. As shown in FIG. 1 , the stowage device 30 has an arm 32 and a control device 80. The arm 32 is a so-called robot arm. The arm 32 is a mechanism that picks up items R and places the picked-up items R on the pallet P, thereby stacking the items R on the pallet P. It is preferable that a waypoint WP of the area AR3 in which the stowage device 30 is located is set to a position that the arm 32 can reach. However, the structure of the stowage device 30 is not limited to this, and the stowage device 30 may have any structure that is capable of stacking items R on a pallet P. The control device 80 is a device that controls the operation of the stowage device 30. The configuration of the control device 80 will be described later.

[0028] (Management Device) FIG. 3 is a schematic block diagram of the management device. The management device 40 is a system that manages the operation of each device included in the conveyance system 1. In this embodiment, the management device 40 is a WCS (warehouse control system) or a WMS (warehouse management system). However, the management device 40 is not limited to a WCS or a WMS and may be any system, such as a back-end system such as a production management system. The management device 40 may be installed in any location, such as within the facility W, or at a location remote from the facility W to manage the facility W from that location. The management device 40 is a computer and, as shown in FIG. 3, includes a communication unit 42, a storage unit 44, and a control unit 46. The management device 40 may be configured as a standalone device, integrated with other devices, or as a system combining various devices such as a computing device and a data server; there is no particular limitation.

[0029] The communication unit 42 is a module used by the control unit 46 to communicate with each device included in the conveyance system 1, and may include, for example, an antenna. In this embodiment, the communication method used by the communication unit 42 is wireless communication, but any communication method may be used. The storage unit 44 is a memory that stores various information such as the calculation contents and programs of the control unit 46, and includes, for example, at least one of a main storage device such as a RAM (Random Access Memory), a ROM (Read Only Memory), and an external storage device such as an HDD (Hard Disk Drive). The program for the control unit 46 stored in the storage unit 44 may be stored in a recording medium readable by the management device 40.

[0030] The control unit 46 is a computing device and includes a computing circuit such as a CPU (Central Processing Unit). The control unit 46 includes an operation setting unit 46A, an information acquisition unit 46B, and a command output unit 46C. The control unit 46 reads and executes a program (software) from the storage unit 44, thereby realizing the operation setting unit 46A, the information acquisition unit 46B, and the command output unit 46C and executing the processes. The control unit 46 may execute the processes using a single CPU, or may be provided with multiple CPUs and execute the processes using the multiple CPUs. Furthermore, at least a portion of the operation setting unit 46A, the information acquisition unit 46B, and the command output unit 46C may be implemented using hardware circuits.

[0031] The work setting unit 46A sets the work content of each device of the transport system 1. The information acquisition unit 46B acquires information transmitted from each device of the transport system 1. The command output unit 46C outputs commands to each device of the transport system 1. Specific processing content of these will be described later.

[0032] (Mobile object management device) FIG. 4 is a schematic block diagram of a mobile object management device. The mobile object management device 50 is a device that manages the mobile object 10. The mobile object management device 50 is, for example, an FCS (Fleet Control System), but is not limited thereto and may be any device that manages the mobile object 10. The mobile object management device 50 may be installed at any location, and may be installed within the facility W or at a location remote from the facility W. The mobile object management device 50 is a computer, and as shown in FIG. 4, includes a communication unit 52, a storage unit 54, and a control unit 56. The mobile object management device 50 may be configured as a standalone device, may be configured integrally with other devices, or may be configured as a system combining various devices such as a computing device and a data server, and is not particularly limited thereto.

[0033] The communication unit 52 is a module used by the control unit 56 to communicate with external devices such as the management device 40 and the mobile object 10, and may include, for example, an antenna. In this embodiment, the communication method used by the communication unit 52 is wireless communication, but any communication method may be used. The storage unit 54 is a memory that stores various information such as the calculation contents and programs of the control unit 56, and includes, for example, at least one of a RAM, a main storage device such as a ROM, and an external storage device such as an HDD. The program for the control unit 56 saved in the storage unit 54 may be stored in a recording medium readable by the mobile object management device 50.

[0034] The control unit 56 is a calculation device and includes a calculation circuit such as a CPU. The control unit 56 includes an information acquisition unit 56A, a path setting unit 56B, and an information output unit 56C. The control unit 56 reads and executes a program (software) from the storage unit 54, thereby realizing the information acquisition unit 56A, the path setting unit 56B, and the information output unit 56C and executing the processes. The control unit 56 may execute the processes using a single CPU, or may be provided with multiple CPUs and execute the processes using the multiple CPUs. Furthermore, at least a portion of the information acquisition unit 56A, the path setting unit 56B, and the information output unit 56C may be implemented using hardware circuits.

[0035] The information acquisition unit 56A acquires information transmitted from each device included in the conveyance system 1. The route setting unit 56B sets a route for the mobile body 10. The information output unit 56C outputs information to each device included in the conveyance system 1. Specific processing contents of these will be described later.

[0036] In this embodiment, the management device 40 and the mobile object management device 50 are separate devices, but they may be integrated into one device. That is, the management device 40 may have at least some of the functions of the mobile object management device 50, or the mobile object management device 50 may have at least some of the functions of the management device 40.

[0037] (Mobile Body Control Device) Next, the control device 60 of the mobile body 10 will be described. FIG. 5 is a schematic block diagram of the mobile body control device. The control device 60 is a device that controls the mobile body 10. The control device 60 is a computer, and as shown in FIG. 5, includes a communication unit 62, a storage unit 64, and a control unit 66. The communication unit 62 is a module used by the control unit 66 to communicate with external devices such as the mobile body management device 50, and may include, for example, an antenna. In this embodiment, the communication method used by the communication unit 62 is wireless communication, but any communication method may be used. The storage unit 64 is a memory that stores various information such as the calculation contents and programs of the control unit 66, and includes, for example, at least one of a RAM, a main storage device such as a ROM, and an external storage device such as an HDD. The program for the control unit 66 stored in the storage unit 64 may be stored in a recording medium readable by the control device 60.

[0038] The control unit 66 is a computing device and includes a computing circuit such as a CPU. The control unit 66 includes an information acquisition unit 66A, a movement control unit 66B, and an information output unit 66C. The control unit 66 reads and executes a program (software) from the storage unit 64, thereby realizing the information acquisition unit 66A, the movement control unit 66B, and the information output unit 66C and executing the processing. The control unit 66 may execute the processing using a single CPU, or may be equipped with multiple CPUs and execute the processing using the multiple CPUs. Furthermore, at least a portion of the information acquisition unit 66A, the movement control unit 66B, and the information output unit 66C may be implemented using hardware circuits.

[0039] The information acquisition unit 66A acquires information transmitted from each device of the conveyance system 1, the movement control unit 66B controls the movement mechanisms of the moving body 10, such as the drive unit and steering, to control the movement of the moving body 10, and the information output unit 66C outputs information to each device of the conveyance system 1. Specific processing contents of these will be described later.

[0040] (Control Device of Supply Device) Next, the control device 70 of the supply device 20 will be described. FIG. 6 is a schematic block diagram of the control device of the supply device. The control device 70 controls the supply device 20. The control device 70 is a computer, and as shown in FIG. 6, includes a communication unit 72, a storage unit 74, and a control unit 76. The communication unit 72 is a module used by the control unit 76 to communicate with external devices such as the management device 40, and may include, for example, an antenna. In this embodiment, the communication method used by the communication unit 72 is wireless communication, but any communication method may be used. The storage unit 74 is a memory that stores various information such as the calculation contents and programs of the control unit 76, and includes, for example, at least one of a RAM, a main storage device such as a ROM, and an external storage device such as an HDD. The program for the control unit 76 stored in the storage unit 74 may be stored in a recording medium readable by the control device 70.

[0041] The control unit 76 is a computing device and includes a computing circuit such as a CPU. The control unit 76 includes an information acquisition unit 76A, an operation control unit 76B, and an information output unit 76C. The control unit 76 reads and executes a program (software) from the storage unit 74, thereby realizing the information acquisition unit 76A, the operation control unit 76B, and the information output unit 76C and executing the processing. The control unit 76 may execute the processing using a single CPU, or may be provided with multiple CPUs and execute the processing using the multiple CPUs. Furthermore, at least a portion of the information acquisition unit 76A, the operation control unit 76B, and the information output unit 76C may be implemented using hardware circuits.

[0042] The information acquisition unit 76A acquires instructions from the management device 40, the operation control unit 76B controls the operation of the supply device 20, and the information output unit 76C outputs information to the management device 40, etc. Specific details of these processes will be described later.

[0043] In addition, for example, when a plurality of supplying devices 20 are provided, a management device for managing the plurality of supplying devices 20 may be provided similar to the mobile body management device 50 that manages the plurality of mobile bodies 10. In this case, the control device 70 of the supplying device 20 may transmit and receive various information and commands (described later) to and from the management device 40 via the management device of the supplying device 20.

[0044] (Control Device of the Stowage Apparatus) Next, the control device 80 of the stowage apparatus 30 will be described. FIG. 7 is a schematic block diagram of the control device of the stowage apparatus. The control device 80 is a device that controls the stowage apparatus 30. The control device 80 is a computer, and as shown in FIG. 7, includes a communication unit 82, a memory unit 84, and a control unit 86. The communication unit 82 is a module used by the control unit 86 to communicate with external devices such as the management device 40, and may include, for example, an antenna. In this embodiment, the communication method used by the communication unit 82 is wireless communication, but any communication method may be used. The memory unit 84 is a memory that stores various information such as the calculation contents and programs of the control unit 86, and includes, for example, at least one of a RAM, a main memory device such as a ROM, and an external memory device such as an HDD.

[0045] The control unit 86 is a computing device and includes a computing circuit such as a CPU. The control unit 86 includes an information acquisition unit 86A, an operation control unit 86B, and an information output unit 86C. The control unit 86 reads and executes a program (software) from the storage unit 84, thereby realizing the information acquisition unit 86A, the operation control unit 86B, and the information output unit 86C and executing the processes. The control unit 86 may execute the processes using a single CPU, or may be equipped with multiple CPUs and execute the processes using the multiple CPUs. Furthermore, at least a portion of the information acquisition unit 86A, the operation control unit 86B, and the information output unit 86C may be implemented using hardware circuits. Furthermore, the program for the control unit 86 stored in the storage unit 84 may be stored in a recording medium readable by the control device 80.

[0046] The information acquisition unit 86A acquires commands from the management device 40, the operation control unit 86B controls the operation of the stowage device 30, and the information output unit 86C outputs information to the management device 40, etc. Specific details of these processes will be described later.

[0047] In addition, for example, when a plurality of stowage devices 30 are provided, a management device for managing the plurality of stowage devices 30 may be provided, similar to the mobile body management device 50 that manages the plurality of mobile bodies 10. In this case, the control device 80 of the stowage device 30 may transmit and receive various information and commands (described later) to and from the management device 40 via the management device of the stowage device 30.

[0048] (Processing of the Transfer System) The processing content of the transfer system 1 described above will be explained below.

[0049] (Work Setting) The work setting unit 46A of the management device 40 sets the work contents of the mobile body 10, the supply device 20, and the stowage device 30, and the order in which each work content will be performed. The work setting unit 46A sets the origin position and destination position of the mobile body 10 as the work content of the mobile body 10. For example, the work setting unit 46A may set a waypoint WP as the origin of the mobile body 10 and a waypoint WP as the destination of the mobile body 10. The work setting unit 46A also sets the collection of pallets P by the supply device 20 and the supply of pallets P by the supply device 20 as the work content of the supply device 20. The work setting unit 46A also sets the stowage of items R onto pallets P by the stowage device 30 as the work content of the stowage device 30. The work setting unit 46A also sets the order in which each of these work contents will be performed. The work contents and the order in which they will be performed may be set as appropriate, for example, depending on the content of the order.

[0050] The management device 40 manages the operations of the mobile body 10, the supply device 20, and the stowage device 30 based on the work content and execution order set by the work setting unit 46A. The management device 40 causes the mobile body 10, the supply device 20, and the stowage device 30 to perform work according to the set work content and execution order while sending and receiving various commands (commands from the management device 40 to the devices to be managed) and various information (work progress information from the managed devices to the management device 40), which will be described later.

[0051] (Work Execution) The work performed by the mobile body 10 and the supply device 20 when replenishing the supply device 20 with pallets P will be described. When replenishing the supply device 20 with pallets P, the mobile body 10 moves to an area AR1 (waypoint WP corresponding to area AR1) where the pallet group Pa is located, and upon arriving at area AR1, acquires the pallet group Pa (tray Q on which the pallet group Pa is loaded in this embodiment) located in area AR1. After acquiring the pallet group Pa, the mobile body 10 moves from area AR1 to an area AR2 (waypoint WP corresponding to area AR2) where the supply device 20 is located, thereby transporting the pallet group Pa from area AR1 to area AR2 and supplying the pallet group Pa to the supply device 20. The supply device 20 retrieves the pallet group Pa held by the mobile body 10 that has arrived at area AR2 using the holding unit 24 and holds the pallet group Pa. In this way, the pallets P are supplied (refilled) to the supply device 20.

[0052] The work of the mobile body 10 and the supply device 20 when loading a pallet P onto the mobile body 10 will be described. When loading a pallet P onto the mobile body 10, the mobile body 10 moves to the area AR2 where the supply device 20 is located. The supply device 20 loads (supplies) the pallet P it holds onto the mobile body 10 located in the area AR2. It is preferable that the supply device 20 load one pallet P onto one mobile body 10. Note that in this embodiment, when the supply device 20 holds multiple pallets P, the supply device 20 loads some of the multiple pallets P it holds (preferably one pallet P) onto the mobile body 10. On the other hand, when the supply device 20 holds one pallet P, the supply device 20 loads the one pallet P it holds onto the mobile body 10.

[0053] The work of the mobile body 10 and the stowage device 30 when transporting a pallet P to the stowage device 30 will be described. When transporting a pallet P to the stowage device 30, the mobile body 10, to which the pallet P has been supplied from the supply device 20, moves from the area AR2 where the supply device 20 is located to the area AR3 where the stowage device 30 is located (waypoint WP corresponding to area AR3), thereby transporting the pallet P from area AR2 to area AR3. The stowage device 30 stows items R onto the pallet P transported to area AR3. Once the stowage of items R has been completed, the pallet P is transported to another location by the mobile body 10.

[0054] As described above, the mobile body 10 that transports the pallet P to the supply device 20, the mobile body 10 to which the pallet P is supplied from the supply device 20 (the mobile body 10 that transports the pallet P to the stowage device 30), and the mobile body 10 that transports the pallet P to another location after the stowage of the items R has been completed may be the same mobile body 10 or different mobile bodies 10. The mobile body 10 that is the target of work is set depending on the work content.

[0055] Furthermore, the route along which the mobile object 10 travels may be set arbitrarily. For example, in this embodiment, the route setting unit 56B of the mobile object management device 50 may set the route from the origin to the destination as the route along which the mobile object 10 travels, based on the information about the origin and destination indicated in the work content. Then, the information acquisition unit 66A of the mobile object 10 may acquire the route from the origin to the destination from the mobile object management device 50, and the movement control unit 66B of the mobile object 10 may move the mobile object 10 to the destination according to the acquired route. Note that the route from the origin to the destination may be a route that passes through each waypoint WP from the origin waypoint WP to the destination waypoint WP. Furthermore, the route from the origin to the destination may be a route that the mobile object 10 can follow, which is set based on the route from the origin to the destination that passes through each waypoint WP.

[0056] Furthermore, the movement control unit 66B of the moving body 10 sequentially grasps the position and attitude (position information) of the moving body 10, and moves the moving body 10 so as to follow the set route. The method of acquiring the position information of the moving body 10 is arbitrary. For example, in this embodiment, an identifier indicating the position information is provided at a position corresponding to the waypoint WP on the floor of the facility W, and the movement control unit 66B detects the identifier using a sensor 16 or the like and acquires the position information of the moving body 10 based on the detection result of the identifier. However, the method of acquiring the position information of the moving body 10 is not limited to using the identifier provided on the floor, and for example, SLAM (Simultaneous Localization and Mapping) may be used. For example, the moving body 10 may detect the position information of the moving body 10 by irradiating a laser beam onto a detection object provided on the facility W and detecting the reflected wave.

[0057] (Series of Operations) A more detailed description will be given below of a series of operations performed by the mobile body 10, the supply device 20, and the stowage device 30. Figures 8 to 12 are schematic diagrams illustrating a series of operations performed by the mobile body, the supply device, and the stowage device.

[0058] (Operation when the number of remaining pallets is less than a predetermined number) Here, the number of pallets P held by the supply device 20 (the number of pallets P held in the storage space 22a) is defined as the number of remaining pallets. When the number of remaining pallets is less than the predetermined number, the movable body 10 transports a group of pallets Pa to the supply device 20 and replenishes the supply device 20 with the group of pallets Pa. In other words, when the number of remaining pallets is less than the predetermined number, the supply device 20 replenishes the group of pallets Pa before the supply device 20 loads the pallets P onto the movable body 10. Note that the predetermined number here may be set arbitrarily, but in this example may be one.

[0059] (Acquisition of the Number of Remaining Pallets) In this embodiment, the information acquisition unit 46B of the management device 40 acquires information on the number of remaining pallets. The management device 40 may acquire information on the number of remaining pallets sequentially. Any method for the management device 40 to acquire the information on the number of remaining pallets may be used. For example, the supply device 20 may use a sensor provided on the supply device 20 to detect the number of pallets P held by the supply device 20 as the number of remaining pallets, and the information output unit 76C may transmit the detected number of remaining pallets to the management device 40. In another example, the management device 40 may calculate the number of remaining pallets based on the work content that has been performed so far. In other words, the number of pallets P replenished to the supply device 20 and the number of pallets P loaded (transported) from the supply device 20 onto the mobile body 10 can be calculated from the work content that has been performed so far, and the management device 40 can calculate the number of remaining pallets from these work content.

[0060] (Transporting Pallets to Supply Device) When the number of remaining pallets is less than a predetermined number (in this example, when the number of remaining pallets is 0), the command output unit 46C of the management device 40 outputs a pallet transport command C1. The pallet transport command C1 is a command to transport the group of pallets Pa to the supply device 20 by the mobile body 10. In this embodiment, the command output unit 46C outputs the pallet transport command C1 to the target mobile body 10 via the mobile body management device 50. The target mobile body 10 may be set in advance in the work content. The management device 40 outputs the pallet transport command C1 to the mobile body management device 50, and the information acquisition unit 56A of the mobile body management device 50 acquires the pallet transport command C1 from the management device 40. The information output unit 56C of the mobile body management device 50 then outputs the pallet transport command C1 to the mobile body 10. However, the management device 40 is not limited to outputting a pallet transport command to the mobile body 10 via the mobile body management device 50, and may output the pallet transport command C1 directly to the mobile body 10. In the following, it will be described that the management device 40 outputs various commands to the mobile body 10 via the mobile body management device 50, but similarly, the management device 40 may output various commands directly to the mobile body 10.

[0061] (Output of Pallet Loading Command) More specifically, the command output unit 46C of the management device 40 outputs a pallet loading command C0 when the number of remaining pallets is less than a predetermined number. The pallet loading command C0 is a command to move the mobile object 10 to the area AR1 where the pallet group Pa is located. FIG. 8 shows an example when the pallet loading command C0 is output. The command output unit 46C outputs the pallet loading command C0 to the target mobile object 10 via the mobile object management device 50. As shown in FIG. 8, the mobile object 10 that has received the pallet loading command C0 moves toward the area AR1. Specifically, the mobile object 10 that has received the pallet loading command C0 moves along a set route from the source waypoint WP0 indicated in the work content to the waypoint WP1 corresponding to the destination (area AR1) indicated in the work content.

[0062] (Output of Loading Completion Information) As shown in FIG. 8 , when the mobile body 10 arrives at waypoint WP1 corresponding to area AR1, it acquires (loads) the pallet group Pa (tray Q on which pallet group Pa is loaded in this example) installed in area AR1. When the mobile body 10 arrives at waypoint WP1 and loads the pallet group Pa, the information output unit 66C outputs loading completion information C1A. The loading completion information C1A may be information indicating that the mobile body 10 has arrived at area AR1, or information indicating that loading of the pallet group Pa onto the mobile body 10 has been completed. The trigger for generating and outputting the loading completion information C1A may be any trigger. For example, the trigger may be recognition, based on the position information of the mobile body 10, that the mobile body 10 has arrived at waypoint WP1. Alternatively, the trigger may be recognition that the mobile body 10 has arrived at waypoint WP1 and that loading of the pallet group Pa has been completed.

[0063] The information output unit 66C of the mobile object 10 outputs the loading completion information C1A to the management device 40 via the mobile object management device 50. That is, the mobile object 10 outputs the loading completion information C1A to the mobile object management device 50, and the information acquisition unit 56A of the mobile object management device 50 acquires the loading completion information C1A from the mobile object 10. Then, the information output unit 56C of the mobile object management device 50 outputs the loading completion information C1A to the management device 40. However, the mobile object 10 is not limited to outputting the loading completion information C1A to the management device 40 via the mobile object management device 50, and may output the loading completion information C1A directly to the management device 40. In the following, the mobile object 10 will be described as outputting various pieces of information to the management device 40 via the mobile object management device 50, but similarly, the mobile object 10 may output various pieces of information directly to the management device 40.

[0064] (Output of Pallet Transport Command) FIG. 9 shows an example in which a pallet transport command C1 is output. Upon receiving the loading completion information C1A, the command output unit 46C of the management device 40 outputs the pallet transport command C1 to the mobile body 10 carrying the pallet group Pa (the mobile body 10 that transmitted the loading completion information C1A) via the mobile body management device 50. As shown in FIG. 9 , the mobile body 10 that received the pallet transport command C1 moves from area AR1 toward area AR2. Specifically, the mobile body 10 that received the pallet transport command C1 moves along a set route from waypoint WP1, which corresponds to the source of movement (area AR1) specified in the work content, to waypoint WP2, which corresponds to the destination of movement (area AR2) specified in the work content. As a result, the pallet group Pa is transported by the mobile body 10 to area AR2 (waypoint WP2). In this embodiment, the mobile object 10 arrives at the area AR2 and waits in the area AR2 (waypoint WP2) with the pallet group Pa still loaded thereon.

[0065] (Output of Transfer Completion Information) As shown in Figure 9, when the mobile body 10 arrives at waypoint WP2 corresponding to area AR2, the information output unit 66C of the mobile body 10 outputs transfer completion information C2A indicating that the transfer of pallet group Pa to the supply device 20 has been completed. The information output unit 66C of the mobile body 10 outputs the transfer completion information C2A to the management device 40 via the mobile body management device 50. The trigger for generating and outputting the transfer completion information C2A may be arbitrary. For example, the trigger may be recognition, from the position information of the mobile body 10, that the mobile body 10 has arrived at waypoint WP2.

[0066] (Output of Pallet Recovery Command) FIG. 10 shows an example where a pallet recovery command C2 has been output. Upon receiving transport completion information C2A, the command output unit 46C of the management device 40 outputs a pallet recovery command C2 to the control device 70 of the supply device 20. The pallet recovery command C2 is a command to have the supply device 20 recover the pallet group Pa. Upon receiving the pallet recovery command C2 via the information acquisition unit 76A, the control device 70 of the supply device 20 controls the holding unit 24 via the operation control unit 76B, as shown in FIG. 10, to have the holding unit 24 recover the pallet group Pa that has been transported to area AR2. Specifically, the operation control unit 76B moves the holding unit 24 downward, causing the holding unit 24 to hold the pallet group Pa located in area AR2. The operation control unit 76B then moves the holding unit 24, which is holding the pallet group Pa, upward to recover the pallet group Pa.

[0067] It is preferable that the supply device 20 leave some of the pallets P of the group of pallets Pa transported to area AR2 in area AR2 (in this example, the mobile body 10 waiting in area AR2) and collect only the other pallets P. Specifically, it is preferable that the supply device 20 leave one pallet P of the group of pallets Pa transported to area AR2 in area AR2 and collect the other pallets P. That is, in the example of FIG. 10 , four pallets P have been transported, so the supply device 20 leaves the one pallet P stacked on the bottom level on the mobile body 10 and collects the three pallets P stacked above it. As a result, the mobile body 10 waiting in area AR2 is loaded with a pallet P (in this example, one pallet P).

[0068] (Output of loading completion information) When the pallet P has been loaded onto the mobile body 10 waiting in area AR2, the information output unit 66C of the mobile body 10 outputs loading completion information C3A indicating that the pallet P has been loaded onto the mobile body 10. The information output unit 66C of the mobile body 10 outputs the loading completion information C3A to the management device 40 via the mobile body management device 50. However, the entity that outputs the loading completion information C3A is not limited to the mobile body 10, and the loading completion information C3A may also be output to the management device 40 by the control device 70 of the supply device 20.

[0069] (Output of Pallet Transport Command) FIG. 11 shows an example in which a pallet transport command C3 is output. Upon receiving the loading completion information C3A, the command output unit 46C of the management device 40 outputs a pallet transport command C3 to the mobile body 10 that has loaded the pallet P in area AR2 (to the mobile body 10 that transmitted the loading completion information C3A) via the mobile body management device 50. The pallet transport command C3 is a command to transport the pallet P to the stowage device 30 by the mobile body 10. As shown in FIG. 11 , the mobile body 10 that received the pallet transport command C3 moves from area AR2 toward area AR3. Specifically, the mobile body 10 that received the pallet transport command C3 moves along a set route from waypoint WP2, which is the source of the movement indicated in the work content, to waypoint WP3, which corresponds to the destination (area AR3) indicated in the work content. As a result, the pallet P is transported by the mobile body 10 to area AR3 (waypoint WP3). In the example of this embodiment, the mobile object 10 that has arrived in the area AR3 waits in the area AR3 (waypoint WP3) with the pallet P still loaded thereon.

[0070] 11 , when the mobile body 10 arrives at waypoint WP3 corresponding to area AR3, the information output unit 66C of the mobile body 10 outputs transport completion information C4A indicating that the transport of the pallet P to the stowage device 30 has been completed. The information output unit 66C of the mobile body 10 outputs the transport completion information C4A to the management device 40 via the mobile body management device 50. The trigger for generating and outputting the transport completion information C4A may be arbitrary. For example, the trigger may be recognition, from the position information of the mobile body 10, that the mobile body 10 has arrived at waypoint WP3.

[0071] (Output of stowage command) Figure 12 shows an example when a stowage command C4 is output. When the command output unit 46C of the management device 40 acquires the transport completion information C4A, it outputs a stowage command C4 to the control device 80 of the stowage device 30. The stowage command C4 is a command to have the stowage device 30 stow items R onto a pallet P. When the stowage device 30 acquires the stowage command C4 from the management device 40 using the information acquisition unit 86A, as shown in Figure 12, the operation control unit 86B controls the arm 32, and the arm 32 loads the items R onto the pallet P located in area AR3 (waypoint WP3). The stowage device 30 loads the items R onto the pallet P based on the work content.

[0072] (Output of stowage completion information) When stowage of the items R onto the pallet P located in area AR3 is completed, the information output unit 86C of the stowage device 30 outputs stowage completion information C5A indicating that stowage of the items R onto the pallet P is completed. The information output unit 86C of the stowage device 30 outputs the stowage completion information C5A to the management device 40.

[0073] (Output of Pallet Transport Command) FIG. 12 shows an example in which a pallet transport command C5 is output. Upon receiving stowage completion information C5A, the command output unit 46C of the management device 40 outputs a pallet transport command C5 to the mobile body 10, which is waiting in area AR3 with the pallet P loaded thereon, via the mobile body management device 50. The pallet transport command C5 is a command to transport the pallet P, on which the stowage of items R has been completed, by the mobile body 10. As shown in FIG. 12, the mobile body 10 that has received the pallet transport command C5 moves from area AR3. As a result, the pallet P, on which the stowage of items R has been completed, is transported from area AR3 (waypoint WP3) by the mobile body 10. Note that the destination of the pallet P, on which the stowage of items R has been completed (the destination of the mobile body 10) may be set as appropriate. The pallet P transported to the destination by the mobile body 10 may be transported, for example, by an AGF to a storage location such as a storage shelf.

[0074] (Processing Flow) The processing flow of the management device 40 when the number of remaining pallets is less than the predetermined number, as described above, will be described with reference to a flowchart. FIG. 13 is a flowchart illustrating the processing flow of the management device when the number of remaining pallets is less than the predetermined number. As shown in FIG. 13, when the number of remaining pallets is less than the predetermined number (step S10), the management device 40 outputs a pallet loading command C0 to the mobile body 10 to move the mobile body 10 to the area AR1 where the pallet group Pa is placed (step S12). Upon receiving the pallet loading command C0, the mobile body 10 moves to the area AR1, and once loading of the pallet group Pa in the area AR1 is completed, outputs loading completion information C1A to the management device 40. Upon receiving the loading completion information C1A (step S14; Yes), the management device 40 outputs a pallet transport command C1 to the mobile body 10 to transport the pallet group Pa to the area AR2 where the supply device 20 is placed (step S16). Upon receiving the pallet transport command C1, the mobile body 10 moves to area AR2, and upon completion of its movement to area AR2, outputs transport completion information C2A to the management device 40. Upon receiving the transport completion information C2A (step S18; Yes), the management device 40 outputs a pallet recovery command C2 to the supply device 20 to recover the transported pallet group Pa (step S20). Upon receiving the pallet recovery command C2, the supply device 20 leaves one pallet P on the mobile body 10 and recovers the other pallets P, and outputs loading completion information C3A indicating that the pallets P have been loaded onto the mobile body 10. Upon receiving the loading completion information C3A (step S22; Yes), the management device 40 outputs a pallet transport command C3 to the mobile body 10 to transport the pallets P to area AR3 where the stowage device 30 is located (step S24). The mobile body 10 that has acquired the pallet transport command C3 moves to area AR3, and when movement to area AR3 is complete, outputs transport completion information C4A to the management device 40. Upon acquiring the transport completion information C4A (step S26; Yes), the management device 40 outputs a stowage command C4 to the stowage device 30 to stow items R onto the transported pallet P (step S28). Upon acquiring the stowage command C4, the stowage device 30 stows items R onto the transported pallet P, and when stowage is complete, outputs stowage completion information C5A to the management device 40.When the management device 40 acquires the stowage completion information C5A (step S30; Yes), it outputs a pallet transport command C35 to the mobile body 10 to transport the pallet P on which the stowage of the items R has been completed (step S32). The mobile body 10 that has acquired the pallet transport command C5 transports the pallet P on which the stowage of the items R has been completed from the area AR3.

[0075] (Another Example) The above is the workflow when the number of remaining pallets is less than the predetermined number. However, the workflow when the number of remaining pallets is less than the predetermined number is not limited to the above description. For example, as shown in FIG. 9 , the mobile body 10 transports the pallet group Pa to area AR2 and waits in area AR2 with the pallet group Pa still loaded, but this is not limited thereto. The mobile body 10 transports the pallet group Pa to area AR2, unloads the pallet group Pa into area AR2, and moves to another location without the pallet group Pa loaded. Also, for example, as shown in FIG. 10 , the supply device 20 leaves some pallets P in the pallet group Pa transported to area AR2 and retrieves only the other pallets P. However, this is not limited thereto, and the supply device 20 may retrieve all of the pallet group Pa transported to area AR2. In such a case, the number of remaining pallets is equal to or greater than the predetermined number, and therefore the workflow is performed in the same manner as when the number of remaining pallets is equal to or greater than the predetermined number, as described below.

[0076] 11 and 12, the mobile body 10 that transported the pallet P to the area AR3 waits in the area AR3 with the pallet P loaded thereon until the stowing of the items R is complete, but this is not limited thereto. The mobile body 10 that transported the pallet P to the area AR3 may unload the pallet P into the area AR3 and move to another location without the pallet P loaded thereon. In this case, upon acquiring the stowing completion information C5A, the command output unit 46C of the management device 40 outputs a pallet transport command C5 to the target mobile body 10 via the mobile body management device 50. The mobile body 10 that acquired the pallet transport command C5 moves to the area AR3, acquires the pallet P loaded with the items R, and transports the pallet P with the stowing of the items R completed from the area AR3.

[0077] (Operations Performed When the Number of Remaining Pallets is More Than a Predetermined Number) Next, operations performed when the number of remaining pallets is more than a predetermined number will be described. FIGS. 14 to 16 are schematic diagrams illustrating a series of operations performed by the mobile body, the supply device, and the stowage device. When the number of remaining pallets is more than a predetermined number (in this example, when the number of remaining pallets is one or more), the supply device 20 supplies (loads) pallets P to the mobile body 10. In other words, when the number of remaining pallets is more than a predetermined number, the supply device 20 supplies pallets P to the mobile body 10 before replenishing the supply device 20 with pallet groups Pa. When the number of remaining pallets is more than a predetermined number, the command output unit 46C of the management device 40 outputs a pallet loading command D1. The pallet loading command D1 is a command to have the supply device 20 load pallets P onto the mobile body 10. The command output unit 46C outputs the pallet loading command D1 to the control device 70 of the supply device 20.

[0078] (Output of Movement Command) More specifically, when the number of remaining pallets is equal to or greater than a predetermined number, the command output unit 46C of the management device 40 outputs a movement command D0 to the target mobile object 10 via the mobile object management device 50. The movement command D0 is a command to move the mobile object 10 to the area AR2 where the supply device 20 is installed. The command output unit 46C outputs the movement command D0 to the target mobile object 10 via the mobile object management device 50. FIG. 14 shows an example in which the movement command D0 is output. As shown in FIG. 14, the mobile object 10 that has acquired the movement command D0 moves toward the area AR2. Specifically, in this embodiment, the mobile object 10 that has acquired the movement command D0 moves, with the tray Q loaded, along a set route to the waypoint WP2 corresponding to the destination (area AR2) indicated in the work content.

[0079] If the target mobile body 10 does not have tray Q loaded, the management device 40 outputs a command to load a tray onto the mobile body 10. Upon receiving this command, the mobile body 10 moves to the tray installation location where tray Q is installed, loads tray Q, and outputs information indicating that tray Q has been loaded to the management device 40. Upon receiving the information indicating that tray Q has been loaded, the management device 40 outputs a movement command D0 to the mobile body 10, causing the mobile body 10 to move to area AR2. However, if a pallet P is transported without using a tray Q, these processes are not necessary.

[0080] 14 , when the moving body 10 arrives at waypoint WP2 corresponding to area AR2, the information output unit 66C of the moving body 10 outputs movement completion information D1A indicating that movement to area AR2 has been completed to the management device 40 via the moving body management device 50. The trigger for generating and outputting the movement completion information D1A may be arbitrary. For example, the trigger may be recognition, based on the position information of the moving body 10, that the moving body 10 has arrived at waypoint WP2.

[0081] (Output of Pallet Loading Command) FIG. 15 shows an example when a pallet loading command is output. Upon receiving movement completion information D1A, the command output unit 46C of the management device 40 outputs a pallet loading command D1 to the control device 70 of the supply device 20. Upon receiving the pallet loading command D1 via the information acquisition unit 76A, the control device 70 of the supply device 20 controls the holding unit 24 via the operation control unit 76B, as shown in FIG. 15, to load the pallet P onto the mobile body 10 located in area AR2 (waypoint WP2). Specifically, the operation control unit 76B moves the holding unit 24, which is holding the pallet P, downward to place the held pallet P on the top surface of the mobile body 10. The operation control unit 76B then releases the holding unit 24 from its hold on the pallet P placed on the top surface of the mobile body 10 and moves the holding unit 24 upward. This loads the pallet P onto the mobile body 10.

[0082] It is preferable that the supply device 20 loads one pallet P onto the moving body 10. Therefore, when the supply device 20 holds multiple pallets P, the supply device 20 loads one of the multiple pallets P it holds onto the moving body 10. On the other hand, when the supply device 20 holds one pallet P, the supply device 20 loads the one pallet P it holds onto the moving body 10.

[0083] (Output of Loading Completion Information) When the pallet P is loaded onto the mobile body 10 located in area AR2, the information output unit 66C of the mobile body 10 outputs loading completion information C3A indicating that the pallet P has been loaded onto the mobile body 10. The information output unit 66C of the mobile body 10 outputs the loading completion information C3A to the management device 40 via the mobile body management device 50. However, the entity that outputs the loading completion information C3A is not limited to the mobile body 10, and the loading completion information C3A may also be output to the management device 40 by the control device 70 of the supply device 20.

[0084] The processing after outputting the loading completion information C3A is the same as the processing after outputting the loading completion information C3A when the number of remaining pallets is less than a predetermined number, and therefore a detailed description thereof will be omitted. That is, when the management device 40 acquires the loading completion information C3A, it outputs a pallet transport command C3 to the mobile object 10 that has loaded the pallet P in area AR2. The mobile object 10 that has acquired the pallet transport command C3 moves to area AR3 where the stowage device 30 is located, as shown in Figure 16. Thereafter, the same processing as that described using Figures 11 and 12 is carried out.

[0085] (Processing Flow) The processing flow of the management device 40 when the number of remaining pallets is equal to or greater than the predetermined number, as described above, will be described with reference to a flowchart. FIG. 17 is a flowchart illustrating the processing flow of the management device when the number of remaining pallets is equal to or greater than the predetermined number. As shown in FIG. 17, when the number of remaining pallets is equal to or greater than the predetermined number (step S40), the management device 40 outputs a movement command D0 to the mobile body 10 to move to the area AR2 where the supply device 20 is located (step S42). After acquiring the movement command D0, the mobile body 10 moves to the area AR2, and once movement to the area AR2 is complete, outputs movement completion information D1A to the management device 40. After acquiring the movement completion information D1A (step S44; Yes), the management device 40 outputs a pallet loading command D1 to the supply device 20 to load a pallet P onto the mobile body 10 (step S46). After acquiring the pallet loading command D1, the supply device 20 loads one pallet P onto the mobile body 10 and outputs loading completion information C3A indicating that the pallet P has been loaded onto the mobile body 10. The processing from step S48 to step S58 is the same as the processing from step S22 to step S32 described with reference to FIG. 13, and therefore a description thereof will be omitted.

[0086] (Effects) As described above, the conveyance system 1 according to the first aspect of the present disclosure includes at least one automatically movable mobile body 10 and a supply device 20. The mobile body 10 conveys multiple pallets P (pallet group Pa) without items R loaded thereon toward the supply device 20 and supplies the multiple pallets P to the supply device 20. The supply device 20 loads the supplied pallets P onto the mobile body 10. The mobile body 10 loaded with the pallets P transports the pallets P toward the stowage device 30, which loads items R onto the pallets P. The conveyance system 1 according to the present disclosure uses the mobile body 10, which is autonomously movable within the facility W, to transport the pallets P to the supply device 20 and from the supply device 20 to the stowage device 30. Therefore, regardless of where the supply device 20 or the stowage device 30 is located, the pallets P can be appropriately transported by adjusting the destination of the mobile body 10. Furthermore, even if the positions of the supply device 20 and the stowage device 30 are changed, the pallet P can be appropriately transported by adjusting the destination of the movable body 10. Therefore, according to the present disclosure, the pallet P can be flexibly transported in accordance with the facility layout, and therefore stowage work can be flexibly performed in accordance with the facility layout.

[0087] A conveying system 1 according to a second aspect of the present disclosure is the conveying system 1 according to the first aspect, wherein, when the number of remaining pallets, which is the number of pallets P held by the supply device 20, is less than a predetermined number, the movable body 10 conveys the pallets P to the supply device 20 before the supply device 20 loads the pallets P onto the movable body 10. Furthermore, when the number of remaining pallets is equal to or greater than the predetermined number, the supply device 20 loads the pallets P onto the movable body 10 before the movable body 10 transports the pallets P to the supply device 20. In this way, by setting the work according to the number of remaining pallets, it is possible to prevent a shortage of the number of pallets P held by the supply device 20 and delays in the work of transporting the pallets P to the stowage device 30.

[0088] A conveying system 1 according to a third aspect of the present disclosure is the conveying system 1 according to the first or second aspect, further including a management device 40 that manages the conveyance of pallets P, and the management device 40 includes an information acquisition unit 46B that acquires information on the number of remaining pallets and a command output unit 46C that outputs a command. If the number of remaining pallets is less than a predetermined number, the command output unit 46C outputs a command (pallet conveyance command C1) to have the mobile body 10 convey the pallet P to the supply device 20, and if the number of remaining pallets is equal to or greater than the predetermined number, it outputs a command (pallet loading command D1) to have the supply device 20 load the pallet P onto the mobile body 10. In this way, by setting the work according to the number of remaining pallets, it is possible to prevent a shortage of pallets P held by the supply device 20 and delays in the transport of the pallets P to the stowage device 30.

[0089] A conveying system 1 according to a fourth aspect of the present disclosure is the conveying system 1 according to the third aspect, wherein, when the number of remaining pallets is less than a predetermined number, the command output unit 46C outputs a command (pallet loading command C0) to move the mobile body 10 to a pallet installation location (area AR1) where multiple pallets P are installed. When the information acquisition unit 46B acquires information (loading completion information C1A) that the mobile body 10 has arrived at the pallet installation location, the command output unit 46C outputs a command (pallet transport command C1) to transport the pallet P to the supply device 20 by the mobile body 10. According to the present disclosure, the management device 40 can issue a command to start the next task when it acquires information that a task has been completed, thereby enabling the pallet P to be transported appropriately.

[0090] A conveying system 1 according to a fifth aspect of the present disclosure is the conveying system 1 according to the third or fourth aspect, wherein the command output unit 46C outputs a command (movement command D0) to move the mobile body 10 toward the supply device 20 when the number of remaining pallets is equal to or greater than a predetermined number. When the information acquisition unit 46B acquires information (movement completion information D1A) that the mobile body 10 has arrived at the installation location (area AR2) of the supply device 20, the command output unit 46C outputs a command (pallet loading command D1) to load a pallet P onto the mobile body 10 by the supply device 20. According to the present disclosure, the management device 40 can issue a command to start the next task when it acquires information that a task has been completed, thereby enabling the conveyance of the pallet P to be carried out appropriately.

[0091] A conveying system 1 according to a sixth aspect of the present disclosure is the conveying system 1 according to any of the third to fifth aspects, wherein when information (loading completion information C3A) that a pallet P has been loaded onto the mobile body 10 is acquired by the information acquisition unit 46B, the command output unit 46C outputs a command (pallet conveyance command C3) to move the mobile body 10 on which the pallet P is loaded toward the stowage device 30. According to the present disclosure, the management device 40 can issue a command to start the next task when it acquires information that a task has been completed, thereby enabling the pallet P to be conveyed appropriately.

[0092] A conveying system 1 according to a seventh aspect of the present disclosure is the conveying system 1 according to any one of the first to sixth aspects, in which the movable body 10 conveys the pallet P while loading the pallet P on the tray Q. According to the present disclosure, the movable body 10 can appropriately convey the pallet P.

[0093] A conveying method according to an eighth aspect of the present disclosure conveys pallets P using at least one automatically movable mobile body 10 and a supply device 20. The method includes the steps of conveying a plurality of pallets P (pallet group Pa) not loaded with items R toward the supply device 20 by the mobile body 10 and supplying the plurality of pallets P to the supply device 20, loading the supplied pallets P onto the mobile body 10 by the supply device 20, and conveying the pallets P by the mobile body 10 loaded with the pallets P toward a stowage device 30 that loads the items R onto the pallets P. According to the present disclosure, the conveyance of the pallets P can be flexibly performed according to the facility layout, thereby enabling flexible stowage work to be performed according to the facility layout.

[0094] A program according to a ninth aspect of the present disclosure causes a computer to execute a conveying method for conveying pallets P using at least one automatically movable mobile body 10 and a supply device 20. The program causes the computer to execute the following steps: conveying, by the mobile body 10, multiple pallets P (pallet group Pa) not loaded with items R toward the supply device 20 and supplying the multiple pallets P to the supply device 20; loading the supplied pallets P onto the mobile body 10 by the supply device 20; and conveying, by the mobile body 10 loaded with the pallets P, the pallets P toward a stowage device 30 that loads the items R onto the pallets P. According to the present disclosure, it is possible to flexibly convey the pallets P according to the facility layout, thereby enabling flexible stowage work to be performed according to the facility layout.

[0095] Although the embodiments of the present disclosure have been described above, the embodiments are not limited to the contents of these embodiments. Furthermore, the above-described components include those that can be easily imagined by a person skilled in the art, those that are substantially the same, and those that are within the so-called equivalent range. Furthermore, the above-described components can be combined as appropriate. Furthermore, various omissions, substitutions, or modifications of the components can be made without departing from the spirit of the above-described embodiments.

[0096] REFERENCE SIGNS LIST 1 Conveying system 10 Mobile body 20 Supply device 30 Stowage device 40 Management device 50 Mobile body management device 60, 70, 80 Control device AR1, AR2, AR3 Area P Pallet Pa Pallet group

Claims

1. A conveying system having at least one automatically movable movable body and a supplying device, wherein the movable body conveys a plurality of pallets not loaded with articles toward the supplying device and supplies the plurality of pallets to the supplying device, the supplying device loads the supplied pallets onto the movable body, and the movable body loaded with the pallets conveys the pallets toward a loading device which loads articles onto the pallets.

2. A conveying system as described in claim 1, wherein, when the number of remaining pallets held by the supply device is less than a predetermined number, the movable body transports the pallet to the supply device before the supply device loads the pallet onto the movable body, and, when the number of remaining pallets is equal to or greater than the predetermined number, the supply device loads the pallet onto the movable body before the movable body transports the pallet to the supply device.

3. A conveying system as described in claim 1 or claim 2, further comprising a management device which manages the transportation of the pallets, the management device including an information acquisition unit which acquires information on the number of remaining pallets, which is the number of pallets held by the supply device, and a command output unit which outputs a command, the command output unit outputs a command to convey the pallet to the supply device by the moving body when the number of remaining pallets is less than a predetermined number, and outputs a command to load the pallet onto the moving body by the supply device when the number of remaining pallets is equal to or greater than the predetermined number.

4. The conveying system of claim 3, wherein the command output unit outputs a command to move the mobile body to a pallet installation location where a plurality of the pallets are installed when the number of remaining pallets is less than the predetermined number, and when information that the mobile body has arrived at the pallet installation location is acquired by the information acquisition unit, outputs a command to transport the pallet to the supply device by the mobile body.

5. The conveying system described in claim 3, wherein the command output unit outputs a command to move the moving body toward a supply device when the number of remaining pallets is equal to or greater than the predetermined number, and when the information acquisition unit acquires information that the moving body has arrived at an installation location of the supply device, outputs a command to have the supply device load the pallets onto the moving body.

6. A conveying system as described in claim 3, wherein the command output unit outputs a command to move the mobile body with the pallet loaded toward the stowage device when information that the pallet has been loaded onto the mobile body is acquired by the information acquisition unit.

7. The conveying system according to claim 1 or 2, wherein the movable body conveys the pallet while the pallet is mounted on a tray.

8. A method for transporting pallets using at least one automatically movable movable body and a supply device, comprising the steps of: transporting a plurality of pallets not loaded with articles by the movable body toward the supply device and supplying the plurality of pallets to the supply device; loading the supplied pallets onto the movable body by the supply device; and transporting the pallet by the movable body loaded with the pallets toward a loading device which loads articles onto the pallets.

9. A program that causes a computer to execute a transportation method for transporting pallets using at least one automatically movable movable body and a supply device, the program causing a computer to execute the steps of: transporting a plurality of pallets without items loaded thereon toward the supply device by the movable body and supplying the plurality of pallets to the supply device; loading the supplied pallets onto a movable body by the supply device; and transporting the pallet by the movable body with the pallets loaded thereon toward a loading device that loads items onto the pallets.

Citation Information

Patent Citations

  • Pallet transfer equipment, and automated storage and retrieval warehouse and picking system which use the equipment

    JP2001130712A

  • Pallet conveyance device

    JP2005330044A

  • Controller and control method for robotic system

    JP2020196622A

  • Automated layer picking and storage system

    US20130177379A1

  • Automatic transportation of pallets of goods

    US20200319648A1