Adaptive control system and method for setting accelerator batching
By using an adaptive control system for accelerator batching, the problems of frequent start-up, shutdown, and failure of accelerator preparation equipment were solved, achieving a match between accelerator preparation and gypsum board production, and ensuring the continuity of gypsum board production and the chemical stability of the accelerator.
Patent Information
- Application Number
- PCT/CN2025/122072
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-07
- Filing Date
- 2025-09-18
- Publication Date
- 2026-11-12
AI Technical Summary
The existing technology suffers from frequent start-ups and shutdowns of accelerator preparation equipment and accelerator failure, failing to effectively control the accelerator output to match the needs of the gypsum board preparation system.
Design an adaptive control system for accelerator batching. The system regulates the rates of conveying and preparation equipment through a linkage control system to ensure the matching of accelerator preparation with gypsum board production. The system includes modules for pre-storage, balanced production, and post-discharge management to achieve precise addition and storage of the accelerator.
Stable operation of the accelerator preparation equipment was achieved, avoiding frequent start-ups and shutdowns, ensuring that the yield of accelerator products matched the needs of gypsum board preparation, and guaranteeing the continuity of gypsum board production and the chemical stability of the accelerator.
Smart Images

Figure CN2025122072_12112026_PF_FP_ABST
Abstract
Description
An adaptive control system and method for coagulant batching Technical Field
[0001] This invention relates to the field of gypsum board production line technology, specifically to an adaptive control system and method for accelerator batching. Background Technology
[0002] During the high-speed production of paper-faced gypsum board, the addition of accelerator ingredients can better promote the molding and bonding of gypsum board.
[0003] The preparation rate of the accelerator is closely related to the demand of the gypsum board preparation system. If the preparation rate of the accelerator is slow and the preparation time is too long, the output of the accelerator will be relatively low and will not meet the demand of the gypsum board preparation system. On the other hand, if the preparation rate of the accelerator is fast and the preparation time is short, the output of the accelerator will be greater than the demand of the gypsum board preparation system, and the excess accelerator will be stored in the storage silo.
[0004] However, the storage conditions of gypsum board accelerators (usually sulfate-based or compound additives) need to be strictly controlled to ensure their chemical stability and effectiveness. When storing the produced accelerators in the storage silo, in order to ensure the stability of storage temperature and humidity, the accelerator preparation equipment needs to be frequently started and stopped to adapt to the gypsum board preparation system's demand for accelerators and the maximum storage capacity of the storage silo. In the existing technology, the production control system for accelerator batching does not consider controlling the output of accelerators, which easily leads to frequent start and stop of accelerator preparation equipment and accelerator failure. Summary of the Invention
[0005] The purpose of this invention is to provide an adaptive control system and method for accelerator batching, in order to solve the technical problem that the existing technology does not take into account the aspect of controlling the output of accelerator, which easily leads to frequent start-ups and shutdowns of accelerator preparation equipment and accelerator failure.
[0006] To solve the above-mentioned technical problems, the present invention specifically provides the following technical solution:
[0007] A coagulant preparation system, comprising:
[0008] The raw material storage silo, the first conveying equipment, the coagulant preparation equipment, the second conveying equipment, and the finished product storage silo are arranged in the production sequence. The coagulant produced by the coagulant preparation equipment is transferred to the finished product storage silo via the second conveying equipment. The coagulant in the finished product storage silo is transferred to the gypsum board preparation system via the feeding equipment below the finished product storage silo.
[0009] The control units of the first conveying equipment, the coagulant preparation equipment, the second conveying equipment, and the feeding equipment constitute a linkage control system.
[0010] The linkage control system calculates the output rate of the feeding equipment and the feeding amount per unit time of the feeding equipment based on the unit addition amount of the coagulant required by the gypsum board preparation system.
[0011] The linkage control system adjusts the amount of coagulant transported by the second conveying device to be the same as the amount of coagulant transported by the coagulant preparation equipment per unit time based on the amount of coagulant prepared by the coagulant preparation equipment per unit time, and determines the corresponding transmission rate of the first conveying device.
[0012] The linkage control system establishes a matching relationship between the output rate of the feeding device, the transmission rate of the second conveying device, the preparation efficiency of the coagulant preparation device, and the transmission rate of the first conveying device, so that when the output rate of the feeding device is adjusted, the transmission rate of the first conveying device can be automatically adjusted in linkage.
[0013] As a preferred embodiment of the present invention, the linkage control system includes: an early-stage material storage production management module, a mid-stage balanced production management module, and a late-stage material discharge production management module;
[0014] The pre-storage production management module controls the coagulant preparation equipment to work at maximum preparation efficiency until the material level in the finished product storage silo reaches the maximum set value.
[0015] The mid-term balance production management module regulates the preparation efficiency of the coagulant preparation equipment until the transmission volume of the second conveying equipment per unit time is the same as the discharge volume of the feeding equipment per minute, so that the material level in the finished product storage bin is kept constant at the maximum set value.
[0016] The post-discharge production management module calculates the time required to empty the finished product storage silo based on its volume and the density of the stored accelerator, and determines the time point at which the first conveying equipment stops transmitting in conjunction with the gypsum board preparation process.
[0017] As a preferred embodiment of the present invention, the switching operation between the early-stage material storage production management module and the mid-stage balancing production management module is triggered by a timer. The specific time point at which the timer triggers the switch from the early-stage material storage production management module to the mid-stage balancing production management module is: B*t=A*t+30%*R; t=(30%*R) / (BA);
[0018] Wherein, B is the maximum amount of coagulant conveyed by the second conveying device per unit time, which is considered to be the same as the amount of coagulant prepared by the coagulant preparation device per unit time;
[0019] A represents the material feed rate per minute corresponding to each output rate of the feeding device;
[0020] R is the maximum storage volume of the finished product storage silo;
[0021] t is the trigger point for switching from the early-stage material storage production management module to the mid-stage balanced production management module, in order to switch the preparation rate of the coagulant preparation equipment and the transmission rate of the second conveying equipment.
[0022] As a preferred embodiment of the present invention, B = a * B'; where B' is the amount of raw material conveyed by the first conveying device per unit time, a is the preparation efficiency of the coagulant preparation device per unit time, a is the ratio between the amount of material produced by the coagulant preparation device per unit time and the amount of material fed by the coagulant preparation device per unit time, and a < 1; t = (30% * R) / (a * B' - A).
[0023] As a preferred embodiment of the present invention, the intermediate balance production management module adjusts B*t=A*t, and a*B'=A, where B'=A / a;
[0024] The amount of raw material conveyed by the first conveying device per unit time is A / ɑ, and the intermediate balance production management module adjusts the transmission rate of the first conveying device based on the amount of raw material conveyed by the first conveying device per unit time.
[0025] As a preferred embodiment of the present invention, the post-discharge production management module determines the time point t3 = t2-t1 for shutting down the first conveying equipment, the coagulant preparation equipment and the second conveying equipment based on the time t1 required to empty the finished product storage bin and the stop production time t2 of the entire gypsum board preparation process.
[0026] Furthermore, the feeding equipment stops operating at the production stop time t2 of the entire gypsum board preparation process.
[0027] In addition, the present invention also provides an adaptive control method for an adaptive control system for accelerator batching, comprising the following steps:
[0028] Step 100: Based on the gypsum board preparation work, determine the amount of accelerator added per unit time, and adjust the feeding amount of the finished product storage silo to be the same as the amount of accelerator added per unit time.
[0029] Step 200: Monitor the material level in the finished product storage silo in real time. Based on the feeding speed of the feeding equipment below the finished product storage silo and the maximum storage capacity of the finished product storage silo, determine the maximum running time for transporting the coagulant raw material to the finished product storage silo at the first transmission speed v1 until the material level in the finished product storage silo reaches the maximum storage capacity.
[0030] Step 300: After the material level in the finished product storage silo reaches the maximum storage capacity, adjust the second transmission speed v2 of the first conveying equipment to the coagulant raw material, and the second transmission speed v2 is the same as the feeding speed of the feeding equipment below the finished product storage silo.
[0031] Step 400: Calculate the time required to empty the finished product storage silo based on its volume and the density of the stored accelerator, and determine the time points when the first conveying equipment, the accelerator preparation equipment, and the second conveying equipment stop transmitting, in conjunction with the gypsum board preparation process.
[0032] In a preferred embodiment of the present invention, in step 200, the second conveying device always maintains its rated conveying efficiency during the batching of the coagulant, and the conveying amount of the second conveying device per unit time is the same as the preparation amount of the coagulant preparation device per unit time.
[0033] Based on the real-time material level of the finished product storage silo, the feeding speed of the feeding device below the finished product storage silo, and the rated conveying efficiency of the second conveying device connected to the inlet above the finished product storage silo, the corresponding relationship between the rated conveying efficiency of the second conveying device and the first conveying speed v1 of the first conveying device is determined.
[0034] By combining the correspondence between the rated conveying efficiency of the second conveying equipment and the maximum storage capacity of the finished product storage silo, and the feeding speed of the feeding device below the finished product storage silo, and by combining the correspondence between the rated conveying efficiency of the second conveying equipment and the first transmission speed v1 of the first conveying equipment, the functional relationship between the first transmission speed v1 of the first conveying equipment, the maximum storage capacity of the finished product storage silo, and the feeding speed of the feeding device below the finished product storage silo is determined. Based on the functional relationship, the maximum running time corresponding to transporting the coagulant raw material to the finished product storage silo at the first transmission speed v1 to reach the maximum storage capacity is determined.
[0035] In a preferred embodiment of the present invention, in step 300, when the second transmission speed v2 of the first conveying device for the coagulant raw material is the same as the feeding speed of the feeding device below the finished product storage silo, the material level in the finished product storage silo is maintained at the maximum storage capacity.
[0036] As a preferred embodiment of the present invention, the system device for preparing the accelerator is shut down earlier than the gypsum board preparation device, and the system device for preparing the accelerator only has one start-stop operation during the gypsum board preparation process.
[0037] Compared with the prior art, the present invention has the following advantages:
[0038] This invention matches the preparation, addition, and raw material transportation of the accelerator with the production speed of gypsum board, thereby preventing the accelerator preparation equipment from frequently starting and stopping during production. It also ensures that the amount of accelerator product prepared by the equipment matches the demand for gypsum board production, thus guaranteeing the continuity of the entire gypsum board production process. Attached Figure Description
[0039] To more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings in the following description are merely exemplary, and those skilled in the art can derive other embodiments based on the provided drawings without creative effort.
[0040] Figure 1 is a schematic diagram of the coagulant preparation system according to an embodiment of the present invention;
[0041] Figure 2 is a control structure block diagram of the coagulant preparation system according to an embodiment of the present invention;
[0042] The labels in the diagram represent the following: 1-Raw material storage silo; 2-First conveying equipment; 3-Accelerator preparation equipment; 4-Second conveying equipment; 5-Discharging equipment; 6-Linkage control system; 7-Timer; 8-Finished product storage silo; 61-Early stage storage production management module; 62-Mid-stage balance production management module; 63-Late stage discharge production management module. Detailed Implementation
[0043] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0044] As shown in Figures 1 and 2, the present invention provides a coagulant preparation system, comprising: a raw material storage silo 1, a first conveying device 2, a coagulant preparation device 3, a second conveying device 4, and a finished product storage silo 8 arranged sequentially according to the production sequence. The coagulant produced by the coagulant preparation device 3 is transferred to the finished product storage silo 8 via the second conveying device 4. The coagulant in the finished product storage silo 8 is transferred to the gypsum board preparation system via the feeding device 5 below the finished product storage silo 8.
[0045] Among them, the first conveying device 2, the coagulant preparation device 3, the second conveying device 4 and the feeding device 5 are all connected to a control unit, and the control units of the first conveying device 2, the coagulant preparation device 3, the second conveying device 4 and the feeding device 5 form a linkage control system 6.
[0046] The linkage control system 6 calculates the output rate of the feeding device 5 and the feeding amount of the feeding device 5 per unit time based on the unit addition amount of the coagulant required by the gypsum board preparation system.
[0047] The linkage control system 6 adjusts the amount of coagulant transported by the second conveying device 4 per unit time to be the same as the amount of coagulant transported by the coagulant preparation device 3 per unit time based on the amount of coagulant prepared by the coagulant preparation device 3 per unit time, and determines the corresponding transmission rate of the first conveying device 2.
[0048] The linkage control system 6 establishes a matching relationship between the output rate of the feeding device 5, the transmission rate of the second conveying device 4, the preparation efficiency of the coagulant preparation device 3, and the transmission rate of the first conveying device 2, so that the transmission rate of the first conveying device 2 can be automatically adjusted when the output rate of the feeding device 5 is adjusted.
[0049] This embodiment can match the preparation, addition, and raw material transportation of the accelerator with the production speed of gypsum board, so that the accelerator preparation equipment will not be frequently started and stopped during production, and the amount of accelerator product prepared by the accelerator preparation equipment will match the amount required for gypsum board production, thereby ensuring the continuity of the entire gypsum board production.
[0050] Specifically, in this embodiment, the relationship between the coagulant preparation equipment 3 and the second conveying equipment 4 connected to its outlet is first established, and the transmission rate of the second conveying equipment 4 is determined to be the same as the preparation rate of the coagulant preparation equipment 3. Further, based on the ratio between the finished product output and the raw material input of the coagulant preparation equipment 3 per unit time, the preparation efficiency of the coagulant preparation equipment 3 per unit time is determined, and then the matching relationship between the transmission rate of the first conveying equipment 2 and the transmission rate of the second conveying equipment 4 is determined. Finally, based on the matching relationship between the transmission rate of the second conveying equipment 4 and the output rate of the feeding equipment 5, the matching relationship between the transmission rate of the first conveying equipment 2 and the output rate of the feeding equipment 5 is determined.
[0051] Based on the amount of accelerator required by the gypsum board preparation system, the output rate of the feeding device 5 is determined. Based on the matching relationship between the output rate of the feeding device 5, the transmission rate of the second conveying device 4, the preparation efficiency of the accelerator preparation device 3 and the transmission rate of the first conveying device 2, the transmission rate of the second conveying device 4, the preparation efficiency of the accelerator preparation device 3 and the transmission rate of the first conveying device 2 are further determined.
[0052] In other words, in this embodiment, the preparation of the accelerator (including the addition of raw materials and preparation of the accelerator) and the addition of the accelerator (specifically, the feeding of stored accelerator) are matched with the gypsum board production system. Based on the usage requirements of the gypsum board production system, the preparation and addition of the accelerator are calculated and determined. On the one hand, this avoids the problem of auxiliary material failure caused by over-production of accelerator. On the other hand, the entire process requires the transmission rate of the second conveying device 4, the preparation efficiency of the accelerator preparation device 3, and the transmission rate of the first conveying device 2 to be variable frequency, eliminating frequent start-stop operations and improving the service life of the entire accelerator preparation device.
[0053] The linkage control system 6 includes: a pre-production material storage management module 61, a mid-production balancing management module 62, and a post-production material discharge management module 63.
[0054] Among them, the pre-storage production management module 61 regulates the coagulant preparation equipment 3 to work at the maximum preparation efficiency until the material level in the finished product storage silo 8 reaches the maximum set value.
[0055] The mid-term balance production management module 62 regulates the preparation efficiency of the coagulant preparation equipment 3 until the transmission volume of the second conveying equipment 4 per unit time is the same as the discharge volume of the feeding equipment 5 per minute, so that the material level in the finished product storage bin 8 is kept constant at the maximum set value.
[0056] The post-production material management module 63 calculates the time required to empty the finished product storage silo 8 based on the volume of the finished product storage silo 8 and the density of the stored accelerator, and determines the time point when the first conveying equipment 2 stops transmitting in conjunction with the gypsum board preparation process.
[0057] To ensure the continuity of the entire gypsum board production process, this implementation method establishes the following workflow:
[0058] At the beginning of the preparation of the coagulant, it is a high-speed production stage. At this time, the working speed of the first conveying device 2 and the coagulant preparation device 3 is high. At this time, the amount of coagulant transferred by the second conveying device 4 per unit time is greater than the amount of material discharged by the feeding device 5 per unit time. Therefore, the excess coagulant will accumulate in the finished product storage silo 8. Based on the matching relationship between the feeding rate of the feeding device 5 and the transmission rate of the first conveying device 2, the time point corresponding to the accumulation of excess coagulant in the finished product storage silo 8 reaching the maximum set value is determined. When the time point is reached, the working speed of the first conveying device 2, the coagulant preparation device 3 and the second conveying device 4 are adjusted.
[0059] When the excess coagulant accumulates in the finished product storage silo 8 to the maximum set value, it is the steady-speed production stage. At this time, the transmission rate of the second conveying device 4 is the same as the feeding rate of the feeding device 5, and thus the preparation efficiency of the coagulant preparation device 3 is the same as the transmission rate of the second conveying device 4. Based on the matching relationship between the output rate of the feeding device 5 and the transmission rate of the first conveying device 2, the working rate of the first conveying device 2 is determined.
[0060] After determining the preparation time of the gypsum board preparation process, it is also necessary to further determine the time point when the first conveying equipment 2 stops conveying. In order to ensure that the accelerator stored in the finished product storage silo 8 can be fully utilized and to avoid the stored accelerator absorbing water and becoming ineffective, this embodiment further determines the volume of the finished product storage silo 8 and the density of the stored accelerator, calculates the time required to empty the finished product storage silo 8, and determines the time point when the first conveying equipment 2 stops conveying in conjunction with the gypsum board preparation process.
[0061] In the high-speed production stage, the accelerator is produced quickly and stored in the finished product storage silo 8. This can flexibly meet the demand for accelerators in the gypsum board preparation system. At this time, it is only necessary to adjust the feeding frequency of the feeding equipment per unit time, without having to frequently adjust the speed of the entire accelerator preparation and transportation system.
[0062] The switching between the early-stage material storage production management module 61 and the mid-stage balancing production management module 62 is triggered by timer 7. The specific time point at which timer 7 triggers the switch from the early-stage material storage production management module 61 to the mid-stage balancing production management module 62 is: B*t=A*t+30%*R; t=(30%*R) / (BA);
[0063] Wherein, B is the maximum amount of coagulant conveyed by the second conveying device 4 per unit time, which is considered to be the same as the amount of coagulant prepared by the coagulant preparation device 3 per unit time.
[0064] A represents the material feed rate per minute corresponding to each output rate of the feeding device 5;
[0065] R is the maximum storage volume of the finished product storage silo 8.
[0066] t is the trigger time point for switching from the early stage storage production management module 61 to the mid-stage balance production management module 62, so as to switch the preparation rate of the coagulant preparation equipment 3 and the transmission rate of the second conveying equipment 4.
[0067] Since the second conveying device 4 is used to input the accelerator into the storage silo 8, and the unloading device 5 is used to transfer the accelerator in the storage silo 8 to the gypsum board preparation system, this embodiment first establishes the correspondence between the transmission rates of the second conveying device 4 and the unloading device 5.
[0068] At this time, the control program of the early storage production management module 61 is in the high-speed production stage. Therefore, B is the maximum amount of coagulant conveyed by the second conveying device 4 per unit time, which is considered to be the same as the amount of coagulant prepared by the coagulant preparation device 3 per unit time. After the high-speed production stage, the coagulant will be rapidly accumulated in the storage silo 8.
[0069] Further establish the relationship between the transmission efficiency of the first conveying device 2 and the transmission efficiency of the second conveying device 4: B = ɑ * B'; t = (30% * R) / (ɑ * B' - A);
[0070] Wherein, B' is the amount of raw material conveyed by the first conveying device 2 per unit time, a is the preparation efficiency of the coagulant preparation device 3 per unit time, a is the ratio between the amount of material produced by the coagulant preparation device 3 per unit time and the amount of material fed into the coagulant preparation device 3 per unit time, and a < 1.
[0071] At this time, the control program of the early material storage production management module 61 is in the high-speed production stage. It first establishes the correspondence between the transmission rates of the second conveying device 4 and the unloading device 5, and then establishes the correspondence between the transmission rates of the first conveying device 2 and the second conveying device 4, and further determines the matching relationship between the transmission rate of the first conveying device 2 and the transmission rate of the unloading device 5.
[0072] When the excess coagulant accumulates in the finished product storage silo 8 to the maximum set value, it is the steady-speed production stage. The mid-term balanced production management module 62 is used to adjust the transmission rate of the second conveying device 4 and the feeding device 5 to be the same. At this time, the finished product storage silo 8 always maintains the maximum set value of accumulation according to the first-in-first-out rule.
[0073] The mid-term balance production management module 62 controls B*t=A*t, and a*B'=A, where B'=A / a;
[0074] The amount of raw material conveyed by the first conveying device 2 per unit time is A / ɑ, and the mid-term balance production management module 62 adjusts the transmission rate of the first conveying device 2 based on the amount of raw material conveyed by the first conveying device 2 per unit time.
[0075] Since excess accelerators accumulate in the finished product storage silo 8, in order to ensure that the excess accelerators can be used in this gypsum board preparation work, the subsequent material discharge production management module 63 determines the time point t3 = t2-t1 for shutting down the first conveying equipment 2, the accelerator preparation equipment 3, and the second conveying equipment 4 based on the time t1 required to empty the finished product storage silo 8 and the stop production time t2 of the entire gypsum board preparation process.
[0076] Furthermore, the feeding equipment 5 stops operating at the production stop time t2 of the entire gypsum board preparation process.
[0077] In other words, in this embodiment, based on the stop production time t2 of the gypsum board preparation system, the operation of the coagulant preparation system is shut down in advance. When calculating the time t1 required to empty the finished product storage silo 8, the transmission rate of the feeding device 5 remains constant.
[0078] In addition, the present invention also discloses an adaptive control method for the above-mentioned adaptive control system for accelerator batching, comprising the following steps:
[0079] Step 100: Based on the gypsum board preparation work, determine the amount of accelerator added per unit time, and adjust the feeding amount of the finished product storage silo to be the same as the amount of accelerator added per unit time.
[0080] Step 200: Monitor the material level in the finished product storage silo in real time. Based on the feeding speed of the feeding equipment below the finished product storage silo and the maximum storage capacity of the finished product storage silo, determine the maximum running time for transporting the coagulant raw material to the finished product storage silo at the first transmission speed v1 until the material level in the finished product storage silo reaches the maximum storage capacity.
[0081] Step 300: After the material level in the finished product storage silo reaches the maximum storage capacity, adjust the second transmission speed v2 of the first conveying equipment to the coagulant raw material, and the second transmission speed v2 is the same as the discharge speed of the discharge equipment below the finished product storage silo.
[0082] Step 400: Based on the volume of the finished product storage silo and the density of the stored accelerator, calculate the time required to empty the finished product storage silo, and determine the time points when the first conveying equipment, the accelerator preparation equipment, and the second conveying equipment stop transmitting, in conjunction with the gypsum board preparation process.
[0083] Similarly, in order to establish a matching relationship between the preparation of the accelerator (including the addition of raw materials and the preparation of the accelerator) and the addition of the accelerator (specifically, the feeding of stored accelerator) and the gypsum board production system, this embodiment ensures that the accelerator preparation equipment does not frequently start and stop during production, and that the amount of accelerator produced by the accelerator preparation equipment matches the amount required for gypsum board production, thereby ensuring the continuity of the entire gypsum board production, this embodiment couples the first conveying equipment, the accelerator preparation equipment, and the second conveying equipment. This avoids the accelerator preparation efficiency failing to meet the needs of the gypsum board production system, and also avoids the problem of storage failure caused by the preparation of excessive accelerator.
[0084] In step 200, the second conveying device maintains its rated conveying efficiency throughout the batching process of the coagulant, and the conveying amount of the second conveying device per unit time is the same as the preparation amount of the coagulant preparation device per unit time.
[0085] By combining the real-time material level of the finished product storage silo, the feeding speed of the feeding device below the finished product storage silo, and the rated conveying efficiency of the second conveying device connected to the inlet above the finished product storage silo, the corresponding relationship between the rated conveying efficiency of the second conveying device and the first conveying speed v1 of the first conveying device is determined.
[0086] By combining the correspondence between the rated conveying efficiency of the second conveying equipment and the maximum storage capacity of the finished product storage silo, and the feeding speed of the feeding equipment below the finished product storage silo, and by combining the correspondence between the rated conveying efficiency of the second conveying equipment and the first conveying speed v1 of the first conveying equipment, the functional relationship between the first conveying speed v1 of the first conveying equipment, the maximum storage capacity of the finished product storage silo, and the feeding speed of the feeding equipment below the finished product storage silo is determined. Based on the functional relationship, the maximum running time corresponding to transporting the coagulant raw material to the finished product storage silo at the first conveying speed v1 to reach the maximum storage capacity is determined.
[0087] In step 300, when the second conveying speed v2 of the first conveying device for the coagulant raw material is the same as the feeding speed of the feeding device below the finished product storage silo, the material level in the finished product storage silo is maintained at the maximum storage capacity.
[0088] The accelerator batching system is shut down earlier than the gypsum board preparation system, and the accelerator batching system only has one start-up and shutdown during the gypsum board preparation process.
[0089] The above embodiments are merely exemplary embodiments of this application and are not intended to limit this application. The scope of protection of this application is defined by the claims. Those skilled in the art can make various modifications or equivalent substitutions to this application within its substance and scope of protection, and such modifications or equivalent substitutions should also be considered to fall within the scope of protection of this application.
Claims
1. A coagulant preparation system, characterized in that, include: The raw material storage silo (1), the first conveying equipment (2), the coagulant preparation equipment (3), the second conveying equipment (4) and the finished product storage silo (8) are arranged in the production sequence. The coagulant produced by the coagulant preparation equipment (3) is transferred to the finished product storage silo (8) through the second conveying equipment (4). The coagulant in the finished product storage silo (8) is transferred to the gypsum board preparation system through the feeding equipment (5) below the finished product storage silo (8). Among them, the control units of the first conveying device (2), the coagulant preparation device (3), the second conveying device (4) and the feeding device (5) form a linkage control system (6); The linkage control system (6) calculates the output rate of the feeding device (5) and the feeding amount of the feeding device (5) per unit time based on the unit addition amount of the coagulant required by the gypsum board preparation system. The linkage control system (6) adjusts the amount of coagulant transported by the second conveying device (4) to be the same as the amount of coagulant transported by the coagulant preparation device (3) within a unit time, based on the amount of coagulant prepared by the coagulant preparation device (3) within a unit time, and determines the transmission rate corresponding to the first conveying device (2). The linkage control system (6) establishes a matching relationship between the output rate of the feeding device (5), the transmission rate of the second conveying device (4), the preparation efficiency of the coagulant preparation device (3), and the transmission rate of the first conveying device (2), so that when the output rate of the feeding device (5) is adjusted, the transmission rate of the first conveying device (2) can be automatically adjusted in linkage.
2. The adaptive control system for coagulant batching according to claim 1, characterized in that, The linkage control system (6) includes: a pre-production storage management module (61), a mid-production balancing management module (62), and a post-production discharge management module (63); The pre-storage production management module (61) regulates the coagulant preparation equipment (3) to work at maximum preparation efficiency until the material level in the finished product storage silo (8) reaches the maximum set value. The mid-term balance production management module (62) regulates the preparation efficiency of the coagulant preparation equipment (3) until the transmission amount of the second conveying equipment (4) per unit time is the same as the feeding amount of the feeding equipment (5) per minute, so that the material level in the finished product storage bin (8) is kept constant at the maximum set value. The post-discharge production management module (63) calculates the time required to empty the finished product storage silo (8) based on the volume of the finished product storage silo (8) and the density of the stored accelerator, and determines the time point at which the first conveying equipment (2) stops transmitting in conjunction with the gypsum board preparation process.
3. The adaptive control system for accelerator batching according to claim 2, characterized in that, The switching between the pre-production storage management module (61) and the mid-term balancing production management module (62) is triggered by a timer (7). The specific time point at which the timer (7) triggers the switch from the pre-production storage management module (61) to the mid-term balancing production management module (62) is as follows: B*t = A*t + 30%*R; t = (30% * R) / (BA); Wherein, B is the maximum amount of coagulant conveyed by the second conveying device (4) per unit time, which is considered to be the same as the amount of coagulant prepared by the coagulant preparation device (3) per unit time; A represents the material feed rate per minute corresponding to each output rate of the feeding device (5); R is the maximum storage volume of the finished product storage silo (8); t is the trigger time point for switching from the early stage storage production management module (61) to the mid-term balance production management module (62) to switch the preparation rate of the coagulant preparation equipment (3) and the transmission rate of the second conveying equipment (4).
4. The adaptive control system for accelerator batching according to claim 3, characterized in that, B = a * B'; where B' is the amount of raw material conveyed by the first conveying device (2) per unit time, a is the preparation efficiency of the coagulant preparation device (3) per unit time, a is the ratio between the amount of material produced by the coagulant preparation device (3) per unit time and the amount of material fed by the coagulant preparation device (3) per unit time, and a < 1. t = (30% * R) / (ɑ * B' - A).
5. The adaptive control system for coagulant batching according to claim 4, characterized in that, The mid-term balanced production management module (62) regulates B*t=A*t, and a*B'=A, where B'=A / a; The first conveying device (2) has a raw material conveying capacity of A / ɑ per unit time, and the intermediate balance production management module (62) adjusts the transmission rate of the first conveying device (2) based on the raw material conveying capacity of the first conveying device (2) per unit time.
6. The adaptive control system for accelerator batching according to claim 2, characterized in that, The post-discharge production management module (63) determines the time point t3 = t2-t1 for shutting down the first conveying equipment (2), the coagulant preparation equipment (3), and the second conveying equipment (4) based on the time t1 required to empty the finished product storage silo (8) and the stop production time t2 of the entire gypsum board preparation process. Furthermore, the feeding device (5) stops operating at the production stop time t2 of the entire gypsum board preparation process.
7. An adaptive control method based on the adaptive control system for coagulant batching according to any one of claims 1-6, characterized in that, Includes the following steps: Step 100: Based on the gypsum board preparation work, determine the amount of accelerator added per unit time, and adjust the feeding amount of the finished product storage silo to be the same as the amount of accelerator added per unit time. Step 200: Monitor the material level in the finished product storage silo in real time. Based on the feeding speed of the feeding equipment below the finished product storage silo and the maximum storage capacity of the finished product storage silo, determine the maximum running time for transporting the coagulant raw material to the finished product storage silo at the first transmission speed v1 until the material level in the finished product storage silo reaches the maximum storage capacity. Step 300: After the material level in the finished product storage silo reaches the maximum storage capacity, adjust the second transmission speed v2 of the first conveying equipment to the coagulant raw material, and the second transmission speed v2 is the same as the feeding speed of the feeding equipment below the finished product storage silo. Step 400: Calculate the time required to empty the finished product storage silo based on its volume and the density of the stored accelerator, and determine the time points when the first conveying equipment, the accelerator preparation equipment, and the second conveying equipment stop transmitting, in conjunction with the gypsum board preparation process.
8. The adaptive control method for coagulant batching according to claim 7, characterized in that, In step 200, the second conveying device maintains its rated conveying efficiency throughout the batching process of the coagulant, and the conveying amount of the second conveying device per unit time is the same as the preparation amount of the coagulant preparation device per unit time. Based on the real-time material level of the finished product storage silo, the feeding speed of the feeding device below the finished product storage silo, and the rated conveying efficiency of the second conveying device connected to the inlet above the finished product storage silo, the corresponding relationship between the rated conveying efficiency of the second conveying device and the first conveying speed v1 of the first conveying device is determined. By combining the correspondence between the rated conveying efficiency of the second conveying equipment and the maximum storage capacity of the finished product storage silo, and the feeding speed of the feeding device below the finished product storage silo, and by combining the correspondence between the rated conveying efficiency of the second conveying equipment and the first transmission speed v1 of the first conveying equipment, the functional relationship between the first transmission speed v1 of the first conveying equipment, the maximum storage capacity of the finished product storage silo, and the feeding speed of the feeding device below the finished product storage silo is determined. Based on the functional relationship, the maximum running time corresponding to transporting the coagulant raw material to the finished product storage silo at the first transmission speed v1 to reach the maximum storage capacity is determined.
9. The adaptive control method for coagulant batching according to claim 7, characterized in that, In step 300, when the second conveying speed v2 of the first conveying device for the coagulant raw material is the same as the feeding speed of the feeding device below the finished product storage silo, the material level in the finished product storage silo is maintained at the maximum storage capacity.
10. The adaptive control method for coagulant batching according to claim 1, characterized in that, The system for preparing the accelerator is shut down earlier than the gypsum board preparation device, and the system for preparing the accelerator only has one start-up and shutdown during the gypsum board preparation process.