Embodiment
[0053] The key part of a component is composed of four units (the life is respectively exponential, normal, Weibull and lognormal distribution), and the life distribution of each unit is shown in Table 1. There are 20 sets of this type of parts in the same batch in the warehouse. The time dyT1 of each unit in this batch of parts is the 4th, 2nd, 3rd, and 3rd year respectively, and the probability that the number n of intact parts is greater than M is recorded as P (n>M). It is required that P(n>M) over the years should not be lower than P1, otherwise maintenance work needs to be carried out in time. It is required that after one maintenance is completed, the time interval for the next maintenance shall not be less than T2 years. Known: T2=2, M=14, P1=0.8.
[0054] Under the known background conditions, according to the calculation method recorded in the claims, first calculate the life distribution law of each unit, see Table 1;
[0055] Table 1 Life distribution of each un...