Autonomous operation control system, railway system, autonomous operation control method, and autonomous operation control program

The autonomous operation control system within each train coordinates resource reservations and communicates with others, addressing inefficiencies in information management to enable efficient and flexible train operations.

WO2026234830A1PCT designated stage Publication Date: 2026-11-12MITSUBISHI ELECTRIC CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2025/026293
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-05-08
Filing Date
2025-07-24
Publication Date
2026-11-12

AI Technical Summary

Technical Problem

Existing train control systems manage unnecessary information, leading to inefficiencies in information delay and freshness, which hampers autonomous operation capabilities.

Method used

The system implements an autonomous operation control system within each train, equipped with a resource adjustment unit to coordinate resource reservations and communicate with other trains, managing only necessary information for operation.

Benefits of technology

Enables efficient and flexible autonomous train operation by prioritizing necessary information management, allowing trains to determine priorities and adjust operations to achieve both individual and overall system objectives.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2025026293_12112026_PF_FP_ABST
    Figure JP2025026293_12112026_PF_FP_ABST
Patent Text Reader

Abstract

A train (100) comprises an autonomous operation control system (101). The autonomous operation control system (101) transmits a resource securing request to a target resource to be used for traveling on a route which is in accordance with an operation pattern, and if the target resource is reserved by another train (210), the autonomous operation control system communicates with the another train (210) to adjust the reservation of the target resource with the another train (210).
Need to check novelty before this filing date? Find Prior Art

Description

Autonomous operation control system, railway system, autonomous operation control method, and autonomous operation control program

[0001] The present disclosure relates to autonomous operation control of trains.

[0002] A train control system that controls a plurality of trains is known.

[0003] Patent Document 1 discloses a train control system. This train control system has the following features. Each train is provided with an operation management system for the corresponding vehicle, and the operation management system stores the daily timetable. The train is configured to possess all information including the status of other trains and the line by exchanging information via a timetable management device. With such features, the train control system realizes distributed processing. Normal operation is performed as follows. The train configures a route by transmitting an instruction to control a switch. If a route cannot be configured for other trains or the like, the train waits until the route can be configured. When a delay or a vehicle failure occurs, the following control is performed. The train automatically updates the daily timetable to an optimal timetable. The updated daily timetable is transmitted to the timetable management device. The vehicles share the change information of the daily timetable with each other via the timetable management device. Thereby, autonomous control is continued.

[0004] In the train control system of Patent Document 1, information is managed as follows. To realize distributed control, each train is equipped with a device equivalent to the conventional centrally located operation management system. The train exchanges information via the timetable management device to possess all information including the status of other trains and the line. Each train has to retain and manage even information that is unnecessary for the train as a single unit.

[0005] However, from the viewpoints of information delay and information freshness, the operation-related information managed by each train should be limited to that necessary for operation.

[0006] International Publication No. 2019 / 053930

[0007] This disclosure aims to enable the implementation of functions necessary for autonomous train operation within the train itself.

[0008] The autonomous operation control system of this disclosure is installed in a train. The autonomous operation control system includes a resource adjustment unit that sends a resource reservation request to a target resource used for traveling a route according to an operation pattern, and communicates with the other train to coordinate the reservation of the target resource with the other train if the target resource is reserved by another train.

[0009] According to this disclosure, resource adjustment functions, which are necessary for autonomous train operation, can be implemented within the train.

[0010] Configuration diagram of the railway system 200 in Embodiment 1. Configuration diagram of the autonomous operation control system 101 for train 100 in Embodiment 1. Flowchart of (1) operation pattern start in Embodiment 1. Flowchart of (2) normal operation in Embodiment 1. Flowchart of (3) operation adjustment in Embodiment 1. (4) operation pattern end in Embodiment 1. Data flow of (1) operation pattern start and (2) normal operation in Embodiment 1. Data flow of (3) operation adjustment in Embodiment 1. Data flow of (4) operation pattern end in Embodiment 1. Configuration diagram of the railway system 200 in Embodiment 2. Flowchart of (1) operation pattern start in Embodiment 2. (4) operation pattern end in Embodiment 2. Data flow of (1) operation pattern start and (2) normal operation in Embodiment 2. Data flow of (3) operation adjustment in Embodiment 2. Data flow of (4) operation pattern end in Embodiment 2. Data flow of (5) control intervention in Embodiment 2. Configuration diagram of the computer 190 in Embodiment 1. Hardware configuration diagram of the computer 190 in Embodiment 1.

[0011] In the embodiments and drawings, the same or corresponding elements are denoted by the same reference numeral. The descriptions of elements denoted by the same reference numeral as the described elements are omitted or simplified as appropriate. The arrows in the figures mainly indicate the flow of data or processing.

[0012] Embodiment 1. The autonomous operation of train 100 will be explained based on Figures 1 to 9.

[0013] ***Configuration Description*** Based on Figure 1, the configuration of the railway system 200 will be described. The railway system 200 comprises multiple trains 210, multiple resources 220, and multiple positioning devices 230. The train of interest 210 will be referred to as train 100.

[0014] Train 100 is equipped with an autonomous operation control system 101.

[0015] Resource 220 is a resource used for the operation of train 100. For example, resource 220 may be a station, a switch, or a turnout. Train 210 reserves resource 220 and then uses it. Resource 220 can record the reservation information of train 210. The railway system 200 may include a resource controller (RA) that manages and coordinates the reservation of resource 220 from each train 210. Alternatively, train 210 may have a function to adjust the reservation.

[0016] The positioning device 230 is a device used to measure the position of the train 100. For example, the positioning device 230 is a GPS receiver and transponder. GPS is an abbreviation for Global Positioning System.

[0017] Based on Figure 2, the configuration of the autonomous operation control system 101 for train 100 will be explained. The autonomous operation control system 101 includes a computer 190 which comprises an autonomous operation device 110, a state management device 120, an automatic driving device 130, a safety control device 140, and a communication device 150.

[0018] The autonomous operation device 110 is a device for realizing the autonomous operation of the train 100. The autonomous operation device 110 includes elements such as an operation pattern update unit 111, a resource adjustment unit 112, a route determination unit 113, and an operation adjustment unit 114. These elements are implemented by software.

[0019] The status management device 120 is a device for managing the status of the train 100. The status management device 120 includes an element called the status management unit 121. The status management unit 121 is implemented in software.

[0020] The automatic driving device 130 is a device for realizing the automatic operation of the train 100. The automatic driving device 130 has a function called Automatic Train Operation (ATO). Based on the current position and route information of the train 100, ATO automatically performs operations on the train 100 (such as starting, accelerating, decelerating, and stopping).

[0021] The safety control device 140 is a device for preventing accidents involving train 100. The safety control device 140 has a function called Automatic Train Protection (ATP). ATP maintains the safety of train 100. Specifically, ATP calculates the stopping limit for train 100 based on the positions of other trains 210 and prevents collisions between train 100 and other trains 210.

[0022] The communication device 150 is a communication device of the autonomous operation control system 101. The autonomous operation control system 101 uses the communication device 150 to communicate with the outside of the train 100.

[0023] ***Explanation of Operation*** The operation procedure of the autonomous operation control system 101 corresponds to the autonomous operation control method. Furthermore, the operation procedure of the autonomous operation control system 101 corresponds to the processing procedure of the autonomous operation control program.

[0024] The following outlines the autonomous operation control method. The resource adjustment unit 112 sends a resource reservation request to the target resource used for running the route according to the operation pattern. If the target resource is reserved by another train 210, the resource adjustment unit 112 communicates with the other train 210 to coordinate the reservation of the target resource with the other train 210. The resource adjustment unit 112 calculates an evaluation value for train 100's operation based on the operation target of train 100 given to train 100. As a result of comparing the evaluation value of train 100 with the evaluation value of the other train 210, if train 100 has a higher evaluation, it makes the other train 210 wait to use the target resource and uses the target resource before the other train 210. The resource adjustment unit 112 calculates the evaluation value of train 100's operation as the train evaluation value. The resource adjustment unit 112 calculates the evaluation value of train 100 for the operation of the entire system as the system evaluation value based on the system-wide target including train 100 and the other train 210. Assume that, based on a comparison of the train evaluation value of train 100, the system evaluation value of train 100, the train evaluation value of other trains 210, and the system evaluation value of other trains 210, train 100 has a higher evaluation. In this case, the resource adjustment unit 112 makes other trains 210 wait to use the target resource and uses the target resource before other trains 210. The operation pattern update unit 111 updates the operation pattern after train 100 reaches the turnaround station. The operation pattern is updated based on train status data indicating the status of train 100, train status data indicating the status of trains 210 present around the turnaround station, and resource status data indicating the status of resources 220 present around the turnaround station. The route determination unit 113 determines the route of train 100 based on the operation pattern and resource status data indicating the status of each resource 220. The operation adjustment unit 114 adjusts the travel time of train 100 between stations and the stopping time of train 100 at each station based on train position data indicating the position of each other train 210. The status management unit 121 manages train status data that indicates the status of train 100, including the train's operating pattern. When train status data for train 100 is requested, the status management unit 121 sends the train status data for train 100 to the requesting train 210.

[0025] The details of the autonomous operation control method are described below. The autonomous operation control method includes control methods for (1) operation pattern start, (2) normal operation, (3) operation adjustment, and (4) operation pattern end.

[0026] Based on Figure 3, (1) the control method for starting the operation pattern will be explained. The state management device 120 stores an operation pattern list. For example, the operation pattern list is distributed in advance. The operation pattern list is data that shows one or more operation patterns. The operation pattern is data that shows in order the multiple stations on which the train 100 stops. Intermediate stations on which the train 100 stops are called intermediate stops. The station on which the train 100 turns around is called a turnaround station. The train 100 stops at each intermediate stop in the order shown in the operation pattern, and turns around when it reaches the turnaround station.

[0027] In step S111, if the operating pattern to be used has not been determined, the operating pattern update unit 111 determines the operating pattern to be used from the operating pattern list. For example, the operating pattern update unit 111 determines the operating pattern to be used based on the status of other trains 210 in the vicinity and the status of each resource 220 in the vicinity. Resource status data indicating the status of each resource 220 is obtained by communication with each resource 220. Train status data indicating the status of other trains 210 is obtained by communication with other trains 210. Hereinafter, the operating pattern to be used will simply be referred to as the operating pattern.

[0028] In step S112, the route determination unit 113 determines the train route based on the operation pattern and resource status data of each resource 220. The train route is the route of train 100 and indicates the resources 220 used by train 100, in addition to each intermediate stop station and turnaround station. In other words, the train route indicates the stations that train 100 passes through and the switches and other controls that are controlled during the operation of train 100.

[0029] In step S113, the automatic driving device 130 starts operating the train 100 based on the train route.

[0030] Based on Figure 4, (2) the control method for normal operation will be explained. While train 100 is running, the automatic driving device 130 and the safety control device 140 operate, and the automatic driving device 130 and the safety control device 140 can determine the position of train 100 and the positions of surrounding trains 210.

[0031] Steps S121 through S127 are repeated until train 100 arrives at the turnaround station.

[0032] In step S121, the resource adjustment unit 112 refers to the train route and determines the resource 220 that is scheduled to be used next. This resource 220 is referred to as the target resource.

[0033] The resource adjustment unit 112 sends a resource allocation request to the target resource. The resource allocation request is data for requesting the allocation of resource 220. The target resource receives the resource allocation request.

[0034] In step S122, the target resource completes the reservation process by executing the resource reservation process.

[0035] In step S123, the target resource transmits resource status data indicating the status of the target resource to the train 100. The resource adjustment unit 112 receives the resource status data of the target resource and confirms that the target resource has been secured (reserved) by referring to the resource status data. This completes the securing of the target resource.

[0036] In step S124, the automatic driving device 130 continues to operate the train 100 using the target resources.

[0037] In step S125, the resource adjustment unit 112 sends a resource release request to the target resource. The resource release request is data requesting the release of resource 220. The target resource receives the resource release request.

[0038] In step S126, the target resource is released by executing a resource release process.

[0039] In step S127, the target resource transmits resource status data indicating the status of the target resource to the train 100. The resource adjustment unit 112 receives the resource status data of the target resource, checks the resource status data, and confirms that the target resource has been released. This completes the release of the target resource.

[0040] The control method of (3) operation adjustment will be described based on FIG. 5. While the train 100 is traveling, the operation adjustment unit 114 adjusts the travel time between stations and the stop time at the stations according to the situation of the surrounding trains 210.

[0041] Steps S131 to S136 are executed when the resource status data of the target resource in step S123 of (2) normal operation indicates that the target resource is reserved by another train 210. The train 210 that is reserving the target resource is referred to as the counterpart train.

[0042] In step S131, the resource adjustment unit 112 of the train 100 transmits a resource adjustment request to the counterpart train. The resource adjustment request is data for requesting adjustment of the reservation of the target resource. The resource adjustment unit 112 of the counterpart train receives the resource adjustment request.

[0043] In step S132, the resource adjustment unit 112 of the counterpart train determines whether interruption of the reservation of the target resource is possible.

[0044] For example, interruption of the reservation of the target resource is not possible in the following cases. When the counterpart train is using the target resource, interruption of the reservation of the target resource is not possible. When it is impossible to release the target resource to ensure safety, interruption of the reservation of the target resource is not possible.

[0045] If interruption of the reservation of the target resource is possible, the process proceeds to step S133. If interruption of the reservation of the target resource is not possible, the resource adjustment request is rejected, and the process proceeds to step S136.

[0046] In step S133, the resource adjustment unit 112 of the train 100 calculates the evaluation value of the train 100, and transmits the evaluation value of the train 100 to the counterpart train. The resource adjustment unit 112 of the counterpart train calculates the evaluation value of the counterpart train, and transmits the evaluation value of the counterpart train to the train 100.

[0047] The evaluation value is calculated based on at least one of the operation target of each train 210 and the operation target of the entire system of the railway system 200. The calculation of the evaluation value will be described separately later.

[0048] In step S134, the respective resource adjustment units 112 of the train 100 and the counterpart train determine whether to execute a reservation interruption for the target resource, based on the result of comparison between the evaluation value of the train 100 and the evaluation value of the counterpart train.

[0049] When the evaluation value of the train 100 is higher than the evaluation value of the counterpart train, it is determined that the reservation interruption for the target resource is to be executed.

[0050] When the reservation interruption for the target resource is to be executed, the process proceeds to step S135. When the reservation interruption for the target resource is not to be executed, the process proceeds to step S136.

[0051] In step S135, the autonomous operation control system 101 of the train 100 executes the processing from step S124 onward in (2) normal operation. The resource adjustment unit 112 of the counterpart train communicates with the target resource to register a reservation wait in the reservation queue of the target resource, and waits until the target resource is released and reserved for the counterpart train. After step S135, the process ends.

[0052] In step S136, the resource adjustment unit 112 of the train 100 communicates with the target resource to register a reservation wait in the reservation queue of the target resource, and waits until the target resource is released and reserved for the train 100. After step S136, the process ends.

[0053] Based on FIG. 6, (4) the control method for operation pattern termination will be described. Steps S141 to S143 are executed after the train 100 arrives at the turnaround station.

[0054] In step S141, the operation pattern update unit 111 communicates with other trains 210 located around the turnaround station and obtains train status data for those other trains 210. The operation pattern update unit 111 also communicates with each resource 220 located around the turnaround station and obtains resource status data for each resource 220.

[0055] In step S142, the operation pattern update unit 111 updates the operation pattern based on the train status data of train 100, the train status data of other trains 210, and the resource status data of each resource 220.

[0056] In step S143, the operation pattern update unit 111 passes the updated operation pattern to the state management device 120. The state management unit 121 stores the updated operation pattern.

[0057] ***Features of Embodiment 1*** Embodiment 1 achieves distributed autonomous operation by managing information by focusing only on the information necessary on the train. The train is equipped with autonomous operation functions and train status management functions, rather than functions equivalent to an operation management system. Only the information necessary for autonomous operation (status of other trains and resource reservation status) is managed. Information within the line (status of surrounding trains and resource status) is acquired at the necessary time through communication with surrounding equipment (resources, other trains, operation management system, etc.). Each train system has its own control objective and operates to achieve that objective. The system as a whole also has an objective. Each train system operates in a way that contributes to the objective of the entire system.

[0058] The train system is equipped with autonomous operation capabilities. These autonomous operation capabilities include resource adjustment, route determination, operation adjustment, and operation pattern update functions. The resource adjustment function adjusts resource reservations (resource usage order) based on the goals of the train and the overall system when resource reservations conflict. The route determination function determines the actual route the train will take based on the resource reservation status and the currently set operation pattern. The operation adjustment function adjusts the travel time between stations and the stopping time at stations based on the positions of other trains. The operation pattern update function determines the operation pattern in the initial state and updates the operation pattern when the train turns around. When updating the operation pattern, the operation pattern update function requests information from surrounding trains and resources and makes decisions based on the information obtained.

[0059] The train system includes a train status management function and a train status communication function. The train status management function manages the train's running targets and operational information. Operational information includes information such as the running pattern, the number of passengers, and the running time. The train status communication function sends the status of one train to another train if requested during resource adjustment.

[0060] The train operates as follows: At the start of operation, the train has a list of operating patterns (turnaround stations and intermediate stops). During operation, the train operates as follows: Operation includes normal operation, operational adjustments, route conflicts, and the end of an operating pattern. In normal operation, the train travels while reserving, occupying, and releasing resources (stations, switches, etc.) along the line. In operational adjustments, the train adjusts its speed and stopping time at stations according to the status of stations and other trains. In route conflicts, when resource reservations conflict, trains exchange position information and train status information with each other to determine priority. At the end of an operating pattern, when the train arrives at a turnaround station, it determines the next operating pattern (next initial state) based on the status of surrounding stations and other trains. Since there is no operational management system (central management system), the information available when determining the next operating pattern is limited to information from surrounding equipment. This state is called a local optimum.

[0061] This explains the relationship between train operations and objectives. When adjusting operations, determining priorities in the event of route conflicts, and deciding on the operation pattern at the end of service, the operation of each train is determined by considering not only the achievement status of each train's objectives but also the achievement status of the overall system objectives.

[0062] ***Effects of Embodiment 1*** Embodiment 1 enables efficient distributed information management and distributed control as follows: (1) When resource reservations conflict, trains can determine priority using only minimal information. For example, resource reservations conflict when routes conflict between trains due to delays or other factors, or when the operating route to be used is determined from among multiple operating routes. There are multiple operating routes when there are multiple stopping tracks and multiple routes between stations. (2) By setting targets, efficient operation can be achieved in a distributed state. When resource reservations conflict, autonomous actions are taken to achieve the train's own target and the overall system target. This makes it possible to achieve efficient and autonomous control for the entire line while satisfying the requirements of each stakeholder. Targets can be flexibly set and changed according to the operation that the operator wants to achieve.

[0063] Embodiment 1 enables flexible operation as follows: Only multiple operational patterns (such as a list of stops) that can be run based on the shape of the track are predefined. Each time the train reverses direction, it chooses the next operational pattern from among the multiple patterns. This provides the following benefits: Even during normal operation, the train can efficiently utilize available resources by deciding on the intermediate route and stopping platform according to the situation. When demand fluctuates, on-demand operation can be achieved by re-selecting the operational pattern. Even in the event of an accident or delay, the system can autonomously achieve the efficient operation that has been the goal until now.

[0064] ***Supplement to Embodiment 1*** The calculation of the evaluation value (see step S133) will be explained. Two examples of targets for train 210 will be explained. However, there may be one target or three or more targets. Also, the targets may differ for each train 210.

[0065] The primary objective of train 210 is to operate in such a way that the actual travel time is as close as possible to the target travel time (scheduled travel time). For example, the primary objective of train 210 can be expressed as the ratio of the actual travel time to the target travel time.

[0066] The second objective of train 210 is to operate the train in such a way that its congestion level remains below a certain level. For example, the second objective of train 210 can be expressed as the ratio of the train's capacity to the number of passengers.

[0067] The railway system 200 is referred to as the overall system. One example of an overall system objective is described below. However, there may be multiple objectives.

[0068] The overall system's goal is to predict congestion after passengers board at the next station and operate the train in a way that minimizes overcrowding. For example, the overall system's goal can be expressed as the ratio of the train's capacity to the number of passengers when the train departs the station after all passengers have boarded and alighted at the next station. It is also possible to use congestion predictions that extend beyond the next station.

[0069] A train's evaluation score is represented by a combination of evaluation scores for multiple objectives. By assigning weights to each evaluation score, the objectives of the train can be effectively represented.

[0070] The overall system's evaluation value, like the train's evaluation value, is represented by a combination of evaluation values ​​for multiple objectives. By assigning weights to each evaluation value, the objectives of the overall system can be represented.

[0071] An example of interrupt determination based on evaluation values ​​(step S134) is explained. The interrupt determination determines whether train i can interrupt train j's reservation of the target resource if train i has already reserved the target resource.

[0072] Interrupt detection can be arbitrarily set by comparing the evaluation value of the overall system with the evaluation value of a train. For example, interrupt detection is performed as follows: The overall system evaluation value for train i is compared with the overall system evaluation value for train j. The train with the higher overall system evaluation value takes priority. If the overall system evaluation values ​​for train i and train j are the same, the evaluation value of train i is compared with the evaluation value of train j. The train with the higher evaluation value takes priority. However, interrupt detection is not limited to this method.

[0073] Figures 7 to 9 show the data flow. Figure 7 shows the data flow for (1) the start of the operation pattern and (2) normal operation. Figure 8 shows the data flow for (3) operation adjustments. Figure 9 shows the data flow for (4) the end of the operation pattern.

[0074] The symbols in the data flow represent the following information (data): A1 represents the operation pattern list. A2 represents the operation pattern (initial value). A3 represents a resource allocation request. A4 represents a resource release request. A5 represents the resource allocation result. A6 represents the resource release result. A7 represents the allocated resource information. A8 represents the route (details). A9 represents the train speed. A10 represents the train position (high accuracy). A11 represents the train stopping limit (MAL: Movement Authority Limit). A12 represents the train position (high accuracy / own train). A13 represents the train position (corrected / own train). A14 represents the train position (safety / own train). A15 represents the train position (safety / other train). A16 represents the train status. A17 represents the resource status. A18 means train location request. A19 means train location (correction). B1 means resource adjustment request. B2 means resource adjustment result. B3 means current operation pattern. B4 means other train information (location / status). B5 means station status. B6 means operation adjustment instruction. B7 means train location (safety, high accuracy). B8 means train status (number of passengers, etc.). C1 means other resource status. C2 means operation pattern (updated value). C3 means train information request. C4 means train information. C5 means resource information request. C6 means resource status.

[0075] Embodiment 2. The configuration in which the railway system 200 is equipped with an operation management system 240 will be described, with the main differences from Embodiment 1 being explained based on Figures 10 to 16.

[0076] ***Configuration Description*** The configuration of the railway system 200 will be described based on Figure 10. The railway system 200 further includes an operation management system 240.

[0077] The train operation management system 240 is the train operation management system for the railway system 200. The train operation management system is a system that manages the operation of multiple trains. The train operation management system has a function called Automatic Train Stop (ATS). The ATS manages the entire line and issues instructions to each train. However, the ATS in the train operation management system 240 has simplified functionality and is responsible for information management and issuing instructions in emergencies (e.g., deadlocks).

[0078] ***Explanation of Operation*** Based on Figure 11, (1) the control method for starting the operation pattern will be explained. The state management unit 121 receives the operation pattern list from the operation management system 240.

[0079] In step S211, if the operation pattern to be used has not been determined, the operation pattern update unit 111 determines the operation pattern to be used from the operation pattern list. Step S211 is the same as step S111 in Embodiment 1.

[0080] In step S212, the status management unit 121 transmits the determined operation pattern to the operation management system 240.

[0081] Steps S213 and S214 are the same as steps S112 and S113 in Embodiment 1.

[0082] (2) The control method for normal operation is the same as the method in Embodiment 1. In addition, the status management unit 121 transmits train position data indicating the position of train 100 and train status data indicating the status of train 100 to the operation management system 240.

[0083] (3) The control method for adjusting the operation is the same as the method in Embodiment 1. An evaluation value for each train 210 may also be calculated, which is an evaluation value relative to the target of the operation management system 240.

[0084] Based on Figure 12, (4) the control method for ending the operation pattern will be explained. Steps S241 to S244 are performed after the train 100 reaches the turnaround station.

[0085] In step S241, the operation pattern update unit 111 communicates with the operation management system 240 to obtain train status data of other trains 210 located around the turnaround station and resource status data of each resource 220 located around the turnaround station.

[0086] In step S242, the operation pattern update unit 111 updates the operation pattern. Step S242 is the same as step S142 in Embodiment 1.

[0087] In step S243, the state management unit 121 stores the updated operation pattern. Step S243 is the same as step S143 in Embodiment 1.

[0088] In step S244, the status management unit 121 transmits the operation pattern to the operation management system 240.

[0089] (5) The control method for control intervention will be explained. (5) In control intervention, the operation management system 240 intervenes in the control from (1) the start of the operation pattern to (4) the end of the operation pattern.

[0090] For example, the train operation management system 240 temporarily intervenes in the operation of train 210 in the following deviation situations: (5-1) If the entire line is chronically congested, the train operation management system 240 intervenes in the operation of train 210 as follows: The train operation management system 240 instructs trains 210 that are not running (trains 210 waiting in a depot, etc.) to increase the number of trains. If the entire line is not congested, the train operation management system 240 instructs trains 210 to reduce the number of trains by waiting in a depot or on a platform where they can stop. Trains 210 that have received instructions begin autonomous operation based on the operation pattern, similar to train 100. (5-2) If train 100 is deadlocked, the train operation management system 240 intervenes in the operation of train 210 as follows: The train operation management system 240 instructs deadlocked train 210 to perform an action other than the operation pattern. (5-3) If a malfunction or accident of train 100 is detected, the train operation management system 240 intervenes in the operation of train 210 as follows: The operation management system 240 seals off the detection area and notifies the train 210 of the sealed area. Upon receiving the notification, the train 210 travels while avoiding the sealed area until the seal is lifted. For example, the train 210 may perform shuttle operation or single-track operation. Shuttle operation is bidirectional operation in the section corresponding to the sealed section. When the problem is resolved, the operation management system 240 notifies the train 210 that the seal has been lifted. After the deviance situation is resolved as a result of the intervention, (5) the control intervention ends, and control from (1) the start of the operation pattern to (4) the end of the operation pattern is resumed. If some or all of the functions of the autonomous operation device 110 cease to work, instructions may be given to the train 100 from the operation management system 240 via human intervention.

[0091] ***Features of Embodiment 2*** Embodiment 2 differs from Embodiment 1 in that an operation management system 240 is installed. The operation management system 240 performs monitoring without centralized control by conventional operation management systems. Basically, autonomous distributed control of trains is performed, and the operation management system 240 becomes an overall subsystem and has a goal. If distributed control becomes impossible due to a deadlock of trains on the line, the operation management system 240 will realize that its goal cannot be achieved and will intervene in the control of the trains.

[0092] In the railway system 200, multiple operation management systems 240 can exist. The operation pattern update function acquires information from surrounding trains, various resources, or operation management systems 240 and determines whether to update the operation pattern. The train status management function periodically notifies the operation management system 240 of the status of the trains.

[0093] The train operates as follows: The train receives instructions from the operation management system 240 (including initial state instructions) and utilizes information aggregated by the operation management system 240. This makes operations more efficient. The initial operation pattern may be determined by the operation pattern update function or may be set by the operation management system 240. The next operation pattern may be determined based on information from surrounding equipment or may be determined using information collected by the operation management system 240. Overall efficiency can be achieved through decisions made by the operation management system 240.

[0094] The train operation management system 240 operates as follows: At the start of operation, the train operation management system 240 has a list of operation patterns (turnaround stations and intermediate stops) and gives the train an initial state (starting position, operation pattern). During operation, the train operation management system 240 collects information from the train such as position, status, and current operation pattern, and collects information from resources (stations and switches, etc.) such as the number of people waiting at stations and the reservation status of switches, and performs monitoring. Furthermore, the train operation management system 240 shares monitoring information by providing the train with station status on the line (number of people waiting at stations, etc.) and train status on the line. Furthermore, if the monitoring results show that the operation of the train under its management is not going well, the train operation management system 240 will temporarily intervene in the train's operation. For example, intervention in train operation is carried out as follows: In the event of chronic congestion on the entire line, the train operation management system 240 will instruct an increase in the number of trains. If a train is deadlocked, the train operation management system 240 will instruct a way to resolve the deadlock. In the event of a train malfunction or accident, the train operation management system 240 will instruct a shuttle operation. If some or all of the train's autonomous operation functions fail, the operation management system 240 can issue instructions via human intervention.

[0095] This section explains the relationship between the operation of the train management system 240 and its objectives. Poor train operation means that the contribution to the overall system objective or the train management system 240's objective is low. Low contribution means that the objective is not being achieved. The train management system 240 takes these circumstances into account and decides how to intervene in train operation.

[0096] ***Effects of Embodiment 2*** Embodiment 2 enables efficient distributed information management and distributed control as follows: (1) A balance can be achieved between distributed control and centralized control. For example, if a deadlock occurs, trains cannot coordinate their operations with each other. Only in such cases does the operation management system 240 manage and communicate all information. The operation management system 240 then intervenes in train operations as needed. This enables distributed control while minimizing the amount of information held by trains. Furthermore, the balance between centralized control and distributed control can be adjusted by adjusting the authority level of the operation management system 240. (2) Goals are set. The operation management system 240, the trains, and the entire system each have their own goals. This enables efficient and autonomous control of the entire line while satisfying the requirements of each stakeholder. Setting goals in the operation management system 240 makes it possible to set goals in a more detailed range. It is conceivable that multiple operation management systems 240 operate with different goals according to their respective management scopes across the entire line.

[0097] ***Supplement to Embodiment 2*** Figures 13 to 16 show the data flow. Figure 13 shows the data flow for (1) the start of the operation pattern and (2) normal operation. Figure 14 shows the data flow for (3) operation adjustment. Figure 15 shows the data flow for (4) the end of the operation pattern. Figure 16 shows the data flow for (5) control intervention.

[0098] The symbols in the data flow represent the following information (data): An, Bn, and Cn are as described in Embodiment 1. D1 represents station status (number of people waiting, etc.). D2 represents train status (position / state). G1 represents control intervention.

[0099] ***Supplement to the Embodiment*** The configuration of the computer 190 will be described based on Figure 17. The computer 190 includes hardware such as a processor 191, memory 192, auxiliary storage device 193, communication interface 194, and input / output interface 195. These hardware components are connected to each other via signal lines.

[0100] The processor 191 is an integrated circuit (IC) that performs arithmetic operations and controls other hardware. For example, the processor 191 is a CPU, a DSP, or a combination of these. IC stands for Integrated Circuit. CPU stands for Central Processing Unit. DSP stands for Digital Signal Processor.

[0101] Memory 192 is a volatile or non-volatile storage device. Memory 192 is also called main memory. For example, memory 192 is RAM. Data stored in memory 192 is saved to auxiliary storage device 193 as needed. RAM is an abbreviation for Random Access Memory.

[0102] The auxiliary storage device 193 is a non-volatile storage device. For example, the auxiliary storage device 193 is a ROM, HDD, flash memory, or a combination thereof. Data stored in the auxiliary storage device 193 is loaded into memory 192 as needed. ROM is an abbreviation for Read Only Memory. HDD is an abbreviation for Hard Disk Drive.

[0103] The communication interface 194 is a communication interface. Communication of the computer 190 is carried out using the communication interface 194. NIC is an abbreviation for Network Interface Card.

[0104] The input / output interface 195 is an interface for input and output, and input devices and output devices are connected to it. Input and output of the computer 190 are performed via the input / output interface 195.

[0105] Computer 190 stores programs that enable it to function. These programs are loaded into memory 192 and executed by processor 191.

[0106] The program can be recorded (stored) in a computer-readable format on a non-volatile recording medium such as an optical disc or flash memory.

[0107] The hardware configuration of the computer 190 will be described based on Figure 18. The computer 190 includes a processing circuit 199. The processing circuit 199 is hardware that realizes the functions of the computer 190. The processing circuit 199 may be dedicated hardware, or it may be a processor 191 that executes programs stored in memory 192.

[0108] If the processing circuit 199 is dedicated hardware, the processing circuit 199 may be, for example, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC, an FPGA, or a combination thereof. ASIC is an abbreviation for Application Specific Integrated Circuit. FPGA is an abbreviation for Field Programmable Gate Array.

[0109] In the processing circuit 199, some functions may be implemented by dedicated hardware, while the remaining functions may be implemented by software or firmware.

[0110] Thus, the functions of computer 190 can be realized through hardware, software, firmware, or a combination thereof.

[0111] Each embodiment is an example of a preferred form and is not intended to limit the technical scope of this disclosure. Each embodiment may be implemented in part or in combination with other embodiments. Procedures described using flowcharts, etc., may be modified as appropriate.

[0112] The autonomous operation control system 101 may be implemented with one computer 190, or with two or more computers 190.

[0113] The term "device" in each element of the autonomous operation control system 101 may be read as "part" or "function." The term "part" in each element of the autonomous operation control system 101 may be read as "process," "process," "circuit," or "circuit."

[0114] 100 Train, 101 Autonomous operation control system, 110 Autonomous operation device, 111 Operation pattern update unit, 112 Resource adjustment unit, 113 Route determination unit, 114 Operation adjustment unit, 120 Status management device, 121 Status management unit, 130 Automatic operation device, 140 Safety control device, 150 Communication device, 190 Computer, 191 Processor, 192 Memory, 193 Auxiliary storage device, 194 Communication interface, 195 Input / Output interface, 199 Processing circuit, 200 Railway system, 210 Train, 220 Resource, 230 Positioning device, 240 Operation management system.

Claims

1. An autonomous operation control system installed on a train, comprising a resource adjustment unit that sends a resource reservation request to a target resource used for running a route according to an operation pattern, and communicates with the other train to adjust the reservation of the target resource with the other train if the target resource is reserved by another train.

2. The autonomous operation control system according to claim 1, wherein the resource adjustment unit calculates an evaluation value for the operation of the train based on the operation target of the train given to the train, and as a result of comparing the evaluation value of the train with the evaluation value of the other trains, if the evaluation of the train is higher, it makes the other trains wait to use the target resource and uses the target resource before the other trains.

3. The autonomous operation control system according to claim 2, wherein the resource adjustment unit calculates an evaluation value of the train for the operation of the train as a train evaluation value, calculates an evaluation value of the train for the operation of the entire system including the train and the other trains as a system evaluation value, and as a result of comparing the train evaluation value of the train with the system evaluation value of the train and the train evaluation value of the other trains, if the evaluation of the train is higher, the system adjustment unit makes the other trains wait to use the target resource and uses the target resource before the other trains.

4. An autonomous operation control system according to any one of claims 1 to 3, comprising an operation pattern update unit that updates the operation pattern after the train has reached a turnaround station, based on train status data indicating the status of the train, train status data indicating the status of trains present around the turnaround station, and resource status data indicating the status of resources present around the turnaround station.

5. The autonomous operation control system according to any one of claims 1 to 4, further comprising a route determination unit that determines the route based on the operation pattern and resource status data indicating the status of each resource.

6. An autonomous operation control system according to any one of claims 1 to 5, further comprising an operation adjustment unit that adjusts the travel time of the train between stations and the stopping time of the train at each station based on train position data indicating the position of each other train.

7. An autonomous operation control system according to any one of claims 1 to 6, comprising a state management unit that manages train state data indicating the status of the train, including the operation pattern of the train, and transmits the train state data of the train to the requesting train when the train state data of the train is requested.

8. A railway system comprising: a plurality of trains, each equipped with an autonomous operation control system according to any one of claims 1 to 7; and an operation management system that provides each of the plurality of trains with an operation pattern list.

9. An autonomous operation control method for an autonomous operation control system installed in a train, comprising sending a resource reservation request to a target resource used for running a route according to an operation pattern, and communicating with the other train to coordinate the reservation of the target resource with the other train if the target resource is reserved by another train.

10. An autonomous operation control program for an autonomous operation control system installed on a train, which sends a resource reservation request to a target resource used for running a route according to an operation pattern, and if the target resource is reserved by another train, communicates with the other train and causes the computer to execute a resource adjustment process to coordinate the reservation of the target resource with the other train.